Download:
pdf |
pdf79584
Federal Register / Vol. 80, No. 245 / Tuesday, December 22, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
FOR FURTHER INFORMATION CONTACT:
Menice Santistevan, Northern New
Mexico Citizens’ Advisory Board, 94
Cities of Gold Road, Santa Fe, NM
87506. Phone (505) 995–0393; Fax (505)
989–1752 or Email:
menice.santistevan@em.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
Purpose of the Environmental
Monitoring and Remediation Committee
(EM&R): The EM&R Committee provides
a citizens’ perspective to NNMCAB on
current and future environmental
remediation activities resulting from
historical Los Alamos National
Laboratory (LANL) operations and, in
particular, issues pertaining to
groundwater, surface water and work
required under the New Mexico
Environment Department Order on
Consent. The EM&R Committee will
keep abreast of DOE–EM and site
programs and plans. The committee will
work with the NNMCAB to provide
assistance in determining priorities and
the best use of limited funds and time.
Formal recommendations will be
proposed when needed and, after
consideration and approval by the full
NNMCAB, may be sent to DOE–EM for
action.
Purpose of the Waste Management
(WM) Committee: The WM Committee
reviews policies, practices and
procedures, existing and proposed, so as
to provide recommendations, advice,
suggestions and opinions to the
NNMCAB regarding waste management
operations at the Los Alamos site.
Tentative Agenda:
• Call to Order and Introductions
• Approval of Agenda
• Approval of Minutes from October 14,
2015
• Old Business
• New Business
• Update from DOE
• Presentation by DOE: Los Alamos
Transuranic Waste Program
Corrective Actions
• Public Comment Period
• Sub-Committee Breakout Session
Æ Election of Fiscal Year 2016 (FY16)
EM&R Vice Chair
Æ Draft FY16 Committee Work Plans
Æ General Committee Business
• Adjourn
Public Participation: The NNMCAB’s
Committees welcome the attendance of
the public at their combined committee
meeting and will make every effort to
accommodate persons with physical
VerDate Sep<11>2014
17:21 Dec 21, 2015
Jkt 238001
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Menice
Santistevan at least seven days in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Committees either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Menice Santistevan at the
address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at:
http://energy.gov/em/nnmcab/northernnew-mexico-citizens-advisory-board.
Issued at Washington, DC, on December 16,
2015.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2015–32092 Filed 12–21–15; 8:45 am]
BILLING CODE 6405–01–P
DEPARTMENT OF ENERGY
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC16–1–000]
Commission Information Collection
Activities (FERC–725K); Comment
Request
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting its information
collection FERC–725K (Mandatory
Reliability Standards for the SERC
Region) to the Office of Management
and Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (80 FR 61812,
10/14/2015) requesting public
comments. The Commission received no
comments on the FERC–725K and is
making this notation in its submittal to
OMB.
DATES: Comments on the collection of
information are due by January 21,
2016.
SUMMARY:
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP16–297–000.
Applicants: Young Gas Storage
Company, Ltd.
Description: Section 4(d) rate filing
per 154.204: Average Thermal Content
Adjustment Filing—2015 to be effective
12/1/2015.
Filed Date: 12/11/15.
Accession Number: 20151211–5091.
Comments Due: 5 p.m. ET 12/23/15.
Docket Numbers: RP16–298–000.
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: Section 4(d) rate filing
per 154.204: Average Thermal Content
Adjustment Filing—2015 to be effective
12/1/2015.
Filed Date: 12/11/15.
Accession Number: 20151211–5133.
Comments Due: 5 p.m. ET 12/23/15.
Fmt 4703
[FR Doc. 2015–32124 Filed 12–21–15; 8:45 am]
Federal Energy Regulatory
Commission.
ACTION: Comment request.
Combined Notice of Filings
Frm 00030
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
AGENCY:
Federal Energy Regulatory
Commission
PO 00000
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\22DEN1.SGM
22DEN1
79585
Federal Register / Vol. 80, No. 245 / Tuesday, December 22, 2015 / Notices
Comments filed with OMB,
identified by the OMB Control No.
