RM05-5-022 Standards for Business Practices of Public Utilities

RM05-5-022 Standards for Business Practices of Public Utilities.pdf

FERC-516, (Final Rule in RM05-5-022) Electric Rate Schedules and Tariff Filings

RM05-5-022 Standards for Business Practices of Public Utilities

OMB: 1902-0096

Document [pdf]
Download: pdf | pdf
NORTH AMERICAN ENERGY STANDARDS BOARD

801 Travis, Suite 1675  Houston, Texas 77002  Phone: (713) 356-0060  Fax: (713) 356-0067
email: naesb@naesb.org  Web Site Address: www.naesb.org

September 18, 2012
Filed Electronically
The Honorable Kimberly D. Bose
Secretary
Federal Energy Regulatory Commission
888 First Street N.E., Room 1A
Washington, D.C. 20585
RE:

Standards for Business Practices of Public Utilities (Docket No. RM 05-5 et al)

Dear Ms. Bose:
The North American Energy Standards Board ("NAESB") herewith submits this report to the Federal Energy
Regulatory Commission ("FERC" or "Commission") regarding NAESB’s activities from February 2009 to July
2012 with respect to Version 003 of the NAESB Wholesale Electric Quadrant (“WEQ”) standards. The NAESB
WEQ Version 003 standards approved by the WEQ Executive Committee and ratified by the membership were
published on July 31, 2012 and are referenced herein.1 An executive summary of the changes which resulted in
Version 003 is included in the attached report, along with a description of the standards that were created or
modified as part of Version 003.
The standards in this submittal include modifications of existing standards or new standards to support FERC Order
Nos. 8902, 890-A3, 890-B4 and 890-C,5 including the standards to support Network Integration Transmission Service
on Open Access Same-Time Information System (OASIS), the previously filed standards to support Service Across
Multiple Transmission Systems (SAMTS)6, standards to support the Commissions policy regarding rollover rights
for redirects on a firm basis, standards that incorporate the functionality for transmission providers to credit redirect
requests with the capacity of the parent reservation and standards modifications to support consistency across the
OASIS related standards. In addition to the standards modifications and development of new standards related to

1
The NAESB standards referenced in this report are reasonably available to the public through multiple methods. To access the standards at no
cost, NAESB will provide a limited copyright waiver for evaluation purposes using a product called Locked Lizard (http://www.locklizard.com).
To request a waiver, please contact the NAESB office or follow the instructions in the following document:
http://www.naesb.org/pdf/ordrform.pdf.
2
Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12,266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31,241 (2007) (Order No. 890).
3
Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007) (Order No. 890-A).
4
Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007), order on reh’g, Order
No. 890-B, 123 FERC ¶ 61,299 (2008) (Order 890-B).
5

Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007), order on reh’g, Order
No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g and clarification, Order No. 890-C, 126 FERC ¶ 61,228 (2009) (Order No. 890-C).
6

Submittal for NAESB Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission
Systems (Docket No. RM05-5-013, Order No. 676-E), available at: http://www.naesb.org/pdf4/ferc_100711_samts.pdf (submitted October 17,
2011). Minor Corrections, available at: http://www.naesb.org/pdf4/ferc_012512_weq_minor_corrections_samts.pdf (submitted January 25,
2012).

NORTH AMERICAN ENERGY STANDARDS BOARD

1301 Fannin, Suite 2350  Houston, Texas 77002  Phone: (713) 356-0060  Fax: (713) 356-0067
email: naesb@naesb.org  Web Site Address: www.naesb.org

September 18, 2012

FERC Order No. 890, modifications were made to the set of OASIS Business Practice Standards to support FERC
Order Nos. 676,7 676-A,8 676-E9 and 71710 and for the purpose of consistency.
Standards included in this submittal that are not related to the OASIS set of standards include, modifications to the
Coordinate Interchange standards to compliment the updates to the e-Tag specification,11 modifications to the
Gas/Electric Coordination standards to provide consistency between the two markets and a standard set of terms,
definitions and acronyms applicable to all NAESB WEQ standards. The report also includes standards for Demand
Side Management and Energy Efficiency, as previously filed with the Commission on April 17, 200912 and April 30,
201113 and the Smart Grid related standards previously filed with the Commission on July 7, 2011.14
The development efforts in NAESB reflect the work of multiple market interests. In addition, the NAESB WEQ has
worked in close coordination with NERC on business practice standards that are complementary to NERC reliability
standards so that the standards for both organizations remain in lock-step for consistency in the wholesale electric
industry. The inter-organization collaborations are not only permitted in the NAESB process, but strongly
encouraged – to provide an environment in which standards development has a more diverse vetting in the industry
and a resulting broader acceptance and application.
Some of the standards development activity undertaken that produced Version 003 had considerable industry debate
before an agreement was reached on the level of standardization needed and the actual text of the standards
themselves. The NAESB process supports a wide range of perspectives, and through a public process permitting all
segments of the marketplace to voice equally their issues, balanced voting allows a disparate group to move towards
consensus.
All requests for new standards or modifications of existing standards and requests for interpretation are posted on
the NAESB home page. All work papers and recommendations from subcommittees and task forces regarding the
requests are also posted on the NAESB home page (www.naesb.org). Participation in the task forces and
subcommittees, where requests are addressed and recommended standards are formulated and voted out of
7
Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006)
(Order No. 676)
8

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006), reh’g
denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006) (Order No. 676-A).
9

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006), reh’g
denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006), Order No. 676-B, Final Rule, FERC Stats. & Regs. ¶ 31,246 (2007), Order No. 676-C,
Final Rule, FERC Stats. & Regs. ¶ 31,274 (2008), Order No. 676-D, order granting clarification and denying reh’g, 124 FERC ¶ 61,317 (2008),
Order No. 676-E, Final Rule, 74 FR 63,288 (Dec. 3, 2009), FERC Stats. & Regs. ¶ 31,299 (2009) (Order No. 676-E).
10

Standards of Conduct for Transmission Providers, Order No. 717, 73 FR 63,796 (Oct. 27, 2008), FERC Stats. & Regs. ¶ 31,280 (2008) (Order
No. 717).

11
NAESB WEQ Electronic Tagging – Functional Specifications, Version 1.8.1, available at:
http://www.naesb.org/member_login_check.asp?doc=weq_etag_specification_v181_102709_mc062311.pdf. This document is password
protected. Non-members should contact the NAESB office to access this document.
12

NAESB Report on Wholesale Electric Market Measurement and Verification Standards for Demand Response Products and Services, Docket
No. RM05-5-000, available at http://naesb.org/pdf4/ferc041709_dsm_filing.pdf (April 17, 2009).
13
Submittal for Measurement and Verification of Demand Response Products, Docket No. RM-05-5-000, available at
http://www.naesb.org/pdf4/ferc_043011_weq_demand_response_standards.pdf (April 30, 2011).
14
Submittal of Smart Grid Related Standards, Docket No. RM05-5-000, et al, available at
http://naesb.org/pdf4/ferc_070711_smartgrid_standards.pdf (July 7, 2011).

NORTH AMERICAN ENERGY STANDARDS BOARD

1301 Fannin, Suite 2350  Houston, Texas 77002  Phone: (713) 356-0060  Fax: (713) 356-0067
email: naesb@naesb.org  Web Site Address: www.naesb.org

September 18, 2012

committee, is open to any interested party regardless of membership. Should a participant be unable to attend a
meeting where a request of interest is discussed, the party may prepare written comments, which will be posted as
work papers for the subcommittee or task force.
The Executive Committee meetings where these standards were discussed and adopted took place from February
2009 to May 2012. The minutes of these meetings are provided as links, which include the voting records of the
Executive Committee. The ratification ballots and member ratification voting record results are also included as
links. All comments that were filed on the standards as part of the NAESB formal comment period are also included
as links.
The cover letter, report and enclosures are being filed electronically in Adobe Acrobat Print Document Format
(.pdf), with each enclosure bookmarked separately. The filing is also available on the NAESB web site
(www.naesb.org). Please feel free to call me at (713) 356-0060 or refer to the NAESB website (www.naesb.org)
should you have any questions or need additional information regarding the NAESB WEQ Version 003 standards.
Respectfully submitted,

Rae McQuade
Ms. Rae McQuade
President & COO, North American Energy Standards Board
cc without enclosures:

Chairman Jon Wellinghoff, Federal Energy Regulatory Commission
Commissioner, Tony Clark, Federal Energy Regulatory Commission
Commissioner, Cheryl LaFleur, Federal Energy Regulatory Commission
Commissioner Philip D. Moeller, Federal Energy Regulatory Commission
Commissioner John Norris, Federal Energy Regulatory Commission
Mr. Joseph McClelland, Director, Office of Electric Reliability, Federal Energy
Regulatory Commission
Mr. Michael Bardee, General Counsel of the Commission, Federal Energy Regulatory
Commission
Mr. Mason Emnett, Associate Director, Office of Energy Policy and Innovation, Federal
Energy Regulatory Commission
Mr. Michael Goldenberg, Senior Attorney, Office of General Counsel, Federal Energy
Regulatory Commission
Ms. Jamie L. Simler, Director, Office of Energy Policy and Innovation, Federal Energy
Regulatory Commission
Mr. Michael Desselle, Chairman and CEO, North American Energy Standards Board
Mr. William P. Boswell, General Counsel, North American Energy Standards Board
Mr. Charles Berardesco, General Counsel, North American Electric Reliability
Corporation
Mr. David Taylor, Director of Standards Regulatory Initiatives, North American Electric
Reliability Corporation

NORTH AMERICAN ENERGY STANDARDS BOARD

1301 Fannin, Suite 2350  Houston, Texas 77002  Phone: (713) 356-0060  Fax: (713) 356-0067
email: naesb@naesb.org  Web Site Address: www.naesb.org

September 18, 2012

Enclosures (all documents and links available publicly on the NAESB web site – www.naesb.org):
Appendix A
Executive Committee Meeting Minutes, Comments and Voting Records Links
Appendix B
Ratification Ballots and Results Links
Appendix C
List of Available Meeting Transcripts
Appendix D
Cross Reference of Business Practice Standards Adopted in Version 003 to FERC Action
on those Business Practice Standards
Appendix E
NAESB Process for Standards Development
Appendix F
2008 WEQ Annual Plan
Appendix G
2009 WEQ Annual Plan
Appendix H
2010 WEQ Annual Plan
Appendix I
2011 WEQ Annual Plan
Appendix J
2012 WEQ Annual Plan
Appendix K
Minor Corrections Applied for Versions 002.1 and 003

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Standards for Business Practices and
Communication Protocols for
Public Utilities

)
)
)

Docket No. RM 05-17-000
Docket No. RM 05-5-000
Docket No. RM 07-1-000

REPORT OF THE NORTH AMERICAN ENERGY STANDARDS BOARD
The North American Energy Standards Board ("NAESB") is voluntarily submitting this report in
accordance with the Federal Energy Regulatory Commission’s ("FERC" or "Commission") Order Nos. 890,1 890A,2 890-B,3 890-C,4 676,5 676-A,6 676-E7 and 7178 in the above referenced docket. The report includes a summary
of the changes that resulted in Version 003 of the wholesale electric quadrant standards, along with a list of the
standards that were created or modified as part of Version 003 - cross–referenced both by request number and by
version. The standards can be downloaded from the NAESB home page (www.naesb.org).
In January 2002, the Gas Industry Standards Board (“GISB”) became the Wholesale Gas Quadrant (WGQ)
of NAESB and three other quadrants were formed, the Wholesale Electric Quadrant (WEQ), the Retail Gas
Quadrant, and Retail Electric Quadrant. NAESB WEQ Version 0 standards9 were adopted by the WEQ and

1
Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12,266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31,241 (2007) (Order No. 890).
2

Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007) (Order No. 890-A).
3
Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007), order on reh’g, Order
No. 890-B, 123 FERC ¶ 61,299 (2008) (Order No. 890-B).
4

Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, 72 FR 12, 266 (March 15, 2007), FERC Stats. &
Regs. ¶ 31, 241, order on reh’g, Order No. 890-A, 73 FR 2,984 (January 16, 2008), FERC Stats. & Regs. ¶ 31,261 (2007), order on reh’g, Order
No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g and clarification, Order No. 890-C, 126 FERC ¶ 61,228 (2009) (Order No. 890-C).
5
Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006)
(Order No. 676)
6

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006), reh’g
denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006) (Order No. 676-A).
7

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006), reh’g
denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006), Order No. 676-B, Final Rule, FERC Stats. & Regs. ¶ 31,246 (2007), Order No. 676-C,
Final Rule, FERC Stats. & Regs. ¶ 31,274 (2008), Order No. 676-D, order granting clarification and denying reh’g, 124 FERC ¶ 61,317 (2008),
Order No. 676-E, Final Rule, 74 FR 63,288 (Dec. 3, 2009), FERC Stats. & Regs. ¶ 31,299 (2009) (Order No. 676-E).
8
Standards of Conduct for Transmission Providers, Order No. 717, 73 FR 63,796 (Oct. 27, 2008), FERC Stats. & Regs. ¶ 31,280 (2008) (Order
No. 717).
9

NAESB Version 000 standards in Response to FERC Order No. 890, Docket Nos. RM05-25-000 and RM05-17-000 , available at
http://www.naesb.org/member_login_form.asp?doc=ferc011805_report.pdf (submitted January 18, 2005). This document is password protected.
Non-members should contact the NAESB office to access this document.

Report of the North American Energy Standards Board, September 18, 2012
Page 1

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
published on January 15, 2005. NAESB WEQ Version 1 standards10 were adopted by the WEQ and published on
October 31, 2007 and subsequently filed with the Commission on December 21, 2007. NAESB WEQ Version 002
standards11 were adopted by the WEQ and filed with the Commission on August 29, 2008 and subsequently
published on September 30, 2008. NAESB WEQ Version 002.1 standards12 were adopted by the WEQ and filed
with the Commission on February 19, 2009 and subsequently published on March 11, 2009.
There are eleven enclosures supporting the report. Provided in Appendix A is a list of the links to the
minutes from the Executive Committee ("EC") meetings during which recommendations were considered that
resulted in Version 003 of the NAESB WEQ standards. The EC minutes include discussion of recommendations
from task forces and subcommittees, which ultimately resulted in the standards for Version 003. The EC voting
records are attached as part of the minutes. Also included in Appendix A is the list of links to all comments filed on
the standards that were recommended for adoption to the EC. Provided in Appendix B is the list of links to the
NAESB membership ratification ballots, which include the EC adopted recommendations that are the basis for the
Version 003 modifications. Also provided in this appendix is the list of links to the ratification results. Appendix C
provides the list of available transcripts. Provided in Appendix D, is a cross reference of the standards adopted as
part of Version 003 and filed with the Commission and the subsequent Commission action on those standards.
Appendix E provides an overview of the NAESB process by which the standards were adopted. Appendices F, G,
H, I, and J contain the 2008 - 2012 WEQ Annual Plans respectively, and Appendix I includes the references to the
minor corrections that were applied and referenced in Version 002.1 and Version 003.
This report is intended solely as a status report from NAESB regarding Version 003 of its standards.
NAESB does not advocate that the Commission take a particular position on any of the standards presented.

VERSION 003 SUMMARY
Presented here is a summary of the activities that led to the compilation of the NAESB Wholesale Electric
Quadrant (WEQ) Standards Version 003. All references in this summary pertain only to the WEQ. Supporting
documents can be found in Appendices A, B, C, D, E, F, G, H, I, J and K as enclosures to this report. All Version
003 standards that were added or modified are contained in a table following this summary. The table cross
references the standards to the related requests for development and the actions that were taken.
A number of standards included in the WEQ Version 003 publication have been submitted to the
Commission in previous reports or are the subject of Commission action including the standards to support Service
Across Multiple Transmission Systems (SAMTS), the Smart Grid related standards, phase two of the Measurement
and Verification of Wholesale Electricity Demand Response standards and the standards to support Measurement
10
NAESB Version 001 Standards in Response to FERC Order No. 890, Docket Nos. RM05-17-000 and RM05-25-000, available at
http://www.naesb.org/member_login_form.asp?doc=ferc122107.pdf (submitted December 21, 2007). This document is password protected.
Non-members should contact the NAESB office to access this document.
11
NAESB Version 002 Standards in Response to FERC Order No. 890, Docket Nos. RM05-25-000 and RM05-17-000, available at http:
http://naesb.org/pdf3/ferc082908_order_890_filing.pdf (submitted August 29, 2008). This document is password protected. Non-members
should contat the NAESB office to access this document.
12
NAESB Version 002.1 Standards in Response to FERC Order No. 890, Docket No. RM05-5 et al, available at:
http://www.naesb.org/pdf4/ferc021909_weq_v002.1_with_appendices.pdf (submitted February 19, 2009). This document is password protected.
Non-members should contact the NAESB office to access this document

Report of the North American Energy Standards Board, September 18, 2012
Page 2

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
and Verification of the Energy Efficiency Products. As such, references to the status of all standards included in this
report are made as to whether they have been provided to the Commission as a part of other reports or if they are
subject of Commision action.
Five standards included in the report were developed in response to FERC Order No. 890 including the
previously filed standards to support SAMTS,13 part two of the standards modifications to the WEQ-001-9.7
Business Practice Standard requested in FERC Order No. 890-A14 related to rollover rights to requests for redirect
on a firm basis, the WEQ-001-10.3.1.1 and WEQ-001-9.1.3.1 Business Practice standards which provide for
transmission providers to process redirect requests in a manner in which the request would receive a credit for the
available transfer capability encumbered by the parent reservation, standards to support Network Integration
Transmission Service on the Open Access Same-Time Information System (OASIS) and standards modifications to
support consistency across the NAESB OASIS standards.
In addition to the OASIS standards modified or developed in response FERC Order No. 890, three
additional standards modification efforts were undertaken by the OASIS Subcommittee that have an impact on the
OASIS standards. Modifications to the WEQ-013-2.6.81 and WEQ-013-2.6.82 Business Practice Standards were
made to clarify the listing of service types, modifications to the WEQ-001-14.1.3 and WEQ-001-15.1.2 Business
Practice Standards regarding the timing of posting of narratives, and modifications to several of the WEQ-001,
WEQ-002 and WEQ-003 Business Practice Standards in response to FERC Order No. 717 concerning standards of
conduct posting requirements.
A development effort to modify the Coordinate Interchange (WEQ-004) standards by the Joint Electric
Scheduling Subcommittee (JESS), a standing joint subcommittee made of both NERC and NAESB participants
tasked with the maintenance of the coordinate interchange business practice standards and reliability standards, was
undertaken to modify the WEQ-001, WEQ-003, WEQ-004 and WEQ-013 Business Practice Standards in
coordination with revisions made to the Electronic Tagging Functional Specification.15 Additional modifications
were made to the WEQ-004 standards to support the development of the Abbreviations, Acronyms and Definition of
Terms standards (WEQ-000) and to provide consistency across all WEQ standards.
Similar modifications to support the consistency of the WEQ standards were made to the Gas/Electric
Coordination standards in addition to modifications to the harmonize cross quadrant terms and definitions contained
within the standard. These changes were also coordinated with terms contained in the NERC Glossary.
Also included in the WEQ Version 003 publication and referenced in this report, are the standards
developed to support Smart Grid applications and the measurement and verification of Demand Response (DR) and
13

Submittal of NAESB Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission
Systems (Docket No. RM05-5-013, Order No. 676-E), available at: http://www.naesb.org/pdf4/ferc_100711_samts.pdf (submitted October 7,
2011). Minor Corrections available at: http://www.naesb.org/pdf4/ferc_012512_weq_minor_corrections_samts.pdf (submitted January 25,
2012).
14
NAESB WEQ Business Practices Standards Crediting Redirect Requests with the Capacity of the Parent Reservation, available at:
http://www.naesb.org/member_login_check.asp?doc=pd_weq_ec022112a6.docx. This document is password protected. Non-members should
contact the NAESB office to access this document.
15
NAESB WEQ Electronic Tagging – Functional Specifications, Version 1.8.1, available at:
http://www.naesb.org/member_login_check.asp?doc=weq_etag_specification_v181_102709_mc062311.pdf. This document is password
protected. Non-members should contact the NAESB office to access this document.

Report of the North American Energy Standards Board, September 18, 2012
Page 3

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
Energy Efficiency (EE) products. These standards were the subject of a previous NAESB report or are the subject
of Commission action.16
Finally, included in this report is an interpretation of the WEQ-001-9.1 and WEQ-001-10.1 Business
Practice Standards and the results of a quadrant wide effort to provide a common location for all abbreviations,
acronyms and definitions of terms that created the WEQ-000 Business Practice Standards and addressed both
internal inconsistences and inconsistences with the NERC Glossary.
As with most NAESB standards development of this magnitude, some of the standards development
activity undertaken that produced Version 003 had considerable industry debate before an agreement was reached on
the level of standardization needed and the actual text of the standards themselves. The NAESB process supports a
wide range of perspectives, and through a public process permitting all segments of the marketplace to voice equally
their issues, balanced voting allows a disparate group to move towards consensus.
The summary is organized into ten sections: FERC Order No. 890 related standards, OASIS standards not
related to FERC Order No. 890, FERC Order No. 717 related standards, Coordinate Interchange standards,
Gas/Electric Coordination standards, Smart Grid related standards, Demand Side Management and Energy
Efficiency standards, standards related to Terms, Definitions and Acronyms, Interpretations, and items identified for
NAESB standards development for which NAESB has decided no standards development is necessary.
Descriptions of each grouping are shown below:
FERC Order No. 890 Related Standards
Standards subject of a previous report to the Commission or action by the Commission
NAESB is submitting one FERC Order No. 890 related standard that has been the subject of a previous
report submitted to the Commission or the subject of action by the Commission. It is described below.
In response to paragraph 1377 of FERC Order No. 890 requesting “transmission providers work through
NAESB to develop business practice standards related to the coordination of requests across multiple transmission
systems,”17 the OASIS Subcommittee developed and the NAESB WEQ adopted standards that provide a process by
which a customer may complete a cross-regional transaction. The Service Across Multiple Transmission System
(SAMTS) standards were previously filed with the Commission on October 7, 2011 and are included in the Version
003 publication. 18 The standards require that each affected provider independently evaluate its portion of the linked
request with the opportunity for reconciliation by the customer once all evaluations are complete. After submitting
and monitoring requests on multiple systems, the customer can communicate reconciled information to each of the
affected providers. The SAMTS standards focus exclusively on the coordination of point-to-point transmission
service and/or network transmission service requests across multiple transmission systems. The SAMTS process
modifies and adds standards or terms to the Abbreviations, Acronyms and Definition of Terms (WEQ-000), the

16
Submittal of Smart Grid Related Standards (Docket No. RM05-5-000, et al.), available at:
http://www.naesb.org/pdf4/ferc_070711_smartgrid_standards.pdf (submitted July 7, 2011).

NAESB Report on Wholesale Electric Market Measurement and Verification Standards for Demand Response Products and Services, Docket No.
RM05-5-000, available at http://naesb.org/pdf4/ferc041709_dsm_filing.pdf (April 17, 2009).

Report of the North American Energy Standards Board, September 18, 2012
Page 4

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
OASIS Business Practice Standards (WEQ-001), the OASIS Standards and Communication Protocols (WEQ-002),
the OASIS Data Dictionary (WEQ-003), and the OASIS Implementation Guide (WEQ-013).
An Executive Committee Task Force was created for the purpose of establishing the scope of the SAMTS
standards effort and met nine times from March 2010 to June 2010. The scope, as defined by the task force, was
approved by the WEQ EC on August 17, 2010 and amended on February 1, 2011. After receiving guidance from
the WEQ EC Task Force, the standards were developed through fourteen OASIS Subcommittee meetings held from
January 2011 to June 2011. The recommended standards were approved by the OASIS Subcommittee on May 5,
2011. The recommendation was sent out for a thirty-day industry comment period on May 11, 2011 and ended on
June 10, 2011. A substantive and technical review of the proposed standards by the WEQ EC was held on May 20,
2011 to help provide guidance for industry participants submitting comments. The WEQ EC met to consider the
recommendation and the comments received on June 30, 2011. The vote on the recommended standards was
inconclusive, so a notational ballot was sent out to the WEQ EC members that were not present to vote at the
meeting. Through notational ballots due on July 8, 2011, the EC approved the recommendation and the standards
were ratified by the WEQ membership on August 11, 2011.

