NESHAP for Clay Ceramics Manufacturing, Glass Manufacturing and Secondary Nonferrous Metals Processing Area Sources (40 CFR Part 63, Subparts RRRRRR, SSSSSS, and TTTTTT)

ICR 201605-2060-003

OMB: 2060-0606

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2016-05-05
Supporting Statement A
2016-05-05
ICR Details
2060-0606 201605-2060-003
Historical Active 201403-2060-005
EPA/OAR 2274.05
NESHAP for Clay Ceramics Manufacturing, Glass Manufacturing and Secondary Nonferrous Metals Processing Area Sources (40 CFR Part 63, Subparts RRRRRR, SSSSSS, and TTTTTT)
Extension without change of a currently approved collection   No
Regular
Approved without change 08/24/2016
Retrieve Notice of Action (NOA) 05/19/2016
  Inventory as of this Action Requested Previously Approved
08/31/2019 36 Months From Approved 08/31/2016
14 0 14
1,810 0 1,763
9,850 0 9,854

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subparts RRRRRR, SSSSSS, and TTTTTT. Owners or operators of the affected facilities must submit a one-time-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative.

US Code: 44 USC 3501 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  80 FR 32116 06/05/2015
81 FR 31632 05/19/2016
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 14 14 0 0 0 0
Annual Time Burden (Hours) 1,810 1,763 0 0 47 0
Annual Cost Burden (Dollars) 9,850 9,854 0 0 -4 0
No
No
There is an adjustment increase in respondent labor hours and costs in this ICR from the most recently approved ICR. This is not due to any program changes. The increase occurred because this ICR assumes all existing respondents will take some time each year to re-familiarize with the regulatory requirements. Additionally, there is a small decrease of $4 in the estimated O&M cost due to rounding. This ICR rounds all calculated burden and costs to three significant digits. There is no change in the methodology or assumptions used to calculate the O&M cost.

$1,350
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/19/2016


© 2024 OMB.report | Privacy Policy