NSPS for Kraft Pulp Mills for which Construction, Reconstruction or Modification Commenced after May 23, 2103 (40 CFR part 60, subpart BBa) (Renewal)

ICR 201703-2060-002

OMB: 2060-0690

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2017-03-23
ICR Details
2060-0690 201703-2060-002
Historical Active 201403-2060-007
EPA/OAR 2485.03
NSPS for Kraft Pulp Mills for which Construction, Reconstruction or Modification Commenced after May 23, 2103 (40 CFR part 60, subpart BBa) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 09/11/2017
Retrieve Notice of Action (NOA) 06/27/2017
  Inventory as of this Action Requested Previously Approved
09/30/2020 36 Months From Approved 09/30/2017
60 0 26
3,950 0 1,905
821,000 0 567,180

Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as the specific requirements at 40 CFR Part 60, Subpart BBa. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards.

US Code: 44 USC 3501 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  81 FR 26546 05/03/2016
82 FR 28654 06/23/2017
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 60 26 0 0 34 0
Annual Time Burden (Hours) 3,950 1,905 0 0 2,045 0
Annual Cost Burden (Dollars) 821,000 567,180 0 0 253,820 0
No
No
There is an adjustment increase in the total estimated burden and labor costs as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The change in the burden and cost estimates occurred for two reasons. First, this ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year. Second, the burden has increased due an increase in the estimated number of sources subject to the standard. There is also an increase in the total capital and O&M costs as currently identified in the OMB Inventory of Approved Burdens. This increase is due to an increase in the estimated number of sources, and because in year 2 of this ICR existing sources will need to repeat performance tests that are required every 5 years.

$21,600
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/27/2017


© 2024 OMB.report | Privacy Policy