Standards not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes four sets of standards related to FERC
Order No. 890 that have not been the subject of a previous report submitted to the Commission by NAESB or the
subject of action by the Commission. The sets of standards are described below.
1) The first set of standards embodies the second part of a two-part process to address revisions to the WEQ001-9.7 Business Practice Standard.19 In paragraph no. 52 of FERC Order No. 676, the Commission
declined to adopt the WEQ-001-9.7 Business Practice Standard, filed as part of the WEQ Version 000
publication, concluding the standard was “inconsistent with the pro forma OATT and the Commission’s
policies” on the treatment of rollover rights for requests to redirect on a firm basis and allowed the WEQ to
reconsider and adopt a revised version of the standard. 20 The Commission provided guidance to NAESB
regarding the Commission’s policy on rollover rights in FERC Order Nos. 676,21 676-A,22 89023 and 890A.24 In addition to the guidance provided through the FERC orders, a written clarification was provided to
NAESB by Commission staff regarding rollover rights under the pro forma OATT.25 Using this guidance,
17

Order No. 890 at ¶ 1377.

18

Submittal of NAESB Standards Development to Support Coordination of Requests for Transmission Service Across Multiple Transmission
Systems (Docket No. RM05-5-013, Order No. 676-E), available at: http://www.naesb.org/pdf4/ferc_100711_samts.pdf. Minor Corrections,
available at: http://www.naesb.org/pdf4/ferc_012512_weq_minor_corrections_samts.pdf (submitted January 25, 2012).
19

Part I is filed as part of NAESB Version 002.1 Standards. See footnote 7.

20

Order No. 676 at ¶ 52.

21

Id. at ¶ 51 – 61.

22

Order No. 676-A at ¶ 5 – 8.

23

Order No. 890 at ¶ 1280 – 1282.

24

Order No. 890-A at ¶ 697, 698 and 704 – 708.

25

See Rollover of Redirects FERC Staff Interpretation of OATT, available at http://www.naesb.org/pdf4/weq_ec010809w5.doc. And Rollver of
Redirects FERC Staff Follow-up Response, available at http://www.naesb.org/pdf4/weq_ec010809a1.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 5

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
the OASIS Subcommittee modified the WEQ-001-9.7 Business Practice Standard in an effort to align
NAESB business practice standards with the FERC policy pertaining to the grant of rollover rights to
requests for redirect on a firm basis. Additionally, the subcommittee added examples for the conveyance of
rollover rights with a redirect on a firm basis to Appendix B of the WEQ-001 standards, modified the
WEQ-001-9 Business Practice Standards, modified the definition of Unexercised Rollover Rights and
added a definition for Capacity Eligible for Rollover. Corresponding modifications were also made to the
WEQ-001, WEQ-002 and WEQ-013 Business Practice Standards. These modifications complete a twopart process to address the WEQ-001-9.7 Business Practice Standard as described in the report that
provided the WEQ Version 002.1 publication of standards.26 The OASIS Subcommittee met five times
over the course of ten days to develop a recommendation. The recommendation passed a subcommittee
vote on April 9, 2009 and was sent out for a thirty-day comment period on April 13, 2009. The WEQ EC
adopted the recommendation on June 8, 2009, and the recommendation was ratified on July 27, 2009.
2) Second, on February 21, 2012, the WEQ EC approved the addition of the WEQ-001-10.3.1.1 and WEQ001-9.1.3.1 Business Practice Standards to provide functionality in the standards for transmission providers
to process redirect requests in a manner in which the request would receive a credit for the available
transfer capability encumbered by the parent reservation to the extent that available transfer capability was
needed to enable service to the redirect request. The OASIS Subcommittee crafted the modifications to
avoid an implementation that could result in a violation of the first come, first served principle of queue
priority. The subcommittee drafted and voted out the recommendation on January 25-26, 2012. The
recommendation was adopted by the WEQ EC Committee on February 21, 2012, and was ratified by
membership on March 26, 2012.
3) Next, in response to FERC Order Nos. 89027, 890-A28, 890-B29 and 890-C30, the WEQ EC adopted business
practice standards to support the OASIS functionality associated with NITS on May 1, 2012. In paragraph
no. 385 of FERC Order No. 890, the Commission ordered “public utilities, working through NAESB, to
develop appropriate templates for OASIS” in order to use the system to “request designation of new
network resources and to terminate designation of network resources.”31 Paragraph no. 1477 of FERC
Order No. 890 directed “transmission providers to work in conjunction with NAESB to develop business
practice standards describing procedural requirements for submitting designations over any new OASIS
functionality.”32 In response to FERC Order No. 890 and subsequent FERC Orders, the WEQ OASIS
Subcommittee began the effort in February 2007 to develop new standards and templates that support
applications for network service on the OASIS system. The standards provide functionality for:

26

See footnote 12.

27

Order No. 890 at ¶ 385, 1377, 1477, 1504, 1532 and 1541.

28

Order No. 890-A at ¶ 919.

29

Order No. 890-B at ¶ 182, 188 and 209.

30

Order No. 890-C at ¶ 17.

31

Order No. 890 at ¶ 385.

32

Order No. 890 at ¶ 1477.

Report of the North American Energy Standards Board, September 18, 2012
Page 6

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012


transmission providers to handle requests (loads, designation network resource, non-designated
resources) on a customer-by-customer basis,



the optionality of tracking designated network resource scheduling rights, and



the customers to assign agents to administer OASIS transactions on their behalf.

The recommendation proposed new standards and modifications to standards that affect the WEQ-000,
WEQ-001, WEQ-002 and WEQ-003 Business Practice Standards. In addition, narrative examples and
process diagrams were added to the WEQ-013 Business Practice Standards to assist users in their
implementation efforts.
To develop the recommendation, the OASIS Subcommittee met ninety-seven times over one-hundred and
sixty-eight days over the course of five years. The recommendation passed a subcommittee vote on
December 1, 2011 and was sent out for an extended seventy-five day industry comment period on
December 13, 2011. Given the magnitude of the number of standards developed or modified as part of the
recommendation and the impact NITS has on the OASIS standards, a single topic review session was held
on January 24, 2012 by the WEQ EC to facilitate discussion between the subject matter experts and
industry participants developing comments regarding the recommendation. In response to the large number
of comments received on the recommendation, a series of OASIS Subcommittee meetings were held to
allow the subcommittee to review and respond to the comments in preparation for WEQ EC consideration.
The recommendation was adopted during a two-day WEQ EC meeting held on April 30, 2012 and May 1,
2012 and ratified by the membership on June 11, 2012.
4) Finally, while working on efforts to satisfy FERC directives related to FERC Order No. 890, the WEQ
OASIS Subcommittee developed a recommendation proposing modifications to the introduction sections
and adding applicability sections to the OASIS standards where necessary for consistency. The
introduction section of the standards provides a brief description of the purpose of the standard, while the
applicability section provides the entities that are impacted by the standard. In addition, the
recommendation proposed modifications to the organization and the structure of WEQ-001 and WEQ-013
for consistency. The OASIS Subcommittee met twice over five days to address this item. The
recommendation developed by the subcommittee passed a subcommittee vote on August 4, 2011 and was
sent out for a thirty-day industry comment period on August 9, 2011. The WEQ EC adopted the
recommendation on October 25, 2011 and was ratified by the membership on November 28, 2011.

OASIS Standards not Related to FERC Order No. 890
Standards not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes three sets of OASIS standards not
related to FERC Order No. 890 that have not been the subject of a previous report submitted to the Commission or
the subject of action by the Commission. They are described below.

Report of the North American Energy Standards Board, September 18, 2012
Page 7

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
1) First, the OASIS Subcommittee proposed modifications to the WEQ-013-2.6.8.1 and WEQ-013-2.6.8.2
standards. The minor modifications clarify that the listings of service types within the parentheticals are
intended to be examples and not definitive. The OASIS Subcommittee met twice over three days to
address the issue. The recommendation developed by the subcommittee passed a subcommittee vote on
February 9, 2012 and was sent out for a thirty-day industry comment period on February 21, 2012. The
recommendation was adopted by the WEQ EC on May 1, 2012 and was ratified on June 11, 2012.
2) Second, on October 25, 2011, the WEQ EC modified its business practice standards in response to FERC
Order Nos. 890 and 676-E. In paragraph no. 221 of FERC Order No. 890, the Commission specifically
requested that NAESB seek to develop business practice standards governing the terms and conditions of
conditional firm service and the posting requirement for available transfer capability.33 In paragraph no. 38
of FERC Order No. 676-E, the Commission adopted the WEQ-001-14 standards for Zero ATC Narrative
and theWEQ-001-15 standards for ATC Change Narrative, with the exception of the WEQ-001-14.1.3
standard and the WEQ-001-15.1.2 standard.34 The Commission declined to adopt the standards, stating in
paragraph no. 39 of FERC Order No. 676-E “[t]ransmission providers must post their narratives as soon as
feasibly possible. Posting within one day would appear in most cases to be reasonable.”35 In response, the
OASIS Subcommittee modified the business practice standards to comply with FERC direction by
recommending that narratives be posted within one business day and requiring a posting within five
business days. The recommendation was developed by the subcommittee over the course of two meetings,
spanning five days and passed a subcommittee vote on August 2, 2011. The recommendation was sent out
for a thirty-day industry comment period on August 9, 2011 and the WEQ EC adopted the recommendation
during the October 25, 2011 meeting. The recommendation was ratified on November 28, 2011.
3) In FERC Order No. 717 issued on October 16, 2008, the Commission made several modifications related to
the posting requirements associated with the standards of conduct.36 Specifically, the Commission
discontinued the requirement for public utilities to post standards of conduct information on OASIS.37 In
response, the Business Practice Subcommittee modified the WEQ-001, WEQ-002 and WEQ-003 Business
Practice Standards to remove reference to the standards of conduct related obligations with the exception of
a few template structures that may be implemented at the option of the transmission provider. To develop
the recommendation, the subcommittee held two meetings on February 9, 2009 and March 9, 2009 and
voted the recommendation out of subcommittee on March 23, 2009. On May 12, 2009 the WEQ EC
considered the recommendation and voted to adopt the modifications. The modifications were ratified by
the NAESB membership on June 15, 2009.

33

Order No. 890 at ¶ 221.

34

Order No. 676-E at ¶ 38.

35

Id. at ¶ 39.

36

Order No. 717 at ¶213 – ¶218 and ¶235 – ¶239.

37

Id.

Report of the North American Energy Standards Board, September 18, 2012
Page 8

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
Coordinate Interchange Standards
Standards not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes one Coordinate Interchange related
standard that has not been the subject of a previous report submitted to the Commission or the subject of action by
the Commission. It is described below.
On October 27, 2009, the WEQ EC adopted modifications to the WEQ-001, WEQ-003, WEQ-004 and
WEQ-0013 Business Practice Standards. The modifications proposed by the Joint Electric Scheduling
Subcommittee (JESS) to the WEQ-004 Business Practice Standards were completed to ensure that the
standards are consistent with revisions made to the Electronic Tagging Functional Specification38 during
the update from Version 1.8 to Version 1.8.1 and incorporated a guideline for rounding schedules with
partial megawatt hours. The guideline standardizes the rounding of partial megawatt hours schedules. The
JESS also made conforming modifications to the WEQ-001, WEQ-003 and WEQ-013 Business Practice
Standards and removed the definitions from the WEQ-004 Business Practice Standards as part of an effort
to relocate all definitions the WEQ-000 Business Practice Standards. To develop the recommendation, the
JESS met five times over the course of nine days and voted the recommendation out of subcommittee on
September 2, 2009. It was distributed for a thirty-day comment period on September 9, 2009. The
recommendation was adopted by the WEQ EC on October 27, 2009 and was ratified by the membership on
December 14, 2009.

Gas/Electric Coordination Standards
Standards not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes one standard related to Gas/Electric
Coordination that has not been the subject of a previous report submitted to the Commission or the subject of action
by the Commission. It is described below.
In an effort to coordinate the WEQ-011 Business Practice Standard definitions with the NERC Glossary,
the terms Power Plant Operator and Power Plant Operator’s Facility were changed to Power Plant Gas
Coordinator and Power Plant Gas Coordinator’s Facility, respectively. This was done to eliminate
inconsistencies between other industry definitions for the term and to allow the retention of the electric
reliability connotation. Additionally, the BPS proposed modifications to the WEQ-011 Business Practice
Standards that included the addition of introduction and applicability sections, the development of a
definition for the term Transportation Service Provider and revisions to ensure the consistent application of
the terms Balancing Authority and Reliability Coordinator. The effort was coordinated with the Wholesale
Gas Quadrant BPS and EC to ensure consistency across the wholesale quadrants. The WEQ BPS met five
times to discuss the issue and held three joint meetings with the WGQ BPS on the topic. The
recommendation passed a joint WEQ BPS and WGQ BPS subcommittee vote on September 28, 2009 and
38

See footnote 15.

Report of the North American Energy Standards Board, September 18, 2012
Page 9

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
was sent out for a thirty-day industry comment period on October 2, 2009. The recommendation was
approved by the WEQ EC on June 11, 2010 via notational ballot, and ratified by the membership on July
15, 2010.

Smart Grid Standards
Standards subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes eight Smart Grid related standards that
have been the subject of a previous report submitted to the Commission or the subject of action by the Commission.
They are described below.
On July 7, 2011, NAESB submitted a set of Smart Grid related standards39 that were developed at the
request of the National Institute of Standards and Technology (NIST) and the Smart Grid Interoperability
Panel (SGIP) as part of their national effort to fullfil NIST obligations under the Energy Independence and
Security Act of 2007 (“EISA”). 40 The standards developed by NAESB define use cases and data
requirements that respond to the priority action plans created by the SGIP to foster standards development
within standards setting organizations. Specifically, NAESB was asked to develop use case and data
requirement standards related to priority action plan 03 (Common Price Communication Model)41, priority
action plan 04 (Common Scheduling Mechanism)42 and priority action plan 09 (Standardized Demand
Response and Distributed Energy Resource Signals).43 The standards development effort was coordinated
with a number of external organizations and the standards served as a foundation for the development of
communication specifications created by the Organization of the Advancement of Structured Information
Standards in fulfillment of their obligations under the priority action plans. At the direction of the NAESB
Board of Directors, the NAESB WEQ and Retail Electric Quadrant (REQ) Executive Committees formed
the joint WEQ and REQ Smart Grid Standards Development Subcommittees to address the standards
assignment. The subcommittee developed the standards for both the retail and wholesale markets through a
two phase approach by expediently developing an intial set of use cases and data requirements for use by
the Organization of the Advancement of Structured Information Standards and then refining the use cases
and data requirements in a second phase. This approach was taken to ensure that both organizations
satsified the timeline requirements dictated by NIST and the SGIP through the priority action plans. The
standards development activity took place from September 2009 to October 2010 and resulted in seven sets
of standards. The phase one standards were ratified by the NAESB membership on August 20, 2010, and
the phase two standards were ratified on March 21, 2011.
39

Submittal of Smart Grid Related Standards (Docket No. RM05-5-000, et al.), available at:
http://www.naesb.org/pdf4/ferc_070711_smartgrid_standards.pdf (submitted July 7, 2011).
40

EISA § 1305(d), Public Law No. 110-140, 121 Stats. 1492, 1788 (2007) (to be codified at 15 U.S.C. § 1735(d))

41

NIST Smart Grid Collaboration Wiki Smart Grid Interoperability Panel Site for Priority Action Plan 03 is available at
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP03PriceProduct.

42
NIST Smart Grid Collaboration Wiki Smart Grid Interoperability Panel Site for Priority Action Plan 04 is available at
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP04Schedules
43
NIST Smart Grid Collaboration Wiki Smart Grid Interoperability Panel Site for Priority Action Plan 09 is available at
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP09DRDER.

Report of the North American Energy Standards Board, September 18, 2012
Page 10

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
In addition to the assignments given to NAESB through NIST and SGIP priority action plans 03, 04 and
09, NAESB was asked to develop an information model for the communication of consumer energy usage.
This request was made through priority action plan 10 and was officially given to NAESB in May 2010
with a December 2010 deadline. In response, the joint REQ and WEQ Smart Grid Standards
Subcommittee on Priority Action Plan 10 was created and held its first meeting on June 22, 2010. Between
June 22, 2010 and August 31, 2010, when both the REQ and WEQ Energy Usage Information Model were
unanimously adopted, the subcommittee held a total of fifteen conference calls and a one week informal
comment period. The recommendations were reviewed by the WEQ and REQ Executive Committees on
October 15, 2010 and considered for vote on October 22, 2010. The REQ recommendation was adopted by
the Executive Committee during the October 22, 2010 meeting, and the WEQ recommendation was
adopted through notational ballot on October 29, 2010. Both recommendations were ratified by the
membership on November 29, 2010 and presented at the fall 2010 SGIP meeting the same week. The
energy usage information model serves as a “seed standard” and focuses on the representation of energy
usage information, which includes historic, present and future projected usage and load for specific time
periods. The standard defines a common data format of classes and attributes to communicate information
between utilities, third parties, and energy use customers, via customer devices and/or third-party energy
services providers and enables the exchange of detailed energy information in a consistent format for use
by all parties.

Demand Side Management and Energy Efficiency
Standards subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes two Demand Response and one
Energy Efficiency related sets of standards that have been the subject of a previous report submitted to the
Commission or the subject of action by the Commission. They are described below.
On April 17, 2009, NAESB submitted phase one of the WEQ-021 Measurement and Verification of
Wholesale Electricity Demand Response Business Practice Standards to the Commission.44 These
standards were ratified by the membership on March 16, 2009 and address the measurement and
verification of characteristics of demand response products and services administered for application in the
wholesale electricity market. They provide a framework for transparency, accountability and consistency.
Additionally, the standards address the four product/service categories (energy service, capacity service,
reserve service and regulation service) and establish criteria for the use of equipment, technology and
procedures to quantify the demand reduction value delivered. On September 17, 2009 the Commission
issued a Notice of Proposed Rulemaking (NOPR) on the standards and supported NAESB’s initiative for a
phase two effort to develop more technical standards that apply to the Independent System Operators and
Regional Transmission Organization (ISO-RTO). On April 15, 2010, the Commission adopted the phase
44

NAESB Report on Wholesale Electric Market Measurement and Verification Standards for Demand Response Products and Services, Docket
No. RM05-5-000, available at http://naesb.org/pdf4/ferc041709_dsm_filing.pdf (April 17, 2009).

Report of the North American Energy Standards Board, September 18, 2012
Page 11

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
one standards through a final order and again supported the phase two effort by noting that additional
substantive standards that create transparency and consistency would benefit the wholesale market.45 The
phase two effort took place from April 16, 2009 to January 26, 2011 and resulted in additional granularity
to the business practice standards and definitions developed in the phase one effort, most notably in the
areas of meter data reporting deadline, advanced notification, telemetry interval, meter accuracy for afterthe- fact metering, meter data reporting interval and adjustment window. This effort was conducted with
the agreement of the Demand Side Management / Energy Efficiency Subcommittee that standards
development should not be undertaken in areas that would be duplicative of the ISO-RTO stakeholder
process unless otherwise directed by the Commission. The phase two standards were ratified by the
membership on March 21, 2011and are currently the subject of a NOPR issued by the Commission on
April 19, 2012.46
In addition to the phase two Measurement and Verification of Wholesale Electricity Demand Response
Business Practice Standards, the Measurement and Verification of the Energy Efficiency Products Business
Practice Standards were included in the April 19, 2012 NOPR.47 The WEQ-021 Energy Efficiency
Business Practice Standards create a standardized method for quantifying the energy reduction for energy
efficiency measures, lighting, appliances, industrial process improvements and building management. The
standards contain energy efficiency use criteria in wholesale markets, the general requirements for the
structure of a measurement and verification plan and detailed criteria for accepted measurement and
verfication methodologies. They were developed through working groups and tasks forces of the Demand
Side Management / Energy Efficiency Subcommittee between July 2009 and December 2010 and were
ratified by the membership on May 13, 2011.

Standards Related to Terms, Definitions and Acroynms
Standards not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes two standards related to terms,
definitions and acroynms that have not been the subject of a previous report submitted to the Commission or the
subject of action by the Commission. They are described below.
First, as part of an ongoing NAESB effort to address inconsistencies, the WEQ SRS modified the definition
of Bulk Electric System to be consistent with the NERC approved definition for the term. The WEQ EC
adoption of the modified definition is in alignment with paragraph no. 40 of FERC Order 676 that directed
NERC to take the lead on defining reliability-related terms and suggested NAESB use NERC definitions

45

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, n.5 (2006),
reh’g denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006), Order No. 676-B, Final Rule, FERC Stats. & Regs. ¶ 31,246 (2007), Order No. 676C, Final Rule, FERC Stats. & Regs. ¶ 31,274 (2008), Order No. 676-D, order granting clarification and denying reh’g, 124 FERC ¶ 61,317
(2008), Order No. 676-E, Final Rule, FERC Stats. & Regs. ¶ 31,299 (2009), Order No. 676-F, Final Rule, FERC Stats. & Regs. ¶ 61,022 (2010).
46
Standards for Business Practice and Communication Protocols for Public Utilities, Notice of Proposed Rulemaking, 77 FR 24,427 (April 19,
2012), FERC Stats. & Regs. ¶ 61,041(2012).
47

Id.

Report of the North American Energy Standards Board, September 18, 2012
Page 12

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
for such terms.48 To develop the recommendation, the SRS met twice over two days and on January 17,
2012 voted to send the recommendation out for a thirty-day formal comment period, which began on
January 18, 2012. The recommendation was adopted by the WEQ EC on February 21, 2012 and was
ratified by the membership on March 26, 2012.
Second, the chairs of the WEQ standards development subcommittees developed the WEQ-000 set of
standard definitions in an effort to provide a common location for all abbreviations, acronyms and
definitions of terms and modified existing NAESB definitions to address both internal inconsistences and
inconsistences with the NERC Glossary. The new standards were partially developed in response to
guidance provided by the Commission in FERC Order No. 676-C to ensure that NERC and NAESB
definitions are complementary.49 As a result of the effort, differences between the NAESB and NERC
definitions have been reconciled. To develop the WEQ-000 Business Practice Standards, the chairs of the
WEQ standards development subcommittees met numerous times beginning in October 2008 through
August 2009 when a draft recommendation was sent out for an informal comment period. Based on the
comments received, revisions were made to the draft recommendation, and the recommendation was sent
out for a thirty-day formal comment period on November 12, 2009. The recommendation was adopted by
WEQ EC on February 2, 2010, and was ratified by the membership on March 24, 2010.

Interpretations
Interpretation not subject of a previous report to the Commission or action by the Commission
In the WEQ Version 003 publication of standards, NAESB includes one interpretation that has not been the
subject of a previous report submitted to the Commission or the subject of action by the Commission. It is described
below.
The Version 003 publication includes an interpretation of standards WEQ-001-9.1 and WEQ-001-10.1.
The interpretation was developed by the WEQ Interpretations Subcommittee over the course of two
meetings held in December 2011 and February 2012 and clarifies that a redirect on a firm basis may be
submitted to modify only the source of a long term firm reservation. It was adopted by the WEQ Executive
Committee on February 21, 2012 and ratified by the membership on March 26, 2012.
Items Identified for NAESB Standards Development that the Organization has Decided Needed No Action
Since the publication of NAESB WEQ Version 002.1, several WEQ Annual Plan Items were deemed to
require no standards development action by NAESB as they have been addressed by other NAESB efforts, or
evaluated and determined that standards development was not necessary. When a subcommittee determines that no
action is to be taken on a particular item, that item is posted for a 30 day industry comment period. The EC reviews
any comments submitted and the item must pass a simple majority vote of the EC. Items for which no action is

48

Order No. 676 at ¶ 40.

