| 1305 Year 2 Budget (PPHF) | Form Approved OMB No. 0920-XXXX Exp. Date XX/XX/XXXX |
||||||||||||||||||
| State Public Health Actions to Prevent and Control Diabetes, Heart Disease, Obesity and Associated Risk Factors and Promote School Health | |||||||||||||||||||
| <Enter State Name> | |||||||||||||||||||
| Workbook Contents | |||||||||||||||||||
| Instructions | |||||||||||||||||||
|
|||||||||||||||||||
| Public reporting of this collection of information varies from 1 to 9 hours per response, including the time for reviewing instructions, | |||||||||||||||||||
| searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. | |||||||||||||||||||
| An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a | |||||||||||||||||||
| currently valid OMB control number. Send comments regarding this burden estimate or any other aspect of this collection of | |||||||||||||||||||
| information, including suggestions for reducing this burden to CDC/ATSDR Reports Clearance Officer, 1600 Clifton Road NE, MS D-74, | |||||||||||||||||||
| Atlanta, Georgia 30333; ATTN:PRA (0920-XXXX). | |||||||||||||||||||
| Personnel Salary and Fringe | ||||||||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Personnel Cost | ||||||||||||||||||||
| Name | Position Title | Annual Salary and Wages | % Paid by This Grant | Months | Salary and Wages | Fringe (%) | Fringe ($) if not % |
Fringe | Total Planned | |||||||||||
| $- | $- | $- | ||||||||||||||||||
| Allocation of Cost by Domain and Funding Category | Justification | |||||||||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | |||||||||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | |||||||||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | |||||||||||||||
| Contracts | ||||||||||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Contractor | Salary and Wages | $- | ||||||||||||||
| Method of Selection | Fringe Benefits | $- | ||||||||||||||
| Justification for Sole Source Selection (if applicable) | Consultant Costs | $- | ||||||||||||||
| Period of Performance | Equipment | $- | ||||||||||||||
| Scope of Work | Supplies | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Other | <enter description> | $- | ||||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Subcontract Costs | $- | |||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL DIRECT COSTS | $- | |||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Indirect Rate | ||||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | TOTAL INDIRECT COSTS | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONTRACT | $- | |||||||||
| Consultants | ||||||||||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Information | Itemized Costs | Justification | ||||||||||||||
| Name of Consultant | Number of Days of Consultation | |||||||||||||||
| Organizational Affiliation | Expected Daily Rate of Compensation | $- | ||||||||||||||
| Nature of Services to Be Rendered | BASE COMPENSATION SUBTOTAL | $- | ||||||||||||||
| Travel | $- | |||||||||||||||
| Relevance of Service to the Project | Per Diem (total for all days consultation) | $- | ||||||||||||||
| Supplies | $- | |||||||||||||||
| Method of Accountability | Deliverable Cost | <enter description> | $- | |||||||||||||
| Allocation of Cost by Domain and Funding Category | Other | <enter description> | $- | |||||||||||||
| Funding Category Domain |
HDSP | Diabetes | NPAO | SH | Domain Total | Other | <enter description> | $- | ||||||||
| Basic Activities | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||||
| Domain 2 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 3 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | Other | <enter description> | $- | ||||||||
| Domain 4 Activities | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% ($0) | EXPENSES SUBTOTAL | $- | |||||||||
| Funding Category Total | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | 0.0% ($0) | TOTAL FOR CONSULTANT | $- | |||||||||
| Basic Funding | ||||||||||||||
| BUDGET FOR BASIC | ||||||||||||||
| Planned Budget | Obligated to Date | Expended to Date | Unobligated Balance | Description of Indirect Cost Calculations (also applies to enhanced domains) |
