Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

A. Introduction
1. Title:

Reliability Coordinator Data Specification and Collection  

2. Number:  IRO‐010‐2 
3. Purpose:  To prevent instability, uncontrolled separation, or Cascading outages that 
adversely impact reliability, by ensuring the Reliability Coordinator has the data it needs 
to monitor and assess the operation of its Reliability Coordinator Area. 
4. Applicability 
4.1. Reliability Coordinator. 
4.2. Balancing Authority.
4.3. Generator Owner. 
4.4. Generator Operator.  
4.5. Load‐Serving Entity.  
4.6. Transmission Operator.  
4.7. Transmission Owner. 
4.8. Distribution Provider. 
5. Proposed Effective Date: 
See Implementation Plan.  
6. Background  
See Project 2014‐03 project page. 
B. Requirements 
R1.

 

The Reliability Coordinator shall maintain a documented specification for the data 
necessary for it to perform its Operational Planning Analyses, Real‐time monitoring, 
and Real‐time Assessments.  The data specification shall include but not be limited to: 
(Violation Risk Factor: Low) (Time Horizon: Operations Planning) 
1.1.

A list of data and information needed by the Reliability Coordinator to 
support its Operational Planning Analyses, Real‐time monitoring, and Real‐
time Assessments including non‐BES data and external network data, as 
deemed necessary by the  Reliability Coordinator. 

1.2.

Provisions for notification of current Protection System and Special Protection 
System status or degradation that impacts System reliability. 

1.3.

A periodicity for providing data. 

1.4.

The deadline by which the respondent is to provide the indicated data. 

 

Page 1 of 9 

Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

M1.   The Reliability Coordinator shall make available its dated, current, in force 
documented specification for data. 
R2.

The Reliability Coordinator shall distribute its data specification to entities that have 
data required by the Reliability Coordinator’s Operational Planning Analyses, Real‐
time monitoring, and Real‐time Assessments. (Violation Risk Factor: Low) (Time 
Horizon: Operations Planning) 

M2.   The Reliability Coordinator shall make available evidence that it has distributed its 
data specification to entities that have data required by the Reliability Coordinator’s 
Operational Planning Analyses, Real‐time monitoring, and Real‐time Assessments. This 
evidence could include but is not limited to web postings with an electronic notice of 
the posting, dated operator logs, voice recordings, postal receipts showing the 
recipient, date and contents, or e‐mail records.
R3.

Each Reliability Coordinator, Balancing Authority, Generator Owner, Generator 
Operator, Load‐Serving Entity, Transmission Operator, Transmission Owner, and 
Distribution Provider receiving a data specification in Requirement R2 shall satisfy the 
obligations of the documented specifications using:  (Violation Risk Factor: Medium) 
(Time Horizon: Operations Planning, Same‐Day Operations, Real‐time Operations) 
3.1   A mutually agreeable format 
3.2   A mutually agreeable process for resolving data conflicts 
3.3   A mutually agreeable security protocol 

M3.   The Reliability Coordinator, Balancing Authority, Generator Owner, Generator 
Operator, Load‐Serving Entity, Reliability Coordinator, Transmission Operator, 
Transmission Owner, and Distribution Provider receiving a data specification in 
Requirement R2 shall make available evidence that it satisfied the obligations of the 
documented specification using the specified criteria.   Such evidence could include 
but is not limited to electronic or hard copies of data transmittals or attestations of 
receiving entities. 
C. Compliance
1.

Compliance Monitoring Process 
1.1.

Compliance Enforcement Authority 

As defined in the NERC Rules of Procedure, “Compliance Enforcement Authority” 
(CEA) means NERC or the Regional Entity in their respective roles of monitoring and 
enforcing compliance with the NERC Reliability Standards. 
1.2

Compliance Monitoring and Assessment Processes  

As defined in the NERC Rules of Procedure, “Compliance Monitoring and Assessment 
Processes” refers to the identification of the processes that will be used to evaluate 

 

 

Page 2 of 9 

Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

data or information for the purpose of assessing performance or outcomes with the 
associated reliability standard. 
1.3.

