In accordance
with 5 CFR 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
05/31/2018
36 Months From Approved
05/31/2015
103
0
103
850
0
803
238,000
0
237,800
The provisions of 40 CFR part 60,
subpart CC apply to each glass manufacturing plant that commenced
construction or modification after June 15, 1979. Owners or
operators of subpart CC facilities are required to comply with
reporting and recordkeeping requirements, including initial
notifications, performance tests, and periodic reports. They are
also required to maintain records of the occurrence and duration of
any startup, shutdown, or malfunction in the operation of an
affected facility, or any period during which the monitoring system
is inoperative. These notifications, reports, and records are
needed by EPA to determine if compliance has been
achieved.
There is an increase in the
respondent burden hours and cost in this ICR to account for the
time it take for respondents to re-familiarize themselves with the
rule requirements.
$19,366
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.