||||||||||
| Salary and Wages | $- | $- | ||||||||||||
| Fringe Benefits | $- | $- | ||||||||||||
| Consultant Costs | $- | $- | ||||||||||||
| Equipment | $- | $- | ||||||||||||
| Supplies | $- | $- | ||||||||||||
| Travel | $- | $- | ||||||||||||
| Other | $- | $- | ||||||||||||
| Contractual Costs | $- | $- | ||||||||||||
| Total Direct Costs | $- | $- | $- | $- | ||||||||||
| Indirect Costs | ||||||||||||||
| TOTAL | $- | $- | $- | $- | ||||||||||
| TARGET | $- | |||||||||||||
| DIFFERENCE (should be zero) | $- | |||||||||||||
| Personnel Salary and Fringe | ||||||||||||||
| Totaled from Personnel Salary and Fringe tab (click to view) | Total Salary and Wages Planned | Total Fringe Planned | ||||||||||||
| TOTAL: | $- | $- | ||||||||||||
| Consultant Costs | ||||||||||||||
| Totaled from Consultants tab (click to view) | Total Amount Planned | |||||||||||||
| TOTAL: | $- | |||||||||||||
| Contractual Costs | ||||||||||||||
| Totaled from Contracts tab (click to view) | Total Amount Planned | |||||||||||||
| TOTAL: | $- | |||||||||||||
| Equipment | ||||||||||||||
| In most cases, awardees may not use funds from this grant for the purchase of furniture or equipment. Select "Yes" at right if you plan to purchase equipment. | Select | |||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | Justification | ||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| TOTAL: | $- | |||||||||||||
| Supplies | ||||||||||||||
| Item Requested | Type (if appropriate) | Number Needed | Unit Cost | Amount Planned | Justification | |||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| TOTAL: | $- | |||||||||||||
| Travel | ||||||||||||||
| Description and Number of People | Cost of Airfare or Mileage | Cost of Per Diem or Lodging | Cost of Ground Transportation | Other Costs | Total Amount Planned | Justification | ||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| TOTAL: | $- | $- | $- | $- | $- | |||||||||
| Other | ||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | Justification | ||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| $- | ||||||||||||||
| TOTAL: | $- | |||||||||||||
| Domain 2: Environmental Approaches that Promote Health | ||||||||||||||||
| BUDGET FOR DOMAIN 2 | ||||||||||||||||
| Planned Budget | Obligated to Date | Expended to Date | Unobligated Balance | |||||||||||||
| Funding Category | HDSP | NPAO | SH | HDSP | NPAO | SH | HDSP | NPAO | SH | HDSP | NPAO | SH | ||||
| Salary and Wages | $- | $- | $- | $- | $- | $- | ||||||||||
| Fringe Benefits | $- | $- | $- | $- | $- | $- | ||||||||||
| Consultant Costs | $- | $- | $- | $- | $- | $- | ||||||||||
| Equipment | $- | $- | $- | $- | $- | $- | ||||||||||
| Supplies | $- | $- | $- | $- | $- | $- | ||||||||||
| Travel | $- | $- | $- | $- | $- | $- | ||||||||||
| Other | $- | $- | $- | $- | $- | $- | ||||||||||
| Contractual Costs | $- | $- | $- | $- | $- | $- | ||||||||||
| Total Direct Costs | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | ||||
| Indirect Costs | $- | $- | $- | |||||||||||||
| TOTAL | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | ||||
| TARGET | $- | $- | $- | |||||||||||||
| DIFFERENCE (should be zero) | $- | $- | $- | |||||||||||||
| Personnel Salary and Fringe | ||||||||||||||||
| Totaled from Personnel Salary and Fringe tab (click to view) | Total Salary and Wages Planned | Salary and Wages funded by HDSP | Salary and Wages funded by NPAO | Salary and Wages funded by SH | Total Fringe Planned | Fringe funded by HDSP | Fringe funded by NPAO | Fringe funded by SH | ||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||
| Consultant Costs | ||||||||||||||||
| Totaled from Consultants tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by NPAO | Amount funded by SH | ||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||
| Contractual Costs | ||||||||||||||||
| Totaled from Contracts tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by NPAO | Amount funded by SH | ||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||
| Equipment | ||||||||||||||||
