Table 1: Annual Respondent Burden and Cost – NSPS for Steel Plants: Electric Arc Furnaces and Argon Oxygen Decarburization Vessels (40 CFR Part 60, Subparts AA and AAa) (Renewal) |
|||||||||||
Burden Item | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||
Respondent Hours per Occurrence | Number of Occurrences per Respondent per Year | Hours per Respondent per Year (A x B) |
Number of Respondents per Year a | Technical Hours per Year (C x D) |
Management Hours per Year (E x 0.05) |
Clerical Hours per Year (Ex0.1) | Total Labor Costs per Year, $ b | ||||
1. Applications | N/A | Labor Rates: | |||||||||
2. Survey and Studies | N/A | Management | $147.40 | ||||||||
3. Reporting Requirements | Technical | $117.92 | |||||||||
A. Read and understand rule requirements | 1 | 1 | 1 | 100.66 | 100.66 | 5.033 | 10.066 | $13,185.65 | Clerical | $57.02 | |
B. Required activities | |||||||||||
Initial Performance tests c | 364 | 1 | 364 | 0.33 | 121.212 | 6.0606 | 12.1212 | $15,877.80 | |||
Repeat Performance tests c | 364 | 0.05 | 18.2 | 0.33 | 6.0606 | 0.30 | 0.61 | $793.89 | |||
Monitoring of operations and emissions d, e | ------------------------See 4E---------------------------- | ||||||||||
D. Gather Existing Information | -------------------See 3B and 4E----------------------- | ||||||||||
E. Write report | |||||||||||
Notification of construction/modification | 2 | 1 | 2 | 0.33 | 0.666 | 0.0333 | 0.0666 | $87.24 | |||
Notification of actual startup | 2 | 1 | 2 | 0.33 | 0.666 | 0.0333 | 0.0666 | $87.24 | |||
Notification of initial performance test | 2 | 1 | 2 | 0.33 | 0.666 | 0.0333 | 0.0666 | $87.24 | |||
Reports of performance test results | ------------------------See 3B---------------------------- | ||||||||||
Semiannual reports f | 16 | 2 | 32 | 100.66 | 3221.12 | 161.056 | 322.112 | $421,940.95 | |||
Subtotal for Reporting Requirements | 3,969 | $452,060 | |||||||||
4. Recording Requirements | |||||||||||
A. Read and understand rule requirements | ------------------------See 3A---------------------------- | ||||||||||
B. Plan activities | ------------------------See 3B---------------------------- | ||||||||||
C. Implement activities | ------------------------See 3B---------------------------- | ||||||||||
D. Develop record system | N/A | ||||||||||
E. Time to enter and transmit information: | |||||||||||
Records of daily monitoring of operations d | 0.75 | 350 | 262.5 | 100.66 | 26423.25 | 1321.1625 | 2642.325 | $3,461,234.36 | |||
Records of daily emissions monitoring by a certified observer e, h | 0.5 | 350 | 175 | 48.62 | 8508.2865 | 425.41 | 850.83 | $1,114,517.47 | |||
Records of COMS g, i | 0.5 | 350 | 175 | 26.82 | 4692.7692 | 234.64 | 469.28 | $614,715.22 | |||
Records of BLDS h, i | 0.5 | 350 | 175 | 13.45 | 2353.4308 | 117.67 | 235.34 | $308,280.61 | |||
Records of static pressure on furnace h | 0.5 | 350 | 175 | 52.04 | 9107.2135 | 455.36 | 910.72 | $1,192,972.11 | |||
F. Time to train personnel | N/A | ||||||||||
G. Time for audits | N/A | ||||||||||
Subtotal for Recordkeeping Requirements | 58,748 | $6,691,720 | 203 | responses | |||||||
Total Labor Burden and Cost (rounded) j | 62,700 | $7,140,000 | 309 | hr/response | |||||||
Total Capital and O&M Cost (rounded) j | $207,000 | ||||||||||
Grand Total (rounded) j | $7,350,000 | ||||||||||
Assumptions: | |||||||||||
a We have assumed that there are an annual average of 100.33 sources currently subject to the NSPS, subparts AA and AAa. We have further assumed that one minimill will become subject to the standard over the three-year period of this ICR (0.33 new respondents per year). Therefore, the average number of respondents per year is estimated to be 100.66. | |||||||||||
b This ICR uses the following labor rates: $147.40 per hour for Executive, Administrative, and Managerial labor; $117.92 per hour for Technical labor, and $57.02 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2018, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry. | |||||||||||
c We have assumed that existing sources are in compliance with initial rule requirements including the initial performance test and notification requirements. We have assumed that 5 percent of the sources would repeat performance tests due to failure. | |||||||||||
d Daily monitoring of operations includes time and duration of each charge, time and duration of each tap, flow rate data and pressure data. In addition, sources are required to conduct monthly operational status checks of the equipment (e.g., physical appearance, pressure sensors, dampers, damper switches). | |||||||||||
