OSM 1029-0116 Supporting Statement Revised

OSM 1029-0116 Supporting Statement Revised .docx

30 CFR Part 774 - Revision; Renewal; and Transfer, Assignment, or Sale of Permit Rights

OMB: 1029-0116

Document [docx]
Download: docx | pdf

Supporting Statement A


30 CFR Part 774 – Revisions; Renewals; and

Transfer, Assignment, or Sale of Permit Rights


OMB Control Number: 1029-0116


Terms of Clearance: None


General Instructions


A completed Supporting Statement A must accompany each request for approval of a collection of information. The Supporting Statement must be prepared in the format described below, and must contain the information specified below. If an item is not applicable, provide a brief explanation. When the question “Does this information collection report (ICR) contain surveys, censuses, or employ statistical methods?” is checked "Yes," then a Supporting Statement B must be completed. Office of Management and Budget (OMB) reserves the right to require the submission of additional information with respect to any request for approval.


Introduction


The Office of Surface Mining Reclamation and Enforcement (OSMRE) is submitting this request for information collection to collect information under 30 CFR Part 774, Revision; Renewal; Transfer, Assignment, or Sale of Permit Rights. The regulations under 30 CFR Part 774 address general and specific requirements for permit revisions and renewals; transfer, assignment, or sale of permit rights; permittee post-permit information disclosure; update, maintenance requirements; and procedures for regulatory authorities to pursue permanent permit ineligibility, develop findings of ownership and control, and determine if alternative enforcement actions for Parts 843, 846, or 847 are warranted when a person is found to own or control a surface coal mining operation having an unabated or uncorrected violation.


The OMB has previously approved the information collection for 30 CFR Part 774, which has been assigned the OMB Control Number 1029-0116.


Specific Instructions


Justification


1. Explain the circumstances that make the collection of information necessary. Identify any legal or administrative requirements that necessitate the collection.


Following permit issuance, a permittee continues to have information disclosure obligations under the Act and its implementing regulations. Section 774.12 requires industry respondents (permittees) to provide information following the issuance of a permit when certain specified events occur in accordance with §§507 and 510 of Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act). The information collected from permittees under §774.12 ensures the continued accuracy and completeness of entity, affiliation, and violation information required under §§507 and 510 of the Act after a permit is issued.


The information collection associated with §774.13 is the submission of the information required in an application for a permit revision. The legal authority for §774.13 is found in §511 of SMCRA.


The information collection associated with §774.15 is the information provided by a permittee in an application for a permit renewal. Section 774.15(b)(1) through (b)(4) requires a permittee applying for a permit renewal to comply with the specific information and procedural requirements for an application for a permit renewal. Information such as, terms of the renewal, evidence of adequate liability insurance or self-insurance for the period of renewal, and a copy of the proposed newspaper notice and proof of publication.

The legal authority for §774.15 is found in §506(d) of SMCRA.


Persons must file an application to apply for a transfer, assignment, or sale of permit rights. The application includes the following information: Section 774.17(b)(1) requires an applicant for a transfer, assignment, or sale of permit rights to submit an application for a transfer, assignment, or sale of permit rights; Section 774.17(b)(2) requires an applicant for a transfer, assignment, or sale of permit rights to advertise a filed application in a newspaper of general circulation in the locality of the permitted operation; Section 774.17(e)(2) requires a successor to provide immediate notice to the regulatory authority with jurisdiction of the consummation of a transfer, assignment, or sale of permit rights. The legal authority for §774.17 is found in §§506(b) and 511(b) of SMCRA.


2. Indicate how, by whom, and for what purpose the information is to be used. Except for a new collection, indicate the actual use the agency has made of the information received from the current collection. Be specific. If this collection is a form or a questionnaire, every question needs to be justified.


  • Section 774.12(a) requires permittees to provide updates to information initially disclosed in an application under 30 CFR 778.11 within 30 days of being cited with a cessation order. Information, such as, all permit records, unabated or uncorrected violations, and changes in violation status must be entered in the applicant violator system (AVS). This information is reviewed and approved by the State regulatory authority to ensure the information is complete and in compliance with 30 CFR 778.11.

  • Section 774.12(c) requires permittees to update the information initially required to be provided in an application for a permit under 30 CFR 778.11 within 60 days of a change in that information, including the date of any departure. This information is reviewed and approved by the State regulatory authority to ensure the information is complete and in compliance with 778.11.