49

Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ¶ 31,216, (2006),
reh’g denied, Order No. 676-A, 116 FERC ¶ 61,255 (2006), Order No. 676-B, Final Rule, FERC Stats. & Regs. ¶ 31,246 (2007), Order No. 676C, Final Rule, FERC Stats. & Regs. ¶ 31,274 (2008).

Report of the North American Energy Standards Board, September 18, 2012
Page 13

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
required do not require membership ratification, as that process is reserved for creations of new standards, or
modifications to or deletion of existing standards. There were three items that were determined to require no action
by NAESB:
EC Date

Recommendation

Recommendation Description

May 4, 2010

2009 WEQ Annual Plan
Items 3.a.ii.1 / R07013

Develop a Confidentiality Agreement

October 26,
2010

2010 WEQ Annual Plan
Item 1.d

Monitor and develop NAESB business practices as needed to
complement NERC reliability standards for FAC-012 and FAC013

October 25,
2011

2011 WEQ Annual Plan
Item 2.a.iv.1

Paragraph No. 1390 of Order 890 - Terminations related to:
deficient requests, customer failure to pay required annual
reservation fee, and customer modifications to applications which
are meaningfully different

Report of the North American Energy Standards Board, September 18, 2012
Page 14

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

LIST OF NEW STANDARDS, STANDARDS MODIFICATIONS AND INTERPRETATIONS FOR
VERSION 003
Request Cross Reference:
The request cross reference lists each standard either modified or created in Version 003, its description, the request that
instigated the change, and a brief description of the change itself. If the change was originated through a minor correction,
the date of the minor correction is given. The table is sorted by standard numbering shown below. If a standards manual
is noted, it is for the set of standards that directly follow and is indicated by the series of standards within the manual.
The standards follow a numbering convention which is x-y.z(.n):
x
y
z(.n)
A-G, P or M, INT

standard number and topic
subordinate category or section
optional further subordinate sections for granularity
optional: A - (Appendix A or examples)
B - (Appendix B)
C - (Appendix C)
D - (Appendix D)
E - (Appendix E)
F - (Appendix F)
G - (Appendix G)
P - Principle
M – Model
INT – Interpretations

x

Business Topic – Standard Number
000
Abbreviations, Acronyms, and Definition of Terms
001
Open Access Same-Time Information Systems (OASIS), Version 2.0
002
OASIS Standards and Communication Protocols (S&CP), Version 2.0
003
OASIS S&CP Data Dictionaries, Version 2.0
004
Coordinate Interchange
005
Area Control Error (ACE) Equation Special Cases
006
Manual Time Error Correction
007
Inadvertent Interchange Payback
008
Transmission Loading Relief (TLR) – Eastern Interconnection
009
Standards of Conduct for Electric Transmission Providers
010
Contracts Related Standards
011
Gas / Electric Coordination
012
Public Key Infrastructure (PKI)
013
OASIS Implementation Guide, Version 2.0
014
WEQ/WGQ eTariff Related Business Practice Standards
015
Measurement and Verification of Wholesale Electricity Demand Response
016
Specifications for Common Electricity Product and Pricing Definition
017
Specifications for Common Schedule Communication Mechanism for Energy Transactions
018
Specifications for Wholesale Standard Demand Response Signals
019
Customer Energy Usage Information Communication
020
Smart Grid Standards Data Elements Table
021
Measurement and Verification of Energy Efficiency Products

y

Subordinate category or section to provide granularity, some of which may be specific categories as noted
below:
000
1
Abbreviations and Acronyms
000
2
Definition of Terms
001
0
RESERVED
001
1
RESERVED
001
2
Attribute Values Defining the Period of Service
Report of the North American Energy Standards Board, September 18, 2012
Page 15

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
001
002
002
002
002
002
002
002
002
003
004
004
004
004
004
004
004
004
004
004
004
004
005

3
Entity Registration
4
On-Line Negotiation and Confirmation Process
5
Procurement of Ancillary and Other Services
6
Pathnaming Business Practice Standards
7
Next Hour Market Service
8
Requirement for Dealing with Multiple, Identical Transmission Service Requests
9
Requirements for Dealing with Redirects on a Firm Basis
10
Requirements for Dealing with Redirects on a Non-firm Basis
11
Resales
12
Transfers
13
OASIS General Posting Business Practice Standards
14
Zero ATC Narrative
15
ATC Change Narrative
16
ATC or AFC Methodology Questions
17
Actual and Forecasted Load
18
Postback Requirements
19
Grandfathered Agreements
20
Rollover Rights
21
Granting and Managing a CCO Reservation
22
Information to Audit Usage of CBM
23
Coordination of Requests for Service Across Multiple Transmission Systems
24 to 100 RESERVED for growth in the development of future Business Practice Standards
101
NITS – General Requirements
102
NITS – Application
103
NITS – Evaluation of NITS Application
104
NITS – Administrative Changes to the NITS Application
105
NITS – Modification of Service
106
NITS – Secondary Network Transmission Service
107
NITS – Modification of NITS Application Stop Time
INT2 Clarification of Interpretation Request
A
Appendix A - Queue Hoarding
B
Appendix B - Redirect Business Practice Standards Examples
C
Appendix C - OASIS Business Practice Standards Exemptions
D
Appendix D - Postback Conditions for Use in Calculation of ATC or AFC, as Appropriate
E
Appendix E – Contiguity Examples for Coordinated Groups
0
RESERVED
1
RESERVED
2
Network Architecture Requirements
3
Information Access Requirements
4
General OASIS and PTP Interface Requirements
5
Performance Requirements
6 to 100 RESERVED for growth in the development of future Business Practice Standards
101
NITS Interface Requirements
0
OASIS Data Dictionary, Version 2.0
0
RESERVED
1 to 3 Business Practice Standards
4
RESERVED
5 to 6 Business Practice Standards
7
RESERVED
8 to 15 Business Practice Standards
16
RESERVED
17 to 19 Business Practice Standards
A
Appendix A – e-Tagging Service Performance Requirements and Failure Procedures
B
Appendix B - Transaction e-Tag Actions
C
Appendix C – Data Submission and Modifications
D
Commercial Timing Table
0
RESERVED
Report of the North American Energy Standards Board, September 18, 2012
Page 16

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
005
005
005
005
006
006
006
006
006
006
006
006
006
006
006
007
007
007
007
008
008
008
008
008
008
008
008
009
009
009
009
009
009
009
010
011
011
011
012
012
013
013
013
013
013
013
013
013
013
013
013
013
013
013
013
013

1
2
3
A
0
1 to 3
4
5
6
7
8
9
10
11
12
0
1
2
A
0
1
2

Jointly Owned Units (JOUs)
Supplemental Regulation Service
Load or Generation Transfer by Telemetry
Appendix A - Examples of Accounting of JOUs as Pseudo-Tie or Dynamic Schedule
RESERVED
Business Practice Standards
Time Error Initiation
Interconnection Time Monitoring
Time Error Correction Labeling
Time Correction Offset
Interconnection Time Error Notification
Western Interconnection Time Error Notification
Business Practice Standards
Time Correction on Reconnection
Leap Seconds
RESERVED
Inadvertent Interchange Payback
Other Payback Methods
Appendix A - Inadvertent Interchange On-and Off-Peak Periods
RESERVED
General Requirements Regarding Use of Interconnection-wide TLR Procedures
Interchange Transaction Priorities for Use with Interconnection-wide TLR
Procedures
3
Eastern Interconnection Procedure for Physical Curtailment of Interchange Transactions
A
Appendix A - Examples of On-Path and Off-Path Mitigation
B
Appendix B - Example Calculations of the Per Generator Method
C
Appendix C - Transaction Curtailment Formula
D
RESERVED
0
RESERVED
1
RESERVED
2
RESERVED
3
RESERVED
4
RESERVED
5
RESERVED
6
RESERVED
1
NAESB Funds Transfer Agreement (FTAA) – Electric Power
0
RESERVED
1
Business Practice Standards
INT1 Clarification or Interpretation Request
0
RESERVED
1
Business Practice Standards
0
RESERVED
1
RESERVED
2
OASIS Transaction Processing
3
Specific Template Implementation
4
RESERVED
5
Business Practice Standards
6 to 100 RESERVED for growth in the development of future Business Practice Standards
101
General NITS Application and Modification of Service Processing Requirements
102
NITS Application Processing
103
Evaluation of NITS Application
104
NITS Modification of Service Processing
105
Secondary Network Transmission Service
106
NITS – Extension of NITS Application STOP_TIME
A
Appendix A - Example for Business Practice Standard WEQ-001-15: ATC Change Narrative
B
Appendix B - Example for Business Practice Standard WEQ-001-14: Zero Change Narrative
C
Appendix C – File Request and File Download Examples
Report of the North American Energy Standards Board, September 18, 2012
Page 17

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012
013
013
014
014
014
015
015
016
016
016
016
017
017
017
017
018
018
018
018
019
019
019
019
020
020
021
021
021
021

D
E
0
1 to 2
A
0
1
0
1
2
A
0
1
2
A
0
1
A
B
0
1
2
3
0
1
0
1
2
3

Appendix D – Ancillary Service Linkage Examples
Appendix E – NITS Examples
RESERVED
eTariff Related Business Practice Standards
Appendix A - Implementation Guide for Electronic Tariff Filing
RESERVED
General Business Practice Standards
RESERVED
Specifications for Common Electricity Product and Pricing Definition
Product and Pricing Use Cases
Appendix A – Entity-Relationship Model
RESERVED
Specification for Common Schedule Communication Mechanism for Energy Transactions
Common Schedule Communication Mechanism for Energy Transactions Use Cases
Appendix A – Entity-Relationship Model
RESERVED
Specifications for Wholesale Standard Demand Response Signals
Appendix A – Entity-Relationship Model
Appendix B – Use Case Combinations
RESERVED
Principles
Energy Usage Information Business Practice Standards
Energy Usage Information Model
RESERVED
Smart Grid Standards Data Elements Table
RESERVED
Introduction and Principles
Applicability
Business Practice Standards
Request Cross Reference

Standard

Description

Request No.

Action

WEQ-000 Abbreviations, Acronyms, and Definition of Terms
Introduction

Introduction

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

Add Introduction

Applicability

Applicability

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

Add Applicability

000-1

Abbreviations and
Acronyms

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

Move abbreviations and acronyms from sections to
WEQ-000-1 “ABBREVIATIONS AND ACRONYMS”

000-1

Abbreviations and
Acronyms

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO. Add the acronym PPGC.

Report of the North American Energy Standards Board, September 18, 2012
Page 18

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

000-1

Abbreviations and
Acronyms

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add abbreviations and acronyms in support of WEQ
2010 WEQ Annual Plan Items 6.a-c: “BAS – Building
Automation System”, “CalConnect – Calendaring and
Scheduling Consortium”, “CIM – Common Information
Model”, “C&I – Commercial and Industrial”, “DDE –
Designated Dispatch Entity”, “DER – Distributed
Energy Resource”, “DR – Demand Response”, “EA –
Environmental Authority”, “ED – End Device”, “EMS
– Energy Management System”, “ESI – Energy
Services Interface”, “FIX – Financial Information
eXchange Protocol”, “FR – Federal Regulator”,
“GWAC – GridWise Architecture Council”, “iCalendar
– Internet Calendaring and Scheduling Core Object
Specification”, “IEC TC57 – International
Electrotechnical Commission Technical Committee 57”,
“IETF – Internet Engineering Task Force”, “IRC
Council – Independent System Operator/Regional
Transmission Operator Council”, “ISIN – International
Security Identifier Number”, “ISO – International
Organization for Standardization”, “ISOs/RTOs –
Independent System Operators/Regional Transmission
Operators”, “kW – Kilowatt”, “kWh – Kilowatt Hour”,
“LA – Local Authority”, “MA – Meter Authority”,
“MBL – Maximum Base Load”, “MB/MA – Meter
Before/Meter After”, “MGO – Metering Generator
Output”, “MP – Market Participant”, “PAP-Priority
Action Plan”, “RM – Response Method”, “RMA –
Response Method Aggregation”, “OpenSG – Open
Smart Grid”, “PUC – Public Utility Commission”, “SE
– Scheduling Entity”, “SGTF – Smart Grid Task
Force”, “SO – System Operator”, “SP – Service
Provider”, “SR – State Regulator”, “TDSP –
Transmission/Distribution Service Provider”, “UC –
Utility Customer”, “UCAlug – UCA International Users
Group”, “UDO – Utility Distribution Operator”, and
“UML – Unified Modeling Language.”

000-1

Abbreviations and
Acronyms

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add abbreviations and acronyms: “PEV – Plug-in
Electric Vehicle”, “EISA – Energy Independence and
Security Act”, “DOE – Department of Energy”, “HAN
– Home Area Network”, “XMI – XML Media
Exchange, “IEC – International Electrotechnical
Commission”

000-1

Abbreviations and
Acronyms

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add abbreviations and acronyms “ SDX – System Data
Exchange”

Report of the North American Energy Standards Board, September 18, 2012
Page 19

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

000-1

Abbreviations and
Acronyms

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add abbreviations and acronyms to support
Measurement and Verification of Energy Efficiency
Products: “ANSI – American National Standard
Institute”, “ASHREA –American Society of Heating,
Refrigeration and Air Conditioning Engineers”, “c.v. Coefficient of Variation”, “EERP - Energy Efficiency
Resource Provider”, “FEMP - Federal Energy
Management Program (US)”, “HVAC - Heating,
ventilating, and air conditioning”, “IEEE - Institute of
Electrical and Electronics Engineers”, “IPMVP International Performance Measurement and
Verification Protocol”, “kHz – Kilohertz”, “M&V –
Measurement and Verification”, “RMS – Root-Mean
Square”, “VEE – Validation Editing and Estimation”

000-1

Abbreviations and
Acronyms

MC12020
(06/16/2012)

Delete the Acronym “IPMVP - International
Performance Measurement and Verification Protocol.”

000-1

Abbreviations and
Acronyms

MC12025
(07/31/2012)

Delete the Acronym “SDX –System Data Exchange”

000-1.1

Abbreviations and
Acronyms Do Not
Use

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

Add WEQ-000-1.1 “Abbreviations and Acronyms Do
Not Use”

000-2

Definition of
Terms

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add WEQ-015 Definition of Terms: “Adjustment
Window, Advance Notification(s), After-the-Fact
Metering, Aggregated Demand Resource, Baseline,
Baseline Adjustment, Baseline Type-I (Interval
Metered), Baseline Type-II (Non-Interval Metered,
Baseline Window, Capacity Service, Demand, Demand
Response, Demand Response Event, Demand Response
Provider, Demand Reduction Value, Demand Resource,
Deployment, Deployment Period, Energy Service,
Highly-Variable Load, Load, Maximum Base Load,
Meter Before/Meter After, Meter Data Recording
Interval, Meter Data Reporting Deadline, Metering
Generator Output, Normal Operations, Performance
Window, Ramp Period, Ramp Rate, Recovery Period,
Reduction Deadline, Regulation Service,
Release/Recall, Reserve Service, Sustained Response
Period, System Operator, Telemetry, Telemetry
Interval, Validation, Editing and Estimation.”

000-2

Definition of
Terms

WEQ 2009 Annual
Plan Item 2.a.ii.3
(7/27/2009)

Add Definition “Capacity Eligible for Rollover” and
“Unexercised Rollover Rights.”

000-2

Definition of
Terms

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Definition “Straddle Ramp”

000-2

Definition of
Terms

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

Move abbreviations, acronyms, and definitions from
sections to WEQ-000-2 “Definition of Terms”

Report of the North American Energy Standards Board, September 18, 2012
Page 20

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

000-2

Definition of
Terms

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the definitions Power Plant Operator and Power
Plant Operator Facility. Add definition Power Plant
Gas Coordinator and Power Plant Gas Coordinator
Facility. Modify definition Transportation Service
Provider. Modify “Note:” in descriptions of definitions:
Balancing Authority and Reliability Coordinator.

000-2

Definition of
Terms

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add defined terms in support of WEQ 2010 WEQ
Annual Plan Items 6.a-c: “Business Entity”,
“Communication Method”, “Control”, “Designated
Dispatch Entity”, “Distributed Energy Resources”, “End
Device”, “Environmental Authority”, “Federal
Regulator”, “Load-Serving Entity”, “Local Authority”,
“Market Enrollment”, “Market Participant”,
“Measurement”, “Meter Authority”, “P-Node”,
“Participant”, “Premise”, “Regulator”, “Response
Method”, “Response Method Aggregation”,
“Resource”, “Resource Object”, “Scheduling Entity”,
Service Provider”, “State Regulator”, “Supporting
Objects”, “Transmission/Distribution Service Provider”,
“Utility Customer”, “Utility Distribution Operator” and
“Zone.”

000-2

Definition of
Terms

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add defined terms: “Applicable Regulatory Authority”,
“Distribution Company”, “Entity”, “Governing
Documents”, and “Supplier.”

000-2

Definition of
Terms

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add defined term: “Intra-BA Transaction.”

000-2

Definition of
Terms

MC10032
(01/03/2011)

Minor correction to add definitions “Off-Peak” and
“On-Peak”

000-2

Definition of
Terms

WEQ 2010 Annual
Plan Items 6.a-c
(Phase 2)
(03/21/2011)

Add defined terms: “Asset”, “Asset Group”, “Service
Delivery Point”, “Service Location (was Facility in the
Phase 1 ERD).”

000-2

Definition of
Terms

WEQ 2010 Annual
Plan Items 4.a and
4.b (03/21/2011)

Modify definitions for “Baseline”, “Baseline
Adjustment”, “Baseline Type-II”, “Baseline Window”,
“Capacity Service”, “Demand Reduction Value”,
“Demand Resource Availability”, “Demand Response’,
“Demand Response Event”, “Demand Response
Provider”, “Energy Service”, “Governing Documents”,
“Highly-Variable Load”, “Maximum Base Load”,
“Meter Data Recording Interval”, “Metering Generator
Output”, “Normal Operations”, “Ramp Rate”,
“Recovery Period”, “Regulation Service”,
“Release/Recall”, “Sustained Response Period”,
“System Operator”, “Telemetry”, “Telemetry Interval”,
and “Validation, Editing and Estimation.”

000-2

Definition of
Terms

MC11009
(05/30/2011)

Minor correction to address diagram error by replacing
diagram for definition “Meter Before/Meter After.”

000-2

Definition of
Terms

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add definitions “Coordinated Group, Coordinated
Request and Network Customer.” , (Version 1.6)

Report of the North American Energy Standards Board, September 18, 2012
Page 21

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

000-2

Definition of
Terms

WEQ 2012 Annual
Plan Item 1.d
(03/26/2012)

Modify definition “Bulk Electric System” to read “Shall
have the same meaning as defined in the Glossary of
Terms Used in NERC Reliability Standards.”

000-2

Definition of
Terms

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2.b and 3.a.i –
Network Service on
OASIS (NITS)
(06/11/2012)

Modify definition “Assignee” by deleting the word
“Transmission.” Modify the defined term “Eligible
Transmission Customer” to read “Eligible Customer”
and its definition by deleting the words “the term
Eligible Customer.” Delete the defined term “Network
Customer” and its definition. Modify the definition
“Transmission Customer” to read “Shall have the same
meaning as defined in the FERC pro forma OATT.”
Modify the definition “Transmission Provider” by
deleting the words “(or its designated agent).”
Add the following Definition of Terms: “Concomitant
Evaluation, Designated Agent, Network Load, Network
Resource, NITS Application, Pre-submittal Workspace,
Request Interval”

000-2

Definition of
Terms

MC12025
(07/31/2012)

Delete the Definition of Terms “Intra BA Transaction –
Information describing a physical Transaction and its
participants sourcing and sinking within the same BA
using RFI format.”

WEQ-001 Open Access Same-Time Information Systems (OASIS) Business Practice Standards, Version 2.0
Introduction

Introduction

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify “Introduction” language

Applicability

Applicability

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Applicability” heading and language

Applicability

Applicability

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by changing “Eligible Transmission Customer” to
“Eligible Customer” and deleting “Network Customer.”

001-0.1

Definition

WEQ 2009
ANNUAL PLAN
Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 22

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.11

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.12

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.13

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.14

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.15

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.16

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.17

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.18

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.19

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.20

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 23

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-0.21

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.22

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.23

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.24

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001.0.25

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.26

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.27

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.28

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.29

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.30

Definition

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Definition “Unexercised Rollover Rights” and
add footnote

001-0.30

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-0.31

Definition

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Definition “Capacity Eligible for Rollover” and
footnote

001-0.31

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED - Move abbreviations, acronyms, and
definitions to WEQ-000-2

001-2.1.10

Business Practice
Standard

MC10031
(10/07/2010)

Correct numbering “001-2.10” to “001-2.1.10” for
Business Practice Standard “Extended Daily”

001-2.1.11

Business Practice
Standard

MC10031
(10/07/2010)

Correct numbering “001-2.11” to “001-2.1.11” for
Business Practice Standard “Extended Weekly”

001-2.1.12

Business Practice
Standard

MC10031
(10/07/2010)

Correct numbering “001-2.12” to “001-2.1.12” for
Business Practice Standard “Extended Monthly”

001-2.1.13

Business Practice
Standard

MC10031
(10/07/2010)

Correct numbering “001-2.13” to “001-2.1.13” for
Business Practice Standard “Extended Yearly”

Report of the North American Energy Standards Board, September 18, 2012
Page 24

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-2.1.14

Business Practice
Standard

MC10031
(10/07/2010)

Correct numbering “001-2.14” to “001-2.1.14” for
Business Practice Standard “Next Increment Hourly”

001-4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), Version 1.6

001-4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.7.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.7.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.7.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.7.3.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.9.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.9.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.9.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.9.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 25

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-4.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.10.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.10.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.10.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.10.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.10.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard

001-4.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.11.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

001-4.11.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify Business
Practice Standard

001-4.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

001-4.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify title for
Table 4-2 by adding “PTP” before REQUEST TIMING
REQUIREMENTS.

001-7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by changing “Eligible Transmission Customer” to
“Eligible Customer.”

001-9.1.3.1

Business Practice
Standard

WEQ 2012 Annual
Plan Item 5.e
(03/26/2012)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

Report of the North American Energy Standards Board, September 18, 2012
Page 26

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-9.7

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.1.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.1.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.1.3

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.1.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.3

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.3.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.5

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.6

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.7

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.8

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.8.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.8.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

Report of the North American Energy Standards Board, September 18, 2012
Page 27

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-9.7.8.2.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.8.2.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.9

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.9.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.10

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-9.7.11

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Firm Basis”

001-10.3.1.1

Business Practice
Standard

WEQ 2012 Annual
Plan Item 5.e
(03/26/2012)

Add Business Practice Standard – “Requirements for
Dealing with Redirects on a Non-firm Basis”

001-10.8

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add reference to “Version 1.8.1 Electronic Tagging
Functional Specification”

001-11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by changing “Eligible Transmission Customer” to
“Eligible Customer.”

001-13.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify Business Practice Standard by removing
reference to “Standards of Conduct”

001-13.1.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Delete Business Practice Standard and mark as
RESERVED

001-14.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Item 7.a
(11/28/2011)

Modify “Zero ATC Narrative Timing” Business
Practice Standard to comply with FERC direction.

001-15.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Item 7.a
(11/28/2011)

Modify “ATC Change Narrative Timing” Business
Practice Standard to comply with FERC direction.

001-20.2.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language “Rollover Rights”

001-20.3

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language “Rollover Rights”

Report of the North American Energy Standards Board, September 18, 2012
Page 28

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-21.3.1.2.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Delete Business Practice Standard and mark as
RESERVED

001-23

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems, (Version 1.6)

001-23.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by adding “Eligible Customer” and deleting “or
Network Customer.”

