18 Cfr 40

18 CFR 40.pdf

FERC-725B3, Order in RD19-3-000, (Mandatory Reliability Standards for Critical Infrastructure Protection [CIP] Reliability Standards)

18 CFR 40

OMB: 1902-0315

Document [pdf]
Download: pdf | pdf
Pt. 40

18 CFR Ch. I (4–1–17 Edition)

within the region are just, reasonable,
not unduly discriminatory or preferential, and in the public interest; and
(4) Any other responsibilities requested by the Commission.
(d) The Commission may give deference to the advice of a Regional Advisory Body established by the Commission that is organized on an Interconnection-wide basis.

ability Standards must be included in
the posting.

PART 40—MANDATORY RELIABILITY
STANDARDS FOR THE BULKPOWER SYSTEM

Sec.
41.1
41.2
41.3
41.4
41.5
41.6
41.7
41.8

Sec.
40.1 Applicability.
40.2 Mandatory Reliability Standards.
40.3 Availability of Reliability Standards.

PART 41—ACCOUNTS, RECORDS,
MEMORANDA AND DISPOSITION
OF CONTESTED AUDIT FINDINGS
AND PROPOSED REMEDIES
DISPOSITION OF CONTESTED AUDIT FINDINGS
AND PROPOSED REMEDIES

CERTIFICATION OF COMPLIANCE WITH
ACCOUNTING REGULATIONS

AUTHORITY: 16 U.S.C. 824o.
SOURCE: Order 693, 72 FR 16598, Apr. 4, 2007,
unless otherwise noted.

§ 40.1

Applicability.

(a) This part applies to all users,
owners and operators of the BulkPower System within the United
States (other than Alaska or Hawaii),
including, but not limited to, entities
described in section 201(f) of the Federal Power Act.
(b) Each Reliability Standard made
effective by § 40.2 must identify the
subset of users, owners and operators
of the Bulk-Power System to which a
particular Reliability Standard applies.
§ 40.2 Mandatory
ards.

Reliability

Stand-

(a) Each applicable user, owner or operator of the Bulk-Power System must
comply with Commission-approved Reliability Standards developed by the
Electric Reliability Organization.
(b) A proposed modification to a Reliability Standard proposed to become
effective pursuant to § 39.5 of this Chapter will not be effective until approved
by the Commission.

lpowell on DSK54DXVN1OFR with $$_JOB

§ 40.3 Availability of Reliability Standards.
The Electric Reliability Organization
must post on its Web site the currently
effective Reliability Standards as approved and enforceable by the Commission. The effective date of the Reli-

Notice to audited person.
Response to notification.
Shortened procedure.
Form and style.
Verification.
Determination.
Assignment for oral hearing.
Burden of proof.

41.10
41.11
41.12

Examination of accounts.
Report of certification.
Qualifications of accountants.

AUTHORITY: 16 U.S.C. 791a–825r, 2601–2645; 42
U.S.C. 7101–7352.
SOURCE: Order 141, 12 FR 8500, Dec. 19, 1947,
unless otherwise noted.
CROSS REFERENCE: For rules of practice
and procedure, see part 385 of this chapter.

DISPOSITION OF CONTESTED AUDIT
FINDINGS AND PROPOSED REMEDIES
§ 41.1 Notice to audited person.
(a) Applicability. This part applies to
all audits conducted by the Commission or its staff under authority of the
Federal Power Act except for Electric
Reliability Organization audits conducted pursuant to the authority of
part 39 of the Commission’s regulations.
(b) Notice. An audit conducted by the
Commission’s staff under authority of
the Federal Power Act may result in a
notice of deficiency or audit report or
similar document containing a finding
or findings that the audited person has
not complied with a requirement of the
Commission with respect to, but not
limited to, the following: A filed tariff
or tariffs, contracts, data, records, accounts, books, communications or papers relevant to the audit of the audited person; matters under the Standards of Conduct or the Code of Conduct;
and the activities or operations of the

372

VerDate Sep<11>2014

16:16 May 22, 2017

Jkt 241061

PO 00000

Frm 00382

Fmt 8010

Sfmt 8010

Q:\18\18V1.TXT

31


File Typeapplication/pdf
File Modified2017-07-07
File Created2017-07-07

© 2024 OMB.report | Privacy Policy