		106.45 | 
		138.43 | 
		52.77 | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Burden Items | 
		(A) Person hours per occurrence | 
		(B) Occurrences per respondent per year | 
		(C) Person hours per respondent per year (AxB) | 
		(D) Respondents per year a | 
		(E) Technical person hours per year (CxD) | 
		(F) Managerial person hours per year (Ex0.05) | 
		(G) Clerical person hours per year (Ex0.1)  | 
		(H) Total Cost per year, $ b | 
		
  | 
		
  | 
		
  | 
	
	
		| 1. Applications | 
		N/A | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| 2. Survey and Studies | 
		N/A | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| 3. Reporting Requirements | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| A. Familiarization with the regulatory requirements c | 
		4 | 
		1 | 
		4 | 
		8 | 
		32 | 
		1.6 | 
		3.2 | 
		$3,796.75  | 
		
  | 
		
  | 
		
  | 
	
	
		| B. Required Activities | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Initial performance test d  | 
		421 | 
		1 | 
		421 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Repeat performance test d, e | 
		421 | 
		0.2 | 
		84.2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Operations, maintenance, and monitoring plan f | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Startup, shutdown, and malfunction plan g | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| COS Testing q | 
		
  | 
		
  | 
		
  | 
		8 | 
		
  | 
		
  | 
		
  | 
		$34,400  | 
		
  | 
		
  | 
		
  | 
	
	
		| HCl/HF Testing q | 
		
  | 
		
  | 
		
  | 
		8 | 
		
  | 
		
  | 
		
  | 
		$10,400  | 
		
  | 
		
  | 
		
  | 
	
	
		| Phenol and methanol testing q | 
		
  | 
		
  | 
		
  | 
		8 | 
		
  | 
		
  | 
		
  | 
		$14,400  | 
		
  | 
		
  | 
		
  | 
	
	
		| C. Create Information | 
		See 3B | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| D. Gather Existing Information | 
		See 3B | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| E. Write Reports | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of applicability h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of construction/  reconstruction  h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of actual startup h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of special compliance requirements  h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of initial performance test  h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of compliance status h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Request for extension of compliance adjustment to time periods, and changes in information h | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Report of performance test | 
		See 3B | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Excess emissions report i | 
		16 | 
		2 | 
		32 | 
		1.6 | 
		51.2 | 
		2.56 | 
		5.12 | 
		$6,074.80  | 
		
  | 
		
  | 
		
  | 
	
	
		| Report of no excess emission j | 
		8 | 
		2 | 
		16 | 
		6.4 | 
		102.4 | 
		5.12 | 
		10.24 | 
		$12,149.61  | 
		
  | 
		
  | 
		
  | 
	
	
		| Quality improvement plan k | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Startup, shutdown, and malfunction report l | 
		8 | 
		2 | 
		16 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
		
  | 
		
  | 
		
  | 
	
	
		| Subtotal for Reporting | 
		
  | 
		
  | 
		
  | 
		
  | 
		213 | 
		$81,221.16  | 
		
  | 
		
  | 
		
  | 
	
	
		| 4. Recordkeeping Requirements | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| A. Familiarization with the regulatory requirements | 
		See 3A | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| B. Plan Activities | 
		See 3E | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| C. Implement Activities | 
		See 3E | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| D. Develop Record System | 
		See 3E | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| E. Time to Enter Information | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Records of operating parameters and emissions n | 
		4 | 
		52 | 
		208 | 
		8 | 
		1664 | 
		83.2 | 
		166.4 | 
		$197,431.10  | 
		
  | 
		
  | 
		
  | 
	
	
		| F. Time to transmit or disclose information o | 
		0.25 | 
		2 | 
		0.5 | 
		8 | 
		4 | 
		0.2 | 
		0.4 | 
		$474.59  | 
		
  | 
		
  | 
		
  | 
	
	
		| G. Time to Train Personnel | 
		N/A | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| H. Time for Audits | 
		N/A | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Subtotal for Recordkeeping | 
		
  | 
		
  | 
		
  | 
		
  | 
		1,918 | 
		$197,905.70  | 
		
  | 
		
  | 
		
  | 
	
	
		| Total Labor Burden and Cost (rounded) p | 
		
  | 
		
  | 
		
  | 
		
  | 
		2,130 | 
		$279,000  | 
		
  | 
		133 | 
		hr per resp | 
	
	
		| Capital and O&M Cost (see Section 6(b)(iii)): p | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		$6,000  | 
		
  | 
		
  | 
		
  | 
	
	
		| TOTAL COST: p | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		$285,000  | 
		
  | 
		
  | 
		
  | 
	
	
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Assumptions: | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| a   We have assumed that the average number of respondents potentially subject to this rule is 8.  There will be no additional new sources over the three-year period of this ICR. | 
		
  | 
		
  | 
		
  | 
	
	
		| b  This ICR uses the following labor rates: $138.43 for Managerial, $106.45 for Technical, and $52.77 for Clerical. | 
		
  | 
		
  | 
		
  | 
	
	
		| c  We have assumed that it will take each respondent 4 hours to familiarize with the regulatory requirements. | 
		
  | 
		
  | 
		
  | 
	
	
		| d  We have assumed that it will take 421 hours for each respondent to complete performance test based on the following: (1.7 sources per plant x 130 hours per source +200 hours for calibration, retesting, sample analysis, etc) for a total of 421 hours. | 
		