Data Retention 

The Reliability Coordinator, Balancing Authority,  Generator Owner, Generator 
Operator, Load‐Serving Entity,  Transmission Operator,  Transmission Owner, and 
Distribution Provider shall each keep data or evidence to show compliance as 
identified below unless directed by its Compliance Enforcement Authority to retain 
specific evidence for a longer period of time as part of an investigation: 
The Reliability Coordinator shall retain its dated, current, in force documented 
specification for the data necessary for it to perform its Operational Planning 
Analyses, Real‐time monitoring, and Real‐time Assessments for Requirement R1, 
Measure M1 as well as any documents in force since the last compliance audit.  
The Reliability Coordinator shall keep evidence for three calendar years that it has 
distributed its data specification to entities that have data required by the Reliability 
Coordinator’s Operational Planning Analyses, Real‐time monitoring, and Real‐time 
Assessments for Requirement R2, Measure M2.
Each Reliability Coordinator, Balancing Authority, Generator Owner, Generator 
Operator, Interchange Authority, Load‐Serving Entity, Transmission Operator, 
Transmission Owner, and Distribution Provider receiving a data specification shall 
retain evidence for the most recent 90‐calendar days that it has satisfied the 
obligations of the documented specifications in accordance with Requirement R3 
and Measurement M3.  
The Compliance Enforcement Authority shall keep the last audit records and all 
requested and submitted subsequent audit records. 
1.4.

Additional Compliance Information 

None.

 

 

Page 3 of 9 

Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

Table of Compliance Elements
R# 

R1 

Time 
Horizon 
Operations 
Planning 

VRF 

Low  

Violation Severity Levels  
Lower 

Moderate 

High 

Severe 

The Reliability 
Coordinator did not 
include one of the 
parts (Part 1.1 through 
Part 1.4) of the 
documented 
specification for the 
data necessary for it to 
perform its 
Operational Planning 
Analyses, Real‐time 
monitoring, and Real‐
time Assessments.    

The Reliability 
Coordinator did not 
include two of the 
parts (Part 1.1 
through Part 1.4) of 
the documented 
specification for the 
data necessary for it 
to perform its 
Operational Planning 
Analyses, Real‐time 
monitoring, and 
Real‐time 
Assessments.  

The Reliability 
Coordinator did 
not include three 
of the parts (Part 
1.1 through Part 
1.4) of the 
documented 
specification for 
the data necessary 
for it to perform its 
Operational 
Planning Analyses, 
Real‐time 
monitoring, and 
Real‐time 
Assessments. 

The Reliability 
Coordinator did not 
include any of the 
parts (Part 1.1 
through Part 1.4) of 
the documented 
specification for the 
data necessary for 
it to perform its 
Operational 
Planning Analyses, 
Real‐time 
monitoring, and 
Real‐time 
Assessments. 
OR,  

 

The Reliability 
Coordinator did not 
have a documented 
specification for the 
data necessary for 
it to perform its 
Operational 
Planning Analyses, 
Real‐time 

 

 

Page 4 of 9

Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

R# 

Time 
Horizon 

VRF 

Violation Severity Levels  
Lower 

Moderate 

High 

Severe 
monitoring, and 
Real‐time 
Assessments.  

For the Requirement R2 VSLs only, the intent of the SDT is to start with the Severe VSL first and then to work your way to the 
left until you find the situation that fits.  In this manner, the VSL will not be discriminatory by size of entity.  If a small entity has 
just one affected reliability entity to inform, the intent is that that situation would be a Severe violation. 

R2 

Operations 
Planning 

Low 

The Reliability 
Coordinator did not 
distribute its data 
specification as 
developed in 
Requirement R1 to 
one entity, or 5% or 
less of the entities, 
whichever is greater, 
that have data 
required by the 
Reliability 
Coordinator’s 
Operational Planning 
Analyses, Real‐time 
monitoring, and Real‐
time Assessments. 
 

The Reliability 
Coordinator did not 
distribute its data 
specification as 
developed in 
Requirement R1 to 
two entities, or more 
than 5% and less 
than or equal to 10% 
of the reliability 
entities, whichever is 
greater, that have 
data required by the 
Reliability 
Coordinator’s 
Operational Planning 
Analyses, and Real‐
time monitoring, and 
Real‐time 

The Reliability 
Coordinator did 
not distribute its 
data specification 
as developed in 
Requirement R1 to 
three  entities, or 
more than 10% 
and less than or 
equal to 15% of the 
reliability entities, 
whichever is 
greater, that have 
data required by 
the Reliability 
Coordinator’s 
Operational 
Planning Analyses, 
Real‐time 

The Reliability 
Coordinator did not 
distribute its data 
specification as 
developed in 
Requirement R1 to 
four or more 
entities, or more 
than 15% of the 
entities, whichever 
is greater, that have 
data required by 
the Reliability 
Coordinator’s 
Operational 
Planning Analyses, 
Real‐time 
monitoring, and 
Real‐time 

Page 5 of 9

Standard IRO-010-2 — Reliability Coordinator Data Specification and Collection

R# 

Time 
Horizon 

VRF 

Violation Severity Levels  
Lower 

Moderate 
Assessments. 

