NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)

ICR 202001-2060-012

OMB: 2060-0111

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2020-01-30
Supporting Statement A
2020-01-30
IC Document Collections
ICR Details
2060-0111 202001-2060-012
Active 201611-2060-010
EPA/OAR 1078.12
NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/24/2020
Retrieve Notice of Action (NOA) 01/30/2020
  Inventory as of this Action Requested Previously Approved
03/31/2023 36 Months From Approved 03/31/2020
30 0 33
1,800 0 1,860
126,000 0 141,000

The New Source Performance Standards (NSPS) for Phosphate Rock Plants (40 CFR part 60, subpart NN) apply to the following existing facilities and new facilities at phosphate rock plants with capacities greater than 4 tons per hour: dryers, calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or preparing phosphate rock solely for consumption in elemental phosphorus production. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart NN. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  84 FR 19777 05/06/2019
85 FR 5427 01/30/2020
No

1
IC Title Form No. Form Name
NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 30 33 0 0 -3 0
Annual Time Burden (Hours) 1,800 1,860 0 0 -60 0
Annual Cost Burden (Dollars) 126,000 141,000 0 0 -15,000 0
No
No
There is an adjustment decrease in the total estimated burden in this ICR as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The adjustment decrease in burden from the most-recently approved ICR is due to a decrease in the number of sources. The growth rate for the industry is very low, negative or non-existent, so the ICR has been adjusted to account for no new respondents over the next three years. This also results in a reduction in capital/startup costs. There is an adjustment increase in the labor costs in this ICR compared to the previous ICR due to the increase in labor costs over the past three years.

$6,650
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/30/2020


© 2024 OMB.report | Privacy Policy