  | 
		
  | 
		
  | 
	
	
		| e  We have assumed that 20% of respondents will have to repeat performance test due to failure. | 
		
  | 
		
  | 
		
  | 
	
	
		| f  We have assumed that each of the respondents will take 40 hours to prepare the operation, maintenance, and monitoring plan. | 
		
  | 
		
  | 
		
  | 
	
	
		| g We have assumed that each of the respondents will take 40 hours to prepare the startup, shutdown, and malfunction plan. | 
		
  | 
		
  | 
		
  | 
	
	
		| h We have assumed that each of the respondents will take 2 hours to write reports. | 
		
  | 
		
  | 
		
  | 
	
	
		| i  We have assumed that 20% of respondents will each take 16 hours two times per year to write excess emission reports. | 
		
  | 
		
  | 
		
  | 
	
	
		| j  We have assumed that 80% of respondents will take 8 hours two times per year to complete the report for no excess emissions. | 
		
  | 
		
  | 
		
  | 
	
	
		| k We have assumed that 10% of facilities are required to prepare a quality improvement plan each year. | 
		
  | 
		
  | 
		
  | 
	
	
		| l  We have assumed that each respondent will take 8 hours two times per year to complete a startup, shutdown, and malfunction report. | 
		
  | 
		
  | 
		
  | 
	
	
		| m We have assumed that the respondents will each take 4 hours to familiarize with the regulatory requirements. | 
		
  | 
		
  | 
		
  | 
	
	
		| n  We have assumed that each respondent will take 4 hours 52 times per year to enter information. | 
		
  | 
		
  | 
		
  | 
	
	
		| o  We have assumed that it will take each respondent 15 minutes (0.25 hours) two times per year to transmit of disclose information. | 
		
  | 
		
  | 
		
  | 
	
	
		| p  Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | 
		
  | 
		
  | 
		
  | 
	
	
		| q  We estimate annualized compliance testing cost will cost $59,200 for all 8 facilities ($34,400 for COS test, $10,400 for HCl/HF test, and $14,400 for phenol/methanol test).  See EPA-HQ-OAR-2010-1041-0171.pdf | 
		
  | 
		
  | 
		
  | 
	
	
	
	
	
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		47.62 | 
		64.16 | 
		25.76 | 
		
  | 
	
	
		| Activity | 
		(A) EPA Hours per occurrence | 
		(B) Number of occurrences per Year | 
		(C) EPA Hours per Year (AxB) | 
		(D) Plants per Year a | 
		(E) Technical Hours per Year (CxD) | 
		(F) Managerial Hours per Year (Ex0.05) | 
		(G) Clerical Hours per Year (Ex0.10) | 
		(H) Total cost per year, $ b | 
	
	
		| Initial performance tests | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| New or modified facility | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Repeat performance tests | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| A. Familiarization with the regulatory requirements c | 
		40 | 
		0.2 | 
		8 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Report review | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of applicability | 
		2 | 
		1 | 
		
  | 
		0 | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Notification of construction/ reconstruction | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Notification of actual startup | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Notification of special compliance requirements | 
		1 | 
		1 | 
		1 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Notification of initial performance test | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Notification of compliance status | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Request for extension of compliance, adjustment to time periods, and changes in information | 
		2 | 
		1 | 
		2 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Quality improvement plan d | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Operations, maintenance, and monitoring plan | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Startup, shutdown, and malfunction plan e | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Report of performance test | 
		40 | 
		1 | 
		40 | 
		0 | 
		0 | 
		0 | 
		0 | 
		$0  | 
	
	
		| Excess emissions report f | 
		20 | 
		2 | 
		40 | 
		1.6 | 
		64 | 
		3.2 | 
		6.4 | 
		$3,417.86  | 
	
	
		| Report of no excess emissions g | 
		2 | 
		2 | 
		4 | 
		6.4 | 
		25.6 | 
		1.28 | 
		2.56 | 
		$1,367.14  | 
	
	
		| Startup, shutdown, and malfunction report h | 
		20 | 
		2 | 
		40 | 
		8 | 
		320 | 
		16 | 
		32 | 
		$17,089.28  | 
	
	
		| Review compliance test reports for COS for cupolas and formaldehyde, phenol, and methanol for collection/curing operations i | 
		8 | 
		1 | 
		8 | 
		8 | 
		64 | 
		3.2 | 
		6.4 | 
		$3,417.86  | 
	
	
		| Total Labor Burden and Cost (rounded) j | 
		
  | 
		
  | 
		
  | 
		
  | 
		545 | 
		$25,300  | 
	
	
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| Assumptions: | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| a   We have assumed that the average number of respondents potentially subject to this rule is 8.  There will be no additional new sources over the three-year period of this ICR. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| b  This ICR uses the following labor rates: $64.16 for Managerial, $47.62 for Technical, and $25.76 for Clerical. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| c  We have assumed that 20% of respondents will fail the performance test. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| d  We have assumed that it will take 40 hours for each respondent to review the quality improvement plan report. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| e  We have assumed that it will take 40 hours for each respondent to review the startup, shutdown, and malfunction plan. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| f   We have assumed that 20% of respondents will take 20 hours to review the excess emissions report. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| g   We have assumed that 80% of respondents will take 2 hours to review the report of no excess emissions. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| h   We have assumed that each respondent will take 20 hours to review the startup, shutdown, malfunction report. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| i Assumes Agency will review all of the annual reports - including the new COS, phenol, and methanol emissions testing. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
	
	
		| j Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  | 
		
  |