The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 63, subpart AAAAAAA. Owners or operators of the affected
facilities must submit a one-time-only of any physical or
operational changes, initial performance tests, and periodic
reports and results. Owners or operators are also required to
maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports are also required semiannually.
There is a small adjustment
increase in the respondent labor hours and the total O&M costs
as currently identified in the OMB Inventory of Approved Burdens.
The increase in labor hours is due to a change in assumption. In
this ICR, we assume all existing sources will take some time each
year to re-familiarize themselves with the regulatory requirements.
The increase of five dollars in total O&M cost is due to
rounding of all calculated values to three significant
figures.
$7,960
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked