18 CFR Part 40

eCFR18CFR40_7-6-2017.docx

FERC-725Z, (Order in RD17-4) Mandatory Reliability Standards: IRO Reliability Standards

18 CFR Part 40

OMB: 1902-0276

Document [docx]
Download: docx | pdf

e-CFR data is current as of July 1, 2017



Title 18Chapter ISubchapter B → Part 40

Title 18: Conservation of Power and Water Resources

Shape2

PART 40—MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM

Shape3

Contents
§40.1   Applicability.
§40.2   Mandatory Reliability Standards.
§40.3   Availability of Reliability Standards.

Shape4

Authority: 16 U.S.C. 824o.

Source: Order 693, 72 FR 16598, Apr. 4, 2007, unless otherwise noted.

§40.1   Applicability.

(a) This part applies to all users, owners and operators of the Bulk-Power System within the United States (other than Alaska or Hawaii), including, but not limited to, entities described in section 201(f) of the Federal Power Act.

(b) Each Reliability Standard made effective by §40.2 must identify the subset of users, owners and operators of the Bulk-Power System to which a particular Reliability Standard applies.

§40.2   Mandatory Reliability Standards.

(a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric Reliability Organization.

(b) A proposed modification to a Reliability Standard proposed to become effective pursuant to §39.5 of this Chapter will not be effective until approved by the Commission.

§40.3   Availability of Reliability Standards.

The Electric Reliability Organization must post on its Web site the currently effective Reliability Standards as approved and enforceable by the Commission. The effective date of the Reliability Standards must be included in the posting.

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorEllen Brown
File Modified0000-00-00
File Created2021-01-22

© 2024 OMB.report | Privacy Policy