NSPS for Rubber Tire Manufacturing (40 CFR Part 60, Subpart BBB) (Renewal)

ICR 202001-2060-005

OMB: 2060-0156

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2020-01-22
Supporting Statement A
2020-01-22
IC Document Collections
ICR Details
2060-0156 202001-2060-005
Active 201611-2060-008
EPA/OAR 1158.13
NSPS for Rubber Tire Manufacturing (40 CFR Part 60, Subpart BBB) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/24/2020
Retrieve Notice of Action (NOA) 01/27/2020
  Inventory as of this Action Requested Previously Approved
03/31/2023 36 Months From Approved 03/31/2020
80 0 80
17,700 0 17,700
16,400 0 16,400

The New Source Performance Standards (NSPS) for Rubber Tire Manufacturing (40 CFR Part 60, Subpart BBB) apply to existing and new facilities with the following processes: undertread cementing operations, sidewall cementing operations, tread end cementing operations, bead cementing operations, green tire spraying operations, Michelin-A operations, Michelin-B operations, and Michelin-C automatic operations. Affected facilities include those that commenced construction, modification, or reconstruction after January 20, 1983. This information is being collected to assure compliance with 40 CFR Part 60, Subpart BBB. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  84 FR 19777 05/06/2019
85 FR 4654 01/27/2020
No

1
IC Title Form No. Form Name
NSPS for Rubber Tire Manufacturing (40 CFR Part 60, Subpart BBB)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 80 80 0 0 0 0
Annual Time Burden (Hours) 17,700 17,700 0 0 0 0
Annual Cost Burden (Dollars) 16,400 16,400 0 0 0 0
No
No

$20,100
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/27/2020


© 2024 OMB.report | Privacy Policy