Burden Calculation Tables

0658t13.xls

NSPS for Pressure Sensitive Tape and Label Surface Coating (40 CFR part 60, subpart RR) (Renewal)

Burden Calculation Tables

OMB: 2060-0004

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Pressure Sensitive Tape and Label Surface Coating Operations (40 CFR Part 60, Subpart RR) (Renewal)



























$117.92 $147.40 $57.02



Burden item (A) Person-hours per occurrence (B) No. of occurrences per respondent per year (C) Person-hours per respondent per year (C=AxB) (D) Respondents per year a (E) Technical person-hours per year (E=CxD) (F) Management person-hours per year (Ex0.05) (G) Clerical person-hours per year (Ex0.1) (H) Total costs per Year b


1. Applications N/A









2. Survey and Studies N/A









3. Reporting Requirements










A. Familiarization with the regulatory requirements c 0.87 1 0.87 45 39.15 1.96 3.92 $5,128.34


B. Required activities










Initial performance test 52.17 1 52.17 1 52.17 2.61 5.22 $6,833.85


Repeat performance test d 52.17 1 52.17 0.2 10.43 0.52 1.04 $1,366.77


C. Create information See 3B



D. Gather existing information See 3E



E. Write report










Notification of construction/reconstruction 1.74 1 1.74 1 1.74 0.09 0.17 $227.93


Notification of actual startup 1.74 1 1.74 1 1.74 0.09 0.17 $227.93


Notification of initial performance test 1.74 1 1.74 1 1.74 0.09 0.17 $227.93


Report of performance test See 3B



Excess emission reports










VOC emission reports e 4.35 2 8.7 45 391.5 19.58 39.15 $51,283.37


Temperature reports f 3.48 2 6.96 36 250.56 12.53 25.06 $32,821.36


Subtotal for Reporting Requirements



861 $98,117.46


4. Recordkeeping Requirements










A. Familiarization with the regulatory requirements See 3A



B.  Plan activities See 4C



C. Implement activities See 3B



Monthly performance test g 0.87 12 10.44 45 469.8 23.49 46.98 $61,540.04


D. Develop record system N/A









D.  Develop record system N/A









E.  Time to enter information










Records of operating parameters h 0.22 250 55 45 2,475 123.75 247.5 $324,205.20


F.   Train personnel N/A









G.  Audits N/A









Subtotal for Recordkeeping Requirements



3,387 $385,745.24


TOTAL LABOR BURDEN AND COST (rounded) i 4,250 $484,000


TOTAL CAPITAL AND O&M COSTS (rounded)i






$88,000


GRAND TOTAL (rounded): i






$572,000
26 hr/resp*
























Assumptions:










a We have assumed that the average number of respondents potentially subject to this rule is 45. There will be one additional new source per year over the three-year period of this ICR.










b This ICR uses the following labor rates: $147.40 per hour for Executive, Administrative, and Managerial labor; $117.92 per hour for Technical labor, and $57.02










per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2018, Table 2. Civilian Workers, by occupational and industry group. The rates are from column 1, Total compensation. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.










c We have assumed that it will take 0.87 hours for a new respondent to read instructions.










d We have assumed that 20 percent of respondents will have to repeat performance tests because of failure.










e We have assumed that each source submits one excess emission report every year, in addition to the required semiannual report.










f We have assumed that 80 percent of sources will use incineration to control emissions.










g We assume that each respondent will take 0.87 hours once per month to record performance test.










h We assume that each respondent will take 0.22 hours 250 time per year to record operating parameters.










i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Pressure Sensitive Tape and Label Surface Coating Operations (40 CFR Part 60, Subpart RR) (Renewal)





















48.75 65.71 26.38
Activity (A) EPA person-hours per occurrence (B) No. of occurrences per plant per year (C) EPA person-hours per plant per year (C=AxB) (D) Plants per Year a (E) Technical person-hours per year (E=CxD) (F) Management person-hours per year (Ex0.05) (G) Clerical person-hours per year (Ex0.1) (H) Total Cost, $ b
New facility







Initial performance test 20.87 1 20.87 1 20.87 1.04 2.09 $1,141.04
Repeat performance test/observed 20.87 1 20.87 0.2 4.17 0.21 0.42 $228.21
Review reports c







Notification of construction 1.74 1 1.74 1 1.74 0.09 0.17 $95.13
Notification of initial startup 0.43 1 0.43 1 0.43 0.02 0.04 $23.51
Notification of actual startup 0.43 1 0.43 1 0.43 0.02 0.04 $23.51
Notification of initial performance test 0.43 1 0.43 1 0.43 0.02 0.04 $23.51
Review test results 6.96 1 6.96 1 6.96 0.35 0.70 $380.53
Existing Plant







VOC emission reports d 1.74 2 3.48 45 156.60 7.83 15.66 $8,561.87
Temperature reports e, f 1.74 2 3.48 36 125.28 6.26 12.53 $6,849.50
TOTAL ANNUAL LABOR BURDEN AND COSTS (rounded) g



364 $17,300



























Assumptions:







a We have assumed that the average number of respondents potentially subject to this rule is 45. There will be one additional new source per year over the three-year period of this ICR.







b Labor rates for Federal agency personnel were applied to State/Local agencies, and are based on the average hourly labor rate as follows: Technical $48.75 (GS-12, Step 1, $30.47 + 60%);







Managerial $65.71 (GS-13, Step 5, $41.07 + 60%); and Clerical $26.38 (GS-6, Step 3, $26.38 + 60%). This ICR assumes that







Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the OPM, 2018 General Schedule,







which excludes locality rates of pay. The rates have been applied to local agencies and have been increased by 60 percent to account for the benefit packages







available to government employees.







c We assume that each of the new facilities will submit initial notifications.







d We assume that each source submits one excess emission report every year, in addition to the required semiannual report.







e We assume that 80 percent of sources use incineration.







f We assume that temperature reports are conducted two times per year.







g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







File Typeapplication/vnd.ms-excel
AuthorGGibson
Last Modified ByEric Schultz
File Modified2019-06-28
File Created2009-11-16

© 2024 OMB.report | Privacy Policy