NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)

ICR 201510-2060-001

OMB: 2060-0517

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2015-10-06
Supporting Statement A
2015-10-06
IC Document Collections
ICR Details
2060-0517 201510-2060-001
Historical Active 201208-2060-001
EPA/OAR 2003.06
NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/18/2016
Retrieve Notice of Action (NOA) 10/29/2015
  Inventory as of this Action Requested Previously Approved
03/31/2019 36 Months From Approved 03/31/2016
44 0 44
18,500 0 18,421
67,000 0 67,002

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions of 40 CFR part 63, subpart FFFFF...General Provisions specified at 40 CFR part 63, subpart FFFFF. Owners or operators of the affected facilities must submit initial notification reports, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

US Code: 44 USC 3501 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  80 FR 32116 06/05/2015
80 FR 65753 10/27/2015
No

1
IC Title Form No. Form Name
NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 44 44 0 0 0 0
Annual Time Burden (Hours) 18,500 18,421 0 0 79 0
Annual Cost Burden (Dollars) 67,000 67,002 0 0 -2 0
No
No
The increase in respondent labor burden from the most-recently approved ICR is due to an adjustment. In this ICR, we assume all existing respondents will take some time to re-familiarize with the regulatory requirement. This assumption results in a small increase in labor hours and costs. The respondent labor costs also increased due to use of more updated labor rates. The total estimated cost, including capital and O&M costs, have also been rounded to three significant figures. The rounding results in a small apparent decrease in the total O&M cost.

$22,800
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 yellin.patrick@epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/29/2015


© 2024 OMB.report | Privacy Policy