ICR Spreadsheets Tables 1-33

Chromium Tables 1-33 _111219 ROCIS upload.pdf

Hexavalent Chromium standards for General Industry (29 CFR 1910.1026), Shipyard Employment (29 CFR 1915.1026), and Construction (29 CFR 1926.1126)

ICR Spreadsheets Tables 1-33

OMB: 1218-0252

Document [pdf]
Download: pdf | pdf
Table 1

Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for an IH Technician to Perform Initial Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform initial exposure
monitoring by collecting personal breathing-zone air samples to characterize full-shift exposure for each job classification in each
work area during each shift. To determine the number of new employers that may need to conduct initial monitoring OSHA

Variables:

Cost = (INITCONTTIME * CONTCOST * #INIT * %INITADD * (%LEARN + %CONT) * (#PLANTS* 5%))
INITCONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician) to conduct the initial
monitoring.
CONTCOST = Cost per hour for an outside industrial hygiene contractor
# INIT = Number of initial exposure measurements initial plus confirmation.
% INITADD = Percent of plants that have not satisified initial monitoring requirement
% LEARN = Percent of plants that will develop in-house monitoring capability
% CONT = Percent of plants that will continue to use an outside contractor for monitoring
# PLANTS = Number of plants represented by the model output
# PLANTS (5%) = Number of plants represented by the model output * 5% (new employers)

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
SECTOR 2A. WELDING
SMAW

GMAW

TIG

Item 13 Costs

# PLANTS (5%)

% CONT

2

25%

0%

100%

837

42

$21,991

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
100%

1,576
403

79
20

$24,832
$6,357

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
100%

759
550

38
28

$11,962
$8,666

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
100%

1,035
403

52
20

$16,313
$6,357

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
100%

759
476

38
24

$11,962
$7,508

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
100%

897
837

45
42

$14,132
$13,195

Small

12 $52.52

2

25%

79

$24,832

Large

12 $52.52

2

0%
100%
1,576
GENERAL INDUSTRY
25%
0%
90%
3,676

184

$52,135

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

4,120
2,697

206
135

$64,910
$38,243

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

3,021
817

151
41

$47,606
$11,584

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

915
327

46
16

$14,423
$4,631

Page 1

# PLANTS

% LEARN

20 $52.52

# INIT

% INITADD

Hard Chrome

CONTCOST

Large

Size
SECTOR 1. ELECTROPLATING

INITCONTTIME

Updated October 2019

Plasma Welding

Resistance Welding

SMAW
GMAW
TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting

SAW

SMAW

Item 13 Costs

# PLANTS (5%)

% CONT

2
2

25%
25%

0%
0%

100%
90%

366
81

18
4

$5,763
$1,154

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

91
81

5
4

$1,441
$1,154

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

91
490

5
25

$1,441
$6,953

Small

12 $52.52

2

25%

550

27

$8,660

Large

12 $52.52

2

75%

0%
100%
MARITIME
0%
50%

18

1

$427

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

10
25

1
1

$427
$594

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

14
6

1
0.3

$598
$142

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

3
121

0.2
6

$128
$2,850

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

68
4

3
0

$2,907
$95

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

2
2

0
0

$85
$47

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

1
4

0
0

$43
$95

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

2
2

0
0

$85
$47

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

1
0

0
0

$43
$0

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
0

0
0

$0
$0

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
16

0
1

$0
$380

Small

12 $52.52

2

75%

9

0

$385

Large

12 $52.52

2

25%

209

10

$3,128

Page 2

0%
90%
CONSTRUCTION
0%
95%

# PLANTS

% LEARN

12 $52.52
12 $52.52

# INIT

% INITADD

Plasma Cutting

CONTCOST

Small
Large

Size
SAW

INITCONTTIME

Table 1

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 2B. MILD STEEL WELDING
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Item 13 Costs

# PLANTS (5%)

% CONT

2
2

25%
25%

0%
0%

100%
95%

1,673
3

84
0

$26,360
$45

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

22
42

1
2

$348
$632

Small
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

335
21

17
1

$5,272
$316

Local
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

168
4

8
0

$2,644
$60

Local

12 $52.52

2

25%

33

2

$522

State

12 $52.52

2

25%

0%
100%
GOVERNMENT
0%
95%

20

1

$301

Local
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

614
0

31
0

$9,673
$0

Local
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

8
4

0
0

$127
$60

Local
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

123
2

6
0

$1,931
$30

Local
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

61
1

3
0

$966
$15

Local

12 $52.52

2

25%

1

$190

Large

12 $52.52

2

0%
100%
12
GENERAL INDUSTRY
25%
0%
90%
4,929

246

$69,903

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

5,019
3,615

251
181

$79,079
$51,266

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

3,680
1,095

184
55

$57,991
$15,531

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

1,115
438

56
22

$17,573
$6,212

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

446
110

22
5

$7,029
$1,553

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
90%

112
110

6
5

$1,757
$1,553

Small

12 $52.52

2

25%

0%

100%

112

6

$1,757

Page 3

# PLANTS

% LEARN

12 $52.52
12 $52.52

# INIT

% INITADD

GMAW

CONTCOST

Small
Large

Size
Plasma Cutting

INITCONTTIME

Table 1

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Item 13 Costs

# PLANTS (5%)

% CONT

2

25%

0%

90%

657

33

$9,318

Small

12 $52.52

2

25%

669

33

$10,544

Large

12 $52.52

2

75%

0%
100%
MARITIME
0%
50%

38

2

$902

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

22
55

1
3

$940
$1,306

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

31
13

2
1

$1,325
$309

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

7
259

0
13

$299
$6,127

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

147
8

7
0

$6,241
$190

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

5
3

0
0

$214
$71

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
8

0
0

$0
$190

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
3

0
0

$0
$71

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

2
0

0
0

$85
$0

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
0

0
0

$0
$0

Small
Large

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
50%

0
34

0
2

$0
$807

Small

12 $52.52

2

75%

19

1

$812

Large

12 $52.52

2

25%

313

16

$4,692

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

2,368
4

118
0

$37,315
$60

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

31
62

2
3

$491
$932

Small
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

100%
95%

473
31

24
2

$7,457
$466

Page 4

0%
90%
CONSTRUCTION
0%
95%

# PLANTS

% LEARN

12 $52.52

# INIT

% INITADD

SMAW

CONTCOST

Large

Size
Resistance Welding

INITCONTTIME

Table 1

SECTOR 3. PAINTING
General Industry (Aerospace)

General Industry (Autobody)

General Industry (Coil Coating)

Maritime

Construction

Government

Item 13 Costs

# PLANTS (5%)

% CONT

2
2

25%
25%

0%
0%

100%
95%

237
6

12
0

$3,736
$90

Small

12 $52.52

2

25%

0%

100%

47

2

$744

Large

12 $52.52

2

25%

0%

25%

50

2

$195

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

75%
25%

62
330

3
17

$737
$1,301

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

75%
25%

1,454
101

73
5

$17,187
$398

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

75%
10%

18
274

1
14

$217
$432

Small
Large

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

90%
25%

474
789

24
39

$6,728
$3,110

Small
State

12 $52.52
12 $52.52

2
2

25%
25%

0%
0%

50%
25%

4,197
17

210
1

$33,065
$67

$52.52

2

25%

0%

25%

945

47

$3,723

$52.52

2 100%

0%

100%

2

0

$117

$52.52

2

0%

0%

0%

0

0

$0

$52.52

2

25%

0%

100%

2

0

$44

$52.52

2

25%

0%

100%

1

0

$13

$52.52

2

25%

0%

100%

3

0

$41

$52.52

2

0%

0%

0%

0

0

$0

$52.52

2

25%

0%

20%

5

0

$34

$52.52

2

0%

0%

0%

0

0

$0

$52.52

2

25%

0%

75%

78

4

$924

$52.52

2

25%

0%

75%

123

6

$1,453

$52.52

2 100%

0%

90%

2

0

$126

$52.52

2 100%

0%

90%

7

0

$419

Local
12
SECTOR 4. PRODUCERS OF CHROMATES
Large
12
ALL
Small
12
SECTOR 5. CHROMATE PIGMENT PROCEDU
Large
20
ALL
Small
12
SECTOR 6. CCA PRODUCERS
Large
12
ALL
Small
12
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
28
ALL
Small
12
SECTOR 8. PAINT AND COATING PRODUCERS
Large
12
ALL
Small
12
SECTOR 9. PRINTING INK PRODUCERS
Large
12
ALL
Small
12

Page 5

# PLANTS

% LEARN

12 $52.52
12 $52.52

# INIT

% INITADD

Metallizing

CONTCOST

Local
Large

Size
Brazing

INITCONTTIME

Table 1

% CONT

Item 13 Costs

# PLANTS (5%)

% LEARN

2

25%

0%

100%

79

4

$1,248

2

25%

0%

100%

39

2

$610

2

75%

0%

80%

6

0

$224

2

75%

0%

75%

4

0

$140

2 100%

0%

100%

1

0

$153

# PLANTS

% INITADD

SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
12 $52.52
ALL
Small
12 $52.52
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
12 $52.52
ALL
12 $52.52
Small
SECTOR 13. CHROMIUM METAL PRODUCER
28 $52.52
Large
ALL
12 $52.52
Small
SECTOR 14. IRON AND STEEL MILLS
Large
20 $52.52
Alloy Stainless Steel
Small
12 $52.52
Large
20 $52.52
Carbon Steel
Small
12 $52.52
SECTOR 14.B FORGING INDUSTRY
Large
12 $52.52
Reshaping
Small
12 $52.52
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
28 $52.52
ALL
Small
12 $52.52
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
12 $52.52
ALL
Small
12 $52.52
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
12 $52.52
ALL
Small
12 $52.52
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
12 $52.52
ALL
Small
12 $52.52
SECTOR 20. TEXTILE DYEING
Large
12 $52.52
ALL
Small
12 $52.52
SECTOR 21. Colored Glass Producers
Large
12 $52.52
General Industry
Small
12 $52.52
Large
12 $52.52

# INIT

CONTCOST

INITCONTTIME

Size

Table 1

2

0%

0%

0%

0

0

$0

2

75%

0%

90%

39

2

$2,746

2
2

75%
75%

0%
0%

90%
90%

12
116

1
6

$528
$8,237

2

75%

0%

90%

37

2

$1,554

2

75%

0%

90%

33

2

$1,413

2

75%

0%

90%

31

2

$1,331

2

25%

0%

90%

152

8

$5,035

2

25%

0%

90%

111

6

$1,569

2

25%

0%

100%

2

0

$39

2

25%

0%

100%

1

0

$13

2

0%

0%

0%

0

0

$0

2 100%

0%

100%

5

0

$293

2

75%

0%

100%

212

11

$10,022

2

75%

0%

100%

1,600

80

$75,621

2

75%

0%

90%

307

15

$13,059

2

75%

0%

90%

623

31

$26,502

2

75%

0%

90%

8

0

$329

2
2

75%
75%

0%
0%

90%
90%

24
111

1
6

$1,042
$4,717

Page 6

ALL

Item 13 Costs

75%

0%

90%

6

0

$274

Large

12 $52.52

2

75%

0%

90%

78

4

$3,315

$52.52

2

75%

0%

90%

312

16

$13,259

$52.52

2

75%

0%

90%

193

10

$8,190

$52.52
$52.52

2
2

0%
75%

0%
0%

90%
90%

0
25

0
1

$0
$1,055

$52.52

2

75%

0%

90%

5

0

$201

$52.52

2

75%

0%

90%

5

0

$220

$52.52

2

75%

0%

90%

0

0

$0

$52.52

2

75%

0%

100%

143

7

$6,756

$52.52
$52.52

2
2

75%
75%

0%
0%

100%
100%

76
36

4
2

$3,613
$1,697

$52.52
$52.52

2
2

75%
75%

0%
0%

100%
100%

32
1,232

2
62

$1,495
$58,249

$52.52
$52.52

2
2

75%
75%

0%
0%

100%
100%

4,932
17

247
1

$233,152
$807

$52.52

2

75%

0%

100%

62

3

$2,918

$52.52

2

75%

0%

90%

39

2

$2,797

$52.52
$52.52

2
2

75%
75%

0%
0%

90%
25%

47
0

2
0

$2,014
$0

$52.52

2

75%

0%

90%

24

1

$1,007

$52.52

2

75%

0%

100%

18

1

$1,934

$52.52

2

0%

0%

0%

0

0

$0

$52.52

2

0%

0%

100%

54

3

$0

Small
12
SECTOR 24. CHROMIUM CATALYST USERS
Large
12
Catalyst Users
Small
12
Large
12
Chromium Catalyst Service
Companies
Small
12
SECTOR 25. REFRACTORY BRICK PRODUCER
Large
12
ALL
Small
12
SECTOR 26. WOODWORKING
Large
12
General Industry
Small
12
Large
12
Maritime
Small
12
Large
12
Construction
Small
12
State
12
Government
Local
12
SECTOR 27. SOLID WASTER INCINERATION
Large
20
General Industry
Small
12
State
12
Government
Local
12
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
28
ALL
Small
12
SECTOR 31. CONSTRUCTION
Large
12
Industrial Rehabilitation

# PLANTS (5%)

% CONT

2

# PLANTS

% LEARN

12 $52.52

# INIT

% INITADD

SECTOR 22. PRINTING

CONTCOST

Small

Size
Fiber, Flat and Container Glass

INITCONTTIME

Table 1

Small
State

12 $52.52
12 $52.52

2 0%
2 100%

0%
0%

100%
100%

247
16

12
1

$0
$985

Local

12 $52.52

2 100%

0%

100%

93

5

$5,844

Page 7

Item 13 Costs

# PLANTS (5%)

% CONT

2

75%

0%

90%

43

2

$1,810

Small
State

12 $52.52
12 $52.52

2
2

75%
75%

0%
0%

90%
90%

180
1

9
0

$7,652
$37

Local
Large

12 $52.52
12 $52.52

2
2

75%
0%

0%
0%

90%
90%

252
47

13
2

$10,741
$0

Small

12 $52.52

2

0%

0%

90%
Total

185
78,321

9
3,916

Page 8

# PLANTS

% LEARN

12 $52.52

# INIT

% INITADD

Refractory Brick Restoration

CONTCOST

Large

Size
Hazardous Waste-site Work

INITCONTTIME

Table 1

$0
$1,493,924

Table 2
Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for a Laboratory to Conduct Analysis
of Initial Exposure Monitoring Air Samples
Note: This table calculates the contract cost for the employer to have a laboratory conduct analysis of air
samples collected during initial exposure monitoring. To determine the number of new employers that may
Cost = (SAMPCOST * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD)* #PLANTS

Variables:

SAMPCOST =
JOBCAT =
SHIFTS =
#SAMPS =
#INIT =

Variable cost per sample
Number of job categories (covering each work area).
Number of work shifts
Number of samples per exposure measurement
Number of initial exposure measurements required to be satisfied equals
2

%INITADD =

Percent of plants that have not satisified initial monitoring requirement
#PLANTS = Number of plants represented by the model output
#PLANTS (5%) = Number of plants represented by the model output * 5%

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS (5%)

Item 13 COSTS

Large

$84

7

2

3

2

25%

837

42

$73,761

Job Shop Chrome Plater

Small
Large

$84
$84

7
1

1
2

3
3

2
2

25%
25%

1,576
403

79
20

$69,409
$5,077

Captive Shop Chrome Plater

Small
Large

$84
$84

1
1

1
2

3
3

2
2

25%
25%

759
550

38
28

$4,776
$6,921

Job Shop Plater

Small
Large

$84
$84

1
1

1
2

3
3

2
2

25%
25%

1,035
403

52
20

$6,514
$5,077

Captive Shop Plater

Small
Large

$84
$84

1
1

1
2

3
3

2
2

25%
25%

759
476

38
24

$4,776
$5,996

Operator

Small
Large

$84
$84

1
1

1
2

3
3

2
2

25%
25%

897
837

45
42

$5,643
$10,537

Small

$84

1

1

3

79

$9,916

Large

$84

1

3

2
25%
1,576
GENERAL INDUSTRY
2
2
25%
3,676

184

$46,261

Small
Large

$84
$84

1
1

1
3

3
2

206
135

$25,919
$33,934

SECTOR 1. ELECTROPLATING
Hard Chrome

SECTOR 2A. WELDING
SMAW

GMAW

Page 9

2
2

25%
25%

# PLANTS

Size

Updated October 2019

4,120
2,697

Size

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS

# PLANTS (5%)

Item 13 COSTS

Table 2

TIG

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

3,021
817

151
41

$19,009
$10,279

SAW

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

915
327

46
16

$5,759
$4,109

Plasma Cutting

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

366
81

18
4

$2,301
$1,024

Plasma Welding

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

91
81

5
4

$575
$1,024

Resistance Welding

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

91
490

5
25

$575
$6,170

Small

$84

1

1

3

2

550

27

$3,458

SMAW

Large

$84

1

3

1

25%
MARITIME
2
75%

18

1

$341

GMAW

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

10
25

1
1

$126
$474

TIG

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

14
6

1
0.3

$177
$114

FCAW

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

3
121

0.2
6

$38
$2,276

Plasma Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

68
4

3
0.2

$860
$76

Plasma Welding

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

2
2

0.1
0.1

$25
$38

Oxy-fuel Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

1
4

0.1
0.2

$13
$76

Air Carbon Arc Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

2
2

0.1
0.1

$25
$38

Electric Torch Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

1
0

0.1
-

$13
-

Small

$84

1

2

1

2

75%

0

-

-

Page 10

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS (5%)

Item 13 COSTS

Thermal Spray Tungsten Cutting Large

$84

1

3

1

2

75%

0

-

-

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

0
16

1

$303

Small

$84

1

2

1

0.5

$114

SMAW

Large

$84

1

3

1

2
75%
9
CONSTRUCTION
2
25%
209

10

$1,315

Plasma Cutting

Small
Large

$84
$84

1
1

1
3

1
1

2
2

25%
25%

1,673
3

84
0.2

$3,508
$19

GMAW

Small
Large

$84
$84

1
1

1
3

1
1

2
2

25%
25%

22
42

1
2

$46
$266

Brazing

Small
State

$84
$84

1
1

1
3

1
1

2
2

25%
25%

335
21

17
1

$702
$133

Metallizing

Local
State

$84
$84

1
1

1
3

1
1

2
2

25%
25%

168
4

8
0.2

$352
$25

Local

$84

1

1

1

33

2

$70

SMAW

State

$84

1

1

1

2
25%
GOVERNMENT
2
25%

20

1

$42

Plasma Cutting

Local
State

$84
$84

1
1

1
1

1
1

2
2

25%
25%

614
0

31
-

$1,287
-

GMAW

Local
State

$84
$84

1
1

1
1

1
1

2
2

25%
25%

8
4

0.4
0

$17
$8

Brazing

Local
State

$84
$84

1
1

1
1

1
1

2
2

25%
25%

123
2

6
0.1

$257
$4

Metallizing

Local
State

$84
$84

1
1

1
1

1
1

2
2

25%
25%

61
1

3
0.1

$129
$2

Local

$84

1

1

1

SECTOR 2B. MILD STEEL WELDING
SMAW
Large

$84

1

Small
Large

$84
$84

1
1

SAW

GMAW

# PLANTS

Size

Table 2

1

$25

3

2
25%
12
GENERAL INDUSTRY
2
2
25%
4,929

246

$62,028

1
3

3
2

251
181

$31,576
$45,490

2
2

Page 11

25%
25%

5,019
3,615

Size

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS

# PLANTS (5%)

Item 13 COSTS

Table 2

TIG

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

3,680
1,095

184
55

$23,156
$13,781

SAW

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

1,115
438

56
22

$7,017
$5,512

Plasma Cutting

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

446
110

22
5

$2,807
$1,378

Plasma Welding

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

112
110

6
5

$702
$1,378

Resistance Welding

Small
Large

$84
$84

1
1

1
3

3
2

2
2

25%
25%

112
657

6
33

$702
$8,269

Small

$84

1

1

3

2

669

33

$4,210

SMAW

Large

$84

1

3

1

25%
MARITIME
2
75%

38

2

$721

GMAW

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

22
55

1
3

$278
$1,043

TIG

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

31
13

2
1

$392
$247

FCAW

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

7
259

0.4
13

$89
$4,893

Plasma Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

147
8

7
0.4

$1,846
$152

Plasma Welding

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

5
3

0.3
0

$63
$57

Oxy-fuel Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

8

0.4

$152

Air Carbon Arc Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

3

0.0
0.2

$0
$57

Electric Torch Cutting

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

2
0

0.1
-

$25
-

Page 12

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS (5%)

Item 13 COSTS

Small
Thermal Spray Tungsten Cutting Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

0
0

-

-

Small
Large

$84
$84

1
1

2
3

1
1

2
2

75%
75%

0
34

2

$645

Small

$84

1

2

1

1

$240

SMAW

Large

$84

1

3

1

2
75%
19
CONSTRUCTION
2
25%
313

16

$1,972

Plasma Cutting

Small
Large

$84
$84

1
1

1
3

1
1

2
2

25%
25%

2,368
4

118
0.2

$4,967
$25

GMAW

Small
Large

$84
$84

1
1

1
3

1
1

2
2

25%
25%

31
62

2
3

$65
$392

Brazing

Small
State

$84
$84

1
1

1
3

1
1

2
2

25%
25%

473
31

24
2

$992
$196

Metallizing

Local
State

$84
$84

1
1

1
3

1
1

2
2

25%
25%

237
6

12
0.3

$497
$38

Local

$84

1

1

1

Large

$84

2

General Industry (Autobody)

Small
Large

$84
$84

General Industry (Coil Coating)

Small
Large

SAW

# PLANTS

Size

Table 2

2

$99

3

2
25%
47
GENERAL INDUSTRY
3
2
25%
50

2

$1,871

2
2

1
1

3
1

2
2

25%
25%

62
330

3
17

$785
$1,386

$84
$84

2
2

1
2

1
3

2
2

25%
25%

1,454
101

73
5

$6,100
$2,540

Maritime

Small
Large

$84
$84

2
3

1
3

3
1

2
2

25%
25%

18
274

1
14

$231
$5,180

Construction

Small
Large

$84
$84

3
3

1
3

1
1

2
2

25%
25%

474
789

24
39

$2,985
$14,901

Government

Small
State

$84
$84

3
2

1
3

1
1

2
2

25%
25%

4,197
17

210
1

$26,406
$215

Local
SECTOR 4. PRODUCERS OF CHROMATES

$84

2

1

1

2

25%

945

47

$3,964

SECTOR 3. PAINTING
AEROSPACE

Page 13

Size

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS

# PLANTS (5%)

Item 13 COSTS

Table 2

Large

$84

4

3

3

2

100%

2

0.1

$562

$84
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
$84
ALL
Large

0

1

3

2

0%

0

0.0

$0

9

2

3

2

25%

2

0.1

$189

Small

$84

1

1

3

2

25%

1

0.04

$5

Large

$84

4

3

3

2

25%

3

0

$196

$84 0 3
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
$84 14 3
ALL
Large

0

2

0%

0

0

$0

3

2

25%

5

0

$1,230

ALL

SECTOR 6. CCA PRODUCERS
ALL

$84
Small
SECTOR 8. PAINT AND COATING PRODUCER
$84
ALL
Large

0

1

3

2

0%

0

0

$0

4

2

3

2

25%

78

4

$3,937

$84

4

2

3

2

25%

123

6

$6,187

$84

5

1

9

2

100%

2

0

$837

$84
Small
SECTOR 10. PLASTIC COLORANT PRODUCER
$84
ALL
Large

3

1

5

2

100%

7

0

$930

4

3

3

2

25%

79

4

$5,978

1

1

3

2

25%

39

2

$244

3

1

3

2

75%

6

0

$335

$84 3 1
Small
SECTOR 13. CHROMIUM METAL PRODUCER
$84 16 3
ALL
Large

3

2

75%

4

0

$223

3

2

100%

1

0

$1,255

Small
SECTOR 9. PRINTING INK PRODUCERS
ALL
Large

$84
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
$84
ALL
Large

Small
SECTOR 14. IRON AND STEEL MILLS
Alloy and Stainless Steel
Large

$84

0

1

1

2

0%

0

0

$0

$84

8

3

3

2

75%

39

2

$17,541

Small
Large

$84
$84

4
8

1
3

3
3

2
2

75%
75%

12
116

1
6

$938
$52,623

Small

$84

4

1

1

2

75%

37

2

$919

Carbon Steel

SECTOR 14.B FORGING INDUSTRY

Page 14

Size

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS

# PLANTS (5%)

Item 13 COSTS

Table 2

Large

$84

5

1

3

2

75%

33

2

$3,134

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
ALL
Large

$84

2

1

3

2

75%

31

2

$1,181

$84

9

3

5

2

25%

152

8

$43,078

$84

5

1

5

2

25%

111

6

$5,802

$84

7

1 21

2

25%

2

0

$771

$84
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
$84
ALL
Large

5

1

7

2

25%

1

0

$61

0

1

3

2

0%

0

0

$0

Reshaping

Small
SECTOR 17. CHROMIUM DYE PRODUCERS
ALL
Large

Small
SECTOR 19. CHEMICAL DISTRIBUTORS
ALL
Large

$84

2

1

3

2

100%

5

0

$234

$84

1

1

3

2

75%

212

11

$4,002

Small

$84

1

1

3

2

75%

1,600

80

$30,196

Large

$84

3

3

3

2

75%

307

15

$52,144

$84

2

1

2

2

75%

623

31

$15,677

$84

3

3 12

2

75%

8

0

$5,256

Small
Large

$84
$84

2
5

1
1

4
1

2
2

75%
75%

24
111

1
6

$1,233
$3,488

Small

$84

1

1

1

2

75%

6

0

$41

Large

$84

3

3

2

2

75%

78

4

$8,824

$84

2

1

2

2

75%

312

16

$7,843

$84

2

3

3

2

75%

193

10

$21,803

$84
$84

0
0

1
3

3
3

2
2

0%
75%

0
25

0
1

$0
$0

$84
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
$84
ALL
Large

0

1

3

2

75%

5

0.2

$0.000

9

1 15

2

75%

5

0

$4,402

SECTOR 20. TEXTILE DYEING
ALL

Small
SECTOR 21. COLORED GLASS PRODUCERS
General Industry
Large

Fiber, Flat and Container Glass

SECTOR 22. PRINTING
ALL

Small
SECTOR 24. CHROMIUM CATALYST USERS
Catalyst Users
Large

Chromium Catalyst Service

Small
Large

Page 15

Size

SAMPCOST

JOBCAT

SHIFTS

# SAMPS

# INIT

% INITADD

# PLANTS

# PLANTS (5%)

Item 13 COSTS

Table 2

Small

$84

0

1

0

2

75%

0

0

$0

Large

$84

1

1

2

2

75%

143

7

$1,798

Maritime

Small
Large

$84
$84

1
1

1
1

2
1

2
2

75%
75%

76
36

4
2

$962
$226

Construction

Small
Large

$84
$84

1
1

1
1

1
1

2
2

75%
75%

32
1,232

2
62

$199
$7,753

Government

Small
State

$84
$84

1
1

1
1

1
1

2
2

75%
75%

4,932
17

247
1

$31,033
$107

$84
Local
SECTOR 27. SOLID WASTER INCINERATION
$84
General Industry
Large

1

1

1

2

75%

62

3

$388

6

3 15

2

75%

39

2

$67,012

$84
$84

6
0

1 3
3 15

2
2

75%
75%

47
0

2
0

$5,361
$0

3

2

75%

24

1

$2,680

3

2

75%

18

1

$11,915

SECTOR 26. WOODWORKING
General Industry

Government

Small
State

$84 6 1
Local
SECTOR 30. SUPERALLOY PRODUCERS AND
$84 12 3
ALL
Large

SECTOR 31. CONSTRUCTION
Industrial Rehabilitation

Hazardous Waste-site Work

Refractory Brick Restoration

Small

$84

0

3

3

2

0%

0

0

$0

Large

$84

1

1

1

2

0%

54

3

$0

Small
State

$84
$84

1
1

1
1

1
1

2
2

0%
100%

247
16

12
1

$0
$131

Local
Large

$84
$84

1
1

1
1

1
1

2
2

100%
75%

93
43

5
2

$778
$268

Small
State

$84
$84

1
1

1
1

1
1

2
2

75%
75%

180
1

9
0

$1,132
$5

Local
Large

$84
$84

1
1

1
1

1
1

2
2

75%
0%

252
47

13
2

$1,588
$0

Small

$84

1

1

1

2

0%
185
Total 78,321

9
3,916

$0
$1,113,483

Page 16

Table 4
Semi-Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for an IH Technician to Perform SemiAnnual Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform
semi-annual exposure monitoring.
Cost = (SEMICONTTIME * CONTCOST * SEMI-ANNUALLY * %NOTSEMI * %ABOVE AL *%CONT) *
#PLANTS)

Variables:
SEMICONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician) to conduct semiannual monitoring
CONTCOST = Cost per hour for an outside industrial hygiene contractor
SEMI - ANNUALLY = 2 times per year semi-annually
%NOTSEMI = Percent of plants not performing semi-annual monitoring requirements
%ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL
%CONT = Percent of plants that will continue to use an outside contractor for monitoring
#PLANTS = Number of plants represented by the model input

% CONT

# PLANTS

Item 13 COST

12

$52.52

2 100%

49.00%

100.00%

837

$517,226

12
12

$52.52
$52.52

2 100%
2 100%

49.00%
11.00%

100.00%
100.00%

1,576
403

$973,422
$55,944

12
12

$52.52
$52.52

2 100%
2 100%

11.00%
14.00%

100.00%
100.00%

759
550

$105,266
$97,060

12
12

$52.52
$52.52

2 100%
2 100%

14.00%
10.00%

100.00%
100.00%

1,035
403

$182,702
$50,858

12
12

$52.52
$52.52

2 100%
2 100%

10.00%
13.00%

100.00%
100.00%

759
476

$95,696
$78,082

12
12

$52.52
$52.52

2 100%
2 100%

13.00%
16.00%

100.00%
100.00%

897
837

$146,977
$168,890

12

$52.52

2 100%

1,576

$317,852

12

$52.52

16.00%
100.00%
GENERAL INDUSTRY
2 100% 0.92%
90.00%

3,676

$38,371

12
12

$52.52
$52.52

2 100%
2 100%

0.92%
0.73%

100.00%
90.00%

4,120
2,697

$47,773
$22,334

12

$52.52

2 100%

0.73%

100.00%

3,021

$27,802

% NOTSEMI

% ABOVEAL

SEMI - ANNUALLY

CONTCOST

SECTOR 1. ELECTROPLATING
Large
Hard Chrome
Small
Large
Job Shop Chrome
Plater
Small
Large
Captive Shop Chrome
Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
SECTOR 2A. WELDING
Large
SMAW
Small
Large
GMAW
Small

SEMICONTTIME

Size

0

Page 17

CONTCOST

% ABOVEAL

% CONT

# PLANTS

Item 13 COST

12

$52.52

2 100%

0.00%

90.00%

817

$0

Small
Large

12
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

915
327

$0
$0

SAW

Small
Large

0
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

366
81

$0
$0

Plasma Cutting

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

91
81

$0
$0

Plasma Welding

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

91
490

$0
$0

Resistance Welding

Small

12

$52.52

2 100%

550

$0

Large

12

$52.52

2 100%

0.00%
100.00%
MARITIME
0.00%
50.00%

SMAW

18

$0

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

10
25

$0
$0

GMAW

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

14
6

$0
$0

TIG

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

3
121

$0
$0

FCAW

Small
Large

0
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

68
4

$0
$0

Plasma Cutting

Small
Large

0
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

2
2

$0
$0

Plasma Welding

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

1
4

$0
$0

Oxy-fuel Cutting

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

2
2

$0
$0

Air Carbon Arc Cutting

Small
Large

12
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

1
0

$0
$0

Electric Torch Cutting

Small

0

$52.52

2 100%

0.00%

90.00%

0

$0

% NOTSEMI

SEMICONTTIME

Large

Size

TIG

SEMI - ANNUALLY

Table 4

Page 18

CONTCOST

% ABOVEAL

% CONT

# PLANTS

Item 13 COST

0

$52.52

2 100%

0.00%

50.00%

0

$0

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

0
16

$0
$0

SAW

Small

0

$52.52

2 100%

9

$0

Large

12

$52.52

2 100%

0.00%
90.00%
CONSTRUCTION
0.00%
95.00%

SMAW

209

$0

Small
Large

12
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

1,673
3

$0
$0

Plasma Cutting

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

22
42

$0
$0

GMAW

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

335
21

$0
$0

Brazing

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

168
4

$0
$0

Metallizing

Small

12

$52.52

2 100%

33

$0

State

12

$52.52

2 100%

0.00%
100.00%
GOVERNMENT
0.00%
95.00%

SMAW

20

$0

Local
State

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

614
0

$0
$0

Plasma Cutting

Local
State

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

8
4

$0
$0

GMAW

Local
State

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

123
2

$0
$0

Brazing

Local
State

12
12

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

61
1

$0
$0

Metallizing

12

$52.52

2 100%

12

$0

12

$52.52

2 100%

0.00%
100.00%
GENERAL INDUSTRY
0.00%
90.00%

4,929

$0

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

5,019
3,615

$0
$0

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large

% NOTSEMI

SEMICONTTIME

Large

Size

Thermal Spray
Tungsten Cutting

SEMI - ANNUALLY

Table 4

Page 19

100.00%
90.00%

CONTCOST

% ABOVEAL

% CONT

# PLANTS

Item 13 COST

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

3,680
1,095

$0
$0

TIG

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

1,115
438

$0
$0

SAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

446
110

$0
$0

Plasma Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

112
110

$0
$0

Plasma Welding

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

112
657

$0
$0

Resistance Welding

Small

0

$52.52

2 100%

669

$0

Large

0

$52.52

2 100%

0.00%
100.00%
MARITIME
0.00%
50.00%

38

$0

SMAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

22
55

$0
$0

GMAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

31
13

$0
$0

TIG

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

7
259

$0
$0

FCAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

147
8

$0
$0

Plasma Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

5
3

$0
$0

Plasma Welding

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

0
8

$0
$0

Oxy-fuel Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

0
3

$0
$0

Air Carbon Arc Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

2
0

$0
$0

% NOTSEMI

SEMICONTTIME

Small
Large

Size

GMAW

SEMI - ANNUALLY

Table 4

Page 20

CONTCOST

% ABOVEAL

% CONT

# PLANTS

Item 13 COST

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

0
0

$0
$0

Thermal Spray
Tungsten Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
50.00%

0
34

$0
$0

SAW

Small

0

$52.52

2 100%

19

$0

Large

0

$52.52

2 100%

0.00%
90.00%
CONSTRUCTION
0.00%
95.00%

313

$0

SMAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

2,368
4

$0
$0

Plasma Cutting

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

31
62

$0
$0

GMAW

Small
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

473
31

$0
$0

Brazing

Small
State

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
95.00%

237
6

$0
$0

Metallizing
SECTOR 3. PAINTING

Local

0

$52.52

2 100%

0.00%

100.00%

47

$0

Large

12

$52.52

2 100%

28.00%

25.00%

50

$4,372

AEROSPACE

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

9.00%
5.00%

75.00%
25.00%

62
330

$5,309
$5,205

General Industry
(Autobody)

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

5.00%
8.00%

75.00%
25.00%

1,454
101

$68,750
$2,545

General Industry (Coil
Coating)

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

8.00%
36.00%

75.00%
10.00%

18
274

$1,388
$12,453

Maritime

Small
Large

12
12

$52.52
$52.52

2 100%
2 100%

36.00%
22.00%

90.00%
25.00%

474
789

$193,772
$54,732

Construction

Small
State

12
12

$52.52
$52.52

2 100%
2 100%

22.00%
12.00%

50.00%
25.00%

4,197
17

$581,941
$646

Government

Local

12

$52.52

2 100%

12.00%

25.00%

945

$35,738

% NOTSEMI

SEMICONTTIME

Small
Large

Size

Electric Torch Cutting

SEMI - ANNUALLY

Table 4

Page 21

% ABOVEAL

% CONT

# PLANTS

Item 13 COST

45.00%

100.00%

2

$1,056

0.00%

0.00%

0

$0

71.00%

100.00%

2

$1,491

50.00%

100.00%

1

$525

33.00%

100.00%

3

$1,078

0.00%

0.00%

0

$0

100.00%

20.00%

5

$1,956

0.00%

0.00%

0

$0

13.00%

75.00%

78

$9,614

13.00%

75.00%

123

$15,107

69.00%

90.00%

2

$1,735

69.00%

90.00%

7

$5,783

51.00%

100.00%

79

$50,905

51.00%

100.00%

39

$24,899

100.00%

80.00%

6

$5,968

100.00%

75.00%

4

$3,730

100.00%

100.00%

1

$1,310

0.00%

0.00%

0

$0

38.00%

90.00%

39

$16,693

38.00%
0.00%

90.00%
90.00%

12
116

$5,354
$0

0.00%

90.00%

37

$0

% NOTSEMI

SEMI - ANNUALLY

CONTCOST

SEMICONTTIME

Size

Table 4

SECTOR 4. PRODUCERS OF CHROMATES
12
$52.52
2 100%
Large
ALL
0
$52.52
2 100%
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
12
$52.52
2 100%
Large
ALL
12
$52.52
2 100%
Small
SECTOR 6. CCA PRODUCERS
12
$52.52
2 100%
Large
ALL
0
$52.52
2 100%
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
20
$52.52
2 100%
Large
ALL
0
$52.52
2 100%
Small
SECTOR 8. PAINT AND COATING PRODUCERS
12
$52.52
2 100%
Large
ALL
12
$52.52
2 100%
Small
SECTOR 9. PRINTING INK PRODUCERS
12
$52.52
2 100%
Large
ALL
12
$52.52
2 100%
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
12
$52.52
2 100%
Large
ALL
12
$52.52
2 100%
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
12
$52.52
2 100%
Large
ALL
12
$52.52
2 100%
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
12
$52.52
2 100%
Large
ALL
0
$52.52
2 0%
Small
SECTOR 14. IRON AND STEEL MILLS
12
$52.52
2 100%
Large
Alloy and Stainless
Steel
12
$52.52
2 100%
Small
0
$52.52
2 100%
Large
Carbon Steel
0
$52.52
2 100%
Small

Page 22

% CONT

# PLANTS

Item 13 COST

2 100%

63.00%

90.00%

33

$23,731

2 100%

63.00%

90.00%

31

$22,362

2 100% 100.00%

90.00%

152

$287,687

2 100% 100.00%

90.00%

111

$125,536

2 100%

38.00%

100.00%

2

$1,197

2 100%

38.00%

100.00%

1

$399

2 100%

0.00%

0.00%

0

$0

2 100%

27.00%

100.00%

5

$1,585

2 100%

0.00%

100.00%

212

$0

2 100%

0.00%

100.00%

1,600

$0

2 100%

0.00%

90.00%

307

$0

2 100%

0.00%

90.00%

623

$0

2 100%

25.00%

90.00%

8

$2,194

2 100%
2 100%

0.00%
20.00%

90.00%
90.00%

24
111

$0
$25,155

2 100%

0.00%

90.00%

6

$0

2 100%

0.00%

90.00%

78

$0

2 100%

0.00%

90.00%

312

$0

2 100%

9.00%

90.00%

193

$19,657

2 100%
2 100%

0.00%
0.00%

90.00%
90.00%

0
25

$0
$0

2 100%

0.00%

90.00%

5

$0

% NOTSEMI

% ABOVEAL

SECTOR 14.B FORGING INDUSTRY
12
$52.52
Large
Reshaping
12
$52.52
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
20
$52.52
Large
ALL
12
$52.52
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
12
$52.52
Large
ALL
12
$52.52
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
$52.52
Large
ALL
12
$52.52
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
$52.52
Large
ALL
0
$52.52
Small
SECTOR 20. TEXTILE DYEING
0
$52.52
Large
ALL
0
$52.52
Small
SECTOR 21. COLORED GLASS PRODUCERS
12
$52.52
Large
General Industry
0
$52.52
Small
12
$52.52
Large
Fiber, Flat, Container
Glass
12
$52.52
Small
SECTOR 22. PRINTING
0
$52.52
Large
ALL
0
$52.52
Small
SECTOR 24. CHROMIUM CATALYST USERS
12
$52.52
Large
Catalyst Users
0
$52.52
Small
12
$52.52
Large
Chromium Catalyst
Service Companies
12
$52.52
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS

SEMI - ANNUALLY

CONTCOST

SEMICONTTIME

Size

Table 4

Page 23

% CONT

# PLANTS

Item 13 COST

0
$52.52
Small
SECTOR 26. WOODWORKING
0
$52.52
Large
General Industry
0
$52.52
Small
0
$52.52
Large
Maritime
0
$52.52
Small
12
$52.52
Large
Construction
12
$52.52
Small
12
$52.52
State
Government
12
$52.52
Local
SECTOR 27. SOLID WASTER INCINERATION
0
$52.52
Large
General Industry
0
$52.52
Small
0
$52.52
State
Government
0
$52.52
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
0
$52.52
Large
ALL
0
$52.52
Small
SECTOR 31. CONSTRUCTION
0
$52.52
Large

2 100%

0.00%

90.00%

5

$0

2 100%

0.00%

90.00%

0

$0

2 100%

0.00%

100.00%

143

$0

2 100%
2 100%

0.00%
0.00%

100.00%
100.00%

76
36

$0
$0

2 100%
2 100%

0.00%
22.00%

100.00%
100.00%

32
1,232

$0
$341,727

2 100%
2 100%

22.00%
22.00%

100.00%
100.00%

4,932
17

$1,367,826
$4,735

2 100%

22.00%

100.00%

62

$17,120

2 100%

0.00%

90.00%

39

$0

2 100%
2 100%

0.00%
0.00%

90.00%
25.00%

47
0

$0
$0

2 100%

0.00%

90.00%

24

$0

2 100%

0.00%

100.00%

18

$0

2 100%

0.00%

0.00%

0

$0

2 100%

0.00%

100.00%

54

$0

% NOTSEMI

$52.52

SEMI - ANNUALLY

0

% ABOVEAL

Large

CONTCOST

ALL

SEMICONTTIME

Size

Table 4

Small
State

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
100.00%

247
16

$0
$0

Local
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

100.00%
90.00%

93
43

$0
$0

Hazardous Waste-site Small
Work
State

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
0.00%

90.00%
90.00%

180
1

$0
$0

Local
Large

0
0

$52.52
$52.52

2 100%
2 100%

0.00%
60.00%

90.00%
90.00%

252
47

$0
$0

Small

0

$52.52

2 100%

60.00%

90.00%
Total

185
78,321

$0
$6,281,224

Industrial
Rehabilitation

Refractory Brick
Restoration

Page 24

Table 5
Semi-Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for a Laboratory to Conduct Analysis of SemiAnnual Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples collected
during semi-annual exposure monitoring.
Variables:

Cost = (SAMPCOST * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVE AL) * #PLANTS
SAMPCOST =
JOBAL =
SHIFTS =
#SAMPS =
SEMI =
%NOTSEMI =
%ABOVEAL =

Variable cost per sample
Number of job categories exposed at or above the AL.
Number of work shifts.
Number of samples per exposure measurement.
2 times per year (semi-annual).
Percent of plants not performing semi-annual monitoring requirements.

JOBAL

SHIFTS

#SAMPS

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

$84

1

2

3

2

100%

49%

837

$413,059

$84
$84

1
1

1
2

3
3

2
2

100%
100%

49%
11%

1,576
403

$388,690
$44,677

$84
$84

1
1

1
2

3
3

2
2

100%
100%

11%
14%

759
550

$42,033
$77,513

$84
$84

1
1

1
2

3
3

2
2

100%
100%

14%
10%

1,035
403

$72,953
$40,615

$84
$84

1
1

1
2

3
3

2
2

100%
100%

10%
13%

759
476

$38,212
$62,356

$84
$84

1
1

1
2

3
3

2
2

100%
100%

13%
16%

897
837

$58,688
$134,877

Small

$84

1

1

3

2

1,576

$126,919

Large

$84

1

3

2

2

100%
16%
GENERAL INDUSTRY
100%
1%

3,676

$34,048

Small
Large

$84
$84

1
1

1
3

3
2

2
2

100%
100%

1%
1%

4,120
2,697

$19,076
$19,818

Small

$84

1

1

3

2

100%

1%

3,021

$11,101

Size

SAMPCOST

Percent of plants that have an employee in at least one job category at or above the AL.
#PLANTS = Number of plants represented by the model input.

