| Table 1: Annual Respondent Burden and Cost – NESHAP for Phosphoric Acid Manufacturing and Phosphate Fertilizers Production (40 CFR Part 63, Subparts AA and BB) (Renewal) | |||||||||||
| 120.27 | 141.06 | 58.67 | |||||||||
| Burden item | (A) Technical Hours per Occurrence |
(B) Occurrences per respondent per year |
(C) Person hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical person hours per year (E=CxD) |
(F) Managerial person hours per year (F=Ex0.05) |
(G) Clerical person hours per year (G=Ex0.1) |
(H) Total Cost per Year ($) b |
|||
| 1. Applications | N/A | ||||||||||
| 2. Survey and Studies | N/A | ||||||||||
| 3. Reporting Requirements | |||||||||||
| A. Familiarize with regulatory requirements c | 4 | 1 | 4 | 13 | 52 | 2.6 | 5.2 | $6,925.88 | |||
| B. Required activities | |||||||||||
| Initial performance test | 28 | 1 | 28 | 0 | 0 | 0 | 0 | $0 | |||
| Repeat initial performance test | 28 | 0.1 | 2.8 | 0 | 0 | 0 | 0 | $0 | |||
| Startup, shutdown, malfunction plan | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||
| Annual performance test | 28 | 1 | 28 | 13 | 364 | 18.2 | 36.4 | $48,481.16 | |||
| Repeat annual performance test d | 28 | 0.2 | 5.6 | 0.91 | 5.10 | 0.25 | 0.5 | $678.74 | |||
| Mercury testing - Calciners e | 10 | 1 | 10 | 6 | 60 | 3 | 6 | $7,991.40 | |||
| TF testing | |||||||||||
| a. Oxidation Reactors f | 10 | 1 | 10 | 3 | 30 | 1.5 | 3 | $3,995.70 | |||
| b. Calciners e | 10 | 1 | 10 | 6 | 60 | 3 | 6 | $7,991.40 | |||
| C. Create information | See 3B | ||||||||||
| D. Gather existing information | See 3B | ||||||||||
| E. Write report | |||||||||||
| Notification of applicability | N/A | ||||||||||
| Notification of construction./ reconstruction | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
| Notification of actual startup | N/A | ||||||||||
| Notification of compliance requirements | N/A | ||||||||||
| Notification of performance test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
| Notification of compliance status | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
| Report of performance test | see 3B | ||||||||||
| Report monitoring exceedances g | 16 | 4 | 64 | 1.3 | 83.2 | 4.16 | 8.32 | $11,081.41 | |||
| Report of no excess emissions h | 8 | 2 | 16 | 11.7 | 187.2 | 9.36 | 18.72 | $24,933.17 | |||
| Startup/ shutdown/ malfunction report i | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 | |||
| Develop monitoring plan j | 15 | 1 | 15 | 0 | 0 | 0 | 0 | $0 | |||
| Prepare gypsum stack management j | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | |||
| Subtotal for Reporting | 968 | $112,079 | |||||||||
| 4. Recordkeeping Requirements | |||||||||||
| A. Familiarize with regulatory requirements | See 3A | ||||||||||
| B. Plan activities | See 4E | ||||||||||
| C. Implement activities | See 4E | ||||||||||
| D. Develop record system | See 4E | ||||||||||
| E. Time to enter information | |||||||||||
| Records of operating parameters k | 1.5 | 52 | 78 | 13 | 1014 | 50.7 | 101.4 | $135,054.66 | |||
| Records of Hg testing e | 3 | 1 | 3 | 6 | 18 | 0.9 | 1.8 | $2,397.42 | |||
| Records of TF testing e, f | 3 | 1 | 3 | 9 | 27 | 1.35 | 2.7 | $3,596.13 | |||
| Records of BLDS alarm l | 5 | 1 | 5 | 3 | 15 | 0.75 | 1.5 | $1,997.85 | |||
| F. Time to train personnel | See 3B | ||||||||||
| G. Time to comply with applicable requirements | See 3B | ||||||||||
| H. Time for audits | N/A | ||||||||||
| Subtotal for Recordkeeping | 1,235 | $143,046 | |||||||||
| TOTAL ANNUAL BURDEN and COST (rounded) m | 2,200 | $255,000 | |||||||||
| CAPITAL AND O&M COST (rounded) m | $186,000 | 52 | hr/response | ||||||||
| GRAND TOTAL (rounded) m | $441,000 | ||||||||||
| Assumptions | |||||||||||
| a Based on the 2015 RTR, we estimate that 12 phosphoric acid units and 11 phosphate fertilizers, for a total of 23 processing units, located at 13 facilities will be subject to the rule. No additional respondents will become subject the rule over the three-year period of this ICR. | |||||||||||
| b This ICR uses a labor rate of $141.06 for managerial hours, $120.27 for technical hours, and $58.67 for clerical hours. We assume managerial hours are 5 percent of technical hours, and clerical hours are 10 percent of technical hours. | |||||||||||
| c We assume that all respondents will have to familiarize with the regulatory requirements each year. | |||||||||||
| d We have assumed that 7 percent of respondents will fail the performance test and must repeat it. | |||||||||||
| e Based on the 2015 RTR, we estimate there are 6 phosphate rock calciners that are subject to Hg and TF testing. | |||||||||||
| f Based on the 2015 RTR, we estimate there are 3 oxidation reactors subject to TF testing. | |||||||||||
| g We have assumed that 10 percent of sources will report exceedances. Respondents are required to report quarterly. | |||||||||||