001-23.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – General Requirements, (Version 1.6)

001-23.1.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by adding “Eligible Customer.”

Report of the North American Energy Standards Board, September 18, 2012
Page 29

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-23.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Modify language
by adding “Eligible Customer.”

001-23.2.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.2.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems - Eligibility, (Version 1.6)

001-23.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard regarding requests for
Concomitant Evaluation

Report of the North American Energy Standards Board, September 18, 2012
Page 30

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-23.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

WEQ 2011 Annual Plan Items 2.a.i.1-8, 2b and 3.a.i
(06/11/2012) – Network Service on OASIS (NITS),
(Version 2.0) – Modify language by adding “Eligible
Customer” and deleting “or Network Customer.”

001-23.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer.”

001-23.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

Report of the North American Energy Standards Board, September 18, 2012
Page 31

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-23.3.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

Report of the North American Energy Standards Board, September 18, 2012
Page 32

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-23.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize “STATUS”
and correct spelling “SUPERSEDED.”

001-23.3.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.5.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.5.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.5.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard

001-23.3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

Report of the North American Energy Standards Board, September 18, 2012
Page 33

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-23.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.” Capitalize
“STATUS.”

001-23.3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-23.3.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard for Coordination of
Requests for Service Across Multiple Transmission
Systems – Processing of Coordinated Requests,
(Version 1.6)

001-23.3.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by adding “Eligible Customer” and
deleting “or Network Customer.”

001-101.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 34

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-101.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

WEQ 2011 Annual Plan Items 2.a.i.1-8, 2b and 3.a.i
(06/11/2012) – Network Service on OASIS (NITS),
(Version 2.0) – Add Business Practice Standard “NITS
– General Requirements”

001-101.5.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.5.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 35

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-101.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – General
Requirements”

001-101.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Information
Requirements”

001-101.12.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Information
Requirements”

001-101.12.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Information
Requirements”

001-101.12.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Information
Requirements”

001-101.12.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Information
Requirements”

001-101.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-101.13.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

WEQ 2011 Annual Plan Items 2.a.i.1-8, 2b and 3.a.i
(06/11/2012) – Network Service on OASIS (NITS),
(Version 2.0) – Add Business Practice Standard
“Network Load Information Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 36

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-101.13.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-101.13.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-101.13.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-101.13.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-101.13.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Information Requirements”

001-102

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Application”

001-102.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 37

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-102.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.1.2.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of NITS
Application”

001-102.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
NITS Application”

001-102.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Application”

001-102.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid NITS
Application”

001-102.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid NITS
Application”

001-102.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid NITS
Application”

001-102.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 38

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-102.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.4.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient NITS
Application”

001-102.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed NITS
Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 39

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-102.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed NITS
Application”

001-102.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed NITS
Application”

001-102.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed NITS
Application”

001-103

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Evaluation of
NITS Application”

001-103.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
NITS Application”

001-103.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
NITS Application”

001-103.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
NITS Application”

001-103.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Evaluation of NITS
Application”

001-103.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Evaluation of NITS
Application”

001-103.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Evaluation of NITS
Application”

001-103.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Declining a NITS
Application”

001-103.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Declining a NITS
Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 40

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-103.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Declining a NITS
Application”

001-103.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Completed
NITS Application”

001-103.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Completed
NITS Application”

001-103.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Completed
NITS Application”

001-103.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.5.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.5.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.5.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to NITS
Application”

001-103.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of NITS
Application”

001-103.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of NITS
Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 41

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-103.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of NITS
Application”

001-103.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Changes to NITS
Application Prior To Confirmation”

001-103.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Changes to NITS
Application Prior To Confirmation”

001-103.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Changes to NITS
Application Prior To Confirmation”

001-103.7.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Changes to NITS
Application Prior To Confirmation”

001-103.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.8.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.8.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.8.1.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.8.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.8.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Completed NITS Application”

001-103.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
NITS Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 42

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-103.9.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
NITS Application”

001-103.9.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
NITS Application”

001-103.9.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
NITS Application”

001-103.9.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

WEQ 2011 Annual Plan Items 2.a.i.1-8, 2b and 3.a.i
(06/11/2012) – Network Service on OASIS (NITS),
(Version 2.0) – Add Business Practice Standard “Final
Disposition of NITS Application”

001-104

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-104.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-104.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-104.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-104.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-104.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS –
Administrative Changes to the NITS Application”

001-105

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of Service”

001-105.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

Report of the North American Energy Standards Board, September 18, 2012
Page 43

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

001-105.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

001-105.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

001-105.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

WEQ 2011 Annual Plan Items 2.a.i.1-8, 2b and 3.a.i
(06/11/2012) – Network Service on OASIS (NITS),
(Version 2.0) – Add Business Practice Standard
“General Requirements of Modification of NITS”

001-105.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

Table 105-A

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Table 105-A “NITS Request Timing
Requirements”

001-105.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Requirements
of Modification of NITS”

001-105.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Designation of a
Network Resource”

001-105.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

001-105.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

001-105.2.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

001-105.2.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

Report of the North American Energy Standards Board, September 18, 2012
Page 44

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.2.1.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

001-105.2.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Designation of a Network Resource”

001-105.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Designation of a Network Resource”

001-105.2.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Designation of a Network Resource”

001-105.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Designation of a Network Resource”

001-105.2.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Designation of a Network Resource”

001-105.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

Report of the North American Energy Standards Board, September 18, 2012
Page 45

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.2.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Designation of a Network Resource”

001-105.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Designation of a Network Resource”

001-105.2.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Designation of a Network Resource””

001-105.2.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
Request for Designation of a Network Resource”

001-105.2.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
Request for Designation of a Network Resource”

001-105.2.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
Request for Designation of a Network Resource”

Report of the North American Energy Standards Board, September 18, 2012
Page 46

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.2.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Designation of a Network Resource”

001-105.2.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Designation of a Network Resource”

001-105.2.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Designation of a Network Resource”

001-105.2.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Decline a Request for
Designation of a Network Resource”

001-105.2.8.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Decline a Request for
Designation of a Network Resource”

001-105.2.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Request for
Designation of a Network Resource”

001-105.2.9.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Request for
Designation of a Network Resource”

001-105.2.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Designation of a Network Resource”

001-105.2.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Designation of a Network Resource”

001-105.2.10.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Designation of a Network Resource”

001-105.2.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Designation of a Network Resource”

001-105.2.11.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Designation of a Network Resource”

Report of the North American Energy Standards Board, September 18, 2012
Page 47

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.2.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Designation of a
Network Resource”

001-105.2.12.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Designation of a
Network Resource”

001-105.2.12.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Designation of a
Network Resource”

001-105.2.12.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Designation of a
Network Resource”

001-105.2.12.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Designation of a
Network Resource”

001-105.2.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Designation of a Network Resource”

001-105.2.13.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Designation of a Network Resource”

001-105.2.13.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Designation of a Network Resource”

001-105.2.13.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Designation of a Network Resource”

001-105.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

001-105.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

001-105.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 48

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

001-105.3.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

001-105.3.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of DNR”

001-105.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Temporary
Termination of DNR”

001-105.3.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Temporary Termination of DNR”

001-105.3.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Temporary Termination of DNR”

001-105.3.2.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Temporary Termination of DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 49

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Temporary Termination of DNR”

001-105.3.2.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Temporary Termination of DNR”

001-105.3.2.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Temporary Termination of DNR”

001-105.3.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 50

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.2.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.5.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Temporary Termination of DNR”

001-105.3.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Temporary Termination of DNR”

001-105.3.2.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Temporary Termination of DNR”

001-105.3.2.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Temporary Termination of DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 51

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.2.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Temporary Termination of DNR”

001-105.3.2.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Temporary Termination of DNR”

001-105.3.2.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Temporary Termination of
DNR”

001-105.3.2.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Temporary Termination of
DNR”

001-105.3.2.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Temporary Termination of
DNR”

001-105.3.2.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Temporary Termination of DNR”

001-105.3.2.8.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Temporary Termination of DNR”

001-105.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Indefinite Termination
of DNR”

001-105.3.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Indefinite Termination of DNR”

001-105.3.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Indefinite Termination of DNR”

001-105.3.3.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Indefinite Termination of DNR”

001-105.3.3.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Indefinite Termination of DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 52

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.3.1.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Indefinite Termination of DNR”

001-105.3.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Indefinite Termination of DNR”

001-105.3.3.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Indefinite Termination of DNR”

001-105.3.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Indefinite Termination of DNR”

001-105.3.3.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Indefinite Termination of DNR”

001-105.3.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Indefinite Termination of DNR”

001-105.3.3.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Indefinite Termination of DNR”

001-105.3.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Indefinite Termination of DNR”

001-105.3.3.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Indefinite Termination of DNR”

001-105.3.3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Indefinite Termination of
DNR”

001-105.3.3.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Indefinite Termination of
DNR”

001-105.3.3.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Indefinite Termination of
DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 53

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.3.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Indefinite Termination of DNR”

001-105.3.3.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Indefinite Termination of DNR”

001-105.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Modification of
Network Load”

001-105.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Modification of Network Load”

001-105.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Modification of Network Load”

001-105.4.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Modification of Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 54

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Modification of Network Load”

001-105.4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Modification of Network Load”

001-105.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 55

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.4.4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Deficient Request for
Modification of Network Load”

001-105.4.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Modification of Network Load”

001-105.4.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Modification of Network Load”

001-105.4.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
Request for Modification of Network Load”

001-105.4.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Review of Completed
Request for Modification of Network Load”

001-105.4.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Modification of Network Load”

001-105.4.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Modification of Network Load”

001-105.4.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Study of Request for
Modification of Network Load”

001-105.4.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Decline a Request for
Modification of Network Load”

001-105.4.8.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Decline a Request for
Modification of Network Load”

001-105.4.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Request for
Modification of Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 56

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.4.9.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Refusal of Request for
Modification of Network Load”

001-105.4.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Modification of Network Load”

001-105.4.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Modification of Network Load”

001-105.4.10.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Counteroffer to
Request for Modification of Network Load”

001-105.4.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Modification of Network Load”

001-105.4.11.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Modification of Network Load”

001-105.4.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Modification of
Network Load”

001-105.4.12.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Modification of
Network Load”

001-105.4.12.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Modification of
Network Load”

001-105.4.12.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Modification of
Network Load”

001-105.4.12.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation, Rebid,
or Withdrawal of a Request for Modification of
Network Load”

001-105.4.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Modification of Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 57

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.4.13.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Modification of Network Load”

001-105.4.13.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Modification of Network Load”

001-105.4.13.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Modification of Network Load”

001-105.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of
Network Load”

001-105.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of
Network Load”

001-105.5.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of
Network Load”

001-105.5.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of
Network Load”

001-105.5.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Termination of
Network Load”

001-105.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Termination of Network Load”

001-105.5.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Termination of Network Load”

001-105.5.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Termination of Network Load”

001-105.5.2.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Termination of Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 58

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.5.2.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submission of
Request for Termination of Network Load”

001-105.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Termination of Network Load”

001-105.5.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Initial Review of
Request for Termination of Network Load”

001-105.5.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Termination of Network Load”

001-105.5.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Invalid Request for
Termination of Network Load”

001-105.5.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Termination of Network Load”

001-105.5.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Completed Request
for Termination of Network Load”

001-105.5.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Termination of Network Load”

001-105.5.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Acceptance of
Request for Termination of Network Load”

001-105.5.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Termination of Network
Load”

001-105.5.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Termination of Network
Load”

001-105.5.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Confirmation or
Withdrawal of a Request for Termination of Network
Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 59

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.5.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Termination of Network Load”

001-105.5.8.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Final Disposition of
Request for Termination of Network Load”

001-105.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

Report of the North American Energy Standards Board, September 18, 2012
Page 60

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-105.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Concomitant
Evaluation”

001-105.6.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Concomitant
Evaluation Final Disposition”

001-105.6.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Concomitant
Evaluation Final Disposition”

001-105.6.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Concomitant
Evaluation Final Disposition”

001-106

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Secondary Network
Transmission Service”

001-106.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

Report of the North American Energy Standards Board, September 18, 2012
Page 61

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-106.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.1.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Secondary
Network Transmission Service”

001-106.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

Report of the North American Energy Standards Board, September 18, 2012
Page 62

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-106.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-106.2.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Terminating
Secondary Network Transmission Service Capacity”

001-107

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-107.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-107.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-107.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-107.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-107.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS – Modification
of NITS Application STOP_TIME”

001-INT2

Interpretation

C11004
(03/26/2012)

Add Interpretation for NAESB WEQ Business Practice
Standards WEQ-001-9.1 and WEQ-001-10.1

001-B

Appendix

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify “Notes for Examples” by adding “1-7”; Add
Notes and Examples 8-17

Report of the North American Energy Standards Board, September 18, 2012
Page 63

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

001-C

Appendix

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify Appendix C by deleting “001-C.4:
Requirements related to posting of information under
the Standards of Conduct link”

001-E

Appendix

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Appendix E – Contiguity Examples for
Coordinated Groups, (Version 1.6)

WEQ-002 Open Access Same-Time Information System (OASIS) Standards & Communication Protocols,
Version 2.0
Introduction

Introduction

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify “Introduction” language

Applicability

Applicability

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Applicability” heading and language

Applicability

Applicability

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by changing “Eligible Transmission
Customer” to “Eligible Customer” and deleting
“Network Customer”

002-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

002-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 64

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Internet Tool Requirements”

002-3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Access to Information”

002-3.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify Business Practice Standard by deleting “ b.(ii) –
Standards of Conduct” and marking as RESERVED

002-3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Transmission Provider Updating
Requirements”

002-3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “User Interaction with an OASIS
Node”

002-4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify heading from “Interface Requirements” to
“General OASIS and PTP Interface Requirements” and
add language

002-4.2.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Script Names”

002-4.2.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “OASIS Template Construction”

002-4.2.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language heading from “OASIS Template
HTML Screens” to “OASIS Template Browser-based
Screens” and modify language

002-4.2.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Query Requirements”

002-4.2.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add heading “Response Requirements” and modify
language

002-4.2.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Input Requirements”

002-4.2.8.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete reference to NERC Electronic Tagging
Specification and Add “Version 1.8.1 Electronic
Tagging Functional Specification”

Report of the North American Energy Standards Board, September 18, 2012
Page 65

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-4.2.8.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Transmission Customer Company
Information”

002-4.2.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Transaction Process”

002-4.2.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Request Types”

002-4.2.10.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Dynamic Notification”

002-4.2.10.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Use of Comments”

002-4.2.12

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify reference to “WEQ-013-4.2” by deleting “4.2”
and adding “x”

002-4.2.12

Business Practice
Standard

MC12003
(03/30/2012)

Minor correction to correct reference to Business
Practice Standard WEQ-013-x by deleting the “x” and
adding “C” (WEQ-013-C)

002-4.2.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify heading from “Linking of Ancillary Services to
Transmission Services” to “Linking of Ancillary
Services to PTP”

002-4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify heading from “Template Descriptions” to
“General OASIS and PTP Template Descriptions” and
add language

002-4.3.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify Template(s) column by adding “ (optional
template to be implemented at Transmission Provider’s
discretion)” to Process Name: Personnel Transfers,
Discretion, and Standards of Conduct

002-4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify heading language from “OASIS Template
Summary” to “Template Summary” and modify
language

002-4.3.6.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language for data
element “ROLLOVER_WAIVED”

Report of the North American Energy Standards Board, September 18, 2012
Page 66

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-4.3.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-4.3.6.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language for data
element “ROLLOVER_WAIVED”

002-4.3.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-4.3.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Status of Transmission Customer
Purchase Request/Reservation (transstatus)”

002-4.3.6.2.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language for data
elements “ROLLOVER_ELIGIBLE” and
“ROLLOVER_CAPACITY”

002-4.3.6.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard (OASIS functionality
related to Service Across Multiple Transmission
Systems), (Version 1.6)

002-4.3.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-4.3.6.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-4.3.10.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify the use of the “Personnel Transfers (personnel)
Template”

002-4.3.10.5

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify the use of the “Discretion (discretion)
Template”

002-4.3.10.6

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify the use of the “Standards of Conduct
(stdconduct) Template”

002-4.3.11

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify Business Practice Standard by adding “*A
Transmission Provider is only required to implement the
audit log templates personnelaudit, discretionaudit, and
stdconductaudit …”

002-4.3.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

Report of the North American Energy Standards Board, September 18, 2012
Page 67

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-4.3.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “OASIS Audit Log” by deleting
“cgupdateaudit – audit counterpart to cgupdate”

002-4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify reference to “WEQ-013-4.1” by deleting “4.1”
and adding “x”

002-4.4

Business Practice
Standard

MC12003
(03/30/2012)

Minor correction to correct reference to Business
Practice Standard WEQ-013-x by deleting the “x” and
adding “C” (WEQ-013-C)

002-5.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-5.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language for “Implementation Plan”

002-5.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

002-5.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify heading language from “OASIS Data Element
Cross Reference” to “OASIS Data Element Conversion
and Cross Reference” and modify language by changing
“VERSION 1.6” to “VERSION 2.0” and adding
template “transstatus (query)” for New Data Element
“CONCOMITANT_EVAL_FLAG”

002-5.10.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Implementation
Requirements”

002-5.10.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Specific
Implementation Timeline”

002-101

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Interface
Requirements”

002-101.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Information Model
Concepts”

002-101.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard heading “NITS OASIS
Node Conventions and Structures”

Report of the North American Energy Standards Board, September 18, 2012
Page 68

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “OASIS Node Naming
Requirements”

002-101.2.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “OASIS Node Names”

002-101.2.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “OASIS Node and
Transmission Provider Home Directory”

002-101.2.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Script Names”

002-101.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Data Element
Dictionary”

002-101.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS OASIS
Template Constructs”

002-101.2.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS OASIS
Template Construction”

002-101.2.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS OASIS
Template Categories”

002-101.2.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS OASIS
Template User Interface Screens”

002-101.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query/Response NITS
OASIS Template Requirements”

002-101.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Input/Response NITS
OASIS Template Requirements”

002-101.2.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Input Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 69

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.2.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Response to Input”

002-101.2.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query Variables”

002-101.2.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General”

002-101.2.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Standard Header
Query Variables”

002-101.2.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Responses to Queries”

002-101.2.6.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Multiple Instances”

002-101.2.6.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Logical Operations”

002-101.2.6.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Handling of Time
Data Elements”

002-101.2.6.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Default Values”

002-101.2.6.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Limitations on
Queries”

002-101.2.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS CSV Format”

002-101.2.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “General Record
Format”

Report of the North American Energy Standards Board, September 18, 2012
Page 70

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.2.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Input/Response
Header Records”

002-101.2.7.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query/Response
Header Records”

002-101.2.7.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Data Records”

002-101.2.7.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Continuation
Records”

002-101.2.7.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Error Handling in
NITS CSV Formatted Responses”

002-101.2.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Registration
Information”

002-101.2.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Representation of
Time”

002-101.2.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Transaction Process”

002-101.2.10.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request Types”

002-101.2.10.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “STATUS Values”

002-101.2.10.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Dynamic
Notification”

002-101.2.10.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “HTTP Notification”

Report of the North American Energy Standards Board, September 18, 2012
Page 71

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.2.10.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “E-mail Notification”

002-101.2.10.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Use of Comments”

002-101.2.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Reference Identifiers”

002-101.2.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Linking of Ancillary
Services to NITS”

002-101.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “INPUT/RESPONSE
Template Descriptions”

002-101.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “INPUT Template
Definitions”

002-101.3.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submit New NITS
Request (NewNITSRequest NITS OASIS INPUT
Template)”

002-101.3.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Update NITS Request
(UpdateNITSRequest NITS OASIS INPUT Template)”

002-101.3.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Submit New
Concomitant Request (NewConcomitantRequest NITS
OASIS INPUT Template)”

002-101.3.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Update Concomitant
Request (UpdateConcomitantRequest NITS OASIS
INPUT Template)”

002-101.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “REQUEST Template
Definitions”

002-101.3.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Copy NITS
Application (CopyNITSApplication NITS OASIS
Request Template)”

Report of the North American Energy Standards Board, September 18, 2012
Page 72

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.3.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Copy NITS Request
(CopyNITSRequest NITS OASIS Request Template)

002-101.3.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for New
NITS Application (NewNITSApplication NITS OASIS
REQUEST Template)”

002-101.3.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify
NITS Service (ModifyNITSService NITS OASIS
REQUEST Template)”

002-101.3.2.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify
NITS Customer (ModifyNITSCustomer NITS OASIS
REQUEST Template)”

002-101.3.2.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Add an
Agent (AddNITSAgent NITS OASIS REQUEST
Template)”

002-101.3.2.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify an
Agent (ModifyNITSAgent NITS OASIS REQUEST
Template)”

002-101.3.2.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Add a
Network Load (AddNITSLoad NITS OASIS REQUEST
Template)”

002-101.3.2.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify a
Network Load (ModifyNITSLoad NITS OASIS
REQUEST Template)”

002-101.3.2.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Add a
Generation Asset (AddNITSGeneration NITS OASIS
REQUEST Template)”

002-101.3.2.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify a
Generation Asset (ModifyNITSGeneration NITS OASIS
REQUEST Template)”

002-101.3.2.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Add a
Network Resource (AddNITSResource NITS OASIS
REQUEST Template)”

002-101.3.2.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Modify a
Network Resource (ModifyNITSResource NITS OASIS
REQUEST Template)”

Report of the North American Energy Standards Board, September 18, 2012
Page 73

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.3.2.14

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Add a
DNR (AddNITSDNR NITS OASIS REQUEST
Template)”

002-101.3.2.15

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Terminate
a DNR (TerminateNITSDNR NITS OASIS REQUEST
Template)”

002-101.3.2.16

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Service
from a Non-Designated Network Resource
(AddNITSSecondary NITS OASIS REQUEST
Template)”

002-101.3.2.17

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request to Terminate
Service from a Non-Designated Network Resource
(TerminateNITSSecondary NITS OASIS REQUEST
Template)”

002-101.3.2.18

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for Ancillary
Service (AddNITSAncillary NITS OASIS REQUEST
Template) [Optional]”

002-101.3.2.19

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Request for PTP
(AddPTPService NITS OASIS REQUEST Template)”

002-101.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DATA Template
Definitions”

002-101.3.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Service
Description (NITSService NITS OASIS DATA
Template)”

002-101.3.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Customer
Information (NITSCustomer NITS OASIS DATA
Template)”

002-101.3.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Designated
Agent Information (NITSAgent NITS OASIS DATA
Template)”

002-101.3.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Description (NITSLoadDescription NITS OASIS
DATA Template)”

002-101.3.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Forecast (NITSLoadForecast NITS OASIS Data
Template) [Optional]”

Report of the North American Energy Standards Board, September 18, 2012
Page 74

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.3.3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Generation
Description (NITSGenerationDescription NITS OASIS
DATA Template)”

002-101.3.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Generation
Dispatch Cost (NITSGenerationDispatch NITS OASIS
DATA Template) [Optional]”

002-101.3.3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Description (NITSResourceDescription NITS OASIS
Data Template)”

002-101.3.3.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Forecast (NITSResourceForecast NITS OASIS DATA
Template) [Optional]”

002-101.3.3.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Designation (NITSResourceDesignation NITS OASIS
DATA Template)”

002-101.3.3.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Capacity
(NITSResourceCapacity NITS OASIS DATA
Template)”

002-101.3.3.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Scheduling
Rights (NITSSchedulingRights NITS OASIS DATA
Template) [Optional]”

002-101.3.3.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Auxiliary
Transmission Rights (AuxiliaryTransmission NITS
OASIS DATA Template)”

002-101.3.3.14

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Secondary Network
Transmission Service (NITSSecondaryService NITS
OASIS DATA Template)”

002-101.3.3.15

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Secondary Network
Transmission Capacity (NITSSecondaryCapacity NITS
OASIS DATA Template)”