1902–0260, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov.
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC16–1–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://www.
ferc.gov/help/submission-guide.asp. For
user assistance contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free), or (202) 502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
ADDRESSES:
Title: Mandatory Reliability Standards
for the SERC Region.
OMB Control No.: 1902–0260.
Type of Request: Three-year extension
of the FERC–725K information
collection requirements with no changes
to the reporting requirements.
Abstract: Section 215 of the Federal
Power Act (FPA) requires a
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.
Once approved, the Reliability
Standards may be enforced by NERC,
subject to Commission oversight, or by
the Commission independently.
Reliability Standards that NERC
proposes to the Commission may
include Reliability Standards that are
proposed by a Regional Entity to be
effective in that region. In Order No.
672, the Commission noted that:
As a general matter, we will accept the
following two types of regional differences,
provided they are otherwise just, reasonable,
not unduly discriminatory or preferential and
in the public interest, as required under the
statute: (1) A regional difference that is more
stringent than the continent-wide Reliability
Standard, including a regional difference that
addresses matters that the continent-wide
Reliability Standard does not; and (2) a
regional Reliability Standard that is
necessitated by a physical difference in the
Bulk-Power System.
When NERC reviews a regional
Reliability Standard that would be
applicable on an interconnection-wide
basis and that has been proposed by a
Regional Entity organized on an
interconnection-wide basis, NERC must
rebuttably presume that the regional
Reliability Standard is just, reasonable,
not unduly discriminatory or
preferential, and in the public interest.
In turn, the Commission must give ‘‘due
weight’’ to the technical expertise of
NERC and of a Regional Entity
organized on an interconnection-wide
basis.
On April 19, 2007, the Commission
accepted delegation agreements between
NERC and each of the eight Regional
Entities. In the order, the Commission
accepted SERC as a Regional Entity
organized on less than an
interconnection-wide basis. As a
Regional Entity, SERC oversees BulkPower System reliability within the
SERC Region, which covers a
geographic area of approximately
560,000 square miles in a sixteen-state
area in the southeastern and central
United States (all of Missouri, Alabama,
Tennessee, North Carolina, South
Carolina, Georgia, Mississippi, and
portions of Iowa, Illinois, Kentucky,
Virginia, Oklahoma, Arkansas,
Louisiana, Texas and Florida). The
SERC Region is currently geographically
divided into five subregions that are
identified as Southeastern, Central,
VACAR, Delta, and Gateway.
Type of Respondents: Entities
registered with the North American
Electric Reliability Corporation (within
the SERC region).
Estimate of Annual Burden: 1 The
Commission estimates the annual public
reporting burden for the information
collection as:
mstockstill on DSK4VPTVN1PROD with NOTICES
FERC–725K—MANDATORY RELIABILITY STANDARD FOR THE SERC REGION
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average
burden and
cost per
response 2
Total annual
burden hours
and total
annual cost
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
PCs: Design and Document Automatic UFLS Program ...........
3 21
1
21
PCs: Provide Documentation and Data to SERC ....................
3 21
1
21
GOs: Provide Documentation and Data to SERC ....................
5 104
1
104
GOs: Record Retention .............................................................
5 104
1
104
Total ...................................................................................
........................
........................
125
1 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
2 The $66.45 hourly cost figure (including
benefits) comes from the cost of an engineer as
posted on the Bureau of Labor Statistics (BLS) Web
VerDate Sep<11>2014
18:44 Dec 21, 2015
Jkt 238001
site: http://www.bls.gov/oes/current/naics2_
22.htm#11-0000 (wage category 17–2071).
3 Both figures for PC respondents are not to be
totaled. They represent the same set of respondents.
4 The $66.45 hourly cost figure (including
benefits) comes from the cost of an engineer as
posted on the Bureau of Labor Statistics (BLS) Web
site: http://www.bls.gov/oes/current/naics2_22.
htm#11-0000 (wage category 17–2071).
