2137-0557 Justification2018

2137-0557 Justification2018.docx

Approvals for Hazardous Materials

OMB: 2137-0557

Document [docx]
Download: docx | pdf

Department of Transportation

Office of the Chief Information Officer

Supporting Statement


Approvals for Hazardous Materials

OMB Control No. 2137-0557


(Expiration Date: June 30, 2018)


Introduction


This is to request the Office of Management and Budget’s (OMB) three-year renewal, with adjustments, for the information collection titled, “Approvals for Hazardous Materials” (OMB Control No. 2137-0557), which is currently due to expire on June 30, 2018. This information collection justification addresses the burden associated with the provisions for approvals within the Hazardous Materials Regulations (HMR; 49 CFR parts 171-180).


PHMSA reevaluated it’s use of two information collections in this burden, and is now separating into multiple information collections. However, there is no change in burden hours or number of responses because no program activities have been revised or added in relation to this burden.



Part A. Justification


1. Circumstances that make collection of information necessary


The Pipeline and Hazardous Materials Safety Administration (PHMSA) has the primary responsibility for the issuance of Department of Transportation (DOT) Special Permits and Approvals under the Hazardous Materials Regulations (HMR; 49 CFR parts 171‑180). An approval is a written authorization, including a competent authority approval, issued by the Associate Administrator, the Associate Administrator's designee, or as otherwise prescribed in the HMR, to perform a function for which prior authorization by the Associate Administrator is required under subchapter C of this chapter (49 CFR parts 171-180)1.


There are more than 100 approval provisions in the HMR and associated procedural regulations. Responses to this information collection are required to obtain benefits, including becoming an approval or certification agency, or obtaining a variance from packaging or handling requirements based on information provided by the respondent. These benefits and variances include, but are not limited to: United Nations (UN) third‑party certification; authorization to examine and test lighters; authorization to examine and test explosives; and authorization to re-qualify DOT cylinders. This information collection supports the Departmental Strategic Goal for Safety. Required collections are contained in Hazardous Materials Program Procedures, 49 CFR part 107 and parts 100-185. These regulations are promulgated in accordance with 49 U.S.C. 5110, the Federal hazardous materials transportation law.



2. How, by whom, and for what purpose is the information used


This information is used by PHMSA to: (1) determine whether applicants who apply to become designated approval agencies are qualified to evaluate package design, test packages, classify hazardous materials, etc.; (2) verify that various containers and special loading requirements meet the requirements of the HMR; (3) assure that regulated hazardous materials pose minimal danger to life and property during transportation; and (4) allow minor variations from regulatory requirements based on information provided by respondents, without requiring the respondent to apply using less timely and more burdensome exemption procedures.


The applicable information collection requirements are discussed in the following paragraphs. The actual section citations from the various parts of the HMR referenced in item 1 above are included in this information collection in order to provide a more “user-friendly” format.


Affected sections of the HMR include, but are not limited to:


Sections 107.401; 107.402; 107.403; 107.404; 107.405; 107.801; 107.803; 107.805; 107.807; 173.301; 173.305; 173.314; 173.316; 173.318; and 178.35 – Designated approval agencies, independent cylinder testing agencies, and prospective foreign manufacturers of cylinders. These sections state that an approval from the Associate Administrator is required for parties desiring to become designated approval agencies, independent cylinder testing agencies, and prospective foreign manufacturers of cylinders. Designated approval agencies evaluate the design of packagings used for the shipments of hazardous materials. In addition, designated approval agencies actively engage in the testing of packagings to assure their conformance to applicable standards. Independent cylinder testing agencies perform tests and inspections on foreign-manufactured cylinders to verify that they meet the specifications set forth in the HMR. The information required of foreign packaging manufacturers permits PHMSA to perform quality control on packagings manufactured outside the United States, which will be marked as approved by the Associate Administrator and used for the transportation of hazardous materials within the United States.


The information collected for these approvals is used to evaluate an applicant’s qualifications to perform the applicable packaging function. PHMSA must exercise a reasonable amount of oversight to ensure that applicants are qualified. Without this information, PHMSA would be unable to ensure that qualified persons perform examinations and testing, which could lead to the use of packagings that fail to meet the required standard. For example, the incompetence of a testing facility would not surface until packagings began to fail in transportation, thereby endangering life and property.


Section 107.805 – Approval of cylinder and pressure receptacle requalifiers. Approval by the Associate Administrator is required to inspect, test, certify, repair, or rebuild a DOT specification cylinder or a UN pressure receptacle under subpart C of part 178 or subpart C of part 180 of this chapter, under the terms of a special permit issued under this part, or a TC, CTC, CRC, or BTC specification cylinder or tube manufactured in accordance with Transport Canada’s Transport of Dangerous Goods (TDG) Regulations (IBR, see §171.7 of this chapter).


Section 107.805 – Requalification Identification Number (RIN) Approval for Cylinders (International Shipments). Under §107.805(f)(2), RIN holders are allowed to submit an application containing all the required information prescribed in §107.705(a); identifying the TC, CTC, CRC, or BTC specification cylinder(s) or tube(s) to be inspected; certifying the requalifier will operate in compliance with the applicable TDG Regulations; and certifying the persons performing requalification have been trained and have the information contained in the TDG Regulations. This application is in addition to any existing application and burden encountered during the initial RIN application.


Section 172.101, Special provisions 5, 26, 29, 53, 55, 105, 118, 121, 125, 129, 131, 136, 147, 164, A54, A55, B55, B61, B69, B77, B81, N72, TP9; Sections 173.2a(c)(4); 107.803; 173.4; 173.21; 173.22; 173.24; 173.28; 173.31; 173.32; 173.124; 173.128; 173.159; 173.166; 173.168; 173.171; 173.225; 173.245; 173.306; 173.307; 173.308; 173.340; 173.411; 173.433; 173.471; 173.472; 173.473; 173.476; 175.8; 175.9; 175.701; 176.704; 178.3; 178.503 – Safety determinations as to the adequacy of the packagings for materials with special hazards. Certain hazardous materials require further determination as to the way that they should be classified, and subsequently packaged for transportation. Some examples include:

  • Tear gas and tear gas devices, which pose a special hazard when transported in a closed environment such as an airplane, and therefore require additional approval before being transported on an airplane.

  • Certain organic peroxides that are thermally unstable and are required to be kept at temperatures lower than the normal ranges encountered in transportation (‑20 °F to +130 °F). These thermally unstable materials require special refrigeration to keep them at a temperature well below that which causes self‑accelerating decomposition. PHMSA requires an approval for transportation of such materials.


Sections 173.7; 173.185; 173.214; 173.222; 173.305; 173.315; 173.334; 176.340; 178.47; 178.53; 178.58; 178.509; 178.601; 178.603; 178.604; 178.605; 178.606; 178.608 – Alternative packagings or test methods. An approval is required if a person wants to offer a hazardous material in transportation with alternative packaging or test methods than are currently authorized in the HMR. These approvals permit industry to make packagings not constructed as specifically detailed in the HMR, as well as permitting select testing, test methods, and test intervals.


Sections 173.51; 173.56; 173.58; 173.59; 173.171 – Testing and assignment of the classification of explosive materials. The transportation of various explosives and explosives devices, including fireworks, presents both technical difficulties and extreme hazards. The safe packaging and handling of these materials during transportation by all modes is based on correct hazard classification. An incorrect classification could result in improper packaging or handling and cause damage to property, loss of life, or both during transportation. For this reason, PHMSA approves the testing and assignment of hazard classifications of these hazardous materials.


Section 173.64 – Packaging Exception/Exceptions for Division 1.4G consumer fireworks. Under the provisions of this section, the manufacturer of consumer fireworks applies in writing to the Associate Administrator, following the applicable requirements in American Pyrotechnics Association (APA) Standard 87-1, and is notified in writing by the Associate Administrator that the fireworks have been classed, approved, and assigned an EX number. Each application must be complete and include all relevant background data and copies of all applicable drawings, test results, and any other pertinent information on each device for which approval is being requested. The manufacturer must sign the application and certify that: (1) the device for which approval is requested conforms to APA Standard 87-1; (2) the descriptions and technical information contained in the application are complete and accurate; and (3) no duplicate application has been submitted to a fireworks certification agency. If the application is denied, the manufacturer will be notified in writing of the reasons for the denial. The Associate Administrator may require that the fireworks be examined by an agency listed in §173.56(b)(1).


Section 173.196 – Infectious Substances. A live animal that contains, or is contaminated with, a genetically modified micro-organism, including a genetically modified micro-organism that also meets the definition of a Division 6.2 material, must be transported under terms and conditions approved by the Associate Administrator for Hazardous Materials Safety.


A genetically-modified micro-organism known or suspected to be dangerous to the environment may not be transported by air unless approved by the Associate Administrator for Hazardous Materials Safety.


Live animals may not be used to transport infectious substances unless such substances cannot be sent by any other means. An animal that contains or is contaminated with an infectious substance must be transported under terms and conditions approved by the Associate Administrator for Hazardous Materials Safety.


3. Extent of automated information collection


The burden has been made as simple as possible. Some of the information submitted to PHMSA is computer-generated. PHMSA encourages the use of automation to reduce the burden. The Government Paperwork Elimination Act directs agencies to allow the option of electronic filing and recordkeeping by October 2003, when practicable. Electronic filing and recordkeeping have been authorized and are operational. Currently, PHMSA receives approximately 90 percent of approval applications electronically.