002-101.3.3.16

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Ancillary
Service (NITSAncillaryService NITS OASIS DATA
Template) [Optional]”

002-101.3.3.17

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Ancillary
Service Capacity (NITSAncillaryCapacity NITS OASIS
DATA Template) [Optional]”

Report of the North American Energy Standards Board, September 18, 2012
Page 75

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.3.3.18

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “PTP (PTPService
NITS OASIS DATA Template)”

002-101.3.3.19

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “PTP Capacity
(PTPCapacity NITS OASIS DATA Template)

002-101.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query/Response
Template Descriptions”

002-101.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “QUERY Template
Definitions”

002-101.4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query NITS Request
Summary (QueryNITSRequest NITS OASIS QUERY
Template)”

002-101.4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query NITS Request
Details (QueryNITSRequestDetails NITS OASIS
QUERY Template)”

002-101.4.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query NITS
Application Details (QueryNITSApplication NITS
OASIS QUERY Template)”

002-101.4.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query NITS DNR
(QueryNITSDNR NITS OASIS QUERY Template)”

002-101.4.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Query NITS
Scheduling Rights (QueryNITSSchedulingRights NITS
OASIS QUERY Template) [Optional]”

002-101.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “OBJECT Template
Definitions”

002-101.4.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NTIS Request Object”

002-101.4.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Application
Object (NITSApplication NITS OASIS OBJECT
Template)”

Report of the North American Energy Standards Board, September 18, 2012
Page 76

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.4.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “List of DNRs
(NITSDNRList NIST OASIS OBJECT Template)”

002-101.4.2.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “List of NITS
Scheduling Rights (NITSSchedulingRightsList NITS
OASIS OBJECT Template)”

002-101.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DATA Template
Definitions”

002-101.4.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Service
Description (NITSService NITS OASIS DATA
Template)”

002-101.4.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Transmission
Customer Information (NITSCustomer NITS OASIS
DATA Template)”

002-101.4.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Designated
Agent Information (NITSAgent NITS OASIS DATA
Template)”

002-101.4.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Description (NITSLoadDescription NITS OASIS
DATA Template)”

002-101.4.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Load
Forecast (NITSLoadForecast NITS OASIS DATA
Template)”

002-101.4.3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Generation
Description (NITSGenerationDescription NITS OASIS
DATA Template)”

002-101.4.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Generation
Dispatch Cost (NITSGeneration Dispatch NITS OASIS
DATA Template)”

002-101.4.3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Description (NITSResourceDescription NITS OASIS
DATA Template)”

002-101.4.3.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Forecast (NITSResourceForecast NITS OASIS DATA
Template)”

Report of the North American Energy Standards Board, September 18, 2012
Page 77

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.4.3.10

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Network Resource
Designation (NITSResourceDesignation NITS OASIS
DATA Template)”

002-101.4.3.11

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Capacity
(NITSResourceCapacity NITS OASIS DATA
Template)”

002-101.4.3.12

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “DNR Scheduling
Rights (NITSSchedulingRights NITS OASIS DATA
Template)”

002-101.4.3.13

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Auxiliary
Transmission Rights (AuxiliaryTransmission NITS
OASIS DATA Template)”

002-101.4.3.14

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Secondary Network
Transmission Service (NITSSecondaryService NITS
OASIS DATA Template)”

002-101.4.3.15

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Secondary Network
Transmission Capacity (NITSSecondaryCapacity NITS
OASIS DATA Template)”

002-101.4.3.16

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NTIS Ancillary
Service (NITSAncillaryService NITS AOSIS DATA
Template)”

002-101.4.3.17

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Ancillary
Service Capacity (NITSAncillaryCapacity NITS OASIS
DATA Template)”

002-101.4.3.18

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “PTP (PTPService
NITS OASIS DATA Template)”

002-101.4.3.19

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “PTP Capacity
(PTPCapacity NITS OASIS DATA Template)”

002-101.4.3.20

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Ancillary
Reservation (NITSAncillaryReservation NITS OASIS
DATA Template)”

002-101.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “AUDIT Template
Description”

Report of the North American Energy Standards Board, September 18, 2012
Page 78

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

002-101.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Audit QUERY
Template Definitions”

002-101.5.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Audit OBJECT
Template Definitions”

002-101.5.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Audit DATA
Template Definitions”

002-101.5.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard Audit NITS Request
Summary (AuditNITSRequest NITS OASIS QUERY
Template)”

002-101.5.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “Audit NITS Request
Details (AuditNITSRequestDetails NTIS OASIS
QUERY Template)”

002-101.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “NITS Integration with
OASIS PTP Template Implementation”

002-101.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard
“AddNITSDNR/TerminateNITSDNR Integration”

002-101.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard
“AddNITSSecondary/TerminatedNITSSecondary
Integration”

002-101.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Add Business Practice Standard “AddPTPService
Integration”

WEQ-003 Open Access Same-Time Information Systems (OASIS) Data Dictionary, Version 2.0
Introduction

Introduction

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Introduction” heading and language

Applicability

Applicability

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Applicability” heading and language

Applicability

Applicability

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by changing “Eligible Transmission
Customer” to “Eligible Customer” and deleting

Report of the North American Energy Standards Board, September 18, 2012
Page 79

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

(06/11/2012)

“Network Customer”

003-0

Business Practice
Standard

WEQ 2009 Annual
Plan Item 3.d
(06/15/2009)

Modify definition of Data Elements
“DISCRETION_DESCRIPTION,
EMPLOYEE_NAME, FORMER_COMPANY,
FORMER_DEPARTMENT, FORMER_POSITION,
NEW_COMPANY, NEW_DEPARTMENT,
NEW_POSITION, RESPONSIBLE_PARTY_NAME,
STANDARDS_OF_CONDUCT_ISSUES”

003-0

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Data Elements “ROLLOVER_ELIGIBLE, and
ROLLOVER_WAIVED”

003-0

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

For Data Elements “SCHEDULE_PRIORITY,
TRANSACTION_ID, AND TRANSACTION_TYPE”
Delete reference to NERC Electronic Tagging
Specification and Add “Version 1.8.1 Electronic
Tagging Functional Specification”

003-0

Business Practice
Standard

MC10033
(01/03/2011)

Minor Correction applied (Version 002.1) to OASIS
Data Dictionary Element Name “STATUS” to correct
discrepancy in the definition of “ANNULLED”

003-0

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems) by adding Data Elements
“CR_DEADLINE”, “CG_STATUS”,
CR_ASSIGNMENT_REF”, CR _DISPOSITION”,
“CR_DISPOSITION_TIME”,
CR_PRIMARY_PROVIDER_CODE”,
“CR_SERVICE_INCREMENT”, “CR_TS_CLASS”
and “CR_TS_TYPE.” Modify Data Element
“STATUS.” , (Version 1.6)

003-0

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify the definition language of Data Elements
“CUSTOMER_CODE”, “SERVICE_DESCRIPTION”,
“STATUS”
Add Data Elements
“AGENT_CODE”, “AGENT_COMMENTS”,
“AGENT_DUNS”, “AGENT_EMAIL”,
AGENT_FAX”, “AGENT_NAME”,
“AGENT_PHONE”, “APPLICATION_NAME”,
“APPLICATION_REF”,
“ATTESTATION_SUBMITTER”,
“ATTESTOR_NAME”,
“CONCOMITANT_EVAL_FLAG’,
CREATEDBY_CODE”,
“CUSTOMER_STATEMENT”, “DATA”,
“DISPATCH_COST”, “DISPATCH_PRIORITY”,
“DISPATCH_START”, DISPATCH_STOP”,
“DNR_ACTION”, “DNR_ATTESTATION”,
“EFFECTIVE_START_TIME”,
“EFFECTIVE_STOP_TIME”, “EILING_STATUS”,
“FORESCAST”, “FORECAST_DESCRIPTION”,
“FORECAST_METHOD”, “GEN_AREA”,
“GEN_DESCRIPTION”,
“GEN_ELIGIBLE_CAPACITY’, “GEN_GROUP”,
“GEN_LOCATION”, “GEN_MAX_CAPACITY”,

Report of the North American Energy Standards Board, September 18, 2012
Page 80

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action
“GEN_MIN_CAPACITY”, “GEN_NAME”,
“GEN_NORMAL_CAPACITY”,
“GEN_OPERATOR”, “GEN_SHARE”,
“GEN_VAR_LEADING”, “GEN_VAR_LEADING”,
“GEN_VAR_LAGGING”, “INPUT_STATUS”,
“LOAD_AREA”, “LOAD_DESCRIPTION”,
“LOAD_NAME’, “LOAD_SUBSTATION’,
“LOAD_TYPE”, “LOAD_VOLTAGE”,
“MODIFIEDBY_CODE”, “QUERY_STATUS”,
“REQUEST”, “RESOURCE_CLASS”,.
“RESOURCE_DESCRIPTION”,
“RESOURCE_NAME”, “RESOURCE_TYPE”,
‘SOURCE_AREA”, “SUMMER_FORECAST”,
“SUMMER_INTERRUPTIBLE”, “TITLE_AREA”,
“TRANSACTION_REF”,
“TRANSMISSION_OWNER”,
“WINTER_FORECAST”,
“WINTER_INTERRUPTIBLE”

WEQ-004 Coordinate Interchange Business Practice Standards
Introduction

Introduction

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Introduction language

Applicability

Applicability

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Applicability language

004-0.1

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.1 as RESERVED

004-0.2

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.2 as RESERVED

004-0.3

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.3 as RESERVED

004-0.4

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.4 as RESERVED

004-0.5

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.5 as RESERVED

004-0.6

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.6 as RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 81

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

004-0.7

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.7 as RESERVED

004-0.8

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.8 as RESERVED

004-0.9

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.1 as RESERVED

004-0.10

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.10 as RESERVED

004-0.11

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.11 as RESERVED

004-0.12

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.12 as RESERVED

004-0.13

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.13 as RESERVED

004-0.14

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.14 as RESERVED

004-0.15

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.15 as RESERVED

004-0.16

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.16 as RESERVED

004-0.17

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.17 as RESERVED

004-0.18

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.18 as RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 82

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

004-0.19

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.19 as RESERVED

004-0.20

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.20 as RESERVED

004-0.21

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.21 as RESERVED

004-0.22

Definition

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Definition from “WEQ-004”, Add to “WEQ000” and mark 004-0.22 as RESERVED

004-1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language including
removal of “to the Interchange Authority (IA)” and
adding “to the Sink Balancing Authority’s registered eTag Authority Service”

004-2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language including
removal of “to the Interchange Authority”

004-2.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by adding
reference to “Appendix A”

004-3

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by adding
“HQ (TransEnergie)

004-4

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Business Practice Standard - RESERVED

004-5

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
deleting “load serving Purchasing Selling Entity (PSE)
and modify referenced to “Appendix C”

004-6

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
modifying reference to “Appendix B Transaction e-Tag
Actions”

004-6.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
modifying reference to “Appendix D – Commercial
Timing Tables” and delete “Note”

Report of the North American Energy Standards Board, September 18, 2012
Page 83

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

004-6.1.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
removing “Interchange Authority”

004-6.1.3

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

004-7

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Business Practice Standard - RESERVED

004-8

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Remove heading and add Business Practice Standard
language from “004-8.1”

004-8.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Move Business Practice Standard language to “004-8”
and mark number “004-8.1 as RESERVED”

004-8.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Business Practice Standard - RESERVED

004-9

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
replacing “Purchasing Selling Entity” to the ”PSE”

004-10

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
removing “Interchange, such as Balancing Authorities,
Reliability Coordinators, Generator-Providing Entity,
Load-Serving Entity, and Transmission Service
Providers” and adding “e-Tag”

004-11

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
modifying reference to “Appendix D”

004-11.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
deleting “For Implemented Interchange, only “future”
hours may be modified” and “a)”

004-11.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard Language “prior to
completion”

004-11.2.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Business Practice Standard - RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 84

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

004-11.3

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
changing “confirmed” to “Confirmed”

004-11.4

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

004-12

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
deleting “personnel and facilities on site and
immediately” and adding “resources available to
process”

004-13

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by adding
“Transactions”

004-14

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
deleting “either handled” and adding “designated” and
“and posted business practices”

004-14.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-15

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language by
deleting “PSE” and adding “entity” and changing
“transaction” to “Transaction”

004-16

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Delete Business Practice Standard - RESERVED

004-17

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-17.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-17.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-17.3

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 85

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

004-18

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-18.1

Business Practice
Standard

0 WEQ 2009
Annual Plan 1.a,
3.a.vii, R05020
(12/14/2009)

Modify Business Practice Standard Language

004-18.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Business Practice Standard Language

004-19

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

004-19.1

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

004-19.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Add Business Practice Standard

004-A

Appendix

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Appendix

004-B

Appendix

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Appendix

004-C

Appendix

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Appendix

004-D

Appendix

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

Modify Appendix heading by changing “Table” to
“Tables”

WEQ-005 Area Control Error (ACE) Equation Special Cases Business Practice Standards
005-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 86

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

005-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

005-0.11

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

WEQ-006 Manual Time Error Correction Business Practice Standards
006-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 87

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

006-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

006-1

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-1.1

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-2

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-3

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-4

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-5

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-5

Business Practice
Standard

MC12026
(07/31/2012)

Modify Interconnection Time Monitoring table to add
“ERCOT” and footnotes 1 and 2.

006-6

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-7

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-7.1

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

Report of the North American Energy Standards Board, September 18, 2012
Page 88

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

006-7.2

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-8

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-9

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-10

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-11

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

006-12

Business Practice
Standard

MC11011
(05/30/2011)

Minor correction to suspend the NAESB Business
Practice Standards for WEQ-006-1 through WEQ-00612 based on the motion approved by the NERC
Operating Committee at their March 9, 2011 meeting.

WEQ-007 Inadvertent Interchange Payback Business Practice Standards
007-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 89

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

007-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

007-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

WEQ-008 Transmission Loading Relief (TLR) - Eastern Interconnection Business Practice Standards
008-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.11

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.12

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.13

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 90

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

008-0.14

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.15

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.16

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.17

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.18

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.19

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.20

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.21

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.22

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.23

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.24

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.25

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.26

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.27

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.28

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.29

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 91

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

008-0.30

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.31

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.32

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.33

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.34

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.35

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.36

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.37

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.38

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.39

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.40

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.41

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.42

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-0.43

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

008-1.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard “Reporting
Transmission Service Priorities for Use by the IDC”

008-1.7

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

Report of the North American Energy Standards Board, September 18, 2012
Page 92

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

008-1.7.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard

008-1.7.1

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

008-1.7.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard “Generator Priority
Assignment”

008-1.7.1.1

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

008-1.7.1.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard “Generator Priorities
Submittal via the SDX”

008-1.7.1.1.1

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

008-1.7.1.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard “Generator Priorities
Submittal via Intra-BA Transactions”

008-1.7.1.1.2

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

008-1.7.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 1.a.i
(12/06/2010)

Add Business Practice Standard “Market Flow
Assignment”

008-1.7.1.2

Business Practice
Standard

MC12025
(07/31/2012)

RESERVED – Remove the Parallel Flow Visualization
Interim Solution

WEQ-011 Gas / Electric Coordination Business Practice Standards
Introduction

Introduction

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Add “Introduction” language

Applicability

Applicability

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Add “Applicability” heading and language

011-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

011-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

011-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 93

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

011-1.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-1.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-1.3

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-1.4

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-1.5

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-1.6

Business Practice
Standard

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

011-INT1

Interpretation

WEQ 2009 Annual
Plan Item 5.a.2, 5.i,
R08004, R09011
(07/15/2010)

Delete the acronym PPO and replace with PPGC.
Delete the defined terms: Power Plant Operator and
Power Plant Operator Facility and replace with defined
terms: Power Plant Gas Coordinator and Power Plant
Gas Coordinator Facility. Replace the acronym TSP
with the defined term: Transportation Service Provider.

WEQ-012 Public Key Infrastructure (PKI) Business Practice Standards
012-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 94

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

012-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.7

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.8

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.9

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.10

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.11

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.12

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.13

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.14

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

012-0.15

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

WEQ-013 Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 2.0
Applicability

Applicability

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Applicability” heading and language

Applicability

Applicability

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by changing “Eligible Transmission
Customer” to “Eligible Customer” and deleting
“Network Customer”

Report of the North American Energy Standards Board, September 18, 2012
Page 95

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-0.6

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

013-2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.1.3

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Data Element “ROLLOVER_ELIGIBLE”

Report of the North American Energy Standards Board, September 18, 2012
Page 96

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-2.6.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Data Element “ROLLOVER_WAIVED”

013-2.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.5.1

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Add Data Element “ROLLOVER_WAIVED and
ROLLOVER_ELIGIBLE”

013-2.6.5.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-2.6.8.1

Business Practice
Standard

R11022
(06/11/2012)

Add e.g. to the parenthetical to clarify the listing of
service types within the parenthetical is intended to be
an example and not a definitive and limiting listing.
Add DEFERRAL to the request types listed in the
parenthetical to correct the FULL_TRANSFER
Business Practice Standard.

013-2.6.8.2

Business Practice
Standard

R11022
(06/11/2012)

Add e.g. to the parenthetical to clarify the listing of
service types within the parenthetical is intended to be
an example and not a definitive and limiting listing.
Add RENEWAL, REDIRECT, DEFERRAL, or
MATCHING to the request types listed in the
parenthetical to correct the FULL_TRANSFER
Business Practice Standard.

013-2.6.9

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify reference to WEQ-013-4.1.9 by deleting “4.1.9”
and adding “x”

013-2.6.9

Business Practice
Standard

MC12003
(03/30/2012)

Minor correction to correct reference to Business
Practice Standard WEQ-013-x by deleting the “x” and
adding “C Example 9” (WEQ-013-C Example 9)

013-3.2

Business Practice
Standard

WEQ 2009 Annual
Plan 1.a, 3.a.vii,
R05020
(12/14/2009)

In the scheduledetail template, Delete reference to
NERC Electronic Tagging Specification (ver 1.8.0) and
Add “Version 1.8.1 Electronic Tagging Functional
Specification”

Report of the North American Energy Standards Board, September 18, 2012
Page 97

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Modify reference to WEQ-013-4.1.8 by deleting “4.1.8”
and adding “x”

013-3.8

Business Practice
Standard

MC12003
(03/30/2012)

Minor correction to correct reference to Business
Practice Standard WEQ-013-x by deleting the “x” and
adding “C Example 8” (WEQ-013-C Example 8)

013-4

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and label Business Practice Standard No.
“RESERVED”

013-4.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.5

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language adding
“Transmission Service” and Add
“ROLLOVER_WAIVED”

013-4.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

Report of the North American Energy Standards Board, September 18, 2012
Page 98

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-4.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.1

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.2

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.3

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.6.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.4

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.6.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.5

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

Report of the North American Energy Standards Board, September 18, 2012
Page 99

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-4.1.6.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.6.6

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.7

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.7.1

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.7.2

Business Practice
Standard

WEQ 2009 Annual
Plan Item 2.a.ii.3
(07/27/2009)

Modify Business Practice Standard language for
“Transmission Service” and Add Data Element
“ROLLOVER_WAIVED”

013-4.1.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Modify Business Practice Standard (OASIS
functionality related to Service Across Multiple
Transmission Systems), (Version 1.6)

013-4.1.7.2

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.1.8

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED””

013-4.1.9

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.iii.1
through 2.a.iii.3
(08/11/2011)

Add Business Practice Standard “Process Flow
Example for Service Across Multiple Transmission
Systems.” , (Version 1.6)

013-4.1.9

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix C” and mark Business Practice Standard No.
“RESERVED”

013-4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Move Business Practice Standard language to
“Appendix D” and label Business Practice Standard No.
“RESERVED”

Report of the North American Energy Standards Board, September 18, 2012
Page 100

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-101

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard heading “General NITS Application
and Modification of Service Processing Requirements”

013-101.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Application and Modification
of Service Processing”

013-101.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Overall NITS Application and
Modification of Service Processing”

013-101.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Application and Modification
of Service Templates”

013-101.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Application and Modification
of Service Status”

013-101.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “ACCEPTED or CR_ACCEPTED
STATUS Restrictions”

013-101.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “CONFIRMED STATUS
Restrictions”

013-101.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Application and Modification
of Service Processing”

013-102

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Application Processing”

013-102.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted NITS Application
Process”

013-102.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted NITS Application”

013-102.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Add Information to the Presubmitted NITS Application”

Report of the North American Energy Standards Board, September 18, 2012
Page 101

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-102.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Updating Information to the Presubmitted or Completed NITS Application”

013-102.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Submitting the NITS Application”

013-102.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Completing the NITS Application”

013-102.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Deficient Processing”

013-103

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Evaluation of NITS Application”

013-103.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Review of Completed NITS
Application”

013-104

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS Modification of Service
Processing”

013-104.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “DNR Processing”

013-104.1.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted DNR”

013-104.1.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Add Information to the Presubmitted DNR”

013-104.1.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Updating Information to the Presubmitted or Completed DNR”

013-104.1.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Submitting the DNR”

Report of the North American Energy Standards Board, September 18, 2012
Page 102

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-104.1.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Completing the DNR”

013-104.1.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Deficient Processing”

013-104.1.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Evaluation of DNR”

013-104.1.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Review of Completed DNR”

013-104.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted Termination of DNR”

013-104.2.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted Termination”

013-104.2.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Completing the Termination”

013-104.2.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Evaluation of the Termination”

013-104.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Network Load Processing”

013-104.3.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Pre-submitted Network Load”

013-104.3.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Add Information to the Presubmitted Network Load”

013-104.3.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Updating Information to the Presubmitted or Completed Network Load”

Report of the North American Energy Standards Board, September 18, 2012
Page 103

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-104.3.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Submitting the Network Load”

013-104.3.5

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Completing the Network Load”

013-104.3.6

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Deficient Processing”

013-104.3.7

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Evaluation of Network Load”

013-104.3.8

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Review of Completed Network
Load”

013-104.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS – Concomitant Evaluation”

013-104.4.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “ADDNITSDNR Processing”

013-104.4.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “ADDNITSSECONDARY Processing”

013-104.4.3

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “ADDPTPSERVICE Processing”

013-104.4.4

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Completing the Concomitant
Evaluation Processing”

013-105

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Secondary Network Transmission
Service”

013-105.1

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Request for Secondary Network
Transmission Service”

Report of the North American Energy Standards Board, September 18, 2012
Page 104

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

013-105.2

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “Terminating Secondary Network
Transmission Service”

013-106

Business Practice
Standard

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add Business
Practice Standard “NITS – Extension of NITS
Application STOP_TIME”

013-C

Appendix

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Appendix C” (Appendix language moved from
WEQ-013-4.1marked RESERVED) To enable the
document to be expanded in the future and maintain all
the examples in a single location.

013-C

Appendix

MC12003
(03/30/2012)

Minor correction to correct reference to Business
Practice Standard WEQ-013-x by deleting the “x” and
adding “C” (WEQ-013-C) and correct inadvertent
typographical errors found in Examples 5a, 5d and 7b,

013-C

Appendix

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS), (Version 2.0) –
Modify language by change OASIS version references
from “version 1.5” to “version 2.0”

013-D

Appendix

WEQ 2011 Annual
Plan Item 5.a /
R08001 / R08002 /
R08003 / R08005
(11/28/2011)

Add “Appendix D” (Appendix language moved from
WEQ-013-4.2 marked RESERVED) To enable the
document to be expanded in the future and maintain all
the examples in a single location.

