Download:
pdf |
pdfeCFR — Code of Federal Regulations
Home
gpo.gov
govinfo.gov
Electronic Code of Federal Regulations
e-CFR data is current as of July 20, 2018
Browse / Search Previous
e-CFR Navigation Aids
Browse
Simple Search
Advanced Search
— Boolean
— Proximity
Search History
Search Tips
Corrections
Latest Updates
User Info
FAQs
Agency List
Incorporation By Reference
Title 30 → Chapter II → Subchapter B → Part 250 → Subpart K
Browse Previous | Browse Next
Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart K—Oil and Gas Production Requirements
Contents
General
§250.1150 What are the general reservoir production requirements?
Well Tests and SurveYs
Related Resources
The Code of Federal Regulations (CFR)
annual edition is the codification of the
general and permanent rules published in
the Federal Register by the departments
and agencies of the Federal Government
produced by the Office of the Federal
Register (OFR) and the Government
Publishing Office.
Download the Code of Federal
Regulations in XML.
Download the Electronic Code of Federal
Regulations in XML.
Monthly Title and Part user viewing data
for the e-CFR is available for download in
CSV format.
Parallel Table of Authorities and Rules for
the Code of Federal Regulations and the
United States Code
Text | PDF
Find, review, and submit comments on
Federal rules that are open for comment
and published in the Federal Register
using Regulations.gov.
Purchase individual CFR titles from the
U.S. Government Online Bookstore.
Find issues of the CFR (including issues
prior to 1996) at a local Federal depository
library.
[A2]
§250.1151 How often must I conduct well production tests?
§250.1152 How do I conduct well tests?
§§250.1153-250.1155 [Reserved]
Approvals Prior to Production
§250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
§250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
§250.1158 How do I receive approval to downhole commingle hydrocarbons?
Production Rates
§250.1159 May the Regional Supervisor limit my well or reservoir production rates?
Flaring, Venting, and Burning HYdrocarbons
§250.1160 When may I flare or vent gas?
§250.1161 When may I flare or vent gas for extended periods of time?
§250.1162 When may I burn produced liquid hydrocarbons?
§250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records
must I maintain?
§250.1164 What are the requirements for flaring or venting gas containing H2S?
Other Requirements
§250.1165 What must I do for enhanced recovery operations?
§250.1166 What additional reporting is required for developments in the Alaska OCS Region?
§250.1167 What information must I submit with forms and for approvals?
Back to Top
GENEraL
Back to Top
§250.1150 What are the general reservoir production requirements?
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
You must produce wells and reservoirs at rates that provide for economic development while maximizing ultimate recovery
and without adversely affecting correlative rights.
Back to Top
WELL TEsts aND SUrVEYs
Back to Top
§250.1151 How often must I conduct well production tests?
(a) You must conduct well production tests as shown in the following table:
You must conduct:
(1) A well-flow potential test on all new, recompleted, or
reworked well completions within 30 days of the date of
first continuous production,
(2) At least one well test during a calendar half-year for
each producing completion,
And you must submit to the Regional Supervisor:
Form BSEE-0126, Well Potential Test Report, along with the
supporting data as listed in the table in §250.1167, within 15 days
after the end of the test period.
Results on Form BSEE-0128, Semiannual Well Test Report, of the
most recent well test obtained. This must be submitted within 45 days
after the end of the calendar half-year.
(b) You may request an extension from the Regional Supervisor if you cannot submit the results of a semiannual well test
within the specified time.
(c) You must submit to the Regional Supervisor an original and two copies of the appropriate form required by paragraph
(a) of this section; one of the copies of the form must be a public information copy in accordance with §§250.186 and 250.197,
and marked “Public Information.” You must submit two copies of the supporting information as listed in the table in §250.1167
with form BSEE-0126.
Back to Top
§250.1152 How do I conduct well tests?
