FERC-725A(1C), Mandatory Reliability Standards for Bulk-Power System: Reliability Standard TOP-001-4

ICR 202009-1902-005

OMB: 1902-0298

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2020-10-29
Supplementary Document
2020-10-29
Supplementary Document
2020-10-28
Supplementary Document
2020-10-28
Supplementary Document
2020-10-28
Supplementary Document
2020-10-28
Supporting Statement A
2020-10-30
IC Document Collections
IC ID
Document
Title
Status
227392
Modified
ICR Details
1902-0298 202009-1902-005
Received in OIRA 202001-1902-004
FERC FERC-725A(1C)
FERC-725A(1C), Mandatory Reliability Standards for Bulk-Power System: Reliability Standard TOP-001-4
Extension without change of a currently approved collection   No
Regular 10/30/2020
  Requested Previously Approved
36 Months From Approved 01/31/2021
418 422
2,187 3,376
0 0

Pursuant to section 215(d)(2) of the Federal Power Act (FPA), In a Petition dated March 6, 2017 , the North American Electric Reliability Corporation (“NERC”) requested Commission approval for Reliability Standards IRO-002-5 (Reliability Coordination, Monitoring and Analysis) and TOP-001-4 (Transmission Operations). NERC stated that the “ Reliability Standards address the Commission directives in Order No. 817 related to: (i) transmission operator monitoring of non-bulk electric system (“BES”) facilities; (ii) redundancy and diverse routing of transmission operator, balancing authority, and reliability coordinator data exchange capabilities; and (iii) testing of alternative or less frequently used data exchange capabilities.” NERC states that the “Reliability Standards TOP-001-4 and IRO-002-5 build upon the improvements made in the prior versions of those standards to further advance reliability.”

US Code: 16 USC 824o Name of Law: Energy Policy Act of 2005 (EPAct)
  
None

Not associated with rulemaking

  85 FR 53354 08/28/2020
85 FR 68873 10/30/2020
No

1
IC Title Form No. Form Name
FERC-725A(1C) in Docket IC20-24-000

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 418 422 0 0 -4 0
Annual Time Burden (Hours) 2,187 3,376 0 0 -1,189 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
FERC-725A(1C) is affected by the implementation of Reliability Standard TOP-001-4; estimates are based on the NERC Compliance Registry of 7/17/2020, which indicates there are 168 entities registered as TOPs and 97 entities registered as BAs within the United States. One entity may be registered as having several roles. The changes to the estimate is due to normal fluctuation in Annual responses.

$6,475
No
    No
    No
No
No
No
No
Michael Gandolfo 202 502-6817

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/30/2020