Approved Standard
BAL‐005‐1 R1
BAL‐005‐0.2b R2
BAL‐005‐0.2b R3
BAL‐005‐0.2b R4
BAL‐005‐0.2b R5
Standard: BAL‐005‐1 – Disturbance Control Standard
Transitions to the below Requirement in
Description and Change Justification
New Standard or Other Action
Requirements R1 Parts R1.1 and R1.2 do not provide for necessary
Requirement R1 Part R1.1 and Part R1.2
information concerning the calculation of Reporting ACE. The
have been moved into FAC‐001‐2
requirement provides for information necessary when connecting to
Requirement R3 and R4. Requirement R1
the electric system.
Part R1.3 is being retired.
Requirement R1 Part 1.3 is being retired in conjunction with the Risk‐
based Registration initiative de‐certifying the LSE function.
This requirement was retired as part of the original Paragraph 81
Retired
project. Its retirement was approved by FERC effective January 21,
2014.
This requirement can be retired since coordination of common values
Retire
between Adjacent BAs is covered in the Requirement R7.
This requirement can be retired since coordination of common values
Retire
between Adjacent BAs is covered in the Requirement R7.
This requirement can be retired since coordination of common values
Retire
between Adjacent BAs is covered in the Requirement R7.
Requirement in
Approved Standard
BAL‐005‐0.2b R6
BAL‐005‐0.2b R7
BAL‐005‐0.2b R8
BAL‐005‐0.2b R9
Standard: BAL‐005‐1 – Disturbance Control Standard
Transitions to the below Requirement in
Description and Change Justification
New Standard or Other Action
The portion of the requirement concerning calculating ACE was moved
Moved to definition of Reporting ACE and
into the definition for Reporting ACE. The portion of the requirement
Requirement R2
concerning an entity’s inability to calculate Ace for more than 30
minutes was moved into Requirement R2.
This requirement should be retired under Paragraph 81 criteria. The
first sentence covers having a functional EMS or other system capable
of calculating Reporting ACE and controlling resources, though
Retire
resources can be dispatched manually without any detriment to
reliability. The SDT believes that the term “operate AGC” in R7 refers to
the capability to continuously calculate ACE, not automatic control of
resources to the extent BAs cannot take resources off “AGC” mode.
The body of this requirement was moved to
The body of this requirement has been moved to Requirement R1 and
Requirement R1 and Part 8.1 was moved
Part 8.1 has been moved into Requirement R3.
into Requirement R3
R9 is covered in the definition of Reporting ACE, and the proposed R7
ensures that the BA does not include any Interchange in its Reporting
ACE that does not have an Adjacent BA.
Regarding R9.1, the Actual Net Interchange and Scheduled Net
Interchange values in the Reporting ACE calculation include provisions
Retire
for the Balancing Authority to include its high voltage direct (HVDC) link
to another asynchronous interconnection. By assuring the values are
handled consistently in the actual and scheduled Interchange terms
included in the real‐time Reporting ACE by definition, the Balancing
Authority is not being instructed “how” to implement the HVDC link,
but allowed to decide the method it will use.
2
Requirement in
Approved Standard
BAL‐005‐0.2b R10
BAL‐005‐0.2b R11
BAL‐005‐0.2b R12
BAL‐005‐0.2b R13
BAL‐005‐0.2b R14
BAL‐005‐0.2b R15
BAL‐005‐0.2b R16
Standard: BAL‐005‐1 – Disturbance Control Standard
Transitions to the below Requirement in
Description and Change Justification
New Standard or Other Action
The basics of this requirement is factored into the definition of
Retire
Scheduled Net Interchange (NIS) used in the Reporting ACE calculation
as defined in the NERC Glossary.
The basics of this requirement is factored into the definition of
Retire
Scheduled Net Interchange (NIS) used in the Reporting ACE calculation
as defined in the NERC Glossary.
Moved to Requirement R7
This requirement has been moved to Requirement R7.
The portion of the requirement concerning common time
synchronization was moved into Requirement R7. The portion of the
Moved to Requirement R7
requirement concerning an equipment error was moved into
Requirement R7.
Moved to Requirement R4 and Requirement This requirement has been moved into Requirement R4 and
R7
Requirement R7.
This requirement is duplicative of the intent of EOP‐008 ‐ Loss
of Control Room Functionality. In addition, proposed R3
Retired
requires a performance level that the Balancing Authority
Area must meet. The standard does not tell the BAA how to
meet it.
Moved to Requirement R4
This requirement has been moved into Requirement R4.
3
Requirement in
Approved Standard
BAL‐005‐0.2b R17
Standard: BAL‐005‐1 – Disturbance Control Standard
Transitions to the below Requirement in
Description and Change Justification
New Standard or Other Action
This requirement which address accuracy of RTU and transducers is
meaningless in today’s world. RTUs do not quantize measurement
anymore, these are done by relay or meters. Transducers are not used
anymore and have been replaced by meters and relays which measure
quantities. This requirement should be restored such that it actually
supports an accurate calculation of ACE and proper operation of AGC
Partially retired (partially captured in new
by specifying accuracy requirements for all telemetry associated with
Requirement R3)
ACE (Frequency, MW and the associated sensing devices and
telemetry). In addition, the interpretation effective 8/27/2008 in BAL‐
005‐0.2.b for R17 states that this requirement is specific to the
equipment used to determine the frequency component required for
reporting ACE. This is now being captured in Requirement R3.
4
File Type | application/pdf |
File Title | Microsoft Word - BAL-005-1 Mapping Document - Clean - 2015 10 25 |
Author | richardsond |
File Modified | 2016-10-18 |
File Created | 2015-11-09 |