| In most cases, awardees may not use funds from this grant for the purchase of furniture or equipment. Select "Yes" at right if you plan to purchase equipment. | Select | |||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to NPAO activities | Amount funded by NPAO | % allocated to SH activities | Amount funded by SH | Justification | ||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||
| Supplies | ||||||||||||||||
| Item Requested | Type (if appropriate) | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to NPAO activities | Amount funded by NPAO | % allocated to SH activities | Amount funded by SH | Justification | |||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||
| Travel | ||||||||||||||||
| Description and Number of People | Cost of Airfare or Mileage | Cost of Per Diem or Lodging | Cost of Ground Transportation | Other Costs | Total Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to NPAO activities | Amount funded by NPAO | % allocated to SH activities | Amount funded by SH | Justification | ||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||
| Other | ||||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to NPAO activities | Amount funded by NPAO | % allocated to SH activities | Amount funded by SH | Justification | ||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| $- | $- | $- | $- | |||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||
| Domain 3: Health System Interventions | ||||||||||||||||
| BUDGET FOR DOMAIN 3 | ||||||||||||||||
| Planned Budget | Obligated to Date | Expended to Date | Unobligated Balance | |||||||||||||
| Funding Category | HDSP | Diabetes | HDSP | Diabetes | HDSP | Diabetes | HDSP | Diabetes | ||||||||
| Salary and Wages | $- | $- | $- | $- | ||||||||||||
| Fringe Benefits | $- | $- | $- | $- | ||||||||||||
| Consultant Costs | $- | $- | $- | $- | ||||||||||||
| Equipment | $- | $- | $- | $- | ||||||||||||
| Supplies | $- | $- | $- | $- | ||||||||||||
| Travel | $- | $- | $- | $- | ||||||||||||
| Other | $- | $- | $- | $- | ||||||||||||
| Contractual Costs | $- | $- | $- | $- | ||||||||||||
| Total Direct Costs | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||
| Indirect Costs | $- | $- | ||||||||||||||
| TOTAL | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||
| TARGET | $- | $- | ||||||||||||||
| DIFFERENCE (should be zero) | $- | $- | ||||||||||||||
| Personnel Salary and Fringe | ||||||||||||||||
| Totaled from Personnel Salary and Fringe tab (click to view) | Total Salary and Wages Planned | Salary and Wages funded by HDSP | Salary and Wages funded by Diabetes | Total Fringe Planned | Fringe funded by HDSP | Fringe funded by Diabetes | ||||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | ||||||||||
| Consultant Costs | ||||||||||||||||
| Totaled from Consultants tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by Diabetes | |||||||||||||
| TOTAL: | $- | $- | $- | |||||||||||||
| Contractual Costs | ||||||||||||||||
| Totaled from Contracts tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by Diabetes | |||||||||||||
| TOTAL: | $- | $- | $- | |||||||||||||
| Equipment | ||||||||||||||||
| In most cases, awardees may not use funds from this grant for the purchase of furniture or equipment. Select "Yes" at right if you plan to purchase equipment. | Select | |||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | Justification | ||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| TOTAL: | $- | $- | $- | |||||||||||||
| Supplies | ||||||||||||||||
| Item Requested | Type (if appropriate) | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | Justification | |||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| TOTAL: | $- | $- | $- | |||||||||||||
| Travel | ||||||||||||||||
| Description and Number of People | Cost of Airfare or Mileage | Cost of Per Diem or Lodging | Cost of Ground Transportation | Other Costs | Total Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | Justification | ||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | $- | |||||||||
| Other | ||||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | Justification | ||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| $- | $- | $- | ||||||||||||||
