The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 63, subpart DDDDDDD. Owners or operators of the affected
facilities must submit initial notification, performance tests, and
periodic reports and results. Owners or operators are also required
to maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports, at a minimum, are required annually.
There is an adjustment increase
in the respondent labor hours and cost in this ICR compared to the
previous ICR. This is not due to program changes. The increase
occurred because this ICR assumes all existing respondents will
take some time each year to re-familiarize with the regulatory
requirements. Additionally, there is a small decrease of $36 in the
estimated O&M cost due to rounding. This ICR rounds all
calculated burden and costs to three significant digits. There is
no change in the methodology or assumption used to calculate
O&M cost.
$188,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.