4. Efforts to identify duplication


There is no duplication, as the information is unique to specific situations.



5. Efforts to minimize the burden on small businesses


Because this information is unique, similar information is unavailable. However, the collection of this information is reviewed periodically to ensure that the requirements involving safety in the transportation of hazardous materials are kept to the necessary standards to protect all involved.



6. Impact of less frequent collection of information


The frequency, for the most part, is determined by the applicants requesting an approval. It is not possible to conduct the collection less frequently and still ensure the level of safety of life and property necessary in transporting hazardous materials.



7. Special circumstances


This collection of information is generally conducted in a manner consistent with the guidelines in 5 CFR 1320.5(d)(2).



8. Compliance with 5 CFR 1320.8.


PHMSA published a 60-Day Notice and Request for Comments under Docket No. PHMSA‑2017‑0018 (Notice No. 2017-01) on April 21, 2017, in the Federal Register [82 FR 18828] requesting public comment on the renewal of this information collection, along with 10 other information collections. PHMSA received one comment related to this information collection:

  • Submitted April 25, 2017: At the time of the Notice publication, PHMSA had submitted a renewal, based on a rulemaking action. To ensure OMB Control No. 2137-0557 did not expire, the ICR was included as a part of the 60-day notice. The commenter questioned PHMSA’s decision, as they were aware of the renewal request with OMB, and requested a republication of the 60‑day notice without OMB Control No. 2137‑0057. Because this ICR was approved by OMB, but did not receive an extension in expiration date, a new 60-day Notice was not published and OMB Control No. 2137-0057 was included in the 30-day Notice publication.


PHMSA published a 30-Day Notice and Request for Comments under Docket No. PHMSA 2017 0018 (Notice No. 2017-05) on September 28, 2017, in the Federal Register [82 FR 45356] requesting public comment on the renewal of this information collection.



9. Payments or gifts to respondents


There is no payment or gift provided to respondents associated with this collection of information.



10. Assurance of confidentiality


None of the data collected contain personally identifiable information (PII) or business confidential information. No guarantees of confidentiality are provided to applicants.



11. Justification for collection of sensitive information


No sensitive information is required.



12. Estimate of burden hours for information requested


Total Number of Respondents

Total Number of Annual Responses

Total Annual Burden Hours

Total Annual Salary Costs

14,674

14,674

30,070

$2,377,307



Sections 107.401; 107.402; 107.403; 107.404; 107.405; 107.801; 107.803; 107.805; 107.807; 173.301; 173.305; 173.314; 173.316; 173.318; and 178.35 – Designated approval agencies, independent cylinder testing agencies, and prospective foreign manufacturers of cylinders


Based on the number of approval applications submitted to PHMSA, 15 companies applied for an approval under this information collection. Each application takes approximately 4.75 hours to complete for a total of 71.25 hours (4.75 hours x 15 responses). It is estimated to cost a $79.062 per hour in salary cost for a total of $5,633 (71.25 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

15

1

15

4.75

71.25

$79.06

$5,633



Section 107.805 – Approval of cylinder and pressure receptacle requalifiers


Based on the number of cylinder qualifier approval applications submitted to PHMSA, 7,130 companies apply for this type of approval each year. Each application takes approximately 66.3 minutes to complete for a total of 7,199 burden hours (66.3 minutes x 7,130 responses). It is estimated to cost $79.063 per hour in salary cost for a total of $662,886 (7,199 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Minutes per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

7,130

1

7,130

66.3

7,199

$79.06

$662,886



Sections 107.805 – Requalification Identification Number (RIN) Approval for Cylinders (International Shipments)


Based on the number of RIN approval applications submitted to PHMSA, 3,500 companies apply for this type of approval each year. Each application takes approximately 51.12 minutes to complete for a total of 2,982 burden hours (51.12 minutes x 3,500 responses). It is estimated to cost $79.064 per hour in salary cost for a total of $235,757 (2,982 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Minutes per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

3,500

1

3,500

51.12

2,982

$79.06

$235,757



Section 172.101, Special provisions 5, 26, 29, 53, 55, 105, 118, 121, 125, 129, 131, 136, 147, 164, A54, A55, B55, B61, B69, B77, B81, N72, TP9; Sections 173.2a(c)(4); 107.803; 173.4; 173.21; 173.22; 173.24; 173.28; 173.31; 173.32; 173.124; 173.128; 173.159; 173.166; 173.168; 173.171; 173.225; 173.245; 173.306; 173.307; 173.308; 173.340; 173.411; 173.433; 173.471; 173.472; 173.473; 173.476; 175.8; 175.9; 175.701; 176.704; 178.3; 178.503 – Safety determinations as to the adequacy of the packagings for materials with special hazards


