Appendix B
NSF Facilities Survey Questionnaire
Proposed Changes for Testing
We would like your feedback on the attached changes proposed for the upcoming FY 2017 Facilities Survey. In preparation for the phone call to collect your feedback:
Please review all of the pages in this attachment, paying attention to the highlighted changes on each page.
If these changes went into effect, would the data you report change or would it stay the same? Would these changes impact your ability to report data or cause confusion? We will be asking for your feedback on the revisions. (Note that the test questions have FY 2015 dates; the dates will be changed and highlights removed for FY 2017 survey administration.)
Please fill out the new question 6 (page 3) based on your responses to question 2 in your institution’s FY 2015 Facilities Survey. Please provide your responses to question 6 prior to the phone discussion or have them available for the call. We will be asking about your experience and ability to answer this new question.
Please review the definitions for start date and completion costs for new construction in question 9 (page 4). Based on the new definitions, please review your responses to questions 9, 9B, 9D, and 13 in your institution’s FY 2015 Facilities Survey. If the new definitions would have changed your responses to these questions, please let us know the reasons for the change during the phone discussion. You do not need to provide new answers to these questions.
If you don’t have a copy of your institution’s FY 2015 responses, please contact XXXXXX@westat.com.
Please use these definitions when answering all questions in this survey.
Research is all research and experimental development (R&D) activities of your institution that are separately accounted for. These R&D activities comprise creative and systematic work undertaken in order to increase the stock of knowledge – including knowledge of humankind, culture and society – and to devise new applications of available knowledge. This research can be funded by your own institution, the federal government, a state government, foundations, corporations, or other sources.
Research space
is the net assignable square feet of space in buildings within which
research activities take place.
Research facilities are located
within buildings. A building
is a roofed structure for permanent or temporary shelter of
persons,
animals, plants, materials, or equipment. Structures should be
included if they are (1) attached to a foundation,
(2) roofed,
(3) serviced by a utility, exclusive of lighting, and (4) a source of
significant maintenance and repair activities.
Net assignable square feet
(NASF) is the sum of all areas on all floors of a building assigned
to, or available to be
assigned to, an occupant for a specific
use, such as research or instruction. NASF is measured from the
inside faces of
walls.
Science and engineering
(S&E) includes the following fields: agricultural sciences and
natural resources sciences,
biological and biomedical sciences,
computer and information sciences, engineering, health and clinical
sciences,
mathematics and statistics, physical sciences,
psychology, social sciences, and other science and engineering
fields. See Question 2 on pages 5–7 for a detailed list of the
disciplines included in each of these fields.
6. For each field of S&E below, please indicate whether any of the research NASF reported in Question 2 was (1) shared with any other field(s); and (2) used for purposes other than research (e.g., instruction) at the end of your FY 2015.
In Question 2, the instructions indicate “If research space was shared among fields or used for other purposes in addition to research, report the portion of space used for research for each field.” If you pro-rated the NASF in Question 2 according to these instructions, you should answer “yes” in column 1 and/or column 2 in the field(s) below that were pro-rated due to shared space.
Field of S&E (Include research animal space.) |
Mark “X” if no research space in this field |
|
|
|
|
(1) Was the NASF reported in Question 2 shared with any other field(s)? |
(2) Was the NASF reported in Question 2 used for purposes other than research? |
||||
|
|
(Mark one “X” for each field with research space.) |
(Mark one “X” for each field with research space.) |
||
|
|
Yes |
No |
Yes |
No |
a. Agricultural sciences |
|
|
|
|
|
b. Biological and biomedical sciences |
|
|
|
|
|
c. Computer and information sciences |
|
|
|
|
|
d. Engineering |
|
|
|
|
|
e. Geosciences,
atmospheric, and ocean |
|
|
|
|
|
f. Health sciences |
|
|
|
|
|
g. Mathematics and statistics |
|
|
|
|
|
h. Natural resources and conservation |
|
|
|
|
|
i. Physical sciences |
|
|
|
|
|
j. Psychology |
|
|
|
|
|
k. Social sciences |
|
|
|
|
|
l. Other field of S&E |
|
|
|
|
For Field of S&E definitions, see Question 2 on pages 5–7.
9. Please provide the total number of new construction projects that included S&E research facilities that started during your FY 2014 or FY 2015. Include only projects whose prorated cost was estimated to be $250,000 or more for at least one field of S&E. Include research animal space in the relevant fields of S&E.
New construction is the construction of a new building or additions to an existing building.
Research facilities are defined on pages 2–3 of the survey questionnaire.
Start date is
defined as the first placement of permanent construction of a
building or addition on site, such as the
pouring of a slab or
footing, the installation of piles, the construction of columns or
any work beyond the stage of excavation. When determining start date,
please exclude planning, demolition, or other site preparation work.
Completion costs include planning, site preparation, construction, fixed equipment, nonfixed equipment that costs $1 million or more, and building infrastructure such as plumbing, lighting, air exchange, and safety systems either in the building or within 5 feet of the building foundation. Include costs that meet this definition whether they occur before or after the project start date.