SECTOR 1. ELECTROPLATING
Large
Hard Chrome
Small
Large
Job Shop Chrome Plater
Small
Large
Captive Shop Chrome
Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Operator
Large

SECTOR 2A. WELDING
SMAW

GMAW

Page 25

JOBAL

SHIFTS

#SAMPS

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

Large

$84

1

3

2

2

100%

0%

817

$0

Small
Large

$84
$84

1
0

1
3

3
2

2
2

100%
100%

0%
0%

915
327

$0
$0

Small
Large

$84
$84

0
1

1
3

3
2

2
2

100%
100%

0%
0%

366
81

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

2
2

100%
100%

0%
0%

91
81

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

2
2

100%
100%

0%
0%

91
490

$0
$0

Small

$84

1

1

3

2

550

$0

Large

$84

1

3

1

2

100%
0%
MARITIME
100%
0%

18

$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

10
25

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

14
6

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

3
121

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

68
4

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

2
2

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

1
4

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

2
2

100%
100%

0%
0%

2
2

$0
$0

Small
Large

$84
$84

1
0

2
3

1
1

2
2

100%
100%

0%
0%

1
0

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

0
0

$0
$0

Size

SAMPCOST

Table 5

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten

Page 26

GMAW

Brazing

Metallizing

Item 13 COST

Plasma Cutting

#PLANTS

SMAW

$0

0%
0%

1,673
3

$0
$0

100%
100%

0%
0%

22
42

$0
$0

2
2

100%
100%

0%
0%

335
21

$0
$0

1
1

2
2

100%
100%

0%
0%

168
4

$0
$0

1

1

2

33

$0

1

1

1

2

100%
0%
GOVERNMENT
100%
0%

20

$0

$84
$84

1
1

1
1

1
1

2
2

100%
100%

0%
0%

614
0

$0
$0

Local
State

$84
$84

1
1

1
1

1
1

2
2

100%
100%

0%
0%

8
4

$0
$0

Local
State

$84
$84

1
1

1
1

1
1

2
2

100%
100%

0%
0%

123
2

$0
$0

Local
State

$84
$84

1
1

1
1

1
1

2
2

100%
100%

0%
0%

61
1

$0
$0

$84

1

1

1

2

12

$0

$84

0

3

2

2

100%
0%
GENERAL INDUSTRY
100%
0%

4,929

$0

$84
$84

0
0

1
3

3
2

2
2

100%
100%

0%
0%

5,019
3,615

$0
$0

$84

0

1

3

2

100%

0%

3,680

$0

%NOTSEMI

Metallizing

209

SEMI

Brazing

$0

#SAMPS

GMAW

9

SHIFTS

Plasma Cutting

$0
$0

JOBAL

SMAW

0
16

SAMPCOST

SAW

0%
0%

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

Small

$84

0

2

1

2

Large

$84

1

3

1

2

100%
0%
CONSTRUCTION
100%
0%

Small
Large

$84
$84

1
0

1
3

1
1

2
2

100%
100%

Small
Large

$84
$84

1
1

1
3

1
1

2
2

Small
State

$84
$84

1
1

1
3

1
1

Local
State

$84
$84

1
1

1
3

Local

$84

1

State

$84

Local
State

Size

Thermal Spray Tungsten
Cutting

%ABOVEAL

Table 5

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small

Page 27

JOBAL

SHIFTS

#SAMPS

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

Large

$84

0

3

2

2

100%

0%

1,095

$0

Small
Large

$84
$84

0
0

1
3

3
2

2
2

10000%
100%

0%
0%

1,115
438

$0
$0

Small
Large

$84
$84

0
0

1
3

3
2

2
2

100%
100%

0%
0%

446
110

$0
$0

Small
Large

$84
$84

0
0

1
3

3
2

2
2

100%
100%

0%
0%

112
110

$0
$0

Small
Large

$84
$84

0
0

1
3

3
2

2
2

100%
100%

0%
0%

112
657

$0
$0

Small

$84

0

1

3

2

669

$0

Large

$84

0

3

1

2

100%
0%
MARITIME
100%
0%

38

$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

22
55

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

31
13

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

7
259

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

147
8

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

5
3

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

0
8

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

0
3

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

2
0

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

0%
0%

0
0

$0
$0

Size

SAMPCOST

Table 5

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten

Page 28

#PLANTS

Item 13 COST

313

$0

0%
0%

2,368
4

$0
$0

100%
100%

0%
0%

31
62

$0
$0

2
2

100%
100%

0%
0%

473
31

$0
$0

1
1

2
2

100%
100%

0%
0%

237
6

$0
$0

1

1

2

100%

0%

47

$0

1

3

3

2

100%

28%

50

$20,950

$84
$84

1
1

1
1

3
1

2
2

100%
100%

9%
5%

62
330

$2,827
$2,771

Small
Large

$84
$84

1
1

1
2

1
3

2
2

100%
100%

5%
8%

1,454
101

$12,201
$8,129

Small
Large

$84
$84

1
2

1
3

3
1

2
2

100%
100%

8%
36%

18
274

$739
$99,448

Small
Large

$84
$84

0
1

1
3

1
1

2
2

100%
100%

36%
22%

474
789

$0
$87,418

Small
State

$84
$84

1
1

1
3

1
1

2
2

100%
100%

22%
12%

4,197
17

$154,914
$1,031

Local
$84
SECTOR 4. PRODUCERS OF CHROMATES
Large
$84
ALL
Small
$84

1

1

1

2

100%

12%

945

$19,027

3

3

3

2

100%

45%

2

$3,797

0

1

3

2

100%

0%

0

$0

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
AEROSPACE
General Industry
(Autobody)
General Industry (Coil
Coating)
Maritime

Construction

Government

Small
Large

$84
$84

0
0

2
3

1
1

2
2

100%
100%

Small

$84

0

2

1

2

Large

$84

0

3

1

2

100%
0%
CONSTRUCTION
100%
0%

Small
Large

$84
$84

0
0

1
3

1
1

2
2

100%
100%

Small
Large

$84
$84

0
0

1
3

1
1

2
2

Small
Large

$84
$84

0
0

1
3

1
1

Small
Large

$84
$84

0
0

1
3

Small

$84

0

Large

$84

Small
Large

Size

%NOTSEMI

$0

SEMI

19

SAW

#SAMPS

$0
$0

SHIFTS

0
34

JOBAL

0%
0%

Thermal Spray Tungsten
Cutting

SAMPCOST

%ABOVEAL

Table 5

Page 29

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
$84
5
2
ALL
Small
$84
1
1
SECTOR 6. CCA PRODUCERS
Large
$84
1
3
ALL
Small
$84
0
3
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
$84
6
3
ALL
Small
$84
0
1
SECTOR 8. PAINT AND COATING PRODUCERS
Large
$84
1
2
ALL
Small
$84
1
2
SECTOR 9. PRINTING INK PRODUCERS
Large
$84
3
1
ALL
Small
$84
2
1
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
$84
2
3
ALL
Small
$84
2
1
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
$84
1
1
ALL
Small
$84
1
1
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
$84
2
3
ALL
Small
$84
0
1
SECTOR 14. IRON AND STEEL MILLS
Large
$84
3
3
Alloy Stainless Steel
Small
$84
1
1
Large
$84
0
3
Carbon Steel
Small
$84
0
1
SECTOR 14.B FORGING INDUSTRY
Large
$84
4
1
Forging Industry
Small
$84
2
1
SECTOR 15. IRON AND STEEL FOUNDRIES

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Size

Table 5

3

2

100%

71%

2

$5,955

3

2

100%

50%

1

$210

3

2

100%

33%

3

$1,291

0

2

100%

0%

0

$0

3

2

100%

100%

5

$42,184

3

2

100%

0%

0

$0

3

2

100%

13%

78

$10,237

3

2

100%

13%

123

$16,086

9

2

100%

69%

2

$6,928

5

2

100%

69%

7

$8,553

3

2

100%

51%

79

$121,960

3

2

100%

51%

39

$19,885

3

2

100%

100%

6

$2,979

3

2

100%

100%

4

$1,986

3

2

100%

100%

1

$3,138

1

2

0%

0%

0

$0

3

2

100%

38%

39

$66,656

3
3

2
2

100%
100%

38%
0%

12
116

$2,376
$0

1

2

100%

0%

37

$0

3

2

100%

63%

33

$42,116

3

2

100%

63%

31

$19,843

Page 30

JOBAL

SHIFTS

#SAMPS

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

$84

6

3

5

2

100%

100%

152

$2,297,486

Small
$84
5
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
$84
6
ALL
Small
$84
6
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
$84
0
ALL
Small
$84
1
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
$84
0
ALL
Small
$84
0
SECTOR 20. TEXTILE DYEING
Large
$84
0
ALL
Small
$84
0
SECTOR 21. COLORED GLASS PRODUCERS
Large
$84
1
General Industry
Small
$84
0
Large
$84
3
Fiber, Flat, and Container
Glass
Small
$84
0
SECTOR 22. PRINTING
Large
$84
0
ALL
Small
$84
0
SECTOR 24. CHROMIUM CATALYST USERS
Large
$84
2
Catalyst User
Small
$84
0
Large
$84
0
Chromium Catalyst Service
Companies
Small
$84
0
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
$84
0
ALL
Small
$84
0
SECTOR 26. WOODWORKING
Large
$84
0
General Industry

1

5

2

100%

100%

111

$464,139

1

21

2

100%

38%

2

$20,078

1

7

2

100%

38%

1

$2,231

1

3

2

100%

0%

0

$0

1

3

2

100%

27%

5

$633

1

3

2

100%

0%

212

$0

1

3

2

100%

0%

1,600

$0

3

3

2

100%

0%

307

$0

1

2

2

100%

0%

623

$0

3

12

2

100%

25%

8

$11,680

1
1

4
1

2
2

100%
100%

0%
20%

24
111

$0
$11,161

1

1

2

100%

0%

6

$0

3

2

2

100%

0%

78

$0

1

2

2

100%

0%

312

$0

3

3

2

100%

9%

193

$52,327

1
3

3
3

2
2

100%
100%

0%
0%

0
25

$0
$0

1

3

2

100%

0%

5

$0

1

15

2

100%

0%

5

$0

1

0

2

100%

0%

0

$0

1

2

2

100%

0%

143

$0

Size

SAMPCOST

Table 5

ALL

Large

Page 31

JOBAL

SHIFTS

#SAMPS

SEMI

%NOTSEMI

%ABOVEAL

#PLANTS

Item 13 COST

Small
Large

$84
$84

0
0

1
1

2
1

2
2

100%
100%

0%
0%

76
36

$0
$0

Small
Large

$84
$84

0
1

1
1

1
1

2
2

100%
100%

0%
22%

32
1,232

$0
$45,484

Small
State

$84
$84

1
1

1
1

1
1

2
2

100%
100%

22%
22%

4,932
17

$182,059
$630

Local
$84
1
SECTOR 27. SOLID WASTER INCINERATION
Large
$84
0
General Industry
Small
$84
0
State
$84
0
Government
Local
$84
0
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
$84
0
ALL
Small
$84
0
SECTOR 31. CONSTRUCTION
Large
$84
0

1

1

2

100%

22%

62

$2,279

3

15

2

100%

0%

39

$0

1
3

3
15

2
2

100%
100%

0%
0%

47
0

$0
$0

1

3

2

100%

0%

24

$0

3

3

2

100%

0%

18

$0

3

3

2

100%

0%

0

$0

1

1

2

100%

0%

54

$0

Size

SAMPCOST

Table 5

Maritime

Construction

Government

Industrial Rehabilitation

Hazardous Waste-site
Work

Refractory Brick
Restoration

Small
State

$84
$84

0
0

1
1

1
1

2
2

100%
100%

0%
0%

247
16

$0
$0

Local
Large

$84
$84

0
0

1
1

1
1

2
2

100%
100%

0%
0%

93
43

$0
$0

Small
State

$84
$84

0
0

1
1

1
1

2
2

100%
100%

0%
0%

180
1

$0
$0

Local
Large

$84
$84

0
0

1
1

1
1

2
2

100%
100%

0%
60%

252
47

$0
$0

Small

$84

0

1

1

2

100%

60%
TOTAL

185
78,321

$0
$5,460,453

Page 32

Table 3

TABLE 3: Semi-Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Employee Time and Cost to Conduct Semi-Annual Exposure Monitoring
This table calculates the burden hours and cost of employee time to conduct semi-annual exposure monitoring. When initial monitoring results equal or exceed the AL and are at or below
the PEL, employers must continue to monitor employees at least every 6 months to ensure that exposures remain at or below the PEL.

SECTOR 1. ELECTROPLATING
Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
SECTOR 2A. WELDING
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

#PLANTS

%LEARN

%INHOUSE

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

#SAMPS

SHIFTS

JOBAL

In-house administrative time (e.g., for pump calibration and report writing) per sample, in hours.
Non-supervisory wage rate. $/hr.
Number of job categories exposed at or above the AL
Number of work shifts.
Number of samples per exposure measurement
# times per year (semi-annually)
Percent of plants not performing semi-annual monitoring requirements.
Percent of plants that have an employee in at least one job category at or above the AL.
Percent of plants already with in-house monitoring capabilities.
Percent of plants that will develop in-house monitoring capability.
Number of plants represented by the model input.

SIZE

ADMINTIME =
NONSUPEWAGE =
JOBAL =
SHIFTS =
#SAMPS =
SEMI-ANNUALLY =
%NOTSEMI =
%ABOVEAL =
%INHOUSE =
%LEARN =
#PLANTS =

VARIABLES

Variables:

COST= BURDEN HOURS * NON SUPEWAGE
BURDEN HOURS = (ADMINTIME * NONSUPEWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * (%INHOUSE + %LEARN) * #PLANTS)

Large

1

2

3

2 100%

49%

0%

0%

837

-

-

0.5

-

$32.54 $

-

Small
Large

1
1

1
2

3
3

2 100%
2 100%

49%
11%

0%
0%

0%
0%

1,576
403

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
2

3
3

2 100%
2 100%

11%
14%

0%
0%

0%
0%

759
550

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
2

3
3

2 100%
2 100%

14%
10%

0%
0%

0%
0%

1,035
403

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
2

3
3

2 100%
2 100%

10%
13%

0%
0%

0%
0%

759
476

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
2

3
3

2 100%
2 100%

13%
16%

0%
0%

0%
0%

897
837

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small

1

1

3

2 100%

16%

0%

0%

0.5

-

$32.54 $

-

Large

1

3

2

2 100%

1%

10%

0%

1,576
GENERAL INDUSTRY
3,676
20
41

0.5

20

$32.54 $

660

Small
Large

1
1

1
3

3
2

2 100%
2 100%

1%
1%

0%
10%

0%
0%

4,120
2,697

12

24

1.0
0.5

12

$32.54 $
$32.54 $

384

Small
Large

1
1

1
3

3
2

2 100%
2 100%

1%
0%

0%
10%

0%
0%

3,021
817

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

915
327

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
1

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

366
81

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

91
81

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

91
490

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small

1

1

3

2 100%

0%

0%

0%

550

-

1.0

-

$32.54 $

-

Large

1

3

1

2 100%

0%

50%

0%

18

-

0.5

-

$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

10
25

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

14
6

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
3
0%
121
Page 33

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

MARITIME
-

FCAW

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

#PLANTS

%LEARN

%INHOUSE

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

#SAMPS

SHIFTS

JOBAL

SIZE

VARIABLES

Table 3

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

68
4

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

2
2

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

1
4

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

2
2

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

1
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
16

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small

0

2

1

2 100%

0%

10%

0%

9

-

1.0

-

$32.54 $

-

Large

1

3

1

2 100%

0%

5%

0%

-

0.5

-

$32.54 $

-

Small
Large

1
0

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

1,673
3

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

1
1

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

22
42

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
State

1
1

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

335
21

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
State

1
1

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

168
4

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local

1

1

1

2 100%

0%

0%

0%

33

-

1.0

-

$32.54 $

-

State

1

1

1

2 100%

0%

5%

0%

-

0.5

-

$32.54 $

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

614
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

8
4

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

123
2

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

61
1

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large

1

1

1

2 100%

0%

0%

0%

-

1.0

-

$32.54 $

-

0

3

2

2 100%

0%

10%

0%

12
GENERAL INDUSTRY
4,929
-

-

0.5

-

$32.54 $

-

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

5,019
3,615

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

3,680
1,095

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

1,115
438

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

446
110

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
112
0%
Page 34110

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten
Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

CONSTRUCTION
209
-

GOVERNMENT
20
-

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten
Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
Aerospace

General Industry (Autobody)
General Industry (Coil
Coating)
Maritime

Construction

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

#PLANTS

%LEARN

%INHOUSE

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

#SAMPS

SHIFTS

JOBAL

SIZE

VARIABLES

Table 3

-

1.0
0.5

-

$32.54 $
$32.54 $

-

-

1.0

-

$32.54 $

-

-

0.5

-

$32.54 $

-

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

31
13

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0%
0%

7
259

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

10%
50%

0%
0%

147
8

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0%
0%

10%
50%

0%
0%

5
3

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
8

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
3

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

2
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

0
34

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small

0

2

1

2 100%

0%

10%

0%

19

-

1.0

-

$32.54 $

-

Large

0

3

1

2 100%

0%

5%

0%

-

0.5

-

$32.54 $

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

2,368
4

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

31
62

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

473
31

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0%
0%

0%
5%

0%
0%

237
6

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small

0

1

1

2 100%

0%

0%

0%

1.0

-

$32.54 $

-

Large

1

3

3

2 100%

28%

75%

0%

47
GENERAL INDUSTRY
50
94
187

0.5

94

$32.54 $

3,048

Small
Large

1
1

1
1

3
1

2 100%
2 100%

9%
5%

25%
75%

0%
0%

62
330

4
12

8
25

1.0
0.5

8
12

$32.54 $
$32.54 $

274
403

Small
Large

1
1

1
2

1
3

2 100%
2 100%

5%
8%

25%
75%

0%
0%

1,454
101

18
36

36
73

1.0
0.5

36
36

$32.54 $
$32.54 $

1,183
1,182

Small
Large

1
2

1
3

3
1

2 100%
2 100%

8%
36%

25%
90%

0%
0%

18
274

1
533

2
1,067

1.0
0.5

2
533

$32.54 $
$32.54 $

72
17,360

Small
Large

0
1

1
3

1
1

2 100%
2 100%

36%
22%

10%
75%

0%
0%

474
789

391

782

1.0
0.5

391

$32.54 $
$32.54 $

12,716

Small

1

1

1

2 100%

22%

50%

0%
4,197
Page 35

462

923

1.0

923

$32.54 $

30,046

Small
Large

0
0

1
3

3
2

2 100%
2 100%

0%
0%

0%
10%

0%
0%

112
657

Small

0

1

3

2 100%

0%

0%

0%

669

Large

0

3

1

2 100%

0%

50%

0%

38

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

22
55

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

0%
0%

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

10%
50%

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0%
0%

Small
Large

0
0

2
3

1
1

2 100%
2 100%

Small
Large

0
0

2
3

1
1

Small
Large

0
0

2
3

Small
Large

0
0

Small
Large

MARITIME
-

CONSTRUCTION
313
-

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS
17

5

9

0.5

5

$32.54 $

150

Local
1
1
1
SECTOR 4. PRODUCERS OF CHROMATES
Large
3
3
3
All
Small
0
1
3
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
5
2
3
All
Small
1
1
3
SECTOR 6. CCA PRODUCERS
Large
1
3
3
All
Small
0
3
0
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
6
3
3
All
Small
0
1
3
SECTOR 8. PAINT AND COATING PRODUCERS
Large
1
2
3
All
Small
1
2
3
SECTOR 9. PRINTING INK PRODUCERS
Large
3
1
9
All
Small
2
1
5
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
2
3
3
All
Small
2
1
3
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
1
1
3
All
Small
1
1
3
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
2
3
3
All
Small
0
1
1
SECTOR 14. IRON AND STEEL MILLS
Large
3
3
3
Alloy and Stainless Steel
Small
1
1
3
Large
0
3
3
Carbon Steel
Small
0
1
1
SECTOR 14.B FORGING INDUSTRY
Large
4
1
3
Reshaping
Small
2
1
3
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
6
3
5
All
Small
5
1
5
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
6
1
21
All
Small
6
1
7
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
0
1
3
All
Small
1
1
3
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
0
1
3
All
Small
0
1
3
SECTOR 20. TEXTILE DYEING
Large
0
3
3
All
Small
0
1
2
SECTOR 21. COLORED GLASS PRODUCERS
Large
1
3
12

2 100%

12%

75%

0%

945

85

170

1.0

170

$32.54 $

5,536

2 100%

45%

0%

0%

2

-

-

0.5

-

$32.54 $

-

2 100%

0%

0%

0%

0

-

-

1.0

-

$32.54 $

-

2 100%

71%

0%

0%

2

-

-

0.5

-

$32.54 $

-

2 100%

50%

0%

0%

1

-

-

1.0

-

$32.54 $

-

2 100%

33%

0%

0%

3

-

-

0.5

-

$32.54 $

-

2 100%

0%

0%

0%

0

-

-

1.0

-

$32.54 $

-

2 100% 100%

80%

0%

5

201

402

0.5

201

$32.54 $

6,545

SHIFTS

#PLANTS

0%

3

%LEARN

%INHOUSE
75%

1

#SAMPS

12%

State

JOBAL

2 100%

Government

SIZE

1

VARIABLES

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

Table 3

2 100%

0%

0%

0%

0

-

-

1.0

-

$32.54 $

-

2 100%

13%

25%

0%

78

15

31

0.5

15

$32.54 $

496

2 100%

13%

25%

0%

123

24

48

1.0

48

$32.54 $

1,560

2 100%

69%

10%

0%

2

4

8

0.5

4

$32.54 $

134

2 100%

69%

10%

0%

7

5

10

0.5

5

$32.54 $

166

2 100%

51%

0%

0%

79

-

-

0.5

-

$32.54 $

-

2 100%

51%

0%

0%

39

-

-

1.0

-

$32.54 $

-

2 100% 100%

20%

0%

6

4

7

0.5

4

$32.54 $

116

2 100% 100%

25%

0%

4

3

6

1.0

6

$32.54 $

193

2 100% 100%

0%

0%

1

-

-

0.5

-

$32.54 $

-

0%

0%

0%

0%

0

-

-

1.0

-

$32.54 $

-

2 100%

38%

10%

0%

39

40

79

0.5

40

$32.54 $

1,293

2 100%
2 100%

38%
0%

10%
10%

0%
0%

12
116

1
-

3
-

1.0
0.5

3
-

$32.54 $
$32.54 $

92
-

2 100%

0%

10%

0%

37

-

-

1.0

-

$32.54 $

-

2 100%

63%

10%

0%

33

25

50

0.5

25

$32.54 $

817

2 100%

63%

10%

0%

31

12

24

1.0

24

$32.54 $

770

2 100% 100%

10%

0%

152

1,369

2,739

0.5

1,369

$32.54 $

44,561

2 100% 100%

10%

0%

111

277

553

1.0

553

$32.54 $

18,004

2

2 100%

38%

0%

0%

2

-

-

0.5

-

$32.54 $

-

2 100%

38%

0%

0%

1

-

-

1.0

-

$32.54 $

-

2 100%

0%

0%

0%

0

-

-

0.5

-

$32.54 $

-

2 100%

27%

0%

0%

5

-

-

0.5

-

$32.54 $

-

2 100%

0%

0%

0%

212

-

-

0.5

-

$32.54 $

-

2 100%

0%

0%

0%

1,600

-

-

0.5

-

$32.54 $

-

2 100%

0%

10%

0%

307

-

-

0.5

-

$32.54 $

-

2 100%

0%

10%

0%

623

-

-

0.5

-

$32.54 $

-

2 100%

25%

10%

Page 36 8
0%

7

14

0.5

7

$32.54 $

227

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

0%
20%

10%
10%

0%
0%

24
111

7

13

1.0
0.5

7

$32.54 $
$32.54 $

216

Small

0

1

1

2 100%

0%

10%

0%

6

-

-

1.0

-

$32.54 $

-

Large

0

3

2

2 100%

0%

10%

0%

78

-

-

0.5

-

$32.54 $

-

Small
0
1
SECTOR 24. CHROMIUM CATALYST USERS
Large
2
3
Catalyst Users
Small
0
1
Large
0
3
Chromium Catalyst Service
Companies
Small
0
1
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
0
1
All
0
1
Small
SECTOR 26. WOODWORKING
Large
0
1
General Industry
Small
0
1
Large
0
1
Maritime
Small
0
1
Large
1
1
Construction
Small
1
1
State
1
1
Government
Local
1
1
SECTOR 27. SOLID WASTER INCINERATION
Large
0
3
General Industry
0
1
Small
State
0
3
Government
Local
0
1
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
0
3
All
Small
0
3
SECTOR 31. CONSTRUCTION
0
1
Large

2

2 100%

0%

10%

0%

312

-

-

0.5

-

$32.54 $

-

3

2 100%

9%

10%

0%

193

31

62

0.5

31

$32.54 $

1,015

3
3

2 100%
2 100%

0%
0%

10%
10%

0%
0%

0
25

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

3

2 100%

0%

10%

0%

5

-

-

1.0

-

$32.54 $

-

15

2 100%

0%

10%

0%

5

-

-

0.5

-

$32.54 $

-

0

2 100%

0%

10%

0%

0

-

-

0.5

-

$32.54 $

-

2

2 100%

0%

0%

0%

143

-

-

0.5

-

$32.54 $

-

2
1

2 100%
2 100%

0%
0%

0%
0%

0%
0%

76
36

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

1
1

2 100%
2 100%

0%
22%

0%
0%

0%
0%

32
1,232

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

1
1

2 100%
2 100%

22%
22%

0%
0%

0%
0%

4,932
17

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

1

2 100%

22%

0%

0%

62

-

-

1.0

-

$32.54 $

-

15

2 100%

0%

10%

0%

39

-

-

0.5

-

$32.54 $

-

3
15

2 100%
2 100%

0%
0%

10%
10%

0%
0%

47
0

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

3

2 100%

0%

10%

0%

24

-

-

1.0

-

$32.54 $

-

3

2 100%

0%

0%

0%

18

-

-

0.5

-

$32.54 $

-

3

2 100%

0%

0%

0%

0

-

-

1.0

-

$32.54 $

-

1

2 100%

0%

0%

0%

54

-

-

0.5

-

$32.54 $

-

Fiber, Flat, Container Glass
SECTOR 22. PRINTING
All

SHIFTS

#PLANTS

2 100%
2 100%

General Industry

%LEARN

%INHOUSE

4
1

#SAMPS
1
1

JOBAL
0
3

SIZE

Small
Large

VARIABLES

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

Table 3

Small
State

0
0

1
1

1
1

2 100%
2 100%

0%
0%

0%
0%

0%
0%

247
16

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
Large

0
0

1
1

1
1

2 100%
2 100%

0%
0%

0%
10%

0%
0%

93
43

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
State

0
0

1
1

1
1

2 100%
2 100%

0%
0%

10%
10%

0%
0%

180
1

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Local
Large

0
0

1
1

1
1

2 100%
2 100%

0%
60%

10%
10%

0%
0%

252
47

-

-

1.0
0.5

-

$32.54 $
$32.54 $

-

Small
Weighted Average/Average/Total

0

1

1

2 100%
2

60%

10%

0%

185
78,321

$32.54 $
$32.54 $

149,261

Industrial Rehabilitation

Hazardous Waste-site Work

Refractory Brick Restoration

Page 37

3,699

7,398

1.0
0.62

4,587

Table 6

TABLE 6: Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Employee Time and Cost to Conduct Quarterly Exposure Monitoring
When initial monitoring results exceed the PEL, periodic monitoring every three months allows the employer to maintain an accurate profile of employee exposures. If
the employer installs or upgrades controls, quarterly monitoring will demonstrate whether the controls are working properly.

0%

0%

837

-

-

0.5

-

$ 32.54

$

-

Small
Large

0
0

1
2

3
3

4
4

100%
100%

0%
0%

0%
0%

0%
0%

1,576
403

-

-

0.5
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

1
2

3
3

4
4

100%
100%

0%
0%

0%
0%

0%
0%

759
550

-

-

0.5
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

1
2

3
3

4
4

100%
100%

0%
0%

0%
0%

0%
0%

1,035
403

-

-

0.5
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

1
2

3
3

4
4

100%
100%

0%
0%

0%
0%

0%
0%

759
476

-

-

0.5
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

1
2

3
3

4
4

100%
100%

0%
0%

0%
0%

0%
0%

897
837

-

-

0.5
0.5

-

$ 32.54
$ 32.54

$
$

-

Small

1

1

3

4

100%

0%

0%

0%

1,576

-

-

0.5

-

$ 32.54

$

-

428

0.5

214

$ 32.54

$

6,963

$ 32.54 $
$ 32.54 $

390

ITEM 12 COST

BURDEN HOURS

RESPONSES

# PLANTS

NONSUPEWAGE

0%

ADMINTIME

0%

RESPONDENTS

4

% LEARN

3

% INHOUSE

2

% ABOVEPEL

*4 TIMES PER YEAR
(QUARTERLY)

0

% NOTQUART

# SAMPS

Large

SHIFTS

JOBPEL

In-house administrative time
Non-supervisory wage rate, $/hr
Number of job categories exposed above the PEL
Number of work shifts.
Number of samples per exposure measurement.
Percent of plants not performing quarterly monitoring requirements.
Percent of plants that have an employee in at least one job category above the PEL.
Percent of plantsalready with in-house monitoring capabilities.
Percent of plants that will develop in house monitoring capability.
Number of plants represented by the model output.

SIZE

ADMINTIME =
NONSUPEWAGE =
JOBPEL =
SHIFTS =
#SAMPS =
%NOTQUART =
%ABOVEPEL =
%INHOUSE =
%LEARN =
#PLANTS =

VARIABLES

Variables:

BURDEN HOURS = (ADMINTIME * JOBPEL * SHIFTS * #SAMPS * 4* %NOTQUART * %ABOVEPEL * (%INHOUSE + %LEARN)) * #PLANTS
COST = (NONSUPEWAGE * BURDEN HOURS)

SECTOR 1. ELECTROPLATING
Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater
Captive Shop Plater
Operator
SECTOR 2A. WELDING
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Large

1

3

2

4

100%

5%

10%

GENERAL INDUSTRY
0%
107
3676

Small
Large

1
1

1
3

3
2

4
4

100%
100%

5%
0%

0%
10%

0%
0%

4,120
2697

6

24

1.0
0.5

12

Small
Large

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

3,021
817

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
0

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

915
327

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

366
81

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

91
81

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

91
490

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Page 38

1

100%

0%

0%

0%

550

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

# PLANTS

% LEARN

% INHOUSE

4

% ABOVEPEL

3

% NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

1

# SAMPS

Small

SHIFTS

JOBPEL

Resistance Welding

SIZE

VARIABLES

Table 6

-

-

1.0

-

$ 32.54

$

-

MARITIME
SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten
Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Large

1

3

1

4

100%

0%

50%

0%

18

-

-

0.5

-

$ 32.54

$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

10
25

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

14
6

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

3
121

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

68
4

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

2
2

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

1
4

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
1

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

2
2

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

1
0

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
0

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
16

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small

1

2

1

4

100%

0%

10%

0%

9

-

-

1.0

-

$ 32.54

$

-

-

0.5

-

$ 32.54

$

-

Large

1

3

1

4

100%

0%

5%

0%

CONSTRUCTION
209

Small
Large

1
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

1,673
3

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

1
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

22
42

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
State

1
1

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

335
21

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
State

1
1

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

168
4

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local

1

1

1

4

100%

0%

0%

0%

-

1.0

-

$ 32.54

$

-

State

1

1

1

4

100%

0%

5%

0%

33
GOVERNMENT
20

-

0.5

-

$ 32.54

$

-

Local
State

1
1

1
1

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Page 39

614
0

-

0%
0%

8
4

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
State

1
1

1
1

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

123
2

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
State

1
1

1
1

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

61
1

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

1

1

1

4

100%

0%

0%

0%

12

-

GMAW

Brazing

Metallizing

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

ITEM 12 COST

BURDEN HOURS

RESPONSES

# PLANTS

NONSUPEWAGE

0%
5%

ADMINTIME

0%
0%

RESPONDENTS

100%
100%

% LEARN

4
4

% INHOUSE

1
1

% ABOVEPEL

*4 TIMES PER YEAR
(QUARTERLY)

1
1

Plasma Cutting

% NOTQUART

# SAMPS

1
1

SHIFTS

JOBPEL

Local
State

VARIABLES

SIZE

Table 6

-

1.0

-

$ 32.54

$

-

-

0.5

-

$ 32.54

$

-

1

3

2

4

100%

0%

10%

GENERAL INDUSTRY
0%
4,929
-

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

5,019
3,615

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

3,680
1,095

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

1
0

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

1,115
438

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

0
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

446
110

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

112
110

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

1
1

1
3

3
2

4
4

100%
100%

0%
0%

0%
10%

0%
0%

112
657

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

1

1

3

4

100%

0%

0%

0%

-

1.0

-

$ 32.54

$

-

Large

0

3

1

4

100%

0%

50%

0%

669
MARITIME
38
-

-

0.5

-

$ 32.54

$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

22
55

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

31
13

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

7
259

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

147
8

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

5
3

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
8

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
3

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Page 40

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

Maritime

Construction

Government

10%
50%

0%
0%

2
0

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
0

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

2
3

1
1

4
4

100%
100%

0%
0%

10%
50%

0%
0%

0
34

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small

0

2

1

4

100%

0%

10%

0%

-

1.0

-

$ 32.54

$

-

Large

0

3

1

4

100%

0%

5%

0%

19
CONSTRUCTION
313
-

-

0.5

-

$ 32.54

$

-

Small
Large

0
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

2,368
4

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
Large

0
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

31
62

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
State

0
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

473
31

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
State

0
0

1
3

1
1

4
4

100%
100%

0%
0%

0%
5%

0%
0%

237
6

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local

0

1

1

4

100%

0%

0%

0%

47

-

-

1.0

-

$ 32.54

$

-

Large

1

3

3

4

100% 28%

75%

0%

50

94

375

0.5

187

$ 32.54

$

6,095

Small
Large

1
0

1
1

3
1

4
4

100%
100%

9%
5%

25%
75%

0%
0%

62
330

4
-

17
-

1.0
0.5

17
-

$ 32.54 $
$ 32.54 $

548
-

Small
Large

2
0

1
2

1
3

4
4

100%
100%

5%
8%

25%
75%

0%
0%

1,454
101

36
-

145
-

1.0
0.5

145
-

$ 32.54
$ 32.54

$
$

4,733
-

Small
Large

0
1

1
3

3
1

4
4

100% 8%
100% 36%

25%
90%

0%
0%

18
274

267

1,067

1.0
0.5

533

$ 32.54
$ 32.54

$
$

17,360

Small
Large

1
1

1
3

1
1

4
4

100% 36%
100% 22%

10%
75%

0%
0%

474
789

17
391

68
1,563

1.0
0.5

68
782

$ 32.54
$ 32.54

$
$

2,223
25,433

Small
Large

1
1

1
3

1
1

4
4

100% 22%
100% 12%

50%
75%

0%
0%

4,197
17

462
5

1,847
18

1.0
0.5

1,847
9

$ 32.54 $
$ 32.54 $

60,093
300

1

1

4

100% 12%

75%

0%

945

85

340

1.0

340

$ 32.54

$

11,071

3

3

4

100%

0%

0%

0%

2

-

-

0.5

-

$ 32.54

$

-

1

3

4

100%

0%

0%

0%

0

-

-

1.0

-

$ 32.54

$

-

2

3

4

100% 77%

0%

0%

2

-

-

0.5

-

$ 32.54

$

-

1

3

4

100%

0%

0%

0%

1

-

-

1.0

-

$ 32.54

$

-

3

3

4

100%

0%

0%

0%

3

-

-

0.5

-

$ 32.54

$

-

3

0

4

100%

0%

0%

0%

0

-

-

1.0

-

$ 32.54

$

-

Small
1
SECTOR 4. PRODUCERS OF CHROMATES
Large
0
All
Small
0
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
1
All
Small
0
SECTOR 6. CCA PRODUCERS
Large
0
All
Small
0

Page 41

ITEM 12 COST

BURDEN HOURS

RESPONSES

# PLANTS

NONSUPEWAGE

0%
0%

ADMINTIME

100%
100%

RESPONDENTS

4
4

% LEARN

1
1

% INHOUSE

2
3

% ABOVEPEL

0
0

% NOTQUART

Small
Large

SHIFTS

*4 TIMES PER YEAR
(QUARTERLY)

SAW

# SAMPS

Thermal Spray Tungsten
Cutting

JOBPEL

Electric Torch Cutting

SIZE

VARIABLES

Table 6

SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
0
3
3
All
Small
0
1
3
SECTOR 8. PAINT AND COATING PRODUCERS
Large
0
2
3
All
Small
0
2
3
SECTOR 9. PRINTING INK PRODUCERS
Large
0
1
9
All
Small
0
1
5
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
3
3
3
All
Small
5
1
3
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
0
1
3
All
Small
0
1
3
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
0
3
3
All
Small
0
1
1
SECTOR 14. IRON AND STEEL MILLS
Large
0
3
3
Alloy and Stainless Steel
Small
0
1
3
Large
0
3
3
Carbon Steel
Small
0
1
1
SECTOR 14.B FORGING INDUSTRY
Large
0
1
3
Reshaping
Small
0
1
3
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
0
3
5
All
Small
0
1
5
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
7
1 21
All
Small
5
1
7
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
0
1
3
All
Small
0
1
3
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
0
1
3
All
Small
0
1
3
SECTOR 20. TEXTILE DYEING
Large
0
3
3
All
Small
0
1
2
SECTOR 21. COLORED GLASS PRODUCERS
Large
0
3 12

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

ADMINTIME

RESPONSES

RESPONDENTS

# PLANTS

% LEARN

% INHOUSE

% ABOVEPEL

% NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

# SAMPS

SHIFTS

JOBPEL

SIZE

VARIABLES

Table 6

4

100%

0%

80%

0%

5

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

0

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

25% 75%

78

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

25% 75%

123

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

10%

0%

2

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

7

-

-

0.5

-

$ 32.54

$

-

4

100% 36%

0%

0%

79

-

-

0.5

-

$ 32.54

$

-

4

100% 36%

0%

0%

39

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

20%

0%

6

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

25%

0%

4

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

0%

0%

1

-

-

0.5

-

$ 32.54

$

-

4

0%

0%

0%

0%

0

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

10%

0%

39

-

-

0.5

-

$ 32.54

$

-

4
4

100%
100%

0%
0%

10%
10%

0%
0%

12
116

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4

100%

0%

10%

0%

37

-

-

1.0

-

$ 32.54

$

-

4

100% 63%

10%

0%

33

-

-

0.5

-

$ 32.54

$

-

4

100% 63%

10%

0%

31

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

10%

0%

152

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

111

-

-

1.0

-

$ 32.54

$

-

4

100% 62%

0%

0%

2

-

-

0.5

-

$ 32.54

$

-

4

100% 62%

0%

0%

1

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

0%

0%

0

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

5

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

212

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

1,600

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

307

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

623

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

8

-

-

0.5

-

$ 32.54

$

-

Page 42

24
111

2

9

1.0
0.5

4

$ 32.54 $
$ 32.54 $

Small

1

1

1

4

100%

0%

10%

0%

6

-

-

1.0

-

$ 32.54

$

-

Large

0

3

2

4

100%

0%

10%

0%

78

-

-

0.5

-

$ 32.54

$

-

Small
0
1
2
SECTOR 24. CHROMIUM CATALYST USERS
Large
0
3
3
Catalyst Users
Small
0
1
3
Large
0
3
3
Chromium Catalyst Service
Companies
Small
0
1
3
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
0
1 15
All
Small
0
1
0
SECTOR 26. WOODWORKING
Large
0
1
2
General Industry
Small
0
1
2
Large
0
1
1
Maritime
Small
0
1
1
Large
0
1
1
Construction
Small
0
1
1
STATE
0
1
1
Government
LOCAL 0
1
1
SECTOR 27. SOLID WASTER INCINERATION
Large
0
3 15
General Industry
Small
0
1
3
STATE
0
3 15
Government
LOCAL 0
1
3
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
0
3
3
All
Small
0
3
3
SECTOR 31. CONSTRUCTION
Large
0
1
1

4

100%

0%

10%

0%

312

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

193

-

-

0.5

-

$ 32.54

$

-

4
4

100%
100%

0%
0%

10%
10%

0%
0%

0
25

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4

100%

0%

10%

0%

5

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

10%

0%

5

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

10%

0%

0

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

143

-

-

0.5

-

$ 32.54

$

-

4
4

100%
100%

0%
0%

0%
0%

0%
0%

76
36

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4
4

100% 0%
100% 22%

0%
0%

0%
0%

32
1,232

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4
4

100% 22%
100% 22%

0%
0%

0%
0%

4,932
17

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4

100% 22%

0%

0%

62

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

10%

0%

39

-

-

0.5

-

$ 32.54

$

-

4
4

100%
100%

0%
0%

10%
10%

0%
0%

47
0

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

4

100%

0%

10%

0%

24

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

0%

0%

18

-

-

0.5

-

$ 32.54

$

-

4

100%

0%

0%

0%

0

-

-

1.0

-

$ 32.54

$

-

4

100%

0%

0%

0%

54

-

-

0.5

-

$ 32.54

$

-

Fiber, Flat, Container Glass
SECTOR 22. PRINTING
All

Industrial Rehabilitation

Hazardous Waste-site Work

ITEM 12 COST

BURDEN HOURS

RESPONSES

# PLANTS

NONSUPEWAGE

0%
0%

ADMINTIME

10%
10%

RESPONDENTS

100% 0%
100% 20%

% LEARN

4
4

% INHOUSE

4
1

% ABOVEPEL

*4 TIMES PER YEAR
(QUARTERLY)

1
1

% NOTQUART

# SAMPS

0
1

All

SHIFTS

JOBPEL

Small
Large

VARIABLES

SIZE

Table 6

144

Small
State

0
0

1
1

1
1

4
4

100%
100%

0%
0%

0%
0%

0%
0%

247
16

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
Large

0
0

1
1

1
1

4
4

100%
100%

0%
0%

0%
10%

0%
0%

93
43

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Small
State

0
0

1
1

1
1

4
4

100%
100%

0%
0%

10%
10%

0%
0%

180
1

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Local
Large

0
0

1
1

1
1

4
4

100% 0%
100% 60%

10%
10%

0%
0%

252
47

-

-

1.0
0.5

-

$ 32.54
$ 32.54

$
$

-

Page 43

Small
Weighted Average/Average/Total
Refractory Brick Restoration

0
1
1
4
4
100% 60%
10%

Page 44

0%
185
78,321
1,475
1.0
0.70
- $ 32.54
4,130 $ 32.54

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

5,900

ADMINTIME

RESPONSES

RESPONDENTS

# PLANTS

% LEARN

% INHOUSE

% ABOVEPEL

% NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

# SAMPS

SHIFTS

JOBPEL

SIZE

VARIABLES

Table 6

$
$
134,390

Table 7
TABLE 7: Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for an IH Technician to
Perform Quarterly Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene
technician perform quarterly exposure monitoring.
COST = (QUARTCONTTIME*CONTCOST*4*%NOTQUART*%ABOVEPEL*%CONT)*
#PLANTS

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

CONTCOST

4 times per year (quar

SECTOR 1. ELECTROPLATING
Large
Hard Chrome
Small
Large
Job Shop Chrome Plater
Small
Large
Captive Shop Chrome
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
SECTOR 2A. WELDING
Large
SMAW
Small
Large

QUARTCONTTIME

Size

Variables:
QUARTCONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician) to
conduct quarterly-annual monitoring
CONTCOST = Cost per hour for an outside industrial hygiene contractor
%NOTQUART = Percent of plants not performing quarterly monitoring requirements
%ABOVEPEL= Percent of plants that have an employee in at least one job category above
the PEL
%CONT= Percent of plants that will continue to use an outside contractor for
monitoring
#PLANTS= Number of plants represented by the model output

0

$52.52

4

100% 0.00%

100%

837

$0

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

1,576
403

$0
$0

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

759
550

$0
$0

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

1,035
403

$0
$0

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

759
476

$0
$0

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

897
837

$0
$0

12

$52.52

4

1,576

$0

12

$52.52

4

100% 0.00% 100%
GENERAL INDUSTRY
100% 4.85%
90%

3,676

$404,568

12
12

$52.52
$52.52

4
4

100% 4.84%
100% 0.37%

4,120
2,697

$502,659
$22,640

Page 45

100%
90%

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.38%
100% 0.00%

100%
90%

3,021
817

$28,944
$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

915
327

$0
$0

Small
Large

0
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

366
81

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

91
81

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

91
490

$0
$0

Small

12

$52.52

4

550

$0

Large

12

$52.52

4

100% 0.00% 100%
MARITIME
100% 0.00%
50%

18

$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

10
25

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

14
6

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

3
121

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

68
4

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

2
2

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

1
4

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

2
2

$0
$0

Small

12

$52.52

4

100% 0.00%

90%

1

$0

Page 46

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Large

0

$52.52

4

100% 0.00%

50%

0

$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
0

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
16

$0
$0

Small

0

$52.52

4

9

$0

Large

12

$52.52

4

100% 0.00%
90%
CONSTRUCTION
100% 0.00%
95%

209

$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

1,673
3

$0
$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

22
42

$0
$0

Small
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

335
21

$0
$0

Local
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

168
4

$0
$0

Local

12

$52.52

4

33

$0

State

12

$52.52

4

100% 0.00% 100%
GOVERNMENT
100% 0.00%
95%

20

$0

Local
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

614
0

$0
$0

Local
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

8
4

$0
$0

Local
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

123
2

$0
$0

Local
State

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

61
1

$0
$0

Local
SECTOR 2B. MILD STEEL WELDI

12

$52.52

4

100% 0.00% 100%
MARITIME

12

$0

Electric Torch Cutting
Thermal Spray Tungsten
Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 47

SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Large

12

$52.52

4

100% 0.00%

90%

4,929

$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

5,019
3,615

$0
$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

3,680
1,095

$0
$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

1,115
438

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

446
110

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

112
110

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

112
657

$0
$0

Small

0

$52.52

4

669

$0

Large

12

$52.52

4

100% 0.00% 100%
MARITIME
100% 0.00%
50%

38

$0

Small
Large

12
12

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

22
55

$0
$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

31
13

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

7
259

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

147
8

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

5
3

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
8

$0
$0

Page 48

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray Tungsten
Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
AEROSPACE

AUTOBODY

MARITIME
COIL COATING

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
3

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

2
0

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
0

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
50%

0
34

$0
$0

Small

0

$52.52

4

19

$0

Large

0

$52.52

4

100% 0.00%
90%
CONSTRUCTION
100% 0.00%
95%

313

$0

Small
Large

12
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

2,368
4

$0
$0

Small
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

31
62

$0
$0

Small
State

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

473
31

$0
$0

Local
State

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
95%

237
6

$0
$0

Local

12

$52.52

4

47

$0

Large

12

$52.52

4

100% 0.00% 100%
GENERAL INDUSTRY
100% 28.00% 25%

50

$8,744

Small
Large

12
12

$52.52
$52.52

4
4

100% 9.00%
100% 5.00%

75%
25%

62
330

$10,618
$10,410

Small
Large

12
12

$52.52
$52.52

4
4

100% 5.00%
100% 36.00%

75%
10%

1,454
101

$137,500
$9,161

Small
Large

12
12

$52.52
$52.52

4
4

100% 36.00%
100% 8.00%

90%
25%

18
274

$14,990
$13,836

Small

12

$52.52

4

100% 8.00%

75%

474

$71,768

Page 49

CONSTRUCTION

GOVERNMENT

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Large

12

$52.52

4

100% 22.00%

25%

789

$109,464

Small
Large

12
12

$52.52
$52.52

4
4

100% 22.00%
100% 12.00%

50%
25%

4,197
17

$1,163,881
$1,291

12.00%

25%

945

$71,477

0.00%

100%

2

$0

0.00%

0%

0

$0

77.00%

100%

2

$3,235

0.00%

100%

1

$0

0.00%

100%

3

$0

0.00%

0%

0

$0

0.00%

20%

5

$0

0.00%

0%

0

$0

0.00%

75%

78

$0

0.00%

75%

123

$0

0.00%

90%

2

$0

0.00%

90%

7

$0

36.00%

100%

79

$71,866

36.00%

100%

39

$35,152

0.00%

80%

6

$0

0.00%

75%

4

$0

0.00%

100%

1

$0

0.00%

0%

0

$0

$52.52 4 100%
Small 12
SECTOR 4. PRODUCERS OF CHROMATES
$52.52 4 100%
Large 0
ALL
$52.52 4 100%
Small 0
SECTOR 5. CHROMATE PIGMENT PROCEDURES
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 6. CCA PRODUCERS
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 8. PAINT AND COATING PRODUCERS
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 9. PRINTING INK PRODUCERS
$52.52 4 100%
Large 0
ALL
$52.52 4 100%
Small 0
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 11. PLATING MIXTURE PRODUCERS
$52.52 4 100%
Large 12
ALL
$52.52 4 100%
Small 12
SECTOR 13. CHROMIUM METAL PRODUCERS
$52.52 4 100%
Large 12
ALL
$52.52 4
0%
Small 12

Page 50

SECTOR 14. IRON AND STEEL MILLS
$52.52
Large 0
ALLOY AND STAINLESS
STEEL
$52.52
Small 0
$52.52
Large 0
CARBON STEEL
$52.52
Small 0
SECTOR 14.B FORGING INDUSTRY
$52.52
Large 0
RESHAPING
$52.52
Small 0
SECTOR 15. IRON AND STEEL FOUNDRIES
$52.52
Large 0
ALL
$52.52
Small 0
SECTOR 17. CHROMIUM DYE PRODUCERS
$52.52
Large 12
ALL
$52.52
Small 12
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
$52.52
Large 12
ALL
$52.52
Small 12
SECTOR 19. CHEMICAL DISTRIBUTORS
$52.52
Large 12
ALL
$52.52
Small 12
SECTOR 20. TEXTILE DYEING
$52.52
Large 0
ALL
$52.52
Small 0
SECTOR 21. COLORED GLASS PRODUCERS
$52.52
Large 0
General Industry
$52.52
Small 0
$52.52
Large 12
Fiber, Flat and Container
Glass
$52.52
Small 12
SECTOR 22. PRINTING
$52.52
Large 0
ALL
$52.52
Small 0

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

4

100% 0.00%

90%

39

$0

4
4

100% 0.00%
100% 0.00%

90%
90%

12
116

$0
$0

4

100% 0.00%

90%

37

$0

4

100% 63.00%

90%

33

$0

4

100% 63.00%

90%

31

$0

4

100% 0.00%

90%

152

$0

4

100% 0.00%

90%

111

$0

4

100% 62.00%

100%

2

$3,907

4

100% 62.00%

100%

1

$1,302

4

100% 0.00%

0%

0

$0

4

100% 0.00%

100%

5

$0

4

100% 0.00%

100%

212

$0

4

100% 0.00%

100%

1,600

$0

4

100% 0.00%

90%

307

$0

4

100% 0.00%

90%

623

$0

4

100% 0.00%

90%

8

$0

4
4

100% 0.00%
100% 20.00%

90%
90%

24
111

$0
$50,310

4

100% 0.00%

90%

6

$0

4

100% 0.00%

90%

78

$0

4

100% 0.00%

90%

312

$0

Page 51

SECTOR 24. CHROMIUM CATALYST USERS
$52.52 4
Large 12
CATALYST USER
$52.52 4
Small 12
$52.52 4
Large 12
CATALYST SERVICE
COMPANIES
$52.52 4
Small 12
SECTOR 25. REFRACTORY BRICK PRODUCERS
$52.52 4
Large 0
ALL
$52.52 4
Small 0
SECTOR 26. WOODWORKING
$52.52 4
Large 0
ALL
$52.52 4
Small 0
$52.52 4
Large 0
MARITIME
$52.52 4
Small 0
$52.52 4
Large 0
CONSTRUCTION
$52.52 4
Small 0
$52.52 4
STATE 0
GOVERNMENT
$52.52 4
LOCAL 0
SECTOR 27. SOLID WASTER INCINERATION
$52.52 4
Large 0
GENERAL INDUSTRY
$52.52 4
Small 0
$52.52 4
STATE 0
GOVERNMENT
$52.52 4
LOCAL 0
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
$52.52 4
Large 0
ALL
$52.52 4
Small 0
SECTOR 31. CONSTRUCTION
$52.52 4
Large 0
Industrial Rehabilitation

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

100% 0.00%

90%

193

$0

100% 0.00%
100% 0.00%

90%
90%

0
25

$0
$0

100% 0.00%

90%

5

$0

100% 0.00%

90%

5

$0

100% 0.00%

90%

0

$0

100% 0.00%

100%

143

$0

100% 0.00%
100% 0.00%

100%
100%

76
36

$0
$0

100% 0.00%
100% 22.00%

100%
100%

32
1,232

$0
$0

100% 22.00%
100% 22.00%

100%
100%

4,932
17

$0
$0

100% 22.00%

100%

62

$0

100% 0.00%

90%

39

$0

100% 0.00%
100% 0.00%

90%
25%

47
0

$0
$0

100% 0.00%

90%

24

$0

100% 0.00%

100%

18

$0

100% 0.00%

0%

0

$0

100% 0.00%

100%

54

$0

Small
State

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
100%

247
16

$0
$0

Local
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

100%
90%

93
43

$0
$0

Page 52

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

4 times per year (quar

CONTCOST

QUARTCONTTIME

Size

Table 7

Hazardous Waste-site Small
Work
State

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 0.00%

90%
90%

180
1

$0
$0

Local
Large

0
0

$52.52
$52.52

4
4

100% 0.00%
100% 60.00%

90%
90%

252
47

$0
$0

Small

0

$52.52

4

100% 60.00%

90%

185
78,321

$0
$2,747,724

Refractory Brick
Restoration
Total

Page 53

Table 8
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for a Laboratory to Conduct Analysis of
Quarterly Exposure Monitoring
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples
collected during quarterly exposure monitoring.
Cost = (SAMPCOST * JOBPEL * SHIFTS * #SAMPS * 4 * %NOTQUART * %ABOVEPEL) *
#PLANTS
Variables:

Variable cost per sample
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above
the PEL
#PLANTS = Number of plants represented by the model output