(a) When you conduct well tests you must:
(1) Recover fluid from the well completion equivalent to the amount of fluid introduced into the formation during completion,
recompletion, reworking, or treatment operations before you start a well test;
(2) Produce the well completion under stabilized rate conditions for at least 6 consecutive hours before beginning the test
period;
(3) Conduct the test for at least 4 consecutive hours;
(4) Adjust measured gas volumes to the standard conditions of 14.73 pounds per square inch absolute (psia) and 60 °F for
all tests; and
(5) Use measured specific gravity values to calculate gas volumes.
(b) You may request approval from the Regional Supervisor to conduct a well test using alternative procedures if you can
demonstrate test reliability under those procedures.
(c) The Regional Supervisor may also require you to conduct the following tests and complete them within a specified time
period:
(1) A retest or a prolonged test of a well completion if it is determined to be necessary for the proper establishment of a
Maximum Production Rate (MPR) or a Maximum Efficient Rate (MER); and
(2) A multipoint back-pressure test to determine the theoretical open-flow potential of a gas well.
(d) A BSEE representative may witness any well test. Upon request, you must provide advance notice to the Regional
Supervisor of the times and dates of well tests.
Back to Top
§§250.1153-250.1155 [Reserved]
Back to Top
ApproVaLs Prior to ProDUctioN
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
Back to Top
§250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
(a) You must obtain approval from the Regional Supervisor before you start producing from a reservoir within a well that
has any portion of the completed interval less than 500 feet from a unit or lease line. Submit to BSEE the service fee listed in
§250.125, according to the instructions in §250.126, and the supporting information, as listed in the table in §250.1167, with
your request. The Regional Supervisor will determine whether approval of your request will maximize ultimate recovery, avoid
the waste of natural resources, or protect correlative rights. You do not need to obtain approval if the adjacent leases or units
have the same unit, lease (record title and operating rights), and royalty interests as the lease or unit you plan to produce. You
do not need to obtain approval if the adjacent block is unleased.
(b) You must notify the operator(s) of adjacent property(ies) that are within 500 feet of the completion, if the adjacent
acreage is a leased block in the Federal OCS. You must provide the Regional Supervisor proof of the date of the notification.
The operators of the adjacent properties have 30 days after receiving the notification to provide the Regional Supervisor letters
of acceptance or objection. If an adjacent operator does not respond within 30 days, the Regional Supervisor will presume there
are no objections and proceed with a decision. The notification must include:
(1) The well name;
(2) The rectangular coordinates (x, y) of the location of the top and bottom of the completion or target completion
referenced to the North American Datum 1983, and the subsea depths of the top and bottom of the completion or target
completion;
(3) The distance from the completion or target completion to the unit or lease line at its nearest point; and
(4) A statement indicating whether or not it will be a high-capacity completion having a perforated or open hole interval
greater than 150 feet measured depth.
Back to Top
§250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
(a) You must request and receive approval from the Regional Supervisor:
(1) Before producing gas-cap gas from each completion in an oil reservoir that is known to have an associated gas cap.
(2) To continue production from a well if the oil reservoir is not initially known to have an associated gas cap, but the oil well
begins to show characteristics of a gas well.
(b) For either request, you must submit the service fee listed in §250.125, according to the instructions in §250.126, and the
supporting information, as listed in the table in §250.1167, with your request.
(c) The Regional Supervisor will determine whether your request maximizes ultimate recovery.
Back to Top
§250.1158 How do I receive approval to downhole commingle hydrocarbons?
(a) Before you perforate a well, you must request and receive approval from the Regional Supervisor to commingle
hydrocarbons produced from multiple reservoirs within a common wellbore. The Regional Supervisor will determine whether
your request maximizes ultimate recovery. You must include the service fee listed in §250.125, according to the instructions in
§250.126, and the supporting information, as listed in the table in §250.1167, with your request.
(b) If one or more of the reservoirs proposed for commingling is a competitive reservoir, you must notify the operators of all
leases that contain the reservoir that you intend to downhole commingle the reservoirs. Your request for approval of downhole
commingling must include proof of the date of this notification. The notified operators have 30 days after notification to provide
the Regional Supervisor with letters of acceptance or objection. If the notified operators do not respond within the specified
period, the Regional Supervisor will assume the operators do not object and proceed with a decision.
Back to Top
ProDUctioN RatEs
Back to Top
§250.1159 May the Regional Supervisor limit my well or reservoir production rates?
(a) The Regional Supervisor may set a Maximum Production Rate (MPR) for a producing well completion, or set a
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
Maximum Efficient Rate (MER) for a reservoir, or both, if the Regional Supervisor determines that an excessive production rate
could harm ultimate recovery. An MPR or MER will be based on well tests and any limitations imposed by well and surface
equipment, sand production, reservoir sensitivity, gas-oil and water-oil ratios, location of perforated intervals, and prudent
operating practices.
(b) If the Regional Supervisor sets an MPR for a producing well completion and/or an MER for a reservoir, you may not
exceed those rates except due to normal variations and fluctuations in production rates as set by the Regional Supervisor.
Back to Top
FLariNg, VENtiNg, aND BUrNiNg HYDrocarboNs
Back to Top
§250.1160 When may I flare or vent gas?
(a) You must request and receive approval from the Regional Supervisor to flare or vent natural gas at your facility, except
in the following situations:
Condition
(1) When the gas is lease use gas (produced natural gas which is
used on or for the benefit of lease operations such as gas used to
operate production facilities) or is used as an additive necessary to
burn waste products, such as H2S
Additional requirements
The volume of gas flared or vented may not exceed the
amount necessary for its intended purpose. Burning waste
products may require approval under other regulations.
(2) During the restart of a facility that was shut in because of
Flaring or venting may not exceed 48 cumulative hours
weather conditions, such as a hurricane
without Regional Supervisor approval.
(3) During the blow down of transportation pipelines downstream of (i) You must report the location, time, flare/vent volume,
the royalty meter
and reason for flaring/venting to the Regional Supervisor in
writing within 72 hours after the incident is over.
(ii) Additional approval may be required under subparts H
and J of this part.
(4) During the unloading or cleaning of a well, drill-stem testing,
You may not exceed 48 cumulative hours of flaring or
production testing, other well-evaluation testing, or the necessary venting per unloading or cleaning or testing operation on a
blow down to perform these procedures
single completion without Regional Supervisor approval.
(5) When properly working equipment yields flash gas (natural gas You may not flare or vent more than an average of 50
released from liquid hydrocarbons as a result of a decrease in
MCF per day during any calendar month without Regional
pressure, an increase in temperature, or both) from storage
Supervisor approval.
vessels or other low-pressure production vessels, and you cannot
economically recover this flash gas
(6) When the equipment works properly but there is a temporary
(i) For oil-well gas and gas-well flash gas (natural gas
upset condition, such as a hydrate or paraffin plug
released from condensate as a result of a decrease in
pressure, an increase in temperature, or both), you may
not exceed 48 continuous hours of flaring or venting
without Regional Supervisor approval.
(ii) For primary gas-well gas (natural gas from a gas well
completion that is at or near its wellhead pressure; this
does not include flash gas), you may not exceed 2
continuous hours of flaring or venting without Regional
Supervisor approval.
(iii) You may not exceed 144 cumulative hours of flaring or
venting during a calendar month without Regional
Supervisor approval.
(7) When equipment fails to work properly, during equipment
(i) For oil-well gas and gas-well flash gas, you may not
maintenance and repair, or when you must relieve system
exceed 48 continuous hours of flaring or venting without
pressures
Regional Supervisor approval.
(ii) For primary gas-well gas, you may not exceed 2
continuous hours of flaring or venting without Regional
Supervisor approval.
(iii) You may not exceed 144 cumulative hours of flaring or
venting during a calendar month without Regional
Supervisor approval.
(iv) The continuous and cumulative hours allowed under
this paragraph may be counted separately from the hours
under paragraph (a)(6) of this section.
(b) Regardless of the requirements in paragraph (a) of this section, you must not flare or vent gas over the volume
approved in your Development Operations Coordination Document (DOCD) or your Development and Production Plan (DPP)
submitted to BOEM.
(c) The Regional Supervisor may establish alternative approval procedures to cover situations when you cannot contact the
BSEE office, such as during non-office hours.
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
(d) The Regional Supervisor may specify a volume limit, or a shorter time limit than specified elsewhere in this part, in order
to prevent air quality degradation or loss of reserves.
(e) If you flare or vent gas without the required approval, or if the Regional Supervisor determines that you were negligent
or could have avoided flaring or venting the gas, the hydrocarbons will be considered avoidably lost or wasted. You must pay
royalties on the loss or waste, according to 30 CFR part 1202. You must value any gas or liquid hydrocarbons avoidably lost or
wasted under the provisions of 30 CFR part 1206.
(f) Fugitive emissions from valves, fittings, flanges, pressure relief valves or similar components do not require approval
under this subpart unless specifically required by the Regional Supervisor.
Back to Top
§250.1161 When may I flare or vent gas for extended periods of time?
You must request and receive approval from the Regional Supervisor to flare or vent gas for an extended period of time.
The Regional Supervisor will specify the approved period of time, which will not exceed 1 year. The Regional Supervisor may
deny your request if it does not ensure the conservation of natural resources or is not consistent with National interests relating
to development and production of minerals of the OCS. The Regional Supervisor may approve your request for one of the
following reasons:
(a) You initiated an action which, when completed, will eliminate flaring and venting; or
(b) You submit to the Regional Supervisor an evaluation supported by engineering, geologic, and economic data indicating
that the oil and gas produced from the well(s) will not economically support the facilities necessary to sell the gas or to use the
gas on or for the benefit of the lease.
Back to Top
§250.1162 When may I burn produced liquid hydrocarbons?
(a) You must request and receive approval from the Regional Supervisor to burn any produced liquid hydrocarbons. The
Regional Supervisor may allow you to burn liquid hydrocarbons if you demonstrate that transporting them to market or reinjecting them is not technically feasible or poses a significant risk of harm to offshore personnel or the environment.
(b) If you burn liquid hydrocarbons without the required approval, or if the Regional Supervisor determines that you were
negligent or could have avoided burning liquid hydrocarbons, the hydrocarbons will be considered avoidably lost or wasted. You
must pay royalties on the loss or waste, according to 30 CFR part 1202. You must value any liquid hydrocarbons avoidably lost
or wasted under the provisions of 30 CFR part 1206.
Back to Top
§250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what
records must I maintain?
(a) If your facility processes more than an average of 2,000 bopd during May 2010, you must install flare/vent meters within
180 days after May 2010. If your facility processes more than an average of 2,000 bopd during a calendar month after May
2010, you must install flare/vent meters within 120 days after the end of the month in which the average amount of oil
processed exceeds 2,000 bopd.
(1) You must notify the Regional Supervisor when your facility begins to process more than an average of 2,000 bopd in a
calendar month;
(2) The flare/vent meters must measure all flared and vented gas within 5 percent accuracy;
(3) You must calibrate the meters regularly, in accordance with the manufacturer's recommendation, or at least once every
year, whichever is shorter; and
(4) You must use and maintain the flare/vent meters for the life of the facility.
(b) You must report all hydrocarbons produced from a well completion, including all gas flared, gas vented, and liquid
hydrocarbons burned, to Office of Natural Resources Revenue on Form ONRR-4054 (Oil and Gas Operations Report), in
accordance with 30 CFR 1210.102.
(1) You must report the amount of gas flared and the amount of gas vented separately.
(2) You may classify and report gas used to operate equipment on the lease, such as gas used to power engines,
instrument gas, and gas used to maintain pilot lights, as lease use gas.
(3) If flare/vent meters are required at one or more of your facilities, you must report the amount of gas flared and vented at
each of those facilities separately from those facilities that do not require meters and separately from other facilities with meters.
(4) If flare/vent meters are not required at your facility:
(i) You may report the gas flared and vented on a lease or unit basis. Gas flared and vented from multiple facilities on a
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
single lease or unit may be reported together.
(ii) If you choose to install meters, you may report the gas volume flared and vented according to the method specified in
paragraph (b)(3) of this section.
(c) You must prepare and maintain records detailing gas flaring, gas venting, and liquid hydrocarbon burning for each
facility for 6 years.
(1) You must maintain these records on the facility for at least the first 2 years and have them available for inspection by
BSEE representatives.
(2) After 2 years, you must maintain the records, allow BSEE representatives to inspect the records upon request and
provide copies to the Regional Supervisor upon request, but are not required to keep them on the facility.
(3) The records must include, at a minimum:
(i) Daily volumes of gas flared, gas vented, and liquid hydrocarbons burned;
(ii) Number of hours of gas flaring, gas venting, and liquid hydrocarbon burning, on a daily and monthly cumulative basis;
(iii) A list of the wells contributing to gas flaring, gas venting, and liquid hydrocarbon burning, along with gas-oil ratio data;
(iv) Reasons for gas flaring, gas venting, and liquid hydrocarbon burning; and
(v) Documentation of all required approvals.
(d) If your facility is required to have flare/vent meters:
(1) You must maintain the meter recordings for 6 years.
(i) You must keep these recordings on the facility for 2 years and have them available for inspection by BSEE
representatives.
(ii) After 2 years, you must maintain the recordings, allow BSEE representatives to inspect the recordings upon request and
provide copies to the Regional Supervisor upon request, but are not required to keep them on the facility.
(iii) These recordings must include the begin times, end times, and volumes for all flaring and venting incidents.
(2) You must maintain flare/vent meter calibration and maintenance records on the facility for 2 years.
(e) If your flaring or venting of gas, or burning of liquid hydrocarbons, required written or oral approval, you must submit
documentation to the Regional Supervisor summarizing the location, dates, number of hours, and volumes of gas flared, gas
vented, and liquid hydrocarbons burned under the approval.
Back to Top
§250.1164 What are the requirements for flaring or venting gas containing H2S?
(a) You may not vent gas containing H2S, except for minor releases during maintenance and repair activities that do not
result in a 15-minute time-weighted average atmosphere concentration of H2S of 20 ppm or higher anywhere on the platform.
(b) You may flare gas containing H2S only if you meet the requirements of §§250.1160, 250.1161, 250.1163, and the
following additional requirements:
(1) For safety or air pollution prevention purposes, the Regional Supervisor may further restrict the flaring of gas containing
H2S. The Regional Supervisor will use information provided in the lessee's H2S Contingency Plan (§250.490(f)), Exploration
Plan, DPP, DOCD submitted to BOEM, and associated documents to determine the need for restrictions; and
(2) If the Regional Supervisor determines that flaring at a facility or group of facilities may significantly affect the air quality
of an onshore area, the Regional Supervisor may require you to conduct an air quality modeling analysis, under 30 CFR
550.303, to determine the potential effect of facility emissions. The Regional Supervisor may require monitoring and reporting,
or may restrict or prohibit flaring, under 30 CFR 550.303 and 30 CFR 550.304.
(c) The Regional Supervisor may require you to submit monthly reports of flared and vented gas containing H2S. Each
report must contain, on a daily basis:
(1) The volume and duration of each flaring and venting occurrence;
(2) H2S concentration in the flared or vented gas; and
(3) The calculated amount of SO2 emitted.
Back to Top
OthEr REQUirEmENts
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
Back to Top
§250.1165 What must I do for enhanced recovery operations?
(a) You must promptly initiate enhanced oil and gas recovery operations for all reservoirs where these operations would
result in an increase in ultimate recovery of oil or gas under sound engineering and economic principles.
(b) Before initiating enhanced recovery operations, you must submit a proposed plan to the BSEE Regional Supervisor and
receive approval for pressure maintenance, secondary or tertiary recovery, cycling, and similar recovery operations intended to
increase the ultimate recovery of oil and gas from a reservoir. The proposed plan must include, for each project reservoir, a
geologic and engineering overview and any additional information required by the BSEE Regional Supervisor. You also must
submit Form BOEM-0127 to BOEM along with the supporting data specified in BOEM regulations, 30 CFR part 550, subpart K.
