NESHAP for Plywood and Composite Wood Products (40 CFR Part 63, Subpart DDDD) (Renewal)

ICR 201609-2060-001

OMB: 2060-0552

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2016-09-01
IC Document Collections
IC ID
Document
Title
Status
24796
Modified
ICR Details
2060-0552 201609-2060-001
Historical Active 201309-2060-005
EPA/OAR 1984.06
NESHAP for Plywood and Composite Wood Products (40 CFR Part 63, Subpart DDDD) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 01/06/2017
Retrieve Notice of Action (NOA) 10/27/2016
  Inventory as of this Action Requested Previously Approved
01/31/2020 36 Months From Approved 01/31/2017
548 0 548
11,900 0 11,687
16,000 0 15,960

The NESHAP for Plywood and Composite Products covers both new and existing plywood and composite wood products (PCWP) facilities. Plywood and composite products include, but are not limited to plywood, veneer, particleboard, oriented strand board, hardboard, fiberboard, medium density fiberboard, laminated strand lumber, laminated veneer lumber, wood I-joists, kiln-dried lumber and glue-laminated beams. Owners/operators of plywood and composite products facilities are required to submit initial notification, performance tests, and compliance status reports. Also, respondents are required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Semiannual reports are required.

US Code: 44 USC 3501 etseq Name of Law: Clean Air Act
  
US Code: 44 USC 3501 et seq. Name of Law: Clean Air Act

Not associated with rulemaking

  81 FR 26546 05/03/2016
81 FR 73094 10/24/2016
No

1
IC Title Form No. Form Name
Private Sector

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 548 548 0 0 0 0
Annual Time Burden (Hours) 11,900 11,687 0 0 213 0
Annual Cost Burden (Dollars) 16,000 15,960 0 0 40 0
No
No
There is an adjustment increase in the total estimated labor hours as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The change in the labor burden and cost estimates occurred because of a change in assumption. This ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year. In addition, there is a small increase in O&M cost due to rounding of total cost figure to three significant figures.

$36,600
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/27/2016


© 2024 OMB.report | Privacy Policy