Calculation Tables for ICR 1064.18

Copy of 1064 18 burden estimatesxlsx.xlsx

NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR part 60, subpart MM)(Renewal)

Calculation Tables for ICR 1064.18

OMB: 2060-0034

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2


Sheet 1: Table 1






106.45 138.43 52.77



Burden Item (A)Person hours per occurrence (B)Number of occurrences per respondent per Year (C) Person hours per respondent per year (AxB) (D) Number of respondents per Year a,b (E) Technical person hours per year (CxD) (F) Management person hours per year (Ex0.05) (G) Clerical person hours per year (E x 0.1) (H) Total Labor Costs per Year e


1. Applications a 17.4 1 17.4 2 34.8 1.74 3.48 $4,128.97


2. Survey and studies 116.5 1 116.5 2 233 11.65 23.3 $27,645.10


3. Reporting requirements










A. Familiarization with the regulatory requirements 8.7 1 8.7 66 574.2 28.71 57.42 $68,127.97


B. Required activities










Initial performance test c 2,434.8 1 2,434.8 2 4,869.60 243.48 486.96 $577,770.74


Demonstration of CMS N/A









Repeat performance test c, d 573.9 1 573.9 0.4 229.56 11.478 22.956 $27,236.95


C. Create information ------------------------See 3b----------------------------









D. Gather existing information ------------------------See 3e----------------------------









E. Write Report










Notification of construction/reconstruction 1.7 1 1.7 2 3.4 0.17 0.34 $403.40


Notification of actual startup 1.7 1 1.7 2 3.4 0.17 0.34 $403.40


Notification of initial performance test 35.7 1 35.7 2 71.4 3.57 7.14 $8,471.50


Report of performance test ------------------------See 3b----------------------------









Excess emission reports










  VOC emission reports 8.7 4 34.8 64 2,227.2 111.36 222.72 $264,253.94


Temperature reports 26.1 2 52.2 64 3,340.8 167.04 334.08 $396,380.91


Subtotal for Reporting Requirements



13,325 $1,374,822.88


4. Recordkeeping Requirements










A. Familiarization with the regulatory requirements 8.7 1 8.7 64 556.8 27.84 55.68 $66,063.48


B.  Plan activities 17.4 1 17.4 64 1,113.6 55.68 111.36 $132,126.97


C. Implement activities










Monthly performance test 1,669.6 1 1669.6 64 106,854.4 5342.72 10685.44 $12,678,114.28


D.  Develop record system 4,347.8 1 4347.8 2 8,695.6 434.78 869.56 $1,031,719.90


E.  Time to enter information










Records of temperature 417.4 1 417.4 64 26,713.6 1,335.68 2671.36 $3,169,528.57


F.   Train personnel 34.8 1 34.8 64 2,227.2 111.36 222.72 $264,253.94


G.  Audits 17.4 1 17.4 64 1,113.6 55.68 111.36 $132,126.97


5. Equipment and analytical evaluation expense










A. Continuous monitoring & evaluation 34.8 1 34.8 64 2,227.2 111.36 222.72 $264,253.94


B. Routine testing and maintenance 52.2 1 52.2 64 3,340.8 167.04 334.08 $396,380.91


C. Systems of manage data 34.8 1 34.8 64 2,227.2 111.36 222.72 $264,253.94


Subtotal for Recordkeeping Requirements



178,331 $18,398,823


TOTAL LABOR BURDEN AND COST (rounded) f



192,000 $19,800,000


Capital and O&M Cost (see Section 6(b)(iii)): f






$114,000


TOTAL COST: f






$19,900,000
492.307692307692 hr/resp




































Assumptions








a Number of new facilities (per year) is 2.










b. Number of existing affected facilities (per year) is 64.










c It is assumed the EPA Reference Method 24 test performed on the coatings used by the respondents is generally done by the coatings manufacturers, who provide the test results to the respondents. It is further assumed that the coatings manufacturers routinely perform an EPA Method 24 analysis on their coatings as a quality control measure, so there will be no additional cost incurred by the coatings manufacturers.










d Rate of failed performance tests is 20 percent.










e This ICR uses the following labor rates: $138.43 per hour for Executive, Administrative, and Managerial labor; $106.45 per hour for Technical labor, and $52.77 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2015, “Table 2: Civilian Workers, by Occupational and Industry Group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.










f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 2: Table 2






47.62 64.16 25.76

updates:
Burden Items (A) Person hours per occurrence (B) Number of occurrences per Plant per Year (C) EPA hours per respondent per year (AxB) (D) Plants per Year (E) Technical hours per year (CxD) (F) Management hours per year (Ex0.05) (G) Clerical Hours per Year (Ex0.1) (H) Total costs per year c
updated labor rates
Initial performance test









New Plant a 20.9 1.2 25.08 2 50.16 2.51 5.02 $2,678.74

Report review









New Plant









Notification of construction 1.7 1 1.7 2 3.4 0.17 0.34 $181.57

Notification of initial startup 0.4 1 0.4 2 0.8 0.04 0.08 $42.72

Notification of actual startup 0.4 1 0.4 2 0.8 0.04 0.08 $42.72

Notification of initial performance test b 0.4 1.2 0.48 2 0.96 0.05 0.10 $51.27

Review test results d 7 1.2 8.4 2 16.8 0.84 1.68 $897.19

Existing Plant b









VOC emission reports 1.7 4 6.8 64 435.2 21.76 43.52 $23,241.42

Temperature reports 1.7 2 3.4 64 217.6 10.88 21.76 $11,620.71

TOTAL ANNUAL BURDEN AND COST (rounded) e



835 $38,800
increase in the number of respondents






















Assumptions








a Number of new facilities (per year) is 2.









b. Number of existing affected facilities (per year) is 64.









c This cost is based on the following hourly labor rates times a 1.6 benefits multiplication factor to account for government overhead expenses: $64.16 for Managerial, $47.62 for Technical and $25.76 for Clerical. These rates are from the Office of Personnel Management (OPM) “2016 General Schedule” which excludes locality rates of pay.









d Rate of failed performance tests is 20 percent.









e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.