NSPS for Secondary Lead Smelters (40 CFR part 60, subpart L) (Renewal)

ICR 201904-2060-001

OMB: 2060-0080

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2019-04-12
Supporting Statement A
2019-04-12
IC Document Collections
ICR Details
2060-0080 201904-2060-001
Active 201602-2060-003
EPA/OAR 1128.12
NSPS for Secondary Lead Smelters (40 CFR part 60, subpart L) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 05/22/2019
Retrieve Notice of Action (NOA) 04/17/2019
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
05/31/2022 36 Months From Approved 05/31/2019
12 0 14
32 0 37
0 0 0

The New Source Performance Standards (NSPS) for Secondary Lead Smelters apply to existing facilities and new secondary lead smelting facilities: any pot furnace of more than 250 kg (550 lb) charging capacity, blast (cupola) furnaces, and reverberatory furnaces. The affected facilities include any facility producing lead from a lead bearing scrap material by smelting to the metallic form. Blast furnace means any furnace used to recover metal from slag. Reverberatory furnaces include furnaces of various types, e.g., stationary, rotating, rocking and tilting. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart L. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  83 FR 24785 05/30/2018
84 FR 16012 04/17/2019
No

1
IC Title Form No. Form Name
NSPS for Secondary Lead Smelters (40 CFR part 60, subpart L) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 12 14 0 0 -2 0
Annual Time Burden (Hours) 32 37 0 0 -5 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
The adjustment decrease in burden from the most recently-approved ICR is due to a decrease in the number of sources. There is a decrease in the number of estimated sources from 14 to 12 due to consolidation within the sector. The reduced number of estimated sources also led to a decrease in the number of responses.

$0
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/17/2019


© 2024 OMB.report | Privacy Policy