If facilities are shared for research and nonresearch activities, report only projects with completion costs of $250,000 or more for at least one field of S&E research. For example, if a $300,000 project involves space used for research only one-fourth of the time, this project of $75,000 for the research facilities should not be reported.
If facilities are shared by two or more fields of S&E, report the new construction project only if at least one field of S&E research has completion costs of $250,000 or more. For example, if two fields share the costs equally for a research project costing $400,000, neither field’s share of $200,000 meets the cost minimum.
If your institution had no new construction
projects, check this box and go to Question 10
If your institution had one or
more new construction projects,
enter the number of projects
here and fill out a separate
Individual Project Form for each
one _____________
projects
Please make additional copies of this form as needed.
Individual Project Form for Question 9
Page 1 of 4
Please complete this form for each new construction project that started during your FY 2014 or FY 2015. Include only projects that will cost $250,000 or more for at least one of the S&E fields.
9A. What is the name of this project? ________________________________________________
9B. During which of your fiscal years did the physical work of new construction begin for this project?
Start date is defined as the first placement of permanent construction of a building or addition on site, such as the pouring of a slab or footing, the installation of piles, the construction of columns or any work beyond the stage of excavation. When determining start date, please exclude planning, demolition, or other site preparation work.
FY 2014
FY 2015
9C. When this project is completed, what is (a) the entire project’s (research and nonresearch) gross square feet; (b) the entire project’s net assignable square feet; and (c) the S&E research facilities portion in net assignable square feet?
For multi-year projects, report the space expected when the project is completed.
a. Gross square feet (GSF) for entire project (research and nonresearch) __________ GSF
Gross
square feet (GSF) is the floor area of a structure within the outside
faces of
the exterior walls.
b. Net
assignable square feet (NASF) for entire project
(research and
nonresearch) __________
NASF
Net assignable square feet (NASF) is the sum of all areas on all floors of a building assigned to, or available to be assigned to, an occupant for a specific use, such as research or instruction. NASF is measured from the inside faces of walls.
NOTE: If the entire project is S&E research, the answers for row b and row c will be the same.
c. Net
assignable square feet for S&E
research facilities
portion
(defined on pages 2–3 of the survey
questionnaire) __________
NASF
Research facilities are defined on pages 2–3 of the survey questionnaire, including examples of what areas to include and exclude.
If the research facilities are also used for nonresearch activities, adjust the amount of space based on the amount of time the area is used for S&E research. For example, if an area is used for S&E research one-fourth of the time and for instruction the rest of the time, report one-fourth of the space as S&E research facilities.
If you have any questions about which projects to report or how to fill out
the Individual Project Form, please contact the Facilities Survey Help Desk.
Please make additional copies of this form as needed.
Individual Project Form for Question 9
Page 2 of 4
9D. When this project is completed, what are the completion costs for (a) the entire project (research and nonresearch), and (b) the S&E research facilities portion of the project? For multi-year projects, report the costs expected when the project is completed.
Completion costs include planning, site preparation, construction, fixed equipment, nonfixed equipment that costs $1 million or more, and building infrastructure such as plumbing, lighting, air exchange, and safety systems either in the building or within 5 feet of the building foundation. Include costs that meet this definition whether they occur before or after the project start date.
a. Completion costs for the GSF of the entire project (research and nonresearch) $ __________
b. Completion
costs for the S&E
research facilities
portion
(defined on pages 2–3 of the survey
questionnaire) $ __________
If the research facilities are also used for nonresearch activities, adjust the completion costs based on the amount of time the facilities are used for S&E research. For example, if a facility is used for S&E research one-fourth of the time and for instruction the rest of the time, report one-fourth of the completion costs for S&E research facilities.
If you have any questions about which projects to report or how to fill out
the Individual Project Form, please contact the Facilities Survey Help Desk.
Please make additional copies of this form as needed.
Individual Project Form for Question 9
Page 3 of 4
9E. For
the portion of this project used for S&E
research facilities,
what are (1) the completion costs, and
(2) the net assignable
square feet, for each field listed below? For
multi-year projects,
report costs and NASF expected when the project is completed.
Report only fields with costs of $250,000 or more for research facilities.
If research facilities are shared by two or more fields, allocate the appropriate share of the costs to each field in order to determine which fields to report. For example, if a field will have one-fourth of the costs for a $300,000 project, do not report that field’s share, which is $75,000. If a $400,000 project will have two fields with the same costs, do not report either field’s portion, which is $200,000 each.
If research facilities are also used for nonresearch activities, report the S&E research portion of the cost and net assignable square feet for the fields listed below if the research portion is $250,000 or more. For example, if a facility will be used for S&E research one-fourth of the time and for instruction the rest
of the time, report one-fourth of the completion costs for S&E research facilities.