| TOTAL: | $- | $- | $- | |||||||||||||
| Domain 4: Community-Clinical Linkages | ||||||||||||||||||
| BUDGET FOR DOMAIN 4 | ||||||||||||||||||
| Planned Budget | Obligated to Date | Expended to Date | Unobligated Balance | |||||||||||||||
| Funding Category | HDSP | Diabetes | SH | HDSP | Diabetes | SH | HDSP | Diabetes | SH | HDSP | Diabetes | SH | ||||||
| Salary and Wages | $- | $- | $- | $- | $- | $- | ||||||||||||
| Fringe Benefits | $- | $- | $- | $- | $- | $- | ||||||||||||
| Consultant Costs | $- | $- | $- | $- | $- | $- | ||||||||||||
| Equipment | $- | $- | $- | $- | $- | $- | ||||||||||||
| Supplies | $- | $- | $- | $- | $- | $- | ||||||||||||
| Travel | $- | $- | $- | $- | $- | $- | ||||||||||||
| Other | $- | $- | $- | $- | $- | $- | ||||||||||||
| Contractual Costs | $- | $- | $- | $- | $- | $- | ||||||||||||
| Total Direct Costs | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | ||||||
| Indirect Costs | $- | $- | $- | |||||||||||||||
| TOTAL | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | $- | ||||||
| TARGET | $- | $- | $- | |||||||||||||||
| DIFFERENCE (should be zero) | $- | $- | $- | |||||||||||||||
| Personnel Salary and Fringe | ||||||||||||||||||
| Totaled from Personnel Salary and Fringe tab (click to view) | Total Salary and Wages Planned | Salary and Wages funded by HDSP | Salary and Wages funded by Diabetes | Salary and Wages funded by SH | Total Fringe Planned | Fringe funded by HDSP | Fringe funded by Diabetes | Fringe funded by SH | ||||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||||
| Consultant Costs | ||||||||||||||||||
| Totaled from Consultants tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by Diabetes | Amount funded by SH | ||||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||||
| Contractual Costs | ||||||||||||||||||
| Totaled from Contracts tab (click to view) | Total Amount Planned | Amount funded by HDSP | Amount funded by Diabetes | Amount funded by SH | ||||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||||
| Equipment | ||||||||||||||||||
| In most cases, awardees may not use funds from this grant for the purchase of furniture or equipment. Select "Yes" at right if you plan to purchase equipment. | Select | |||||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | % allocated to SH activities | Amount funded by SH | Justification | ||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||||
| Supplies | ||||||||||||||||||
| Item Requested | Type (if appropriate) | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | % allocated to SH activities | Amount funded by SH | Justification | |||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||||
| Travel | ||||||||||||||||||
| Description and Number of People | Cost of Airfare or Mileage | Cost of Per Diem or Lodging | Cost of Ground Transportation | Other Costs | Total Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | % allocated to SH activities | Amount funded by SH | Justification | ||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| TOTAL: | $- | $- | $- | $- | $- | $- | $- | $- | ||||||||||
| Other | ||||||||||||||||||
| Item Requested | Number Needed | Unit Cost | Amount Planned | % allocated to HDSP activities | Amount funded by HDSP | % allocated to Diabetes activities | Amount funded by Diabetes | % allocated to SH activities | Amount funded by SH | Justification | ||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| $- | $- | $- | $- | |||||||||||||||
| TOTAL: | $- | $- | $- | $- | ||||||||||||||
| Budget Reports | |||||||
| PPHF Budget | |||||||
| Target versus Planned Budget by Domain and Funding Category | |||||||
| Funding Category | Heart Disease and Stroke Prevention | Diabetes | Nutrition, Physical Activity, and Obesity | School Health | TOTAL | ||
| Target Funding | Basic | $- | $- | $- | $- | $- | |
| Enhanced | $- | $- | $- | $- | $- | ||
| Domain 2 | $- | $- | $- | $- | $- | ||
| Domain 3 | $- | $- | $- | $- | $- | ||
| Domain 4 | $- | $- | $- | $- | $- | ||
| TOTAL TARGET | $- | $- | $- | $- | $- | ||
| Planned Budget | Basic | $- | $- | $- | $- | $- | |
