|
|
|
|
|
103.97 |
129.93 |
51.79 |
|
|
|
|
| Burden item |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
| Person-hours per occurrence |
No. Of occurrences per respondent per year |
Person-hours per respondent per year (C=AxB) |
Respondents per year a |
Technical person-hour / year (E=CxD) |
Management person-hour / year (Ex0.05) |
Clerical (Ex0.1) |
Cost, $ b |
|
|
|
| 1. Applications |
N/A |
|
|
|
|
|
|
|
|
|
|
| 2. Survey and Studies |
N/A |
|
|
|
|
|
|
|
|
|
|
| 3. Acquisition, Installation, and Utilization of Technology and Systems |
N/A |
|
|
|
|
|
|
|
|
|
|
| 4. Reporting Requirements |
|
|
|
|
|
|
|
|
|
New Respondents |
0 |
| A. Familiarize with rule requirement: |
|
|
|
|
|
|
|
|
|
Existing Respondents |
27 |
| New Respondents |
25 |
1 |
25 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| Existing Respondents |
1 |
1 |
1 |
27 |
27 |
1.35 |
2.7 |
$3,122.43 |
|
|
|
| B. Required activities: |
|
|
|
|
|
|
|
|
|
|
|
| New Respondents c, d |
|
|
|
|
|
|
|
|
|
|
|
| i. Initial performance test |
24 |
1 |
24 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| ii. Repeat of performance test |
24 |
1 |
24 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| iii. Startup, shutdown, malfunction plan |
40 |
1 |
40 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| New and Existing Respondents |
|
|
|
|
|
|
|
|
|
|
|
| iv. Monitoring of operating parameters and equipment: e |
Included in 5E |
|
|
|
|
|
|
|
|
|
|
| C. Gather Existing Information |
Included in 5D, 5E |
|
|
|
|
|
|
|
|
|
|
| D. Write report c, d |
|
|
|
|
|
|
|
|
|
|
|
| i. Notification of compliance status |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| ii. Notification of intent to construct a major source and review application |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| iii. Notification of initial construction/ reconstruction a |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| iv. Notification of actual startup |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| v. Notification of performance test |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| vi. Reports of performance test results |
Included in 4B, 5E |
|
|
|
|
|
|
|
|
|
|
| vii. Semiannual compliance reports d |
12 |
2 |
24 |
27 |
648 |
32.4 |
64.8 |
$74,938.28 |
|
|
|
| viii. Startup, shutdown, malfunction report f |
8 |
1 |
8 |
1 |
8 |
0.4 |
0.8 |
$925.16 |
|
|
|
| Subtotal for Reporting Requirements |
785 |
$78,985.88 |
|
|
|
| 5. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
| A. Read instructions |
Included in 4A |
|
|
|
|
|
|
|
|
|
|
| B. Plan activities |
10 |
1 |
10 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| C. Implement activities |
Included in 4B |
|
|
|
|
|
|
|
|
|
|
| D. Develop record system g |
NA |
|
|
|
|
|
|
|
|
|
|
| E. Time to enter and transmit all information into record system h |
|
|
|
|
|
|
|
|
|
|
|
| i. Record performance tests |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| ii. Record operating parameters |
1 |
365 |
365 |
27 |
9,855 |
492.75 |
985.5 |
$1,139,686.40 |
|
|
|
| iii Record malfunctions |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| iv. Continuous parameter monitoring calibration and maintenance |
4 |
5 |
20 |
27 |
540 |
27 |
54 |
$62,448.57 |
|
|
|
| v. Store, file, and maintain records |
20 |
1 |
20 |
27 |
540 |
27 |
54 |
$62,448.57 |
|
|
|
| F. Time to train personnel |
16 |
1 |
16 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| G. Time for audits |
N/A |
|
|
|
|
|
|
|
|
|
|
| Subtotal for Recordkeeping Requirements |
12,575 |
$1,264,583.54 |
|
|
|
| TOTAL LABOR BURDEN AND COST (rounded) |
|
|
|
|
13,400 |
$1,340,000 |
|
Previously 13,500 hr |
|
| Capital and O&M Cost (see Section 6(b)(iii)) |
|
|
|
|
|
|
|
$135,000 |
|
|
|
| TOTAL COST (rounded) |
|
|
|
|
|
|
|
$1,480,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
248 |
hr/response |
|
|
|
|
|
|
|
|
46.67 |
62.9 |
25.25 |
|
|
|
|
| Burden item |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
| Person-hours per occurrence |
No. Of occurrences per respondent per year |
Person-hours per respondent per year (C=AxB) |
Respondents per year a |
Technical person-hours per year (E=CxD) |
Management person-hours per year (Ex0.05) |
Clerical person-hours per year (Ex0.1) |
Cost, $ b |
|
|
|
| New Respondents: |
|
|
|
|
|
|
|
|
|
|
|
| i. Notification of compliance status |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
New Respondents |
0 |
| ii. Notification of intent to construct a major source and review application |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
Existing Respondents |
27 |
| iii. Notification of start of construction |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| iv. Notification of actual startup |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| v. Notification of initial performance test and test plan |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| New and Existing Respondents |
|
|
|
|
|
|
|
|
|
|
|
| i. Report of performance test results including operating parameters |
20 |
1 |
20 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| ii. Review of semiannual compliance reports |
8 |
2 |
16 |
27 |
432 |
21.6 |
43.2 |
$22,610.88 |
|
|
|
| iii. Review of startup, shutdown, malfunction reports d |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0.00 |
|
|
|
| TOTAL ANNUAL BURDEN AND COST (rounded) |
497 |
$22,600 |
|
Prev: 543 hr |
|
|
| Capital/Startup vs. Operation and Maintenance (O&M) Costs |
|
|
|
|
|
|
|
| (A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
| Continuous Monitoring Device |
Capital/Startup Cost for One Respondent |
Number of New Respondents |
Total Capital/Startup Cost, (B X C) |
Annual O&M Costs for One Respondent |
Number of Respondents with O&M |
Total O&M, |
| PM control device |
$7,000 |
0 |
$0 |
$5,000 |
27 |
$135,000 |
| Thermal oxidizer |
$25,000 |
0 |
$0 |
NA |
0 |
0 |
| Photocopy / postage |
|
|
|
$7.50 |
54 |
$405 |
| Total |
|
|
0 |
|
|
$135,000 |
| NA – not applicable; EPA assumes that all facilities subject to the standard have or will obtain add-on control devices that are already equipped with continuous parameter monitoring equipment. This monitoring equipment is required not only for compliance purposes but also to operate the control equipment. |
|
|
|
|
|
|
| Total Annual Responses |
| (A) |
(B) |
(C) |
(D) |
(E) |
| Information Collection Activity |
Number of Respondents |
Number of Responses |
Number of Existing Respondents That Keep Records But Do Not Submit Reports |
Total Annual Responses |
| Notification of compliance status |
0 |
1 |
0 |
0 |
| Notification/application of construction |
0 |
1 |
0 |
0 |
| Notification of actual startup |
0 |
1 |
0 |
0 |
| Notification of performance test and test plan |
0 |
1 |
0 |
0 |
| Report of performance test results |
0 |
1.2 |
0 |
0 |
| Report of semiannual compliance reports |
27 |
2 |
0 |
54 |
| Report of startup, shutdown, malfunction |
0 |
1 |
0 |
0 |
|
|
|
Total |
54 |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Respondents |
0 |
|
|
|
Existing Respondents |
27 |