In accordance
with 5 CFR 1320, the information collection is approved for three
years. As terms of clearance, the Corps is required to consult with
the Inland Waterways Users Board and any other applicable group
before submitting this ICR for renewal on matters including the
accuracy of the burden estimate and the need to collect the
individual data elements.
Inventory as of this Action
Requested
Previously Approved
02/28/2021
36 Months From Approved
474,642
0
0
20,568
0
0
149,128
0
0
The US Army Corps of Engineers
utilities the data collected to monitor and analyze the use and
operation of federally owned and operated locks. Owners, agents and
masters of vessels provide general data about vessels and estimated
tonnage and commodities carried. The information is used for sizing
and scheduling replacement or maintenance of locks and
canals.
US Code:
33
USC 555 Name of Law: null
Statute at Large: 42
Stat. 1043 Name of Statute: Rivers and Harbors Appropriations
Act
Decrease in burden is due to a
decrease in the utilization of the lockes.
$209,884
No
No
No
No
No
No
Uncollected
Reginald Lucas 571 372-0403
reginald.t.lucas2.ctr@mail.mil
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.