013-E

Appendix

WEQ 2011 Annual
Plan Items 2.a.i.1-8,
2b and 3.a.i
(06/11/2012)

Network Service on OASIS (NITS) – Add “Appendix E
– NITS Examples”

WEQ-014 WEQ / WGQ eTariff Related Business Practice Standards
014-0.1

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED– Move abbreviations, acronyms, and
definitions to WEQ-000-2

014-0.2

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED– Move abbreviations, acronyms, and
definitions to WEQ-000-2

014-0.3

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

014-0.4

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

014-0.5

Definition

WEQ 2009 Annual
Plan Item 5.b
(03/24/2010)

RESERVED – Move abbreviations, acronyms, and
definitions to WEQ-000-2

Report of the North American Energy Standards Board, September 18, 2012
Page 105

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

014-A

Appendix

MC10019
(10/07/2010)

Minor correction to the WEQ/WGQ Implementation
Guide for Electronic Tariff Filing to correspond to
modifications made by FERC to its Implementation
Guide for Electronic Filing of Parts 35, 154, 284, 300,
and 341 Tariff Filings

014-A

Appendix

MC10036
(11/20/2010)

Minor correction to correct all references to “NAESB
WGQ Standard” to include “No.” at the end so they
read “NAESB WGQ Standard No.”

014-A

Appendix

MC11041
(02/03/2011)

Minor Corrections to the NAESB WEQ/WGQ
Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its
Implementation Guide for Electronic Filing of Parts 25,
154, 284, 300, and 341 Tariff Filings as noted in the
FERC eTariff RSS Feed(s), dated October 8, 2010.

014-A

Appendix

MC11016
(06/03/2011)

Minor Corrections to the NAESB WEQ/WGQ
Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its
Implementation Guide for Electronic Filing of Parts 25,
154, 284, 300, and 341 Tariff Filings as noted in the
FERC eTariff RSS Feed(s), dated April 18, 2011.

014-A

Appendix

MC11032
(03/06/2012)

Minor Corrections to the NAESB WEQ/WGQ
Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its
Implementation Guide for Electronic Filing of Parts 25,
154, 284, 300, and 341 Tariff Filings as noted in the
FERC eTariff RSS Feed(s), dated December 22, 2011.

WEQ-015 Measurement and Verification of Wholesale Electricity Demand Response Business Practice Standards
Introduction

Introduction

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add “Introduction”

Applicability

Applicability

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add “Applicability”

Applicability

Applicability

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify language to provide additional enhancement.

Overview

Overview

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add “Overview”

Overview

Overview

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify language to provide additional enhancement.

Performance
Evaluation
Methodology

Performance
Evaluation
Methodology

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add “Performance Evaluation Methodology”

Performance
Evaluation
Methodology

Performance
Evaluation
Methodology

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify language to provide additional enhancement.

Report of the North American Energy Standards Board, September 18, 2012
Page 106

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.0

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Energy Products”
– General

015-1.0

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

015-1.0.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Advance Notification” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents”

015-1.0.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Deployment Time” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents”

015-1.0.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Reduction Deadline” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents”

015-1.0.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Release/Recall” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.0.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Normal Operations” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents”

015-1.0.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Demand Resource Availability
Measurement” and modify Business Practice Standard
by removing “System Operator” and replacing it with
“Governing Documents”

015-1.0.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Aggregation” and modify Business
Practice Standard by removing “System Operator” and
replacing it with “Governing Documents”

015-1.0.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Transparency of Requirements” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

015-1.1

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Energy Products”
- Telemetry

015-1.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Requirement” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Telemetry” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

Report of the North American Energy Standards Board, September 18, 2012
Page 107

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Accuracy” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Interval” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.1.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Other Telemetry Measurements”
and modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

015-1.1.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Communication Protocol” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

015-1.1.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Governor Control Equivalent” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents”

015-1.2

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Energy Products”
– After-The-Fact Metering

015-1.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “After-the-Fact Metering
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”

015-1.2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Accuracy” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.2.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Details of Meter/Equipment
Standards” and modify Business Practice Standard by
removing “System Operator” ” and replacing it with
“Governing Documents”

015-1.2.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Deadline”
and modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.2.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Interval” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.2.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Clock / Time Accuracy” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.2.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Validating, Editing & Estimating
(VEE) Method” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 108

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.2.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011) –

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.3

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Energy Products”
– Performance Evaluation

015-1.3.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Rules for Performance Evaluation”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.4

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Capacity
Products” - General

015-1.4.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Advance Notification” and modify
Business Practice Standard by removing “System
Operator” ”and provide additional enhancement.

015-1.4.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Deployment Time” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.4.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Reduction Deadline” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.4.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Release/Recall” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.4.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Normal Operations” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.4.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Demand Resource Availability
Measurement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.4.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Aggregation” and modify Business
Practice Standard by removing “System Operator” ” and
replacing it with “Governing Documents” and provide
additional enhancement.

015-1.4.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Transparency of Requirements” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.5

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Capacity
Products” - Telemetry

Report of the North American Energy Standards Board, September 18, 2012
Page 109

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.5.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Requirement” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.5.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.5.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Accuracy” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.5.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Interval” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.5.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Other Telemetry Measurements”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.5.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Communication Protocol” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.5.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Governor Control Equivalent” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.6

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Capacity
Products” – After-The-Fact Metering

015-1.6.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “After-the-Fact Metering
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.6.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Accuracy” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.6.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Details of Meter/Equipment
Standards” and modify Business Practice Standard by
removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.6.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Deadline”
and modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.6.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Interval” and
modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

Report of the North American Energy Standards Board, September 18, 2012
Page 110

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.6.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Clock/Time Accuracy” and modify
Business Practice Standard deleting first sentence and
removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.6.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Validating, Editing & Estimating
(VEE) Method” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.6.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.7

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Capacity
Products” – Performance Evaluation

015-1.7.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Rules of Performance Evaluation”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.8

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Reserve
Products” - General

015-1.8.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Advance Notification” and modify
Business Practice Standard by removing “System
Operator.”

015-1.8.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Deployment Time” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.8.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Reduction Deadline” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.8.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Release/Recall” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.8.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Normal Operations” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.8.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Demand Resource Availability
Measurement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.8.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Aggregation” and modify Business
Practice Standard by removing “System Operator” ” and
replacing it with “Governing Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 111

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.8.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Transparency of Requirements” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.9

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Reserve
Products” - Telemetry

015-1.9.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Requirement” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.9.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.9.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Accuracy” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.9.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Interval” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.9.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Other Telemetry Measurements”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.9.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Communication Protocol” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.9.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Governor Control Equivalent” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.10

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Reserve
Products” – After-The-Fact Metering

015-1.10.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “After-the-Fact Metering
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.10.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Accuracy” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.10.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Details of Meter/Equipment
Business Practice Standards” and modify Business
Practice Standard by removing “System Operator” ” and
replacing it with “Governing Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 112

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.10.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Deadline”
and modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.10.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Interval” and
modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.10.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Clock/Time Accuracy” and modify
Business Practice Standard deleting first sentence and
removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.10.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Validating, Editing & Estimating
(VEE) Method” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.10.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.11

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Reserve
Products” – Performance Evaluation

015-1.11.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Rules for Performance Evaluation”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.12

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Regulation
Products” - General

015-1.12.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Advance Notification” and modify
Business Practice Standard by removing “System
Operator” and replacing it with “Governing
Documents.”

015-1.12.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Deployment Time” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.12.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Reduction Deadline” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.12.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Release/Recall” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.12.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Normal Operations” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 113

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.12.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Demand Resource Availability
Measurement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.12.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Aggregation” and modify Business
Practice Standard by removing “System Operator” ” and
replacing it with “Governing Documents”.

015-1.12.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Transparency of Requirements” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.13

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Regulation
Products” - Telemetry

015-1.13.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Requirement” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.13.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.13.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Accuracy” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.13.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Telemetry Interval” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.13.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Other Telemetry Measurements”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.13.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Communication Protocol” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.13.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Governor Control Equivalent” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.14

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Regulation
Products” – After-The-Fact Metering

015-1.14.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “After-the-Fact Metering
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 114

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.14.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Accuracy” and modify
Business Practice Standard by removing “System
Operator” and provide additional enhancement.

015-1.14.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Details of Meter/Equipment
Business Practice Standards” and modify Business
Practice Standard by removing “System Operator” ” and
replacing it with “Governing Documents”.

015-1.14.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Deadline”
and modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.14.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Meter Data Reporting Interval” and
modify Business Practice Standard by removing
“System Operator” and provide additional
enhancement.

015-1.14.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Clock/Time Accuracy” and modify
Business Practice Standard deleting first sentence and
removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.14.7

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Validating, Editing & Estimating
(VEE) Method” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.14.8

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.15

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Provision of
Wholesale Electric Demand Response Regulation
Products” – Performance Evaluation

015-1.15.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Rules for Performance Evaluation”

015-1.16

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Maximum Base
Load Evaluation” – Baseline Information

015-1.16

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.17

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Maximum Base
Load Evaluation” – Event Information

015-1.17.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents” and provide additional
enhancement.

Report of the North American Energy Standards Board, September 18, 2012
Page 115

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.17.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.17.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.17.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Meter
Requirement” and modify Business Practice Standard
by removing “System Operator” ” and replacing it with
“Governing Documents”.

015-1.18

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Maximum Base
Load Evaluation” – Special Processing

015-1.18

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.19

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Meter Before /
Meter After” – Baseline Information

015-1.19.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.19.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Calculation Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.19.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Sampling Precision and Accuracy”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.19.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Exclusion Rules” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.19.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Adjustments” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.19.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Adjustment Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.20

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Meter Before /
Meter After” – Event Information

Report of the North American Energy Standards Board, September 18, 2012
Page 116

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.20.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of real-time Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.20.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of After-The-Fact Metering”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.20.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Performance Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.20.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Measurement Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.21

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Meter Before /
Meter After” - Special Processing

015-1.21.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Highly-Variable Load Logic” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.21.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Requirements”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.22

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Baseline Type – I
(Interval Meter)” – Baseline Information

015-1.22.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.22.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Calculation Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.22.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Sampling Precision and Accuracy”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.22.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Exclusion Rules” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.22.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Adjustments” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 117

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.22.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Adjustment Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.23

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Baseline Type – I
(Interval Meter)” – Event Information

015-1.23.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of Real-Time Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.23.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of After-The-Fact Metering”
and modify Business Practice Standard by providing
additional enhancement.

015-1.23.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Performance Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.23.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Measurement Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.24

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Baseline Type – I
(Interval Meter)” – Special Processing

015-1.24.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Highly-Variable Load Logic” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.24.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “On-Site Generation Requirements”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.25

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add Business Practice Standard – “Baseline Type – II
(Non-Interval Meter)” – Baseline Information

015-1.25.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.25.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Calculation Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.25.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Sampling Precision and Accuracy”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

Report of the North American Energy Standards Board, September 18, 2012
Page 118

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.25.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Exclusion Rules” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.25.5

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Baseline Adjustments” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.25.6

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Adjustment Window” and modify
Business Practice Standard by providing additional
enhancement.

015-1.26

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Baseline Type – II
(Non-Interval Meter)” – Event Information

015-1.26.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of Real-Time Telemetry” and
modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents” and provide additional enhancement.

015-1.26.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of After-The-Fact Metering”
and modify Business Practice Standard by providing
additional enhancement.

015-1.26.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Performance Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.26.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Measurement Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents” and deleting the word “measurements.”

015-1.27

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Baseline Type – II
(Non-Interval Meter)” – Special Processing

015-1.27

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.28

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Metering Generator
Output” – Baseline Information

015-1.28

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.29

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Metering Generator
Output” – Event Information

015-1.29.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of Real-Time Telemetry” and
modify Business Practice Standard by removing
“System Operator” and replacing it with “Governing
Documents” and deleting the word “measurements.”

Report of the North American Energy Standards Board, September 18, 2012
Page 119

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

015-1.29.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Use of After-The-Fact Metering”
and modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

015-1.29.3

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Performance Window” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.29.4

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Add numbering to “Measurement Type” and modify
Business Practice Standard by removing “System
Operator” ” and replacing it with “Governing
Documents”.

015-1.30

Business Practice
Standard

WEQ 2008 Annual
Plan Item 5.a
(03/16/2009)

Add Business Practice Standard – “Metering Generator
Output” – Special Processing

015-1.30

Business Practice
Standard

WEQ 2010 Annual
Plan Items 4.a and
4b (03/21/2011)

Modify Business Practice Standard by removing
“System Operator” ” and replacing it with “Governing
Documents”.

WEQ-016 Specifications for Common Electricity Product and Pricing Definition Business Practice Standards
Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add “Executive Summary”

Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify language

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add “Introduction”

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify language

Abbreviations,
Acronyms and
Definition of Terms

Abbreviations,
Acronyms and
Definition of
Terms

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add “Abbreviations, Acronyms and Definition of
Terms”

Abbreviations,
Acronyms and
Definition of Terms

Abbreviations,
Acronyms and
Definition of
Terms

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Add Definition of Terms: “Asset”, “Asset Group”,
“Service Delivery Point”, “Service Location (was
Facility in Phase 1 ERD)”, Delete Definition of Terms
“Premise”, “Response Method” and “Response Method
Aggregation (RMA)”

016-1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Specifications for
Common Electricity Product and Pricing Definition”

016-1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Actors List”

016-1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Use Case Data
Consideration”

Report of the North American Energy Standards Board, September 18, 2012
Page 120

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

016-1.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Tariff Rate Types
Considered for Use Cases”

016-1.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify Business Practice Standard by adding “,’ after
“…type of service,…”

016-1.2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Product and pricing
Attributes Considered for Use Cases”

016-1.2.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Product
Identification”

016-1.2.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify Business Practice Standard by adding
Attributes: “Product Name”, “Source Location
Identifier”, “Source Location Identifier Type”,
“Delivery Time”, “Delivery Interval” and “Price
Location.” Modify Attributes: “Product Identifier”,
“Identifier Source”, “Product Type”, “Product Subtype” and “Unit of Measure.”

016-1.2.2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Pricing Attributes”

016-1.2.2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify Business Practice Standard by adding Attribute:
“Product Price Factor”, Modify Attributes: “Price
Component Type”, “Price Type”, and “Override Unit of
Measure.” Change Attributes: “Total Price” to “Product
Price” and “Price Component” to “Price Component
Value.” Delete Attributes: Time and Interval, Source
Location Identifier and Source Location Identifier Type.

016-2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Product and Pricing
Use Cases”

016-2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Use Case Overview”

016-2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify Business Practice Standard by changing
“requirements” to “elements” and “clarification” to
“informational.”

016-2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Pricing Use Case”

016-2.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add Business Practice Standard “Specific Use Cases”

016-2.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify Business Practice Standard by modifying
language in Use Cases “Demand Response”, “NonPrice (Environmental) Response” , “Load-follower”,
and Price-taker” SAMPLE Scenarios.

Report of the North American Energy Standards Board, September 18, 2012
Page 121

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

Appendix A

Appendix

WEQ 2010 Annual
Plan Item 6.a
(08/20/2010)

Add “Appendix A – Entity-Relationship Model”

Appendix A

Appendix

WEQ 2010 Annual
Plan Item 6.a.ii
(03/21/2011)

Modify appendix language

WEQ-017 Specifications for Common Schedule Communication Mechanism for Energy Transactions Business Practice
Standards
Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add “Executive Summary”

Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify language

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add “Introduction”

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify language

Abbreviations,
Acronyms and
Definition of Terms

Abbreviations,
Acronyms and
Definition of
Terms

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add “Abbreviations, Acronyms and Definition of
Terms” (See WEQ 2010 Annual Plan Item 6.a
(08/20/2010)

017-1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add Business Practice Standard “Specification for
Common Scheduling Mechanism for Energy
Transactions”

017-1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify Business Practice Standard title by deleting
“Scheduling” and adding “Schedule Communication”

017-1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add Business Practice Standard “Actors List”

017-2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add Business Practice Standard “Common Scheduling
Mechanism for Energy Transactions Use Cases”

017-2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify Business Practice Standard title by deleting
“Scheduling” and adding “Schedule Communication”

017-2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add Business Practice Standard “Use Case Overview”

017-2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify Business Practice Standard language

017-2.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add Business Practice Standard “Requirements for Date
and Time Usage”

Report of the North American Energy Standards Board, September 18, 2012
Page 122

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

017-2.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify Business Practice Standard title by deleting
“Requirements” and adding “Specifications” and
modify language

017-A

Appendix

WEQ 2010 Annual
Plan Item 6.b
(08/20/2010)

Add “Appendix A – Entity-Relationship Model”

017-A

Appendix

WEQ 2010 Annual
Plan Item 6.b.ii
(03/21/2011)

Modify language and replace Figure 1A.

WEQ-018 Specifications for Wholesale Standard Demand Response Signals Business Practice Standards
Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add “Executive Summary”

Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify “Executive Summary”

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add “Introduction”

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify “Introduction”

Abbreviations,
Acronyms and
Definition of Terms

Abbreviations,
Acronyms and
Definition of
Terms

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add “Definition of Terms” (See WEQ 2010 Annual
Plan Item 6.a (08/20/2010))

018-1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Specifications for
Wholesale Standard Demand Response Signals”

018-1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify the business activity diagrams and use cases to
illustrate the standard interactions between a System
Operator and various Market Participants for the
administration and deployment of demand response
resources in organized wholesale electric markets.

018-1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Conventions”

018-1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify the business activity diagrams and use cases to
illustrate the standard interactions between a System
Operator and various Market Participants for the
administration and deployment of demand response
resources in organized wholesale electric markets.

018-1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Actors”

018-1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Use Case Overview”

Report of the North American Energy Standards Board, September 18, 2012
Page 123

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

018-1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify the business activity diagrams and use cases to
illustrate the standard interactions between a System
Operator and various Market Participants for the
administration and deployment of demand response
resources in organized wholesale electric markets.

018-1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Specific Use Cases”

018-1.4.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Enrollment and
Qualification”

018-1.4.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by replacing “Figure 2 – Enrollment and
Qualification” and adding “Table 4. Data Elements by
Interaction Number 1.0.1a through 1.0.9: Enrollment
and Qualification” and “Table 5. Data Requirements by
Interaction Number 1.0.10 through 1.0.16: Enrollment
and Qualification”

018-1.4.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Scheduling and
Award Notification - Economic”

018-1.4.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by changing title “Table 4 – Use Cases for
Figure 3” to “Table 6 – Use Cases for Figure 3”,
Replace Figure 3 -“Scheduling & Award Notification –
Economic” and add Note

018-1.4.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Scheduling and
Award Notification - Reliability”

018-1.4.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by changing title “Table 5 – Use Cases for
Figure 4” to “Table 7 – Use Cases for Figure 4, Replace
Figure 4 “Scheduling and Award Notification –
Reliability”, Add “Table 8 – Data Elements by
Interaction Number: Scheduling and Award
Notification”

018-1.4.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010) – Add

Add Business Practice Standard “Deployment and RealTime Communications - Economic”

018-1.4.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify “Overview” by deleting “process flows” in
second sentence and adding “business activity
diagrams”, Modify by changing title “Table 6 – Use
Cases for Figure 5” to “Table 9 – Use Cases for Figure
5, Replace Figure 5 – “Demand Response –
Deployment & Real-time Communications –
Economics” and add Note

018-1.4.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Deployment and RealTime Communications - Reliability”

Report of the North American Energy Standards Board, September 18, 2012
Page 124

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

018-1.4.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify “Overview” by deleting “process flows” in
second sentence and adding “business activity
diagrams”, Modify by changing title “Table 7 – Use
Cases for Figure 6” to “Table 10 – Use Cases for Figure
6, Replace Figure 6 – “Deployment and Real-Time
Communications – Reliability”, “Add “Table 11. Data
Elements by Interaction Number: Deployment & RealTime Communications”

018-1.4.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Measurement and
Performance - Baseline”

018-1.4.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by adding “or response” after “event reduction”,
Replace Figure 7 – “Measurement & Performance
(Baseline)” and add Note

018-1.4.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add Business Practice Standard “Measurement and
Performance – All Others”

018-1.4.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by adding “or response” after “event reduction”,
Replace Figure 8 “Measurement and Performance – All
Others”, Add “Table 12. Data Elements by Interaction
Number: Measurement and Performance”

018-A

Appendix

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add “Appendix A – Entity-Relationship Model”

018-A

Appendix

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify the business activity diagrams and use cases to
illustrate the standard interactions between a System
Operator and various Market Participants for the
administration and deployment of demand response
resources in organized wholesale electric markets.

018-B

Appendix

WEQ 2010 Annual
Plan Item 6.c
(08/20/2010)

Add “Appendix B – Use Case Combinations”

018-B

Appendix

WEQ 2010 Annual
Plan Item 6.c.ii
(03/21/2011)

Modify by deleting the word “included” and adding the
word “referenced”

WEQ-019 Customer Energy Usage Information Communication Business Practice Standards
Executive Summary

Executive
Summary

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Executive Summary”

Introduction

Introduction

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Introduction”

Abbreviations,
Acronyms and
Definition of Terms

Abbreviations,
Acronyms and
Definition of
Terms

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Abbreviations, Acronyms and Definition of
Terms”

Business Processes
and Practices Overview

Business
Processes and
Practices Overview

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Business Processes and Practices - Overview”

Report of the North American Energy Standards Board, September 18, 2012
Page 125

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

019-1

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Principles” heading

019-1.1

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add “Overall Principles” heading

019-1.1.1

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.2

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.3

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.4

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.5

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.6

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-1.1.7

Principle

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Principle

019-2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard heading “Energy Usage
Information Business Practice Standards”

019-2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Introduction”

019-2.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.1.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 126

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

019-2.1.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Energy Usage
Information Model Format and Use”

019-2.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Energy Usage
Information Model Technical Considerations”

019-2.3.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.3.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.3.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.3.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.3.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.3.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Conformance”

019-2.4.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.4.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-2.4.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Energy Usage
Information Model”

019-3.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard “Energy Usage
Information Model Details”

019-3.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 127

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

019-3.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.8

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.9

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.10

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.11

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.12

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.13

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.14

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.15

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.16

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.17

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 128

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

019-3.1.18

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.19

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.20

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.21

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.22

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.23

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.24

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.25

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.26

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.27

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.28

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.29

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.30

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.31

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.32

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.33

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 129

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

019-3.1.34

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.35

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.36

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.37

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.38

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.39

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.40

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.41

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

019-3.1.42

Business Practice
Standard

WEQ 2010 Annual
Plan Item 6.d
(11/29/2010)

Add Business Practice Standard

WEQ-020 Smart Grid Standards Data Elements Table Business Practice Standards
Introduction

Introduction

WEQ 2010 Annual
Plan Items 6.a-c
(03/21/2011)

Add “Introduction”

020-1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 6.a-c
(03/21/2011)

Add Business Practice Standard “Smart Grid Standards
Data Element Table”

020-1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Items 6.a-c
(03/21/2011)

Add Business Practice Standard “Alphabetical Listing
by Data Element Name”

020-1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Items 6.a-c
(03/21/2011)

Add Business Practice Standard “Listing by Category
ID and Category Element ID”

WEQ-021 Measurement and Verification of Energy Efficiency Products Business Practice Standards
021-1

Introduction

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add “Introduction and Principles” heading

021-1.1

Introduction and
Principles

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add “Introduction and Principles”

Report of the North American Energy Standards Board, September 18, 2012
Page 130

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-2

Applicability

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add “Applicability” heading

021-2.1.1

Applicability

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Applicability language

021-2.1.2

Applicability

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Applicability language

021-2.1.3

Applicability

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Applicability language

021-3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Energy Efficiency
Resource Use Criteria in Wholesale Markets”

021-3.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Installation and
Eligibility”

021-3.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Modeling Energy
Efficiency”

021-3.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Increase in Energy
Efficiency Value”

021-3.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Early Completion”

021-3.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “General Measurement
and Verification Plan Requirements”

021-3.2.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Project Description”

021-3.2.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Schedule”

021-3.2.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measure Description”

021-3.2.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Equipment/Process
Specification and Documentation”

021-3.2.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measurement and
Verification Approach”

Report of the North American Energy Standards Board, September 18, 2012
Page 131

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.2.5

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “International Performance
Protocol (IPMVP)” and its footnote (add the word
“standard” before M&V). IPMVP is a registered
trademark and the WEQ did not want the reference to
another organization’s standard and protocols which
may change and represents concepts differently than
what the NAESB process intended. The minor
correction also aligns the REQ and WEQ energy
efficiency standards consistent with Board directive.

