Form 2100, Schedule 349 – FM Translator or FM Booster Station Construction Permit Application

ICR 202008-3060-013

OMB: 3060-0405

Federal Form Document

Forms and Documents
ICR Details
3060-0405 202008-3060-013
Active 201905-3060-009
FCC MB
Form 2100, Schedule 349 – FM Translator or FM Booster Station Construction Permit Application
Revision of a currently approved collection   No
Regular
Approved without change 10/02/2020
Retrieve Notice of Action (NOA) 08/21/2020
  Inventory as of this Action Requested Previously Approved
10/31/2023 36 Months From Approved 07/31/2022
3,750 0 2,775
4,050 0 3,775
4,447,539 0 3,950,725

On May 12, 2020, the Commission adopted Amendment of Section 73.3580 of the Commission’s Rules Regarding Public Notice of the Filing of Applications; Modernization of Media Regulation Initiative; Revision of the Public Notice Requirements of Section 73.3580, Second Report and Order, MB Docket Nos. 17-254, 17-105, & 05-6, FCC 20-65 (rel. May 13, 2020). The Commission adopted new, streamlined procedures for stations to provide public notice of the filing of certain applications. Stations, including stations filing for new construction permits or major modifications to facilities, that were previously required to post public notice in a local newspaper, must now post notice online, either on the station website or a website affiliated with the station, its licensee, or its parent entity, or else must post notice on a publicly accessible, locally targeted website, for 30 continuous days following acceptance of the application for filing. This submission is being made to OMB for approval of the modified third-party disclosure requirements for this Information Collection, as adopted in the 2020 Public Notice Second Report and Order. The changes pertaining to this Information Collection and to 47 CFR § 73.3580 adopted in the 2020 Public Notice Second Report and Order, which are listed below, do not necessitate changes to the Schedule 349, nor do they affect the substance, burden hours, or costs of completing the forms. The rule changes do, however, reduce burdens and costs associated with filing the application, as set forth below. In April 2020, the Commission adopted a Report and Order making certain changes to the LPFM technical rules, to improve reception and increase flexibility while maintaining interference protection and the core LPFM goals of diversity and localism. Amendments of Parts 73 and 74 to Improve the Low Power FM Radio Service Technical Rules; Modernization of Media Regulation Initiative, Report and Order, MB Docket Nos. 19-193, 17-105, FCC 20-53 (rel. Apr. 23, 2020) (2020 Technical Report and Order). LPFM stations provide a secondary, noncommercial radio service with a community focus. The Commission originally designed LPFM engineering requirements to be simple so that non-profit organizations with limited engineering expertise and small budgets could readily apply for, construct, and operate community-oriented stations serving highly localized areas. LPFM organizations suggested that the service has matured and requires additional engineering options to improve reception. Thus, the 2020 Technical Report and Order adopted the following rules: Allow expanded LPFM use of directional antennas. All LPFM stations may use directional facilities, with either off-the-shelf or composite antennas, upon a satisfactory engineering showing. Such antennas could improve service near international borders by allowing LPFM stations to serve more listeners in the United States while continuing to protect Mexican and Canadian stations. Redefine “Minor Changes” for LPFM stations. An LPFM station may apply for approval to relocate its transmitter site without awaiting a filing window if the change is “minor,” redefined in the 2020 Technical Report and Order as a move of 11.2 kilometers or less. The 2020 Technical Report and Order also allowed proposals of greater distances to qualify as minor if the existing and proposed service contours overlap. Permit LPFM Use of FM Booster Stations. FM booster stations amplify and retransmit a station’s signal. The 2020 Technical Report and Order amended rules that had prohibited LPFM stations from operating booster stations, allowing LPFM stations to operate an FM booster in lieu of an FM translator when a booster would better address unique terrain challenges.

US Code: 47 USC 154(i), 303 and 308 Name of Law: Communications Act of 1934, as amended
  
None

3060-AK68 Final or interim final rulemaking 85 FR 36786 06/18/2020

  85 FR 34440 06/04/2020
85 FR 51703 08/21/2020
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 3,750 2,775 0 975 0 0
Annual Time Burden (Hours) 4,050 3,775 0 275 0 0
Annual Cost Burden (Dollars) 4,447,539 3,950,725 0 496,814 0 0
Yes
Changing Regulations
No
There are program changes to this collection as follows because of the information collection requirements adopted in FCC 20-65 and FCC 20-53: -100 to the number of respondents, +975 to the annual number of responses, +275 to the annual burden hours and +$496,814 to the annual cost.

$398,897
No
    No
    No
No
No
No
No
Lisa Scalan 202 418-2700

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/21/2020


© 2024 OMB.report | Privacy Policy