| h We have assumed that 90 percent of sources will report no excess emissions semiannually. | |||||||||||
| i No longer applies. | |||||||||||
| j This is a one-time activity. We assume the burden was already incured during the first year of the amendment. | |||||||||||
| k We have assumed that it will take 1.5 hours per respondent to enter information and that information is entered one-time per week for 52 weeks per year. | |||||||||||
| l Records of BLDS alarms must be kept, we assume each fabric filter will warrant 5 hours of documenting for this requirement. | |||||||||||
| m Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | |||||||||||
| Table 2: Average Annual EPA Burden and Cost – NESHAP for Phosphoric Acid Manufacturing and Phosphate Fertilizers Production (40 CFR Part 63, Subparts AA and BB) (Renewal) | ||||||||
| 49.44 | 66.62 | 26.75 | ||||||
| Burden Item | (A) Person hours per occurrence |
(B) Number of occurences per respondent per year |
(C) Person hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical person hours per year (E=CxD) |
(F) Managerial person hours per year (F=Ex0.05) |
(G) Clerical person hours per year (G=Ex0.1) |
(H) Total Cost per Year ($) b |
| Initial performance test | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 |
| Repeat initial performance test | ||||||||
| Retesting preparation | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 |
| Retesting | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 |
| Excess emissions enforcement activities | N/A | |||||||
| Report review | ||||||||
| Notification of applicability | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 |
| Notification of construction./reconstruction | N/A | |||||||
| Notification of anticipated startup | N/A | |||||||
| Notification of actual startup | N/A | |||||||
| Notification of special compliance requirements | N/A | |||||||
| Notification of initial performance test | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 |
| Notification of compliance status | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 |
| Observe stack tests c | 20 | 1 | 20 | 3 | 60 | 3 | 6 | $3,326.76 |
| Annual performance test | 40 | 1 | 40 | 13 | 520 | 26 | 52 | $28,831.92 |
| Repeat annual performance test d | 40 | 1 | 40 | 0.91 | 36.4 | 1.82 | 3.64 | $2,018.23 |
| Excess emissions report e | 20 | 4 | 80 | 1.3 | 104 | 5.2 | 10.4 | $5,766.38 |
| No excess emissions report f | 20 | 2 | 40 | 11.7 | 468 | 23.4 | 46.8 | $25,948.73 |
| Review monitoring plan g | 10 | 1 | 10 | 0 | 0 | 0 | 0 | $0 |
| Review gypsum stack and cooling pond management plan g | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 |
| Waiver application | N/A | |||||||
| Startup, shutdown, malfunction report h | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0.00 |
| TOTAL ANNUAL BURDEN AND COST (rounded) i | 1,370 | $65,900 | ||||||
| Assumptions | ||||||||
| a Based on the 2015 RTR, we estimate that 12 phosphoric acid units and 11 phosphate fertilizers, for a total of 23 processing units, located at 13 facilities will be subject to the rule. No additional respondents will become subject the rule over the three-year period of this ICR. | ||||||||
| b This cost is based on the following hourly labor rates times a 1.6 benefits multiplication factor to account for government overhead expenses: $66.62 for Managerial, $49.44 for Technical and $26.75 for Clerical. These rates are from the Office of Personnel Management (OPM) “2019 General Schedule” which excludes locality rates of pay. | ||||||||
| c Assumes EPA will attend 20 percent of stack tests. Only considers facilities with new emission points. | ||||||||
| d We have assumed that 7 percent of respondents will fail the initial performance test and must repeat it. | ||||||||
| e We have assumed that 10 percent of respondent will report exceedances. Respondents are required to report quarterly. | ||||||||
| f We have assumed that 90 percent of existing respondents report no excess emissions semiannually. | ||||||||
| g This is a one-time activity. We assume the burden was already incured during the first year of the amendment. | ||||||||
| h No longer applies. | ||||||||
| i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | ||||||||
| Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||
| (A) | (B) | (C) | (D) | (E) | (F) | (G) |
| Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, |
| (E X F) | ||||||
| Temperature monitoring device | $2,700 | 0 | $0 | $886 | 13 | $11,518 |
| Mercury testing | $0 | 0 | $0 | $8,000 | 6 | $48,000 |
| TF testing | $0 | 0 | $0 | $5,600 | 9 | $50,400 |
| Performance evaluation | $0 | 0 | $0 | $2,000 | 23 | $46,000 |
| BLDS alarm | $25,200 | 0 | $0 | $9,900 | 3 | $29,700 |
| Total | $0 | $186,000 | ||||