021-3.2.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Methodological
Assumptions”

021-3.2.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “M&V Activities:
Energy Efficiency Baseline Period”

021-3.2.8

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “M&V Activities: Post
Installation Period”

021-3.2.9

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Calculation and
Adjustments”

021-3.2.10

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Metering Plan”

021-3.2.11

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Updated M&V Plan
Components”

021-3.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Post Installation M&V
Report Components”

021-3.3.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Initial PostInstallation M&V Report”

021-3.3.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Updated PostInstallation M&V Report”

021-3.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Performance
Reporting”

021-3.4.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Minimum
Requirements”

021-3.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “M&V Supporting
Documents”

021-3.5.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Minimum
Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 132

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “M&V Methodologies”

021-3.6.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Acceptable
Methodologies”

021-3.6.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “IPMVP Option A:
Partially Measured Retrofit Isolation/Stipulated
Measurement”

021-3.6.1.1

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “IPMVP” (International
Performance Measurement and Verification Protocol).
This is a registered trademark and the WEQ did not
want the reference to another organization’s standard
and protocols which may change and represents
concepts differently than what the NAESB process
intended. The minor correction also aligns the REQ and
WEQ energy efficiency standards consistent with Board
directive.

021-3.6.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “IPMVP Option B:
Retrofit Isolation/Metered Equipment”

021-3.6.1.2

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “IPMVP” (International
Performance Measurement and Verification Protocol).
This is a registered trademark and the WEQ did not
want the reference to another organization’s standard
and protocols which may change and represents
concepts differently than what the NAESB process
intended. The minor correction also aligns the REQ and
WEQ energy efficiency standards consistent with Board
directive.

021-3.6.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “IPMVP Option C:
Whole Facility/Regression”

021-3.6.1.3

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “IPMVP” (International
Performance Measurement and Verification Protocol).
This is a registered trademark and the WEQ did not
want the reference to another organization’s standard
and protocols which may change and represents
concepts differently than what the NAESB process
intended. The minor correction also aligns the REQ and
WEQ energy efficiency standards consistent with Board
directive.

021-3.6.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011) –

Add Business Practice Standard “IPMVP Option D:
Calibrated Simulation”

Report of the North American Energy Standards Board, September 18, 2012
Page 133

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.6.1.4

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “IPMVP” (International
Performance Measurement and Verification Protocol).
This is a registered trademark and the WEQ did not
want the reference to another organization’s standard
and protocols which may change and represents
concepts differently than what the NAESB process
intended. The minor correction also aligns the REQ and
WEQ energy efficiency standards consistent with Board
directive.

021-3.6.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Alternative
Acceptable M&V Methodologies”

021-3.6.2

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “IPMVP” (International
Performance Measurement and Verification Protocol)
and add the word “standard.” This is a registered
trademark and the WEQ did not want the reference to
another organization’s standard and protocols which
may change and represents concepts differently than
what the NAESB process intended. The minor
correction also aligns the REQ and WEQ energy
efficiency standards consistent with Board directive.

021-3.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Energy Efficiency
Baseline Conditions”

021-3.7.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Energy Efficiency
Baseline Criteria For All Energy Efficiency”

021-3.7.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.7.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.7.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.7.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.7.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Standard Energy
Efficiency Baseline”

021-3.7.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “The Current Load
Energy Efficiency Baseline”

021-3.8

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Statistical
Significance”

021-3.8.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “General
Requirements”

Report of the North American Energy Standards Board, September 18, 2012
Page 134

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.8.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Specification for
Statistical Error and Precision when Sampling is Used”

021-3.8.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Sample Size
Calculation”

021-3.8.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Sample Size
Recalibration”

021-3.8.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Sampling Over Zones

021-3.8.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Sample Bias Control”

021-3.9

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Nominated Energy
Efficiency Value Calculations/Demand Reduction
Value Calculations”

021-3.9.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Energy Efficiency
Value Calculation Variables”

021-3.9.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Reduction in the Final
Nominated Value”

021-3.10

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measurement and
Monitoring”

021-3.10.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measurement and
Monitoring Parameters and Variables Requirements”

021-3.10.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Monitoring Frequency
and Duration”

021-3.11

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measurement
Equipment Specification”

021-3.11.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Measurement
Equipment Requirements”

021-3.11.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

Report of the North American Energy Standards Board, September 18, 2012
Page 135

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.11.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.7

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.8

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.9

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.10

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.11

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.12

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.12

Business Practice
Standard

MC12020
(07/16/2012)

Minor correction to delete “the IPMVP,” (International
Performance Measurement and Verification Protocol).
This is a registered trademark and the WEQ did not
want the reference to another organization’s standard
and protocols which may change and represents
concepts differently than what the NAESB process
intended. The minor correction also aligns the REQ and
WEQ energy efficiency standards consistent with Board
directive.

021-3.11.1.13

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.11.1.14

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-11.1.15

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.12

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Data Validation”

Report of the North American Energy Standards Board, September 18, 2012
Page 136

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Request Cross Reference
Standard

Description

Request No.

Action

021-3.12.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard

021-3.12.1.1

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Time Check”

021-3.12.1.2

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Sum Check”

021-3.12.1.3

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “High/Low Check”

021-3.12.1.4

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Zero Value Check”

021-3.12.1.5

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Identification of
Estimated Data”

021-3.12.1.6

Business Practice
Standard

WEQ 2010 Annual
Plan Item 4.d
(05/13/2011)

Add Business Practice Standard “Identification of Data
Classifications”

Report of the North American Energy Standards Board, September 18, 2012
Page 137

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Version Cross Reference:
The Version Cross Reference lists each NAESB standard number followed by four columns. The column
entitled "Adopted" identifies for which version the standard was adopted. The column entitled "Revised" identifies
versions where the standard was revised. The column entitled "Interpreted Version" identifies versions where the
standard was interpreted. The last column "Interpretation Number" identifies the interpretation number for the
version specified in the previous column. The language of the standards themselves can be accessed from the
NAESB home page (www.naesb.org). With the Version Cross Reference, a determination can be made of all
standards that were created, changed or interpreted for a given version.
For standards that were created in Version 003, the "Adopted" column will contain the value "003." For
standards that were modified in Version 003, the "Revised" column will contain the value "003." A standard may
have multiple revisions specified. For standards that were interpreted in Version 003, the " Interpreted Version "
column will contain the value "003" and the "Interpretation Number" column will contain the related interpretation
number. There were no interpretations processed for Versions 001 or for Version 002.1. A standard may have
multiple interpretations specified.
The versions noted in the version cross reference are:
Version 000

January 15, 2005

Version 000 NAESB WEQ Standards were published on January 15, 2005. Those standards that were
federally jurisdictional were submitted to the Federal Energy Regulatory Commission on January 18, 2005.
The Version 000 standards were the subject of a FERC Rulemaking, Order No. 676, Docket No. RM05-5000, issued on April 25, 2006, and Order No. 676-B, Docket No. RM05-5-003, issued on April 19, 2007.
Version 001

October 31, 2007

Version 001 NAESB WEQ Standards were published on October 31, 2007. Those standards that were
federally jurisdictional were submitted to the Federal Energy Regulatory Commission on December 21,
2007. The Version 001 standards were the subject of a FERC Rulemaking, Order No. 676-C, Docket No.
RM05-5-005, issued on July 21, 2008. On October 9, 2009 minor corrections were submitted to the
Federal Energy Regulatory Commission (FERC) (Docket No. RM05-5 et al).
Version 002

September 30, 2008

Version 002 NAESB WEQ Standards were published on September 30, 2008. Those standards that are
federally jurisdictional were submitted to the Federal Energy Regulatory Commission on August 29, 2008.
On October 9, 2009 minor corrections were submitted to the Federal Energy Regulatory Commission
(FERC) (Docket No. RM05-5 et al).
Version 002.1

March 11, 2009

Version 002.1 NAESB WEQ Standards were published on March 11, 2009. Those standards that are
federally jurisdictional were submitted to the Federal Energy Regulatory Commission on February 19,
2009. On July 7 and October 9, 2009 minor corrections were submitted to the Federal Energy Regulatory
Commission (FERC) (Docket No. RM05-5 et al). The Version 002.1 standards were the subject of a FERC
Rulemaking, Order No. 676-E, Docket No. RM05-5-013, issued on November 24, 2009. On December
16, 2009 and June 20, 2011 minor corrections were submitted to the Federal Energy Regulatory
Commission (FERC) (Docket No. RM05-5 et al, Docket No. RM01-5).
Version 003

July 31, 2012

Version 003 NAESB WEQ Business Practice Standards were published on July 31, 2012. Those standards
that are federally jurisdictional were submitted to the Federal Energy Regulatory Commission on
September 18, 2012.

Report of the North American Energy Standards Board, September 18, 2012
Page 138

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

WEQ-000 Abbreviations, Acronyms, and Definition of Terms

Introduction

003

Applicability

003

000-1

003

000-1.1

003

000-2

003

WEQ-001 Open Access Same-Time Information Systems (OASIS) Business Practice Standards, Version 2.0

Title
Introduction

002.0
000

002.0
003

Applicability

003

Definition of Terms

000

001

001-0.1

000

003
RESERVED

001-0.2

000

003
RESERVED

001-0.3

000

001
003
RESERVED

001-0.4

000

003
RESERVED

001-0.5

000

003
RESERVED

001-0.6

000

001
003
RESERVED

001-0.7

000

003
RESERVED

001-0.8

000

003
RESERVED

001-0.9

000

003
RESERVED

001-0.10

000

001
003
RESERVED

001-0.11

000

003
RESERVED
Report of the North American Energy Standards Board, September 18, 2012
Page 139

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-0.12

000

003
RESERVED

001-0.13

000

003
RESERVED

001-0.14

001

003
RESERVED

001-0.15

001

003
RESERVED

001-0.16

001

003
RESERVED

001-0.17

001

003
RESERVED

001-0.18

001

003
RESERVED

001-0.19

001

003
RESERVED

001-0.20

001

003
RESERVED

001-0.21

002.0

003
RESERVED

001-0.22

002.0

003
RESERVED

001-0.23

002.0

003
RESERVED

001-0.24

002.0

003
RESERVED

001.0.25

002.0

003
RESERVED

001-0.26

002.0

003
RESERVED

001-0.27

002.0

003
RESERVED

001-0.28

002.0

003
RESERVED

001-0.29

002.0

003
RESERVED

001-0.30

002.1

003
RESERVED

001-0.31

003

003
RESERVED

001-1.0

000

001

Interpretation Number
( ) – indicates reference

002.1
RESERVED
001-1.1

000
RESERVED
Report of the North American Energy Standards Board, September 18, 2012
Page 140

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-1.2

000
RESERVED

001-1.3

000
RESERVED

001-1.4

000
RESERVED

001-1.5

000

002.1
RESERVED

001-1.6

000

002.0

Interpretation Number
( ) – indicates reference

002.1
RESERVED
001-1.7

000

001
002.0
002.1
RESERVED

001-1.8

000

002.1
RESERVED

001-2.0

000

001-2.1

000

001-2.1.1

000

001-2.1.2

000

001-2.1.3

000

001-2.1.4

000

001-2.1.5

000

001-2.1.6

000

001-2.1.7

000

001-2.1.8

000

001-2.1.9

000

002.0

001-2.1.10

000

003

001-2.1.11

000

003

001-2.1.12

000

003

001-2.1.13

000

002.0
003

Report of the North American Energy Standards Board, September 18, 2012
Page 141

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-2.1.14

000

001-2.2

000

001-2.2.1

000

001-2.2.2

000

001-2.3

000

001-2.3.1

000

001-2.3.2

000

001-2.4

000

001-2.5

000

001-2.5.1

000

001-2.5.2

000

002.0

001-2.5.3

000

002.0

001-2.5.4

000

002.0

001-2.5.5

000

002.0

001-2.5.6

000

002.0

001-2.5.7

000

001-2.5.8

000

001-2.5.9

000

001-2.5.10

000

001-2.6

000

001-2.6.1

000

001-2.6.2

000

001-3

000

001-3.1

000

001-3.2

000

001-3.3

000

001-3.4

000

001-3.5

000

Interpretation Number
( ) – indicates reference

003

001

002.0

001

Report of the North American Energy Standards Board, September 18, 2012
Page 142

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-3.6

000

001-4

000

001-4.1

000

Interpretation Number
( ) – indicates reference

001
002.0

001-4.2

000
RESERVED

001-4.3

000
RESERVED

001-4.4

000

002.0
RESERVED

001-4.5

000

002.0
RESERVED

001-4.6

000

002.0
003

001-4.7

000

001-4.7.1

002.0

001-4.7.2

002.0

001-4.7.2.1

002.0

001-4.7.3

002.0

001-4.7.3.1

002.0

001-4.7.3.2

002.0

001-4.7.3.3

002.0

001-4.7.3.4

002.0

001-4.7.3.4.1
001-4.7.3.5

003

003

003

003

003

003
002.0

001-4.8

000

002.0

001-4.9

000

002.0
003

001-4.9.1

002.0

001-4.9.2

002.0

001-4.9.3

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 143

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-4.9.4

003

001-4.9.4.1

003

001-4.9.4.2

003

001-4.9.4.3

003

001-4.10

000

Interpretation Number
( ) – indicates reference

002.0
003

001-1.10.1

002.0

001-4.10.2

002.0

001-4.10.3

002.0

001-4.10.4

002.0

001-4.10.5

003

001-4.10.6

003

001-4.10.6.1

003

001-4.10.6.2

003

001-4.10.6.3

003

001-4.11

000

001-4.11.1

003

001-4.12

000

001-4.12.1

003

002.0

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 144

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard
001-4.13

Adopted

Revised

Interpretated
Version/Adopted/Revised

000

Interpretation Number
( ) – indicates reference

002.0
003

001-4.14

000

002.0

001-4.14.1

000

001-4.14.2

000

001-4.14.3

000

001-4.14.4

000

001-4.14.5

000

001-4.14.6

000

001-4.15

000

002.0

001-4.16

000

002.0

001-4.17

000

002.0

001-4.18

000

002.0

001-4.19

000

001

001-4.20

000

001

001-4.21

000

001-4.22

000

001-4.23

000

001-4.24

000

001-4.25

000

001-4.26

000

002.0
RESERVED

001-4.27

000

002.0

001-5

000

001-5.1

000

001-5.2

000

001-5.3

000

001-5.4

000

001-5.5

000
Report of the North American Energy Standards Board, September 18, 2012
Page 145

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-5.6

000

001-6

000

001-6.1

000

001-6.2

000

001-6.3

000

001-6.4

000

001-7

000

001-7.1

000

001-7.2

000

001-7.3

000

001-7.4

000

001-7.5

000

001-7.6

000

001-7.7

000

001-7.8

000

001-7.9

000

001-7.10

000

001-7.11

000

001-7.12

000

001-7.13

000

001-7.14

000

001-7.15

000

001-7.16

000

001-8

000

001-8.1

000

001-8.1.1

000

001-8.2

000

001-8.3

000

Interpretation Number
( ) – indicates reference

001

003

Report of the North American Energy Standards Board, September 18, 2012
Page 146

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-8.3.1

000

001-8.3.2

000

001-8.3-A

000

001-9

000

001-9.1

000

001-9.1.1

000

001-9.1.2

000

001-9.1.3

000

001-9.1.3.1

003

001-9.1.4

000

001-9.2

000

001-9.2-A

000

001-9.3

000

001-9.3.1

000

001-9.3.2

000

001-9.3-A

000

001
RESERVED

001-9.4

000

001

001-9.4.1

000

001-9.4.1-A

000

001
RESERVED

001-9.4.2

000

001

001-9-4.3

001

001-9.4.2-A

000

001
RESERVED

001-9.5

000

001

001-9.5-A

000

001
RESERVED

001-9.5.1

000

001

001-9.5.1-A

000

001
RESERVED

Interpretation Number
( ) – indicates reference

001
RESERVED

000 / 003

001-INT2
(C11004)

001

001

001
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 147

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-9.5.2

000

001

001-9.5.3

000

002.1

001-9.6

000

001-9.6.1

000

001-9.6.2

000

001-9.7

000

001-9.7.1

003

001-9.7.1.1

003

001-9.7.1.2

003

001-9.7.1.3

003

001-9.7.1.4

003

001-9.7.2

003

001-9.7.3

003

001-9.7.3.1

003

001-9.7.4

003

001-9.7.5

003

001-9.7.6

003

001-9.7.7

003

001-9.7.8

003

001-9.7.8.1

003

001-9.7.8.2

003

001-9.7.8.2.1

003

001-9.7.8.2.2

003

001-9.7.9

003

001-9.7.9.1

003

001-9.7.10

003

001-9.7.11

003

001-9.8

000

Interpretation Number
( ) – indicates reference

003

Report of the North American Energy Standards Board, September 18, 2012
Page 148

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-9.8.1

000

001-10

000

001-10.1

000

001-10.1.1

000

001-10.1.2

000

001-10.1.3

000

001-10.1.4

000

001-10.1.5

000

001-10.1.6

000

001-10.2

000

001-10.2-A

000

001-10.3

000

001-10.3.1

000

001-10.3.1.1

003

001-10.3-A

000

001
RESERVED

001-10.4

000

001

001-10.4.1

000

001-10.4.1-A

000

001-10.4.2

000

001-10.4.3

001

001-10.4.2-A

000

001
RESERVED

001-10.5

000

001

001-10.5-A

000

001
RESERVED

001-10.5.1

000

001-10.5.1-A

000

001
RESERVED

001-10.5.2

000

001

Interpretation Number
( ) – indicates reference

001

000 / 003

001-INT2
(C11004)

