Contractor's Certificate of Actual Cost Section 242 |
U.S. Department of Housing and Urban Development Office of Hospital Facilities
|
OMB Approval No. 2502-0602 (Exp. 05/31/2016) |
Public reporting burden for this collection of information is average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. This information is required to obtain benefits, HUD may not collect this information, and you are not required to complete this form, unless it displays a currently valid OMB control number. 24 C.F.R. 242.42, authorizes the collection of this information. The information is required for a general contractor when an identity of interest exists between the general contract and the mortgagor or when a mortgagor is a non-profit entity and a cost plus contract has been used. The information is required from the contractor to convey its actual construction cost in a standardized format for cost certification.
Privacy Act Notice. The United States Department of Housing and Urban Development, Federal Housing Administration, is authorized to solicit the information requested in this form by virtue of Title 12, United States Code, Section 1701 et seq., and regulations promulgated thereunder at Title 12, Code of Federal Regulations. While no assurances of confidentiality is pledged to respondents, HUD generally discloses this data only in response to a Freedom of Information request.
Project Number
|
Building Number |
Borrower |
Contractor
|
Name of Project |
Location |
This Certificate is made pursuant to the provisions of the Construction Contract, entered into by and between us under date of
Div.
Trade
Item
Paid
in Cash
To Be
Paid In Cash
Total
Name
of Subcontractor or Payee
Line
3
Concrete
1
4
Masonry
2
5
Metals
3
6
Rough
Carpentry
4
6
Finish
Carpentry
5
7
Waterproofing
6
7
Insulation
7
7
Roofing
8
7
Sheet
Metal
9
8
Doors
10
8
Windows
11
8
Glass
12
9
Lath
and Plaster
13
9
Drywall
14
9
Tile
Work
15
9
Acoustical
16
9
Wood
Flooring
17
9
Resilient
Flooring
18
9
Painting
and Decorating
19
10
Specialties
20
11
Special
Equipment
21
11
Cabinets
22
11
Appliances
23
12
Blinds
and Shades, Artwork
24
12
Carpets
25
13
Special
Construction
26
14
Elevators
27
15
Plumbing
and Hot Water
28
15
Heat
and Ventilation
29
15
Air
Conditioning
30
16
Electrical
31
Subtotal
(Structures)
32
Accessory
Structures
33
Total
(Structures)
34
General
Requirements (Job Overhead)
Other
Fees–Paid by Contractor
Item
Total
Item
Total
Supervision
$
$
Field
Engineering
Field
Office Expense
Temporary
Facilities
Temporary
Utilities
Cleaning
and Rubbish Removal
Watchmen
Wages
Total
for General Requirements
$
Total
$
Itemized
Breakdown
The undersigned hereby certifies that: (Check One)
[ ] There has not been and is not now any identity of interest between mortgagor and/or Construction Manager or general contractor on the one hand and any subcontractor, material supplier or equipment lessor on the other.
[ ] The accompaniment contains a statement fully describing any identities of interest. Identity of Interest is defined as follows: When there is any financial interest of the party of the first part in the party of the second part; when one or more of the officers, directors or stockholders or the part of the first part is also an officer, director or stockholder of the party of the second part; when any officer, director or stockholder of the party of the first part has any financial interest whatsoever in the party of the second part; when the part of the second part advances any funds to the party of the first part; when the party of the second part provides and pays on behalf of the party of the first part the cost of any architectural services or engineering services other than those of a surveyor, general superintendent, or engineer employed by a general contract in connection with its obligations under the construction contract; when the party of the second part takes stock or any interest in the party of the first part as part of the consideration to be paid them; when there exist or come into being any side deals, agreements, contracts or undertakings entered into or contemplated, thereby altering, amending or cancelling any of the required closing documents except as approved by the Commissioner.
All amounts shown include all change orders for the project, and all amounts shown above as “to be paid in cash” will be so paid within forty-five (45) days after final endorsement.
Note:
This certificate must be supported by a certification as to actual
cost by an independent Certified Public Accountant or by an
independent public accountant as required for Forms HUD-93305.
I hereby
certify that all the information stated herein, as well as any
information provided in the accompaniment herewith, is true and
accurate. Warning:
HUD will prosecute false claims and statements. Conviction may
result in criminal and/or civil penalties. (18 U.S.C. 1001, 1010,
1012; 31 U.S.C. 3729, 3802)
Signature of Authorized Official: |
Date:
|
Div.
Trade
Item
Paid
in Cash
To be
Paid Cash
Total
Name
of Subcontractor or Payee
Line
2
Earth
Work
35
2
Site
Utilities
36
2
Roads
and Walks
37
2
Site
Improvements
38
2
Lawns
and Planting
39
2
Unusual
Site Conditions
40
Total
(Land Improvements)
41
Total
(Structure and Land Improvements)
42
1
General
Requirements
43
General
Overhead
44
Miscellaneous
(Labor and Materials)*
45
Bond
Premium
46
Other
Fees–Paid by Contractor
47
48
Total
Costs
49
*
Total purchases of materials and cost of labor amounting to less
than $1,000 may be included as a lump sum under miscellaneous
materials and labor. Costs exceeding this amount for materials and
labor must be allocated to the trade item under which they were
expended on HUD-92330A-OHF worksheets 3 & 4.
Note:
If additional space is required for these or other items, append
Rider thereto, with references and initial. When more than one
subcontractor is performing a trade item, the attached work sheet
must be completed giving the information indicated.
Worksheet
Div.
Trade
Item
Paid
in Cash
To be
Paid Cash
Total
Name
of Subcontractor or Payee
3
Concrete
4
Masonry
5
Metals
6
Rough
Carpentry
6
Finish
Carpentry
7
Waterproofing
7
Insulation
7
Roofing
7
Sheet
Metal
8
Doors
8
Windows
8
Glass
9
Lath
and Plaster
9
Drywall
9
Tile
Work
9
Acoustical
9
Wood
Flooring
9
Resilient
Flooring
Div.
Trade
Item
Paid
in Cash
To be
Paid Cash
Total
Name
of Subcontractor or Payee
9
Painting
and Decorating
10
Specialties
11
Special
Equipment
11
Cabinets
11
Appliances
12
Blinds
and Shades, Artwork
12
Carpets
13
Special
Construction
14
Elevators
15
Plumbing
and Hot Water
15
Heat
and Ventilation
15
Air
Conditioning
16
Electrical
2
Earth
Work
2
Site
Utilities
2
Roads
and Walks
2
Site
Improvements
2
Lawns
and Planting
2
Unusual
Site Conditions
Previous
versions obsolete Page
ref. Handbook 4470.1,4470.2, & 4615.1
| File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
| Author | Senator, Robin L |
| File Modified | 0000-00-00 |
| File Created | 2021-01-24 |