NSPS for Surface Coating of Large Appliances (40 CFR part 60, subpart SS) (Renewal)

ICR 201512-2060-002

OMB: 2060-0108

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2015-12-01
Supporting Statement A
2015-12-01
IC Document Collections
ICR Details
2060-0108 201512-2060-002
Historical Active 201211-2060-006
EPA/OAR 0659.13
NSPS for Surface Coating of Large Appliances (40 CFR part 60, subpart SS) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/17/2016
Retrieve Notice of Action (NOA) 12/23/2015
  Inventory as of this Action Requested Previously Approved
03/31/2019 36 Months From Approved 03/31/2016
288 0 288
7,740 0 7,659
8,400 0 8,400

The affected entities are subject to the General Provisions of the NSPS at 40 CFR part 60, subpart A and any changes, or additions to the Provisions specified at 40 CFR part 60, subpart SS. Owners or operators of the affected facilities must make an initial notification, performance tests, periodic reports, and maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports are also required semiannually.

US Code: 44 USC 3501 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  80 FR 32116 06/05/2015
80 FR 79891 12/23/2015
No

1
IC Title Form No. Form Name
NSPS for Surface Coating of Large Appliances (40 CFR part 60, subpart SS)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 288 288 0 0 0 0
Annual Time Burden (Hours) 7,740 7,659 0 0 81 0
Annual Cost Burden (Dollars) 8,400 8,400 0 0 0 0
No
No
There is a small increase in the total estimated respondent burden and cost compared with the ICR currently approved by OMB. This increase is due to assuming that all existing respondents will need to spend some time reviewing the rule requirement each year to re-familiarize themselves with it. In previous ICRs, it was assumed that only new respondents would need to read and review the rule requirement. In addition, a portion of the increase in burden cost is due to using updated labor rates from the Bureau of Labor Statistics.

$30,100
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/23/2015


© 2024 OMB.report | Privacy Policy