FERC-729, Electric Transmission Facilities

ICR 201602-1902-004

OMB: 1902-0238

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2016-03-09
Supplementary Document
2016-03-09
Supplementary Document
2016-03-09
Supplementary Document
2016-03-08
Supplementary Document
2016-03-08
Supplementary Document
2016-03-08
Supplementary Document
2016-03-08
Supplementary Document
2016-03-07
Supplementary Document
2016-03-03
Supplementary Document
2013-02-12
IC Document Collections
IC ID
Document
Title
Status
46193
Modified
ICR Details
1902-0238 201602-1902-004
Historical Active 201302-1902-004
FERC FERC-729
FERC-729, Electric Transmission Facilities
Extension without change of a currently approved collection   No
Regular
Approved without change 05/03/2016
Retrieve Notice of Action (NOA) 03/09/2016
In accordance with 5 CFR 1320, the information collection is approved for three years. Note that the burden estimates presented here serve as ‘placeholder’ values as is approved as such. FERC does not currently have any applications pending or any proposed projects in the pre-filing process. If the number of respondents or the burden changes significantly during this approval period, such that the burden estimate, as approved, is no longer a reasonable estimate, FERC will request a modification to update this collection.
  Inventory as of this Action Requested Previously Approved
05/31/2019 36 Months From Approved 05/31/2016
1 0 1
9,600 0 9,600
0 0 0

The blackout of August 2003 highlighted the need to bolster the nation’s electric transmission system. However, even after the blackout, construction of interstate transmission remained relatively stagnant. This prompted Congress to require that the Department of Energy (DOE) identify transmission constraints. Specifically, the Energy Policy Act of 2005 (EPAct 2005) mandates that DOE conduct a study of electric transmission congestion within one year of enactment and every three years thereafter. After DOE conducts the study, EPAct 2005 requires that DOE issue a report, based on the study, designating any geographic areas experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers as a national interest electric transmission corridor (NIETC). Section 1221 of EPAct 2005 added a new Section 216 to the Federal Power Act (FPA). Section 216(c)(2) of the FPA requires that the Commission issue rules specifying the form of and the information to be contained in an application for proposed construction or modification of electric transmission facilities in a designated NIETC, and the manner of service of notice of the permit application on interested persons. The Commission implemented these requirements in a new Part 50 of existing subchapter B of the Commission’s regulations. The new procedures required certain modifications to other existing regulations, including the Commission’s regulations implementing the National Environmental Policy Act of 1969 (NEPA) in Part 380. The purpose of these regulations is to implement the Commission’s mandates under EPAct 2005 Section 1221 which authorizes the Commission to issue permits under FPA Section 216(b) for electric transmission facilities and the Commission’s delegated responsibility to coordinate all other federal authorizations under FPA Section 216(h). Section 50.2(b) and (c) requires any entity seeking a permit to construct electric transmission facilities to file all the information required by the proposed regulations for Commission consideration. The Commission considers the requirements of Part 50 a direct obligation. All filing requirements necessary to issue a construction permit must be filed unless the prospective applicant or applicant provides a specific showing of why something was not filed. Finally, under Section 50.2(d), the burden of proof of providing all the information in an intelligible form and justification for omitted data lies on the prospective applicant.

US Code: 16 USC 216 Name of Law: Federal Power Act
   PL: Pub.L. 109 - 58 1221 Name of Law: Energy Policy Act of 2005 (EPAct of 2005)
   US Code: 42 USC 4321 Name of Law: National Environmental Policy Act of 1969
   US Code: 42 USC 7172 Name of Law: Department of Energy Organization Act
  
None

Not associated with rulemaking

  80 FR 68312 11/04/2015
81 FR 11781 03/07/2016
No

1
IC Title Form No. Form Name
Electric Transmission Facilities

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 1 1 0 0 0 0
Annual Time Burden (Hours) 9,600 9,600 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$50,040
No
No
No
No
No
Uncollected
Sheila Lampitoc 202 502-6193

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/09/2016


© 2024 OMB.report | Privacy Policy