Based on the number of approval applications submitted to PHMSA each year, 100 companies apply for this type of approval. Each application takes approximately 4.75 hours to complete for a total of 475 hours (4.75 hours x 100 responses). It is estimated to cost $79.065 per hour in salary cost for a total of $37,554 (475 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

100

1

100

4.75

475

$79.06

$37,554



Sections 173.7; 173.185; 173.214; 173.222; 173.305; 173.315; 173.334; 176.340; 178.47; 178.53; 178.58; 178.509; 178.601; 178.603; 178.604; 178.605; 178.606; 178.608 – Alternative packagings or test methods


Based on the number of alternative packaging applications submitted to PHMSA each year, 24 companies apply for this type of approval. Each application takes approximately 4.75 hours to complete for a total of 114 hours (4.75 hours x 24 responses). It is estimated to cost $79.066 per hour in salary cost for a total of $9,013 (114 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

24

1

24

4.75

114

$79.06

$9,013



Sections 173.51; 173.56; 173.58; 173.59; 173.171 – Testing and assignment of the classification of explosive materials


Based on the number of explosive approval applications submitted to PHMSA, 700 companies apply for this type of approval each year. Each application takes approximately 4.75 hours to complete for a total of 3,325 hours (4.75 hours x 700 responses). It is estimated to cost $79.067 per hour in salary cost for a total of $262,875 (3,325 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

700

1

700

4.75

3,325

$79.06

$262,875



Sections 173.64 – Packaging Exception/Exceptions for Division 1.4G consumer fireworks


Based on the number of approvals of fireworks packaging exceptions applied for each year, 3,200 companies apply for this type of approval. Each application takes approximately 4.75 hours to complete for a total of 15,200 hours (4.75 hours x 3,200 responses). It is estimated to cost a $79.068 per hour in salary cost for a total of $1,201,712 (15,200 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

3,200

1

3,200

4.75

15,200

$79.06

$1,201,712



Section 173.196 – Infectious Substances.


Based on the number of infectious substance approval applications submitted to PHMSA under this information collection, five companies applied for this type of approval. Each application takes approximately 4.75 hours to complete for a total of 23.75 hours (4.75 hours x 5 responses). It is estimated to cost a $79.069 per hour in salary cost for a total of $1,878 (23.75 burden hours x $79.06 per hour).


Number of Respondents

Response per Carrier

Number of Responses

Hours per Response

Total Burden Hours

Salary Cost per Hour

Total Salary Cost

5

1

5

4.75

23.75

$79.06

$1,878



13. Estimate of total annual costs to respondents



PHMSA estimates there are no out-of-pocket expenses, and therefore there is no annual cost to respondents.



14. Estimate of cost to the Federal Government


There are approximately 15,235 approval applications submitted annually to PHMSA. Each review takes 30 minutes, for a total of 7,617.5 annual hours (15,235 approvals x 30 minutes). Review by a GS-13 in Washington, D.C. is approximately $46.6210 per hour, for a total of $355,127.85 cost to the Federal Government.


Total Number of Approvals

Minutes per Review

Total Number of Review Hours

Salary Cost per Hour

Total Salary Cost

15,235

30

7,617.5

46.62

$355,127.85



15. Explanation of program changes or adjustments


During review of this burden, PHMSA noted it has historically consolidated all of these reporting requirements into two information collections. As demonstrated throughout this justification, there are eight different reporting requirements, which PHMSA is now identifying individually. However, this did not change the number of total burden hours or number of responses, because no changes were made to the approval requirements.



16. Publication of results of data collection


Approval applications are published on the PHMSA website and can be located at: https://www.phmsa.dot.gov/approvals-and-permits/hazmat/approvals-search. There are no statistical techniques involved in this information collection.



17. Approval for not displaying the expiration date of OMB approval


The approved OMB Control No. is prominently displayed in the text of 49 CFR 171.6.



18. Exceptions to certification statement


There are no exceptions to PHMSA’s certification of this request for information collection approval.

1 As defined in § 171.8

2 Occupation labor rates based on 2017 Occupational and Employment Statistics Survey (OES) for “Chemical Engineers (17-2041)” in the Chemical Manufacturing industry. The hourly mean wage for this occupation ($54) is adjusted to reflect the total costs of employee compensation based on the BLS Employer Costs for Employee Compensation Summary, which indicates that wages for civilian workers are 68.3 percent of total compensation (total wage = wage rate/wage % of total compensation).

3 Ibid.

4 Ibid.


5 Ibid.

6 Ibid.

7 Ibid.

8 Ibid.

9 Ibid.

10


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
Authorfosterg
File Modified0000-00-00
File Created2021-01-20

© 2024 OMB.report | Privacy Policy