The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the General Provisions specified
at 40 CFR part 63, subpart RRR. Owners or operators of the affected
facilities must submit a one-time-only of any physical or
operational changes, initial performance tests, and periodic
reports and results. Owners or operators are also required to
maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports are also required semiannually.
There is a decrease in the
total estimated burden as currently identified in the OMB Inventory
of Approved Burdens. This decrease is primarily a result of
updating the number of sources. A recent industry analysis
conducted during development of the 2015 final rule indicates a
substantial decrease in both the number of major and area source
facilities subject to the rule from the estimates used in the
previous ICR renewal, EPA ICR Number 1894.07. Note this ICR merges
the burden from EPA ICR Number 2453.02, the ICR for the 2015 final
rule. Therefore, this ICR reflects additional burden items not
present in the previous renewal. In addition, this ICR revises bag
leak detector costs per comments received from The Aluminum
Association. These changes result in an overall increase in the
capital and O&M costs.
$79,800
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.