  • Section 774.13(b)(2) requires a permittee applying for, at minimum, a significant permit revision to comply with the information and procedural requirements under §§773.6, 773.19(b)(1) and (3), and 778.21. The permittee is also required to file a notice in a newspaper of general circulation in the locality of the permitted operation announcing the application

  • Section 774.13(c) requires a regulatory authority to disapprove an application for a permit revision if an applicant does not meet the criteria for approval.

  • Section 774.15(b)(1) through (b)(4) requires a permittee applying for a permit renewal to comply with the specific information and procedural requirements for an application for a permit renewal to advertise a filed application in a newspaper of general circulation in the locality of the permitted operation.

  • Section 774.15(c) requires regulatory authorities to review applications for permit renewals and determine the eligibility of an applicant.

  • Section 774.15(e) requires regulatory authorities to notify OSMRE, if OSMRE is not the regulatory authority, and the applicant, each person who filed comments or objections on the renewal, and to each party to any informal conference held on the permit renewal, of its decision regarding the permit.

  • Section 774.17(b)(1) requires an applicant for a transfer, assignment, or sale of permit rights to submit an application for a transfer, assignment, or sale of permit rights.

  • Section 774.17(b)(2) requires an applicant for a transfer, assignment, or sale of permit rights to advertise a filed application in a newspaper of general circulation in the locality of the permitted operation.

  • Section 774.17(d)(1) provides that a regulatory authority may allow a permittee to transfer, assign, or sell permit rights to a successor, if the regulatory authority makes a written finding with respect to an applicant’s eligibility for a permit under §§773.12 and 773.14.

  • Section 774.17(e)(1) requires a regulatory authority to notify OSMRE, if OSMRE is not the regulatory authority, the permittee, the successor, and commenters of its permitting decision and findings on the proposed transfer, assignment, or sale of permit rights.

  • Section 774.17(e)(2) requires a successor to provide immediate notice to the regulatory authority with jurisdiction of the consummation of a transfer, assignment, or sale of permit rights.


3. Describe whether, and to what extent, the collection of information involves the use of automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses, and the basis for the decision for adopting this means of collection. Also describe any consideration of using information technology to reduce burden and specifically how this collection meets Government Paperwork Elimination Act (GPEA) requirements.


Applicants are required to provide specific information in applications for permit revisions; permit renewals; and transfer, assignment, or sale of permit rights, and update specific information after a permit is issued. This information is maintained in the Applicant/Violator System (AVS). The legal authority under the Act for information collection in 30 CFR Part 774 is found at §§506, 507, 509, 510, and 511.


The majority of the information used in 30 CFR Part 774 is required for initial disclosure under 30 CFR Part 778. Most of the information collected for 30 CFR Part 774 is conducive to electronic media and transmission. Since 1987, OSMRE and 24 approved State regulatory programs have used AVS, among other things, to assist in determining the eligibility of permittee-applicants for permit revisions, permit renewals, and transfer, assignment or sale of permit rights. AVS contains permitting history as well as entity and compliance information. OSMRE continues to maintain operation of the AVS and coordinates with and assists States in maintaining accurate and complete data. The industry and general public may also obtain access to AVS to view applicant, permittee, permit history, and violation information.


Many State regulatory authorities have the capability of receiving permit applications electronically, either through an FTP site or via CD-ROM. Some permit applicants use computer technology to create, store, and submit information electronically, but the percentage varies based on the size of the company and their technical abilities. Larger coal companies have in-house staff or hire engineering firms to prepare their applications. These companies use automated technology to prepare and submit the applications to State regulatory authorities. Small coal companies, which may not have the technical capability or personnel capable of preparing and submitting applications, may still submit paper forms. Once the State regulatory authorities receive paper applications, some will convert the applications to an electronic format for review and processing. The states with the greatest number of permit applications, such as Kentucky and Virginia, receive approximately 90% electronically, while some receive 0%. Nationally, OSMRE estimates that the State regulatory authorities receive approximately 75% of permit applications electronically.


It must be noted that the vast majority of permit applications are received by States where OSMRE does not have the authority to require electronic submissions of permit applications. OSMRE can only recommend using electronic methods to improve efficiency and reduce costs.


4. Describe efforts to identify duplication. Show specifically why any similar information already available cannot be used or modified for use for the purposes described in Item 2 above.