(c) You must report to Office of Natural Resources Revenue the volumes of oil, gas, or other substances injected,
produced, or produced for a second time under 30 CFR 1210.102.
[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]
Back to Top
§250.1166 What additional reporting is required for developments in the Alaska OCS Region?
(a) For any development in the Alaska OCS Region, you must submit an annual reservoir management report to the
Regional Supervisor. The report must contain information detailing the activities performed during the previous year and
planned for the upcoming year that will:
(1) Provide for the prevention of waste;
(2) Provide for the protection of correlative rights; and
(3) Maximize ultimate recovery of oil and gas.
(b) If your development is jointly regulated by BSEE and the State of Alaska, BSEE and the Alaska Oil and Gas
Conservation Commission will jointly determine appropriate reporting requirements to minimize or eliminate duplicate reporting
requirements.
(c) [Reserved]
Back to Top
§250.1167 What information must I submit with forms and for approvals?
You must submit the supporting information listed in the following table with the form identified in column 1 and for the
approvals required under this subpart identified in columns 2 through 4:
(a) Maps:
(1) Base map with surface, bottomhole, and completion locations with
respect to the unit or lease line and the orientation of representative
seismic lines or cross-sections
(2) Structure maps with penetration point and subsea depth for each
well penetrating the reservoirs, highlighting subject wells; reservoir
boundaries; and original and current fluid levels
(3) Net sand isopach with total net sand penetrated for each well,
identified at the penetration point
(4) Net hydrocarbon isopach with net feet of pay for each well,
identified at the penetration point
(b) Seismic data:
(1) Representative seismic lines, including strike and dip lines that
confirm the structure; indicate polarity
(2) Amplitude extraction of seismic horizon, if applicable
(c) Logs:
(1) Well log sections with tops and bottoms of the reservoir(s) and
proposed or existing perforations
(2) Structural cross-sections showing the subject well and nearby
wells
(d) Engineering data:
WPT
Production
BSEEwithin 5000126
ft of a unit
(2
Gas cap
Downhole
or lease
copies) production commingling line
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
*
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
eCFR — Code of Federal Regulations
(1) Estimated recoverable reserves for each well completion in the
reservoir; total recoverable reserves for each reservoir; method of
calculation; reservoir parameters used in volumetric and decline
curve analysis
(2) Well schematics showing current and proposed conditions
(3) The drive mechanism of each reservoir
(4) Pressure data, by date, and whether they are estimated or
measured
(5) Production data and decline curve analysis indicative of the
reservoir performance
(6) Reservoir simulation with the reservoir parameters used, history
matches, and prediction runs (include proposed development
scenario)
(e) General information:
(1) Detailed economic analysis
(2) Reservoir name and whether or not it is competitive as defined
under §250.105
(3) Operator name, lessee name(s), block, lease number, royalty rate,
and unit number (if applicable) of all relevant leases
(4) Geologic overview of project
(5) Explanation of why the proposed completion scenario will
maximize ultimate recovery
(6) List of all wells in subject reservoirs that have ever produced or
been used for injection
†
†
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
*
*
*
*
✓
*
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓Required.
†Each Gas Cap Production request and Downhole Commingling request must include the estimated recoverable reserves
for (1) the case where your proposed production scenario is approved, and (2) the case where your proposed production
scenario is denied.
*Additional items the Regional Supervisor may request.
Note: All maps must be at a standard scale and show lease and unit lines. The Regional Supervisor may waive submittal of
some of the required data on a case-by-case basis.
(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in
§250.125, according to the instructions in §250.126.
Back to Top
Need assistance?
file:///ISESTRNAS01/BSEE/ORP/EXPLICIT/RegStanBR/INFORMATION COLLECTION/0019 - K/2018/eCFR — Code of Federal Regulations 7-24-18.html[7/24/2018 9:47:24 AM]
File Type | application/pdf |
File Title | eCFR — Code of Federal Regulations |
File Modified | 2018-07-24 |
File Created | 2018-07-24 |