SAMPCOST =
JOBPEL =
SHIFTS =
#SAMPS =
%NOTQUART =
%ABOVEPEL =

SHIFTS

#SAMPS

4 times per Year (Quat

%NOTQUART

%ABOVEPEL

#PLANTS

Item 13 COST

Job Shop Chrome Plater

JOBPEL

Hard Chrome

SAMPCOST

SECTOR 1. ELECTROPLATING

Size

0

Large

$84

0

2

3

4

100%

0.00%

837

$0

Small

$84
$84

0
0

1
2

3
3

4
4

100%
100%

0.00%
0.00%

1,576
403

$0
$0

$84
$84

0
0

1
2

3
3

4
4

100%
100%

0.00%
0.00%

759
550

$0
$0

$84
$84

0
0

1
2

3
3

4
4

100%
100%

0.00%
0.00%

1,035
403

$0
$0

$84
$84

0
0

1
2

3
3

4
4

100%
100%

0.00%
0.00%

759
476

$0
$0

Small
Large

$84
$84

0
0

1
2

3
3

4
4

100%
100%

0.00%
0.00%

897
837

$0
$0

Small

$84

1

1

3

1,576

$0

Large

$84

1

3

2

4 100% 0.00%
GENERAL INDUSTRY
4 100% 4.85%

3,676

$358,989

Small
Large

$84
$84

1
1

1
3

3
2

4
4

4,120
2,697

$200,713
$20,089

Large
Small

Captive Shop Chrome Plater

Job Shop Plater

Large
Small
Large
Small

Captive Shop Plater

Operator
SECTOR 2A. WELDING
SMAW

GMAW

Large

Page 54

100%
100%

4.84%
0.37%

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Item 13 COST

FCAW

#PLANTS

TIG

%ABOVEPEL

GMAW

%NOTQUART

SMAW

4 times per Year (Quat

Resistance Welding

#SAMPS

Plasma Welding

SHIFTS

Plasma Cutting

JOBPEL

SAW

SAMPCOST

TIG

Size

Table 8

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.38%
0.00%

3,021
817

$11,557
$0

Small
Large

$84
$84

1
0

1
3

3
2

4
4

100%
100%

0.00%
0.00%

915
327

$0
$0

Small
Large

$84
$84

0
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

366
81

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

91
81

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

91
490

$0
$0

Small

$84

1

1

3

4

550

$0

Large

$84

1

3

1

4

100% 0.00%
MARITIME
100% 0.00%

18

$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

10
25

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

14
6

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

3
121

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

68
4

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

2
2

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

1
4

$0
$0

Small
Large

$84
$84

1
1

2
3

1
1

4
4

100%
100%

0.00%
0.00%

2
2

$0
$0

Small
Large

$84
$84

1
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

1
0

$0
$0

Page 55

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 2B. MILD STEEL WELDING

Item 13 COST

SMAW

#PLANTS

Metallizing

%ABOVEPEL

Brazing

%NOTQUART

GMAW

4 times per Year (Quat

Plasma Cutting

#SAMPS

SMAW

SHIFTS

SAW

JOBPEL

Thermal Spray Tungsten Cutting

SAMPCOST

Electric Torch Cutting

Size

Table 8

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

0
0

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

0
16

$0
$0

Small

$84

0

2

1

4

9

$0

Large

$84

1

3

1

100% 0.00%
CONSTRUCTION
4 100% 0.00%

209

$0

Small
Large

$84
$84

1
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

1,673
3

$0
$0

Small
Large

$84
$84

1
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

22
42

$0
$0

Small
State

$84
$84

1
1

1
3

1
1

4
4

100%
100%

0.00%
0.00%

335
21

$0
$0

Local
State

$84
$84

1
1

1
3

1
1

4
4

100%
100%

0.00%
0.00%

168
4

$0
$0

Local

$84

1

1

1

4

33

$0

Large

$84

1

1

1

100% 0.00%
GOVERNMENT
4 100% 0.00%

20

$0

Small
Large

$84
$84

1
1

1
1

1
1

4
4

100%
100%

0.00%
0.00%

614
0

$0
$0

Small
Large

$84
$84

1
1

1
1

1
1

4
4

100%
100%

0.00%
0.00%

8
4

$0
$0

Small
State

$84
$84

1
1

1
1

1
1

4
4

100%
100%

0.00%
0.00%

123
2

$0
$0

Local
State

$84
$84

1
1

1
1

1
1

4
4

100%
100%

0.00%
0.00%

61
1

$0
$0

Local

$84

1

1

1

12

$0

Large

$84

1

3

2

4 100% 0.00%
GENERAL INDUSTRY
4 100% 0.00%

4,929

$0

Page 56

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Item 13 COST

GMAW

#PLANTS

SMAW

%ABOVEPEL

Resistance Welding

%NOTQUART

Plasma Welding

4 times per Year (Quat

Plasma Cutting

#SAMPS

SAW

SHIFTS

TIG

JOBPEL

GMAW

SAMPCOST

SMAW

Size

Table 8

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

5,019
3,615

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

3,680
1,095

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

1,115
438

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

446
110

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

112
110

$0
$0

Small
Large

$84
$84

1
1

1
3

3
2

4
4

100%
100%

0.00%
0.00%

112
657

$0
$0

Small

$84

1

1

3

4

669

$0

Large

$84

0

3

1

4

100% 0.00%
MARITIME
100% 0.00%

38

$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

22
55

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

31
13

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

7
259

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

147
8

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

5
3

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

0
8

$0
$0

Small

$84

0

2

1

4

100%

0.00%

0

$0

Page 57

SECTOR 3. PAINTING
AEROSPACE

AUTOBODY

COIL COATING

MARITIME

Item 13 COST

Metallizing

#PLANTS

Brazing

%ABOVEPEL

GMAW

%NOTQUART

Plasma Cutting

4 times per Year (Quat

SMAW

#SAMPS

SAW

SHIFTS

Thermal Spray Tungsten Cutting

JOBPEL

Electric Torch Cutting

SAMPCOST

Air Carbon Arc Cutting

Size

Table 8

Large

$84

0

3

1

4

100%

0.00%

3

$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

2
0

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

0
0

$0
$0

Small
Large

$84
$84

0
0

2
3

1
1

4
4

100%
100%

0.00%
0.00%

0
34

$0
$0

Small

$84

0

2

1

4

19

$0

Large

$84

0

3

1

100% 0.00%
CONSTRUCTION
4 100% 0.00%

313

$0

Small
Large

$84
$84

0
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

2,368
4

$0
$0

Small
Large

$84
$84

0
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

31
62

$0
$0

Small
Large

$84
$84

0
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

473
31

$0
$0

Small
Large

$84
$84

0
0

1
3

1
1

4
4

100%
100%

0.00%
0.00%

237
6

$0
$0

Small

$84

0

1

1

4

100%

0.00%

47

$0

Large

$84

1

3

3

4

100%

28.00%

50

$41,900

Small
Large

$84
$84

1
0

1
1

3
1

4
4

100%
100%

9.00%
5.00%

62
330

$5,653
$0

Small
Large

$84
$84

2
0

1
2

1
3

4
4

100%
100%

5.00%
8.00%

1,454
101

$48,804
$0

Small
Large

$84
$84

0
1

1
3

3
1

4
4

100%
100%

8.00%
36.00%

18
274

$0
$99,448

Small
Large

$84
$84

1
1

1
3

1
1

4
4

100%
100%

36.00%
22.00%

474
789

$57,314
$174,837

Page 58

JOBPEL

SHIFTS

#SAMPS

4 times per Year (Quat

%NOTQUART

%ABOVEPEL

#PLANTS

Item 13 COST

GOVERNMENT

SAMPCOST

CONSTRUCTION

Size

Table 8

Small
Large

$84
$84

1
1

1
3

1
1

4
4

100%
100%

22.00%
12.00%

4,197
17

$309,827
$2,063

1
$84
Small
SECTOR 4. PRODUCERS OF CHROMATES
0
Large
$84
ALL
0
$84
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
1
Large
$84
ALL
0
Small
$84
SECTOR 6. CCA PRODUCERS
0
Large
$84
ALL
0
Small
$84
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
0
Large
$84
ALL
0
Small
$84
SECTOR 8. PAINT AND COATING PRODUCERS
0
Large
$84
ALL
0
Small
$84
SECTOR 9. PRINTING INK PRODUCERS
0
Large
$84
ALL
0
Small
$84
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
3
Large
$84
ALL
5
Small
$84
SECTOR 11. PLATING MIXTURE PRODUCERS
0
Large
$84
ALL
0
Small
$84
SECTOR 13. CHROMIUM METAL PRODUCERS
0
Large
$84
ALL
0
Small
$84
SECTOR 14. IRON AND STEEL MILLS

1

1

4

100%

12.00%

945

$38,054

3

3

4

100%

0.00%

2

$0

1

3

4

100%

0.00%

0

$0

2

3

4

100%

77.00%

2

$2,583

1

3

4

100%

0.00%

1

$0

3

3

4

100%

0.00%

3

$0

3

0

4

100%

0.00%

0

$0

3

3

4

100%

0.00%

5

$0

1

3

4

100%

0.00%

0

$0

2

3

4

100%

0.00%

78

$0

2

3

4

100%

0.00%

123

$0

1

9

4

100%

0.00%

2

$0

1

5

4

100%

0.00%

7

$0

3

3

4

100%

36.00%

79

$258,268

1

3

4

100%

36.00%

39

$70,181

1

3

4

100%

0.00%

6

$0

1

3

4

100%

0.00%

4

$0

3

3

4

100%

0.00%

1

$0

1

1

4

0%

0.00%

0

$0

Page 59

Size

SAMPCOST

JOBPEL

SHIFTS

#SAMPS

4 times per Year (Quat

%NOTQUART

%ABOVEPEL

#PLANTS

Item 13 COST

Table 8

Large

$84

0

3

3

4

100%

0.00%

39

$0

Small
Large

$84
$84

0
0

1
3

3
3

4
4

100%
100%

0.00%
0.00%

12
116

$0
$0

Small

$84

0

1

1

4

100%

0.00%

37

$0

Large

$84

0

1

3

4

100%

63.00%

33

$0

Small
$84
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
$84
ALL
Small
$84
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
$84
ALL
Small
$84
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
$84
ALL
Small
$84
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
$84
ALL
Small
$84
SECTOR 20. TEXTILE DYEING
Large
$84
ALL
Small
$84
SECTOR 21. COLORED GLASS PRODUCERS
Large
$84
General Industry
Small
$84
Large
$84
Fiber, Flat and Container Glass
Small
$84
SECTOR 22. PRINTING
Large
$84
ALL
Small
$84
SECTOR 24. CHROMIUM CATALYST USERS

0

1

3

4

100%

63.00%

31

$0

0

3

5

4

100%

0.00%

152

$0

0

1

5

4

100%

0.00%

111

$0

7

1

21

4

100%

62.00%

2

$76,436

5

1

7

4

100%

62.00%

1

$6,066

0

1

3

4

100%

0.00%

0

$0

0

1

3

4

100%

0.00%

5

$0

0

1

3

4

100%

0.00%

212

$0

0

1

3

4

100%

0.00%

1,600

$0

0

3

3

4

100%

0.00%

307

$0

0

1

2

4

100%

0.00%

623

$0

0

3

12

4

100%

0.00%

8

$0

0
1

1
1

4
1

4
4

100%
100%

0.00%
20.00%

24
111

$0
$7,440

1

1

1

4

100%

0.00%

6

$0

0

3

2

4

100%

0.00%

78

$0

0

1

2

4

100%

0.00%

312

$0

ALLOY AND STAINLESS STEEL

CARBON STEEL
SECTOR 14.B FORGING INDUSTRY
Reshaping

Page 60

Size

SAMPCOST

JOBPEL

SHIFTS

#SAMPS

4 times per Year (Quat

%NOTQUART

%ABOVEPEL

#PLANTS

Item 13 COST

Table 8

Large

$84

0

3

3

4

100%

0.00%

193

$0

Small
Large

$84
$84

0
0

1
3

3
3

4
4

100%
100%

0.00%
0.00%

0
25

$0
$0

Small
$84
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
$84
ALL
Small
$84
SECTOR 26. WOODWORKING
Large
$84
General Industry
Small
$84
Large
$84
Maritime
Small
$84
Large
$84
Construction
Small
$84
State
$84
Government
Local
$84
SECTOR 27. SOLID WASTER INCINERATION
Large
$84
GENERAL INDUSTRY
Small
$84
Large
$84
GOVERNMENT
Small
$84
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
$84
ALL
Small
$84
SECTOR 31. CONSTRUCTION
Large
$84

0

1

3

4

100%

0.00%

5

$0

0

1

15

4

100%

0.00%

5

$0

0

1

0

4

100%

0.00%

0

$0

0

1

2

4

100%

0.00%

143

$0

0
0

1
1

2
1

4
4

100%
100%

0.00%
0.00%

76
36

$0
$0

0
0

1
1

1
1

4
4

100%
22%

0.00%
0.00%

32
1,232

$0
$0

0
0

1
1

1
1

4
4

22%
22%

0.00%
0.00%

4,932
17

$0
$0

0

1

1

4

22%

0.00%

62

$0

0

3

15

4

100%

0.00%

39

$0

0
0

1
3

3
15

4
4

100%
100%

0.00%
0.00%

47
0

$0
$0

0

1

3

4

100%

0.00%

24

$0

0

3

3

4

100%

0.00%

18

$0

0

3

3

4

100%

0.00%

0

$0

0

1

1

4

100%

0.00%

54

$0

Chromium Users
Chromium Catalyst Service
Companies

Industrial Rehabilitation

Small
State

$84
$84

0
0

1
1

1
1

4
4

100%
100%

0.00%
0.00%

247
16

$0
$0

Local
Large

$84
$84

0
0

1
1

1
1

4
4

100%
100%

0.00%
0.00%

93
43

$0
$0

Page 61

SHIFTS

#SAMPS

4 times per Year (Quat

%NOTQUART

%ABOVEPEL

#PLANTS

Item 13 COST

Total

JOBPEL

Refractory Brick Restoration

SAMPCOST

Hazardous Waste-site Work

Size

Table 8

Small
State

$84
$84

0
0

1
1

1
1

4
4

100%
100%

0.00%
0.00%

180
1

$0
$0

Local
Large

$84
$84

0
0

1
1

1
1

4
4

100%
100%

0.00%
60.00%

252
47

$0
$0

Small

$84

0

1

1

4

100%

60.00%

185
78,321

$0
$1,790,224

Page 62

Table 9

TABLE 9: Employer Time and Cost to Notify Employees of Quarterly Monitoring Results

Captive Shop Chrome Plater

Job Shop Plater
Captive Shop Plater
Operator
SECTOR 2A. WELDING
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEPEL

%NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

#SAMPS

Job Shop Chrome Plater

SHIFTS

Hard Chrome

JOBPEL

SECTOR 1. ELECTROPLATING

Supervisory wage rate, $/hr.
Time, in hours, to notify an employee of the exposure monitoring results
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Number of plants represented by the model input

SIZE

SUPWAGE =
NOTETIME =
JOBPEL =
SHIFTS =
#SAMPS =
%NOTQUART =
%ABOVEPEL =
* #PLANTS =

VARIABLES

Variables:

BURDEN HOURS = ((NOTETIME * JOBPEL * SHIFTS * # SAMPS * 4) * %NOTQUART * %ABOVEPEL) * #PLANTS
COST = (SUPWAGE) * BURDEN HOURS

Large

0

2

3

4 100%

0%

837

-

-

0.25

- $ 43.90

$

-

Small
Large

0
0

1
2

3
3

4 100%
4 100%

0%
0%

1,576
403

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
2

3
3

4 100%
4 100%

0%
0%

759
550

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
2

3
3

4 100%
4 100%

0%
0%

1,035
403

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
2

3
3

4 100%
4 100%

0%
0%

759
476

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
2

3
3

4 100%
4 100%

0%
0%

897
837

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

0

1

3

4 100%

0%

0.25

- $ 43.90

$

-

Large

1

3

2

4 100%

5%

1,576
GENERAL INDUSTRY
3,676 1,070
4,279

0.25

1,070 $ 43.90

$

46,969

Small
Large

1
1

1
3

3
2

4 100%
4 100%

5%
0%

4,120
2,697

598
60

2,393
239

0.25
0.25

598 $ 43.90
60 $ 43.90

$
$

26,261
2,628

Small
Large

1
1

1
3

3
2

4 100%
4 100%

0%
0%

3,021
817

34
-

138
-

0.25
0.25

34 $ 43.90
- $ 43.90

$
$

1,512
-

Small
Large

1
0

1
3

3
2

4 100%
4 100%

0%
0%

915
327

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
1

1
3

3
2

4 100%
4 100%

0%
0%

366
81

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
3

3
2

4 100%
4 100%

0%
0%

91
81

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
3

3
2

4 100%
4 100%

0%
0%

91
490

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

1

1

3

4 100%

0%

550

-

0.25

- $ 43.90

$

-

Page 63

MARITIME

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEPEL

%NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

#SAMPS

TIG

SHIFTS

GMAW

JOBPEL

SMAW

SIZE

VARIABLES

Table 9

Large

1

1

1

4 100%

0%

18

-

-

0.25

- $ 43.90

$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

10
25

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

14
6

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

3
121

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

68
4

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

2
2

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

1
4

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
1

1
1

1
1

4 100%
4 100%

0%
0%

2
2

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
0

1
1

1
1

4 100%
4 100%

0%
0%

1
0

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
1

1
1

4 100%
4 100%

0%
0%

0
0

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

1
1

1
1

4 100%
4 100%

0%
0%

0
16

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

0

1

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Large

1

3

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Small
Large

1
0

1
3

1
1

4 100%
4 100%

0%
0%

1,673
3

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

1
0

1
3

1
1

4 100%
4 100%

0%
0%

22
42

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
State

1
1

1
3

1
1

4 100%
4 100%

0%
0%

335
21

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
State

1
1

1
3

1
1

4 100%
4 100%

0%
0%

168
4

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local

1

1

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Large

1

1

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Small
Large

1
0

1
1

1
1

4 100%
4 100%

0%
0%

614
0

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

1

1

1

4 100%

0%

8

-

-

0.25

- $ 43.90

$

-

Page 64

9
CONSTRUCTION
209
-

33
GOVERNMENT
20
-

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#SAMPS

#PLANTS

%ABOVEPEL

SHIFTS

%NOTQUART

JOBPEL

*4 TIMES PER YEAR
(QUARTERLY)

SIZE

VARIABLES

Table 9

Large

1

1

1

4 100%

0%

4

-

-

0.25

- $ 43.90

$

-

Small
State

1
1

1
1

1
1

4 100%
4 100%

0%
0%

123
2

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
State

1
1

1
1

1
1

4 100%
4 100%

0%
0%

61
1

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

1

1

1

4 100%

0%

0.25

- $ 43.90

$

-

0

1

1

4 100%

0%

12
GENERAL INDUSTRY
4,929
-

0.25

- $ 43.90

$

-

1
1

1
1

1
1

4 100%
4 100%

0%
0%

5,019
3,615

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1
1

1
1

1
1

4 100%
4 100%

0%
0%

3,680
1,095

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1
1

1
1

1
1

4 100%
4 100%

0%
0%

1,115
438

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1
0

1
1

1
1

4 100%
4 100%

0%
0%

446
110

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1
1

1
1

1
1

4 100%
4 100%

0%
0%

112
110

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1
1

1
1

1
1

4 100%
4 100%

0%
0%

112
657

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

1

1

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Large

0

3

1

4 100%

0%

669
MARITIME
38
-

-

0.25

- $ 43.90

$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

22
55

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

31
13

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

7
259

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

147
8

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

5
3

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

0
8

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

0
3

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

0

2

1

4 100%

0%

2

-

-

0.25

- $ 43.90

$

-

GMAW

Brazing

Metallizing

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Page 65

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

Maritime

Construction

Government

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEPEL

%NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

#SAMPS

SAW

SHIFTS

Thermal Spray Tungsten Cutting

JOBPEL

Electric Torch Cutting

SIZE

VARIABLES

Table 9

Large

0

3

1

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

0
0

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

0
34

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

0

2

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Large

0

3

1

4 100%

0%

-

0.25

- $ 43.90

$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

2,368
4

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
Large

0
0

2
3

1
1

4 100%
4 100%

0%
0%

31
62

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
State

0
0

2
3

1
1

4 100%
4 100%

0%
0%

473
31

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
State

0
0

2
3

1
1

4 100%
4 100%

0%
0%

237
6

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local

0

2

1

4 100%

0%

0.25

- $ 43.90

$

-

Large

1

3

3

4 100%

28%

47
GENERAL INDUSTRY
50
125
499

0.25

125 $ 43.90

$

5,482

Small
Large

1
1

1
3

3
3

4 100%
4 100%

9%
5%

62
330

17
149

67
595

0.25
0.25

17 $ 43.90
149 $ 43.90

$
$

740
6,526

Small
Large

1
1

1
3

3
3

4 100%
4 100%

5%
8%

1,454
101

218
73

873
291

0.25
0.25

218 $ 43.90
73 $ 43.90

$
$

9,578
3,191

Small
Large

1
1

1
3

3
3

4 100%
4 100%

8%
36%

18
274

4
889

18
3,556

0.25
0.25

4 $ 43.90
889 $ 43.90

$
$

193
39,034

Small
Large

1
1

1
3

3
3

4 100%
4 100%

36%
22%

474
789

512
1,563

2,050
6,252

0.25
0.25

512 $ 43.90
1,563 $ 43.90

$
$

22,496
68,626

Small
Large

1
1

1
3

3
3

4 100%
4 100%

22%
12%

4,197
17

2,770
18

11,080
74

0.25
0.25

2,770 $ 43.90
18 $ 43.90

$
$

121,611
810

1

3

4 100%

12%

945

340

1,361

0.25

340 $ 43.90

$

14,937

3

3

4 100%

0%

2

-

-

0.25

- $ 43.90

$

-

1

3

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

2

3

4 100%

77%

2

8

31

0.25

8 $ 43.90

$

338

1

3

4 100%

0%

1

-

-

0.25

- $ 43.90

$

-

3

3

4 100%

0%

3

-

-

0.25

- $ 43.90

$

-

3

0

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

1
Small
SECTOR 4. PRODUCERS OF CHROMATES
0
Large
All
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
1
Large
All
0
Small
SECTOR 6. CCA PRODUCERS
0
Large
All
0
Small

Page 66

19
CONSTRUCTION
313
-

SECTOR 7. CHROMIUM CATALYST PRODUCTERS
0
3
3
Large
All
0
1
3
Small
SECTOR 8. PAINT AND COATING PRODUCERS
0
2
3
Large
All
0
2
3
Small
SECTOR 9. PRINTING INK PRODUCERS
0
1
9
Large
All
0
1
5
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
3
3
3
Large
All
5
1
3
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
0
1
3
Large
All
0
1
3
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
0
3
3
Large
All
0
1
1
Small
SECTOR 14. IRON AND STEEL MILLS
0
3
3
Large
Alloy and Stainless Steel
0
1
3
Small
3
3
3
Large
Carbon Steel
1
1
3
Small
SECTOR 14.B FORGING INDUSTRY
3
3
3
Large
Forging Industry
1
1
3
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
0
3
5
Large
All
0
1
5
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
7
1 21
Large
All
5
1
7
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
1
3
Large
All
0
1
3
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
1
3
Large
All
0
1
3
Small
SECTOR 20. TEXTILE DYEING
0
3
3
Large
All
0
1
2
Small
SECTOR 21. COLORED GLASS PRODUCERS
0
3 12
Large

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEPEL

%NOTQUART

*4 TIMES PER YEAR
(QUARTERLY)

#SAMPS

SHIFTS

JOBPEL

SIZE

VARIABLES

Table 9

4 100%

0%

5

-

-

0.25

- $ 43.90

$

-

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

4 100%

0%

78

-

-

0.25

- $ 43.90

$

-

4 100%

0%

123

-

-

0.25

- $ 43.90

$

-

4 100%

0%

2

-

-

0.25

- $ 43.90

$

-

4 100%

0%

7

-

-

0.25

- $ 43.90

$

-

4 100%

36%

79

770

3,079

0.25

770 $ 43.90

$

33,791

4 100%

36%

39

209

837

0.25

209 $ 43.90

$

9,182

4 100%

0%

6

-

-

0.25

- $ 43.90

$

-

4 100%

0%

4

-

-

0.25

- $ 43.90

$

-

4 100%

0%

1

-

-

0.25

- $ 43.90

$

-

4

0%

0%

0

-

-

0.25

- $ 43.90

$

-

4 100%

0%

39

-

-

0.25

- $ 43.90

$

-

4 100%
4 100%

0%
38%

12
116

1,192

4,767

0.25
0.25

- $ 43.90
1,192 $ 43.90

$
$

52,327

4 100%

38%

37

42

167

0.25

42 $ 43.90

$

1,828

4 100%

38%

33

341

1,363

0.25

341 $ 43.90

$

14,957

4 100%

38%

31

36

143

0.25

36 $ 43.90

$

1,566

4 100%

0%

152

-

-

0.25

- $ 43.90

$

-

4 100%

0%

111

-

-

0.25

- $ 43.90

$

-

4 100%

62%

2

228

911

0.25

228 $ 43.90

$

10,001

4 100%

62%

1

18

72

0.25

18 $ 43.90

$

794

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

4 100%

0%

5

-

-

0.25

- $ 43.90

$

-

4 100%

0%

212

-

-

0.25

- $ 43.90

$

-

4 100%

0%

1,600

-

-

0.25

- $ 43.90

$

-

4 100%

0%

307

-

-

0.25

- $ 43.90

$

-

4 100%

0%

623

-

-

0.25

- $ 43.90

$

-

4

0%

8

-

-

0.25

- $ 43.90

$

-

25%

Page 67

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#SAMPS

#PLANTS

%ABOVEPEL

SHIFTS

%NOTQUART

JOBPEL

*4 TIMES PER YEAR
(QUARTERLY)

SIZE

VARIABLES

Table 9

Small
Large

0
1

1
3

4
1

4
4

0%
25%

0%
0%

24
111

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small

0

1

1

4

0%

0%

6

-

-

0.25

- $ 43.90

$

-

Large

0

3

2

4 100%

0%

78

-

-

0.25

- $ 43.90

$

-

0
1
Small
SECTOR 24. CHROMIUM CATALYST USERS
0
3
Large
Catalyst Users
0
1
Small
2
3
Large
Catalyst Companies
0
1
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
1
Large
All
0
1
Small
SECTOR 26. WOODWORKING
0
1
Large
General Industry
0
1
Small
0
1
Large
Maritime
0
1
Small
1
1
Large
Construction
1
1
Small
1
1
Large
Government
1
1
Small
SECTOR 27. SOLID WASTER INCINERATION
0
3
Large
General Industry
0
1
Small
0
3
State
Government
0
1
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
0
3
Large
All
0
3
Small
SECTOR 31. CONSTRUCTION
0
1
Large

2

4 100%

0%

312

-

-

0.25

- $ 43.90

$

-

3

4 100%

13%

193

-

-

0.25

- $ 43.90

$

-

3
3

4 100%
4 100%

0%
13%

0
25

58

232

0.25
0.25

- $ 43.90
58 $ 43.90

$
$

2,548

3

4 100%

0%

5

-

-

0.25

- $ 43.90

$

-

15

4 100%

0%

5

-

-

0.25

- $ 43.90

$

-

0

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

2

4 100%

0%

143

-

-

0.25

- $ 43.90

$

-

2
2

4 100%
4 100%

0%
0%

76
36

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

2
2

4 100%
4 100%

0%
0%

32
1,232

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

2
2

4 100%
4 100%

0%
0%

4,932
17

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

2

4 100%

0%

62

-

-

0.25

- $ 43.90

$

-

15

4 100%

0%

39

-

-

0.25

- $ 43.90

$

-

3
15

4 100%
4 100%

0%
0%

47
0

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

3

4 100%

0%

24

-

-

0.25

- $ 43.90

$

-

3

4 100%

0%

18

-

-

0.25

- $ 43.90

$

-

3

4 100%

0%

0

-

-

0.25

- $ 43.90

$

-

3

4 100%

0%

54

-

-

0.25

- $ 43.90

$

-

General Industry
Fiber, Flat, and Container Glass
SECTOR 22. PRINTING
All

Industrial Rehabilitation

Hazardous Waste-site Work

Small
State

0
0

1
1

2
2

4 100%
4 100%

0%
0%

247
16

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
Large

0
0

1
1

3
1

4 100%
4 100%

0%
0%

93
43

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Small
State

0
0

1
1

1
1

4 100%
4 100%

0%
0%

180
1

-

-

0.25
0.25

- $ 43.90
- $ 43.90

$
$

-

Local
Large

0
1

1
1

1
1

4 100%
4 100%

0%
60%

252
47

28

113

0.25
0.25

- $ 43.90
28 $ 43.90

$
$

1,235

Page 68

4 100%
4

60%

Page 69

185
111
78,321 11,481

445 0.25
45,924 0.25

111 $ 43.90
11,481 $ 43.90

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

1

%ABOVEPEL

1

%NOTQUART

#SAMPS

1

*4 TIMES PER YEAR
(QUARTERLY)

SHIFTS

Small
Weighted Average/Average/Total

JOBPEL

Refractory Brick Restoration

SIZE

VARIABLES

Table 9

$
4,885
$ 504,016

Table 9a (Remand)

TABLE 9A: Employer Time and Cost to Notify Employees of Initial Monitoring Results
BURDEN HOURS =
COST =
Variables
NOTETIME =
NONSUPWAGE =
JOBCAT =
SHIFTS =
#SAMPS =
#INIT =

(NOTETIME * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD * #PLANTS)
BURDEN HOURS * NONSUPWAGE

SECTOR 1. ELECTROPLATING
Large
Hard Chrome
Small
Large
Job Shop Chrome
Plater
Small
Large
Captive Shop Chrome
Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
SECTOR 2A. WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

SMAW

837
0
1,576
403
0
759
550
0
1,035
403
0
759
476
0
897
837
0
1,576

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

42

440

879

0.25

220

$32.54

$

7,153

79
20

414
30

827
61

0.25
0.25

207
15

$32.54
$32.54

$
$

6,731
492

38
28

28
41

57
83

0.25
0.25

14
21

$32.54
$32.54

$
$

463
671

52
20

39
30

78
61

0.25
0.25

19
15

$32.54
$32.54

$
$

632
492

38
24

28
36

57
71

0.25
0.25

14
18

$32.54
$32.54

$
$

463
581

45
42

34
63

67
126

0.25
0.25

17
31

$32.54
$32.54

$
$

547
1,022

59
118
GENERAL INDUSTRY
551
184
276

0.25

30

$32.54

$

962

0.25

138

$32.54

$

4,486

206
135

154
202

309
405

0.25
0.25

77
101

$32.54
$32.54

$
$

2,514
3,291

151
41

113
61

227
123

0.25
0.25

57
31

$32.54
$32.54

$
$

1,843
997

46
16

34
24

69
49

0.25
0.25

17
12

$32.54
$32.54

$
$

558
398

18
4

14
6

27
12

0.25
0.25

7
3

$32.54
$32.54

$
$

223
99

5
4

3
6

7
12

0.25
0.25

2
3

$32.54
$32.54

$
$

56
99

5
25

3
37

7
74

0.25
0.25

2
18

$32.54
$32.54

$
$

56
598

41

0.25

10

$32.54

$

335

4

0.25

1

$32.54

$

33

2

0.25

0.4

$32.54

$

12

7

2

3

2

25%

7
1

1
2

3
3

2
2

25%
25%

1
1

1
2

3
3

2
2

25%
25%

1
1

1
2

3
3

2
2

25%
25%

1
1

1
2

3
3

2
2

25%
25%

1
1

1
2

3
3

2
2

25%
25%

1

1

3

2

25%

1

3

2

2

25%

1
1

1
3

3
2

2
2

25%
25%

1
1

1
3

3
2

2
2

25%
25%

1
1

1
3

3
2

2
2

25%
25%

1
1

1
3

3
2

2
2

25%
25%

1
1

1
3

3
2

2
2

25%
25%

1
1

1
3

3
2

2
2

25%
25%

1

1

3

2

25%

3,676
0
4,120
2,697
0
3,021
817
0
915
327
0
366
81
0
91
81
0
91
490
0
550

Large

1

3

1

2

75%

18

1

Small

1

2

1

2

75%

10

1

Page 70

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

JOBCAT

SIZE

VARIABLES

Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 minutes).
Non-supervisory wage rate, $/hr.
Number of job categories (covering each work area)
Number of work shifts
Number of samples per exposure measurement
Equals two, reflecting that initial monitoring will have to be conducted twice — with readings below the action level in order for the
requirement of semi-annual monitoring to be waived.
%INITADD = Percent of plants that have not satisified initial monitoring requirement
#PLANTS * 5% = Number of plants represented by the model output * 5%

79

27

21
MARITIME
2
1

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

JOBCAT

SIZE

VARIABLES

Table 9a (Remand)

Large

1

3

1

2

75%

25

1

3

6

0.25

1

$32.54

$

46

Small
Large

1
1

2
3

1
1

2
2

75%
75%

14
6

1
0.3

1
1

2
1

0.25
0.25

1
0.3

$32.54
$32.54

$
$

17
11

Small
Large

1
1

2
3

1
1

2
2

75%
75%

3
121

0.2
6

0.2
14

0.5
27

0.25
0.25

0.1
7

$32.54
$32.54

$
$

4
221

Small
Large

1
1

2
3

1
1

2
2

75%
75%

68
4

3
0.2

5
0.5

10
1

0.25
0.25

3
0.2

$32.54
$32.54

$
$

83
7

Small
Large

1
1

2
3

1
1

2
2

75%
75%

2
2

0.1
0.1

0.2
0.2

0.3
0.5

0.25
0.25

0.1
0.1

$32.54
$32.54

$
$

2
4

Small
Large

1
1

2
3

1
1

2
2

75%
75%

1
4

0.1
0.2

0.1
0.5

0.2
1

0.25
0.25

0.0
0.2

$32.54
$32.54

$
$

1
7

Small
Large

1
1

2
3

1
1

2
2

75%
75%

2
2

0.1
0.1

0.2
0.2

0.3
0.5

0.25
0.25

0.1
0.1

$32.54
$32.54

$
$

2
4

Small
Large

1
1

2
3

1
1

2
2

75%
75%

1
0

0.1
-

0.1
-

0.2
-

0.25
0.25

0.04
-

$32.54
$32.54

$
$

1
-

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
0

-

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
16

1

2

4

0.25
0.25

1

$32.54
$32.54

$
$

29

Small

1

2

1

2

75%

9

Large

1

3

1

2

25%

209

Small
Large

1
1

1
3

1
1

2
2

25%
25%

Small
Large

1
1

1
3

1
1

2
2

Small
State

1
1

1
3

1
1

Local
State

1
1

1
3

Local

1

Large

0.5
1
CONSTRUCTION
10
8

1

0.25

0.3

$32.54

$

11

16

0.25

4

$32.54

$

128

1,673
3

84
0.2

21
0.1

42
0.2

0.25
0.25

10.5
0.1

$32.54
$32.54

$
$

340
2

25%
25%

22
42

1
2

0.3
2

1
3

0.25
0.25

0.1
1

$32.54
$32.54

$
$

4
26

2
2

25%
25%

335
21

17
1

4
1

8
2

0.25
0.25

2.1
0.4

$32.54
$32.54

$
$

68
13

1
1

2
2

25%
25%

168
4

8
0.2

2
0.2

4
0.3

0.25
0.25

1.0
0.1

$32.54
$32.54

$
$

34
2

1

1

2

25%

33

1

0.25

0.2

$32.54

$

7

1

1

1

2

25%

20

1

0.25

0.1

$32.54

$

4

Small
Large

1
1

1
1

1
1

2
2

25%
25%

614
0

31
-

8
-

15
-

0.25
0.25

3.8
-

$32.54
$32.54

$
$

125
-

Small
Large

1
1

1
1

1
1

2
2

25%
25%

8
4

0.4
0.2

0.1
0.1

0
0

0.25
0.25

0.1
0.03

$32.54
$32.54

$
$

2
1

Small
State

1
1

1
1

1
1

2
2

25%
25%

123
2

6
0.1

2
0.03

3
0

0.25
0.25

0.8
0.01

$32.54
$32.54

$
$

25
0.4

Local
State

1
1

1
1

1
1

2
2

25%
25%

61
1

3
0.05

1
0.01

2
0

0.25
0.25

0.4
0.01

$32.54
$32.54

$
$

12
0.2

Page 71

2
0.4
GOVERNMENT
1
0.3

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray
Tungsten Cutting
SAW

SMAW

1

1

1

2

25%

12

1

3

2

2

25%

1
1

1
3

3
2

2
2

1
1

1
3

3
2

1
1

1
3

1
1

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

0

0.25

0.1

$32.54

$

2

4,929

1
0.2
GENERAL INDUSTRY
246
370

739

0.25

185

$32.54

$

6,015

25%
25%

5,019
3,615

251
181

188
271

376
542

0.25
0.25

94.1
136

$32.54
$32.54

$
$

3,062
4,412

2
2

25%
25%

3,680
1,095

184
55

138
82

276
164

0.25
0.25

69.0
41

$32.54
$32.54

$
$

2,246
1,336

3
2

2
2

25%
25%

1,115
438

56
22

42
33

84
66

0.25
0.25

20.9
16

$32.54
$32.54

$
$

680
535

1
3

3
2

2
2

25%
25%

446
110

22
5

17
8

33
16

0.25
0.25

8.4
4

$32.54
$32.54

$
$

272
134

1
1

1
3

3
2

2
2

25%
25%

112
110

6
5

4
8

8
16

0.25
0.25

2.1
4

$32.54
$32.54

$
$

68
134

1
1

1
3

3
2

2
2

25%
25%

112
657

6
33

4
49

8
99

0.25
0.25

2.1
25

$32.54
$32.54

$
$

68
802

1

1

3

2

25%

669

33

50

0.25

12.5

$32.54

$

408

Large

1

3

1

2

75%

38

25
MARITIME
2
4

9

0.25

2

$32.54

$

70

Small
Large

1
1

2
3

1
1

2
2

75%
75%

22
55

1
3

2
6

3
12

0.25
0.25

0.8
3

$32.54
$32.54

$
$

27
101

Small
Large

1
1

2
3

1
1

2
2

75%
75%

31
13

2
1

2
1

5
3

0.25
0.25

1.2
1

$32.54
$32.54

$
$

38
24

Small
Large

1
1

2
3

1
1

2
2

75%
75%

7
259

0.4
13

1
29

1
58

0.25
0.25

0.3
15

$32.54
$32.54

$
$

9
475

Small
Large

1
1

2
3

1
1

2
2

75%
75%

147
8

7
0.4

11
1

22
2

0.25
0.25

5.5
0.5

$32.54
$32.54

$
$

179
15

Small
Large

1
1

2
3

1
1

2
2

75%
75%

5
3

0.3
0.2

0.4
0.3

1
1

0.25
0.25

0.2
0.2

$32.54
$32.54

$
$

6
6

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
8

0
0.4

1

2

0.25
0.25

0.5

$32.54
$32.54

$
$

15

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
3

0
0.2

0.3

1

0.25
0.25

0.2

$32.54
$32.54

$
$

6

Small
Large

1
1

2
3

1
1

2
2

75%
75%

2
0

0.1
0

0.2
-

0.3
-

0.25
0.25

0.1
-

$32.54
$32.54

$
$

2
-

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
0

0
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2
2

75%
75%

0
34

0
2

4

8

0.25
0.25

2

$32.54
$32.54

$
$

63

Small

1

2

1

2

75%

19

3

0.25

0.7

$32.54

$

23

Large

1

3

1

2

25%

313

24

0.25

6

$32.54

$

191

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

SMAW

JOBCAT

SIZE

VARIABLES

Table 9a (Remand)

Page 72

1
1
CONSTRUCTION
16
12

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3. PAINTING
General Industry
(Aerospace)
General Industry
(Autobody)
General Industry (Coil
Coating)
Maritime

Construction

Government

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

JOBCAT

SIZE

VARIABLES

Table 9a (Remand)

Small
Large

1
1

1
3

1
1

2
2

25%
25%

2,368
4

118
0.2

30
0.2

59
0.3

0.25
0.25

14.8
0.1

$32.54
$32.54

$
$

482
2

Small
Large

1
1

1
3

1
1

2
2

25%
25%

31
62

2
3

0.4
2

1
5

0.25
0.25

0.2
1

$32.54
$32.54

$
$

6
38

Small
State

1
1

1
3

1
1

2
2

25%
25%

473
31

24
2

6
1

12
2

0.25
0.25

3
1

$32.54
$32.54

$
$

96
19

Local
State

1
1

1
3

1
1

2
2

25%
25%

237
6

12
0.3

3
0.2

6
0.5

0.25
0.25

1
0.1

$32.54
$32.54

$
$

48
4

Local

1

1

1

2

25%

47

Large

2

3

3

2

25%

50

Small
Large

1
2

1
2

3
3

2
2

25%
25%

Small
Large

2
2

1
2

3
3

2
2

Small
Large

2
3

1
3

3
1

Small
Large

3
3

1
3

Small
Large

3
2

1
3

2
1
GENERAL INDUSTRY
2
11

1

0.25

0.3

$32.54

$

10

22

0.25

6

$32.54

$

181

62
330

3
17

2
50

5
99

0.25
0.25

1
25

$32.54
$32.54

$
$

38
806

25%
25%

1,454
101

73
5

109
15

218
30

0.25
0.25

55
8

$32.54
$32.54

$
$

1,775
246

2
2

25%
25%

18
274

1
14

1
31

3
62

0.25
0.25

1
15

$32.54
$32.54

$
$

22
502

1
1

2
2

25%
25%

474
789

24
39

18
89

36
178

0.25
0.25

9
44

$32.54
$32.54

$
$

289
1,445

1
1

2
2

25%
25%

4,197
17

210
1

157
1

315
3

0.25
0.25

79
1

$32.54
$32.54

$
$

2,561
21

2

25%

945

47

24

47

0.25

12

$32.54

$

384

2

100%

2

0

3

7

0.25

2

$32.54

$

55

2

0%

0

0

-

-

0.25

-

$32.54

$

-

2

25%

2

0.1

1

2

0.25

1

$32.54

$

18

2

25%

1

0.04

0.03

0.1

0.25

0.02

$32.54

$

1

2

25%

3

0.1

1

2

0.25

1

$32.54

$

19

2

0%

0

0

-

-

0.25

-

$32.54

$

-

2

25%

5

0.2

7

15

0.25

4

$32.54

$

119

2

0%

0

0

-

-

0.25

-

$32.54

$

-

2

25%

78

4

23

47

0.25

12

$32.54

$

382

2

25%

123

6

37

74

0.25

18

$32.54

$

600

2

100%

2

0.1

5

10

0.25

2

$32.54

$

81

2

100%

7

0.4

6

11

0.25

3

$32.54

$

90

2

25%

79

4

36

71

0.25

18

$32.54

$

580

2

25%

39

2

1

3

0.25

1

$32.54

$

24

Small
2
1
1
SECTOR 4. PRODUCERS OF CHROMATES
Large
4
3
3
All
Small
0
1
3
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
9
2
3
All
Small
1
1
3
SECTOR 6. CCA PRODUCERS
Large
4
3
3
All
Small
0
3
0
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
14
3
3
All
Small
0
1
3
SECTOR 8. PAINT AND COATING PRODUCERS
Large
4
2
3
All
Small
4
2
3
SECTOR 9. PRINTING INK PRODUCERS
Large
5
1
9
All
Small
3
1
5
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
4
3
3
All
Small
1
1
3

Page 73

SECTOR 11. PLATING MIXTURE PRODUCERS
Large
3
1
All
Small
3
1
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
16
3
All
Small
0
1
SECTOR 14. IRON AND STEEL MILLS
Large
8
3
Alloy Stainless Steel
Small
4
1
Large
8
3
Carbon Steel
Small
4
1
SECTOR 14.B FORGING INDUSTRY
Large
5
1
Forging Industry
Small
2
1
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
9
3
All
Small
5
1
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
7
1
All
Small
5
1
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
0
1
All
Small
2
1
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
1
1
All
Small
1
1
SECTOR 20. TEXTILE DYEING
Large
3
3
All
Small
2
1
SECTOR 21. COLORED GLASS PRODUCERS
3
3
Large
General Industry
Small
2
1
Large
3
3
Fiber, Flat and
Container Glass
Small
2
1
SECTOR 22. PRINTING
Large
3
3
All
Small
2
1
SECTOR 24. CHROMIUM CATALYST USERS
Large
2
3
Catalyst Users
Small
0
1
Large
2
3
Chromium Catalyst
Service Companies
Small
0
1
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
9
1
All

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

JOBCAT

SIZE

VARIABLES

Table 9a (Remand)

3

2

75%

6

0.3

2

4

0.25

1

$32.54

$

32

3

2

75%

4

0.2

1

3

0.25

1

$32.54

$

22

3

2

100%

1

0.1

7

15

0.25

4

$32.54

$

122

1

2

0%

0

0

-

-

0.25

-

$32.54

$

-

3

2

75%

39

2

105

209

0.25

52

$32.54

$

1,701

3
3

2
2

75%
75%

12
116

1
6

6
314

11
627

0.25
0.25

3
157

$32.54
$32.54

$
$

91
5,103

3

2

75%

37

2

16

33

0.25

8

$32.54

$

267

3

2

75%

33

2

19

37

0.25

9

$32.54

$

304

1

2

75%

31

2

2

5

0.25

1

$32.54

$

38

5

2

25%

152

8

257

514

0.25

128

$32.54

$

4,178

5

2

25%

111

6

35

69

0.25

17

$32.54

$

563

21

2

25%

2

0.1

5

9

0.25

2

$32.54

$

75

7

2

25%

1

0.0

0.4

1

0.25

0.2

$32.54

$

6

3

2

0%

0

0

-

-

0.25

-

$32.54

$

-

3

2

100%

5

0.2

1

3

0.25

1

$32.54

$

23

3

2

75%

212

11

24

48

0.25

12

$32.54

$

388

3

2

75%

1,600

80

180

360

0.25

90

$32.54

$

2,928

3

2

75%

307

15

311

622

0.25

155

$32.54

$

5,057

2

2

75%

623

31

93

187

0.25

47

$32.54

$

1,520

12

2

75%

8

0.4

31

63

0.25

16

$32.54

$

510

4
12

2
2

75%
75%

24
111

1
6

7
449

15
898

0.25
0.25

4
225

$32.54
$32.54

$
$

120
7,306

4

2

75%

6

0.3

2

4

0.25

1

$32.54

$

31

2

2

75%

78

4

53

105

0.25

26

$32.54

$

856

2

2

75%

312

16

47

93

0.25

23

$32.54

$

761

3

2

75%

193

10

130

260

0.25

65

$32.54

$

2,114

3
3

2
2

0%
75%

0
25

0
1

17

33

0.25
0.25

8

$32.54
$32.54

$
$

272

3

2

0%

5

0

-

-

0.25

-

$32.54

$

-

15

2

75%

5

0

26

52

0.25

13

$32.54

$

427

Page 74

Small
0
1
SECTOR 26. WOODWORKING
Large
1
1
General Industry
Small
1
1
Large
1
1
Maritime
Small
1
1
Large
1
1
Construction
Small
1
1
Large
1
1
Government
Small
1
1
SECTOR 27. SOLID WASTER INCINERATION
Large
6
3
General Industry
Small
6
1
State
0
3
Government
Local
6
1
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
12
3
All
Small
0
3
SECTOR 31. CONSTRUCTION
Large
4
1

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS * 5%

# PLANTS

% INITADD

# INIT

# SAMPS

SHIFTS

JOBCAT

SIZE

VARIABLES

Table 9a (Remand)

0

2

75%

0

0

-

-

0.25

-

$32.54

$

-

1

2

75%

143

7

5

11

0.25

3

$32.54

$

87

1
1

2
2

75%
75%

76
36

4
2

3
1

6
3

0.25
0.25

1
1

$32.54
$32.54

$
$

47
22

1
1

2
2

75%
75%

32
1,232

2
62

1
46

2
92

0.25
0.25

1
23

$32.54
$32.54

$
$

19
752

1
1

2
2

75%
75%

4,932
17

247
1

185
1

370
1

0.25
0.25

92
0

$32.54
$32.54

$
$

3,009
10

1

2

75%

62

3

2

5

0.25

1

$32.54

$

38

15

2

75%

39

2

399

799

0.25

200

$32.54

$

6,499

3
15

2
2

75%
75%

47
0

2
0

32
-

64
-

0.25
0.25

16
-

$32.54
$32.54

$
$

520
-

3

2

75%

24

1

16

32

0.25

8

$32.54

$

260

3

2

75%

18

1

71

142

0.25

36

$32.54

$

1,155

3

2

0%

0

0

-

-

0.25

-

$32.54

$

-

3

2

75%

54

3

24

48

0.25

12

$32.54

$

394

Small
State

4
1

1
1

2
1

2
2

75%
100%

247
16

12
1

74
1

148
2

0.25
0.25

37
0.4

$32.54
$32.54

$
$

1,205
13

Local
Large

1
1

1
1

1
1

2
2

100%
75%

93
43

5
2

5
2

9
3

0.25
0.25

2
1

$32.54
$32.54

$
$

75
26

Hazardous Waste-site Small
Work
State

1
1

1
1

1
1

2
2

75%
75%

180
1

9
0.04

7
0.03

13
0.1

0.25
0.25

3
0.02

$32.54
$32.54

$
$

110
1

Local
Large

1
1

1
1

1
1

2
2

75%
0%

252
47

13
2

9
-

19
-

0.25
0.25

5
-

$32.54
$32.54

$
$

154
-

Small
Large

1
4

1
1

1
3

2
2

0%
75%

185
9,373

9
469

4,218

8,436

0.25
0.25

2,109

$32.54
$32.54

$
$

68,628

Small
State

4
4

1
1

2
3

2
2

75%
75%

96,390
23

4,819
1

28,917
10

57,834
20

0.25
0.25

14,458
5

$32.54
$32.54

$ 470,498
$
165

4

1

2

2

75%

774

39

232

465

0.25

116

$32.54

$

3,779

7

1

11

2

75%

1,094

55

3,160

6,320

0.25

1,580

$32.54

$

51,416

5

1

6

2

75%

1,800

90

2,025

4,051

0.25

1,013

$32.54

$

32,953

7

1

11

2

75%

1,642

82

4,740

9,480

0.25

2,370

$32.54

$

77,123

5

1

6

2
2

75%

3,830
193,248

192
9,662

4,309
54,903

8,618 0.25
109,806 0.25

2,155
27,452

$32.54
$32.54

$ 70,112
$ 893,288

Industrial
rehabilitation

Refractory Brick
Restoration

Cement Workers

Local
SECTOR 32. Pre-Cast Concrete Products
Large
All
Small
SECTOR 32A. Ready Mix Concrete
Large
All
Small
Total/Average

Page 75

Table 9b

TABLE 9B: Employer Time and Cost to Notify Employees of Semi-Annual Monitoring Results
BURDEN HOURS = (NOTETIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * #PLANTS)
COST = BURDEN HOURS * NON SUPEWAGE

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

#SAMPS

%ABOVEAL

SHIFTS

%NOTSEMI

JOBAL

SECTOR 1. ELECTROPLATING
Large
Hard Chrome
Small
Large
Job Shop Chrome
Plater
Small
Large
Captive Shop
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
SECTOR 2A. WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small

SEMI-ANNUALLY

Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 mintues).
Non-supervisory wage rate. $/hr.
Number of job categories exposed at or above the AL
Number of work shifts.
Number of samples per exposure measurement
# times per year (semi-annually)
Percent of plants not performing semi-annual monitoring requirements.
Percent of plants that have an employee in at least one job category above the AL.
Number of plants represented by the model input.