The required information under 30 CFR Part 774 is unique to each surface coal mining applicant for permit revision; permit renewal, and transfer, assignment, or sale of permit rights. No other source of the information is available. Industry respondents are companies in the coal mining business who have been issued permits and must then comply with the information disclosure requirements following permit issuance, or with application requirements concerning permit revisions; permit renewals; and transfers, assignments, or sales of permit rights. State respondents are the OSMRE-approved State programs that implement permitting and enforcement for surface coal mining operations.


5. If the collection of information impacts small businesses or other small entities, describe any methods used to minimize burden.

There are no special provisions for small businesses or other small entities under these regulations. OSMRE believes that approximately 98% of coal mining operations qualify as small businesses under Small Business Administration regulations. OSMRE does have a small operator assistance program, regulated under 30 CFR Part 795, which has a separately approved information collection clearance number where OSMRE and the States provide data and assistance to assist small businesses.


6. Describe the consequence to Federal program or policy activities if the collection is not conducted or is conducted less frequently, as well as any technical or legal obstacles to reducing burden.


Respondents provide information required for 30 CFR Part 774 only at the time of application for a permit renewal; revision; or transfer, assignment or sale of permit rights. Less frequent collection of the information would compromise the accuracy and completeness of information required for nationwide permitting and enforcement purposes and would not be in compliance with the Act.


7. Explain any special circumstances that would cause an information collection to be conducted in a manner:

* requiring respondents to report information to the agency more often than quarterly;

* requiring respondents to prepare a written response to a collection of information in fewer than 30 days after receipt of it;

* requiring respondents to submit more than an original and two copies of any document;

* requiring respondents to retain records, other than health, medical, government contract, grant-in-aid, or tax records, for more than three years;

* in connection with a statistical survey that is not designed to produce valid and reliable results that can be generalized to the universe of study;

* requiring the use of a statistical data classification that has not been reviewed and approved by OMB;

* that includes a pledge of confidentiality that is not supported by authority established in statute or regulation, that is not supported by disclosure and data security policies that are consistent with the pledge, or which unnecessarily impedes sharing of data with other agencies for compatible confidential use; or

* requiring respondents to submit proprietary trade secrets, or other confidential information, unless the agency can demonstrate that it has instituted procedures to protect the information's confidentiality to the extent permitted by law.


The information collection for 30 CFR Part 774 is consistent with 5 CFR 1320(d)(2). Information is collected at the time a permittee applicant applies for a permit revision; permit renewal; or a transfer, assignment, or sale of permit rights and at the time a permittee is cited with a cessation order, or incurs a change in the information required for disclosure when initially applying for a permit. OSMRE is currently working with State regulatory authorities to accept electronic permit applications, thereby reducing or eliminating paper copies submitted by applicants. Where OSMRE is the regulatory authority we require no more than one original and two copies of each application.


8. If applicable, provide a copy and identify the date and page number of publication in the Federal Register of the agency's notice, required by 5 CFR 1320.8(d), soliciting comments on the information collection prior to submission to OMB. Summarize public comments received in response to that notice and in response to the PRA statement associated with the collection over the past three years, and describe actions taken by the agency in response to these comments. Specifically address comments received on cost and hour burden.


Describe efforts to consult with persons outside the agency to obtain their views on the availability of data, frequency of collection, the clarity of instructions and recordkeeping, disclosure, or reporting format (if any), and on the data elements to be recorded, disclosed, or reported.


Consultation with representatives of those from whom information is to be obtained or those who must compile records should occur at least once every three years — even if the collection of information activity is the same as in prior periods. There may be circumstances that may preclude consultation in a specific situation. These circumstances should be explained.


In December 2019, OSMRE received information from the following Federal, State and industry offices concerning the burden imposed by this collection of information.


Federal Regulatory Authority Offices Contacted:


Applicant/Violator System Office

Office of Surface Mining Reclamation and Enforcement

Lexington KY 40503


Office of Surface Mining Reclamation and Enforcement

Knoxville, TN 37902


State Regulatory Offices Contacted:


Illinois Department of Natural Resources

Office of Mines & Minerals

Land Reclamation Division

One natural Resources Way

Springfield, Illinois 62702


Wyoming Department of Environmental Quality

Land Quality Division

200 W. 17th Street, Suite 10

Cheyenne, Wyoming 82002


Coal Mining Industry Representative Contacted:


White Stallion Energy

250 Cross Pointe Blvd.

Evansville, Indiana 47715


We were unable to obtain State 2019 burden hours for the Appalachian Region for this supporting statement. Because the Appalachian region accounts for over half of the revisions and renewals covered under CFR 774, we thought it was important to include State burden hours from a state in the Appalachian region; thus, we used November 2019 burden hours provided to us by State of Ohio for this supporting statement (see contact information below).


Ohio, DNR Mineral Resources Management

2045 Morse Road, Building H-3

Columbus, Ohio 43229-6693

The above respondents did not identify any concerns regarding the availability of data, frequency of collection, clarity of instructions and record keeping of the information collection requirements. These individuals did provide the burden estimates identified in items 12 and 14 for each section.


On October 2, 2018, OSMRE published in the Federal Register (83 FR 49570) a notice requesting comments from the public regarding the need for the collection of information, the accuracy of the burden estimate, ways to enhance the information collection, and ways to minimize the burden on respondents. This notice gave the public 60 days in which to comment. However, OSMRE did not receive any comments.


9. Explain any decision to provide any payment or gift to respondents, other than remuneration of contractors or grantees.


OSMRE does not provide payments or gifts to respondents.


10. Describe any assurance of confidentiality provided to respondents and the basis for the assurance in statute, regulation, or agency policy.


No confidential information is solicited or required under the information collection requirements for 30 CFR Part 774. If an applicant identifies information for 30 CFR Part 774 it wants to remain confidential, regulatory authorities rely upon the regulatory provisions at 30 CFR 773.6(d) to ensure confidentiality of qualified information.


11. Provide additional justification for any questions of a sensitive nature, such as sexual behavior and attitudes, religious beliefs, and other matters that are commonly considered private. This justification should include the reasons why the agency considers the questions necessary, the specific uses to be made of the information, the explanation to be given to persons from whom the information is requested, and any steps to be taken to obtain their consent.


No sensitive information is solicited or required under the information collection requirements for 30 CFR Part 774.


12. Provide estimates of the hour burden of the collection of information. The statement should:

* Indicate the number of respondents, frequency of response, annual hour burden, and an explanation of how the burden was estimated. Unless directed to do so, agencies should not conduct special surveys to obtain information on which to base hour burden estimates. Consultation with a sample (fewer than 10) of potential respondents is desirable. If the hour burden on respondents is expected to vary widely because of differences in activity, size, or complexity, show the range of estimated hour burden, and explain the reasons for the variance. Generally, estimates should not include burden hours for customary and usual business practices.

* If this request for approval covers more than one form, provide separate hour burden estimates for each form and aggregate the hour burdens.

* Provide estimates of annualized cost to respondents for the hour burdens for collections of information, identifying and using appropriate wage rate categories. The cost of contracting out or paying outside parties for information collection activities should not be included here.







a. Burden Hour Estimates for Respondents



SECTION

APPLICANT/

PERMITTEE RESPONSES


STATE RESPONSES


APPLICANT

BURDEN HOURS PER RESPONSE


STATE

BURDEN HOURS PER RESPONSE


TOTAL REQUESTED

HOURS


CURRENTLY APPROVED

HOURS


CHANGE TO BURDEN

774.12(a)

417

405

2

2

1,644

1,764

(120)

774.12(c)

185

182

8

4

2,208

1,074

+1,134

774.13

2,188

2,101

70

90

342,250

267,412

+74,838

774.15

551

546

16

45

33,386

15,489

+17,897

774.17(b)(1),

(b)(2), (e)(2)

278

0

24

0

24,677

17,076

+7,701

774.17(d)(1), (e)(1)

0

277

0

65

TOTALS

3,619

3,511

120

206

404,165

302,815

+101,350



b. Estimated Wage Cost to Respondents

OSMRE has estimated wage costs for respondents: industry and State regulatory employees. OSMRE has derived these wages from the Bureau of Labor Statistics (BLS) websites at (https://www.bls.gov/oes/current/oes_nat.htm#19-0000) for industry wages, and https://www.bls.gov/oes/current/naics4_999200.htm for State employees. Benefits have been calculated using a rate of 1.4 of the salary for industry personnel and 1.6 for State employees per the BLS news release USDL-19-2195, EMPLOYER COSTS FOR EMPLOYEE COMPENSATION—September 2019, dated December 18, 2019 (http://www.bls.gov/news.release/pdf/ecec.pdf).



