Instructions for
Assignment of Record Title Interest in Federal OCS Oil and Gas Lease (Form BOEM-0150)
and Assignment of Operating Rights Interest (Form BOEM-0151)
1. Forms must be typed.
2. Fill in the complete legal description of the lease or officially designated subdivision (described in
aliquots not less than ¼ ¼ ¼ of the block) being assigned, including the OCS lease number(s). For
assignment of a pipeline right-of-way grant, include the segment number.
3. Enter names of all assignors and the assignee. The company number must be identified next to the name
of each assignor and assignee.
4. A separate assignment form must be used for each type of interest conveyed, i.e. record title or operating
rights.
5. For assignments of operating rights, a maximum of two vertical depth subdivisions are allowed, shallow
and deep. All operating rights assignments must have a defined top and bottom depth, e.g. 0 – 10,000
feet and 10,001 feet – 20,000 feet.
6. Enter the interest assigned and received expressed as a percentage of total interest in the lease. Undivided
interests in a lease or officially designated subdivision may be expressed in decimals using a maximum of
five places, e.g. 40.12345%. All interests together must equal one hundred percent.
7. Assignments must be filed in duplicate originals. If multiple leases or officially designated subdivisions
are included in the same assignment, BOEM still must receive two originals for each separate assignment
of record title or operating rights interest.
8. The nonrefundable filing fee must accompany the assignment along with the following additional forms,
if applicable: (i) Designation of Operator, (ii) Oil Spill Financial Responsibility, and (iii) General and/or
Supplemental Bonds. The assignment must be filed with the appropriate OCS office of BOEM within 90
days after the last date of execution by an assignor or the assignee.
9. The assignee must be in good standing with acceptable performance as provided under 30 CFR §§ 550
and 556.
10. Assignments may be filed in counterparts. However, all counterparts must be filed simultaneously or the
assignment will not be accepted.
11. Include other provisions between Assignor(s) and the Assignee as Exhibit “A” and attach to the
assignment.
12. This form may be duplicated by means of word processing software, but any duplicate which differs from
the approved form, must be deemed to include any omitted language as if it were the original form.
13. Witnesses, notary acknowledgements, and corporate seals are not required, although you may include
these if you wish.
14. Do not alter forms.
EFFECT OF NOT PROVIDING INFORMATION - If all requested information is not provided, the
assignment may not be approved.
(March 2014)
Previous Editions are Obsolete.

Page 1 of 1


File Typeapplication/pdf
File TitleMicrosoft Word - BOEM Form 0150-0151 instructions.doc
Authorburasd
File Modified2019-04-10
File Created2014-03-11

© 2024 OMB.report | Privacy Policy