SIZE

VARIABLES

Variables:
NOTETIME =
NONSUPEWAGE =
JOBAL =
SHIFTS =
#SAMPS =
SEMI-ANNUALLY =
%NOTSEMI =
%ABOVEAL =
#PLANTS =

1

2

3

2 100%

49.00%

837

2,462

4,924

0.25

1,231

$32.54

$

40,058

1
1

1
2

3
3

2 100%
2 100%

49.00%
11.00%

1,576
403

2,317
266

4,633
533

0.25
0.25

1,158
133

$32.54
$32.54

$
$

37,694
4,333

1
1

1
2

3
3

2 100%
2 100%

11.00%
14.00%

759
550

251
462

501
924

0.25
0.25

125
231

$32.54
$32.54

$
$

4,076
7,517

1
1

1
2

3
3

2 100%
2 100%

14.00%
10.00%

1,035
403

435
242

870
484

0.25
0.25

217
121

$32.54
$32.54

$
$

7,075
3,939

1
1

1
2

3
3

2 100%
2 100%

10.00%
13.00%

759
476

228
372

456
743

0.25
0.25

114
186

$32.54
$32.54

$
$

3,706
6,047

1
1

1
2

3
3

2 100%
2 100%

13.00%
16.00%

897
837

350
804

700
1,608

0.25
0.25

175
402

$32.54
$32.54

$
$

5,691
13,080

1

1

3

2 100%

16.00%

1,576

0.25

378

$32.54

$

12,308

1

3

2

2 100%

0.92%

3,676

1,513
756
GENERAL INDUSTRY
203
406

0.25

101

$32.54

$

3,302

1
1

1
3

3
2

2 100%
2 100%

0.92%
0.73%

4,120
2,697

114
118

227
236

0.25
0.25

57
59

$32.54
$32.54

$
$

1,850
1,922

1
1

1
3

3
2

2 100%
2 100%

0.73%
0.00%

3,021
817

66
-

132
-

0.25
0.25

33
-

$32.54
$32.54

$
$

1,077
-

1
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

915
327

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
1

1
3

3
2

2 100%
2 100%

0.00%
0.00%

366
81

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

1
1

1
3

3
2

2 100%
2 100%

0.00%
0.00%

91
81

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

1

1

3

2 100%

0.00%

91

-

-

0.25

-

$32.54

$

-

Page 76

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy-fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

#SAMPS

GMAW

SHIFTS

SMAW

JOBAL

Resistance Welding

Large

1

3

2

2 100%

0.00%

490

-

-

0.25

-

$32.54

$

-

Small

1

1

3

2 100%

0.00%

550

-

0.25

-

$32.54

$

-

Large

1

3

1

2 100%

0.00%

18

MARITIME
-

-

0.25

-

$32.54

$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

10
25

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

14
6

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

3
121

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

68
4

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

2
2

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

1
4

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

2
3

1
1

2 100%
2 100%

0.00%
0.00%

2
2

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

1
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
16

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small

0

2

1

2 100%

0.00%

9

-

0.25

-

$32.54

$

-

Large

1

3

1

2 100%

0.00%

209

CONSTRUCTION
-

-

0.25

-

$32.54

$

-

Small
Large

1
0

1
3

1
1

2 100%
2 100%

0.00%
0.00%

1,673
3

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

1
1

1
3

1
1

2 100%
2 100%

0.00%
0.00%

22
42

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
State

1
1

1
3

1
1

2 100%
2 100%

0.00%
0.00%

335
21

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
State

1
1

1
3

1
1

2 100%
2 100%

0.00%
0.00%

168
4

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local

1

1

1

2 100%

0.00%

33

GOVERNMENT

-

0.25

-

$32.54

$

-

SIZE

VARIABLES

Table 9b

Page 77

Brazing

Metallizing

GMAW

TIG

FCAW

Plasma Cutting

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEAL

%NOTSEMI

State

1

1

1

2 100%

0.00%

20

-

-

0.25

-

$32.54

$

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0.00%
0.00%

614
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0.00%
0.00%

8
4

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0.00%
0.00%

123
2

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
State

1
1

1
1

1
1

2 100%
2 100%

0.00%
0.00%

61
1

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

1

1

1

2 100%

0.00%

12

0.25

-

$32.54

$

-

0

3

2

2 100%

0.00%

4,929

GENERAL INDUSTRY
-

0.25

-

$32.54

$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

5,019
3,615

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

3,680
1,095

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

1,115
438

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

446
110

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

112
110

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0
0

1
3

3
2

2 100%
2 100%

0.00%
0.00%

112
657

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

0

1

3

2 100%

0.00%

669

-

0.25

-

$32.54

$

-

Large

0

3

1

2 100%

0.00%

38

MARITIME
-

-

0.25

-

$32.54

$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

22
55

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

31
13

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

7
259

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

147
8

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

5
3

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
SECTOR 2B. MILD STEEL WELDING
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

SMAW

SEMI-ANNUALLY

#SAMPS

GMAW

SHIFTS

Plasma Cutting

JOBAL

SMAW

SIZE

VARIABLES

Table 9b

Page 78

Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEAL

#SAMPS

Air Carbon Arc
Cutting

%NOTSEMI

SHIFTS

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
8

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
3

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

2
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

2
3

1
1

2 100%
2 100%

0.00%
0.00%

0
34

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small

0

2

1

2 100%

0.00%

19

-

0.25

-

$32.54

$

-

Large

0

3

1

2 100%

0.00%

313

CONSTRUCTION
-

-

0.25

-

$32.54

$

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0.00%
0.00%

2,368
4

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0.00%
0.00%

31
62

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0.00%
0.00%

473
31

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small
Large

0
0

1
3

1
1

2 100%
2 100%

0.00%
0.00%

237
6

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

1

1

2 100%

0.00%

47

0.25

-

$32.54

$

-

3

3

2 100%

28.00%

50

GENERAL INDUSTRY
125
250

0.25

62

$32.54

$

2,032

1
1

3
1

2 100%
2 100%

9.00%
5.00%

62
330

17
17

34
33

0.25
0.25

8
8

$32.54
$32.54

$
$

274
269

1
2

1
3

2 100%
2 100%

5.00%
8.00%

1,454
101

73
48

145
97

0.25
0.25

36
24

$32.54
$32.54

$
$

1,183
788

1
3

3
1

2 100%
2 100%

8.00%
36.00%

18
274

4
593

9
1,185

0.25
0.25

2
296

$32.54
$32.54

$
$

72
9,644

1
3

1
1

2 100%
2 100%

36.00%
22.00%

474
789

521

1,042

0.25
0.25

261

$32.54
$32.54

$
$

8,478

1
3

1
1

2 100%
2 100%

22.00%
12.00%

4,197
17

923
6

1,847
12

0.25
0.25

462
3

$32.54
$32.54

$
$

15,023
100

1

1

2 100%

12.00%

945

113

227

0.25

57

$32.54

$

1,845

3

3

2 100%

45.00%

2

23

45

0.25

11

$32.54

$

368

Plasma Welding

Oxy-fuel Cutting

SEMI-ANNUALLY

JOBAL

Small
Large

SIZE

VARIABLES

Table 9b

Small
0
SECTOR 3. PAINTING
Large
1
Aerospace
Small
1
Large
1
General Industry
(Autobody)
Small
1
Large
1
General Industry
(Coil Coating)
Small
1
Large
2
Maritime
Small
0
Large
1
Construction
Small
1
State
1
Government
Local
1
SECTOR 4. PRODUCERS OF CHROMATES
Large
3

Page 79

All

Small
0 1 3 2 100%
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
5 2 3 2 100%
All
Small
1 1 3 2 100%
SECTOR 6. CCA PRODUCERS
Large
1 3 3 2 100%
All
Small
0 3 0 2 100%
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
6 3 3 2 100%
ALL
Small
0 1 3 2 100%
SECTOR 8. PAINT AND COATING PRODUCERS
Large
1 2 3 2 100%
ALL
Small
1 2 3 2 100%
SECTOR 9. PRINTING INK PRODUCERS
Large
3 1 9 2 100%
All
Small
2 1 5 2 100%
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
2 3 3 2 100%
All
Small
2 1 3 2 100%
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
1 1 3 2 100%
All
Small
1 1 3 2 100%
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
2 3 3 2 100%
All
0%
Small
0 1 1 2
SECTOR 14. IRON AND STEEL MILLS
Large
3 3 3 2 100%
Alloy and Stainless
Steel
Small
1 1 3 2 100%
Large
0 3 3 2 100%
Carbon Steel
Small
0 1 1 2 100%
SECTOR 14.B FORGING INDUSTRY
Large
4 1 3 2 100%
Reshaping
Small
2 1 3 2 100%
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
6 3 5 2 100%
All
Small
5 1 5 2 100%
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
6 1 21 2 100%
All
Small
6 1 7 2 100%
SECTOR 18. CHROMIUM SULFATE PRODUCTERS

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI-ANNUALLY

#SAMPS

SHIFTS

JOBAL

SIZE

VARIABLES

Table 9b

0.00%

0

-

-

0.25

-

$32.54

$

-

71.00%

2

35

71

0.25

18

$32.54

$

577

50.00%

1

1

2

0.25

1

$32.54

$

20

33.00%

3

8

15

0.25

4

$32.54

$

125

0.00%

0

-

-

0.25

-

$32.54

$

-

100.00%

5

251

503

0.25

126

$32.54

$

4,091

0.00%

0

-

-

0.25

-

$32.54

$

-

13.00%

78

61

122

0.25

31

$32.54

$

993

13.00%

123

96

192

0.25

48

$32.54

$

1,560

69.00%

2

41

83

0.25

21

$32.54

$

672

69.00%

7

51

102

0.25

25

$32.54

$

829

51.00%

79

727

1,454

0.25

363

$32.54

$

11,827

51.00%

39

119

237

0.25

59

$32.54

$

1,928

100.00%

6

18

36

0.25

9

$32.54

$

289

100.00%

4

12

24

0.25

6

$32.54

$

193

100.00%

1

19

37

0.25

9

$32.54

$

304

0.00%

0

-

-

0.25

-

$32.54

$

-

38.00%

39

397

795

0.25

199

$32.54

$

6,464

38.00%
0.00%

12
116

14
-

28
-

0.25
0.25

7
-

$32.54
$32.54

$
$

230
-

0.00%

37

-

-

0.25

-

$32.54

$

-

63.00%

33

251

502

0.25

126

$32.54

$

4,084

63.00%

31

118

237

0.25

59

$32.54

$

1,924

100.00%

152

13,694

27,387

0.25

6,847

$32.54

$ 222,805

100.00%

111

2,766

5,533

0.25

1,383

$32.54

$

45,011

38.00%

2

120

239

0.25

60

$32.54

$

1,947

38.00%

1

13

27

0.25

7

$32.54

$

216

Page 80

2 100%

Small
1 1 3 2
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
0 1 3 2
All
Small
0 1 3 2
SECTOR 20. TEXTILE DYEING
Large
0 3 3 2
All
Small
0 1 2 2
SECTOR 21. COLORED GLASS PRODUCERS
Large
1 3 12 2
General Industry
Small
0 1 4 2
Large
3 1 1 2
Fiber, Flat,
Container Glass
Small
0 1 1 2
SECTOR 22. PRINTING
Large
0 3 2 2
All
Small
0 1 2 2
SECTOR 24. CHROMIUM CATALYST USERS
Large
2 3 3 2
Catalyst Users
Small
0 1 3 2
Large
0 3 3 2
Chromium Catalyst
Service Companies
Small
0 1 3 2
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
0 1 15 2
All
Small
0 1 0 2
SECTOR 26. WOODWORKING
Large
0 1 2 2
General Industry
Small
0 1 2 2
Large
0 1 1 2
Maritime
Small
0 1 1 2
Large
1 1 1 2
Construction
Small
1 1 1 2
State
1 1 1 2
Government
Local
1 1 1 2
SECTOR 27. SOLID WASTER INCINERATION
Large
0 3 15 2
General Industry
Small
0 1 3 2
State
0 3 15 2
Government
Local
0 1 3 2
SECTOR 30. SUPERALLOY PRODUCERS AND USERS

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

3

%ABOVEAL

1

%NOTSEMI

#SAMPS

0

SEMI-ANNUALLY

SHIFTS

Large

JOBAL

All

SIZE

VARIABLES

Table 9b

0.00%

0

-

-

0.25

-

$32.54

$

-

100%

27.00%

5

4

8

0.25

2

$32.54

$

61

100%

0.00%

212

-

-

0.25

-

$32.54

$

-

100%

0.00%

1,600

-

-

0.25

-

$32.54

$

-

100%

0.00%

307

-

-

0.25

-

$32.54

$

-

100%

0.00%

623

-

-

0.25

-

$32.54

$

-

100%

25.00%

8

70

139

0.25

35

$32.54

$

1,133

100%
100%

0.00%
20.00%

24
111

67

133

0.25
0.25

33

$32.54
$32.54

$
$

1,082

100%

0.00%

6

-

-

0.25

-

$32.54

$

-

100%

0.00%

78

-

-

0.25

-

$32.54

$

-

100%

0.00%

312

-

-

0.25

-

$32.54

$

-

100%

9.00%

193

312

624

0.25

156

$32.54

$

5,075

100%
100%

0.00%
0.00%

0
25

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

100%

0.00%

5

-

-

0.25

-

$32.54

$

-

100%

0.00%

5

-

-

0.25

-

$32.54

$

-

100%

0.00%

0

-

-

0.25

-

$32.54

$

-

100%

0.00%

143

-

-

0.25

-

$32.54

$

-

100%
100%

0.00%
0.00%

76
36

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

100%
100%

0.00%
22.00%

32
1,232

271

542

0.25
0.25

136

$32.54
$32.54

$
$

4,411

100%
100%

22.00%
22.00%

4,932
17

1,085
4

2,170
8

0.25
0.25

543
2

$32.54
$32.54

$
$

17,656
61

100%

22.00%

62

14

27

0.25

7

$32.54

$

221

100%

0.00%

39

-

-

0.25

-

$32.54

$

-

100%
100%

0.00%
0.00%

47
0

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

100%

0.00%

24

-

-

0.25

-

$32.54

$

-

Page 81

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

NOTETIME

RESPONSES

RESPONDENTS

#PLANTS

%ABOVEAL

%NOTSEMI

#SAMPS

SEMI-ANNUALLY

SHIFTS

0

3

3

2 100%

0.00%

18

-

-

0.25

-

$32.54

$

-

0

3

3

2 100%

0.00%

0

-

-

0.25

-

$32.54

$

-

0

1

1

2 100%

0.00%

54

-

-

0.25

-

$32.54

$

-

Small
State

0
0

1
1

1
1

2 100%
2 100%

0.00%
0.00%

247
16

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
Large

0
0

1
1

1
1

2 100%
2 100%

0.00%
0.00%

93
43

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Hazardous Waste- Small
site Work
State

0
0

1
1

1
1

2 100%
2 100%

0.00%
0.00%

180
1

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Local
Large

0
0

1
1

1
1

2 100%
2 100%

0.00%
60.00%

252
47

-

-

0.25
0.25

-

$32.54
$32.54

$
$

-

Small

0

1

1

2 100%
2

60.00%

185

$32.54
$32.54

$
$ 529,523

All

SIZE

JOBAL

VARIABLES

Table 9b

Large

Small
SECTOR 31. CONSTRUCTION
Large
Industrial
Rehabilitation

Refractory Brick
Restoration
Average/Total

Page 82

32,546

- 0.25
65,092 0.25

16,273

Table 10

TABLE 10: Respiratory-Protection Program:  Qualitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and
1926.1126(f)(2)); Employee and Industrial Hygiene Technician Time and Cost to Conduct Qualitative Fit Testing
This table calculates the burden hours and cost of employee and industrial hygienist time to conduct fit-testing. The time, in
hours, for an employee to be qualitative fit-tested is multiplied by the number of employees that require fit -testing and by
the nonsupervisory wage rate.
(QLFITTIME + QLFITTECH) * QLFITEMP * 1-%FITBASE * #PLANTS
BURDEN HOURS * NONSUPEWAGE

1

3,595

3,595

0.25

0.25

1,797

$32.54 $

58,490

1,104

97%

1

1,071

1,071

0.25

0.25

535

$32.54 $

17,422

2,968

81%

1

2,404

2,404

0.25

0.25

1,202

$32.54 $

39,117

2,170
2,422

98%
55%

1
1

2,127
1,332

2,127
1,332

0.25
0.25

0.25
0.25

1,063
666

$32.54 $
$32.54 $

34,606
21,678

57
3,354

95%
88%

1
1

54
2,951

54
2,951

0.25
0.25

0.25
0.25

27
1,476

$32.54 $
$32.54 $

885
48,022

2,593
15

99%
88%

1
1

2,567
13

2,567
13

0.25
0.25

0.25
0.25

1,284
7

$32.54 $
$32.54 $

41,773
216

76

99%

1

76

76

0.25

0.25

38

$32.54 $

1,230

718

81%

1

582

582

0.25

0.25

291

$32.54 $

9,468

2,170
17

98%
55%

1
1

2,127
9

2,127
9

0.25
0.25

0.25
0.25

1,063
5

$32.54 $
$32.54 $

34,606
153

0
684

95%
88%

1
1

602

602

0.25
0.25

0.25
0.25

301

$32.54 $
$32.54 $

9,797

551
15

99%
88%

1
1

545
13

545
13

0.25
0.25

0.25
0.25

273
7

$32.54 $
$32.54 $

8,869
216

76

99%

1

76

76

0.25

0.25

38

$32.54 $

1,230

46

81%

50

1,841

1,841

0.25

0.25

921

$32.54 $

29,962

QLFITTIME

#PLANTS

QLFITEMP

RESPONSES

Page 83

ITEM 12 COST

NONSUPEWAGE

71%

RESPONDENTS

5,063

1-%FITBASE

BURDEN HOURS

SECTOR 1. ELECTROPLATING
Large
All
Small
SECTOR 2A. WELDING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 2B. MILD STEEL WELDING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 3. PAINTING
Large
General Industry
(Aerospace)

QLFITTECH

Time, in hours, for an employee to be qualitative fit-tested
Time, in hours, for a technician to conduct one qualitative fit test
Number of employees requiring annual qualitative fit-testing
(%FITBASE is the percent of plants conducting annual respirator fit-testing in the baseline)
Non-Supervisory wage rate
Number of plants represented by the model input

SIZE

VARIABLES

BURDEN HOURS =
COST =
Variables:
QLFITTIME =
QLFITTECH =
QLFITEMP =
1-%FITBASE =
NONSUPEWAGE =
#PLANTS =

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QLFITTECH

QLFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QLFITEMP

(Aerospace)

SIZE

VARIABLES

Table 10

Small
Large

0
1

98%
81%

62
330

8
246

8
246

0.25
0.25

0.25
0.25

4
123

$32.54 $
$32.54 $

128
3,995

Small
Large

0
2

98%
81%

1,454
101

301
150

301
150

0.25
0.25

0.25
0.25

150
75

$32.54 $
$32.54 $

4,894
2,441

Small
Large

1
3

98%
55%

18
274

17
409

17
409

0.25
0.25

0.25
0.25

8
205

$32.54 $
$32.54 $

269
6,655

Small
Large

1
486

95%
0%

474
1

424
-

424
-

0.25
0.25

0.25
0.25

212
-

$32.54 $
$32.54 $

6,896
-

Small
State

612
45

0%
0%

1
1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

195
0%
1
Local
SECTOR 4. PRODUCERS OF CHROMATES
7
37%
2
Large
All
0
93%
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
7
37%
2
Large
All
1
93%
1
Small
SECTOR 6. CCA PRODUCERS
2
37%
3
Large
All
0
93%
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
37%
5
Large
All
0
93%
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
37%
78
Large
All
0
93%
123
Small
SECTOR 9. PRINTING INK PRODUCERS
9
37%
2
Large
All
2
93%
7
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
332
54%
1
Large
All
34
95%
1
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
37%
6
Large
All
1
93%
4
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
56%
1
Large

-

-

0.25

0.25

-

$32.54 $

-

5

5

0.25

0.25

2

$32.54 $

78

-

-

0.25

0.25

-

$32.54 $

-

4

4

0.25

0.25

2

$32.54 $

70

1

1

0.25

0.25

0

$32.54 $

13

2

2

0.25

0.25

1

$32.54 $

31

-

-

0.25

0.25

-

$32.54 $

-

19

19

0.25

0.25

9

$32.54 $

308

-

-

0.25

0.25

-

$32.54 $

-

29

29

0.25

0.25

14

$32.54 $

471

-

-

0.25

0.25

-

$32.54 $

-

7

7

0.25

0.25

4

$32.54 $

120

14

14

0.25

0.25

7

$32.54 $

224

179

179

0.25

0.25

90

$32.54 $

2,919

32

32

0.25

0.25

16

$32.54 $

519

7

7

0.25

0.25

3

$32.54 $

107

4

4

0.25

0.25

2

$32.54 $

60

5

5

0.25

0.25

2

$32.54 $

76

General Industry (Auto
Body Repair)
Coil Coating

Maritime

Construction

Page 84

All

0
95%
Small
SECTOR 14. IRON AND STEEL MILLS
31
56%
Large
Alloy and Stainless Steel
1
95%
Small
1
56%
Large
Carbon Steel
1
95%
Small
SECTOR 14.B FORGING INDUSTRY
3
56%
Large
Reshaping Industry
1
95%
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
56%
Large
All
4
95%
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
27
37%
Large
All
6
93%
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
37%
Large
All
0
93%
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
92%
Large
All
0
99%
Small
SECTOR 20. TEXTILE DYEING
0
89%
Large
All
0
99%
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
76%
Large
General Industry
0
97%
Small
12
76%
Large
Fiber, Flat, and
Container Glass
3
97%
Small
SECTOR 22. PRINTING
0
98%
Large
All
0 99.70%
Small
SECTOR 24. CHROMIUM CATALYST USERS
1
67%
Large
Chromium Catalyst
Users
0
97%
Small
0
0%
Large
Catalyst Service
Companies

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QLFITTECH

QLFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QLFITEMP

SIZE

VARIABLES

Table 10

0

-

-

0.25

0.25

-

$32.54 $

-

39

672

672

0.25

0.25

336

$32.54 $

10,937

12
116

12
65

12
65

0.25
0.25

0.25
0.25

6
33

$32.54 $
$32.54 $

192
1,058

37

35

35

0.25

0.25

17

$32.54 $

565

33

56

56

0.25

0.25

28

$32.54 $

908

31

30

30

0.25

0.25

15

$32.54 $

484

152

1,363

1,363

0.25

0.25

682

$32.54 $

22,181

111

420

420

0.25

0.25

210

$32.54 $

6,842

2

25

25

0.25

0.25

12

$32.54 $

406

1

5

5

0.25

0.25

2

$32.54 $

76

-

-

-

0.25

0.25

-

$32.54 $

-

5

-

-

0.25

0.25

-

$32.54 $

-

212

-

-

0.25

0.25

-

$32.54 $

-

1,600

-

-

0.25

0.25

-

$32.54 $

-

307

-

-

0.25

0.25

-

$32.54 $

-

623

-

-

0.25

0.25

-

$32.54 $

-

8

6

6

0.25

0.25

3

$32.54 $

96

24
111

1,011

1,011

0.25
0.25

0.25
0.25

506

$32.54 $
$32.54 $

16,451

6

19

19

0.25

0.25

9

$32.54 $

305

78

-

-

0.25

0.25

-

$32.54 $

-

312

-

-

0.25

0.25

-

$32.54 $

-

1

1

1

0.25

0.25

0.3

$32.54 $

11

1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

Page 85

0
0%
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
76%
Large
ALL
0
97%
Small
SECTOR 26. WOODWORKING
0
94%
Large
General Industry
0
99%
Small
0
55%
Large
Maritime
0
95%
Small
0
88%
Large
Construction
0
99%
Small
0
88%
State
Government
0
88%
Local
SECTOR 27. SOLID WASTER INCINERATION
5
59%
Large
All
1
96%
Small
0
59%
State
Government
0
96%
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
0
56%
Large
All
0
95%
Small
SECTOR 31. CONSTRUCTION
Large
0
88%

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QLFITTECH

QLFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QLFITEMP

Companies

SIZE

VARIABLES

Table 10

1

-

-

0.25

0.25

-

$32.54 $

-

5

-

-

0.25

0.25

-

$32.54 $

-

0

-

-

0.25

0.25

-

$32.54 $

-

1

-

-

0.25

0.25

-

$32.54 $

-

1
36

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

32
1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

1
1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

1

-

-

0.25

0.25

-

$32.54 $

-

39

116

116

0.25

0.25

58

$32.54 $

1,893

47
0

45
-

45
-

0.25
0.25

0.25
0.25

23
-

$32.54 $
$32.54 $

739
-

24

-

-

0.25

0.25

-

$32.54 $

-

18

-

-

0.25

0.25

-

$32.54 $

-

0

-

-

0.25

0.25

-

$32.54 $

-

54

-

-

0.25

0.25

-

$32.54 $

-

Industrial Rehabilitation Small
and Maintenance
State

0
0

99%
88%

247
16

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

Local
Large

0
0

88%
88%

93
1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

Hazardous Waste-Site Small
Work
State

0
0

99%
88%

1
1

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

Local
Large

0
0

88%
88%

1
47

-

-

0.25
0.25

0.25
0.25

-

$32.54 $
$32.54 $

-

Small

0

99%

185
7,697

27,728

27,728

0.25
0.25

0.25
0.25 13,864

$32.54 $
$32.54 $

451,135

Refractory Brick
Restoration
Average/Total

Page 86

Table 11
Respiratory-Protection Program: Cost of Materials for Qualitative Fit Testing
This table calculates the contract cost of the materials used for qualitative fit-testing by multiplying the
number of employees who require qualitative fit-testing by the cost of materials per fit-test.
COST = ((QLFITMTRLS * QLFITEMP) * 1-%FITBASE * #PLANTS)

Variables:

QLFITMTRLS = Cost of materials per qualitative fit-testing
QLFITEMP = Number of employees requiring annual qualitative fit-testing
1-%FITBASE = (%FITBASE is the percent of plants conducting annual respirator
fit-testing in the baseline)
#PLANTS = Number of plants represented by the model input

1-%FITBASE

#PLANTS

ALL
SECTOR 2A. WELDING
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 2B. MILD STEEL WELDING
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)

Item 13 Cost

QLFITEMP

Large

$ 0.10

5,063

71%

1

$352

Small

$ 0.10

1,104

97%

1

$105

Large

$ 0.10

2,968

81%

1

$235

Small
Large

$ 0.10
$ 0.10

2,170
2,422

98%
55%

1
1

$208
$130

Small
Large

$ 0.10
$ 0.10

57
3,354

95%
88%

1
1

$5
$289

Small
State

$ 0.10
$ 0.10

2,593
15

99%
88%

1
1

$251
$1

Local

$ 0.10

76

99%

1

$7

Large

$ 0.10

718

81%

1

$57

Small
Large

$ 0.10
$ 0.10

2,170
17

98%
55%

1
1

$208
$1

Small
Large

$ 0.10
$ 0.10

0
684

95%
88%

1
1

$0
$59

Small
State

$ 0.10
$ 0.10

551
15

99%
88%

1
1

$53
$1

Local

$ 0.10

76

99%

1

$7

Large

$ 0.10

46

81%

50

$180

Small

$ 0.10

0

98%

62

$1

Size
SECTOR 1. ELECTROPLATING

QLFITMTRLS

Variables

$

Page 87

QLFITEMP

1-%FITBASE

#PLANTS

Item 13 Cost

Large

$ 0.10

1

81%

330

$24

Small
Large

$ 0.10
$ 0.10

0
2

98%
81%

1,454
101

$29
$15

Small
Large

$ 0.10
$ 0.10

1
3

98%
55%

18
274

$2
$40

Small
Large

$ 0.10
$ 0.10

1
486

95%
0%

474
1

$41
$0.00

Small
State

$ 0.10
$ 0.10

612
45

0%
0%

1
1

$0.00
$0.00

Local

$ 0.10

195

0%

1

$0.00

Large

$ 0.10

7

37%

2

$0.47

Small $ 0.10
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large $ 0.10
ALL
Small $ 0.10
SECTOR 6. CCA PRODUCERS
Large $ 0.10
ALL
Small $ 0.10
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large $ 0.10
ALL
Small $ 0.10
SECTOR 8. PAINT AND COATING PRODUCERS
Large $ 0.10
ALL
Small $ 0.10
SECTOR 9. PRINTING INK PRODUCERS
Large $ 0.10
ALL
Small $ 0.10
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large $ 0.10
ALL
Small $ 0.10
SECTOR 11. PLATING MIXTURE PRODUCERS
Large $ 0.10
ALL
Small $ 0.10

0

93%

0

$0.00

7

37%

2

$0.42

1

93%

1

$0.08

2

37%

3

$0.19

0

93%

0

$0.00

11

37%

5

$2

0

93%

0

$0

1

37%

78

$3

0

93%

123

$0

9

37%

2

$1

2

93%

7

$1

332

54%

1

$18

34

95%

1

$3

3

37%

6

$1

1

93%

4

$0

Size

QLFITMTRLS

Variables

Table 11

GENERAL INDUSTRY (AUTO BODY REPAIR)

COIL COATING

MARITIME

CONSTRUCTION

SECTOR 4. PRODUCERS OF CHROMATES
ALL

Page 88

QLFITEMP

1-%FITBASE

#PLANTS

Item 13 Cost

SECTOR 13. CHROMIUM METAL PRODUCERS
Large
ALL
Small
SECTOR 14. IRON AND STEEL MILLS
Large
ALLOY AND STAINLESS STEEL
Small
Large
CARBON STEEL
Small
SECTOR 14.B FORGING INDUSTRY
Large
RESHAPING INDUSTRY
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
GENERAL INDUSTRY
Small
Large
FIBER, FLAT AND CONTAINER GLASS
Small
SECTOR 22. PRINTING
Large
ALL
Small
SECTOR 24. CHROMIUM CATALYST USERS

QLFITMTRLS

Size

Variables

Table 11

$ 0.10

8

56%

1

$0

$ 0.10

0

95%

0

$0

$ 0.10

31

56%

39

$66

$ 0.10
$ 0.10

1
1

95%
56%

12
116

$1
$6

$ 0.10

1

95%

37

$3

$ 0.10

3

56%

33

$5

$ 0.10

1

95%

31

$3

$ 0.10

16

56%

152

$133

$ 0.10

4

95%

111

$41

$ 0.10

27

37%

2

$2

$ 0.10

6

93%

1

$0

$ 0.10

0

37%

0

$0

$ 0.10

0

93%

5

$0

$ 0.10

0

92%

212

$0

$ 0.10

0

99%

1,600

$0

$ 0.10

0

89%

307

$0

$ 0.10

0

99%

623

$0

$ 0.10

1

76%

8

$1

$ 0.10
$ 0.10

0
12

97%
76%

24
111

$0
$99

$ 0.10

3

97%

6

$2

$ 0.10

0

98%

78

$0

$ 0.10

0

100%

312

$0

Page 89

QLFITEMP

1-%FITBASE

#PLANTS

Item 13 Cost

Large

$ 0.10

1

67%

1

$0

Small
Large

$ 0.10
$ 0.10

0
0

97%
67%

0
1

$0
$0

Small

$ 0.10

0

97%

1

$0

Large

$ 0.10

0

76%

5

$0

Small

$ 0.10

0

97%

0

$0

Large

$ 0.10

0

94%

1

$0

Small
Large

$ 0.10
$ 0.10

0
0

99%
55%

1
36

$0
$0

Small
Large

$ 0.10
$ 0.10

0
0

95%
88%

32
1

$0
$0

Small
State

$ 0.10
$ 0.10

0
0

99%
88%

1
1

$0
$0

Local

$ 0.10

0

88%

1

$0

Large

$ 0.10

5

59%

39

$11

Small
State

$ 0.10
$ 0.10

1
0

96%
59%

47
0

$4
$0

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large

$ 0.10

0

96%

24

$0

$ 0.10

0

56%

18

$0

$ 0.10

0

95%

0

$0

$ 0.10

0

88%

54

$0

Small
State

$ 0.10
$ 0.10

0
0

99%
88%

247
16

$0
$0

Local
Large

$ 0.10
$ 0.10

0
0

88%
88%

93
1

$0
$0

Small
State

$ 0.10
$ 0.10

0
0

99%
88%

1
1

$0
$0

Local

$ 0.10

0

88%

1

$0

Size

QLFITMTRLS

Variables

Table 11

CHROMIUM CATALYST USERS

CHROMIUM CATALYST COMPANIES
SECTOR 25. REFRACTORY BRICK PRODUCERS
ALL
SECTOR 26. WOODWORKING
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 27. SOLID WASTER INCINERATION
ALL

GOVERNMENT

INDUSTRIAL REHABILITATION AND
MAINTENANCE

HAZARDOUS WASTE-SITE WORK

Page 90

QLFITEMP

1-%FITBASE

#PLANTS

Item 13 Cost

Large

$ 0.10

0

88%

47

$0

Small

$ 0.10

0

99%
Total

Size

QLFITMTRLS

Variables

Table 11

REFRACTORY BRICK RESTORATION

Page 91

185
7,697 $

$0
2,714

Table 12

TABLE 12: Respirator Protection Program: Quantitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and
1926.1126(f)(2)); Employee Time and Cost to Conduct Quantitative Fit Testing
This table calculates the burden hour and cost of employee time to be fit-tested. The time, in hours, for an employee to be quantitative
fit-tested is multiplied by the number of employees that require fit -testing and by the nonsupervisory wage rate.

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QNFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QNFITEMP

Time, in hours, for an employee to be quantitative fit-tested
Number of employees requiring annual quantitative fit-testing
(%FITBASE is the percent of plants conducting annual respirator fit-testing in the baseline)
Number of plants represented by the model input
Non-Supervisory wage rate

SIZE

QNFITTIME =
QNFITTEMP =
1-%FITBASE =
#PLANTS =
NONSUPEWAGE =

VARIABLES

Variables:

BURDEN HOURS = (QNFITTIME + QNFITTEMP) * 1-%FITBASE * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
General Industry (Aerospace)

Large

0

71%

1

-

-

0.5

-

$32.54 $

-

Small

0

97%

1

-

-

0.5

-

$32.54 $

-

Large

0

81%

1

-

-

0.5

-

$32.54 $

-

Small
Large

0
0

98%
55%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

95%
88%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
State

0
0

99%
88%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Local

0

99%

1

-

-

0.5

-

$32.54 $

-

Large

0

81%

1

-

-

0.5

-

$32.54 $

-

Small
Large

0
0

98%
55%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

95%
82%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small

0

99%

1

-

-

0.5

-

$32.54 $

-

Large

0

81%

50

-

-

0.5

-

$32.54 $

-

Small

0

98%

62

-

-

0.5

-

$32.54 $

-

Page 92

General Industry (Autobody Repair)

Coil Coating

Maritime

Construction

Government

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QNFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QNFITEMP

SIZE

VARIABLES

Table 12

Large

0

81%

330

-

-

0.5

-

$32.54 $

-

Small
Large

0
0

98%
81%

1,454
101

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

98%
55%

18
274

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
Large

0
0

95%
0%

474
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
State

0
0

0%
0%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

0%

1

-

-

0.5

-

$32.54 $

-

37%

2

-

-

0.5

-

$32.54 $

-

93%

0

-

-

0.5

-

$32.54 $

-

37%

2

-

-

0.5

-

$32.54 $

-

93%

1

-

-

0.5

-

$32.54 $

-

37%

3

-

-

0.5

-

$32.54 $

-

93%

0

-

-

0.5

-

$32.54 $

-

37%

5

-

-

0.5

-

$32.54 $

-

93%

0

-

-

0.5

-

$32.54 $

-

37%

78

-

-

0.5

-

$32.54 $

-

93%

123

-

-

0.5

-

$32.54 $

-

37%

2

-

-

0.5

-

$32.54 $

-

93%

7

-

-

0.5

-

$32.54 $

-

54%

1

-

-

0.5

-

$32.54 $

-

95%

1

-

-

0.5

-

$32.54 $

-

37%

6

-

-

0.5

-

$32.54 $

-

93%

4

-

-

0.5

-

$32.54 $

-

0
Local
SECTOR 4. PRODUCERS OF CHROMATES
0
Large
All
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
0
Large
All
0
Small
SECTOR 6. CCA PRODUCERS
0
Large
All
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
0
Large
All
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
0
Large
All
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
All
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
All
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
0
Large
All
0
Small

Page 93

SECTOR 13. CHROMIUM METAL PRODUCERS
Large
All
Small
SECTOR 14. IRON AND STEEL MILLS
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14.B FORGING INDUSTRY
Large
Reshaping Industry
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
All
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QNFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QNFITEMP

SIZE

VARIABLES

Table 12

0

56%

1

-

-

0.5

-

$32.54 $

-

0

95%

0

-

-

0.5

-

$32.54 $

-

0

56%

39

-

-

0.5

-

$32.54 $

-

0
0

95%
56%

12
116

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

0

95%

37

-

-

0.5

-

$32.54 $

-

0

56%

33

-

-

0.5

-

$32.54 $

-

0

95%

31

-

-

0.5

-

$32.54 $

-

0

56%

152

-

-

0.5

-

$32.54 $

-

0

95%

111

-

-

0.5

-

$32.54 $

-

0

37%

2

-

-

0.5

-

$32.54 $

-

0

93%

1

-

-

0.5

-

$32.54 $

-

0

37%

0

-

-

0.5

-

$32.54 $

-

0

93%

5

-

-

0.5

-

$32.54 $

-

0

92%

212

-

-

0.5

-

$32.54 $

-

0

99%

1,600

-

-

0.5

-

$32.54 $

-

0

89%

307

-

-

0.5

-

$32.54 $

-

0

99%

623

-

-

0.5

-

$32.54 $

-

0

76%

8

-

-

0.5

-

$32.54 $

-

0
0

97%
76%

24
111

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

0

97%

6

-

-

0.5

-

$32.54 $

-

0

98%

78

-

-

0.5

-

$32.54 $

-

0

100%

312

-

-

0.5

-

$32.54 $

-

Page 94

SECTOR 24. CHROMIUM CATALYST USERS
0
Large
Chromium Catalyst Users
0
Small
128
Large
Chromium Catalyst Companies
12
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
Large
All
0
Small
SECTOR 26. WOODWORKING
0
Large
General Industry
0
Small
0
Large
Maritime
0
Small
0
Large
Construction
0
Small
0
State
Government
0
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
0
All
0
Small
0
State
Government
0
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
0
Large
All
0
Small
SECTOR 31. CONSTRUCTION
Large
0
Industrial Rehabilitation and
Maintenance

Hazardous Waste-Site Work

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QNFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QNFITEMP

SIZE

VARIABLES

Table 12

67%

1

-

-

0.5

-

$32.54 $

-

97%
67%

0
1

85

85

0.5
0.5

43

97%

1

11

11

0.5

6

$32.54

$

186

76%

5

-

-

0.5

-

$32.54 $

-

97%

0

-

-

0.5

-

$32.54 $

-

94%

1

-

-

0.5

-

$32.54 $

-

99%
55%

1
36

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

95%
88%

32
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

99%
88%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

88%

1

-

-

0.5

-

$32.54 $

-

59%

39

-

-

0.5

-

$32.54 $

-

96%
59%

47
0

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

96%

24

-

-

0.5

-

$32.54 $

-

56%

18

-

-

0.5

-

$32.54 $

-

95%

0

-

-

0.5

-

$32.54 $

-

88%

54

-

-

0.5

-

$32.54 $

-

$32.54 $
$32.54 $ 1,391

Small
State

0
0

99%
88%

247
16

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Local
Large

0
0

88%
88%

93
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Small
State

0
0

99%
88%

1
1

-

-

0.5
0.5

-

$32.54 $
$32.54 $

-

Page 95

Refractory Brick Restoration
Average/Total

Local
Large

0
0

88%
88%

1
47

-

-

0.5
0.5

-

Small

0

99%

185
7,695

97

97

0.5
0.5

49

Page 96

$32.54 $
$32.54 $

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

QNFITTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

QNFITEMP

SIZE

VARIABLES

Table 12

-

$32.54 $
$32.54 $ 1,594

Table 13
Respiratory Protection Program: Contract Cost for an Industrial Hygienist to Conduct Quantitative Fit Testing for
Respirators
This table calculates the contract cost for the industrial hygiene technician to conduct quantitative fit-testing.
COST = ((QNFITCOST * QNFITEMP) * 1-%FITBASE * #PLANTS)

Variables:

QNFITCOST = Hourly cost for a industrial hygiene technician * # of hours
QNFITTEMP = # Employees requiring annual quantitative fit-test
1-%FITBASE = Percent of plants not conducting fit-testing (%FITBASE is the percent of plants
conducting annual respirator fit-testing in the baseline)
#PLANTS = Number of plants represented by the model input

QNFITCOST

# of Hours

QNFITEMP

1-%FITBASE

#PLANTS

Item 13 COST

Size

Variables

0.00

Large

$0

0

0

71%

1

$

-

Small

$0

0

0

97%

1

$

-

Large

$84

2

0

81%

1

$

-

Small
Large

$84
$0

2
0

0
0

98%
55%

1
1

$
$

-

Small
Large

$0
$0

0
0

0
0

95%
88%

1
1

$
$

-

Small
State

$0
$0

0
0

0
0

99%
88%

1
1

$
$

-

Local

$0

0

0

99%

1

$

-

Large

$84

2

0

81%

1

$

-

MARITIME

Small
Large

$84
$0

2
0

0
0

98%
81%

1
1

$
$

-

CONSTRUCTION

Small
Large

$0
$0

0
0

0
0

98%
81%

1
1

$
$

-

Small

$0

0

0

98%

1

$

-

Large

$0

0

0

81%

50

$

-

Small
Large

$0
$0

0
0

0
0

98%
81%

62
330

$
$

-

SECTOR 1. ELECTROPLATING
ALL
SECTOR 2A. WELDING
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 2B. MILD STEEL WELDING
GENERAL INDUSTRY

SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE

Page 97

QNFITCOST

# of Hours

QNFITEMP

1-%FITBASE

#PLANTS

Item 13 COST

Size

Variables

Table 13

Small
Large

$0
$0

0
0

0
0

98%
81%

1,454
101

$
$

-

Small
Large

$0
$0

0
0

0
0

98%
55%

18
274

$
$

-

Small
Large

$0
$0

0
0

0
0

95%
0%

474
1

$
$

-

Small
State

$0
$0

0
0

0
0

0%
0%

1
1

$
$

-

Local

$0

0

0

0%

1

$

-

Large

$0

0

0

37%

2

$

-

$0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
$0
Large
ALL
$0
Small
SECTOR 6. CCA PRODUCERS
$0
Large
ALL
$0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
$0
Large
ALL
$0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
$0
Large
ALL
$0
Small
SECTOR 9. PRINTING INK PRODUCERS
$0
Large
ALL
$0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
$0
Large
ALL
$0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
$0
Large
ALL

0

0

93%

0

$

-

0

0

37%

2

$

-

0

0

93%

1

$

-

0

0

37%

3

$

-

0

0

93%

0

$

-

0

0

37%

5

$

-

0

0

93%

0

$

-

0

0

37%

78

$

-

0

0

93%

123

$

-

0

0

37%

2

$

-

0

0

93%

7

$

-

0

0

54%

1

$

-

0

0

95%

1

$

-

0

0

37%

6

$

-

GENERAL INDUSTRY AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4. PRODUCERS OF CHROMATES
ALL

Page 98

QNFITEMP

1-%FITBASE

#PLANTS

Item 13 COST

# of Hours

Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
ALL
Small
SECTOR 14. IRON AND STEEL MILLS
Large
ALL
Small
Large
CARBON STEEL
Small
SECTOR 14.B FORGING INDUSTRY
Large
RESHAPING
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
ALL
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22. PRINTING
Large

QNFITCOST

Size

Variables

Table 13

$0

0

0

93%

4

$

-

$0

0

0

56%

1

$

-

$0

0

0

95%

0

$

-

$0

0

0

56%

39

$

-

$0
$0

0
0

0
0

95%
56%

12
116

$
$

-

$0

0

0

95%

37

$

-

$0

0

0

56%

33

$

-

$0

0

0

95%

31

$

-

$0

0

0

56%

152

$

-

$0

0

0

95%

111

$

-

$0

0

0

37%

2

$

-

$0

0

0

93%

1

$

-

$0

0

0

37%

0

$

-

$0

0

0

93%

5

$

-

$0

0

0

92%

212

$

-

$0

0

0

99%

1,600

$

-

$0

0

0

89%

307

$

-

$0

0

0

99%

623

$

-

$0

0

0

76%

8

$

-

$0
$0

0
0

0
0

97%
76%

24
111

$
$

-

$0

0

0

97%

6

$

-

$0

0

0

98%

78

$

-

Page 99

QNFITCOST

# of Hours

QNFITEMP

1-%FITBASE

#PLANTS

Item 13 COST

Size

Variables

Table 13

Small

$0

0

0

100%

312

$

-

Large

$0

0

0

67%

1

$

-

Small
Large

$0
$151

0
4

0
35

97%
100%

0
1

$
$

5,350

Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large

$14

0

35

100%

1

$

495

$0

0

0

76%

5

$

-

$0

0

0

97%

0

$

-

$0

0

0

94%

1

$

-

$0
$0

0
0

0
0

99%
55%

1
36

$
$

-

$0
$0

0
0

0
0

95%
88%

32
1

$
$

-

Small
State

$0
$0

0
0

0
0

99%
88%

1
1

$
$

-

Local

$0

0

0

88%

1

$

-

Large

$0

0

0

59%

39

$

-

Small
State

$0
$0

0
0

0
0

96%
59%

47
0

$
$

-

$0

0

0

96%

24

$

-

$0

0

0

56%

18

$

-

$0

0

0

95%

0

$

-

$0

0

0

88%

54

$

-

Small
State

$0
$0

0
0

0
0

99%
88%

247
16

$
$

-

Local
Large

$0
$0

0
0

0
0

88%
88%

93
1

$
$

-

ALL
SECTOR 24. CHROMIUM CATALYST USERS
Chromium Catalyst Users

Chromium Catalyst Companies

CONSTRUCTION

SECTOR 27. SOLID WASTER INCINERATION
ALL

GOVERNMENT

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large
INDUSTRIAL REHABILITATION AND
MAINTENANCE

Page 100

QNFITEMP

1-%FITBASE

#PLANTS

Item 13 COST

# of Hours

REFRACTORY BRICK RESTORATION AND
MAINTENANCE

QNFITCOST

HAZARDOUS WASTE-SITE WORK

Size

Variables

Table 13

Small
State

$0
$0

0
0

0
0

99%
88%

1
1

$
$

-

Local
Large

$0
$0

0
0

0
0

88%
88%

1
47

$
$

-

Small

$0

0

0

99%
Total

Page 101

185
$
7,695 $

5,846

Table 14

TABLE 14: Respiratory-Protection Program:  Medical  Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and
1926.1126(f)(2)); Employee Time and Cost to Complete the Medical Questionnaire for Respirator Use
This table calculates the burden hours and cost of employee time to complete a medical questionnaire. The hours and cost is determined by the
number of employees who are at or above the action level and at or below the PEL by the time it takes to fill our the medical questionnaire and by
non-supervisory wage rate.