5 Both figures for GO respondents are not to be
totaled. They represent the same set of respondents.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
8
$532
16
$1,064
16
$1,064
4
$150
........................
168
$532
4 $11,172
336
$22,344
6 1,664
$110,656
416
7 $15,600
1,064
2,584
$159,772
2,810
1,064
150
6 The hourly cost for GOs uses the hourly
reporting cost of $66.45 per hour is based on the
cost (including benefits) of an engineer to
implement the requirements of the rule.
7 The record retention cost of $37.50 per hour
(including benefits) comes from Commission staff
research on record retention requirements (wage
category 43–4199 for information and record
clerks).
E:\FR\FM\22DEN1.SGM
22DEN1
79586
Federal Register / Vol. 80, No. 245 / Tuesday, December 22, 2015 / Notices
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32128 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP15–1022–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Alliance Pipeline, L.P.; Notice of
Informal Settlement Conference
Take notice that an informal
settlement conference will be convened
in this proceeding commencing at 10:00
a.m. (EST) on December 21, 2015, at the
offices of the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, for the purpose
of exploring the possible settlement of
the above-referenced docket.
Any party, as defined by 18 CFR
385.102(c), or any participant as defined
by 18 CFR 385.102(b), is invited to
attend. Persons wishing to become a
party must move to intervene and
receive intervenor status pursuant to the
Commission’s regulations (18 CFR
385.214).
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
1–866–208–3372 (voice) or 202–502–
8659 (TTY), or send a FAX to 202–208–
2106 with the required
accommodations.
For additional information, please
contact Ken Ende, kenneth.ende@
ferc.gov, at 202–502–6762 or Sharli
Silva, sharli.silva@ferc.gov, at 202–502–
8719 or Kelsey Bagot at (202) 502–8121,
kelsey.bagot@ferc.gov.
VerDate Sep<11>2014
18:44 Dec 21, 2015
Jkt 238001
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Filed Date: 12/16/15.
Accession Number: 20151216–5101.
Comments Due: 5 p.m. ET 1/6/16.
[FR Doc. 2015–32132 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–525–000]
UGI Sunbury, LLC; Revised Notice of
Schedule for Environmental Review of
the Sunbury Pipeline Project
This notice identifies the Federal
Energy Regulatory Commission
(Commission or FERC) staff’s revised
schedule for the completion of the
environmental assessment (EA) for UGI
Sunbury LLC’s Sunbury Pipeline
Project. The previous notice of
schedule, issued on November 9, 2015,
identified January 7, 2016 as the EA
issuance date.
Schedule for Environmental Review
Issuance of EA—December 28, 2015
90-day Federal Authorization Decision
Deadline—March 27, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. Go
to www.ferc.gov/docs-filing/
esubscription.asp.
[FR Doc. 2015–32126 Filed 12–21–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
National Fuel Gas Supply Corporation;
Notice of Application
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2056–001.
Applicants: Upper Peninsula Power
Company.
Description: Compliance filing:
Amendment to Triennial Market Based
Rate to be effective 8/28/2015.
Fmt 4703
[FR Doc. 2015–32123 Filed 12–21–15; 8:45 am]
[Docket No. CP16–28–000]
DEPARTMENT OF ENERGY
Frm 00032
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Dated: December 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
PO 00000
Docket Numbers: ER16–539–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: Membership Agreement
Amendments for Central Power and
Mountrail-Williams to be effective
2/14/2016.
Filed Date: 12/16/15.
Accession Number: 20151216–5170.
Comments Due: 5 p.m. ET 1/6/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Sfmt 4703
Take notice that on December 3, 2015,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed in
the above referenced docket an
application pursuant to sections 7(b)
and 7(c) of the Natural Gas Act (NGA),
and Part 157 of the Commission’s
regulations requesting authorization for
the construction and operation of new
Line QP and permission to abandon the
Queen Storage Field, including the base
gas in the field, the Queen Compressor
E:\FR\FM\22DEN1.SGM
22DEN1
File Type | application/pdf |
File Modified | 2015-12-22 |
File Created | 2015-12-22 |