Industry Wage Cost

Position

Hour Burden

Total Hours

Cost Per Hour ($)

Hourly Rate with Benefits (x 1.4) ($)

Total Wage Burden ($) (rounded)

Clerical

8

11,398

24.21

33.89

386,278

Mining Engineer

97

138,194

47.32

66.24

9,153,971

Operations Manager

15

21,370

71.63

100.28

2,142,983

Total

120

170,962



11,683,232


Therefore, the estimated total annual wage cost for industry respondents for Part 774 is $11,683,232.


State Wage Cost

Position

Hour Burden

Total Hours

Cost Per Hour ($)

Hourly Rate with Benefits (x 1.6) ($)

Total Wage Burden ($) (rounded)

Physical Scientist

206

233,203

32.64

52.22

12,177,861


Therefore, the estimated total annual wage cost for State respondents for Part 774 is $12,177,861.


The total wage cost for all respondents is $23,861,093.


13. Provide an estimate of the total annual non-hour cost burden to respondents or recordkeepers resulting from the collection of information. (Do not include the cost of any hour burden already reflected in item 12.)

* The cost estimate should be split into two components: (a) a total capital and start-up cost component (annualized over its expected useful life) and (b) a total operation and maintenance and purchase of services component. The estimates should take into account costs associated with generating, maintaining, and disclosing or providing the information (including filing fees paid for form processing). Include descriptions of methods used to estimate major cost factors including system and technology acquisition, expected useful life of capital equipment, the discount rate(s), and the time period over which costs will be incurred. Capital and start-up costs include, among other items, preparations for collecting information such as purchasing computers and software; monitoring, sampling, drilling and testing equipment; and record storage facilities.

* If cost estimates are expected to vary widely, agencies should present ranges of cost burdens and explain the reasons for the variance. The cost of purchasing or contracting out information collection services should be a part of this cost burden estimate. In developing cost burden estimates, agencies may consult with a sample of respondents (fewer than 10), utilize the 60-day pre-OMB submission public comment process and use existing economic or regulatory impact analysis associated with the rulemaking containing the information collection, as appropriate.

* Generally, estimates should not include purchases of equipment or services, or portions thereof, made: (1) prior to October 1, 1995, (2) to achieve regulatory compliance with requirements not associated with the information collection, (3) for reasons other than to provide information or keep records for the government, or (4) as part of customary and usual business or private practices.


a. Annual Capital and Start-up Costs


The information collection requirements for Part 774 do not involve any capital or start-up costs apart from expenditures associated with customary business practices.


b. Operation and Maintenance Costs


Each applicant for a revision or renewal is required to publish a newspaper notice advertising the application and seeking public comment once a week for four consecutive weeks. This requirement is found at §774.13 and §774.15. Section 774.17(b)(2) requires that each applicant for a transfer, assignment, or sale of permit rights is required to publish a newspaper notice advertising the application and seeking public comment one time only. At $322 per 4 weekly publications, and $100 for a one-time publication, the cost to all applicants is $909,758 (2,739 x $322) + (278 x $100).


14. Provide estimates of annualized cost to the Federal government. Also, provide a description of the method used to estimate cost, which should include quantification of hours, operational expenses (such as equipment, overhead, printing, and support staff), and any other expense that would not have been incurred without this collection of information.


Oversight. In keeping with the current guidance concerning oversight of State program implementation, OSMRE does not anticipate significant oversight review of State compliance with Part 774 in the absence of indication of problems. OSMRE estimates that it will conduct an oversight review in two States per year. OSMRE estimates that the oversight review will require 256 hours.


Federal Programs. Where OSMRE is the regulatory authority (Tennessee, Washington and Indian lands), we estimate receiving 87 applications for revisions, 5 application for renewals, and 1 application for transfer, assignment or sale of permits rights annually. The total burden for Federal program states will be 2,048.5 hours.


Based on the U.S. Office of Personnel Management Salary Table 2019-RUS located at, https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2019/RUS_h.pdf, the annual average salary used to estimate the wage cost to the Federal Government is $46.75 per hour for a GS 13 step 4 technician. Incorporating benefits using a 1.6 multiplier from the ratio between wages and benefits derived using BLS news release USDL-19-2195, the hourly wage cost to the Federal Government is $74.80 per hour.