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDHISTTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

EMPAL

SIZE

EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL in the model
plant
MEDHISTTIME = Employee time to complete medical history questionnaire (10 mins)
1-%FITBASE = Percent of plants not conducting annual respirator fit-test
#PLANTS = Number of plants represented by the model output
NONSUPEWAGE = Non-Supervisory wage rate

VARIABLES

Variables:

BURDEN HOURS = (EMPAL * MEDHISTTIME * 1-%FITBASE * #PLANTS)
COST = Hours x NONSUPEWAGE

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
General Industry (Aerospace)

General Industry (Autobody Repair)

Coil Coating

Large

5,063

71%

1

3,595

3,595

0.17

599

$32.54

$19,497

Small

1,104

97%

1

1,071

1,071

0.17

178

$32.54

$5,807

Large

0

81%

1-

Small
Large

0
2,422

98%
55%

11

1,332

1,332

0.17 0.17

222

$32.54
$32.54

$7,226

Small
Large

57
3,354

95%
88%

1
1

54
2,951

54
2,951

0.17
0.17

9
492

$32.54
$32.54

$295
$16,007

Small
State

2,593
15

99%
88%

1
1

2,567
13

2,567
13

0.17
0.17

428
2

$32.54
$32.54

$13,924
$72

Local

76

99%

1

76

76

0.17

13

$32.54

$410

Large

0

55%

1

-

-

0.17

Small
Large

0
17

95%
88%

1
1

15

15

0.17
0.17

3

Small
Large

0
684

99%
88%

1
1

602

602

0.17
0.17

100

Small

551

99%

1

545

545

0.17

Large

32

81%

50

1,289

1,289

Small
Large

0
1

98%
81%

62
330

246

Small
Large

0
2

98%
81%

1,454
101

150

Page 102

-

0.17 -

-

$32.54

-

-

$32.54

-

-

$32.54
$32.54

$82

-

$32.54
$32.54

$3,266

91

$32.54

$2,956

0.17

215

$32.54

$6,991

246

0.17
0.17

41

$32.54
$32.54

$1,332

150

0.17
0.17

25

$32.54
$32.54

$814

-

-

-

-

-

Maritime

Construction

Government

Small
Large

1
98%
1 55.00%

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDHISTTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

EMPAL

SIZE

VARIABLES

Table 14

18
274

17
129

17
129

0.17
0.17

3
22

$32.54
$32.54

$90
$700

75

$32.54
$32.54

$2,445

-

Small
Large

1
486

95%
0%

474
1

451
-

451
-

0.17
0.17

Small
State

612
45

0%
0%

1
1

-

-

0.17
0.17

-

$32.54
$32.54

-

0%

1

-

-

0.17

-

$32.54

-

37%

2

5

5

0.17

93%

0

-

-

0.17

37%

2

3

3

0.17

1

$32.54

$17

93%

1

1

1

0.17

0

$32.54

$4

37%

3

2

2

0.17

0

$32.54

$10

93%

0

-

-

0.17

37%

5

19

19

0.17

93%

0

-

-

0.17

37%

78

29

29

0.17

93%

123

-

-

0.17

37%

2

7

7

0.17

1

$32.54

$40

93%

7

14

14

0.17

2

$32.54

$75

54%

1

179

179

0.17

30

$32.54

$972

95%

1

32

32

0.17

5

$32.54

$175

37%

6

7

7

0.17

1

$32.54

$36

93%

4

4

4

0.17

1

$32.54

$20

56%

1

5

5

0.17

1

$32.54

$25

95%

0

-

-

0.17

56%

39

665

665

0.17

111

$32.54

$3,609

95%
56%

12
116

17
48

17
48

0.17
0.17

3
8

$32.54
$32.54

$94
$258

95%

37

51

51

0.17

8

$32.54

$275

195
Local
SECTOR 4. PRODUCERS OF CHROMATES
7
Large
All
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
5
Large
All
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
All
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
All
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
All
0
Small
SECTOR 9. PRINTING INK PRODUCERS
9
Large
All
2
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
332
Large
All
34
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
All
1
Small
1
Large
Carbon Steel
1
Small

Page 103

1
-

3

$32.54

5
-

-

$26

$32.54

-

$32.54
$32.54

-

-

$103

$32.54
$32.54

$157

$32.54

-

$32.54

-

SECTOR 14.B FORGING INDUSTRY

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDHISTTIME

RESPONSES

RESPONDENTS

56%

33

56

56

0.17

9

$32.54

$303

1
95%
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
56%
Large
All
4
95%
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
27
37%
Large
All
6
93%
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
37%
Large
All
1
93%
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
92%
Large
All
0
99%
Small
SECTOR 20. TEXTILE DYEING
0
89%
Large
All
0
99%
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
76%
Large
All
0
97%
Small
9
76%
Large
Fiber, Flat, Container Glass
1
97%
Small
SECTOR 22. PRINTING
0
98%
Large
All
0 99.70%
Small
SECTOR 24. CHROMIUM CATALYST USERS
1
67%
Large
All
0
97%
Small
128
0%
Large
Chromium Catalyst Companies
0
0%
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
76%
Large
All
0
97%
Small
SECTOR 26. WOODWORKING
0
94%
Large
General Industry
0
99%
Small
0
55%
Large
Maritime
0
95%
Small

31

30

30

0.17

5

$32.54

$161

152

1,363

1,363

0.17

227

$32.54

$7,394

111

420

420

0.17

70

$32.54

$2,281

2

25

25

0.17

4

$32.54

$135

1

5

5

0.17

1

$32.54

$25

0

-

-

0.17

5

4

4

0.17

212

-

-

0.17

-

$32.54

-

1,600

-

-

0.17

-

$32.54

-

307

-

-

0.17

-

$32.54

-

623

-

-

0.17

-

$32.54

-

8

8

8

0.17

1

24
111

760

760

0.17
0.17

6

8

8

0.17

78

-

-

0.17

-

$32.54

-

312

-

-

0.17

-

$32.54

-

1

1

1

0.17

0
1

-

-

0.17
0.17

-

$32.54
$32.54

-

1

-

-

0.17

-

$32.54

-

5

-

-

0.17

-

$32.54

-

0

-

-

0.17

-

$32.54

-

1

-

-

0.17

-

$32.54

-

1
36

-

-

0.17
0.17

-

$32.54
$32.54

-

32

-

-

0.17

-

$32.54

-

Reshaping

Large

3

#PLANTS

1-%FITBASE

EMPAL

SIZE

VARIABLES

Table 14

Page 104

1

$32.54
$32.54

$23

$32.54

$41

127

$32.54
$32.54

$4,124

1

$32.54

$44

-

0

$32.54

-

$4

Construction

Government

Hazardous Waste-Site Work

Refractory Brick Restoration
Average/Total

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDHISTTIME

RESPONSES

RESPONDENTS

#PLANTS

Large

0

88%

1

-

-

0.17

-

$32.54

-

Small
State

0
0

99%
88%

1
1

-

-

0.17
0.17

-

$32.54
$32.54

-

0

88%

1

-

-

0.17

-

$32.54

-

0

59%

39

-

-

0.17

-

$32.54

-

0
0

96%
59%

47
0

-

-

0.17
0.17

-

$32.54
$32.54

-

0

96%

24

-

-

0.17

-

$32.54

-

0

56%

18

-

-

0.17

-

$32.54

-

0

95%

0

-

-

0.17

-

$32.54

-

0

88%

54

-

-

0.17

-

$32.54

-

Small
State

0
0

99%
88%

247
16

-

-

0.17
0.17

-

$32.54
$32.54

-

Local
Large

0
0

88%
88%

93
1

-

-

0.17
0.17

-

$32.54
$32.54

-

Small
State

0
0

99%
88%

1
1

-

-

0.17
0.17

-

$32.54
$32.54

-

Local
Large

0
0

88%
88%

1
47

-

-

0.17
0.17

-

$32.54
$32.54

-

Small

0

99%

185
7,695

18,870

18,870

0.17
0.17

-

$32.54
$32.54

Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation and
Maintenance

1-%FITBASE

EMPAL

SIZE

VARIABLES

Table 14

Page 105

3,145

$ 102,338

-

Table 15

Respiratory Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2),
and 1926.1126(f)(2)); Contract Cost for a PLHCP to Review the Medical Questionnaire for Respirator Use
This table calculates the contract cost of the medical questionnaire and review by the licensed physician.
COST = (EMPAL * MEDHISTCOST * 1-%FITBASE * #PLANTS)

Variables:

EMPAL = Number of employees who wear respirators who are at or above the
AL and at or below the PEL in the model plant
MEDHISTCOST = Cost of medical history questionnaire to be reviewed by a PLHCP.
1-%FITBASE = Percent of plants not conducting annual respirator fit-test
#PLANTS = Number of plants represented by the model output

Item 13 COST

#PLANTS

5,063 $

49.68

71%

1

$

178,576.02

Small

1,104 $

49.68

97%

1

$

53,190.54

Large

0 $

49.68

81%

1

$

MARITIME

Small
Large

0 $
2,422 $

49.68
49.68

98%
55%

1
1

$
$

66,186.50

CONSTRUCTION

Small
Large

57 $
3,354 $

49.68
49.68

95%
88%

1
1

$
$

2,702.76
146,615.04

Small
State

2,593 $
15 $

49.68
49.68

99%
88%

1
1

$
$

127,535.98
658.85

Local

76 $

49.68

99%

1

$

3,755.42

Large

0 $

49.68

81%

1

$

-

MARITIME

Small
Large

0 $
17 $

49.68
49.68

98%
55%

1
1

$
$

466.68

CONSTRUCTION

Small
Large

0 $
684 $

49.68
49.68

95%
88%

1
1

$
$

29,911.58

Small

551 $

49.68

99%

1

$

27,078.54

Large

32 $

49.68

81%

50

$

64,034.27

SECTOR 1. ELECTROPLATING
ALL

SECTOR 2A. WELDING
GENERAL INDUSTRY

GOVERNMENT
SECTOR 2B. MILD STEEL WELDING
GENERAL INDUSTRY

SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)

EMPAL

Large

Size

1-%FITBASE

MEDHISTCOST

Variables

0

Page 106

-

Item 13 COST

#PLANTS

0 $
1 $

49.68
49.68

98%
81%

62
330

$
$

12,197.00

Small
Large

0 $
2 $

49.68
49.68

98%
81%

1,454
101

$
$

7,453.72

MARITIME

Small
Large

1 $
1 $

49.68
49.68

98%
55%

18
274

$
$

819.83
6,409.43

CONSTRUCTION

Small
Large

1 $
486 $

49.68
49.68

95%
0%

474
1

$
$

22,390.60
-

Small
State

612 $
45 $

49.68
49.68

0%
0%

1
1

$
$

-

Local

195 $

49.68

0%

1

$

-

Large

7 $

49.68

37%

2

$

239.62

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
ALL
Large

0 $

49.68

93%

0

$

-

5 $

49.68

37%

2

$

153.13

Small

1 $

49.68

93%

1

$

38.49

Large

2 $

49.68

37%

3

$

95.24

Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
ALL
Large

0 $

49.68

93%

0

$

-

11 $

49.68

37%

5

$

941.37
-

GENERAL INDUSTRY (AUTOBODY REPAIR)

GENERAL INDUSTRY (COIL COATING)

GOVERNMENT
SECTOR 4. PRODUCERS OF CHROMATES
ALL

SECTOR 6. CCA PRODUCERS
ALL

EMPAL

Small
Large

Size

1-%FITBASE

MEDHISTCOST

Variables

Table 15

Small
SECTOR 8. PAINT AND COATING PRODUCERS
ALL
Large

0 $

49.68

93%

0

$

1 $

49.68

37%

78

$

Small

0 $

49.68

93%

123

$

-

Large

9 $

49.68

37%

2

$

366.63

2 $
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
332 $
ALL
Large

49.68

93%

7

$

682.61

49.68

54%

1

$

8,905.91

34 $

49.68

95%

1

$

1,604.53

SECTOR 9. PRINTING INK PRODUCERS
ALL

Small

Page 107

1,437.72

Item 13 COST

#PLANTS

MEDHISTCOST

1-%FITBASE

SECTOR 11. PLATING MIXTURE PRODUCERS
ALL
Large

3 $

49.68

37%

6

$

326.33

EMPAL

Size

Variables

Table 15

Small
SECTOR 13. CHROMIUM METAL PRODUCERS
ALL
Large

1 $

49.68

93%

4

$

182.27

8 $

49.68

56%

1

$

231.25

Small

0 $

49.68

95%

0

$

-

Large

31 $

49.68

56%

39

$

33,054.34

Small
Large

1 $
1 $

49.68
49.68

95%
56%

12
116

$
$

856.48
2,361.02

Small

1 $

49.68

95%

37

$

2,519.06

Large

3 $

49.68

56%

33

$

2,771.04

Small

1 $

49.68

95%

31

$

1,476.56

Large

16 $

49.68

56%

152

$

67,722.40

Small

4 $

49.68

95%

111

$

20,888.40

Large

27 $

49.68

37%

2

$

1,240.34

Small
CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
CHEMICAL DISTRIBUTORS
Large
ALL
Small
TEXTILE DYEING
Large
ALL
Small
COLORED GLASS PRODUCERS
Large
ALL
Small
Large

6 $

49.68

93%

1

$

230.93

0 $

49.68

37%

0

$

-

1 $

49.68

93%

5

$

215.10

0 $

49.68

92%

212

$

-

0 $

49.68

99%

1,600

$

-

0 $

49.68

89%

307

$

-

0 $

49.68

99%

623

$

-

1 $

49.68

76%

8

$

376.46

0 $
9 $

49.68
49.68

97%
76%

24
111

$
$

37,771.81

SECTOR 14. IRON AND STEEL MILLS
Alloy and Stainless Steel

Carbon Steel

SECTOR 14.B FORGING INDUSTRY
Reshaping Industry
SECTOR 15. IRON AND STEEL FOUNDRIES
ALL
SECTOR 17. CHROMIUM DYE PRODUCERS
ALL

SECTOR 18.

SECTOR 19.

SECTOR 20.

SECTOR 21.

Page 108

Item 13 COST

#PLANTS

1 $

49.68

97%

6

$

400.41

Large

0 $

49.68

98%

78

$

-

Small

0 $

49.68

100%

312

$

-

Large

1 $

49.68

67%

1

$

39.31

Small
Large

0 $
128 $

49.68
49.68

97%
0%

0
1

$
$

-

Small

0 $

49.68

0%

1

$

-

Large

0 $

49.68

76%

5

$

-

Small

0 $

49.68

97%

0

$

-

Large

0 $

49.68

94%

1

$

-

Small
Large

0 $
0 $

49.68
49.68

99%
55%

1
36

$
$

-

Small
Large

0 $
0 $

49.68
49.68

95%
88%

32
1

$
$

-

Small
State

0 $
0 $

49.68
49.68

99%
88%

1
1

$
$

-

Local

0 $

49.68

88%

1

$

-

Large

0 $

49.68

59%

39

$

-

Small
State

0 $
0 $

49.68
49.68

96%
59%

47
0

$
$

-

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large

0 $

49.68

96%

24

$

-

0 $

49.68

56%

18

$

-

0 $

49.68

95%

0

$

-

0 $

49.68

88%

54

$

-

FIBER, FLAT AND CONTAINER GLASS
SECTOR 22. PRINTING
ALL
SECTOR 24. CHROMIUM CATALYST USERS
ALL

Chromium Catalyst Companies
SECTOR 25. REFRACTORY BRICK PRODUCERS
ALL
SECTOR 26. WOODWORKING
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

Government
SECTOR 27. SOLID WASTER INCINERATION
ALL

Government

EMPAL

Small

Size

1-%FITBASE

MEDHISTCOST

Variables

Table 15

Page 109

#PLANTS

HAZARDOUS WASTE-SITE WORK

REFRACTORY BRICK RESTORATION

Item 13 COST

1-%FITBASE

0 $
0 $

49.68
49.68

99%
88%

247
16

$
$

-

Local
Large

0 $
0 $

49.68
49.68

88%
88%

93
1

$
$

-

Small
State

0 $
0 $

49.68
49.68

99%
88%

1
1

$
$

-

Local
Large

0 $
0 $

49.68
49.68

88%
88%

1
47

$
$

-

Small

0 $

49.68

99%
Total

EMPAL

Small
State

Size
INDUSTRIAL REHABILITATION AND
MAINTENANCE

MEDHISTCOST

Variables

Table 15

Page 110

185
$
7,695 $

937,112

Table 16

TABLE 16: Respiratory Protection Program: Follow-up Medical Examination for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and
1926.1126(f)(2)); Employee Time and Cost to Complete the Medical Examination for Respirator Use
This table calculates the burden hour and cost estimate for employees that "fail" the medical history questionnaire. It is estimated that 23%
(EMPMEDXAM) will not pass the medial questionnaire

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
General Industry (Aerospace)
General Industry (Autobody
Respair)
General Industry (Coil Coating)

Number of employees who wear respirators who are at or above the AL and at or below the PEL in the model plant
Employee time, in hours, for medical exam for respirator use
Percent of employees that will require a medical exam for respirator use
Percent of plants not conducting annual respirator fit-test
Number of plants represented by the model output
Non-Supervisory wage rate
Percent of employees who "fail" an initial medical exam

1

827

827

3

2,480

$32.54 $

80,716

Small

1,104

23%

97%

1

246

246

3

739

$32.54 $

24,042

Large

0

23%

81%

1

-

-

3

-

$32.54 $

-

Small
Large

0
2,422

23%
23%

98%
55%

1
1

306

306

3
3

919

$32.54 $
$32.54 $

29,916

Small
Large

57
3,354

23%
23%

95%
88%

1
1

13
679

13
679

3
3

38
2,036

$32.54 $
$32.54 $

1,222
66,270

Small
State

2,593
15

23%
23%

99%
88%

1
1

590
3

590
3

3
3

1,771
9

$32.54 $
$32.54 $

57,646
298

Local

76

23%

99%

1

17

17

3

52

$32.54 $

1,697

Large

0

23%

81%

1

-

-

3

-

$32.54 $

-

Small
Large

0
17

23%
23%

98%
55%

1
1

2

2

3
3

6

$32.54 $
$32.54 $

211

Small
Large

0
684

23%
23%

95%
88%

1
1

138

138

3
3

415

$32.54 $
$32.54 $

13,520

Small

551

23%

99%

1

125

125

3

376

$32.54 $

12,239

Large

32

23%

81%

50

296

296

3

889

$32.54 $

28,943

Small
Large

0
1

23%
23%

98%
81%

62
330

56

56

3
3

169

$32.54 $
$32.54 $

5,513

Small
Large

0
2

23%
23%

98%
81%

1,454
101

35

35

3
3

104

$32.54 $
$32.54 $

3,369

Small

1

23%

98%

18

4

4

3

11

$32.54 $

371

BURDEN HOURS

RESPONSES

#PLANTS
Page 111

ITEM 12 COST

71%

NONSUPEWAGE

23%

RESPEXAMTIME

5,063

RESPONDENTS

Large

1-%FITBASE

%EMPMEDEXAM

VARIABLES

RESPEXAMTIME =
%EMPMEDEXAM =
1-%FITBASE =
#PLANTS =
NONSUPEWAGE =
%EMPMEDEXAM =

EMPAL

EMPAL =

SIZE

Variables:

BURDEN HOURS = (EMPAL * RESPEXAMTIME * %EMPMEDEXAM * 1-%FITBASE * PLANTS)
COST = BURDEN HOURS * NONSUPEWAGE

Maritime

Construction

Government

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

RESPEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

%EMPMEDEXAM

EMPAL

SIZE

VARIABLES

Table 16

Large

1

23%

55%

274

30

30

3

89

$32.54 $

2,897

Small
Large

1
486

23%
23%

95%
0%

474
1

104
-

104
-

3
3

311
-

$32.54 $
$32.54 $

10,121
-

Small
State

612
45

23%
23%

0%
0%

1
1

-

-

3
3

-

$32.54 $
$32.54 $

-

23%

0%

1

-

-

3

-

$32.54 $

-

23%

37%

2

1

1

3

3

$32.54 $

108

23%

93%

0

-

-

3

-

$32.54 $

-

23%

37%

2

1

1

3

2

$32.54 $

69

23%

93%

1

0.2

0.2

3

1

$32.54 $

17

23%

37%

3

0.4

0.4

3

1

$32.54 $

43

23%

93%

0

-

-

3

-

$32.54 $

-

23%

37%

5

4

4

3

13

$32.54 $

425

23%

93%

0

-

-

3

-

$32.54 $

-

23%

37%

78

7

7

3

20

$32.54 $

650

23%

93%

123

-

-

3

-

$32.54 $

-

23%

37%

2

2

2

3

5

$32.54 $

166

23%

93%

7

3

3

3

9

$32.54 $

309

23%

54%

1

41

41

3

124

$32.54 $

4,025

23%

95%

1

7

7

3

22

$32.54 $

725

23%

37%

6

2

2

3

5

$32.54 $

147

23%

93%

4

1

1

3

3

$32.54 $

82

23%

56%

1

1

1

3

3

$32.54 $

105

23%

95%

0

-

-

3

-

$32.54 $

-

23%

56%

39

153

153

3

459

$32.54 $

14,941

23%
23%

95%
56%

12
116

4
11

4
11

3
3

12
33

$32.54 $
$32.54 $

387
1,067

23%

95%

37

12

12

3

35

$32.54 $

1,139

23%

56%

33

13

13

3

38

$32.54 $

1,253

Local
195
SECTOR 4. PRODUCERS OF CHROMATES
7
Large
All
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
5
Large
All
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
All
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
All
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
All
0
Small
SECTOR 9. PRINTING INK PRODUCERS
9
Large
All
2
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
332
Large
All
34
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
Alloy and Stainless Steel
1
Small
1
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY
3
Large

Page 112

Reshaping Industry

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
All
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
All
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

RESPEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

%EMPMEDEXAM

EMPAL

SIZE

VARIABLES

Table 16

1

23%

95%

31

7

7

3

21

$32.54 $

667

16

23%

56%

152

314

314

3

941

$32.54 $

30,610

4

23%

95%

111

97

97

3

290

$32.54 $

9,442

27

23%

37%

2

6

6

3

17

$32.54 $

561

6

23%

93%

1

1

1

3

3

$32.54 $

104

0

23%

37%

0

-

-

3

-

$32.54 $

-

1

23%

93%

5

1

1

3

3

$32.54 $

0

23%

92%

212

-

-

3

-

$32.54 $

-

0

23%

99%

1,600

-

-

3

-

$32.54 $

-

0

23%

89%

307

-

-

3

-

$32.54 $

-

0

23%

99%

623

-

-

3

-

$32.54 $

-

1

23%

76%

8

2

2

3

5

$32.54 $

170

0
9

23%
23%

97%
76%

24
111

175

175

3
3

525

$32.54 $
$32.54 $

17,073

1

23%

97%

6

2

2

3

6

$32.54 $

181

0

23%

98%

78

-

-

3

-

$32.54 $

-

0

23%

100%

312

-

-

3

-

$32.54 $

-

1

23%

67%

1

0.2

0.2

3

1

$32.54 $

0
128

23%
23%

0%
0%

0
1

-

-

3
3

-

$32.54 $
$32.54 $

-

0

23%

97%

1

-

-

3

-

$32.54 $

-

0

23%

76%

5

-

-

3

-

$32.54 $

-

0

23%

97%

0

-

-

3

-

$32.54 $

-

0

23%

94%

1

-

-

3

-

$32.54 $

-

0
0

23%
23%

99%
55%

1
36

-

-

3
3

-

$32.54 $
$32.54 $

-

0
0

23%
23%

95%
88%

32
1

-

-

3
3

-

$32.54 $
$32.54 $

-

0

23%

99%

1

-

-

3

-

$32.54 $

-

Page 113

97

18

Government

Hazardous Waste-Site Work

Refractory Brick Restoration
Average/Total

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

RESPEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

1-%FITBASE

0

23%

88%

1

-

-

3

-

$32.54 $

-

0

23%

88%

1

-

-

3

-

$32.54 $

-

0

23%

59%

39

-

-

3

-

$32.54 $

-

0
0

23%
23%

96%
59%

47
0

-

-

3
3

-

$32.54 $
$32.54 $

-

0

23%

96%

24

-

-

3

-

$32.54 $

-

0

23%

56%

18

-

-

3

-

$32.54 $

-

0

23%

95%

0

-

-

3

-

$32.54 $

-

0

23%

88%

54

-

-

3

-

$32.54 $

-

Small
State

0
0

23%
23%

99%
88%

247
16

-

-

3
3

-

$32.54 $
$32.54 $

-

Local
Large

0
0

23%
23%

88%
88%

93
1

-

-

3
3

-

$32.54 $
$32.54 $

-

Small
State

0
0

23%
23%

99%
88%

1
1

-

-

3
3

-

$32.54 $
$32.54 $

-

Local
Large

0
0

23%
23%

88%
88%

1
47

-

-

3
3

-

$32.54 $
$32.54 $

-

Small

0

23%

99%
Total

185
7,695

State

Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation and
Maintenance

%EMPMEDEXAM

EMPAL

SIZE

VARIABLES

Table 16

Page 114

4,339

4,339

3
3

13,017

$32.54 $
$32.54 $

423,573

Table 17
Respiratory Protection Program: Follow-up Medical Examination for Respirator Use; Contract Cost for a PLHCP to
Conduct the Medical Examination for Respirator Use
Employers must use a PLHCP to conduct the follow-up medical examination. The follow-up medical examination allows
PLHCPs to obtain additional information that may be useful in arriving at a final medical recommendation regarding
respirator use.

Variables:

COST = (EMPAL * RESPEXAMCOST * %EMPMEDEXAM * 1-%FITBASE * #PLANTS)
EMPAL = Number of employees who wear respirators for more than 5 hours/week and
who are at or above the AL and at or below the PEL in the model plant
RESPEXAMCOST = Cost for medical exam for respirator use
%EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
1-%FITBASE = Percent of plants not conducting annual respirator fit-test
#PLANTS = Number of plants represented by the model output

#PLANTS

5,063 $

149.01

23%

71%

1

$

123,205.90

ALL
SECTOR 2A. WELDING

Small

1,104 $

149.01

23%

97%

1

$

36,698.03

GENERAL INDUSTRY

Large

0 $

149.01

23%

81%

1

$

Small
Large

0 $
2,422 $

149.01
149.01

23%
23%

98%
55%

1
1

$
$

45,664.40

MARITIME

Small
Large

57 $
3,354 $

149.01
149.01

23%
23%

95%
88%

1
1

$
$

1,864.73
101,154.89

CONSTRUCTION

Small
State

2,593 $
15 $

149.01
149.01

23%
23%

99%
88%

1
1

$
$

87,991.57
454.56

GOVERNMENT

Local

76 $

149.01

23%

99%

1

$

2,591.00

SECTOR 2B. MILD STEEL WELDING
GENERAL INDUSTRY

Large

0 $

149.01

23%

81%

1

$

-

Small
Large

0 $
17 $

149.01
149.01

23%
23%

98%
55%

1
1

$
$

321.98

MARITIME

Small
Large

0 $
684 $

149.01
149.01

23%
23%

95%
88%

1
1

$
$

20,637.05

CONSTRUCTION
SECTOR 3. PAINTING

Small

551 $

149.01

23%

99%

1

$

18,682.44

EMPAL
Page 115

Item 13 Cost

1-%FITBASE

SECTOR 1. ELECTROPLATING

RESPEXAMCOST

Large

Size

%EMPMEDEXAM

0

-

#PLANTS

149.01

23%

81%

50

$

44,179.50

GENERAL INDUSTRY AEROSPACE

Small
Large

0 $
1 $

149.01
149.01

23%
23%

98%
81%

62
330

$
$

8,415.14

GENERAL INDUSTRY AUTOBODY

Small
Large

0 $
2 $

149.01
149.01

23%
23%

98%
81%

1,454
101

$
$

5,142.59

COIL COATINGS

Small
Large

1 $
1 $

149.01
149.01

23%
23%

98%
55%

18
274

$
$

565.63
4,422.09

MARITIME

Small
Large

1 $
486 $

149.01
149.01

23%
23%

95%
0%

474
1

$
$

15,448.07
-

CONSTRUCTION

Small
State

612 $
45 $

149.01
149.01

23%
23%

0%
0%

1
1

$
$

-

GOVERNMENT

$

149.01

23%

0%

1

$

-

$

149.01

23%

37%

2

$

165.32

$

149.01

23%

93%

0

$

-

$

149.01

23%

37%

2

$

105.65

$

149.01

23%

93%

1

$

26.55

$

149.01

23%

37%

3

$

65.71

$

149.01

23%

93%

0

$

-

$

149.01

23%

37%

5

$

649.48

$

149.01

23%

93%

0

$

-

$

149.01

23%

37%

78

$

991.93

$

149.01

23%

93%

123

$

-

$

149.01

23%

37%

2

$

252.95

$

149.01

23%

93%

7

$

470.96

EMPAL

195
Local
SECTOR 4. PRODUCERS OF CHROMATES
7
Large
ALL
0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
5
Large
ALL
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
ALL
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
ALL
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
ALL
0
Small
SECTOR 9. PRINTING INK PRODUCERS
9
Large
ALL
2
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS

Page 116

Item 13 Cost

1-%FITBASE

32 $

RESPEXAMCOST

Large

Size

%EMPMEDEXAM

Table 17

149.01

23%

54%

1

$

6,144.50

34 $

149.01

23%

95%

1

$

1,107.02

3 $

149.01

23%

37%

6

$

225.14

1 $

149.01

23%

93%

4

$

125.76

8 $

149.01

23%

56%

1

$

159.55

0 $

149.01

23%

95%

0

$

-

31 $

149.01

23%

56%

39

$

22,805.35

1 $
1 $

149.01
149.01

23%
23%

95%
56%

12
116

$
$

590.92
1,628.95

1 $

149.01

23%

95%

37

$

1,737.99

3 $

149.01

23%

56%

33

$

1,911.84

1 $

149.01

23%

95%

31

$

1,018.73

16 $

149.01

23%

56%

152

$

46,724.07

4 $

149.01

23%

95%

111

$

14,411.65

27 $

149.01

23%

37%

2

$

855.75

6 $

149.01

23%

93%

1

$

159.33

0 $

149.01

23%

37%

0

$

-

1 $

149.01

23%

93%

5

$

148.41

0 $

149.01

23%

92%

212

$

-

0 $

149.01

23%

99%

1,600

$

-

0 $

149.01

23%

89%

307

$

-

0 $

149.01

23%

99%

623

$

-

Page 117

Item 13 Cost

#PLANTS

332 $

RESPEXAMCOST

1-%FITBASE

Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
ALL
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
ALL
Small
SECTOR 14. IRON AND STEEL MILLS
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14.B FORGING INDUSTRY
Large
Reshaping Industry
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS

%EMPMEDEXAM

ALL

Large

EMPAL

Size

Table 17

#PLANTS

149.01

23%

76%

8

$

259.74

ALL

Small
Large

0 $
9 $

149.01
149.01

23%
23%

97%
76%

24
111

$
$

26,060.11

Fiber, Flat and Container

small

1 $

149.01

23%

97%

6

$

276.25

SECTOR 22. PRINTING
ALL

Large

0 $

149.01

23%

98%

78

$

-

0 $

149.01

23%

100%

312

$

-

1 $

149.01

23%

67%

1

$

27.12

0 $
128 $

149.01
149.01

23%
23%

0%
0%

0
1

$
$

-

0 $

149.01

23%

0%

1

$

-

0 $

149.01

23%

76%

5

$

-

0 $

149.01

23%

97%

0

$

-

0 $

149.01

23%

94%

1

$

-

0 $
0 $

149.01
149.01

23%
23%

99%
55%

1
36

$
$

-

0 $
0 $

149.01
149.01

23%
23%

95%
88%

32
1

$
$

-

0 $
0 $

149.01
149.01

23%
23%

99%
88%

1
1

$
$

-

0 $

149.01

23%

88%

1

$

-

0 $

149.01

23%

59%

39

$

-

0 $
0 $

149.01
149.01

23%
23%

96%
59%

47
0

$
$

-

0 $

149.01

23%

96%

24

$

-

0 $

149.01

23%

56%

18

$

-

Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Chromium Catalyst Users
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
ALL
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large

EMPAL
Page 118

Item 13 Cost

1-%FITBASE

1 $

RESPEXAMCOST

Large

Size

%EMPMEDEXAM

Table 17

#PLANTS

0 $

149.01

23%

95%

0

$

-

SECTOR 31. CONSTRUCTION

Large

0 $

149.01

23%

88%

54

$

-

INDUSTRIAL REHABILITATION AND
MAINTENANCE

Small
State

0 $
0 $

149.01
149.01

23%
23%

99%
88%

247
16

$
$

-

Local
Large

0 $
0 $

149.01
149.01

23%
23%

88%
88%

93
1

$
$

-

HAZARDOUS WASTE-SITE WORK

Small
State

0 $
0 $

149.01
149.01

23%
23%

99%
88%

1
1

$
$

-

Local
Large

0 $

149.01

23%

88%

1

$

-

0 $

149.01

23%

88%

47

$

-

REFRACTORY BRICK RESTORATION
Total

Small

0 $
17,961

149.01

23%

99%

185
$
7,695 $

EMPAL
Page 119

Item 13 Cost

1-%FITBASE

ALL

RESPEXAMCOST

Small

Size

%EMPMEDEXAM

Table 17

646,546

Table 18
Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv), and
1926.1126(g)(2)(iv)); Contract Cost to Obtain Cr(VI) Hazard-Warning Labels for Bags or Containers Used to Store
Cr(VI)-Contaminated Protective Clothing or Equipment
This table calculates the contract cost for purchasing appropriate labels for glove disposal containers. OSHA
estimates that 5% of the containers will need new or replacement labels. The number of replacement gloves used
throughout the year is divided by 1,602. The factor of 1,602 is the estimated number of gloves that can fit into a
thirty-gallon garbage bag.
Cost = GLOVERPL/1,602 * 5%*COST *#PLANTS

Variables:

GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty-gallon container.
5% of containers need new or replacement labels.
COST = The cost of a label
#PLANTS = Number of model plants
COST = The cost of a label

Item 13 Cost

1

$766

SECTOR 2A. WELDING

Small

11,970,179 1,602 373.60

$0.45

1

$167

GENERAL INDUSTRY

Large

0 1,602

0.00

$0.45

8,171

$0

Small
Large

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

9,155
197

$0
$0

MARITIME

Small
Large

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

112
278

$0
$0

CONSTRUCTION

Small
State

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

2,231
26

$0
$0

GOVERNMENT

Local

0 1,602

0.00

$0.45

819

$0

SECTOR 2B. MILD STEEL WELDING
GENERAL INDUSTRY

Large

0 1,602

0.00

$0.45

10,955

$0

Small
Large

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

11,152
425

$0
$0

Page 120

COST

#PLANTS

ALL

5% of containers need labels

54,888,821 1,602 1713.13 $0.45

GLOVEREPL

Large

Size
SECTOR 1. ELECTROPLATING

NOGLOVESCONT

Variables

0

COST

#PLANTS

Item 13 Cost

0.00
0.00

$0.45
$0.45

241
418

$0
$0

Small

0 1,602

0.00

$0.45

3,158

$0

Large

125,000 1,602

3.90

$0.45

50

$86

Small
Large

1,000 1,602
61,000 1,602

0.03
1.90

$0.45
$0.45

62
330

$1
$281

Small
Large

5,000 1,602
14,000 1,602

0.16
0.44

$0.45
$0.45

1,454
101

$102
$20

Small
Large

3,000 1,602
5,000 1,602

0.09
0.16

$0.45
$0.45

18
274

$1
$19

Small
Large

2,000 1,602
14,000 1,602

0.06
0.44

$0.45
$0.45

474
789

$13
$154

Small
State

3,000 1,602
5,000 1,602

0.09
0.16

$0.45
$0.45

4,197
17

$176
$1

Local

59,000 1,602

1.84

$0.45

945

$779

Large

75,000 1,602

2.34

$0.45

2

$2

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
ALL
Small
SECTOR 6. CCA PRODUCERS
Large
ALL
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
ALL

0 1,602

0.00

$0.45

0

$0

24,000 1,602

0.75

$0.45

2

$1

3,000 1,602

0.09

$0.45

1

$0

8,760 1,602

0.27

$0.45

3

$0

0 1,602

0.00

$0.45

0

$0

57,000 1,602

1.78

$0.45

5

$4

Size
CONSTRUCTION
SECTOR 3. PAINTING
AEROSPACE

AUTO BODY

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4. PRODUCERS OF CHROMATES
ALL

Page 121

NOGLOVESCONT

0 1,602
0 1,602

MARITIME

GLOVEREPL

Small
Large

Variables

5% of containers need labels

Table 18

5% of containers need labels

COST

#PLANTS

Item 13 Cost

Size
Small
SECTOR 8. PAINT AND COATING PRODUCERS
Large
ALL
Small
SECTOR 9. PRINTING INK PRODUCERS
Large
ALL
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
ALL
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
ALL
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
ALL
Small
SECTOR 14. IRON AND STEEL MILLS
Large
GENERAL INDUSTRY
Small
Large
CARBON STEEL
Small
SECTOR 14.B FORGING INDUSTRY
Large
RESHAPING INDUSTRY
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL

0.00

$0.45

0

$0

12,000 1,602

0.37

$0.45

78

$13

6,000 1,602

0.19

$0.45

123

$10

24,000 1,602

0.75

$0.45

2

$1

480 1,602

0.01

$0.45

7

$0

583 1,602

0.02

$0.45

79

$1

120 1,602

0.00

$0.45

39

$0

14,400 1,602

0.45

$0.45

6

$1

2,880 1,602

0.09

$0.45

4

$0

0 1,602

0.00

$0.45

1

$0

0 1,602

0.00

$0.45

0

$0

0 1,602

0.00

$0.45

39

$0

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

12
0

$0
$0

0 1,602

0.00

$0.45

0

$0

0 1,602

0.00

$0.45

33

$0

0 1,602

0.00

$0.45

31

$0

0 1,602

0.00

$0.45

152

$0

0 1,602

0.00

$0.45

111

$0

3,840 1,602

0.12

$0.45

2

$0

Page 122

NOGLOVESCONT

0 1,602

GLOVEREPL

Variables

Table 18

#PLANTS

Item 13 Cost

840 1,602

0.03

$0.45

1

$0

0 1,602

0.00

$0.45

0

$0

2,000 1,602

0.06

$0.45

5

$0

0 1,602

0.00

$0.45

212

$0

0 1,602

0.00

$0.45

1,600

$0

7,580 1,602

0.24

$0.45

307

$32

240 1,602

0.01

$0.45

623

$2

1,000 1,602

0.03

$0.45

8

$0

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

24
0

$0
$0

0 1,602

0.00

$0.45

0

$0

5,460 1,602

0.17

$0.45

78

$6

360 1,602

0.01

$0.45

312

$2

2,000 1,602

0.06

$0.45

193

$5

0 1,602
30,000 1,602

0.00
0.94

$0.45
$0.45

0
25

$0
$10

15,000 1,602

0.47

$0.45

5

$1

11,000 1,602

0.34

$0.45

5

$1

0 1,602

0.00

$0.45

0

$0

0 1,602

0.00

$0.45

143

$0

0 1,602

0.00

$0.45

76

$0

Page 123

NOGLOVESCONT

COST

Small

5% of containers need labels

Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22. PRINTING
Large
ALL
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
GENERAL INDUSTRY
Large

GLOVEREPL

Size

Variables

Table 18

COST

#PLANTS

Item 13 Cost

0 1,602

0.00

$0.45

36

$0

CONSTRUCTION

Small
Large

0 1,602
2,000 1,602

0.00
0.06

$0.45
$0.45

32
1,232

$0
$34

Small
State

1,000 1,602
1,000 1,602

0.03
0.03

$0.45
$0.45

4,932
17

$69
$0

Local

1,000 1,602

0.03

$0.45

62

$1

Large

20,000 1,602

0.62

$0.45

39

$11

Small
State

3,000 1,602
20,000 1,602

0.09
0.62

$0.45
$0.45

47
0

$2
$0

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large

3,000 1,602

0.09

$0.45

24

$1

0 1,602

0.00

$0.45

18

$0

0 1,602

0.00

$0.45

0

$0

0 1,602

0.00

$0.45

0

$0

Small
State

0 1,602
0 1,602

0.00
0.00

$0.45
$0.45

0
0

$0
$0

Local
Large

0 1,602
14,000 1,602

0.00
0.44

$0.45
$0.45

0
43

$0
$8

Small
State

3,000 1,602
2,000 1,602

0.09
0.06

$0.45
$0.45

180
1

$8
$0

Local
Large

3,000 1,602
14,000 1,602

0.09
0.44

$0.45
$0.45

252
47

$11
$9

Small

1,000 1,602

0.03

$0.45
Total

185
67,548

$3
$2,816

Size
GOVERNMENT
SECTOR 27. SOLID WASTER INCINERATION
ALL

GOVERNMENT

INDUSTRIAL REHABILITATION AND
MAINTENANCE

HAZARDOUS WASTE-SITE WORK

REFRACTORY BRICK RESTORATION

Page 124

NOGLOVESCONT

Large

GLOVEREPL

MARITIME

Variables

5% of containers need labels

Table 18

Table 18a

TABLE 18 (a): Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv), and 1926.1126(g)(2)(iv)); Clerical Time
and Cost to Affix Cr(VI) Hazard-Warning Labels for Bags or Containers Used to Store Cr(VI)-Contaminated Protective Clothing or Equipment
OSHA assumes that it will take 1 minute of clerical employee time to obtain and affix Cr(VI) hazard-warning labels to glove disposal containers. OSHA assumes the
number of labels will be the same as the number of containers needing labels, as calculated in Table 18.
BURDEN HOURS = 5% OF CONTAINERS NEED LABELS *#PLANTS * AFFIX
COST = BURDEN HOURS * HCLWAGE

Variables:

SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
Aerospace

Auto Body

Coil Coating

Maritime

ITEM 12 COST

BURDEN HOURS

RESPONDENTS

5% OF CONTAINERS NEED LABELS

NOGLOVESCONT

GLOVEREPL

54,888,821 1,602

1713

1

1,713

1,713

0.02

29

$26.65

$

761

Small

11,970,179 1,602

374

1

374

374

0.02

6

$26.65

$

166

Large

0 1,602

0

8,171

-

-

0.02

-

$26.65

$

-

Small
Large

0 1,602
0 1,602

0
0

9,155
197

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Small
Large

0 1,602
0 1,602

0
0

112
278

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Small
State

0 1,602
0 1,602

0
0

2,231
26

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Local

0 1,602

0

819

-

-

0.02

-

$26.65

$

-

Large

0 1,602

0

10,955

-

-

0.02

-

$26.65

$

-

Small
Large

0 1,602
0 1,602

0
0

11,152
425

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Small
Large

0 1,602
0 1,602

0
0

241
418

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Small

0 1,602

0

3,158

-

-

0.02

-

$26.65

$

-

Large

125,000 1,602

3.90

50

193

193

0.02

3

$26.65

$

86

Small
Large

1,000 1,602
61,000 1,602

0.03
1.90

62
330

2
629

2
629

0.02
0.02

0.03
10

$26.65
$26.65

$
$

1
279

Small
Large

5,000 1,602
14,000 1,602

0.16
0.44

1,454
101

227
44

227
44

0.02
0.02

4
1

$26.65
$26.65

$
$

101
20

Small
Large

3,000 1,602
5,000 1,602

0.09
0.16

18
274

2
43

2
43

0.02
0.02

0.03
1

$26.65
$26.65

$
$

1
19

Page 125

HCLWAGE

Large

#PLANTS

AFFIX

All

RESPONSES

SECTOR 1. ELECTROPLATING

SIZE

VARIABLES

GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty-gallon container.
5% of containers need new or replacement labels = see Table 18
HCLWAGE = Highest clerical wage rate (overestimation)
AFFIX = 1 minute for a clerical worker to obtain and affix label
#PLANTS = Number of model plants
COST = The cost to obtain and affix the label

Construction

Government
SECTOR 4. PRODUCERS OF CHROMATES
All

ITEM 12 COST

HCLWAGE

BURDEN HOURS

AFFIX

RESPONSES

RESPONDENTS

#PLANTS

5% OF CONTAINERS NEED LABELS

NOGLOVESCONT

GLOVEREPL

SIZE

VARIABLES

Table 18a

Small
Large

2,000 1,602
14,000 1,602

0.06
0.44

474
789

30
345

30
345

0.02
0.02

0.5
6

$26.65
$26.65

$
$

13
153

Small
State

3,000 1,602
5,000 1,602

0.09
0.16

4,197
17

393
3

393
3

0.02
0.02

7
0.04

$26.65
$26.65

$
$

175
1

Local

59,000 1,602

1.84

945

1,740

1,740

0.02

29

$26.65

$

773

Large

75,000 1,602

2

2

4

4

0.02

0.07

$26.65

$

2

0 1,602

-

-

-

-

0.02

-

$26.65

$

24,000 1,602

1

2

1

1

0.02

0.02

$26.65

$

1

3,000 1,602

0

1

0.1

0.1

0.02

0.001

$26.65

$

0.03

8,760 1,602

0

3

1

1

0.02

0.01

$26.65

$

0.3

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

57,000 1,602

2

5

8

8

0.02

0.14

$26.65

$

0 1,602

-

0

-

-

0.02

-

$26.65

$

12,000 1,602

0.4

78

29

29

0.02

0.49

$26.65

$

13

6,000 1,602

0.2

123

23

23

0.02

0.4

$26.65

$

10

24,000 1,602

1

2

2

2

0.02

0.03

$26.65

$

1

480 1,602

0.01

0.1

0.02

0.002

$26.65

$

0.05

583 1,602

0.02

79

1

1

0.02

0.02

$26.65

$

1

120 1,602

0.004

39

0.1

0.1

0.02

0.002

$26.65

14,400 1,602

0.4

6

3

3

0.02

0.04

$26.65

2,880 1,602

0.1

4

0.4

0.4

0.02

0.006

$26.65

0 1,602

-

1

-

-

0.02

-

$26.65

$

-

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

0 1,602

-

39

-

-

0.02

-

$26.65

$

-

0 1,602
0 1,602

-

12
0

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

0 1,602

-

33

-

-

0.02

-

$26.65

$

-

0 1,602

-

31

-

-

0.02

-

$26.65

$

-

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
All
Small
SECTOR 6. CCA PRODUCERS
Large
All
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
All
Small
SECTOR 8. PAINT AND COATING PRODUCERS
Large
All
Small
SECTOR 9. PRINTING INK PRODUCERS
Large
All
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
All
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
All
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
All
Small
SECTOR 14. IRON AND STEEL MILLS
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14.B FORGING INDUSTRY
Large
Reshaping Industry
Small
SECTOR 15. IRON AND STEEL FOUNDRIES

Page 126

7 $

0.1 $

-

4
-

0.1
$

1
0.2

ITEM 12 COST

HCLWAGE

BURDEN HOURS

AFFIX

RESPONSES

RESPONDENTS

#PLANTS

5% OF CONTAINERS NEED LABELS

NOGLOVESCONT

GLOVEREPL

SIZE

VARIABLES

Table 18a

Large

0 1,602

-

152

-

-

0.02

-

$26.65

$

-

Small

0 1,602

-

111

-

-

0.02

-

$26.65

$

-

Large

3,840 1,602

0.1

2

0.3

0.3

0.02

0.005

$26.65

$

0.1

Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat, and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION

840 1,602

0.03

1

0.02

0.02

0.02

0.0004

$26.65

$

0.01

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

2,000 1,602

0.1

5

0.3

0.3

0.02

0.005

$26.65

$

0.1

0 1,602

-

212

-

-

0.02

-

$26.65

$

-

0 1,602

-

1,600

-

-

0.02

-

$26.65

$

-

7,580 1,602

0.2

307

73

73

0.02

1.21

$26.65

$

32

240 1,602

0.01

623

5

5

0.02

0.1

$26.65

$

2

1,000 1,602

0.03

8

0.2

0.2

0.02

0.004

$26.65

$

0.1

0 1,602
0 1,602

-

24
0

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

5,460 1,602

0.2

78

13

13

0.02

0.22

$26.65

$

6

360 1,602

0.01

312

4

4

0.02

0.1

$26.65

$

2

2,000 1,602

0.1

193

12

12

0.02

0.20

$26.65

$

5

0 1,602
30,000 1,602

1

25

23

23

0.02
0.02

0.39

$26.65
$26.65

$
$

15,000 1,602

0.5

5

2

2

0.02

0.04

$26.65

$

1

11,000 1,602

0.3

5

2

2

0.02

0.03

$26.65

$

1

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

0 1,602

-

143

-

-

0.02

-

$26.65

$

-

0 1,602
0 1,602

-

76
36

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

0 1,602
2,000 1,602

0.1

32
1,232

77

77

0.02
0.02

1.28

$26.65
$26.65

$
$

34

1,000 1,602
1,000 1,602

0.03
0.03

4,932
17

154
1

154
1

0.02
0.02

3
0.01

$26.65
$26.65

$
$

68
0.2

1,000 1,602

0.03

62

2

2

0.02

0.03

$26.65

$

1

All
SECTOR 17. CHROMIUM DYE PRODUCERS
All

Page 127

10

ITEM 12 COST

HCLWAGE

BURDEN HOURS

AFFIX

RESPONSES

RESPONDENTS

#PLANTS

5% OF CONTAINERS NEED LABELS

NOGLOVESCONT

GLOVEREPL

SIZE

VARIABLES

Table 18a

Large

20,000 1,602

1

39

25

25

0.02

0.41

$26.65

$

Small
State

3,000 1,602
20,000 1,602

0.1
1

47
0

4
-

4
-

0.02
0.02

0
-

$26.65
$26.65

$
$

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large

3,000 1,602

0

24

2

2

0.02

0

$26.65

$

0 1,602

-

18

-

-

0.02

-

$26.65

$

-

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

0 1,602

-

0

-

-

0.02

-

$26.65

$

-

Small
State

0 1,602
0 1,602

-

0
0

-

-

0.02
0.02

-

$26.65
$26.65

$
$

-

Local
Large

0 1,602
14,000 1,602

0

0
43

19

19

0.02
0.02

0.31

$26.65
$26.65

$
$

-

Small
State

3,000 1,602
2,000 1,602

0
0

180
1

17
0.1

17
0.1

0.02
0.02

0.3
0.001

$26.65
$26.65

$
$

7
0.02

Local
Large

3,000 1,602
14,000 1,602

0
0

252
47

24
20

24
20

0.02
0.02

0.4
0.34

$26.65
$26.65

$
$

10
9

Small

1,000 1,602

0

185
67,548

0.1 $26.65 $
105 $26.65 $

3
2,798

All

Government

Industrial Rehabilitation and Maintenance

Hazardous Waste-Site Work

Refractory Brick Restoration
Total/Average

Page 128

6
6,295

6
6,295

0.02
0.02

11
2
1

8

Table 19

TABLE 19: Protective Work Clothing and Equipment, Cleaning and Replacement (§§ 1910.1026(h)(3)(iii), 1915.1026(g)(3)(iii), and 1926.1126(g)(3)(iii))
Employer Time and Cost to Inform Laundry Contractor About Cr(VI)-Contaminated Protective Clothing or Equipment
The laundering company will be informed of the presence of hexavalent chromium in the laundry at the commencement of the laundering agreement.
Laundering facilities typically collect dirty uniforms for cleaning. It is estimated that the laundering facility will assume the cost burden for labeling the
contaminated laundry and include the cost in their laundering fee. For purposes of calculating burden hours, OSHA assumes that it will take a maximum of
five minutes to notify the laundry, and that 25% of the plants will need to annually notify or reinform the laundry.
BURDEN HOURS = #PLANTS * NOTTIME
COST = Hours * SUPEWAGE

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

Maritime

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTIME

RESPONSES

RESPONDENTS

# of PLANTS *25%

Number of plants represented by the model plant
Number of plants represented by the model plant * 25% need to notify or reinform
Time to notify the laundry.
Supervisory Wage Rate

#PLANTS

VARIABLES

#PLANTS =
#PLANTS * 25% =
NOTIME =
SUPEWAGE =

SIZE

Variables:

Large

1

0.25

0.25

0.25

0.08

0.02

$43.90

$

1

Small

1

0.25

0.25

0.25

0.08

0.02

$43.90

$

1

Large

8,171

2,043

2,043

2,043

0.08

170

$43.90

$

7,473

Small
Large

9,155
197

2,289
49

2,289
49

2,289
49

0.08
0.08

191
4

$43.90
$43.90

$
$

8,374
180

Small
Large

112
278

28
70

28
70

28
70

0.08
0.08

2
6

$43.90
$43.90

$
$

102
255

Small
State

2,231
26

558
7

558
7

558
7

0.08
0.08

46
1

$43.90
$43.90

$
$

2,040
24

Local

819

205

205

205

0.08

17

$43.90

$

749

Large

10,955

2,739

2,739

2,739

0.08

228

$43.90

$

10,020

Small
Large

11,152
425

2,788
106

2,788
106

2,788
106

0.08
0.08

232
9

$43.90
$43.90

$
$

10,200
389

Small
Large

241
418

60
104

60
104

60
104

0.08
0.08

5
9

$43.90
$43.90

$
$

221
382

Small

3,158

789

789

789

0.08

66

$43.90

$

2,888

Large

50

12

12

12

0.08

1

$43.90

$

45

Small
Large

62
330

16
83

16
83

16
83

0.08
0.08

1
7

$43.90
$43.90

$
$

57
302

Small
Large

1,454
101

364
25

364
25

364
25

0.08
0.08

30
2

$43.90
$43.90

$
$

1,330
92

Small
Large

18
274

5
69

5
69

5
69

0.08
0.08

0.4
6

$43.90
$43.90

$
$

17
251

Small

474

119

119

119

0.08

10

$43.90

$

434

Page 129

Construction

Government
SECTOR 4. PRODUCERS OF CHROMATES
All

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTIME

RESPONSES

RESPONDENTS

# of PLANTS *25%

#PLANTS

SIZE

VARIABLES

Table 19

Large

789

197

197

197

0.08

16

$43.90

$

722

Small
State

4,197
17

1,049
4

1,049
4

1,049
4

0.08
0.08

87
0.4

$43.90
$43.90

$
$

3,839
16

Local

945

236

236

236

0.08

20

$43.90

$

864

Large

2

0.5

0.5

0.5

0.08

0.04

$43.90

$

2

0

-

-

-

0.08

-

$43.90

$

-

2

0.4

0.4

0.4

0.08

0.03

$43.90

$

2

1

0.2

0.2

0.2

0.08

0.02

$43.90

$

1

3

1

1

1

0.08

0.1

$43.90

$

2

0

-

-

-

0.08

-

$43.90

$

-

5

1

1

1

0.08

0.1

$43.90

$

4

0

-

-

-

0.08

-

$43.90

$

-

78

20

20

20

0.08

2

$43.90

$

72

123

31

31

31

0.08

3

$43.90

$

112

2

1

1

1

0.08

0.05

$43.90

$

2

7

2

2

2

0.08

0.2

$43.90

$

7

79

20

20

20

0.08

2

$43.90

$

72

39

10

10

10

0.08

1

$43.90

$

35

6

1

1

1

0.08

0

$43.90

$

5

4

1

1

1

0.08

0

$43.90

$

4

1

0.3

0.3

0.3

0.08

0.02

$43.90

$

1

0

-

-

-

0.08

-

$43.90

$

-

39

10

10

10

0.08

1

$43.90

$

35

12
0

3
-

3
-

3
-

0.08
0.08

0.3
-

$43.90
$43.90

$
$

11
-

0

-

-

-

0.08

-

$43.90

$

-

33

8

8

8

0.08

1

$43.90

$

30

31

8

8

8

0.08

1

$43.90

$

29

152

38

38

38

0.08

3

$43.90

$

139

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
All
Small
SECTOR 6. CCA PRODUCERS
Large
All
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
All
Small
SECTOR 8. PAINT AND COATING PRODUCERS
Large
All
Small
SECTOR 9. PRINTING INK PRODUCERS
Large
All
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
All
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
All
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
All
Small
SECTOR 14. IRON AND STEEL MILLS
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14.B FORGING INDUSTRY
Large
Reshaping Industry
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All

Page 130

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTIME

RESPONSES

RESPONDENTS

# of PLANTS *25%

#PLANTS

SIZE

VARIABLES

Table 19

Small

111

28

28

28

0.08

2

$43.90

$

101

Large

2

1

1

1

0.08

0.1

$43.90

$

2

Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat, and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small

1

0.2

0.2

0.2

0.08

0.02

$43.90

$

1

0

-

-

-

0.08

-

$43.90

$

-

5

1

1

1

0.08

0.1

$43.90

$

4

212

53

53

53

0.08

4

$43.90

$

194

1,600

400

400

400

0.08

33

$43.90

$

1,463

307

77

77

77

0.08

6

$43.90

$

281

623

156

156

156

0.08

13

$43.90

$

570

8

2

2

2

0.08

0.2

$43.90

$

7

24
0

6
-

6
-

6
-

0.08
0.08

1
-

$43.90
$43.90

$
$

22
-

0

-

-

-

0.08

-

$43.90

$

-

78

19

19

19

0.08

2

$43.90

$

71

312

78

78

78

0.08

6

$43.90

$

285

193

48

48

48

0.08

4

$43.90

$

176

0
25

6

6

6

0.08
0.08

1

$43.90
$43.90

$
$

23

5

1

1

1

0.08

0.1

$43.90

$

4

5

1

1

1

0.08

0.1

$43.90

$

5

0

-

-

-

0.08

-

$43.90

$

-

143

36

36

36

0.08

3

$43.90

$

131

76
36

19
9

19
9

19
9

0.08
0.08

2
1

$43.90
$43.90

$
$

70
33

32
1,232

8
308

8
308

8
308

0.08
0.08

1
26

$43.90
$43.90

$
$

29
1,127

4,932
17

1,233
4

1,233
4

1,233
4

0.08
0.08

103
0.4

$43.90
$43.90

$
$

4,511
16

62

15

15

15

0.08

1

$43.90

$

56

39

10

10

10

0.08

1

$43.90

$

36

47

12

12

12

0.08

1

$43.90

$

43

SECTOR 17. CHROMIUM DYE PRODUCERS
All

Page 131

ITEM 12 COST

SUPWAGE

BURDEN HOURS

NOTIME

RESPONSES

RESPONDENTS

# of PLANTS *25%

#PLANTS

SIZE

VARIABLES

Table 19

State

0

-

-

-

0.08

-

$43.90

$

-

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large

24

6

6

6

0.08

0.5

$43.90

$

22

18

4

4

4

0.08

0.4

$43.90

$

16

0

-

-

-

0.08

-

$43.90

$

-

0

-

-

-

0.08

-

$43.90

$

-

Small
State

0
0

-

-

-

0.08
0.08

-

$43.90
$43.90

$
$

-

Local
Large

0
43

11

11

11

0.08
0.08

1

$43.90
$43.90

$
$

39

Small
State

180
1

45
0.2

45
0.2

45
0.2

0.08
0.08

4
0.02

$43.90
$43.90

$
$

165
1

Local
Large

252
47

63
12

63
12

63
12

0.08
0.08

5
1

$43.90
$43.90

$
$

231
43

Small

185

$43.90
$43.90

$
$

170
61,767

Government

Industrial Rehabilitation and Maintenance

Hazardous Waste-Site Work

Refractory Brick Restoration
Average/Total

46
16,887

Page 132

46
16,887

46
16,887

0.08
0.08

4
1,407

Table 20

TABLE 20: Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii)) Employee Time and Cost to Complete the Initial Medical Examination
This table calculates the burden hours and costs of employee time to complete the initial medical examinations for those employees who are potentially
exposed to airborne hexavalent chromium at or above the action level or who show "signs or symptoms" of exposure to hexavalent chromium before the
implementation of engineering controls. For purposes of estimating the ICR costs, the Agency assumes that: all initial monitoring is completed, existing
employers will experience a 5% turnover of potentially exposed employees with initial medical examinations, and new employers will have no employees
requiring an initial medical examination.
BURDEN HOURS = (POTEXEMP*5%)*MEDEXAMTIME * #PLANTS
COST = (POTEXEMP*5%) MEDEXAMTIME *NONSUPWAGE * #PLANTS

Variables:

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP * 5%

POTEXEMP

SIZE

VARIABLES

POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls * 5%
POTEXEMP * 5% = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls * 5%
MEDEXAMTIME = Employee time, in hours, for a medical examination.
NONSUPEWAGE = Non-supervisory wage rate
#PLANTS = Number of Plants

Large

5

0.25

1,752

438

438

3

1,314

$32.54

$

42,769

Small

1

0.05

3,297

165

165

3

495

$32.54

$

16,093

Large

2 0.1005

8,171

821

821

3

2,463

$32.54

$

80,146

Small
Large

0
0
19 0.9545

9,155
197

188

188

3
3

564

$32.54
$32.54

$
$

18,351

Small
Large

1 0.0502
51 2.5621

112
278

6
713

6
713

3
3

17
2,139

$32.54
$32.54

$
$

547
69,615

Small
Local

5 0.2512
2 0.1005

2,231
26

560
3

560
3

3
3

1,681
8

$32.54
$32.54

$
$

54,699
256

State

0

819

-

-

3

-

$32.54

$

-

Large

1 0.0502

10,955

550

550

3

1,651

$32.54

$

53,728

Small
Large

0
0

11,152
425

-

-

3
3

-

$32.54
$32.54

$
$

-

12
399

12
399

3
3

36
1,197

$32.54
$32.54

$
$

1,183
38,949

952

$32.54

$

30,976

348

$32.54

$

11,319

0

0
0

Small
Large

1 0.0502
19 0.9545

241
418

Small

2 0.1005

3,158

317
317 3
GENERAL INDUSTRY
116
116 3

Large

47

2.3399

50

Small
Large

1
12

0.0459
0.5964

62
330

3
197

3
197

3
3

9
591

$32.54
$32.54

$
$

279
19,235

Small
Large

1
2

0.0459
0.0918

1,454
101

67
9

67
9

3
3

200
28

$32.54
$32.54

$
$

6,514
904

Small

1

0.0459

18

1

1

3

3

$32.54

$

82

Page 133

Government
SECTOR 4. PRODUCERS OF CHROMATES
All

0.1282

274

35

35

3

106

$32.54

$

3,435

Small
Large

1
2

0.0427
0.1121

474
789

20
89

20
89

3
3

61
266

$32.54
$32.54

$
$

1,980
8,642

Small
Local

1
9

0.0374
0.4597

4,197
17

157
8

157
8

3
3

471
24

$32.54
$32.54

$
$

15,315
766

State

1

0.0328

945

31

31

3

93

$32.54

$

3,030

0.35

2

1

1

3

2

$32.54

$

64

0

0

-

-

3

-

$32.54

$

-

1

2

2

2

3

5

$32.54

$

163

0.1

1

0.1

0.1

3

0.2

$32.54

$

8

0.15

3

0.4

0.4

3

1

$32.54

$

38

0

0

-

-

3

-

$32.54

$

-

1.2

5

6

6

3

17

$32.54

$

545

0

0

-

-

3

-

$32.54

$

-

0.25

78

20

20

3

59

$32.54

$

1,909

0.1

123

12

12

3

37

$32.54

$

1,200

0

2

-

-

3

-

$32.54

$

-

0

7

-

-

3

-

$32.54

$

-

0

79

-

-

3

-

$32.54

$

-

0

39

-

-

3

-

$32.54

$

-

0.15

6

1

1

3

3

$32.54

$

87

0.05

4

0.2

0.2

3

1

$32.54

$

19

0.7

1

1

1

3

2

$32.54

$

65

0

0

-

-

3

-

$32.54

$

-

2.0822

39

81

81

3

242

$32.54

$

7,871

0.0731
0.5114

12
116

1
59

1
59

3
3

3
178

$32.54
$32.54

$
$

89
5,800

0.0731

37

3

3

3

8

$32.54

$

261

Large

7

0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
20
Large
All
2
Small
SECTOR 6. CCA PRODUCERS
3
Large
All
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
24
Large
All
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
5
Large
All
2
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
All
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
All
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
14
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
42
Large
Alloy Stainless Steel
1
Small
10
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY
Reshaping

ITEM 12 COST

BURDEN HOURS

RESPONSES

#PLANTS

NONSUPEWAGE

3

MEDEXAMTIME

Large

RESPONDENTS

POTEXEMP * 5%

Construction

POTEXEMP

Maritime

SIZE

VARIABLES

Table 20

Large

3

0.15

33

5

5

3

15

$32.54

$

486

Small

0

0

31

-

-

3

-

$32.54

$

-

Page 134

SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
All
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Catalyst Users
Small
Large
Chromium Catalyst Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP * 5%

POTEXEMP

SIZE

VARIABLES

Table 20

23

1.15

152

175

175

3

525

$32.54

$

17,082

5

0.25

111

28

28

3

83

$32.54

$

2,701

0

0

2

-

-

3

-

$32.54

$

-

0

0

1

-

-

3

-

$32.54

$

-

0

0

0

-

-

3

-

$32.54

$

-

3

0.15

5

1

1

3

2

$32.54

$

68

0

0

212

-

-

3

-

$32.54

$

-

0

0

1,600

-

-

3

-

$32.54

$

-

0

0

307

-

-

3

-

$32.54

$

-

0

0

623

-

-

3

-

$32.54

$

-

1 0.0645

8

0.5

0.5

3

1

$32.54

$

49

0
0
14 0.709

24
111

79

79

3
3

236

$32.54
$32.54

$
$

7,674

3 0.1289

6

1

1

3

2

$32.54

$

81

0

0

78

-

-

3

-

$32.54

$

-

0

0

312

-

-

3

-

$32.54

$

-

1 0.0591

193

11

11

3

34

$32.54

$

1,110

0
0
12 0.5906

0
25

15

15

3
3

44

$32.54
$32.54

$
$

1,430

6 0.2953

5

1

1

3

4

$32.54

$

136

0

0

5

-

-

3

-

$32.54

$

-

0

0

0

-

-

3

-

$32.54

$

-

143

5

5

3

16

$32.54

$

521

76
36

-

-

3
3

-

$32.54
$32.54

$
$

-

0
0
2 0.1241

32
1,232

153

153

3
3

459

$32.54
$32.54

$
$

14,934

1 0.0414
1 0.0328

4,932
17

204
1

204
1

3
3

612
2

$32.54
$32.54

$
$

19,915
55

1 0.0328

62

2

2

3

6

$32.54

$

198

1 0.0382
0
0

0
0

Page 135

All

Government

Hazardous Waste Site Work

Refractory Brick Restoration
Total/Average

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMTIME

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP * 5%

Large

0

0

39

-

-

3

-

$32.54

$

-

Small
State

0
0

0
0

47
0

-

-

3
3

-

$32.54
$32.54

$
$

-

0

0

24

-

-

3

-

$32.54

$

-

2

0.1

18

2

2

3

5

$32.54

$

171

0

0

0

-

-

3

-

$32.54

$

-

0

0

54

-

-

3

-

$32.54

$

-

Small
State Gov't

0
0

0
0

247
16

-

-

3
3

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0
0

0
0

93
43

-

-

3
3

-

$32.54
$32.54

$
$

-

Small
State Gov't

0
0

0
0

180
1

-

-

3
3

-

$32.54
$32.54

$
$

-

0
0
11 0.5586

252
47

26

26

3
3

79

$32.54
$32.54

$
$

2,557

1 0.0559

185
73,274

10
5,809

$32.54
$
$32.54 $

1,011
567,075

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation & Maintenance

POTEXEMP

SIZE

VARIABLES

Table 20

Local Gov't
Large
Small

Page 136

10 3
5,809 3

31
17,427

Table 21
Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and
(i)(3)(ii); and 1926.1126(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii)) Contract Cost for a PLHCP to Conduct the Initial Medical
Examination
This table calculates the cost for a contractor PLHCP to conduct initial medical examinations.
COST = (POTEXEMP*5%) * MEDEXAMCOST * # PLANTS

Variables:

POTEXEMP = Total number of potentially exposed employees at or above the AL
and workers with "signs and symptoms" before the
implementation of engineering controls
MEDEXAMCOST = Cost of medical exam
#PLANTS = Number of Plants

SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE

MEDEXAMCOST

COST

All

POTEXEMP*5%

#PLANTS

SECTOR 1. ELECTROPLATING

POTEXEMP

Large

5 0.2500

$175

1,752

$76,565

Small

1 0.0500

$175

3,297

$28,810

Large

2 0.1005

$175

8,171

$143,478

Small
Large

0 0.0000
19 0.9545

$175
$175

9,155
197

$0
$32,852

Small
Large

1 0.0502
51 2.5621

$175
$175

112
278

$979
$124,626

Small
State

5 0.2512
2 0.1005

$175
$175

2,231
26

$97,922
$459

Local

0 0.0000

$175

819

$0

Large

1 0.0502

$175

10,955

$96,184

Small
Large

0 0.0000
0 0.0000

$175
$175

11,152
425

$0
$0

Small
Large

1 0.0502
19 0.9545

$175
$175

241
418

$2,117
$69,728

Small

2 0.1005

$55,454

Large

47 2.3399

$175
3,158
GENERAL INDUSTRY
$175
50

Size

Variables

$0

Page 137

$20,263

COST

Coil Coating

Maritime
Construction
Government
SECTOR 4. PRODUCERS OF CHROMATES
ALL
SECTOR 5. CHROMATE PIGMENT PROCEDURES
ALL
SECTOR 6. CCA PRODUCERS
ALL
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
ALL
SECTOR 8. PAINT AND COATING PRODUCERS
ALL
SECTOR 9. PRINTING INK PRODUCERS
ALL

MEDEXAMCOST

#PLANTS

Auto Body

POTEXEMP*5%

POTEXEMP

Small
Large

1 0.0459
12 0.5964

$175
$175

62
330

$500
$34,435

Small
Large

1 0.0459
2 0.0918

$175
$175

1,454
101

$11,662
$1,619

Small
Large

1 0.0459
3 0.1282

$175
$175

18
274

$147
$6,150

Small
Large

1 0.0427
2 0.1121

$175
$175

474
789

$3,544
$15,472

Small
State

1 0.0374
9 0.4597

$175
$175

4,197
17

$27,418
$1,372

Local

1 0.0328

$175

945

$5,424

Large

7 0.3500

$175

2

$114

Small

0 0.0000

$175

0

$0

Large

20 1.0000

$175

2

$291

Small

2 0.1000

$175

1

$15

Large

3 0.1500

$175

3

$68

Small

0 0.0000

$175

0

$0

Large

24 1.2000

$175

5

$976

Small

0 0.0000

$175

0

$0

Large

5 0.2500

$175

78

$3,418

Small

2 0.1000

$175

123

$2,148

Large

0 0.0000

$175

2

$0

0 0.0000

$175

7

$0

0 0.0000

$175

79

$0

Size

Variables

Table 21

Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
ALL

Page 138

SECTOR 13. CHROMIUM METAL PRODUCERS
ALL
SECTOR 14. IRON AND STEEL MILLS
General Industry

Carbon Steel
SECTOR 14.B FORGING INDUSTRY
Reshaping
SECTOR 15. IRON AND STEEL FOUNDRIES
ALL
SECTOR 17. CHROMIUM DYE PRODUCERS
ALL
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
ALL
SECTOR 19. CHEMICAL DISTRIBUTORS
ALL
SECTOR 20. TEXTILE DYEING
ALL
SECTOR 21. COLORED GLASS PRODUCERS
General Industry

MEDEXAMCOST

COST

ALL

POTEXEMP*5%

#PLANTS

SECTOR 11. PLATING MIXTURE PRODUCERS

POTEXEMP

Small

0 0.0000

$175

39

$0

Large

3 0.1500

$175

6

$155

Small

1 0.0500

$175

4

$34

Large

14 0.7000

$175

1

$127

Small

0 0.0000

$175

0

$0

Large

42 2.0822

$175

39

$14,091

Small
Large

1 0.0731
10 0.5114

$175
$175

12
116

$159
$10,383

Small

1 0.0731

$175

37

$466

Large

3 0.1500

$175

33

$870

Small

0 0.0000

$175

31

$0

Large

23 1.1500

$175

152

$30,580

Small

5 0.2500

$175

111

$4,835

Large

0 0.0000

$175

2

$0

Small

0 0.0000

$175

1

$0

Large

0 0.0000

$175

0

$0

Small

3 0.1500

$175

5

$122

Large

0 0.0000

$175

212

$0

Small

0 0.0000

$175

1,600

$0

Large

0 0.0000

$175

307

$0

Small

0 0.0000

$175

623

$0

Large

1 0.0645

$175

8

$87

Size

Variables

Table 21

Page 139

COST

Small
Large

0 0.0000
14 0.7090

$175
$175

24
111

$0
$13,738

Small

3 0.1289

$175

6

$145

Large

0 0.0000

$175

78

$0

Small

0 0.0000

$175

312

$0

Large

1 0.0591

$175

193

$1,987

Small
Large

0 0.0000
12 0.5906

$175
$175

0
25

$0
$2,560

Small

6 0.2953

$175

5

$244

Large

0 0.0000

$175

5

$0

Small

0 0.0000

$175

0

$0

Large

1 0.0382

$175

143

$955

Small
Large

0 0.0000
0 0.0000

$175
$175

76
36

$0
$0

Small
Large

0 0.0000
2 0.1241

$175
$175

32
1,232

$0
$26,734

Small
State

1 0.0414
1 0.0328

$175
$175

4,932
17

$35,670
$98

Local

1 0.0328

$175

62

$354

Large

0 0.0000

$175

39

$0

Small
State

0 0.0000
0 0.0000

$175
$175

47
0

$0
$0

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small

0 0.0000

$175

24

$0

2 0.1000

$175

18

$306

0 0.0000

$175

0

$0

Size

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

POTEXEMP

Variables

Table 21

Fiber, Flat and Container Glass
SECTOR 22. PRINTING
ALL
SECTOR 24. CHROMIUM CATALYST USERS
General Industry

Chromium Service Companies
SECTOR 25. REFRACTORY BRICK PRODUCERS
ALL
SECTOR 26. WOODWORKING
General Industry

Maritime

Construction

Government
SECTOR 27. SOLID WASTER INCINERATION
ALL

Government

Page 140

Hazardous Waste Site Work

Refractory Brick Restoration

MEDEXAMCOST

COST

Industrial Rehabilitation & Maintenance

POTEXEMP*5%

#PLANTS

SECTOR 31. CONSTRUCTION

POTEXEMP

Large

0 0.0000

$175

54

$0

Small
State

0 0.0000
0 0.0000

$175
$175

247
16

$0
$0

Local
Large

0 0.0000
0 0.0000

$175
$175

93
43

$0
$0

Small
State

0 0.0000
0 0.0000

$175
$175

180
1

$0
$0

Local
Large

0 0.0000
11 0.5586

$175
$175

252
47

$0
$4,578

Small

1 0.0559

$175

185
73,274

$1,810
$1,015,299

Size

Variables

Table 21

Page 141

Total

Table 22

TABLE 22: Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(2)(ii), (i)(3)(i), and (i)(3)(ii)) Employee Time and
Cost to Complete the Annual Medical Examination
This table calculates the burden hours and costs associated with employee time to complete the annual medical examination in the year after the initial medical examination is completed. These hours
and costs are for existing emplyoees who are potentially exposed at or above the action level or who show "signs and symptoms" of exposure. The Agency assumes that a varying percentage of
existing plants will have employees who will complete these exams; these percentages are specific to each sector and plant size (large or small). Employees who work for employers who conduct
annual examinations, %BASEMED, will incur a incremental medical exam time of 3 hours. Employees who are not working for employers providing annual medical examinations (1-%BASEMED) will
incur three hours for a full limited medical exam.

General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry
Maritime
Construction
SECTOR 3. PAINTING
Aerospace

Auto Body

Coil Coating
Maritime
Construction
Government

HOURS PER RESPONSE
(FOR "ITEM 12 TABLE")

1,752

5,257

5,257

3

15,771

$32.54 $

513,225

Small

0

0.000000 3

100.00%

3.00 1 100.00%

3,297

-

-

3

-

$32.54 $

-

Large

0

0.000000 3

5.00%

3.00 1

5.00%

8,171

-

-

3

-

$32.54 $

-

Small
Large

0
14

0.000000 3
3.014286 3

0.00%
5.00%

3.00 1
3.00 1

0.00%
5.00%

9,155
197

3,364

3,364

3
3

10,091

$32.54 $
$32.54 $

328,388

Small
Large

1
27

0.000000 3
3.014286 3

0.00%
5.00%

3.00 1
3.00 1

0.00%
5.00%

112
278

112
8,389

112
8,389

3
3

336
25,168

$32.54 $
$32.54 $

10,940
818,999

Small
State

3
0

0.000000 3
0.000000 3

0.00%
5.00%

3.00 1
3.00 1

0.00%
5.00%

2,231
26

6,724
-

6,724
-

3
3

20,171
-

$32.54 $
$32.54 $

656,382
-

Local

0

0.000000 3

0.00%

3.00 1

0.00%

819

-

-

3

-

$32.54 $

-

Large

0

0.000000 3

5.00%

3.00 1

5.00%

10,955

-

-

3

-

$32.54 $

-

Small
Large

0
0

0.000000 3
0.000000 3

0.00%
5.00%

3.00 1
3.00 1

0.00%
5.00%

11,152
425

-

-

3
3

-

$32.54 $
$32.54 $

-

Small
Large

0
10

0.000000 3
0.000000 3

0.00%
5.00%

3.00 1
3.00 1

0.00%
5.00%

241
418

4,200

4,200

3
3

12,599

$32.54 $
$32.54 $

409,992

Small

1

0.000000 3

0.00%

3.00 1

0.00%

3,158

3,173

3,173

3

9,519

$32.54 $

309,761

Large

46

0.000000 3

80.00%

3.00 1

80.00%

50

2,273

2,273

3

6,820

$32.54 $

221,942

Small
Large

0
1

0.000000 3
0.000000 3

50.00%
80.00%

3.00 1
3.00 1

50.00%
80.00%

62
330

303

303

3
3

909

$32.54 $
$32.54 $

29,592

Small
Large

0
2

0.000000 3
0.000000 3

50.00%
80.00%

3.00 1
3.00 1

50.00%
80.00%

1,454
101

185

185

3
3

556

$32.54 $
$32.54 $

18,084

Small
Large

1
2

0.000000 3
0.000000 3

50.00%
100.00%

3.00 1 50.00%
3.00 1 100.00%

18
274

17
469

17
469

3
3

51
1,408

$32.54 $
$32.54 $

1,644
45,803

Small
Large

1
2

0.000000 3
0.000000 3

50.00%
100.00%

3.00 1 50.00%
3.00 1 100.00%

474
789

406
1,771

406
1,771

3
3

1,217
5,312

$32.54 $
$32.54 $

39,596
172,849

Small
State

0
0

0.000000 3
0.000000 3

100.00%
100.00%

3.00 1 100.00%
3.00 1 100.00%

4,197
17

-

-

3
3

-

$32.54 $
$32.54 $

-

9

0.000000 3

100.00%

3.00 1 100.00%

945

8,689

8,689

3

26,068

$32.54 $

848,293

7

0.000000 3

50.00%

3.00 1

50.00%

2

13

13

3

39

$32.54 $

1,273

0

0.000000 3

0.00%

3.00 1

0.00%

0

-

-

3

-

$32.54 $

-

7

0.000000 3

100.00%

2

12

12

3

35

$32.54 $

1,139

Local
SECTOR 4. PRODUCERS OF CHROMATES
Large
All
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large

Page 142

RESPONSES

#PLANTS

1-%BASEMED

3.00 1 100.00%

RESPONDENTS

3.00 1 100.00%

LIMPFULLTIME

100.00%

%BASEMED

0.000000 3

LIMPARTIME

3

LIMEMPAL

Large

SIZE

ITEM 12 COSTS

SECTOR 2A. WELDING

NONSUPEWAGE

All

BURDEN HOURS

SECTOR 1. ELECTROPLATING

MEDEXAMADDERM

LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
MEDEXAMADDERM =
Number of employees above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.
LIMPARTIME = Incremental employee time, in hours, for a partial limited exam
%BASEMED = Percentage of employers who are providing annual medical examinations
LIMITFULLTIME = Employee time, in hours, for a full limited medical exam
1-%BASEMED = Percentage of plants that are not providing annual medical examinations.
#PLANTS = Number of Plants

VARIABLES

Variables:

COST = (LIMEMPAL + MEDEXAMADDERM)*(LIMPARTIME * %BASEMED)+(LIMFULLTIME*(1-%BASEMED))*PLANTS
BURDEN HOURS = Burden Hours x NONSUPEWAGE

All
SECTOR 6. CCA PRODUCERS
All

ITEM 12 COSTS

NONSUPEWAGE

BURDEN HOURS

HOURS PER RESPONSE
(FOR "ITEM 12 TABLE")

RESPONSES

RESPONDENTS

#PLANTS

1-%BASEMED

LIMPFULLTIME

%BASEMED

LIMPARTIME

MEDEXAMADDERM

LIMEMPAL

SIZE

VARIABLES

Table 22

Small

1

0.000000 3

100.00%

3.00 1 100.00%

1

1

1

3

2

$32.54 $

81

Large

2

0.000000 3

100.00%

3.00 1 100.00%

3

5

5

3

16

$32.54 $

506

0.000000 3

0.00%

3.00 1

0

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

5

51

51

3

154

$32.54 $

5,000

0.000000 3

100.00%

3.00 1 100.00%

0

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

78

78

78

3

235

$32.54 $

7,636

0.000000 3

100.00%

3.00 1 100.00%

123

-

-

3

-

$32.54 $

-

0.000000 3

80.00%

3.00 1

80.00%

2

-

-

3

-

$32.54 $

-

0.000000 3

10.00%

3.00 1

10.00%

7

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

79

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

39

-

-

3

-

$32.54 $

-

0.000000 3

50.00%

3.00 1

50.00%

6

18

18

3

53

$32.54 $

1,733

0.000000 3

30.00%

3.00 1

30.00%

4

4

4

3

12

$32.54 $

385

0.000000 3

100.00%

3.00 1 100.00%

1

8

8

3

25

$32.54 $

812

0.000000 3

0.00%

3.00 1

0.00%

0

-

-

3

-

$32.54 $

-

0.006751 3

50.00%

3.00 1

50.00%

39

1,188

1,188

3

3,565

$32.54 $

116,023

0.000321 3
0.000161 3

30.00%
50.00%

3.00 1
3.00 1

30.00%
50.00%

12
116

18
85

18
85

3
3

54
255

$32.54 $
$32.54 $

1,772
8,287

0.000321 3

30.00%

3.00 1

30.00%

37

53

53

3

160

$32.54 $

5,212

0.000643 3

50.00%

3.00 1

50.00%

33 $

0.02

$

0.02

3 $

0.1

$32.54 $

2

0.000161 3

30.00%

3.00 1

30.00%

31 $

0.01

$

0.01

3 $

0.02

$32.54 $

0.5

0.000000 3

80.00%

3.00 1

80.00%

152

2,434

2,434

3

7,303

$32.54 $

237,659

0.000000 3

10.00%

3.00 1

10.00%

111

443

443

3

1,328

$32.54 $

43,211

0.000000 3

100.00%

3.00 1 100.00%

2

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

1

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

0

-

-

3

-

$32.54 $

-

0.000000 3

100.00%

3.00 1 100.00%

5

5

5

3

14

$32.54 $

455

0.000000 3

0.00%

3.00 1

0.00%

212

-

-

3

-

$32.54 $

-

0.000000 3

0.00%

3.00 1

0.00%

1,600

-

-

3

-

$32.54 $

-

0.000000 3

80.00%

3.00 1

80.00%

307

-

-

3

-

$32.54 $

-

0.000000 3

10.00%

3.00 1

10.00%

623

-

-

3

-

$32.54 $

-

0.000000 3

80.00%

3.00 1

80.00%

8

10

10

3

30

$32.54 $

973

0.000000 3
0.000000 3

10.00%
80.00%

3.00 1
3.00 1

10.00%
80.00%

24
111

1,286

1,286

3
3

3,859

$32.54 $
$32.54 $

125,577

0.000000 3

10.00%

3.00 1

10.00%

6

17

17

3

50

$32.54 $

1,622

0.000000 3

80.00%

3.00 1

80.00%

78

-

-

3

-

$32.54 $

-

0.000000 3

10.00%

3.00 1

10.00%

312

-

-

3

-

$32.54 $

-

0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
All
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
All
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
All
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
All
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
General Industry
1
Small
1
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY
0
Large
Reshaping
0
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
Large
All
4
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
0
Large
All
0
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
Large
All
1
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
Large
All
0
Small
SECTOR 20. TEXTILE DYEING
0
Large
All
0
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
Large
General Industry
0
Small
12
Large
Fiber, Flat and Container Glass
3
Small
SECTOR 22. PRINTING
0
Large
All
0
Small

0.00%

Page 143

Hazardous Waste Site Work

Refractory Brick Restoration
Weighted Average/Total

ITEM 12 COSTS

NONSUPEWAGE

BURDEN HOURS

HOURS PER RESPONSE
(FOR "ITEM 12 TABLE")

80.00%

193

-

-

3

-

$32.54 $

-

0
6

0.000000 3
0.000000 3

80.00%
80.00%

3.00 1
3.00 1

80.00%
80.00%

0
25

146

146

3
3

439

$32.54 $
$32.54 $

14,300

4

0.000000 3

30.00%

3.00 1

30.00%

5

17

17

3

50

$32.54 $

1,634

0

0.000000 3

80.00%

3.00 1

80.00%

5

-

-

3

-

$32.54 $

-

0

0.000000 3

10.00%

3.00 1

10.00%

0

-

-

3

-

$32.54 $

-

0

0.000000 3

25.00%

3.00 1

25.00%

143

-

-

3

-

$32.54 $

-

0
0

0.000000 3
0.000000 3

0.00%
25.00%

3.00 1
3.00 1

0.00%
25.00%

76
36

-

-

3
3

-

$32.54 $
$32.54 $

-

0
1

0.000000 3
0.000000 3

0.00%
50.00%

3.00 1
3.00 1

0.00%
50.00%

32
1,232

1,020

1,020

3
3

3,059

$32.54 $
$32.54 $

99,557

1
1

0.000000 3
0.000000 3

50.00%
50.00%

3.00 1
3.00 1

50.00%
50.00%

4,932
17

4,082
11

4,082
11

3
3

12,246
34

$32.54 $
$32.54 $

398,496
1,095

1

0.000000 3

50.00%

3.00 1

50.00%

62

41

41

3

122

$32.54 $

3,958

0

0.000000 3

50.00%

3.00 1

50.00%

39

-

-

3

-

$32.54 $

-

0
1

0.000000 3
0.000000 3

30.00%
50.00%

3.00 1
3.00 1

30.00%
50.00%

47
0

-

-

3
3

-

$32.54 $
$32.54 $

-

0

0.000000 3

30.00%

3.00 1

30.00%

24

-

-

3

-

$32.54 $

-

2

2.000000 3

50.00%

3.00 1

50.00%

18

70

70

3

210

$32.54 $

6,847

0

0.000000 3

30.00%

3.00 1

30.00%

0

-

-

3

-

$32.54 $

-

0

0.000000 3

50.00%

3.00 1

50.00%

54

-

-

3

-

$32.54 $

-

Small
State

0
0

0.000000 3
0.000000 3

50.00%
50.00%

3.00 1
3.00 1

50.00%
50.00%

247
16

-

-

3
3

-

$32.54 $
$32.54 $

-

Local
Large

0
0

0.000000 3
0.000000 3

50.00%
50.00%

3.00 1
3.00 1

50.00%
50.00%

93
43

-

-

3
3

-

$32.54 $
$32.54 $

-

Small
State

0
0

0.000000 3
0.000000 3

50.00%
50.00%

3.00 1
3.00 1

50.00%
50.00%

180
1

-

-

3
3

-

$32.54 $
$32.54 $

-

Local
Large

0
1

0.000000 3
0.000000 3

50.00%
50.00%

3.00 1
3.00 1

50.00%
50.00%

252
47

52

52

3
3

157

$32.54 $
$32.54 $

5,114

Small

1

0.000000 3

50.00%

3.00 1

50.00%

185
73,274

207
56,708

207
56,708

3
3

621
170,124

Page 144

RESPONSES

#PLANTS

RESPONDENTS

1-%BASEMED

3.00 1

%BASEMED
80.00%

LIMPARTIME

LIMPFULLTIME

Industrial Rehabilitation &
Maintenance

MEDEXAMADDERM

0.000000 3

SECTOR 24. CHROMIUM CATALYST USERS
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large

LIMEMPAL
0

SIZE

VARIABLES

Table 22

$32.54 $
20,224
$32.54 $ 5,535,835

Table 23

Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(2)(ii), (i)(3)(i),
and (i)(3)(ii)) Contract Cost for a PLHCP to Conduct the Medical Examination
This table calculates the cost for a contractor PLHCP to conduct the annual medical examination. Employers who were providing annual examinations
(%BASEMED) will incur a partial medical exam cost per employee. Employers who were NOT providing annual medical examinations (1-%BASEMED)
will incur the full cost of a medical exam per employee.
Variables:

COST = (LIMEMPAL + MEDEXAMADDERM)*((PARTFULLCOST*%BASEMED)+(LIMFULLCOST *(1-%BASEMED))*PLANTS
LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of
engineering controls.
MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and
symptoms" after the implementation of engineering controls.
PARTFULLCOST = The cost of a partial medical exam for employers who are providing annual medical examinations.
%BASEMED = Percentage of employers who are providing annual medical examinations
LIMITFULLCOST = The cost of a medical examination for employers who are not providing annual medical examinations
1-%BASEMED = Percentage of plants that are not providing annual medical examinations.
#PLANTS = Number of Plants

SECTOR 1. ELECTROPLATING
All

1,752 $

SECTOR 2A. WELDING

Small

0

0.000000

$149

100.00%

$175 * 1 100.00%

3,297 $

-

General Industry

Large

0

0.000000

$149

5.00%

$175 * 1

5.00%

8,171 $

-

Small
Large

0
14

0.000000
3.014286

$149
$149

0.00%
5.00%

$175 * 1
$175 * 1

0.00%
5.00%

9,155 $
197 $

583,554

Maritime

Small
Large

1
27

0.000000
3.014286

$149
$149

0.00%
5.00%

$175 * 1
$175 * 1

0.00%
5.00%

112 $
278 $

19,584
1,455,381

Construction

Small
State

3
0

0.000000
0.000000

$149
$149

0.00%
5.00%

$175 * 1
$175 * 1

0.00%
5.00%

2,231 $
26 $

1,175,064
-

Government
SECTOR 2B. MILD STEEL WELDING

Local

0

0.000000

$149

0.00%

$175 * 1

0.00%

819 $

-

General Industry

Large

0

0.000000

$149

5.00%

$175 * 1

5.00%

10,955 $

-

Small
Large

0
0

0.000000
0.000000

$149
$149

0.00%
5.00%

$175 * 1
$175 * 1

0.00%
5.00%

11,152 $
425 $

-

Maritime

Small
Large

0
10

0.000000
0.000000

$149
$149

0.00%
5.00%

$175 * 1
$175 * 1

0.00%
5.00%

241 $
418 $

728,566

Construction
SECTOR 3. PAINTING

Small

1

0.000000

$149

3,158 $

554,539

Large

46

0.000000

$149

0.00%
$175 * 1 0.00%
GENERAL INDUSTRY
80.00%
$175 * 1 80.00%

AEROSPACE

50 $

350,484

Small
Large

0
1

0.000000
0.000000

$149
$149

50.00%
80.00%

$175 * 1
$175 * 1

50.00%
80.00%

62 $
330 $

46,731

Auto Body

Small
Large

0
2

0.000000
0.000000

$149
$149

50.00%
80.00%

$175 * 1
$175 * 1

50.00%
80.00%

1,454 $
101 $

28,558

Coil Coating

Page 145

COST

$175 * 1 100.00%

#PLANTS

100.00%

1-%BASEMED

$149

LIMFULLCOST

0.000000

%BASEMED

3

PARTFULLCOST

MEDEXAMADDERM

Large

Size

LIMEMPAL

Variables

0

783,390

18 $
274 $

2,726
69,915

Small
Large

1
2

0.000000
0.000000

$149
$149

50.00%
100.00%

$175 * 1 50.00%
$150 * 1 100.00%

474 $
789 $

65,663
263,837

Small
State

0
0

0.000000
0.000000

$149
$149

100.00%
100.00%

$150 * 1 100.00%
$150 * 1 100.00%

4,197 $
17 $

Local

9

0.000000

$149

100.00%

$150 * 1 100.00%

945 $

1,294,842

Large

7

0.000000

$149

50.00%

$175 * 1

50.00%

2 $

2,111

0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
7
Large
ALL
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
ALL
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
ALL
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
ALL
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
ALL
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
ALL
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
ALL
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
ALL
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
General Industry
1
Small
1
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY

0.000000

$149

0.00%

$175 * 1

0.00%

0 $

-

0.000000

$149

100.00%

$175 * 1 100.00%

2 $

1,738

0.000000

$149

100.00%

$175 * 1 100.00%

1 $

124

0.000000

$149

100.00%

$175 * 1 100.00%

3 $

772

0.000000

$149

0.00%

$175 * 1

0 $

-

0.000000

$149

100.00%

$175 * 1 100.00%

5 $

7,632

0.000000

$149

100.00%

$175 * 1 100.00%

0 $

-

0.000000

$149

100.00%

$175 * 1 100.00%

78 $

11,656

0.000000

$149

100.00%

$175 * 1 100.00%

123 $

-

0.000000

$149

80.00%

$175 * 1

80.00%

2 $

-

0.000000

$149

10.00%

$175 * 1

10.00%

7 $

-

0.000000

$149

100.00%

$175 * 1 100.00%

79 $

-

0.000000

$149

100.00%

$175 * 1 100.00%

39 $

-

0.000000

$149

50.00%

$175 * 1

50.00%

6 $

2,874

0.000000

$149

30.00%

$175 * 1

30.00%

4 $

659

0.000000

$149

100.00%

$175 * 1 100.00%

1 $

1,239

0.000000

$149

0.00%

$175 * 1

0.00%

0 $

-

0.006751

$149

50.00%

$175 * 1

50.00%

39 $

192,403

0.000321
0.000161

$149
$149

30.00%
50.00%

$175 * 1
$175 * 1

30.00%
50.00%

12 $
116 $

3,032
13,743

0.000321

$149

30.00%

$175 * 1

30.00%

37 $

8,918

Maritime
Construction
Government
SECTOR 4. PRODUCERS OF CHROMATES
ALL

Page 146

0.00%

COST

$175 * 1 50.00%
$175 * 1 100.00%

#PLANTS

50.00%
100.00%

1-%BASEMED

$149
$149

LIMFULLCOST

0.000000
0.000000

%BASEMED

1
2

PARTFULLCOST

MEDEXAMADDERM

Small
Large

Size

LIMEMPAL

Variables

Table 23

-

Large

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
ALL
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large

50.00%

33 $

3

0

0.000161

$149

30.00%

$175 * 1

30.00%

31 $

1

16

0.000000

$149

80.00%

$175 * 1

80.00%

152 $

375,304

4

0.000000

$149

10.00%

$175 * 1

10.00%

111 $

76,217

0

0.000000

$149

100.00%

$175 * 1 100.00%

2 $

-

0

0.000000

$149

100.00%

$175 * 1 100.00%

1 $

-

0

0.000000

$149

100.00%

$175 * 1 100.00%

0 $

-

1

0.000000

$149

100.00%

$175 * 1 100.00%

5 $

694

0

0.000000

$149

0.00%

$175 * 1

0.00%

212 $

-

0

0.000000

$149

0.00%

$175 * 1

0.00%

1,600 $

-

0

0.000000

$149

80.00%

$175 * 1

80.00%

307 $

-

0

0.000000

$149

10.00%

$175 * 1

10.00%

623 $

-

1

0.000000

$149

80.00%

$175 * 1

80.00%

8 $

1,537

0
12

0.000000
0.000000

$149
$149

10.00%
80.00%

$175 * 1
$175 * 1

10.00%
80.00%

24 $
111 $

198,307

3

0.000000

$149

10.00%

$175 * 1

10.00%

6 $

2,862

0

0.000000

$149

80.00%

$175 * 1

80.00%

78 $

-

0

0.000000

$149

10.00%

$175 * 1

10.00%

312 $

-

0

0.000000

$149

80.00%

$175 * 1

80.00%

193 $

-

0
6

0.000000
0.000000

$149
$149

80.00%
80.00%

$175 * 1
$175 * 1

80.00%
80.00%

0 $
25 $

22,582

4

0.000000

$149

30.00%

$175 * 1

30.00%

5 $

2,796

0

0.000000

$149

80.00%

$175 * 1

80.00%

5 $

-

0

0.000000

$149

10.00%

$175 * 1

10.00%

0 $

-

0

0.000000

$149

25.00%

$175 * 1

25.00%

143 $

-

0
0

0.000000
0.000000

$149
$149

0.00%
25.00%

$175 * 1
$175 * 1

0.00%
25.00%

76 $
36 $

-

0
1

0.000000
0.000000

$149
$149

0.00%
50.00%

$175 * 1
$175 * 1

0.00%
50.00%

32 $
1,232 $

Page 147

COST

$175 * 1

#PLANTS

50.00%

1-%BASEMED

$149

LIMFULLCOST

0.000643

%BASEMED

0

PARTFULLCOST

MEDEXAMADDERM

Reshaping

LIMEMPAL

Size

Variables

Table 23

165,097

Construction

4,932 $
17 $

660,830
1,816

Government

1

0.000000

$149

50.00%

$175 * 1

50.00%

62 $

6,564

0

0.000000

$149

50.00%

$175 * 1

50.00%

39 $

-

0
1

0.000000
0.000000

$149
$149

30.00%
50.00%

$175 * 1
$175 * 1

30.00%
50.00%

47 $
0 $

-

0

0.000000

$149

30.00%

$175 * 1

30.00%

24 $

-

2

2.000000

$149

50.00%

$175 * 1

50.00%

18 $

11,355

0

0.000000

$149

30.00%

$175 * 1

30.00%

0 $

-

0

0.000000

$149

50.00%

$175 * 1

50.00%

54 $

-

Small
State

0
0

0.000000
0.000000

$149
$149

50.00%
50.00%

$175 * 1
$175 * 1

50.00%
50.00%

247 $
16 $

-

Local
Large

0
0

0.000000
0.000000

$149
$149

50.00%
50.00%

$175 * 1
$175 * 1

50.00%
50.00%

93 $
43 $

-

Small
State

0
0

0.000000
0.000000

$149
$149

50.00%
50.00%

$175 * 1
$175 * 1

50.00%
50.00%

180 $
1 $

-

Local
Large

0
1

0.000000
0.000000

$149
$149

50.00%
50.00%

$175 * 1
$175 * 1

50.00%
50.00%

252 $
47 $

8,480

Small

1

0.000000

$149

50.00%

$175 * 1

50.00%
Total

185 $
73,274 $

33,538
9,237,718

Local
SECTOR 27. SOLID WASTER INCINERATION
Large
ALL
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration

Page 148

COST

50.00%
50.00%

#PLANTS

$175 * 1
$175 * 1

1-%BASEMED

50.00%
50.00%

LIMFULLCOST

$149
$149

%BASEMED

0.000000
0.000000

Small
State

PARTFULLCOST

MEDEXAMADDERM

1
1

Size

LIMEMPAL

Variables

Table 23

Table 24

TABLE 24: Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)-(k)(3)(iii); 1915.1026(i)(1)(i)(B) and (i)(3)(i)(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)-(i)(3)(iii)) Employee Time and Cost for Complete Initial Medical Examination with Additional Tests
The burden hour and cost equation is for the employee time to receive additional tests after the employee is found to have abnormal initial medical
exam results. The Agency assumes that .5% of employees potentially exposed employees at or above the AL and workers with "signs and symptoms"
will be found to have abnormal exam results and will receive additional testing.

