OMB files this
comment in accordance with 5 CFR 1320.11(c) of the Paperwork
Reduction Act and is withholding approval of this collection at
this time. This OMB action is not an approval to conduct or sponsor
an information collection under the Paperwork Reduction Act of
1995. The agency shall examine public comment in response to the
Notice of Proposed Rulemaking and will include in the supporting
statement of the next ICR, to be submitted to OMB at the final rule
stage, a description of how the agency has responded to any public
comments on the ICR. This action has no effect on any current
approvals. If OMB has assigned this ICR a new OMB Control Number,
the OMB Control Number will not appear in the active inventory. For
future submissions of this information collection, reference the
OMB Control Number provided.
Inventory as of this Action
Requested
Previously Approved
04/30/2017
36 Months From Approved
04/30/2017
3,696
0
3,696
29,832
0
29,832
0
0
0
The FERC-725R information collection
includes requirements for Reliability Standards for the Bulk Power
System: BAL Reliability Standards. Currently, FERC-725R contains
only the previously approved standard from the RM13-11-000 Final
Rule (ICR: 201401-1902-001) In this notice of proposed rulemaking
(NOPR) in Docket RM14-10, the Commission proposes to approve the
Reliability Standard pertaining to requiring balancing authorities
to operate such that its clock-minute average reporting Area
Control Error (ACE) does not exceed its clock-minute Balancing
Authority ACE Limits (BAAL) for more than 30 consecutive
clock-minutes. The proposed Reliability Standard Requirement R2
provides each balancing authority a dynamic ACE limit that is a
function of Interconnection frequency. The proposed Reliability
Standard will provide dynamic limits that are balancing authority
and Interconnection specific. In addition, these ACE limits are
based on identified Interconnection frequency limits to ensure the
Interconnection returns to a reliable state when an individual
balancing authority's ACE or Interconnection frequency deviation
contributes undue risk to the Interconnection.
The burden for the FERC-725R
information collection increased due to the NOPR in RM14-10 and is
related to: • The new Requirement R2 requires that Balancing
Authority shall operate such that its clock-minute average of
Reporting ACE does not exceed its clock-minute Balancing Authority
ACE Limit (BAAL) for more than 30 consecutive clock-minutes,
calculated in accordance with Attachment 2, for the applicable
Interconnection in which the Balancing Authority operates. The new
requirement necessitates respondent entities to update
documentation and software to ensure compliance.
$5,092
No
No
No
No
No
Uncollected
Syed Ahmad 202 502-8718
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.