Exhibit I
BAL-005-1 Mapping Document

Project 2010-14.2.1 Mapping Document

Transition of BAL-005-0.2b to BAL-005-1
 
Requirement in 
Approved Standard 

BAL‐005‐1 R1 

BAL‐005‐0.2b R2 
BAL‐005‐0.2b R3 
BAL‐005‐0.2b R4 
BAL‐005‐0.2b R5 

Standard: BAL‐005‐1 – Disturbance Control Standard 
Transitions to the below Requirement in 
Description and Change Justification 
New Standard or Other Action 
Requirements R1 Parts R1.1 and R1.2 do not provide for necessary 
Requirement R1 Part R1.1 and Part R1.2 
information concerning the calculation of Reporting ACE.  The 
have been moved into FAC‐001‐2 
requirement provides for information necessary when connecting to 
Requirement R3 and R4.  Requirement R1 
the electric system. 
Part R1.3 is being retired. 
Requirement R1 Part 1.3 is being retired in conjunction with the Risk‐
based Registration initiative de‐certifying the LSE function. 
This requirement was retired as part of the original Paragraph 81 
Retired 
project.  Its retirement was approved by FERC effective January 21, 
2014. 
This requirement can be retired since coordination of common values 
Retire 
between Adjacent BAs is covered in the Requirement R7. 
This requirement can be retired since coordination of common values 
Retire 
between Adjacent BAs is covered in the Requirement R7. 
This requirement can be retired since coordination of common values 
Retire 
between Adjacent BAs is covered in the Requirement R7. 

 
 

Requirement in 
Approved Standard 
BAL‐005‐0.2b R6 

BAL‐005‐0.2b R7 

BAL‐005‐0.2b R8 

BAL‐005‐0.2b R9 

 

Standard: BAL‐005‐1 – Disturbance Control Standard 
Transitions to the below Requirement in 
Description and Change Justification 
New Standard or Other Action 
The portion of the requirement concerning calculating ACE was moved 
Moved to definition of Reporting ACE and 
into the definition for Reporting ACE.  The portion of the requirement 
Requirement R2 
concerning an entity’s inability to calculate Ace for more than 30 
minutes was moved into Requirement R2. 
This requirement should be retired under Paragraph 81 criteria.  The 
first sentence covers having a functional EMS or other system capable 
of calculating Reporting ACE and controlling resources, though 
Retire 
resources can be dispatched manually without any detriment to 
reliability. The SDT believes that the term “operate AGC” in R7 refers to 
the capability to continuously calculate ACE, not automatic control of 
resources to the extent BAs cannot take resources off “AGC” mode. 
The body of this requirement was moved to 
The body of this requirement has been moved to Requirement R1 and 
Requirement R1 and Part 8.1 was moved 
Part 8.1 has been moved into Requirement R3. 
into Requirement R3 
R9 is covered in the definition of Reporting ACE, and the proposed R7 
ensures that the BA does not include any Interchange in its Reporting 
ACE that does not have an Adjacent BA.  
Regarding R9.1, the Actual Net Interchange and Scheduled Net 
Interchange values in the Reporting ACE calculation include provisions 
Retire 
for the Balancing Authority to include its high voltage direct (HVDC) link 
to another asynchronous interconnection. By assuring the values are 
handled consistently in the actual and scheduled Interchange terms 
included in the real‐time Reporting ACE by definition, the Balancing 
Authority is not being instructed “how” to implement the HVDC link, 
but allowed to decide the method it will use. 

2   

 
 

Requirement in 
Approved Standard 
BAL‐005‐0.2b R10 

BAL‐005‐0.2b R11 
BAL‐005‐0.2b R12 
BAL‐005‐0.2b R13 

BAL‐005‐0.2b R14 

BAL‐005‐0.2b R15 

BAL‐005‐0.2b R16 

 

Standard: BAL‐005‐1 – Disturbance Control Standard 
Transitions to the below Requirement in 
Description and Change Justification 
New Standard or Other Action 
The basics of this requirement is factored into the definition of 
Retire 
Scheduled Net Interchange (NIS) used in the Reporting ACE calculation 
as defined in the NERC Glossary. 
The basics of this requirement is factored into the definition of 
Retire 
Scheduled Net Interchange (NIS) used in the Reporting ACE calculation 
as defined in the NERC Glossary. 
Moved to Requirement R7 
This requirement has been moved to Requirement R7. 
The portion of the requirement concerning common time 
synchronization was moved into Requirement R7.  The portion of the 
Moved to Requirement R7 
requirement concerning an equipment error was moved into 
Requirement R7. 
Moved to Requirement R4 and Requirement  This requirement has been moved into Requirement R4 and 
R7 
Requirement R7. 
This requirement is duplicative of the intent of EOP‐008 ‐ Loss 
of Control Room Functionality. In addition, proposed R3 
Retired 
requires a performance level that the Balancing Authority 
Area must meet.  The standard does not tell the BAA how to 
meet it.  
Moved to Requirement R4 
This requirement has been moved into Requirement R4. 

3   

 
 

Requirement in 
Approved Standard 

BAL‐005‐0.2b R17 

Standard: BAL‐005‐1 – Disturbance Control Standard 
Transitions to the below Requirement in 
Description and Change Justification 
New Standard or Other Action 
This requirement which address accuracy of RTU and transducers is 
meaningless in today’s world.  RTUs do not quantize measurement 
anymore, these are done by relay or meters.  Transducers are not used 
anymore and have been replaced by meters and relays which measure 
quantities.  This requirement should be restored such that it actually 
supports an accurate calculation of ACE and proper operation of AGC 
Partially retired (partially captured in new 
by specifying accuracy requirements for all telemetry associated with 
Requirement R3) 
ACE (Frequency, MW and the associated sensing devices and 
telemetry).  In addition, the interpretation effective 8/27/2008 in BAL‐
005‐0.2.b for R17 states that this requirement is specific to the 
equipment used to determine the frequency component required for 
reporting ACE.  This is now being captured in Requirement R3. 
 

 
 

 

4   


File Typeapplication/pdf
File TitleMicrosoft Word - BAL-005-1 Mapping Document - Clean - 2015 10 25
Authorrichardsond
File Modified2016-10-18
File Created2015-11-09

© 2025 OMB.report | Privacy Policy