In accordance
with 5 CFR 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
03/31/2019
36 Months From Approved
03/31/2016
84
0
84
1,850
0
1,849
0
0
0
The affected entities are subject to
the General Provisions of the NSPS at 40 CFR part 60, subpart A and
any changes, or additions to the Provisions specified at 40 CFR
part 60, subpart JJJ. Owners or operators of the affected
facilities must make an initial notification, performance tests,
periodic reports, and maintain records of the occurrence and
duration of any startup, shutdown, or malfunction in the operation
of an affected facility, or any period during which the monitoring
system is inoperative. Reports, at a minimum, are required
semiannually.
The small increase in labor
hours from the most-recently approved ICR is due to rounding. In
this ICR, we rounded the total annual burden and costs to three
significant figures. In addition, we have updated all calculations
using the latest labor rates, which results in an adjustment
increase in total labor costs.
$32,700
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.