The total hourly burden and wage costs to the Federal government are as follows:


SECTION

OVERSIGHT BURDEN HOURS1


FEDERAL PROGRAM


TOTAL

HOURS


HOURLY COST $ (W/ BENEFITS)

TOTAL FEDERAL COST $



Responses

Hour Burden Per Response2

Total Burden Hours




774.12

16

12

16

192

208

74.80

15,558.40

774.13-

revisions

80

87

16

1,392

1,472

74.80

110.105.60

774.15-

renewals

80

5

40

200

280

74.80

20,944.00

774.17-

TAS

80

1

8.5

8.5

88.5

74.80

6,619.80

TOTALS

256

105


1,792.5

2,048.5

74.80

153,227.80




15. Explain the reasons for any program changes or adjustments in hour or cost burden.


This information collection request will increase the burden estimate for Part 774 due to several factors.


  • 774.12(a) and (c) includes a burden for State regulatory authorities to review updated information submitted by permittees after the permittee receives a cessation order and after a change in the ownership or control of the mining operation. The burden for both State regulatory authorities and operators to comply with information collection requirements under 774.12(a) decreased slightly solely due to 36 fewer applications for State regulatory authorities to review in 2019 compared to 2017. Under 774.12(c) operators submitted 86 fewer applications for the State regulatory authorities to review in 2019. However, the hours required for operators and State regulatory authorities to comply with information collection requirement under 774.12(c) increased from 2 hours for both State regulatory authorities and operators in 2017, to 8 and 4 hours, respectively, in 2019.


  • In 774.13—Based on stakeholder consultation, OSMRE is estimating a significant increase in burden hours for the State regulatory authorities to approve or disapprove an application for a significant permit revision. The State regulatory authorities’ estimated burden hours increased from 44 hours to 90 hours per response; the increase in burden hours, although higher, is a realistic estimate due to increased scrutiny on permit revisions from State regulatory authorities to ensure that the decision makers are well informed before approving or disapproving a permit revision. Operators have estimated a slightly higher burden hours (from 60 to 70 burden hours) to comply with their information requirements under 774.13. The increases in burden hours for operators under these regulations also are likely due to increased scrutiny from the State regulatory authorities concerning requests for significant permit revisions.


  • 774.15 –Although permittees submitted nearly an identical number of applications for permit renewals in 2017 and 2019, 549 and 551, respectively, hours required to meet the requirements under 774.15 for both the permittees and State regulatory authorities, increased from 8 hours to 16 hours for the permittee and 20.25 hours to 45 hours for the State regulatory authority.


  • In 774.17(b)(1), (b)(2), (3)(2)--There was a decrease of 169 requests from permittees to State regulatory authorities for a transfer, assign or sell permit rights to a successor; however, burden hours increased because hours required for the permittee to meet the requirements under 774.17, increased from 16 hours per request in 2017, to 24 hours in 2019.


  • In 774.17(d)(1), (e)(1)—There was a decrease of 189 requests from permittees to State regulatory authorities to allow a transfer, assign or sell permit rights to a successor; however, burden hours increased because hours required for the State to meet the requirements under 774.17, increased from 22.25 hours per request in 2017 to 65 hours in 2019.

These burden re-estimates are derived from discussions with individuals identified in item 8.


302,815 hours currently approved

+ 101,350 hours due to adjustments

404,165 hours requested


This collection also includes a non-hour cost burden for newspaper advertisements of $909,758, a reduction of $149,886; the reduction was due to a fewer number of respondents required to file permit revisions in newspaper advertisements.


16. For collections of information whose results will be published, outline plans for tabulation and publication. Address any complex analytical techniques that will be used. Provide the time schedule for the entire project, including beginning and ending dates of the collection of information, completion of report, publication dates, and other actions.


OSMRE has no plans to publish the information collected under 30 CFR Part 774.


17. If seeking approval to not display the expiration date for OMB approval of the information collection, explain the reasons that display would be inappropriate.


OSMRE does not seek a waiver from the requirement to display the expiration date of the OMB approval of the information collection for 30 CFR Part 774. The OMB control number is 1029-0116 for 30 CFR Part 774 and is found in §774.9.


18. Explain each exception to the topics of the certification statement identified in "Certification for Paperwork Reduction Act Submissions."


There are no exceptions to OMB’s Certification for Paperwork Reduction Act Submissions.



1 These are burden hours that federal government needs to conduct oversight on the state regulatory authority where the State is the regulatory authority.

2 These are burden hours that federal government needs to conduct oversight where we are the regulatory authority (Tennessee, Washington, and Indian lands).

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleSupporting Statements for Reporting and Recordkeeping
AuthorTrelease, John A
File Modified0000-00-00
File Created2021-01-14

© 2024 OMB.report | Privacy Policy