R3 

Operations  Medium  
Planning, 
Same‐Day 
Operations, 
Real‐time 
Operations  

The responsible entity 
receiving a data 
specification in 
Requirement R2 
satisfied the 
obligations of the 
documented 
specifications for data 
but failed to follow 
one of the criteria 
shown in Parts 3.1 – 
3.3. 

The responsible 
entity receiving a 
data specification in 
Requirement R2 
satisfied the 
obligations of the 
documented 
specifications for 
data but failed to 
follow two of the 
criteria shown in 
Parts 3.1 – 3.3. 

High 

Severe 

monitoring, and 
Real‐time 
Assessments. 

Assessments. 

The responsible 
entity receiving a 
data specification 
in Requirement R2 
satisfied the 
obligations of the 
documented 
specifications for 
data but failed to 
follow any of the 
criteria shown in 
Parts 3.1 – 3.3. 

The responsible 
entity receiving a 
data specification in 
Requirement R2 did 
not satisfy the 
obligations of the 
documented 
specifications for 
data. 

 

Page 6 of 9

Standard IRO-010-2 — Guidelines and Technical Basis

D. Regional Variances
None 
E. Interpretations
None 
F. Associated Documents
None 
 
Version History
Version 

Date 

Action 

Change Tracking 

1 

October 17, 2008 

Adopted by Board of Trustees 

New 

1a 

August 5, 2009 

Added Appendix 1: Interpretation of 
R1.2 and R3 as approved by Board of 
Trustees 

Addition 

1a 

March 17, 2011 

Order issued by FERC approving IRO‐
010‐1a (approval effective 5/23/11) 

 

1a 
2 

November 19, 2013  Updated VRFs based on June 24, 2013 
approval 
Revisions pursuant to Project 2014‐03 
April 2014 

2 

November 13, 2014  Adopted by NERC Board of Trustees 

 
 
Revisions under Project 
2014‐03 

 

Page 7 of 9

Standard IRO-010-2 — Guidelines and Technical Basis

Guidelines and Technical Basis 
  

 

Rationale: 
During development of this standard, text boxes were embedded within the standard to explain 
the rationale for various parts of the standard.  Upon BOT adoption, the text from the rationale 
text boxes was moved to this section. 
 
Rationale for Definitions: 
Changes made to the proposed definitions were made in order to respond to issues raised in 
NOPR paragraphs 55, 73, and 74 dealing with analysis of SOLs in all time horizons, questions on 
Protection Systems and Special Protection Systems in NOPR paragraph 78, and 
recommendations on phase angles from the SW Outage Report (recommendation 27). The 
intent of such changes is to ensure that Real‐time Assessments contain sufficient details to result 
in an appropriate level of situational awareness.  Some examples include: 1) analyzing phase 
angles which may result in the implementation of an Operating Plan to adjust generation or 
curtail transactions so that a Transmission facility may be returned to service, or 2) evaluating 
the impact of a modified Contingency resulting from the status change of a Special Protection 
Scheme from enabled/in‐service to disabled/out‐of‐service. 
 
Rationale for Applicability Changes:  
Changes were made to applicability based on IRO FYRT recommendation to address the need for 
UVLS and UFLS information in the data specification.  
The Interchange Authority was removed because activities in the Coordinate Interchange 
standards are performed by software systems and not a responsible entity. The software, not a 
functional entity, performs the task of accepting and disseminating interchange data between 
entities.  The Balancing Authority is the responsible functional entity for these tasks. 
The Planning Coordinator and Transmission Planner were removed from Draft 2 as those entities 
would not be involved in a data specification concept as outlined in this standard.  
 
Rationale: 
 
Proposed Requirement R1, Part 1.1: 
Is in response to issues raised in NOPR paragraph 67 on the need for obtaining non‐BES and 
external network data necessary for the Reliability Coordinator to fulfill its responsibilities.   
Proposed Requirement R1, Part 1.2: 
Is in response to NOPR paragraph 78 on relay data. 
 
Proposed Requirement R3, Part 3.3: 

Page 8 of 9

Standard IRO-010-2 — Guidelines and Technical Basis

Is in response to NOPR paragraph 92 where concerns were raised about data exchange through 
secured networks.   
 
Corresponding changes have been made to proposed TOP‐003‐3. 
 
 
 

Page 9 of 9

* FOR INFORMATIONAL PURPOSES ONLY *
Enforcement Dates: Standard IRO-010-2 — Reliability Coordinator Data Specification and
Collection
United States
Standard

Requirement

IRO-010-2

All

Enforcement Date

Inactive Date

This standard has not yet been approved by the applicable regulatory authority.