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry
Maritime
Construction
SECTOR 3. PAINTING
Aerospace

Autobody Repair

Coil Coating

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMADDAL

RESPONSES

RESPONDENTS

#PLANTS

%PREVABN

POTEXEMP * 5%

SIZE

POTEXEMP * 5% = Total number of employees potentially exposed at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls.
%PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
MEDEXAMADDAL = Employee time for medical examination with additional testing
#PLANTS = Number of Plants
NONSUPEWAGE = Nonsupervisory wage rate.
0.0500

VARIABLES

Variables:

BURDEN HOURS = POTEXEMP * 5% * %PREVABN * MEDEXAMADDAL * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE

Large

0.2500

0.50%

1,752

2

2

4

9

$32.54

$

285

Small

0.0500

0.50%

3,297

1

1

4

3

$32.54

$

107

Large

0.1005

0.50%

8,171

4

4

4

16

$32.54

$

534

Small
Large

0.0000
0.9545

0.50%
0.50%

9,155
197

1

1

4
4

4

$32.54
$32.54

$
$

122

Small
Large

0.0502
2.5621

0.50%
0.50%

112
278

0.03
4

0.03
4

4
4

0.1
14

$32.54
$32.54

$
$

4
464

Small
State

0.2512
0.1005

0.50%
0.50%

2,231
26

3
0.01

3
0.01

4
4

11
0.1

$32.54
$32.54

$
$

365
2

Local

0.0000

0.50%

819

-

-

4

-

$32.54

$

-

Large

0.0502

0.50%

10,955

3

3

4

11

$32.54

$

358

Small
Large

0.0000
0.0000

0.50%
0.50%

11,152
425

-

-

4
4

-

$32.54
$32.54

$
$

-

Small
Large

0.0502
0.9545

0.50%
0.50%

241
418

0.1
2

0.1
2

4
4

0.2
8

$32.54
$32.54

$
$

8
260

Small

0.1005

0.50%

3,158

2

2

4

6

$32.54

$

207

Large

2.3399

0.50%

50

1

1

4

2

$32.54

$

75

Small
Large

0.0459
0.5964

0.50%
0.50%

62
330

0.01
1

0.01
1

4
4

0.1
4

$32.54
$32.54

$
$

2
128

Small
Large

0.0459
0.0918

0.50%
0.50%

1,454
101

0.3
0.05

0.3
0.05

4
4

1
0.2

$32.54
$32.54

$
$

43
6

Page 149

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMADDAL

RESPONSES

RESPONDENTS

#PLANTS

%PREVABN

POTEXEMP * 5%

SIZE

VARIABLES

Table 24

Small
Large

0.0459
0.1282

0.50%
0.50%

18
274

0.004
0.2

0.004
0.2

4
4

0.0
1

$32.54
$32.54

$
$

1
23

Small
Large

0.0427
0.1121

0.50%
0.50%

474
789

0.1
0.4

0.1
0.4

4
4

0.4
2

$32.54
$32.54

$
$

13
58

Small
State

0.0374
0.4597

0.50%
0.50%

4,197
17

1
0.04

1
0.04

4
4

3
0.2

$32.54
$32.54

$
$

102
5

Local

0.0328

0.50%

945

0.2

0.2

4

1

$32.54

$

20

Large

0.3500

0.50%

2

0.003

0.00

4

0.01

$32.54

0.0000
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
1.0000
Large
All
0.1000
Small
SECTOR 6. CCA PRODUCERS
0.1500
Large
All
0.0000
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
1.2000
Large
All
0.0000
Small
SECTOR 8. PAINT AND COATING PRODUCERS
0.2500
Large
All
0.1000
Small
SECTOR 9. PRINTING INK PRODUCERS
0.0000
Large
All
0.0000
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0.0000
Large
All
0.0000
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
0.1500
Large
All
0.0500
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
0.7000
Large
All
0.0000
Small
SECTOR 14. IRON AND STEEL MILLS
2.0822
Large
All
0.0731
Small
0.5114
Large
Carbon Steel

0.50%

0

-

-

4

-

$32.54

$

-

0.50%

2

0.01

0.01

4

0.03

$32.54

$

1

0.50%

1

0.0004

0.0004

4

0.002

$32.54

0.1

0.50%

3

0.002

0.002

4

0.01

$32.54

0.3

0.50%

0

-

-

4

-

$32.54

$

-

0.50%

5

0.03

0.03

4

0.1

$32.54

$

4

0.50%

0

-

-

4

-

$32.54

$

-

0.50%

78

0.1

0.1

4

0.4

$32.54

$

13

0.50%

123

0.1

0.1

4

0.2

$32.54

$

8

0.50%

2

-

-

4

-

$32.54

$

-

0.50%

7

-

-

4

-

$32.54

$

-

0.50%

79

-

-

4

-

$32.54

$

-

0.50%

39

-

-

4

-

$32.54

$

-

0.50%

6

0.004

0.004

4

0.018

$32.54

$

1

0.50%

4

0.001

0.001

4

0.004

$32.54

0.1

0.50%

1

0.004

0.004

4

0.01

$32.54

0.5

0.50%

0

-

-

4

-

$32.54

$

-

0.50%

39

0.4

0.4

4

2

$32.54

$

52

0.50%
0.50%

12
116

0.005
0.3

0.005
0.3

4
4

0.02
1

$32.54
$32.54

$
$

1
39

Maritime
Construction

Government
SECTOR 4. PRODUCERS OF CHROMATES
All

Page 150

0.4

SECTOR 14.B FORGING INDUSTRY
Reshaping Industry

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMADDAL

RESPONSES

RESPONDENTS

#PLANTS

%PREVABN

POTEXEMP * 5%

SIZE

VARIABLES

Table 24

Small

0.0731

0.50%

37

0.01

0.01

4

0.1

$32.54

$

2

Large

0.1500

0.50%

33

0.02

0.02

4

0.1

$32.54

$

3

0.0000

0.50%

31

-

-

4

-

$32.54

$

-

1.1500

0.50%

152

1

1

4

3

$32.54

$

114

0.2500

0.50%

111

0.1

0.1

4

1

$32.54

$

18

0.0000

0.50%

2

-

-

4

-

$32.54

$

-

0.0000

0.50%

1

-

-

4

-

$32.54

$

-

0.0000

0.50%

0

-

-

4

-

$32.54

$

-

0.1500

0.50%

5 $

0.003

4

$ 0.01

$32.54

$

0.5

0.0000

0.50%

212

-

-

4

-

$32.54

$

-

0.0000

0.50%

1,600

-

-

4

-

$32.54

$

-

0.0000

0.50%

307

-

-

4

-

$32.54

$

-

0.0000

0.50%

623

-

-

4

-

$32.54

$

-

0.0645

0.50%

8

0.002

0.002

4

0.01

$32.54

$

0.3

0.0000
0.7090

0.50%
0.50%

24
111

0.4

0.4

4
4

2

$32.54
$32.54

$
$

51

0.1289

0.50%

6

0.004

0.004

4

0.02

$32.54

$

1

0.0000

0.50%

78

-

-

4

-

$32.54

$

-

0.0000

0.50%

312

-

-

4

-

$32.54

$

-

0.0591

0.50%

193

0.1

0.1

4

0.2

$32.54

$

7

0.0000
0.5906

0.50%
0.50%

0
25

0.1

0.1

4
4

0.3

$32.54
$32.54

$
$

10

0.2953

0.50%

5

0.01

0.01

4

0.03

$32.54

$

1

0.0000

0.50%

5

-

-

4

-

$32.54

$

-

0.0000

0.50%

0

-

-

4

-

$32.54

$

-

0.0382

0.50%

143

0.03

0.03

4

0.1

$32.54

$

4

0.0000
0.0000

0.50%
0.50%

76
36

-

-

4
4

-

$32.54
$32.54

$
$

-

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
All
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
All
Small
Large
Catalyst Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large

Page 151

0.003 $

Maritime

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

MEDEXAMADDAL

RESPONSES

RESPONDENTS

#PLANTS

%PREVABN

POTEXEMP * 5%

SIZE

VARIABLES

Table 24

Small
Large

0.0000

0.50%

32

-

-

4

-

$32.54

$

-

0.1241

0.50%

1,232

1

1

4

3

$32.54

$

100

Small
Local

0.0414

0.50%

4,932

1

1

4

4

$32.54

$

133

0.0328

0.50%

17

0.003

0.003

4

0.01

$32.54

$

0.4

State
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
Local
Government

0.0328

0.50%

62

0.01

0.01

4

0.04

$32.54

$

1

0.0000

0.50%

39

-

-

4

-

$32.54

$

-

0.0000

0.50%

47

-

-

4

-

$32.54

$

-

0.0000

0.50%

0

-

-

4

-

$32.54

$

-

State
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large

0.0000

0.50%

24

-

-

4

-

$32.54

$

-

0.1000

0.50%

18

0.01

0.01

4

0.04

$32.54

$

1

0.0000

0.50%

0

-

-

4

-

$32.54

$

-

0.0000

0.50%

54

-

-

4

-

$32.54

$

-

Small
State Gov't

0.0000
0.0000

0.50%
0.50%

247
16

-

-

4
4

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0.0000

0.50%

93

-

-

4

-

$32.54

$

-

0.0000

0.50%

43

-

-

4

-

$32.54

$

-

Small
State Gov't

0.0000
0.0000

0.50%
0.50%

180
1

-

-

4
4

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0.0000
0.5586

0.50%
0.50%

252
47

0.1

0.1

4
4

1

$32.54
$32.54

$
$

17

Small

0.0559

0.50%

185
73,274

0.1
29

0.1
29

4

$32.54 $
$32.54 $

7
3,775

Construction

Government

Industrial Rehabilitation &
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration &
Maintenance
Total/Average

Page 152

4

0.2
116

Table 25
Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)-(k)(3)(iii); 1915.1026(i)(1)(i)(B) and
(i)(3)(i)-(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)-(i)(3)(iii)) Contract Cost for a PLHCP to Conduct the Initial Medical
Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have
abnormal annual medical examination results.
Variables:

SECTOR 1. ELECTROPLATING

Cost

#PLANTS

MEDCOSTADD

%PREVABN

POTEXEMP * 5%

Size

Variables

POTEXEMP * 5% = Total number of new potentially exposed employees at or above the
AL and workers with "signs and symptoms" before the
implementation of engineering controls.
%PREVABN = Percent of previously exposed employees who will be found to have
abnormal exam results.
MEDCOSTADD = Cost for medical examination with additional testing
#PLANTS = Number of Plants
0.0500
0

Large

0.2500

0.50%

$298.04

1,752 $653

Small

0.0500

0.50%

$298.04

3,297 $246

Large

0.1005

0.50%

$298.04

8,171 $1,223

Small
Large

0.0000
0.9545

0.50%
0.50%

$298.04

9,155 $0

$298.04

197 $280

Small
Large

0.0502
2.5621

0.50%
0.50%

$298.04
$298.04

112 $8
278 $1,063

Small
State

0.2512
0.1005

0.50%
0.50%

$298.04

2,231 $835

$298.04

26 $4

Local

0.0000

0.50%

$298.04

819 $0

Large

0.0502

0.50%

$298.04

10,955 $820

Small
Large

0.0000
0.0000

0.50%
0.50%

$298.04

11,152 $0

$298.04

425 $0

Small
Large

0.0502
0.9545

0.50%
0.50%

$298.04

241 $18

$298.04

418 $595

Small

0.1005

0.50%

$298.04

3,158 $473

Large

2.3399

0.50%

$298.04

50 $173

All
SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
General Industry AEROSPACE

Page 153

Cost

#PLANTS

MEDCOSTADD

%PREVABN

Small
Large

0.0459
0.5964

0.50%
0.50%

$298.04

62 $4

$298.04

330 $294

Small
Large

0.0459
0.0918

0.50%
0.50%

$298.04

1,454 $99

$298.04

101 $14

Small
Large

0.0459
0.1282

0.50%
0.50%

$298.04

18 $1

$298.04

274 $52

Small
Large

0.0427
0.1121

0.50%
0.50%

$298.04

474 $30

$298.04

789 $132

Small

0.0374

0.50%

$298.04

4,197 $234

State

0.4597

0.50%

$298.04

17 $12

Local

0.0328

0.50%

$298.04

945 $46

Large

0.3500

0.50%

$298.04

2 $1

Small

0.0000

0.50%

$298.04

0 $0

Large

1.0000

0.50%

$298.04

2 $2

Small

0.1000

0.50%

$298.04

1 $0

Large

0.1500

0.50%

$298.04

3 $1

Small

0.0000

0.50%

$298.04

0 $0

Large

1.2000

0.50%

$298.04

5 $8

Small

0.0000

0.50%

$298.04

0 $0

Large

0.2500

0.50%

$298.04

78 $29

Small

0.1000

0.50%

$298.04

123 $18

Large

0.0000

0.50%

$298.04

2 $0

Small

0.0000

0.50%

$298.04

7 $0

Large

0.0000

0.50%

$298.04

79 $0

Small

0.0000

0.50%

$298.04

39 $0

General Industry AUTOBODY

COIL COATING

Maritime

POTEXEMP * 5%

Size

Variables

Table 25

Construction

Governments
SECTOR 4. PRODUCERS OF CHROMATES
ALL
SECTOR 5. CHROMATE PIGMENT PROCEDURES
ALL
SECTOR 6. CCA PRODUCERS
ALL
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
ALL
SECTOR 8. PAINT AND COATING PRODUCERS
ALL
SECTOR 9. PRINTING INK PRODUCERS
ALL
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
ALL
SECTOR 11. PLATING MIXTURE PRODUCERS

Page 154

Cost

#PLANTS

MEDCOSTADD

%PREVABN

Large

0.1500

0.50%

$298.04

6 $1

Small

0.0500

0.50%

$298.04

4 $0

Large

0.7000

0.50%

$298.04

1 $1

Small

0.0000

0.50%

$298.04

0 $0

Large

2.0822

0.50%

$298.04

39 $120

Small
Large

0.0731
0.5114

0.50%
0.50%

$298.04

12 $1

$298.04

116 $89

Small

0.0731

0.50%

$298.04

37 $4

Large

0.1500

0.50%

$298.04

33 $7

Small

0.0000

0.50%

$298.04

31 $0

Large

1.1500

0.50%

$298.04

152 $261

Small

0.2500

0.50%

$298.04

111 $41

Large

0.0000

0.50%

$298.04

2 $0

Small

0.0000

0.50%

$298.04

1 $0

Large

0.0000

0.50%

$298.04

0 $0

Small

0.1500

0.50%

$298.04

5 $1

Large

0.0000

0.50%

$298.04

212 $0

Small

0.0000

0.50%

$298.04

1,600 $0

Large

0.0000

0.50%

$298.04

307 $0

Small

0.0000

0.50%

$298.04

623 $0

Large

0.0645

0.50%

$298.04

8 $1

Small
Large

0.0000
0.7090

0.50%
0.50%

$298.04

24 $0

$298.04

111 $117

Small

0.1289

0.50%

$298.04

6 $1

ALL
SECTOR 13. CHROMIUM METAL PRODUCERS
ALL
SECTOR 14. IRON AND STEEL MILLS
ALL

Carbon Steel
SECTOR 14.B FORGING INDUSTRY
ALL
SECTOR 15. IRON AND STEEL FOUNDRIES
ALL
SECTOR 17. CHROMIUM DYE PRODUCERS
ALL
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
ALL
SECTOR 19. CHEMICAL DISTRIBUTORS

POTEXEMP * 5%

Size

Variables

Table 25

ALL
SECTOR 20. TEXTILE DYEING
ALL
SECTOR 21. COLORED GLASS PRODUCERS
ALL

Fiber, Flat, Container Glass

Page 155

SECTOR 22. PRINTING

Cost

#PLANTS

MEDCOSTADD

%PREVABN

Large

0.0000

0.50%

$298.04

78 $0

Small

0.0000

0.50%

$298.04

312 $0

Large

0.0591

0.50%

$298.04

193 $17

Small
Large

0.0000
0.5906

0.50%
0.50%

$298.04

0 $0

$298.04

25 $22

Small

0.2953

0.50%

$298.04

5 $2

Large

0.0000

0.50%

$298.04

5 $0

Small

0.0000

0.50%

$298.04

0 $0

Large

0.0382

0.50%

$298.04

143 $8

Small
Large

0.0000
0.0000

0.50%
0.50%

$298.04

76 $0

$298.04

36 $0

Small
Large

0.0000
0.1241

0.50%
0.50%

$298.04

32 $0

$298.04

1,232 $228

Small
State

0.0414
0.0328

0.50%
0.50%

$298.04

4,932 $304

$298.04

17 $1

Local

0.0328

0.50%

$298.04

62 $3

Large

0.0000

0.50%

$298.04

39 $0

Small
State

0.0000
0.0000

0.50%
0.50%

$298.04

47 $0

$298.04

0 $0

Local

0.0000

0.50%

$298.04

24 $0

Large

0.1000

0.50%

$298.04

18 $3

Small

0.0000

0.50%

$298.04

0 $0

Large

0.0000

0.50%

$298.04

54 $0

Small
State Gov't

0.0000
0.0000

0.50%
0.50%

$298.04

247 $0

$298.04

16 $0

ALL
SECTOR 24. CHROMIUM CATALYST USERS
ALL

Chromium Catalyst Companies
SECTOR 25. REFRACTORY BRICK PRODUCERS
ALL
SECTOR 26. WOODWORKING
General Industry

Maritime

Construction

Government
SECTOR 27. SOLID WASTER INCINERATION
ALL

Government
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
ALL
SECTOR 31. CONSTRUCTION

Industrial Rehabilitation & Maintenance

POTEXEMP * 5%

Size

Variables

Table 25

Page 156

Hazardous Waste Site Work

Cost

#PLANTS

MEDCOSTADD

%PREVABN

POTEXEMP * 5%

Size

Variables

Table 25

Local Gov't
Large

0.0000
0.0000

0.50%
0.50%

$298.04

93 $0

$298.04

43 $0

Small
State Gov't

0.0000
0.0000

0.50%
0.50%

$298.04

180 $0

$298.04

1 $0

Local Gov't
Large

0.0000
0.5586

0.50%
0.50%

$298.04

252 $0

Small

0.0559

0.50%

$298.04

47 $39

Refractory Brick Restoration & Maintenance

Page 157

$298.04

Total

185 $15

73,274

$8,657

Table 26

TABLE 26: Annual Medical Examination with Additional Tests (1910.1026(k)(2)(ii) and (k)(3)(i)-(k)(3)(iii) and (i)(3)(i)-(i)(3)(iii); and 1926.1126(i)(2)(ii)
and (i)(3)(i)-(i)(3)(iii)) Employee Time and Cost to Complete the Annual Medical Examination with Additional Tests
This table calculates the burden hours and costs for the time it takes an employee to receive additional tests after the employee is found to have
abnormal annual medical exam test results.

Variables:

BURDEN HOURS = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * ADDMEDTIME * #PLANTS
COST = BURDEN HOURS *NONSUPWAGE

SECTOR 2A. WELDING
General Industry

Maritime

Construction

Government
SECTOR 2B. MILD STEEL
WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

0.50%

3

1,752

26

26

79

$32.54

$

2,566

Small

0

0.00000

0.50%

3

3,297

-

-

-

$32.54

$

-

Large

0

0.00000

0.50%

3

8,171

-

-

-

$32.54

$

-

Small
Large

0
14

0.00000
3.01429

0.50%
0.50%

3
3

9,155
197

17

17

50

$32.54
$32.54

$
$

1,642

Small
Large

1
27

0.00000
3.01429

0.50%
0.50%

3
3

112
278

1
42

1
42

2
126

$32.54
$32.54

$
$

55
4,095

Small
Local

3
0

0.00000
0.00000

0.50%
0.50%

3
3

2,231
26

34
-

34
-

101
-

$32.54
$32.54

$
$

3,282
-

State

0

0.00000

0.50%

3

819

-

-

-

$32.54

$

-

Large

0

0.00000

0.50%

3

10,955

-

-

-

$32.54

$

-

Small
Large

0
0

0.00000
0.00000

0.50%
0.50%

3
3

11,152
425

-

-

-

$32.54
$32.54

$
$

-

Small
Large

0
10

0.00000
0.00000

0.50%
0.50%

3
3

241
418

21

21

63

$32.54
$32.54

$
$

2,050

Small

1

0.00000

0.50%

3

3,158

16

16

48

$32.54

$

1,549

Large

46

0.00000

0.50%

3

50

11

11

34

$32.54

$

1,110

Small
Large

0
1

0.00000
0.00000

0.50%
0.50%

3
3

62
330

2

2

5

$32.54
$32.54

$
$

148

Small
Large

0
2

0.00000
0.00000

0.50%
0.50%

3
3

1,454
101

1

1

3

$32.54
$32.54

$
$

90

Small

1

0.00000

0.50%

3

18

0.1

0.1

0.3

$32.54

$

8

ITEM 12 COST

BURDEN HOURS

RESPONSES

#PLANTS

NONSUPEWAGE

0.00000

RESPONDENTS

3

ADDMEDTIME

Large

%ALABN

MEDEXAMADDERM

All

LIMEMPAL

SECTOR 1. ELECTROPLATING

SIZE

VARIABLES

LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after
the implementation of engineering controls.
%ALABN = Percent of employees exposed at or above the action level 30 days per year (and therefore requiring a limited or
comprehensive medical exam who will be found to have abnormal results)
ADDMEDTIME = Three hours for an employee to receive additional testing after exam tests are abnormal.
NONSUPEWAGE = Non-supervisory wage rate
#PLANTS = Number of Plants

274

2

2

7

$32.54

$

229

Small
Large

1
2

0.00000
0.00000

0.50%
0.50%

3
3

474
789

2
9

2
9

6
27

$32.54
$32.54

$
$

198
864

Small
Local

0
0

0.00000
0.00000

0.50%
0.50%

3
3

4,197
17

-

-

-

$32.54
$32.54

$
$

-

9
0.00000
State
SECTOR 4. PRODUCERS OF CHROMATES
7
0.00000
Large
All
0
0.00000
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
7
0.00000
Large
All
1
0.00000
Small
SECTOR 6. CCA PRODUCERS
2
0.00000
Large
All
0
0.00000
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
0.00000
Large
All
0
0.00000
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
0.00338
Large
All
0
0.00000
Small
SECTOR 9. PRINTING INK PRODUCERS
0
0.00000
Large
All
0
0.00000
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
0.00000
Large
All
0
0.00000
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
0.00000
Large
All
1
0.00000
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
0.00000
Large
All
0
0.00000
Small
SECTOR 14. IRON AND STEEL MILLS
31
0.00675
Large
Alloy Stainless Steel
1
0.00032
Small
1
0.00016
Large
Carbon Steel
1
0.00032
Small
SECTOR 14.B FORGING INDUSTRY
0
0.00064
Large
Reshaping

0.50%

3

945

43

43

130

$32.54

$

4,241

0.50%

3

2

0.1

0.1

0.2

$32.54

$

6

0.50%

3

0

-

-

-

$32.54

$

-

0.50%

3

2

0.1

0.1

0.2

$32.54

$

6

0.50%

3

1

0.004

0.004

0.01

$32.54

$

0.4

0.50%

3

3

0.03

0.03

0.1

$32.54

$

3

0.50%

3

0

-

-

-

$32.54

$

-

0.50%

3

5

0.3

0.3

1

$32.54

$

25

0.50%

3

0

-

-

-

$32.54

$

-

0.50%

3

78

0.4

0.4

1

$32.54

$

38

0.50%

3

123

-

-

-

$32.54

$

-

0.50%

3

2

-

-

-

$32.54

$

-

0.50%

3

7

-

-

-

$32.54

$

-

0.50%

3

79

-

-

-

$32.54

$

-

0.50%

3

39

-

-

-

$32.54

$

-

0.50%

3

6

0.1

0.1

0.3

$32.54

$

9

0.50%

3

4

0.02

0.02

0.1

$32.54

$

2

0.50%

3

1

0.04

0.04

0.1

$32.54

$

4

0.50%

3

0

-

-

-

$32.54

$

-

0.50%

3

39

6

6

18

$32.54

$

580

0.50%
0.50%

3
3

12
116

0.1
0.4

0.1
0.4

0
1

$32.54
$32.54

$
$

9
41

0.50%

3

37

0.3

0.3

1

$32.54

$

26

0.50%

3

33

0.0001

0.0001

0.0003

$32.54

$

0.010

Construction

Government

ITEM 12 COST

BURDEN HOURS

RESPONSES

#PLANTS

NONSUPEWAGE

3

RESPONDENTS

0.50%

ADDMEDTIME

0.00000

%ALABN

MEDEXAMADDERM

2

Maritime

SIZE
Large

VARIABLES

LIMEMPAL

Table 26

NONSUPEWAGE

31

0.00003

0.00003

0.0001

$32.54

$

0.002

0.00000

0.50%

3

152

12

12

37

$32.54

$

1,188

0.00000

0.50%

3

111

2

2

7

$32.54

$

216

0.00000

0.50%

3

2

-

-

-

$32.54

$

-

0.00000

0.50%

3

1

-

-

-

$32.54

$

-

0.00000

0.50%

3

0

-

-

-

$32.54

$

-

0.00000

0.50%

3

5

0.02

0.02

0.1

$32.54

$

2

0.00000

0.50%

3

212

-

-

-

$32.54

$

-

0.00000

0.50%

3

1,600

-

-

-

$32.54

$

-

0.00000

0.50%

3

307

-

-

-

$32.54

$

-

0.00000

0.50%

3

623

-

-

-

$32.54

$

-

0.00000

0.50%

3

8

0.05

0.05

0.1

$32.54

$

5

0.00000
0.00000

0.50%
0.50%

3
3

24
111

6

6

19

$32.54
$32.54

$
$

628

0.00000

0.50%

3

6

0.1

0.1

0.2

$32.54

$

8

0.00000

0.50%

3

78

-

-

-

$32.54

$

-

0.00000

0.50%

3

312

-

-

-

$32.54

$

-

0.00000

0.50%

3

193

-

-

-

$32.54

$

-

0.00000
0.00000

0.50%
0.50%

3
3

0
25

1

1

2

$32.54
$32.54

$
$

71

0.00000

0.50%

3

5

0.1

0.1

0.3

$32.54

$

8

0.00000

0.50%

3

5

-

-

-

$32.54

$

-

0.00000

0.50%

3

0

-

-

-

$32.54

$

-

0.00000

0.50%

3

143

-

-

-

$32.54

$

-

0.00000
0.00000

0.50%
0.50%

3
3

76
36

-

-

-

$32.54
$32.54

$
$

-

0.00000
0.00000

0.50%
0.50%

3
3

32
1,232

5

5

15

$32.54
$32.54

$
$

498

0.00000
0.00000

0.50%
0.50%

3
3

4,932
17

20
0.1

20
0.1

61
0

$32.54
$32.54

$
$

1,992
5

#PLANTS

ITEM 12 COST

BURDEN HOURS

3

RESPONDENTS

0.50%

ADDMEDTIME

0.00016

%ALABN

RESPONSES

0
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
Large
All
4
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
0
Large
All
0
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
Large
All
1
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
Large
All
0
Small
SECTOR 20. TEXTILE DYEING
0
Large
All
0
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
Large
All
0
Small
12
Large
Fiber, Flat and Container Glass
3
Small
SECTOR 22. PRINTING
0
Large
All
0
Small
SECTOR 24. CHROMIUM CATALYST USERS
0
Large
Catalyst Users
0
Small
6
Large
Chromium Catalyst Service
Companies
4
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
Large
All
0
Small
SECTOR 26. WOODWORKING
0
Large
General Industry
0
Small
0
Large
Maritime
0
Small
1
Large
Construction
1
Small
1
State
Government

MEDEXAMADDERM

LIMEMPAL

SIZE

VARIABLES

Table 26

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

RESPONSES

RESPONDENTS

#PLANTS

ADDMEDTIME

%ALABN

MEDEXAMADDERM

LIMEMPAL

SIZE

VARIABLES

Table 26

1
Local
SECTOR 27. SOLID WASTER INCINERATION
0
Large
All
0
Small
0
State
Government
0
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
4
Large
All
0
Small
SECTOR 31. CONSTRUCTION
0
Large

0.00000

0.50%

3

62

0.2

0.2

1

$32.54

$

20

0.00000

0.50%

3

39

-

-

-

$32.54

$

-

0.00000
0.00000

0.50%
0.50%

3
3

47
0

-

-

-

$32.54
$32.54

$
$

-

0.00000

0.50%

3

24

-

-

-

$32.54

$

-

2.00000

0.50%

3

18

1

1

2

$32.54

$

50

0.00000

0.50%

3

0

-

-

-

$32.54

$

-

0.00000

0.50%

3

54

-

-

-

$32.54

$

-

Small
State Gov't

0
0

0.00000
0.00000

0.50%
0.50%

3
3

247
16

-

-

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0
0

0.00000
0.00000

0.50%
0.50%

3
3

93
43

-

-

-

$32.54
$32.54

$
$

-

Small
State Gov't

0
0

0.00000
0.00000

0.50%
0.50%

3
3

180
1

-

-

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0
1

0.00000
0.00000

0.50%
0.50%

3
3

252
47

0.3

0.3

1

$32.54
$32.54

$
$

26

Small

1

0.00000

0.50%

3
3

185
73,274

1
284

1
284

3

$32.54 $
$32.54 $

101
27,724

Industrial Rehabilitation &
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration
Average/Total

852

Table 27

Annual Medical Examination with Additional Tests (§§ 1910.1026(k)(2)(ii) and (k)(3)(i)-(k)(3)(iii); 1915.1026(i)(2)(ii) and (i)(3)(i)-(i)(3)(iii); and
1926.1126(i)(2)(ii) and (i)(3)(i)-(i)(3)(ii)) Contract Cost for a PLHCP to Conduct the Annual Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual medical
examination results. Abnormal results will require additional medical testing "as deemed appropriate by the physician."
COST = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * MEDCOSTADD* #PLANTS

Variables:

LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after
implementation of engineering controls.
MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal
%ALABN = Percent of employees exposed at or above the action level 30 days per year (and
therefore requiring a limited or comprehensive medical exam who will be found to have
abnormal results
#PLANTS = Number of Plants

#PLANTS

Cost

All

0.000000

0.50% $298.04

1,752

$7,834

SECTOR 2A. WELDING

Small

0

0.000000

0.50% $298.04

3,297

$0

General Industry

Large

0

0.000000

0.50% $298.04

8,171

$0

Small
Large

0
14

0.000000
3.014286

0.50% $298.04
0.50% $298.04

9,155
197

$0
$5,013

Maritime

Small
Large

1
27

0.000000
3.014286

0.50% $298.04
0.50% $298.04

112
278

$167
$12,502

Construction

Small
State

3
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

2,231
26

$10,020
$0

Government
SECTOR 2B. MILD STEEL WELDING

Local

0

0.000000

0.50% $298.04

819

$0

General Industry

Large

0

0.000000

0.50% $298.04

10,955

$0

Small
Large

0
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

11,152
425

$0
$0

Maritime

Small
Large

0
10

0.000000
0.000000

0.50% $298.04
0.50% $298.04

241
418

$0
$6,258

Construction
SECTOR 3. PAINTING

Small

1

0.000000

0.50% $298.04

3,158

$4,728

General Industry AEROSPACE

Large

46

0.000000

0.50% $298.04

50

$3,388

Small
Large

0
1

0.000000
0.000000

0.50% $298.04
0.50% $298.04

62
330

$0
$452

General Industry AUTOBODY
COIL COATING

Small
Large

0
2

0.000000
0.000000

0.50% $298.04
0.50% $298.04

1,454
101

$0
$276

Small

1

0.000000

0.50% $298.04

18

$25

Page 162

MEDCOSTADD

3

Size

SECTOR 1. ELECTROPLATING

%ALABN

MEDEXAMADDERM

Large

Variables

LIMEMPAL

0

#PLANTS

Cost

0.000000

0.50% $298.04

274

$699

Small
Large

1
2

0.000000
0.000000

0.50% $298.04
0.50% $298.04

474
789

$604
$2,638

Construction

Small
State

0

0.000000

0.50% $298.04

4,197

$0

0

0.000000

0.50% $298.04

17

$0

Governments
SECTOR 4. PRODUCERS OF CHROMATES

Local

9

0.000000

0.50% $298.04

945

$12,949

ALL

Large

7

0.000000

0.50% $298.04

2

$19

SECTOR 5. CHROMATE PIGMENT PROCEDURES

Small

0

0.000000

0.50% $298.04

0

$0

ALL

Large

7

0.000000

0.50% $298.04

2

$17

SECTOR 6. CCA PRODUCERS

Small

1

0.000000

0.50% $298.04

1

$1

ALL

Large

2

0.000000

0.50% $298.04

3

$8

SECTOR 7. CHROMIUM CATALYST PRODUCTERS

Small

0

0.000000

0.50% $298.04

0

$0

ALL

Large

11

0.000000

0.50% $298.04

5

$76

SECTOR 8. PAINT AND COATING PRODUCERS

Small

0

0.000000

0.50% $298.04

0

$0

ALL

Large

1

0.003380

0.50% $298.04

78

$117

SECTOR 9. PRINTING INK PRODUCERS

Small

0

0.000000

0.50% $298.04

123

$0

ALL

Large

0

0.000000

0.50% $298.04

2

$0

SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS

Small

0

0.000000

0.50% $298.04

7

$0

ALL

Large

0

0.000000

0.50% $298.04

79

$0

SECTOR 11. PLATING MIXTURE PRODUCERS

Small

0

0.000000

0.50% $298.04

39

$0

ALL

Large

3

0.000000

0.50% $298.04

6

$26

SECTOR 13. CHROMIUM METAL PRODUCERS

Small

1

0.000000

0.50% $298.04

4

$6

ALL

Large

8

0.000000

0.50% $298.04

1

$12

SECTOR 14. IRON AND STEEL MILLS

Small

0

0.000000

0.50% $298.04

0

$0

ALL

Large

31

0.006751

0.50% $298.04

39

$1,771

Small
Large

1
1

0.000321
0.000161

0.50% $298.04
0.50% $298.04

12
116

$27
$127

Carbon Steel
SECTOR 14.B FORGING INDUSTRY

Small

1

0.000321

0.50% $298.04

37

$80

Page 163

MEDCOSTADD

2

Size
Maritime

%ALABN

MEDEXAMADDERM

Large

Variables

LIMEMPAL

Table 27

#PLANTS

Cost

0.000643

0.50% $298.04

33

$0

SECTOR 15. IRON AND STEEL FOUNDRIES

Small

0

0.000161

0.50% $298.04

31

$0

ALL

Large

16

0.000000

0.50% $298.04

152

$3,628

SECTOR 17. CHROMIUM DYE PRODUCERS

Small

4

0.000000

0.50% $298.04

111

$660

ALL

Large

0

0.000000

0.50% $298.04

2

$0

SECTOR 18. CHROMIUM SULFATE PRODUCTERS

Small

0

0.000000

0.50% $298.04

1

$0

ALL

Large

0

0.000000

0.50% $298.04

0

$0

SECTOR 19. CHEMICAL DISTRIBUTORS

Small

1

0.000000

0.50% $298.04

5

$7

ALL

Large

0

0.000000

0.50% $298.04

212

$0

SECTOR 20. TEXTILE DYEING

Small

0

0.000000

0.50% $298.04

1,600

$0

ALL

Large

0

0.000000

0.50% $298.04

307

$0

SECTOR 21. COLORED GLASS PRODUCERS

Small

0

0.000000

0.50% $298.04

623

$0

ALL

Large

1

0.000000

0.50% $298.04

8

$15

Small
Large

0
12

0.000000
0.000000

0.50% $298.04
0.50% $298.04

24
111

$0
$1,917

Fiber, Flat, Container Glass
SECTOR 22. PRINTING

Small

3

0.000000

0.50% $298.04

6

$25

ALL

Large

0

0.000000

0.50% $298.04

78

$0

SECTOR 24. CHROMIUM CATALYST USERS

Small

0

0.000000

0.50% $298.04

312

$0

ALL

Large

0

0.000000

0.50% $298.04

193

$0

Small
Large

0
6

0.000000
0.000000

0.50% $298.04
0.50% $298.04

0
25

$0
$218

Chromium Catalyst Companies
SECTOR 25. REFRACTORY BRICK PRODUCERS

Small

4

0.000000

0.50% $298.04

5

$25

ALL

Large

0

0.000000

0.50% $298.04

5

$0

SECTOR 26. WOODWORKING

Small

0

0.000000

0.50% $298.04

0

$0

General Industry

Large

0

0.000000

0.50% $298.04

143

$0

Small
Large

0
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

76
36

$0
$0

Maritime

Small
Large

0
1

0.000000
0.000000

0.50% $298.04
0.50% $298.04

32
1,232

$0
$1,520

Page 164

MEDCOSTADD

0

Size
ALL

%ALABN

MEDEXAMADDERM

Large

Variables

LIMEMPAL

Table 27

#PLANTS

Cost

0.000000
0.000000

0.50% $298.04
0.50% $298.04

4,932
17

$6,083
$17

Local

1

0.000000

0.50% $298.04

62

$60

Large

0

0.000000

0.50% $298.04

39

$0

Small
State

0
1

0.000000
0.000000

0.50% $298.04
0.50% $298.04

47
0

$0
$0

Local

0

0.000000

0.50% $298.04

24

$0

Large

2

2.000000

0.50% $298.04

18

$105

Small

0

0.000000

0.50% $298.04

0

$0

Large

0

0.000000

0.50% $298.04

54

$0

Small
State Gov't

0
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

247
16

$0
$0

Local Gov't
Large

0
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

93
43

$0
$0

Small
State Gov't

0
0

0.000000
0.000000

0.50% $298.04
0.50% $298.04

180
1

$0
$0

Local Gov't
Large

0
1

0.000000
0.000000

0.50% $298.04
0.50% $298.04

252
47

$0
$78

Small

1

0.000000

0.50% $298.04

185
73,274

$0
$84,199

Size
Government

SECTOR 27. SOLID WASTER INCINERATION
ALL

Government
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
ALL
SECTOR 31. CONSTRUCTION

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration & Maintenance
Total

Page 165

MEDCOSTADD

1
1

Construction

%ALABN

MEDEXAMADDERM

Small
State

Variables

LIMEMPAL

Table 27

Table 28

TABLE 28: Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(2)(i), (i)(3)(i),
and (i)(3)(ii)) Employee Time and Cost to Complete the Medical Examination After Initial Assignment
This table calculates the burden hours and cost for those employees who are newly assigned to operations that involve exposure at or above the action level to receive medical
examinations. It is estimated that the employee will be provided a comprehensive medical examination.

0.00%

1,752

-

-

4

-

$32.54

$

-

Small

0

0.00000

43%

0.00%

3,297

-

-

4

-

$32.54

$

-

Large

0

0.00000

43%

95.00%

8,171

-

-

4

-

$32.54

$

-

Small
Large

0
14

0.00000
3.01429

43%
43%

100.00%
95.00%

9,155
197

1,374

1,374

4
4

5,496

$32.54
$32.54

$
$

178,862

Small
Large

1
27

0.00000
3.01429

43%
43%

100.00%
95.00%

112
278

48
3,427

48
3,427

4
4

193
13,708

$32.54
$32.54

$
$

6,272
446,082

Small
Local

3
0

0.00000
0.00000

43%
43%

100.00%
95.00%

2,231
26

2,891
-

2,891
-

4
4

11,565
-

$32.54
$32.54

$
$

376,326
-

State

0

0.00000

43%

100.00%

819

-

-

4

-

$32.54

$

-

Large

0

0.00000

43%

95.00%

10,955

-

-

4

-

$32.54

$

-

Small
Large

0
0

0.00000
0.00000

43%
43%

100.00%
95.00%

11,152
425

-

-

4
4

-

$32.54
$32.54

$
$

-

Small
Large

0
10

0.00000
0.00000

43%
43%

100.00%
95.00%

241
418

1,716

1,716

4
4

6,862

$32.54
$32.54

$
$

223,309

Small

1

0.00000

43%

100.00%

3,158

1,364

1,364

4

5,458

$32.54

$

177,596

Large

46

0.00000

43%

20.00%

50

196

196

4

782

$32.54

$

25,449

Small
Large

0
1

0.00000
0.00000

43%
43%

50.00%
20.00%

62
330

26

26

4
4

104

$32.54
$32.54

$
$

3,393

Small
Large

0
2

0.00000
0.00000

43%
43%

50.00%
20.00%

1,454
101

16

16

4
4

64

$32.54
$32.54

$
$

2,074

Small
Large

1
2

0.00000
0.00000

43%
43%

50.00%
0.00%

18
274

4
-

4
-

4
4

14
-

$32.54
$32.54

$
$

471
-

Small
Large

1
2

0.00000
0.00000

43%
43%

50.00%
0.00%

474
789

87
-

87
-

4
4

349
-

$32.54
$32.54

$
$

11,351
-

Small
Local

0
0

0.00000
0.00000

43%
43%

0.00%
0.00%

4,197
17

-

-

4
4

-

$32.54
$32.54

$
$

-

State
SECTOR 4. PRODUCERS OF CHROMATES
Large

9

0.00000

43%

0.00%

945

-

-

4

-

$32.54

$

-

7

0.00000

43%

50.00%

2

3

3

4

11

$32.54

$

365

SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry

Maritime

Construction
SECTOR 3. PAINTING
Aerospace

Autobody

Coil Coating

Maritime
Construction
Government

Page 166

ITEM 12 COST

NONSUPEWAGE

RESPONSES

#PLANTS

BURDEN HOURS

43%

COMPFULLTIME

1-%BASEMED

0.00000

All

RESPONDENTS

TURNOVER

3

SECTOR 1. ELECTROPLATING

SIZE
Large

VARIABLES

MEDEXAMADDERM

LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of
engineering controls.
COMPFULLTIME = 4 hours for an employee to receive a comprehensive medical examination
NONSUPEWAGE = Non-supervisory wage rate
1-%BASEMED = Percentage of plants that are not providing annual medical examinations.
#PLANTS = Number of Plants

LIMEMPAL

Variables:

BURDEN HOURS = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLTIME * (1-%BASEMED) * #PLANTS
COST = BURDEN HOURS *NONSUPWAGE

100.00%

0

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

2

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

1

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

3

-

-

4

-

$32.54

$

-

0.00000

43%

100.00%

0

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

5

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

0

-

-

4

-

$32.54

$

-

0.00338

43%

0.00%

78

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

123

-

-

4

-

$32.54

$

-

0.00000

43%

20.00%

2

-

-

4

-

$32.54

$

-

0.00000

43%

90.00%

7

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

79

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

39

-

-

4

-

$32.54

$

-

0.00000

43%

50.00%

6

4

4

4

15

$32.54

$

497

0.00000

43%

70.00%

4

1

1

4

5

$32.54

$

155

0.00000

43%

0.00%

1

-

-

4

-

$32.54

$

-

0.00000

43%

100.00%

0

-

-

4

-

$32.54

$

-

0.00675

43%

50.00%

39

256

256

4

1,022

$32.54

$

33,260

0.00032
0.00016

43%
43%

70.00%
50.00%

12
116

5
18

5
18

4
4

22
73

$32.54
$32.54

$
$

711
2,376

0.00032

43%

70.00%

37

16

16

4

64

$32.54

$

2,092

0.00064

43%

50.00%

33

0.005

0.005

4

0.02

$32.54

$

1

0.00016

43%

70.00%

31

0.002

0.002

4

0.01

$32.54

$

0.2

0.00000

43%

20.00%

152

209

209

4

837

$32.54

$

27,252

0.00000

43%

90.00%

111

171

171

4

685

$32.54

$

22,297

0.00000

43%

0.00%

2

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

1

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

0

-

-

4

-

$32.54

$

-

0.00000

43%

0.00%

5

-

-

4

-

$32.54

$

-

0.00000

43%

100.00%

212

-

-

4

-

$32.54

$

-

0.00000

43%

100.00%

1,600

-

-

4

-

$32.54

$

-

0.00000

43%

20.00%

307

-

-

4

-

$32.54

$

-

Page 167

ITEM 12 COST

NONSUPEWAGE

RESPONSES

#PLANTS

BURDEN HOURS

43%

COMPFULLTIME

1-%BASEMED

0.00000

RESPONDENTS

TURNOVER

LIMEMPAL

0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
7
Large
All
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
All
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
ALL
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
ALL
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
ALL
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
All
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
Alloy Stainless Steel
1
Small
1
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY
0
Large
Reshaping
0
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
Large
All
4
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
0
Large
All
0
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
Large
All
1
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
Large
All
0
Small
SECTOR 20. TEXTILE DYEING
0
Large

MEDEXAMADDERM

All

SIZE

VARIABLES

Table 28

Industrial Rehabilitation &
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration

90.00%

623

-

-

4

-

$32.54

$

-

0.00000

43%

20.00%

8

1

1

4

3

$32.54

$

112

0.00000
0.00000

43%
43%

90.00%
20.00%

24
111

111

111

4
4

442

$32.54
$32.54

$
$

14,399

0.00000

43%

90.00%

6

6

6

4

26

$32.54

$

837

0.00000

43%

20.00%

78

-

-

4

-

$32.54

$

-

0.00000

43%

90.00%

312

-

-

4

-

$32.54

$

-

0.00000

43%

20.00%

193

-

-

4

-

$32.54

$

-

0.00000
0.00000

43%
43%

20.00%
20.00%

0
25

13

13

4
4

50

$32.54
$32.54

$
$

1,640

0.00000

43%

20.00%

5

1

1

4

6

$32.54

$

187

0.00000

43%

20.00%

5

-

-

4

-

$32.54

$

-

0.00000

43%

90.00%

0

-

-

4

-

$32.54

$

-

0.00000

43%

75.00%

143

-

-

4

-

$32.54

$

-

0.00000
0.00000

43%
43%

100.00%
75.00%

76
36

-

-

4
4

-

$32.54
$32.54

$
$

-

0.00000
0.00000

43%
43%

100.00%
50.00%

32
1,232

219

219

4
4

877

$32.54
$32.54

$
$

28,540

0.00000
0.00000

43%
43%

50.00%
50.00%

4,932
17

878
2

878
2

4
4

3,510
10

$32.54
$32.54

$
$

114,235
314

0.00000

43%

50.00%

62

9

9

4

35

$32.54

$

1,135

0.00000

43%

50.00%

39

-

-

4

-

$32.54

$

-

0.00000
0.00000

43%
43%

70.00%
50.00%

47
0

-

-

4
4

-

$32.54
$32.54

$
$

-

0.00000

43%

70.00%

24

-

-

4

-

$32.54

$

-

2.00000

43%

50.00%

18

15

15

4

60

$32.54

$

1,963

0.00000

43%

70.00%

0

-

-

4

-

$32.54

$

-

0.00000

43%

50.00%

54

-

-

4

-

$32.54

$

-

ITEM 12 COST

NONSUPEWAGE

RESPONSES

#PLANTS

BURDEN HOURS

43%

COMPFULLTIME

0.00000

RESPONDENTS

1-%BASEMED

0
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
Large
All
0
Small
12
Large
Fiber, Flat and Container Glass
3
Small
SECTOR 22. PRINTING
0
Large
All
0
Small
SECTOR 24. CHROMIUM CATALYST USERS
0
Large
Catalyst Users
0
Small
6
Large
Chromium Catalyst Service
Companies
4
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
Large
All
0
Small
SECTOR 26. WOODWORKING
0
Large
General Industry
0
Small
0
Large
Maritime
0
Small
1
Large
Construction
1
Small
1
State
Government
1
Local
SECTOR 27. SOLID WASTER INCINERATION
0
Large
All
0
Small
1
State
Government
0
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
2
Large
All
0
Small
SECTOR 31. CONSTRUCTION
0
Large

TURNOVER

All

MEDEXAMADDERM

LIMEMPAL

SIZE

VARIABLES

Table 28

Small
State Gov't

0
0

0.00000
0.00000

43%
43%

50.00%
50.00%

247
16

-

-

4
4

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0
0

0.00000
0.00000

43%
43%

50.00%
50.00%

93
43

-

-

4
4

-

$32.54
$32.54

$
$

-

Small
State Gov't

0
0

0.00000
0.00000

43%
43%

50.00%
50.00%

180
1

-

-

4
4

-

$32.54
$32.54

$
$

-

Local Gov't
Large

0
1

0.00000
0.00000

43%
43%

50.00%
50.00%

252
47

11

11

4
4

45

$32.54
$32.54

$
$

1,466

Page 168

Total
TURNOVER

1-%BASEMED

1
0.00000
43%
50.00%
185
73,274

Page 169

45
13,143
45
13,143
4
4
178
52,572
$32.54 $
$32.54 $

ITEM 12 COST

NONSUPEWAGE

BURDEN HOURS

COMPFULLTIME

RESPONSES

RESPONDENTS

#PLANTS

MEDEXAMADDERM

Small

LIMEMPAL

SIZE

VARIABLES

Table 28

5,798
1,710,693

Table 29

Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii);
and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii)) Contract Cost for a PLHCP to Conduct the Medical Examination After Initial Assignment
This table calculates the cost for a contractor PLHCP to conduct medical examinations to employees newly assigned to operations that
involve exposure at or above the action level.