e Daily emissions monitoring includes stack emissions monitoring using a continuous opacity monitor if the source has an EAF equipped with a direct shell evacuation system (DEC) and uses a negative pressure baghouse and has not elected the alternative option. In addition, the source is required to conduct fugitive emissions monitoring using a furnace static pressure monitoring device or by electing to perform shop opacity observations using a certified visible emissions observer, it the source has an EAF equipped with a DEC. | |||||||||||
f Sources are required to provide semiannual reports of opacity observations and operational values (i.e., furnace static pressure, fan motor amperes) that exceed or are below (i.e, flow rates) those established during the performance test, and of all shop opacity observations in excess of the emission limit. | |||||||||||
g We have assumed that the new source will equipped its EAFs with a DEC system and use a positive pressure baghouse, and therefore, will not be required to install a continuous opacity monitor (COMS). | |||||||||||
h We have assumed that approximately 51.7 percent of the respondents (or 52.04 respondents) will choose to comply with the fugitive emissions monitoring requirements by measuring the furnace static pressure continuously and 48.3 percent (48.62 respondents) will choose the alternative option of daily opacity shop observations by a certified visible emission observer couple with the use of bag leak detection systems (BLDS). | |||||||||||
i We have assumed that approximately 40 percent of respondents use negative pressure baghouses. Of these, 66.6 percent (26.82 respondents) use COMS to measure stack emissions and 33.3 percent (13.45 respondents) have elected to use the alternative option of using BLDS monitoring couple with visible emissions observations instead of using COMS. | |||||||||||
j Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NSPS for Steel Plants: Electric Arc Furnaces and Argon Oxygen Decarburization Vessels (40 CFR Part 60, Subparts AA and AAa) (Renewal) | |||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||
EPA Hours per Occurrence | Number of Occurrences per Plant Per Year | EPA Hours per Year (AxB) |
Plants per Year a | Technical Hours per Year (CxD) |
Management Hours per Year (Ex0.05) |
Clerical Hours per Year (Ex0.1) |
Costs per Year, $ b | ||||
Notification of construction/modification | 2 | 1 | 2 | 0.33 | 0.666 | 0.0333 | 0.0666 | $36.41 | Labor Rates: | ||
Notification of actual startup | 1 | 1 | 1 | 0.33 | 0.333 | 0.02 | 0.03 | $18.21 | Management | $65.71 | |
Notification of performance test c | 0.5 | 1.05 | 0.525 | 0.33 | 0.174825 | 0.01 | 0.02 | $9.56 | Technical | $48.75 | |
Initial performance test | 24 | 1 | 24 | 0.33 | 7.992 | 0.40 | 0.80 | $436.95 | Clerical | $26.38 | |
Repeat Performance test c | 24 | 0.05 | 1.2 | 0.33 | 0.3996 | 0.02 | 0.04 | $21.85 | |||
Review Performance Test results c | 8 | 1.05 | 8.4 | 0.33 | 2.7972 | 0.14 | 0.28 | $152.93 | |||
Notification of COMS Demonstration | 0.5 | 1 | 0.5 | 0.33 | 0.1665 | 0.01 | 0.02 | $9.10 | |||
Semiannual reports | 8 | 2 | 16 | 100.66 | 1610.56 | 80.528 | 161.056 | $88,054.95 | |||
TOTAL (rounded)d | 1,870 | $88,700 | |||||||||
Assumptions | |||||||||||
a We have assumed that there are an annual average of 100.33 sources currently subject to the NSPS, subparts AA and AAa. We have further assumed that one minimill will become subject to the standard over the three-year period of this ICR (0.33 new respondents per year). Therefore, the average number of respondents per year is estimated to be 100.66. | |||||||||||
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $65.71 (GS-13, Step 5, $41.07 + 60%), Technical rate of $48.75 (GS-12, Step 1, $30.47 + 60%), and Clerical rate of $26.38 (GS-6, Step 3, $16.49 + 60%). These rates are from the Office of Personnel Management (OPM) “2018 General Schedule” which excludes locality rates of pay. | |||||||||||
c We have assumed that 5 percent of the sources would repeat performance tests due to failure. | |||||||||||
d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) |
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, |
(B X C) | (E X F) | |||||
Continuous Opacity Monitors | $25,000 | 0 | $0 | $7,500 | 26.82 | $201,119 |
Furnace Static Pressure Monitors | $300 | 0.33 | $99 | $0 | 52.04 | $0 |
Volumetric Flow Rate Monitor | $18,000 | 0.33 | $5,940 | $0 | 100.66 | $0 |
TOTAL | $6,039 | $201,119 | ||||
Rounded | $6,040 | $201,000 | ||||
$207,158 | ||||||
Total Annual Responses | ||||||
(A) | (B) | (C) | (D) | (E) | ||
Information Collection Activity | Number of Respondents | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D | ||
Notification of actual startup | 0.33 | 1 | 0 | 0.33 | ||
Notification of construction/ modification | 0.33 | 1 | 0 | 0.33 | ||
Notification of performance test | 0.33 | 1 | 0 | 0.33 | ||
Reports of performance test results | 0.33 | 1.05 | 0 | 0.35 | ||
Semiannual reports | 100.66 | 2 | 0 | 201.3 | ||
Total | 203 |