NSPS for Lime Manufacturing (40 CFR Part 60, Subpart HH) (Renewal)

ICR 201810-2060-011

OMB: 2060-0063

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2018-10-22
Supporting Statement A
2018-10-22
IC Document Collections
ICR Details
2060-0063 201810-2060-011
Active 201502-2060-009
EPA/OAR 1167.12
NSPS for Lime Manufacturing (40 CFR Part 60, Subpart HH) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/17/2018
Retrieve Notice of Action (NOA) 11/01/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
12/31/2021 36 Months From Approved 12/31/2018
82 0 82
3,820 0 3,772
61,500 0 61,500

The New Source Performance Standards (NSPS) for Lime Manufacturing (40 CFR Part 60, Subpart HH) apply to each existing and new rotary lime kiln used in the manufacturing of lime. These standards do not apply to facilities used in the manufacture of lime at kraft pulp mills. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart HH.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 54748 10/31/2018
No

1
IC Title Form No. Form Name
NSPS for Lime Manufacturing (40 CFR part 60, subpart HH)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 82 82 0 0 0 0
Annual Time Burden (Hours) 3,820 3,772 0 0 48 0
Annual Cost Burden (Dollars) 61,500 61,500 0 0 0 0
No
No
There is an adjustment increase in the respondent labor hours and costs as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The change in the burden and cost estimates occurred due to a change in assumption. This ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year.

$17,700
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/01/2018


© 2024 OMB.report | Privacy Policy