| Enhanced | $- | $- | $- | $- | $- | ||
| Domain 2 | $- | $- | $- | $- | $- | ||
| Domain 3 | $- | $- | $- | $- | $- | ||
| Domain 4 | $- | $- | $- | $- | $- | ||
| TOTAL PLANNED | $- | $- | $- | $- | $- | ||
| Balance (Not Yet Planned) |
Basic | $- | $- | $- | $- | $- | |
| Enhanced | $- | $- | $- | $- | $- | ||
| Domain 2 | $- | $- | $- | $- | $- | ||
| Domain 3 | $- | $- | $- | $- | $- | ||
| Domain 4 | $- | $- | $- | $- | $- | ||
| NET BALANCE | $- | $- | $- | $- | $- | ||
| Planned Budget by Object Class and Funding Category | |||||||
| Basic Component | |||||||
| Funding Category | |||||||
| Object Class | HDSP | Diabetes | NPAO | SH | TOTAL | ||
| Salary and Wages | $- | $- | $- | $- | $- | ||
| Fringe Benefits | $- | $- | $- | $- | $- | ||
| Consultant Costs | $- | $- | $- | $- | $- | ||
| Equipment | $- | $- | $- | $- | $- | ||
| Supplies | $- | $- | $- | $- | $- | ||
| Travel | $- | $- | $- | $- | $- | ||
| Other | $- | $- | $- | $- | $- | ||
| Contractual Costs | $- | $- | $- | $- | $- | ||
| Indirect Costs | $- | $- | $- | $- | $- | ||
| TOTAL | $- | $- | $- | $- | $- | ||
| Enhanced Component | |||||||
| Funding Category | |||||||
| Object Class | HDSP | Diabetes | NPAO | SH | TOTAL | ||
| Salary and Wages | $- | $- | $- | $- | $- | ||
| Fringe Benefits | $- | $- | $- | $- | $- | ||
| Consultant Costs | $- | $- | $- | $- | $- | ||
| Equipment | $- | $- | $- | $- | $- | ||
| Supplies | $- | $- | $- | $- | $- | ||
| Travel | $- | $- | $- | $- | $- | ||
| Other | $- | $- | $- | $- | $- | ||
| Contractual Costs | $- | $- | $- | $- | $- | ||
| Indirect Costs | $- | $- | $- | $- | $- | ||
| TOTAL | $- | $- | $- | $- | $- | ||
| Form 424A, Section B | ||||||
| PPHF Funding | ||||||
| Object Class Categories | Funding Category | TOTAL Enhanced (sum of C-F) | TOTAL Award (Basic & Enhanced) (sum of B and G) |
|||
| Basic (HDSP, Diabetes, NPAO) |
Enhanced Heart Disease & Stroke Prev |
Enhanced Diabetes |
||||
| a. Personnel | $- | $- | $- | $- | $- | |
| b. Fringe Benefits | $- | $- | $- | $- | $- | |
| c. Travel | $- | $- | $- | $- | $- | |
| d. Equipment | $- | $- | $- | $- | $- | |
| e. Supplies | $- | $- | $- | $- | $- | |
| f. Contractual | $- | $- | $- | $- | $- | |
| g. Construction | $- | $- | $- | $- | $- | |
| h. Other | $- | $- | $- | $- | $- | |
| i. Total Direct Charges (sum of a-h) | $- | $- | $- | $- | $- | |
| j. Indirect Charges | $- | $- | $- | $- | $- | |
| k. TOTALS (sum of i and j) | $- | $- | $- | $- | $- | |
| Form 424A, Section B | |||||||
| Non-PPHF Funding | |||||||
| Object Class Categories | Funding Category | TOTAL Enhanced (sum of C-F) | TOTAL Award (Basic & Enhanced) (sum of B and G) |
||||
| Basic (SH) |
Enhanced Heart Disease & Stroke Prev |
Enhanced Diabetes |
Enhanced School Health |
Enhanced Nutrition, PA & Obesity |
|||
| a. Personnel | $- | $- | $- | $- | $- | $- | $- |
| b. Fringe Benefits | $- | $- | $- | $- | $- | $- | $- |
| c. Travel | $- | $- | $- | $- | $- | $- | $- |
| d. Equipment | $- | $- | $- | $- | $- | $- | $- |
| e. Supplies | $- | $- | $- | $- | $- | $- | $- |
| f. Contractual | $- | $- | $- | $- | $- | $- | $- |
| g. Construction | $- | $- | $- | $- | $- | $- | $- |
| h. Other | $- | $- | $- | $- | $- | $- | $- |
| i. Total Direct Charges (sum of a-h) | $- | $- | $- | $- | $- | $- | $- |
| j. Indirect Charges | $- | $- | $- | $- | $- | $- | $- |
| k. TOTALS (sum of i and j) | $- | $- | $- | $- | $- | $- | $- |
| In-Kind Funding (Optional) | ||||||
| Total non-Federal Funds (if not using table below) | ||||||
| Estimated In-Kind Funding | ||||||
| Object Class | Applicant Funds | State Funds | Local Funds | Other | Program Income | TOTAL |
| Salary and Wages | $- | |||||
| Fringe Benefits | $- | |||||
| Consultant Costs | $- | |||||
| Equipment | $- | |||||
| Supplies | $- | |||||
| Travel | $- | |||||
| Other | $- | |||||
| Contractual Costs | $- | |||||
| TOTAL | $- | $- | $- | $- | $- | $- |
| You may use the space below to provide additional detail on in-kind and matching funds provided. | ||||||
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
| File Modified | 0000-00-00 |
| File Created | 0000-00-00 |