For Field of S&E definitions, see Question 2 on pages 5–7.
|
Research facilities |
|
||
Field of S&E (Include research animal space.) |
(1) |
(2) |
|
|
a. Agricultural sciences $ ___________ |
___________ |
NASF |
||
b. Biological and biomedical sciences $ ___________ |
___________ |
NASF |
||
c. Computer and information sciences $ ___________ |
___________ |
NASF |
||
d. Engineering $ ___________ |
___________ |
NASF |
||
e. Geosciences, atmospheric, and ocean sciences $ ___________ |
___________ |
NASF |
||
f. Health sciences $ ___________ |
___________ |
NASF |
||
g. Mathematics and statistics $ ___________ |
___________ |
NASF |
||
h. Natural resources and conservation $ ___________ |
___________ |
NASF |
||
i. Physical sciences $ ___________ |
___________ |
NASF |
||
j. Psychology $ ___________ |
___________ |
NASF |
||
k. Social sciences $ ___________ |
___________ |
NASF |
||
l. Other field of S&E (Please describe.) $ ___________ |
___________ |
NASF |
||
_________________________________________ |
If you have any questions about which projects to report or how to fill out
the Individual Project Form, please contact the Facilities Survey Help Desk.
Please make additional copies of this form as needed.
Individual Project Form for Question 9
Page 4 of 4
Reminder: Please see page 1 for confidentiality of this item.
9F. How much of the completion costs and NASF reported in Question 9E are for research animal space?
Research animal space includes all departmental and central facilities, such as laboratories, housing, and associated support areas, that are subject to local, state, and federal government policies and regulations concerning humane care and use of laboratory animals.
|
Completion |
Net assignable square feet |
|
|
Research animal portion included in Question 9E (If none, enter “0.”) $ ___________ |
___________ |
NASF |
9G. If your institution has a medical school, how much of the completion costs and NASF reported in Question 9E are for research facilities located in the medical school?
Medical school is a school that awards the M.D. or D.O. degree.
If your institution does not have a medical
school, check this box and go to Question 10
|
Completion |
Net assignable square feet |
|
|
Medical school portion included in Question 9E (If none, enter “0.”) $ ___________ |
___________ |
NASF |
If you have any questions about which projects to report or how to fill out
the Individual Project Form, please contact the Facilities Survey Help Desk.
13. Please provide the estimated completion costs and NASF for planned new construction of S&E research facilities that are funded and scheduled to start in your FY 2016 or FY 2017. Include research animal space in the relevant fields of S&E. Include only projects whose prorated cost was estimated to be $250,000 or more for at least one field of S&E listed below. For multi-year projects, report the entire completion cost even if some work will occur in future years.
Start date is defined
as the first placement of permanent construction of a building or
addition on site, such as the
pouring of a slab or footing, the
installation of piles, the construction of columns or any work beyond
the stage of excavation. When determining start date, please exclude
planning, demolition, or other site preparation work.
New construction is the construction of a new building or additions to an existing building.
Completion costs include
planning, site preparation, construction,
fixed equipment,
nonfixed equipment that
costs
$1 million or more, and building infrastructure such as
plumbing, lighting, air exchange, and safety systems either in the
building or within 5 feet of the building foundation. Include costs
that meet this definition whether they occur before or after the
project start date.
If research facilities are shared by two or more fields, allocate the appropriate share of the costs to each field in order to determine which fields to report. For example, if a field will have one-fourth of the costs for a $300,000 project, do not report that field’s share, which is $75,000. If a $400,000 project will have two fields with the same costs, do not report either field’s portion, which is $200,000 each.
If research facilities are also used for nonresearch activities, report the S&E research portion of the costs and net assignable square feet for the fields listed below if the research portion is $250,000 or more. For example, if a facility will be used for S&E research one-fourth of the time and for instruction the rest of the time, report one-fourth of the completion costs for S&E research facilities.
If your institution does not
have any planned new
construction projects, check this box and
go to Question 15
For Field of S&E definitions, see Question 2 on pages 5–7.
Field of S&E (Include costs for research animal space.) |
Planned new construction scheduled to start in FY 2016 or FY 2017 |
|
||
Completion |
Net assignable |
|||
a. Agricultural sciences $ ___________ |
___________ |
NASF |
||
b. Biological and biomedical sciences $ ___________ |
___________ |
NASF |
||
c. Computer and information sciences $ ___________ |
___________ |
NASF |
||
d. Engineering $ ___________ |
___________ |
NASF |
||
e. Geosciences, atmospheric, and ocean sciences $ ___________ |
___________ |
NASF |
||
f. Health sciences $ ___________ |
___________ |
NASF |
||
g. Mathematics and statistics $ ___________ |
___________ |
NASF |
||
h. Natural resources and conservation $ ___________ |
___________ |
NASF |
||
i. Physical sciences $ ___________ |
___________ |
NASF |
||
j. Psychology $ ___________ |
___________ |
NASF |
||
k. Social sciences $ ___________ |
___________ |
NASF |
||
l. Other field of S&E (Please describe.) $ ___________ |
___________ |
NASF |
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Title | 8932.10.05: 2011 NSF Facilities Survey Part 1 |
Author | Eric Jodts |
File Modified | 0000-00-00 |
File Created | 2021-01-22 |