NESHAP for Pesticide Active Ingredient Production (40 CFR part 63, subpart MMM) (Renewal)

ICR 201811-2060-016

OMB: 2060-0370

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2018-11-30
IC Document Collections
ICR Details
2060-0370 201811-2060-016
Active 201506-2060-010
EPA/OAR 1807.09
NESHAP for Pesticide Active Ingredient Production (40 CFR part 63, subpart MMM) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/08/2019
Retrieve Notice of Action (NOA) 12/11/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2022 36 Months From Approved 03/31/2019
44 0 44
12,100 0 12,000
26,500 0 236,000

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Pesticide Active Ingredient Production (40 CFR Part 63, Subpart MMM) apply to existing and new facilities engaged in the production of pesticide active ingredients (PAIs) that emit HAPs. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 63, Subpart MMM.

US Code: 42 USC 7401 Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 63639 12/11/2018
No

1
IC Title Form No. Form Name
NESHAP for Pesticide Active Ingredient Production (40 CFR part 63, subpart MMM)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 44 44 0 0 0 0
Annual Time Burden (Hours) 12,100 12,000 0 0 100 0
Annual Cost Burden (Dollars) 26,500 236,000 0 0 -209,500 0
No
No
There is a decrease in the total capital/startup cost and O&M cost due to a correction. This ICR corrects an error in the capital/startup cost calculation in the previous ICR, as existing sources are not expected to incur capital/startup costs associated with purchasing PRD electronic indicators. There is also a small adjustment increase in the estimated labor hours due to a change in assumption. This ICR assumes all existing sources will take some time to re-familiarize with the regulations each year.

$9,920
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/11/2018


© 2024 OMB.report | Privacy Policy