Burden Calculation Tables

1056t13.xlsx

NSPS for Nitric Acid Plants (40 CFR part 60, subparts G and Ga) (Renewal)

Burden Calculation Tables

OMB: 2060-0019

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Nitric Acid Plants (40 CFR Part 60, Subparts G and Ga) (Renewal)

















117.92 147.4 57.02





Burden Item (A)
Respondent Hours per Occurrence
(B)
Number of Occurrences per Respondent per Year
(C)
Hours per Respondent per Year
(C=AxB)
(D)
Number of Respondents per Year a
(E)
Technical Hours per Year
(E=CxD)
(F)
Management Hours per Year
(F=Ex0.05)
(G)
Clerical Hours per Year
(G=Ex0.1)
(H)
Total Labor Costs per Year, b





1. Applications N/A











2. Survey and Studies N/A











3. Reporting Requirements












Sources Constructed or Modified after 10/14/2011 – Subpart Ga












A. Familiarize with regulatory requirements c 1 1 1 8 8 0.4 0.8 $1,047.94




B. Required Activities












Initial performance test 180 1 180 1.2 216 10.8 21.6 $28,294.27




Demonstration of CERMS 180 1 180 1.2 216 10.8 21.6 $28,294.27




Repeat performance test d 180 1 180 0.24 43.2 2.16 4.32 $5,658.85




Daily monitoring of CERMS 0.5 330 165 1.2 198 9.9 19.8 $25,936.42




C. Create Information See 3B











D. Gather Existing Information See 3E











E. Write Report












Notification of construction/reconstruction 2 1 2 1.2 2.4 0.12 0.24 $314.38




Notification of actual startup 2 1 2 1.2 2.4 0.12 0.24 $314.38




Notification of initial performance test 2 1 2 1.2 2.4 0.12 0.24 $314.38




Notification of demonstration of CERMS 2 1 2 1.2 2.4 0.12 0.24 $314.38




Report of performance test 2 1 2 1.2 2.4 0.12 0.24 $314.38




Report of noncompliance with NOX emission standard e 2 1 2 0.8 1.6 0.08 0.16 $209.59




Subtotal for Reporting Requirements - Subpart Ga



799 $91,013




Existing Sources – Subpart G












A. Familiarize with regulatory requirements c 1 1 1 24 24 1.2 2.4 $3,143.81




B. Write Report












Notification of physical/operational changes f 8 1 8 0.2 1.6 0.08 0.16 $209.59




Semiannual reports g 8 2 16 24 384 19.2 38.4 $50,300.93




Subtotal for Reporting Requirements- Subpart G



471 $53,654




Total Reporting Requirements for Subparts G and Ga



1,270 $145,000




4. Recordkeeping Requirements












A. Familiarize with regulatory requirements See 3A











B. Plan activities See 3B











C. Implement activities See 3B











D. Develop record system N/A











Subpart Ga: Sources Constructed or Modified after 10/14/2011












E Time to Enter Information












Records of noncompliance e 0.5 1 0.5 0.8 0.4 0.02 0.04 $52.40




Daily production and flow rates 8 1 8 8 64 3.2 6.4 $8,383.49




Data collection 0.13 330 41.25 8 330 16.50 33.00 $43,227.36




Records of occurrence of startup, shutdown and malfunctions 8 1 8 8 64 3.2 6.4 $8,383.49




F. Time to Train Personnel












Train personnel for CERMS maintenance 16 2 32 8 256 12.8 25.6 $33,533.95




Subtotal for Recordkeeping Requirements - Subpart Ga



822 $93,581




Subpart G: Existing Sources












E. Time to Enter Information












Records of daily production rates and hours of operation 8 1 8 24 192 9.6 19.2 $25,150.46




Records of occurrence of startup, shutdown and malfunctions 8 1 8 24 192 9.6 19.2 $25,150.46




Records of performance test data 80 1 80 0 0 0 0 $0




G. Audits N/A











Subtotal for Recordkeeping Requirements - Subpart G



442 $50,301




Total Recordkeeping Requirements for Subparts G and Ga



1263 $143,900




Total Labor Burden and Cost for Subpart Ga (rounded) h



1,620 $185,000




Total Labor Burden and Cost for Subpart G (rounded) h



913 $104,000




TOTAL LABOR BURDEN AND COST (rounded) h



2,530 $289,000




TOTAL CAPITAL AND O&M COST (rounded) h






$2,750,000


46 hrs per response
GRAND TOTAL (rounded) h






$3,040,000


















Assumptions












a We have assumed there are approximately 32 respondents (24 subject to Subpart G and 8 subject to Subpart Ga), with 1.2 new sources per year becoming subject to the rule over the next three years.












b This ICR uses the following labor rates: $117.92 for technical, $147.40 for managerial, and $57.02 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2018, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.












c We have assumed that each respondent will have to familiarize with regulatory requirements each year.












d We assume that 20% of sources will have to repeat performance tests.












e We assume 10% of sources will report non-compliance.












f We assume 1 existing facility will be reconstructed or modified over the next 5 years (0.2 respondents per year).












g We assume it will take 8 hours to write semiannual reports.












h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.













Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Nitric Acid Plants (40 CFR Part 60, Subparts G and Ga) (Renewal)












48.75 65.71 26.38
Burden Item (A)
EPA Hours per Occurrence
(B)
Number of Occurrences per Plant per Year
(C)
EPA Hours per Respondent per Year
(C=AxB)
(D)
Number of Respondents per Year a
(E)
Technical Hours per Year
(E=CxD)
(F)
Management Hours per Year
(F=Ex0.05)
(G)
Clerical Hours per Year
(G=Ex0.1)
(H)
Total Labor Costs per Year, b
Subpart Ga a   







Required Activities







Observe initial performance test 24 1 24 1.2 28.8 1.44 2.88 $1,574.60
Repeat performance test c 24 0.2 4.8 1.2 5.76 0.29 0.58 $314.92
Report Review



0 0 0 $0.00
Notification of construction/reconstruction 2 1 2 1.2 2.4 0.12 0.24 $131.22
Notification of actual startup 0.5 1 0.5 1.2 0.6 0.03 0.06 $32.80
Notification of initial performance test 0.5 1 0.5 1.2 0.6 0.03 0.06 $32.80
Review test results 8 1 8 1.2 9.6 0.48 0.96 $524.87
Review test NOX noncompliance reports d 8 1 8 0.8 6.4 0.32 0.64 $349.91
Subtotal for Subpart Ga



62 $2,961
Subpart G 







Report Review







Semiannual reports a 2 2 4 24 96 4.8 9.6 $5,248.66
Subtotal for Subpart G



110 $5,250
TOTAL ANNUAL BURDEN and COST (rounded) e



173 $8,210









Assumptions







a We have assumed there are approximately 32 respondents (24 subject to Subpart G and 8 subject to Subpart Ga), with 1.2 new sources per year becoming subject to the rule over the next three years







b This ICR uses the following average hourly labor rates: $65.71 for managerial (GS-13, Step 5, $41.07 + 60%), $48.75 (GS-12, Step 1, $30.47 + 60%) for technical and $26.38 (GS-6, Step 3, $16.49 + 60%) for clerical. These rates are from the Office of Personnel Management (OPM), 2018 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.







c We assume that 20% of new sources will have to repeat performance tests.







d We assume 10% of sources will report non-compliance.







e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.