Variables:

Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLCOST *(1-%BASEMED)*#PLANTS
Cost = Hours *NONSUPWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of
engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and
symptoms" after the implementation of engineering controls.
*COMPFULLCOST = Cost for an employer to administer a comprehensive medical examination
1-%BASEMED = Percentage of establishments that do not have annual medical surveillance for their employees in
the baseline.
* #PLANTS = Number of Plants

1 -%BASEMED

ALL

3

0.00000

43%

$560.32

0.00%

1,752

$0

SECTOR 2A. WELDING

Small

0

0.00000

43%

$560.32

0.00%

3,297

$0

General Industry

Large

0

0.00000

43%

$560.32

95.00%

8,171

$0

Small
Large

0
14

0.00000
3.01429

43%
43%

$560.32
$560.32

100.00%
95.00%

9,155
197

$0
$769,944

Maritime

Small
Large

1
27

0.00000
3.01429

43%
43%

$560.32
$560.32

100.00%
95.00%

112
278

$26,999
$1,920,237

Construction

Small
Local

3
0

0.00000
0.00000

43%
43%

$560.32
$560.32

100.00%
95.00%

2,231
26

$1,619,961
$0

GOVERNMENT
SECTOR 2B. MILD STEEL WELDING

State

0

0.00000

43%

$560.32

100.00%

819

$0

General Industry

Large

0

0.00000

43%

$560.32

95.00%

10,955

$0

Small
Large

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

100.00%
95.00%

11,152
425

$0
$0

Maritime

Small
Large

0
10

0.00000
0.00000

43%
43%

$560.32
$560.32

100.00%
95.00%

241
418

$0
$961,274

Construction

Small

1

0.00000

43%

$560.32

100.00%

3,158

$764,495

SECTOR 3. PAINTING
AEROSPACE

Large

46

0.00000

43%

$560.32

20.00%

50

$109,551

Small
Large

0
1

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
20.00%

62
330

$0
$14,607

Page 170

Cost

#PLANTS

COMPFULLCOST

SECTOR 1. ELECTROPLATING

TURNOVER

MEDEXAMADDERM

Large

Size

LIMEMPAL

Variables

0

1 -%BASEMED

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
20.00%

1,454
101

$0
$8,926

Small
Large

1
2

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
0.00%

18
274

$2,029
$0

Small
Large

1
2

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
0.00%

474
789

$48,862
$0

Small
Local

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

0.00%
0.00%

4,197
17

$0
$0

9

0.00000

43%

$560.32

0.00%

945

$0

7

0.00000

43%

$560.32

50.00%

2

$1,571

0

0.00000

43%

$560.32

100.00%

0

$0

7

0.00000

43%

$560.32

0.00%

2

$0

Small

1

0.00000

43%

$560.32

0.00%

1

$0

Large

2

0.00000

43%

$560.32

0.00%

3

$0

0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
ALL
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
ALL
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
ALL
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
ALL
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
ALL
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
ALL

0.00000

43%

$560.32

100.00%

0

$0

0.00000

43%

$560.32

0.00%

5

$0

0.00000

43%

$560.32

0.00%

0

$0

0.00338

43%

$560.32

0.00%

78

$0

0.00000

43%

$560.32

0.00%

123

$0

0.00000

43%

$560.32

20.00%

2

$0

0.00000

43%

$560.32

90.00%

7

$0

0.00000

43%

$560.32

0.00%

79

$0

0.00000

43%

$560.32

0.00%

39

$0

0.00000

43%

$560.32

50.00%

6

$2,139

0.00000

43%

$560.32

70.00%

4

$665

0.00000

43%

$560.32

0.00%

1

$0

Coil Coating
Maritime
Construction
Government

State
SECTOR 4. PRODUCERS OF CHROMATES
Large
ALL
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
ALL

SECTOR 6. CCA PRODUCERS
ALL

Page 171

Cost

#PLANTS

COMPFULLCOST

0
2

Autobody

TURNOVER

MEDEXAMADDERM

Small
Large

Size

LIMEMPAL

Variables

Table 29

1 -%BASEMED

0

0.00000

43%

$560.32

100.00%

0

$0

Alloy Stainless Steel

Large

31

0.00675

43%

$560.32

50.00%

39

$143,174

Small
Large

1
1

0.00032
0.00016

43%
43%

$560.32
$560.32

70.00%
50.00%

12
116

$3,062
$10,227

Carbon Steel
SECTOR 14.B FORGING INDUSTRY

Small

1

0.00032

43%

$560.32

70.00%

37

$9,005

Reshaping

Large

0

0.00064

43%

$560.32

50.00%

33

$3

0

0.00016

43%

$560.32

70.00%

31

$1

16

0.00000

43%

$560.32

20.00%

152

$117,309

4

0.00000

43%

$560.32

90.00%

111

$95,980

0

0.00000

43%

$560.32

0.00%

2

$0

0

0.00000

43%

$560.32

0.00%

1

$0

0

0.00000

43%

$560.32

0.00%

0

$0

1

0.00000

43%

$560.32

0.00%

5

$0

0

0.00000

43%

$560.32

100.00%

212

$0

0

0.00000

43%

$560.32

100.00%

1,600

$0

0

0.00000

43%

$560.32

20.00%

307

$0

0

0.00000

43%

$560.32

90.00%

623

$0

1

0.00000

43%

$560.32

20.00%

8

$481

0
12

0.00000
0.00000

43%
43%

$560.32
$560.32

90.00%
20.00%

24
111

$0
$61,985

3

0.00000

43%

$560.32

90.00%

6

$3,604

0

0.00000

43%

$560.32

20.00%

78

$0

0

0.00000

43%

$560.32

90.00%

312

$0

0

0.00000

43%

$560.32

20.00%

193

$0

0
6

0.00000
0.00000

43%
43%

$560.32
$560.32

20.00%
20.00%

0
25

$0
$7,058

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
ALL
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
Catalyst Users
Small
Large
Chromium Catalyst Service
Companies

Page 172

Cost

#PLANTS

COMPFULLCOST

SECTOR 14. IRON AND STEEL MILLS

TURNOVER

MEDEXAMADDERM

Small

Size

LIMEMPAL

Variables

Table 29

1 -%BASEMED

43%

$560.32

20.00%

5

$807

0

0.00000

43%

$560.32

20.00%

5

$0

0

0.00000

43%

$560.32

90.00%

0

$0

0

0.00000

43%

$560.32

75.00%

143

$0

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

100.00%
75.00%

76
36

$0
$0

0
1

0.00000
0.00000

43%
43%

$560.32
$560.32

100.00%
50.00%

32
1,232

$0
$122,854

1
1

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
50.00%

4,932
17

$491,747
$1,351

1

0.00000

43%

$560.32

50.00%

62

$4,884

0

0.00000

43%

$560.32

50.00%

39

$0

0
1

0.00000
0.00000

43%
43%

$560.32
$560.32

70.00%
50.00%

47
0

$0
$0

0

0.00000

43%

$560.32

70.00%

24

$0

2

2.00000

43%

$560.32

50.00%

18

$8,450

0

0.00000

43%

$560.32

70.00%

0

$0

0

0.00000

43%

$560.32

50.00%

54

$0

Small
State Gov't

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
50.00%

247
16

$0
$0

Local Gov't
Large

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
50.00%

93
43

$0
$0

Small
State Gov't

0
0

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
50.00%

180
1

$0
$0

Local Gov't
Large

0
1

0.00000
0.00000

43%
43%

$560.32
$560.32

50.00%
50.00%

252
47

$0
$6,311

Small

1

0.00000

43%

$560.32

50.00%
TOTAL

185
73,274

$24,957
$7,364,507

Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
ALL
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation &
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration

Page 173

Cost

#PLANTS

COMPFULLCOST

0.00000

Companies

TURNOVER

MEDEXAMADDERM

4

Size

LIMEMPAL

Variables

Table 29

Table 30

TABLE 30: Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)-(k)(3)(iii); 1915.1026(i)(2)(vi) and (i)(3)(i)-(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)-(i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing (%BASEMED) the additional employee time will be 3 hours
(COMPARTTIME). For employers who are not providing annual medical testing (1-%BASEMED) the time for a full comprehensive examination is 4 hours (COMPFULLTIME). The employee turnover rate is divided by
two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination. It is estimated that half of
the employee turnover occurs at the beginning of the year and the other half occurs a the end of the year. Therefore, based on this estimation at any time during the year, it has been greater then six months
since their last medical examination for half of the employees that are leaving, and therefore, these employees require a medical examination.
BURDEN HOURS = (LIMEMPAL + MEDEXAMADDERM)*(TURNOVER/2)* ((COMPARTTIME*%BASEMED)+(COMPFULLTIME*(1-%BASEMED)))*#PLANTS
COST = BURDEN HOURS x NONSUPEWAGE

SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry
Maritime
Construction
SECTOR 3. PAINTING
Aerospace

Auto Body

Coil Coating
Maritime
Construction
Government
SECTOR 4. PRODUCERS OF CHROMATES
All

5.00%

Small
Large

0
14

0.000000 43% 22%
3.014286 43% 22%

3
3

Small
Large

1
27

0.000000 43% 22%
3.014286 43% 22%

Small
State

3
0

Local
Large

ITEM 12 COST

100.00%

3

NONSUPEWAGE

3

0.000000 43% 22%

BURDEN HOURS

0.000000 43% 22%

0

HOUR PER RESPONSE
(FOR ITEM 12 TABLE)

0

Large

RESPONSES

Small

RESPONDENTS

4

#PLANTS

100.00%

COMPFULLTIME

3

TURNOVER / 2

0.000000 43% 22%

TURNOVER

3

1- %BASEMED

MEDEXAMADDERM

Large

LIMEMPAL

%BASEMED

All

COMPPARTTIME

SECTOR 1. ELECTROPLATING

Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.
The time an employee takes for a comprehensive exam when employed by employers already providing annual medical testing in the baseline.
Percentage of employers who are providing annual medical examinations
The time an employee takes for a comprehensive exam when employed by employers who were not providing any annual medical testing in the baseline.
Percentage of plants that are not providing annual medical examinations.
Number of Plants
Non-supervisory Wage Rate

SIZE

LIMEMPAL =
MEDEXAMADDERM =
COMPARTTIME =
%BASEMED =
COMPFULLTIME =
*1-%BASEMED =
* #PLANTS =
NONSUPEWAGE =

VARIABLES

Variables:

1,130

1,130

3

3,391

$32.54 $

110,343

3,297

-

-

3

-

$32.54 $

-

8,171

-

-

4

-

$32.54 $

-

4 100.00%
4 95.00%

9,155
197

723

723

4
4

2,857

$32.54 $
$32.54 $

92,961

0.00%
5.00%

4 100.00%
4 95.00%

112
278

24
1,804

24
1,804

4
4

96
7,125

$32.54 $
$32.54 $

3,136
231,845

3
3

0.00%
5.00%

4 100.00%
4 95.00%

2,231
26

1,446
-

1,446
-

4
4

5,782
-

$32.54 $
$32.54 $

188,163
-

0.000000 43% 22%

3

0.00%

4 100.00%

819

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

5.00%

4

95.00%

10,955

-

-

4

-

$32.54 $

-

Small
Large

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

0.00%
5.00%

4 100.00%
4 95.00%

11,152
425

-

-

4
4

-

$32.54 $
$32.54 $

-

Small
Large

0
10

0.000000 43% 22%
0.000000 43% 22%

3
3

0.00%
5.00%

4 100.00%
4 95.00%

241
418

903

903

4
4

3,567

$32.54 $
$32.54 $

116,062

Small

1

0.000000 43% 22%

3

0.00%

682

682

4

2,729

$32.54 $

88,798

Large

46

0.000000 43% 22%

3

80.00%

4 100.00%
3,158
GENERAL INDUSTRY
4 20.00%
50

489

489

3

1,564

$32.54 $

50,899

Small
Large

0
1

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
80.00%

4
4

50.00%
20.00%

62
330

65

65

4
3

209

$32.54 $
$32.54 $

6,786

Small
Large

0
2

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
80.00%

4
4

50.00%
20.00%

1,454
101

40

40

4
3

127

$32.54 $
$32.54 $

4,147

Small
Large

1
2

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
100.00%

4
4

50.00%
0.00%

18
274

4
101

4
101

4
3

13
303

$32.54 $
$32.54 $

412
9,848

Small
Large

1
2

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
100.00%

4
4

50.00%
0.00%

474
789

87
381

87
381

4
3

305
1,142

$32.54 $
$32.54 $

9,932
37,162

Small
State

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

100.00%
100.00%

4
4

0.00%
0.00%

4,197
17

-

-

3
3

-

$32.54 $
$32.54 $

-

Local

9

0.000000 43% 22%

3

100.00%

4

0.00%

945

1,868

1,868

3

5,605

$32.54 $

182,383

Large

7

0.000000 43% 22%

3

50.00%

4

50.00%

2

3

3

4

10

$32.54 $

319

0

0.000000 43% 22%

3

0.00%

4 100.00%

0

-

-

4

-

$32.54 $

-

7

0.000000 43% 22%

3

100.00%

4

0.00%

2

3

3

3

8

$32.54 $

245

1

0.000000 43% 22%

3

100.00%

4

0.00%

1

0.2

0.2

3

1

$32.54 $

17

2

0.000000 43% 22%

3

100.00%

4

0.00%

3

1

1

3

3

$32.54 $

109

0

0.000000 43% 22%

3

0.00%

0

-

-

4

-

$32.54 $

-

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
All
Small
SECTOR 6. CCA PRODUCERS
Large
All
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS

0.00%

1,752

4

0.00%

4

95.00%

0.00%
5.00%

3
3

0.000000 43% 22%
0.000000 43% 22%

0
0

4 100.00%

Page 174

HOUR PER RESPONSE
(FOR ITEM 12 TABLE)

100.00%

4

0.00%

0

-

-

3

-

$32.54 $

-

3

100.00%

4

0.00%

78

17

17

3

51

$32.54 $

1,647

0.000000 43% 22%

3

100.00%

4

0.00%

123

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

80.00%

4

20.00%

2

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

10.00%

4

90.00%

7

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

100.00%

4

0.00%

79

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

100.00%

4

0.00%

39

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

50.00%

4

50.00%

6

4

4

4

13

$32.54 $

435

0.000000 43% 22%

3

30.00%

4

70.00%

4

1

1

4

3

$32.54 $

102

0.000000 43% 22%

3

100.00%

4

0.00%

1

2

2

3

5

$32.54 $

174

0.000000 43% 22%

3

0.00%

4 100.00%

0

-

-

4

-

$32.54 $

-

0.006751 43% 22%

3

50.00%

4

50.00%

39

256

256

4

894

$32.54 $

29,103

0.000321 43% 22%
0.000161 43% 22%

3
3

30.00%
50.00%

4
4

70.00%
50.00%

12
116

4
18

4
18

4
4

14
64

$32.54 $
$32.54 $

470
2,079

0.000321 43% 22%

3

30.00%

4

70.00%

37

11

11

4

42

$32.54 $

1,382

0.000643 43% 22%

3

50.00%

4

50.00%

33

0.005

0.005

4

0.02

$32.54 $

1

0.000161 43% 22%

3

30.00%

4

70.00%

31

0.001

0.001

4

0.004

$32.54 $

0.1

0.000000 43% 22%

3

80.00%

4

20.00%

152

523

523

3

1,675

$32.54 $

54,503

0.000000 43% 22%

3

10.00%

4

90.00%

111

95

95

4

371

$32.54 $

12,077

0.000000 43% 22%

3

100.00%

4

0.00%

2

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

100.00%

4

0.00%

1

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

100.00%

4

0.00%

0

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

100.00%

4

0.00%

5

1

1

3

3

$32.54 $

98

0.000000 43% 22%

3

0.00%

4 100.00%

212

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

0.00%

4 100.00%

1,600

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

80.00%

4

20.00%

307

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

10.00%

4

90.00%

623

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

80.00%

4

20.00%

8

2

2

3

7

$32.54 $

223

0.000000 43% 22%
0.000000 43% 22%

3
3

10.00%
80.00%

4
4

90.00%
20.00%

24
111

277

277

4
3

885

$32.54 $
$32.54 $

28,799

0.000000 43% 22%

3

10.00%

4

90.00%

6

4

4

4

14

$32.54 $

453

0.000000 43% 22%

3

80.00%

4

20.00%

78

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

10.00%

4

90.00%

312

-

-

4

-

$32.54 $

-

0.000000 43% 22%

3

80.00%

4

20.00%

193

-

-

3

-

$32.54 $

-

0.000000 43% 22%
0.000000 43% 22%

3
3

80.00%
80.00%

4
4

20.00%
20.00%

0
25

31

31

3
3

101

$32.54 $
$32.54 $

3,279

0.000000 43% 22%

3

30.00%

4

70.00%

5

4

4

4

13

$32.54 $

433

0.000000 43% 22%

3

80.00%

4

20.00%

5

-

-

3

-

$32.54 $

-

0.000000 43% 22%

3

10.00%

4

90.00%

0

-

-

4

-

$32.54 $

-

Page 175

11

3

BURDEN HOURS

#PLANTS

RESPONSES
11

33

$32.54 $

ITEM 12 COST

3

0.003380 43% 22%

5

NONSUPEWAGE

0.000000 43% 22%

RESPONDENTS

0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
All
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
All
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
All
Small
0
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
All
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
All
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
General Industry
1
Small
1
Large
Carbon Steel
1
Small
SECTOR 14.B FORGING INDUSTRY
0
Large
Reshaping
0
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
16
Large
All
4
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
0
Large
All
0
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
Large
All
1
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
0
Large
ALL
0
Small
SECTOR 20. TEXTILE DYEING
0
Large
All
0
Small
SECTOR 21. COLORED GLASS PRODUCERS
1
Large
General Industry
0
Small
12
Large
Fiber, Flat and Container Glass
3
Small
SECTOR 22. PRINTING
0
Large
All
0
Small
SECTOR 24. CHROMIUM CATALYST USERS
0
Large
General Industry
0
Small
6
Large
Chromium Service Companies
4
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
0
Large
All
0
Small
SECTOR 26. WOODWORKING

1- %BASEMED
0.00%

COMPFULLTIME

%BASEMED

4

TURNOVER / 2

100.00%

TURNOVER

3

Large

LIMEMPAL

0.000000 43% 22%

All

SIZE

11

VARIABLES

COMPPARTTIME

MEDEXAMADDERM

Table 30

1,075

Construction

Government

Hazardous Waste Site Work

Refractory Brick Restoration
Average/Total

HOUR PER RESPONSE
(FOR ITEM 12 TABLE)

-

-

4

-

$32.54 $

-

Small
Large

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

0.00%
25.00%

4 100.00%
4 75.00%

76
36

-

-

4
4

-

$32.54 $
$32.54 $

-

Small
Large

0
1

0.000000 43% 22%
0.000000 43% 22%

3
3

0.00%
50.00%

4 100.00%
4 50.00%

32
1,232

219

219

4
4

767

$32.54 $
$32.54 $

24,972

Small
State

1
1

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
50.00%

4
4

50.00%
50.00%

4,932
17

878
2

878
2

4
4

3,072
8

$32.54 $
$32.54 $

99,956
275

1

0.000000 43% 22%

3

50.00%

4

50.00%

62

9

9

4

31

$32.54 $

993

0

0.000000 43% 22%

3

50.00%

4

50.00%

39

-

-

4

-

$32.54 $

-

0
1

0.000000 43% 22%
0.000000 43% 22%

3
3

30.00%
50.00%

4
4

70.00%
50.00%

47
0

-

-

4
4

-

$32.54 $
$32.54 $

-

0

0.000000 43% 22%

3

30.00%

4

70.00%

24

-

-

4

-

$32.54 $

-

2

2.000000 43% 22%

3

50.00%

4

50.00%

18

15

15

4

53

$32.54 $

1,718

0

0.000000 43% 22%

3

30.00%

4

70.00%

0

-

-

4

-

$32.54 $

-

0

0.000000 43% 22%

3

50.00%

4

50.00%

54

-

-

4

-

$32.54 $

-

Small
State Gov't

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
50.00%

4
4

50.00%
50.00%

247
16

-

-

4
4

-

$32.54 $
$32.54 $

-

Local Gov't
Large

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
50.00%

4
4

50.00%
50.00%

93
43

-

-

4
4

-

$32.54 $
$32.54 $

-

Small
State Gov't

0
0

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
50.00%

4
4

50.00%
50.00%

180
1

-

-

4
4

-

$32.54 $
$32.54 $

-

Local Gov't
Large

0
1

0.000000 43% 22%
0.000000 43% 22%

3
3

50.00%
50.00%

4
4

50.00%
50.00%

252
47

11

11

4
4

39

$32.54 $
$32.54 $

1,283

Small

1

0.000000 43% 22%

3

50.00%

4
4

50.00%

185
73,274

$32.54 $
$32.54 $

5,073
1,586,911

Page 176

4
4

BURDEN HOURS

#PLANTS

RESPONSES

45
45
12,192 12,192

156
48,768

ITEM 12 COST

143

NONSUPEWAGE

75.00%

RESPONDENTS

4

1- %BASEMED

25.00%

COMPFULLTIME

3

TURNOVER / 2

0.000000 43% 22%

TURNOVER

0

Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation & Maintenance

MEDEXAMADDERM

Large

LIMEMPAL

%BASEMED

Maritime

COMPPARTTIME

General Industry

SIZE

VARIABLES

Table 30

Table 31

Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)-(k)(3)(iii); 1915.1026(i)(2)(vi) and (i)(3)(i)-(i)(3)(iii); and
1926.1126(i)(2)(vi) and (i)(3)(i)-(i)(3)(ii)) Contract Cost for a PLHCP to Conduct the Medical Examination at the Termination of Employment 
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing
(%BASEMED) the additional cost will be $227.00 (COMPARTCOST). For employers who are not providing annual medical testing (1-%BASEMED) the cost
for a full comprehensive examination will be $454.00 (COMPFULLCOST). The employee turnover rate is divided by two, because medical examinations
must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination. It is
estimated that half of the employee turnover occurs at the begining of the year and the other half occurs a the end of the year. Therefore, based on this
estimation at any time during the year, it has been greater then six months since their last medical examination for half of the employees that are
leaving, and therefore, these employees require a medical examination.

Variables:

COST = (LIMEMPAL + MEDEXAMADDDERM)*(TURNOVER/2)* ((COMPARTCOST*%BASEMED)+(COMPFULLCOST*(1%BASEMED)))*#PLANTS
LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering c
MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and
symptoms" after the implementation of engineering controls.
TURNOVER/2 = Represents the frequency of termination exams.
COMPARTCOST= The cost of a comprehensive exam for those employers already providing annual medical testing in the baseline
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLCOST = The cost of a comprehensive exam for those employers who were not providing any annual medical testing in th
1-%BASEMED = Percentage of plants that are not providing annual medical examinations.
#PLANTS = Number of Plants

COMPPARTCOST

%BASEMED

3

0.000000

43%

22%

$280

100.00%

$559

0.00%

1,752

SECTOR 2A. WELDING

Small

0

0.000000

43%

22%

$280

100.00%

$559

0.00%

3,297

General Industry

Large

0

0.000000

43%

22%

$280

5.00%

$559

95.00%

8,171

Small
Large

0
14

0.000000
3.014286

43%
43%

22%
22%

$280
$280

0.00%
5.00%

$559 100.00%
$559 95.00%

9,155
197

Maritime

Small
Large

1
27

0.000000
3.014286

43%
43%

22%
22%

$280
$280

0.00%
5.00%

$559 100.00%
$559 95.00%

112
278

Construction

Small
State

3
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

0.00%
5.00%

$559 100.00%
$559 95.00%

2,231
26

Government
SECTOR 2B. MILD STEEL WELDING

Local

0

0.000000

43%

22%

$280

0.00%

$559 100.00%

819

General Industry

Large

0

0.000000

43%

22%

$280

5.00%

$559

95.00%

10,955

Small
Large

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

0.00%
5.00%

$559 100.00%
$559 95.00%

11,152
425

Maritime

Small
Large

0
10

0.000000
0.000000

43%
43%

22%
22%

$280
$280

0.00%
5.00%

$559 100.00%
$559 95.00%

241
418

Construction
SECTOR 3. PAINTING

Small

1

0.000000

43%

$559 100.00%

3,158

Large

46

0.000000

43%

22%
$280
0.00%
GENERAL INDUSTRY
22%
$280
80.00%

AEROSPACE

$559

20.00%

50

Small
Large

0
1

0.000000
0.000000

43%
43%

22%
22%

$559
$559

50.00%
20.00%

62
330

Page 177

$280
$280

50.00%
80.00%

#PLANTS

TURNOVER / 2

All

1 - %BASEMED

TURNOVER

SECTOR 1. ELECTROPLATING

COMPFULLCOST

MEDEXAMADDERM

Large

Size

LIMEMPAL

Variables

0

COMPPARTCOST

%BASEMED

43%
43%

22%
22%

$280
$280

50.00%
80.00%

$559
$559

50.00%
20.00%

1,454
101

Small
Large

1
2

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
100.00%

$559
$559

50.00%
0.00%

18
274

Small
Large

1
2

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
100.00%

$559
$559

50.00%
0.00%

474
789

Small
State

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

100.00%
100.00%

$559
$559

0.00%
0.00%

4,197
17

Local

9

0.000000

43%

22%

$280

100.00%

$559

0.00%

945

Large

7

0.000000

43%

22%

$280

50.00%

$559

50.00%

2

0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
7
Large
ALL
1
Small
SECTOR 6. CCA PRODUCERS
2
Large
ALL
0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
11
Large
ALL
0
Small
SECTOR 8. PAINT AND COATING PRODUCERS
1
Large
ALL
0
Small
SECTOR 9. PRINTING INK PRODUCERS
0
Large
ALL
0
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
0
Large
ALL
0
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
3
Large
ALL
1
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
8
Large
ALL
0
Small
SECTOR 14. IRON AND STEEL MILLS
31
Large
General Industry
1
Small

0.000000

43%

22%

$280

0.00%

$559 100.00%

0

0.000000

43%

22%

$280

100.00%

$559

0.00%

2

0.000000

43%

22%

$280

100.00%

$559

0.00%

1

0.000000

43%

22%

$280

100.00%

$559

0.00%

3

0.000000

43%

22%

$280

0.00%

0.000000

43%

22%

$280

0.000000

43%

22%

0.003380

43%

0.000000

Coil Coating
Maritime
Construction
Government
SECTOR 4. PRODUCERS OF CHROMATES
ALL

#PLANTS

TURNOVER / 2

0.000000
0.000000

1 - %BASEMED

TURNOVER

0
2

Auto Body

COMPFULLCOST

MEDEXAMADDERM

Small
Large

Size

LIMEMPAL

Variables

Table 31

$559 100.00%

0

100.00%

$559

0.00%

5

$280

100.00%

$559

0.00%

0

22%

$280

100.00%

$559

0.00%

78

43%

22%

$280

100.00%

$559

0.00%

123

0.000000

43%

22%

$280

80.00%

$559

20.00%

2

0.000000

43%

22%

$280

10.00%

$559

90.00%

7

0.000000

43%

22%

$280

100.00%

$559

0.00%

79

0.000000

43%

22%

$280

100.00%

$559

0.00%

39

0.000000

43%

22%

$280

50.00%

$559

50.00%

6

0.000000

43%

22%

$280

30.00%

$559

70.00%

4

0.000000

43%

22%

$280

100.00%

$559

0.00%

1

0.000000

43%

22%

$280

0.00%

$559 100.00%

0.006751

43%

22%

$280

50.00%

$559

50.00%

39

0.000321

43%

22%

$280

30.00%

$559

70.00%

12

Page 178

0

TURNOVER

TURNOVER / 2

COMPPARTCOST

%BASEMED

1 - %BASEMED

#PLANTS

Carbon Steel

1

0.000161

43%

22%

$280

50.00%

$559

50.00%

116

SECTOR 14.B FORGING INDUSTRY

Small

1

0.000321

43%

22%

$280

30.00%

$559

70.00%

37

Reshaping

Large

0

0.000643

43%

22%

$280

50.00%

$559

50.00%

33

0

0.000161

43%

22%

$280

30.00%

$559

70.00%

31

16

0.000000

43%

22%

$280

80.00%

$559

20.00%

152

4

0.000000

43%

22%

$280

10.00%

$559

90.00%

111

0

0.000000

43%

22%

$280

100.00%

$559

0.00%

2

0

0.000000

43%

22%

$280

100.00%

$559

0.00%

1

0

0.000000

43%

22%

$280

100.00%

$559

0.00%

0

1

0.000000

43%

22%

$280

100.00%

$559

0.00%

5

0

0.000000

43%

22%

$280

0.00%

$559 100.00%

212

0

0.000000

43%

22%

$280

0.00%

$559 100.00%

1,600

0

0.000000

43%

22%

$280

80.00%

$559

20.00%

307

0

0.000000

43%

22%

$280

10.00%

$559

90.00%

623

1

0.000000

43%

22%

$280

80.00%

$559

20.00%

8

0
12

0.000000
0.000000

43%
43%

22%
22%

$280
$280

10.00%
80.00%

$559
$559

90.00%
20.00%

24
111

3

0.000000

43%

22%

$280

10.00%

$559

90.00%

6

0

0.000000

43%

22%

$280

80.00%

$559

20.00%

78

0

0.000000

43%

22%

$280

10.00%

$559

90.00%

312

0

0.000000

43%

22%

$280

80.00%

$559

20.00%

193

0
6

0.000000
0.000000

43%
43%

22%
22%

$280
$280

80.00%
80.00%

$559
$559

20.00%
20.00%

0
25

4

0.000000

43%

22%

$280

30.00%

$559

70.00%

5

0

0.000000

43%

22%

$280

80.00%

$559

20.00%

5

0

0.000000

43%

22%

$280

10.00%

$559

90.00%

0

0

0.000000

43%

22%

$280

25.00%

$559

75.00%

143

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

0.00%
25.00%

$559 100.00%
$559 75.00%

76
36

Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
ALL
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
Small
SECTOR 20. TEXTILE DYEING
Large
ALL
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. PRINTING
Large
ALL
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large

Page 179

COMPFULLCOST

MEDEXAMADDERM

Large

Size

LIMEMPAL

Variables

Table 31

COMPPARTCOST

%BASEMED

0.000000
0.000000

43%
43%

22%
22%

$280
$280

0.00%
50.00%

$559 100.00%
$559 50.00%

32
1,232

Construction

Small
State

1
1

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
50.00%

$559
$559

50.00%
50.00%

4,932
17

Government

1

0.000000

43%

22%

$280

50.00%

$559

50.00%

62

0

0.000000

43%

22%

$280

50.00%

$559

50.00%

39

0
1

0.000000
0.000000

43%
43%

22%
22%

$280
$280

30.00%
50.00%

$559
$559

70.00%
50.00%

47
0

0

0.000000

43%

22%

$280

30.00%

$559

70.00%

24

2

2.000000

43%

22%

$280

50.00%

$559

50.00%

18

0

0.000000

43%

22%

$280

30.00%

$559

70.00%

0

0

0.000000

43%

22%

$280

50.00%

$559

50.00%

54

Small
State Gov't

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
50.00%

$559
$559

50.00%
50.00%

247
16

Local Gov't
Large

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
50.00%

$559
$559

50.00%
50.00%

93
43

Small
State Gov't

0
0

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
50.00%

$559
$559

50.00%
50.00%

180
1

Local Gov't
Large

0
1

0.000000
0.000000

43%
43%

22%
22%

$280
$280

50.00%
50.00%

$559
$559

50.00%
50.00%

252
47

Small

1

0.000000

43%

22%

$280

50.00%

$559

50.00%
Total

185
73,274

Local
SECTOR 27. SOLID WASTER INCINERATION
Large
ALL
Small
State
Government
Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
ALL
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration

Page 180

#PLANTS

TURNOVER / 2

0
1

1 - %BASEMED

TURNOVER

Maritime

COMPFULLCOST

MEDEXAMADDERM

Small
Large

Size

LIMEMPAL

Variables

Table 31

Table 32

TABLE 32: Information Provided to the PLHCP (§§ 1910.1026(k)(4), 1915.1026(i)(4), and 1926.1126(i)(4)); Clerical Time and Cost to Provide Information
to the PLHCP
This table estimates the burden hours and costs for employers to update required information in worker records and provide the information to the
PLHCP. OSHA assumes that it will take 5 minutes for a clerical worker to update the worker record and provide this information. The Agency reduced
the time for this requirement from 1 hour to 5 minutes because, after the first year of medical surveillance, employers will not need to establish files.
Variables:
BURDEN HOURS = POTEXEMP * MEDRECORD * PLANTS
COST = BURDEN HOURS * CLWAGE

SECTOR 1. ELECTROPLATING
All
SECTOR 2A. WELDING
General Industry
Maritime
Construction
Government
SECTOR 2B. MILD STEEL WELDING
General Industry
Maritme
Construction
SECTOR 3. PAINTING
Aerospace

Auto Body

Coil Coating
Maritime

ITEM 12 COST

CLWAGE

BURDEN HOURS

MEDRECORD

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP

SIZE

VARIABLES

POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls.
MEDRECORD = Clerical time per employee, in hours, to maintain detailed medical records and provide to the PLHCP (5
mins)
CLWAGE = Clerical wage. $/hr.
#PLANTS = Number of plants represented by the model

Large

5

1,752

8,762

8,762

0.08

730

$26.65 $

19,457

Small

1

3,297

3,297

3,297

0.08

275

$26.65 $

7,321

Large

2

8,171

16,419

16,419

0.08

1,368

$26.65 $

36,461

Small
Large

0
19

9,155
197

0
3,760

3,760

0.08
0.08

313

$26.65 $
$26.65 $

8,348

Small
Large

1
51

112
278

112
14,262

112
14,262

0.08
0.08

9
1,188

$26.65 $
$26.65 $

249
31,670

Small
State

5
2

2,231
26

11,206
52

11,206
52

0.08
0.08

934
4

$26.65 $
$26.65 $

24,884
117

Local

0

819

0

-

0.08

-

$26.65 $

-

Large

1

10,955

11,007

11,007

0.08

917

$26.65 $

24,442

Small
Large

0
0

11,152
425

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

Small
Large

1
19

241
418

242
7,979

242
7,979

0.08
0.08

20
665

$26.65 $
$26.65 $

538
17,719

Small

2

3,158

6,346

529

$26.65 $

14,092

Large

47

50

2,319

193

$26.65 $

5,149

Small
Large

1
12

62
330

57
3,941

57
3,941

0.08
0.08

5
328

$26.65 $
$26.65 $

127
8,751

Small
Large

1
2

1,454
101

1,335
185

1,335
185

0.08
0.08

111
15

$26.65 $
$26.65 $

2,964
411

Small
Large

1
3

18
274

17
704

17
704

0.08
0.08

1
59

$26.65 $
$26.65 $

37
1,563

Small
Large

1
2

474
789

406
1,771

406
1,771

0.08
0.08

34
148

$26.65 $
$26.65 $

901
3,932

Page 181

6,346
0.08
GENERAL INDUSTRY
2,319
0.08

Construction
Government
SECTOR 4. PRODUCERS OF CHROMATES
All

ITEM 12 COST

CLWAGE

BURDEN HOURS

MEDRECORD

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP

SIZE

VARIABLES

Table 32

Small
State

1
9

4,197
17

3,138
157

3,138
157

0.08
0.08

261
13

$26.65 $
$26.65 $

6,967
349

Local

1

945

621

621

0.08

52

$26.65 $

1,378

Large

7

2

13

13

0.08

1

$26.65 $

29

0

0

0

-

0.08

-

$26.65 $

-

20

2

33

33

0.08

3

$26.65 $

74

2

1

2

2

0.08

0.1

$26.65 $

4

3

3

8

8

0.08

1

$26.65 $

17

0

0

0

-

0.08

-

$26.65 $

-

24

5

112

112

0.08

9

$26.65 $

248

0

0

0

-

0.08

-

$26.65 $

-

5

78

391

391

0.08

33

$26.65 $

868

2

123

246

246

0.08

20

$26.65 $

546

0

2

0

-

0.08

-

$26.65 $

-

0

7

0

-

0.08

-

$26.65 $

-

0

79

0

-

0.08

-

$26.65 $

-

0

39

0

-

0.08

-

$26.65 $

-

3

6

18

18

0.08

1

$26.65 $

39

1

4

4

4

0.08

0.3

$26.65 $

9

14

1

15

15

0.08

1

$26.65 $

32

0

0

0

-

0.08

-

$26.65 $

-

42

39

1,613

1,613

0.08

134

$26.65 $

3,581

1
10

12
116

18
1,188

18
1,188

0.08
0.08

2
99

$26.65 $
$26.65 $

40
2,639

1

37

53

53

0.08

4

$26.65 $

119

3

33

100

100

0.08

8

$26.65 $

221

0

31

0

-

0.08

-

$26.65 $

-

23

152

3,499

3,499

0.08

292

$26.65 $

7,771

5

111

553

553

0.08

46

$26.65 $

1,229

Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
Large
All
Small
SECTOR 6. CCA PRODUCERS
Large
All
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
Large
All
Small
SECTOR 8. PAINT AND COATING PRODUCERS
Large
All
Small
SECTOR 9. PRINTING INK PRODUCERS
Large
All
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
Large
All
Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
All
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
All
Small
SECTOR 14. IRON AND STEEL MILLS
Large
All
Small
Large
Carbon Steel
Small
SECTOR 14.B FORGING INDUSTRY
Large
All
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
All
Small

Page 182

SECTOR 17. CHROMIUM DYE PRODUCERS

ITEM 12 COST

CLWAGE

BURDEN HOURS

MEDRECORD

RESPONSES

RESPONDENTS

#PLANTS

POTEXEMP

SIZE

VARIABLES

Table 32

Large

0

2

0

-

0.08

-

$26.65 $

-

Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
Large
All
Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
All
Small
SECTOR 20. TEXTILE DYEING
Large
All
Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
All
Small
Large
Fiber, Flat, and Container Glass
Small
SECTOR 22. PRINTING
Large
All
Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
All
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
All
Small
SECTOR 26. WOODWORKING
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. SOLID WASTER INCINERATION
Large
All
Small
State

0

1

0

-

0.08

-

$26.65 $

-

0

0

0

-

0.08

-

$26.65 $

-

3

5

14

14

0.08

1

$26.65 $

31

0

212

0

-

0.08

-

$26.65 $

-

0

1,600

0

-

0.08

-

$26.65 $

-

0

307

0

-

0.08

-

$26.65 $

-

0

623

0

-

0.08

-

$26.65 $

-

1

8

10

10

0.08

1

$26.65 $

22

0
14

24
111

0
1,572

1,572

0.08
0.08

131

$26.65 $
$26.65 $

3,491

3

6

17

17

0.08

1

$26.65 $

37

0

78

0

-

0.08

-

$26.65 $

-

0

312

0

-

0.08

-

$26.65 $

-

1

193

227

227

0.08

19

$26.65 $

505

0
12

0
25

0
293

293

0.08
0.08

24

$26.65 $
$26.65 $

651

6

5

28

28

0.08

2

$26.65 $

62

0

5

0

-

0.08

-

$26.65 $

-

0

0

0

-

0.08

-

$26.65 $

-

1

143

109

109

0.08

9

$26.65 $

243

0
0

76
36

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

0
2

32
1,232

0
3,059

3,059

0.08
0.08

255

$26.65 $
$26.65 $

6,794

1
1

4,932
17

4,082
11

4,082
11

0.08
0.08

340
1

$26.65 $
$26.65 $

9,064
25

1

62

41

41

0.08

3

$26.65 $

90

0

39

0

-

0.08

-

$26.65 $

-

0
0

47
0

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

All

Page 183

Government

Hazardous Waste Site Work

Refractory Brick Restoration
Average/Total

ITEM 12 COST

CLWAGE

BURDEN HOURS

MEDRECORD

RESPONSES

RESPONDENTS

#PLANTS
0

24

0

-

0.08

-

$26.65 $

-

2

18

35

35

0.08

3

$26.65 $

78

0

0

0

-

0.08

-

$26.65 $

-

0

54

0

-

0.08

-

$26.65 $

-

Small
State Gov't

0
0

247
16

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

Local Gov't
Large

0
0

93
43

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

Small
State Gov't

0
0

180
1

0
0

-

0.08
0.08

-

$26.65 $
$26.65 $

-

Local Gov't
Large

0
11

252
47

0
524

524

0.08
0.08

44

$26.65 $
$26.65 $

1,163

1

185
73,274

207
116,188

Local
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
Large
All
Small
SECTOR 31. CONSTRUCTION
Large
Industrial Rehabilitation & Maintenance

POTEXEMP

SIZE

VARIABLES

Table 32

Small

Page 184

207
116,188

0.08
0.08

17
9,682

$26.65 $
$26.65

460
$258,025

Table 33

TABLE 33: Clerical Time and Cost to Provide the PLHCP’s Written Medical Opinion to Employee and to Establish and Maintain Record
for Air Monitoring Data and Medical  Surveillance
The Standard requires that employers maintain exposure and medical surveillance records. As part of the medical record, employers
must maintain a copy of the PLHCP's written opinion. OSHA assumes that the 5 minutes for recordkeeping includes the time it takes for
employers to provide a copy of the PLHCP's written opinion to the employee.
BURDEN HOURS = RECTIME * EMPEXP * #PLANTS
COST = BURDEN HOURS x CLWAGE

SECTOR 1. ELECTROPLATING

ITEM 12 COST

CLWAGE

HOURS

RECTIME

RESPONSES

#PLANTS

RESPONDENTS

Time,5 mins per record for exposed workers
Exposed employees to chromium or employees exposed dermally
Number of Plants
Clerical wage Rate

EMPEXP

VARIABLES

RECTIME =
EMPEXP =
#PLANTS =
CLWAGE =

SIZE

Variables:

Large

13

1,752

22,781

22,781 0.083

1,898

$26.65 $

50,588

Small

3

3,297

9,891

9,891 0.083

824

$26.65 $

21,964

Large

3

8,672

26,016

26,016 0.083

2,168

$26.65 $

57,772

Small
SECTOR 2B. MILD STEEL WELDING
Large

3

12,316

36,949

36,949 0.083

3,079

$26.65 $

82,049

4

11,798

47,192

47,192 0.083

3,933

$26.65 $

104,794

Small

1

14,551

14,551

14,551 0.083

1,213

$26.65 $

32,312

Large

45

1,562

70,280

70,280 0.083

5,857

$26.65 $

156,063

2

7,152

14,303

14,303 0.083

1,192

$26.65 $

31,762

70

2

130

130 0.083

11

$26.65 $

289

0
Small
SECTOR 5. CHROMATE PIGMENT PROCEDURES
20
Large
ALL

0

-

- 0.083

-

$26.65 $

-

2

33

33 0.083

3

$26.65 $

74

Small

2

1

2

2 0.083

0.1

$26.65 $

4

Large

8

3

21

21 0.083

2

$26.65 $

46

0
Small
SECTOR 7. CHROMIUM CATALYST PRODUCTERS
59
Large
ALL

0

-

- 0.083

-

$26.65 $

-

5

275

275 0.083

23

$26.65 $

610

0

0

-

- 0.083

-

$26.65 $

-

17

78

1,330

1,330 0.083

111

$26.65 $

2,953

ALL
SECTOR 2A. WELDING
ALL

SECTOR 3. PAINTING
ALL

Small
SECTOR 4. PRODUCERS OF CHROMATES
Large
ALL

SECTOR 6. CCA PRODUCERS
ALL

Small
SECTOR 8. PAINT AND COATING PRODUCERS
Large
ALL

Page 185

ITEM 12 COST

CLWAGE

HOURS

RECTIME

RESPONSES

RESPONDENTS

#PLANTS

EMPEXP

SIZE

VARIABLES

Table 33

7

123

860

860 0.083

72

$26.65 $

1,911

15

2

33

33 0.083

3

$26.65 $

74

15
7
Small
SECTOR 10. PLASTIC COLORANT PRODUCERS AND USERS
5
79
Large
ALL

111

111 0.083

9

$26.65 $

246

396

396 0.083

33

$26.65 $

879

Small
SECTOR 9. PRINTING INK PRODUCERS
Large
ALL

Small
SECTOR 11. PLATING MIXTURE PRODUCERS
Large
ALL
Small
SECTOR 13. CHROMIUM METAL PRODUCERS
Large
ALL
Small
SECTOR 14. IRON AND STEEL MILLS
Large
ALL
Small
SECTOR 15. IRON AND STEEL FOUNDRIES
Large
ALL
Small
SECTOR 17. CHROMIUM DYE PRODUCERS
Large
ALL

1

39

39

39 0.083

3

$26.65 $

86

17

6

101

101 0.083

8

$26.65 $

223

4

4

16

16 0.083

1

$26.65 $

35

49

1

51

51 0.083

4

$26.65 $

113

0

0

-

- 0.083

-

$26.65 $

-

48

2,207

105,944

105,944 0.083

8,829

$26.65 $

235,260

3

25

75

75 0.083

6

$26.65 $

165

98

152

14,911

14,911 0.083

1,243

$26.65 $

33,111

98

111

10,844

10,844 0.083

904

$26.65 $

24,081

2

67

67 0.083

6

$26.65 $

150

27

6
Small
SECTOR 18. CHROMIUM SULFATE PRODUCTERS
0
Large
ALL

1

5

5 0.083

0.4

$26.65 $

11

0

-

- 0.083

-

$26.65 $

-

2

5

9

9 0.083

1

$26.65 $

21

0

212

-

- 0.083

-

$26.65 $

-

Small

0

1,600

-

- 0.083

-

$26.65 $

-

Large

52

307

15,962

15,962 0.083

1,330

$26.65 $

35,445

2

623

1,246

1,246 0.083

104

$26.65 $

2,767

6

119

712

712 0.083

59

$26.65 $

1,580

Small

1

31

31

31 0.083

3

$26.65 $

69

Large

37

78

2,883

2,883 0.083

240

$26.65 $

6,402

Small
SECTOR 19. CHEMICAL DISTRIBUTORS
Large
ALL
SECTOR 20. TEXTILE DYEING
ALL

Small
SECTOR 21. COLORED GLASS PRODUCERS
Large
ALL
SECTOR 22. PRINTING
ALL

Page 186

ITEM 12 COST

CLWAGE

HOURS

RECTIME

RESPONSES

RESPONDENTS

#PLANTS

EMPEXP

SIZE

VARIABLES

Table 33

2

312

623

623 0.083

52

$26.65 $

1,384

35

193

6,822

6,822 0.083

568

$26.65 $

15,148

18
1

0
25

29

- 0.083
29 0.083

2

$26.65 $
$26.65 $

65

0

5

-

- 0.083

-

$26.65 $

-

10

5

52

52 0.083

4

$26.65 $

115

Small

0

0

-

- 0.083

-

$26.65 $

-

Large

0

1,428

-

- 0.083

-

$26.65 $

-

0

5,102

-

- 0.083

-

$26.65 $

-

0

39

-

- 0.083

-

$26.65 $

-

1
Small
SECTOR 30. SUPERALLOY PRODUCERS AND USERS
38
Large
ALL

71

71

71 0.083

6

$26.65 $

158

18

666

666 0.083

56

$26.65 $

1,480

Small

0

0

-

- 0.083

-

$26.65 $

-

Large

27

54

1,443

1,443 0.083

120

$26.65 $

3,205

Small
State Gov't

1
1

247
16

276
17

276 0.083
17 0.083

23
1

$26.65 $
$26.65 $

612
39

Local Gov't
Large

1
16

93
43

104
665

104 0.083
665 0.083

9
55

$26.65 $
$26.65 $

230
1,478

Small
State Gov't

3
2

180
1

603
2

603 0.083
2 0.083

50
0.2

$26.65 $
$26.65 $

1,339
4

Local Gov't
Large

3
16

252
47

846
733

846 0.083
733 0.083

71
61

$26.65 $
$26.65 $

1,879
1,629

1

185
75,237

207
411,209

207 0.083
411,209 0.083

17
34,267

$26.65 $
$26.65 $

460
913,216

Small
SECTOR 24. CHROMIUM CATALYST USERS
Large
ALL

Catalyst Service Companies

Small
Large

Small
SECTOR 25. REFRACTORY BRICK PRODUCERS
Large
ALL
SECTOR 26. WOODWORKING
ALL

Small
SECTOR 27. SOLID WASTER INCINERATION
Large
ALL

SECTOR 31. CONSTRUCTION

Industrial Rehabilitation &
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration &
Maintenance
Average/Total

Small

Page 187


File Typeapplication/pdf
AuthorOSHA_User
File Modified2019-11-21
File Created2019-11-21

© 2024 OMB.report | Privacy Policy