001

001
RESERVED

001

001
RESERVED

001
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 149

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-10.5.3

000

001-10.5.3.1

001

001-10.5.3.2

001

001-10.5.3.2.1

001

001-10.5.3.3

001

001-10.5.3.4

001

001-10.5.3.5

001

001-10.5.3.6

001

001-10.5.3.6.1

001

001-10.5.3.7

001

001-10.5.3.8

001

001-10.5.3.9

001

001-10.6

000

001-10.6.1

000

001-10.7

000

001-10.7.1

000

001-10.8

000

Interpretation Number
( ) – indicates reference

001

002.1
003

001-10.8.1

000

001-10.8.2

000

001-10.8.3

000

001-10.8.4

000

001-10.8.5

000

001-10.8.6

000

001-10-8.7

001

001-11

001

001-11.1

001

001-11.1.1

001

001

003

Report of the North American Energy Standards Board, September 18, 2012
Page 150

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-11.1.2

001

001-11.1.3

001

001-11.1.4

001

001-11.1.5

001

001-11.1.6

001

001-11.1.7

001

001-11.2

001

001-11.2.1

001

001-11.2.1.1

001

Interpretation Number
( ) – indicates reference

001
RESERVED
001-11.2.2

001

001-11.3

001

001-11.3.1

001

001-11.3.2

001
002.0

001-11.3.3

001

001-11.3.4

001

001-11.4

001

001-11.5

001

001-11.5.1

001

001-11.5.2

001

001-11.5.3

001

001-11.6

001

001-11.6.1

001

001-11.6.2

001

001-11.6.3

001

001-11.7

001

001-11.7.1

001
Report of the North American Energy Standards Board, September 18, 2012
Page 151

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-12

001

001-12.1

001

001-12.1.1

001

001-12.1.2

001

001-12.1.3

001

001-12.1.4

001

001-12.1.5

001

001-12.1.6

001

001-12.2

001

001-12.3

001

001-12.3.1

001

001-12.3.2

001

001-12.4

001

001-12.4.1

001

001-12.4.2

001

001-12.4.2.1

001

001-12.4.2.2

001

001-12.4.2.3

001

001-12.5

001

001-12.5.1

001

001-12.5.2

001

001-13

002.0

001-13.1

002.0

001-13.1.1

002.0

001-13.1.2

002.0

001-13.1.3

002.0

001-13.1.4

002.0

001-13.1.5

002.0

Interpretation Number
( ) – indicates reference

003

003
RESERVED

002.1
Report of the North American Energy Standards Board, September 18, 2012
Page 152

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-14

002.0

001-14.1

002.0

001-14.1.1

002.0

001-14.1.2

002.0

001-14.1.3

002.0

001-14.2

002.0

001-14.2.1

002.0

001-14.2.2

002.0

001-14.2.3

002.0

001-4.2.3.1

002.0

001-4.2.3.2

002.0

001-15

002.0

001-15.1

002.0

001-15.1.1

002.0

001-15.1.2

002.0

001-15-1.3

002.0

001-15.2

002.0

001-15.2.1

002.0

001-15.2.2

002.0

001-15.2.3

002.0

001-15.2.3.1

002.0

001-15.2.3.2

002.0

001-15.2.3.3

002.0

001-15.2.3.4

002.0

001-15.2.3.5

002.0

001-16

002.0

002.1

001-16.1

002.0

002.1

001-17

002.0

Interpretation Number
( ) – indicates reference

003

003

Report of the North American Energy Standards Board, September 18, 2012
Page 153

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-17.1

002.0

001-17.1.1

002.0

001-17.1.2

002.0

001-17.2

002.0

001-17.2.1

002.0

001-17.2.2

002.0

001-17.2.3

002.0

001-17.2.4

002.0

001-17.3

002.0

001-17.3.1

002.0

001-17.3.2

002.0

001-17.3.2.1

002.0

001-17.3.3

002.0

001-17.4

002.0

001-17.4.1

002.0

001-17.4.2

002.0

001-17.4.2.1

002.0

001-17.4.2.2

002.0

001-17.4.3

002.0

001-17.5

002.0

001-17.5.1

002.0

001-17.5.2

002.0

001-17.5.3

002.0

001-17.5.4

002.0

001-17.6

002.0

001-17.6.1

002.0

001-17.6.2

002.0

001-17.6.3

002.0

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 154

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-17.6.4

002.0

001-17.6.5

002.0

001-17.6.6

002.0

001-17

002.0

001-18

002.0

001-18.1

002.0

001-18.1.1

002.0

001-18.1.2

002.0

001-18.1.2.1

002.0

001-18.1.2.2

002.0

001-18.1.2.3

002.0

001-18.1.3

002.0

001-18.2

002.0

001-19

002.0

001-19.1

002.0

001-19.1.1

002.0

001-19.1.2

002.0

001-20

002.0

001-20.1

002.0

002.1

001-20.2

002.0

002.1

001-20.2.1

002.1

001-20.2.2

002.1

001-20.2.3

002.1

001-20.2.4

002.1

003

001-20.3

002.1

003

001-21

002.0

001-21.1

002.0

001-21.1.1

002.0

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 155

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-21.1.2

002.0

001-21.1.3

002.0

001-21.1.3.1

002.0

001-21.1.4

002.0

001-21.1.5

002.0

001-21.1.6

002.0

001-21.2

002.0

001-21.2.1

002.0

001-21.2.1.1

002.0

001-21.2.1.2

002.0

001-21.2.1.3

002.0

001-21.2.1.4

002.0

001-21.3

002.0

001-21.3.1

002.0

001-21.3.1.1

002.0

001-21.3.1.2

002.0

001-21.3.1.2.1

002.0

001-21.3.1.2.2

002.0

001-21.3.1.2.3

002.0

001-21.3.1.2.4

002.0

001-21.3.2

002.0

001-21.3.3

002.0

001-21.3.3.1

002.0

001-21.3.3.2

002.0

001-21.3.4

002.0

001-21.3.5

002.0

001-21.3.5.1

002.0

001-21.3.5.2

002.0

Interpretation Number
( ) – indicates reference

003
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 156

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-21.3.5.3

002.0

001-21.3.5.4

002.0

001-21.3.6

002.0

001-21.3.7

002.0

001-21.3.7.1

002.0

001-21.3.7.2

002.0

001-21.3.7.3

002.0

001-21.3.8

002.0

001-21.4

002.0

001-21.4.1

002.0

001-21.4.2

002.0

001-21.4.2.1

002.0

001-21.4.2.2

002.0

001-21.4.3

002.0

001-21.4.3.1

002.0

001-21.4.3.2

002.0

001-21.4.3.3

002.0

001-21.4.3.3.1

002.0

001-21.4.4

002.0

001-21.4.4.1

002.0

001-21.4.4.2

002.0

001-21.5

002.0

001-21.5.1

002.0

001-21.5.2

002.0

001-21.5.2.1

002.0

001-21.5.2.2

002.0

001-21.5.2.2.1

002.0

001-21.5.3

002.0

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 157

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-21.5.3.1

002.0

001-21.5.3.2

002.0

001-21.5.4

002.0

001-21.5.4.1

002.0

001-21.5.5

002.0

001-22

002.1

001-22.1

002.1

001-22.2

002.1

001-23

003

001-23.1

003

001-23.1.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 158

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-23.1.2

003

001-23.1.3

003

001-23.1.4

003

001-23.1.5

003

001-23.1.6

003

001-23.1.7

003

001-23.1.8

003

001-23.2

003

001-23.2.1

003

001-23.2.1.1

003

001-23.2.1.2

003

001-23.2.1.3

003

001-23.2.2

003

001-23.2.3

003

001-23.2.4

003

001-23.2.5

003

001-23.3

003

001-23.3.1

003

001-23.3.2

003

001-23.3.2.1

003

001-23.3.3

003

001-23.3.4

003

001-23.3.4.1

003

001-23.3.4.2

003

001-23.3.4.2.1

003

001-23.3.4.2.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 159

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-23.3.4.3

003

001-23.3.4.3.1

003

001-23.3.5

003

001-23.3.5.1

003

001-23.3.5.2

003

001-23.3.5.3

003

001-23.3.5.4

003

001-23.3.5.5

003

001-23.3.6

003

001-23.3.7

003

001-23.3.8

003

001-23.3.9

003

001-101.1

003

001-101.2

003

001-101.2.1

003

001-101.2.2

003

001-101.2.3

003

001-101.2.4

003

001-101.2.5

003

001-101.3

003

001-101.4

003

001-101.5

003

001-101.5.1

003

001-101.5.2

003

001-101.5.3

003

001-101.5.3.1

003

001-101.5.3.1.1

003

001-101.5.3.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 160

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-101.5.3.3

003

001-101.5.3.4

003

001-101.6

003

001-101.7

003

001-101.8

003

001-101.9

003

001-101.10

003

001-101.11

003

001-101.12

003

001-101.12.1

003

001-101.12.2

003

001-101.12.3

003

001-101.12.4

003

001-101.13

003

001-101.13.1

003

001-101.13.2

003

001-101.13.2.1

003

001-101.13.2.2

003

001-101.13.3

003

001-101.13.4

003

001-102

003

001-102.1

003

001-102.1.1

003

001-102.1.1.1

003

001-102.1.1.2

003

001-102.1.1.2.1

003

001-102.1.2

003

001-102.1.2.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 161

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-102.1.2.1.1

003

001-102.1.2.2

003

001-102.1.2.2.1

003

001-102.2

003

001-102.2.1

003

001-102.3

003

001-102.3.1

003

001-102.3.1.1

003

001-102.4

003

001-102.4.1

003

001-102.4.1.1

003

001-102.4.1.2

003

001-102.4.2

003

001-102.4.3

003

001-102.4.4

003

001-102.4.4.1

003

001-102.4.4.2

003

001-102.4.4.3

003

001-102.4.5

003

001-102.4.6

003

001-102.4.7

003

001-102.4.8

003

001-102.5

003

001-102.5.1

003

001-102.5.2

003

001-102.5.3

003

001-103

003

001-103.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 162

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-103.1.1

003

001-103.1.2

003

001-103.2

003

001-103.2.1

003

001-103.2.2

003

001-103.3

003

001-103.3.1

003

001-103.3.1.1

003

001-103.4

003

001-103.4.1

003

001-103.4.1.1

003

001-103.5

003

001-103.5.1

003

001-103.5.2

003

001-103.5.2.1

003

001-103.5.2.2

003

001-103.5.2.3

003

001-103.6

003

001-103.6.1

003

001-103.6.2

003

001-103.7

003

001-103.7.1

003

001-103.7.2

003

001-103.7.2.1

003

001-103.8

003

001-103.8.1

003

001-103.8.1.1

003

001-103.8.1.1.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 163

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-103.8.1.2

003

001-103.8.1.3

003

001-103.9

003

001-103.9.1

003

001-103.9.1.1

003

001-103.9.1.2

003

001-103.9.2

003

001-104

003

001-104.1

003

001-104.2

003

001-104.3

003

001-104.4

003

001-104.5

003

001-105

003

001-105.1

003

001-105.1.1

003

001-105.1.2

003

001-105.1.3

003

001-105.1.4

003

001-105.1.5

003

Table 105-A

003

001-105.1.6

003

001-105.2

003

001-105.2.1

003

001-105.2.1.1

003

001-105.2.1.2

003

001-105.2.1.2.1

003

001-105.2.1.2.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 164

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.2.1.3

003

001-105.2.2

003

001-105.2.2.1

003

001-105.2.3

003

001-105.2.3.1

003

001-105.2.4

003

001-105.2.4.1

003

001-105.2.4.1.1

003

001-105.2.4.1.2

003

001-105.2.4.2

003

001-105.2.4.3

003

001-105.2.4.4

003

001-105.2.4.5

003

001-105.2.4.5.1

003

001-105.2.4.5.2

003

001-105.2.4.5.3

003

001-105.2.4.6

003

001-105.2.4.7

003

001-105.2.5

003

001-105.2.5.1

003

001-105.2.6

003

001-105.2.6.1

003

001-105.2.6.2

003

001-105.2.7

003

001-105.2.7.1

003

001-105.2.7.2

003

001-105.2.8

003

001-105.2.8.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 165

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.2.9

003

001-105.2.9.1

003

001-105.2.10

003

001-105.2.10.1

003

001-105.2.10.2

003

001-105.2.11

003

001-105.2.11.1

003

001-105.2.12

003

001-105.2.12.1

003

001-105.2.12.1.1

003

001-105.2.12.1.2

003

001-105.2.12.1.3

003

001-105.2.13

003

001-105.2.13.1

003

001-105.2.13.1.1

003

001-105.2.13.2

003

001-105.3

003

001-105.3.1

003

001-105.3.1.1

003

001-105.3.1.2

003

001-105.3.1.3

003

001-105.3.1.4

003

001-105.3.2

003

001-105.3.2.1

003

001-105.3.2.1.1

003

001-105.3.2.1.2

003

001-105.3.2.1.3

003

001-105.3.2.1.4

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 166

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.3.2.1.5

003

001-105.3.2.2

003

001-105.3.2.2.1

003

001-105.3.2.3

003

001-105.3.2.3.1

003

001-105.3.2.3.1.1

003

001-105.3.2.4

003

001-105.3.2.4.1

003

001-105.3.2.4.1.1

003

001-105.3.2.4.1.2

003

001-105.3.2.4.2

003

001-105.3.2.4.2.1

003

001-105.3.2.4.2.2

003

001-105.3.2.4.2.3

003

001-105.3.2.4.3

003

001-105.3.2.4.4

003

001-105.3.2.4.5

003

001-105.3.2.4.5.1

003

001-105.3.2.4.5.2

003

001-105.3.2.4.5.3

003

001-105.3.2.4.5.3.1

003

001-105.3.2.4.6

003

001-105.3.2.4.6.1

003

001-105.3.2.4.7

003

001-105.3.2.5

003

001-105.3.2.5.1

003

001-105.3.2.6

003

001-105.3.2.6.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 167

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.3.2.6.2

003

001-105.3.2.7

003

001-105.3.2.7.1

003

001-105.3.2.7.2

003

001-105.3.2.8

003

001-105.3.2.8.1

003

001-105.3.3

003

001-105.3.3.1

003

001-105.3.3.1.1

003

001-105.3.3.1.2

003

001-105.3.3.1.2.1

003

001-105.3.3.1.2.2

003

001-105.3.3.2

003

001-105.3.3.2.1

003

001-105.3.3.3

003

001-105.3.3.3.1

003

001-105.3.3.4

003

001-105.3.3.4.1

003

001-105.3.3.5

003

001-105.3.3.5.1

003

001-105.3.3.6

003

001-105.3.3.6.1

003

001-105.3.3.6.2

003

001-105.3.3.7

003

001-105.3.3.7.1

003

001-105.4

003

001-105.4.1

003

001-105.4.1.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 168

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.4.1.1.1

003

001-105.4.1.2

003

001-105.4.1.2.1

003

001-105.4.1.2.2

003

001-105.4.1.3

003

001-105.4.2

003

001-105.4.2.1

003

001-105.4.3

003

001-105.4.3.1

003

001-105.4.4

003

001-105.4.4.1

003

001-105.4.4.1.1

003

001-105.4.4.1.2

003

001-105.4.4.3

003

001-105.4.4.4

003

001-105.4.4.5

003

001-105.4.4.5.1

003

001-105.4.4.5.2

003

001-105.4.4.5.3

003

001-105.4.4.6

003

001-105.4.4.7

003

001-105.4.5

003

001-105.4.5.1

003

001-105.4.6

003

001-105.4.6.1

003

001-105.4.7

003

001-105.4.7.1

003

001-105.4.7.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 169

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.4.8

003

001-105.4.8.1

003

001-105.4.9

003

001-105.4.9.1

003

001-105.4.10

003

001-105.4.10.1

003

001-105.4.10.1.1

003

001-105.4.11

003

001-105.4.11.1

003

001-105.4.12

003

001-105.4.12.1

003

001-105.4.12.1.1

003

001-105.4.12.1.2

003

001-105.4.12.1.3

003

001-105.4.13

003

001-105.4.13.1

003

001-105.4.13.1.1

003

001-105.4.13.2

003

001-105.5

003

001-105.5.1

003

001-105.5.1.2

003

001-105.5.1.3

003

001-105.5.1.4

003

001-105.5.2

003

001-105.5.2.1

003

001-105.5.2.2

003

001-105.5.2.2.1

003

001-105.5.2.2.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 170

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.5.3

003

001-105.5.3.1

003

001-105.5.4

003

001-105.5.4.1

003

001-105.5.5

003

001-105.5.5.1

003

001-105.5.6

003

001-105.5.6.1

003

001-105.5.7

003

001-105.5.7.1

003

001-105.5.7.2

003

001-105.5.8

003

001-105.5.8.1

003

001-105.6

003

001-105.6.1

003

001-105.6.1.1

003

001-105.6.1.2

003

001-105.6.1.2.1

003

001-105.6.1.3

003

001-105.6.1.4

003

001-105.6.1.5

003

001-105.6.1.6

003

001-105.6.2

003

001-105.6.3

003

001-105.6.4

003

001-105.6.5

003

001-105.6.5.1

003

001-105.6.6

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 171

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-105.6.7

003

001-105.6.7.1

003

001-105.6.7.2

003

001-106

003

001-106.1

003

001-106.1.1

003

001-106.1.2

003

001-106.1.3

003

001-106.1.4

003

001-106.1.4.1

003

001-106.1.5

003

001-106.1.6

003

001-106.1.7

003

001-106.1.8

003

001-106.1.9

003

001-106.1.10

003

001-106.2

003

001-106.2.1

003

001-106.2.2

003

001-106.2.3

003

001-106.2.4

003

001-106.2.5

003

001-106.2.6

003

001-106.2.7

003

001-107

003

001-107.1

003

001-107.2

003

001-107.2.1

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 172

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

001-107.3

003

001-107.3.1

003

001-INT2

003

001-A

001

002.0

001-B

001

003

001-C

002.0

003

001-D

002.0

001-E

003

Interpretation Number
( ) – indicates reference

WEQ-002 Open Access Same-Time Information System (OASIS) Standards & Communication Protocols,
Version 2.0

Title
Introduction

002.0
000

001
003

Applicability

003

Definition of Terms

000

001

002-0.1

000

003
RESERVED

002-0.2

001

003
RESERVED

002-0.3

001

003
RESERVED

002-0.4

001

003
RESERVED

002-0.5

001

003
RESERVED

002-0.6

001

003
RESERVED

002-0.7

001

003
RESERVED

002-0.8

001

003
RESERVED

002-1

000

001
RESERVED

002-1.1

000

001
RESERVED

002-2

000

002-2.1

000

001
Report of the North American Energy Standards Board, September 18, 2012
Page 173

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-2.2

000

002.0

002-2.3

000

001

Interpretation Number
( ) – indicates reference

002.0
002-2.4

000

002.0
003

002-2.5

000

002-3

000

002-3.1

000

002-3.2

000

002-3.3

000

001
002.0
003

002-3.4

000

001
002.0
003

002-3.5

000

002-3.6

000

001
002.0
003

002-4

000

003

002-4.1

000

001
002.0

002-4.2

000

002-4.2.1

000

002-4.2.1.1

000

002-4.2.1.2

000

002-4.2.1.3

000

002.0
003

Report of the North American Energy Standards Board, September 18, 2012
Page 174

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-4.2.2

000

002-4.2.3

000

002-4.2.3.1

000

Interpretation Number
( ) – indicates reference

001

001
003

002-4.2.3.2

000

002-4.2.3.3

000

002-4.2.4

000

002-4.2.4.1

000

003

002-4.2.4.2

000

003

002-4.2.5

000

002-4.2.5.1

000

002-4.2.5.2

000

002-4.2.6

000

002-4.2.6.1

000

002-4.2.6.2

000

002-4.2.6.3

000

002-4.2.6.4

000

002-4.2.6.5

000

002-4.2.6.6

000

002-4.2.6.7

000

002-4.2.6.8

000

002-4.2.7

000

002-4.2.7.1

000

002-4.2.7.2

000

003

003

002.0

001
002.0

002-4.2.7.3

000

001
002.0

002-4.2.7.4

000

Report of the North American Energy Standards Board, September 18, 2012
Page 175

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-4.2.7.5

000

001

002-4.2.7.6

000

001

002-4.2.8

000

002-4.2.8.1

000

002-4.2.8.2

000

002-4.2.8.3

000

002-4.2.9

000

002-4.2.9.1

000

002-4.2.9.2

000

002-4.2.9.3

000

002-4.2.10

000

Interpretation Number
( ) – indicates reference

003

001
002.0
003

002-4.2.10.1

000

001
003

002-4.2.10.2

000

001

002-4.2.10.3

000

003

002-4.2.10.3.1

000

001
002.0

002-4.2.10.3.2

000

002-4.2.10.4

000

003

002-4.2.11

000

002.0

002-4.2.12

000

001
002.0
003

002-4.2.13

000

001
RESERVED

002-4.2.13.1

000

001
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 176

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-4.2.13.2

000

001
RESERVED

002-4.2.13.3

000

001
RESERVED

002-4.2.13.4

000

001
RESERVED

002-4.2.13.5

000

001
RESERVED

002-4.2.13.6

000

001
RESERVED

002-4.2.13.7

000

001
RESERVED

002-4.2.13.8

000

001
RESERVED

002-4.2.13.9

000

001
RESERVED

002-4.2.13.10

000

001
RESERVED

002-4.3

000

001

Interpretation Number
( ) – indicates reference

003
002-4.3.1

000

002.0
003

002-4.3.2

000

002.0

002-4.3.2.1

000

002.0

002-4.3.2.2

000

002-4.3.3

000

002-4.3.3.1

000

002-4.3.3.2

000

002-4.3.4

000

002-4.3.4.1

000

001
002.0
002.1

002-4.3.4.2

000

001
002.0

002-4.3.4.3

000

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 177

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-4.3.4.4

000

002-4.3.5

000

002-4.3.5.1

000

002-4.3.6

000

002-4.3.6.1

000

Interpretation Number
( ) – indicates reference

002.0

001
002.0
003

002-4.3.6.2

000

001
002.0
003

002-4.3.6.2.1

002.0

002-4.3.6.2.2

002.0

002-4.3.6.2.3

003

002-4.3.6.3

000

003

001
002.0
003

002-4.3.6.4

000

001
002.0
003

002-4.3.6.4.1

003

002-4.3.6.5

000

002-4.3.7

000

002-4.3.7.1

000

002.0

002-4.3.7.2

000

002.0

002-4.3.8

000

002-4.3.8.1

000

002-4.3.8.2

000

001

002-4.3.8.3

000

001

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 178

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard
002-4.3.8.4

Adopted

Revised

Interpretated
Version/Adopted/Revised

000

Interpretation Number
( ) – indicates reference

001
002.0

002-4.3.8.5

000

002-4.3.9

000

002-4.3.9.1

000

002-4.3.9.2

000

002-4.3.10

000

002-4.3.10.1

000

002-4.3.10.2

000

002-4.3.10.3

000

002-4.3.10.4

000

001
003

002-4.3.10.5

000

001
003

002-4.3.10.6

000

001
003

002-4.3.11

000

001
003

002-4.3.11.1

000

002-4.3.11.2

000

002-4.3.11.3

000

002-4.3.11.3.1

000

002-4.3.11.3.2

000

002-4.3.11.3.3

000

002-4.3.11.3.4

000

002-4.3.11.4

000

002-4.3.11.5

000

002-4.4

000

003

Report of the North American Energy Standards Board, September 18, 2012
Page 179

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-4.4.1

000

001
RESERVED

002-4.4.2

000

001
RESERVED

002-4.4.3

000

001
RESERVED

002-4.4.4

000

001
RESERVED

002-4.4.5

000

001
RESERVED

002-4.4.6

000

001
RESERVED

002-4.4.6.1

000

001
RESERVED

002-4.4.6.2

000

001
RESERVED

002-4.4.6.3

000

001
RESERVED

002-4.4.6.4

000

001
RESERVED

002-4.4.6.5

000

001
RESERVED

002-4.4.6.6

000

001
RESERVED

002-4.4.7

000

001
RESERVED

002-4.4.7.1

000

001
RESERVED

002-4.4.7.2

000

001
RESERVED

002-4.5

000

001

002-4.5.1

001

002.0

002-4.5.2

001

002.0

002-5

000

002-5.1

000

002-5.2

000

002-5.3

000

002-5.3.1

000

002-5.3.2

000

002-5.3.3

000

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 180

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-5.4

000

002-5.5

000

002-5.6

000

002-5.7

000

002-5.8

000

002-5.9

000

002-5.10

000

Interpretation Number
( ) – indicates reference

002.0
003

002-5.10.1

002.0

002.1
003

002-5.10.2

003

002-5.10.3

003

002-101

003

002-101.1

003

002-101.2

003

002-101.2.1

003

002-101.2.1.1

003

002-101.2.1.2

003

002-101.2.1.3

003

002-101.2.2

003

002-101.2.3

003

002-101.2.3.1

003

002-101.2.3.2

003

002-101.2.3.3

003

002-101.2.4

003

002-101.2.5

003

002-101.2.5.1

003

002-101.2.5.2

003

Report of the North American Energy Standards Board, September 18, 2012
Page 181

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-101.2.6

003

002-101.2.6.1

003

002-101.2.6.2

003

002-101.2.6.3

003

002-101.2.6.4

003

002-101.2.6.5

003

002-101.2.6.6

003

002-101.2.6.7

003

002-101.2.6.8

003

002-101.2.7

003

002-101.2.7.1

003

002-101.2.7.2

003

002-101.2.7.3

003

002-101.2.7.4

003

002-101.2.7.5

003

002-101.2.7.6

003

002-101.2.8

003

002-101.2.9

003

002-101.2.10

003

002-101.2.10.1

003

002-101.2.10.2

003

002-101.2.10.3

003

002-101.2.10.3.1

003

002-101.2.10.3.2

003

002-101.2.10.4

003

002-101.2.11

003

002-101.2.12

003

002-101.3

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 182

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-101.3.1

003

002-101.3.1.1

003

002-101.3.1.2

003

002-101.3.1.3

003

002-101.3.1.4

003

002-101.3.2

003

002-101.3.2.1

003

002-101.3.2.2

003

002-101.3.2.3

003

002-101.3.2.4

003

002-101.3.2.5

003

002-101.3.2.6

003

002-101.3.2.7

003

002-101.3.2.8

003

002-101.3.2.9

003

002-101.3.2.10

003

002-101.3.2.11

003

002-101.3.2.12

003

002-101.3.2.13

003

002-101.3.2.14

003

002-101.3.2.15

003

002-101.3.2.16

003

002-101.3.2.17

003

002-101.3.2.18

003

002-101.3.2.19

003

002-101.3.3

003

002-101.3.3.1

003

002-101.3.3.2

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 183

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-101.3.3.3

003

002-101.3.3.4

003

002-101.3.3.5

003

002-101.3.3.6

003

002-101.3.3.7

003

002-101.3.3.8

003

002-101.3.3.9

003

002-101.3.3.10

003

002-101.3.3.11

003

002-101.3.3.12

003

002-101.3.3.13

003

002-101.3.3.14

003

002-101.3.3.15

003

002-101.3.3.16

003

002-101.3.3.17

003

002-101.3.3.18

003

002-101.3.3.19

003

002-101.4

003

002-101.4.1

003

002-101.4.1.1

003

002-101.4.1.2

003

002-101.4.1.3

003

002-101.4.1.4

003

002-101.4.1.5

003

002-101.4.2

003

002-101.4.2.1

003

002-101.4.2.2

003

002-101.4.2.3

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 184

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-101.4.2.4

003

002-101.4.3

003

002-101.4.3.1

003

002-101.4.3.2

003

002-101.4.3.3

003

002-101.4.3.4

003

002-101.4.3.5

003

002-101.4.3.6

003

002-101.4.3.7

003

002-101.4.3.8

003

002-101.4.3.9

003

002-101.4.3.10

003

002-101.4.3.11

003

002-101.4.3.12

003

002-101.4.3.13

003

002-101.4.3.14

003

002-101.4.3.15

003

002-101.4.3.16

003

002-101.4.3.17

003

002-101.4.3.18

003

002-101.4.3.19

003

002-101.4.3.20

003

002-101.5

003

002-101.5.1

003

002-101.5.2

003

002-101.5.3

003

002-101.5.4

003

002-101.5.5

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 185

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

002-101.6

003

002-101.6.1

003

002-101.6.2

003

002-101.6.3

003

Interpretation Number
( ) – indicates reference

WEQ-003 Open Access Same-Time Information Systems (OASIS) Data Dictionary, Version 2.0

Title

002.0

Introduction

003

Applicability

003

003-0

000

001
002.0
002.1
003

WEQ-004 Coordinate Interchange Business Practice Standards

Introduction

000

001
002.0
003

Applicability

000

001
003

Definition of Terms

000

001

004-0

000

001
RESERVED

004-0.1

000

001
003
RESERVED

004-0.2

001

003
RESERVED

004-0.3

000

001
003
RESERVED

004-0.4

000

001
003
RESERVED
Report of the North American Energy Standards Board, September 18, 2012
Page 186

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

004-0.5

001

003
RESERVED

004-0.6

001

003
RESERVED

004-0.7

001

003
RESERVED

004-0.8

001

003
RESERVED

004-0.9

001

003
RESERVED

004-0.10

001

003
RESERVED

004-0.11

000

001

Interpretation Number
( ) – indicates reference

003
RESERVED
004-0.12

001

003
RESERVED

004-0.13

000

001
003
RESERVED

004-0.14

001

003
RESERVED

004-0.15

000

001
003
RESERVED

004-0.16

000

001
003
RESERVED

004-0.17

000

001
003
RESERVED

004-0.18

000

001
003
RESERVED

004-0.19

001

003
RESERVED

004-0.20

000

001
003
RESERVED

004-0.21

000

001

Report of the North American Energy Standards Board, September 18, 2012
Page 187

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
RESERVED
004-0.22

000

001
003
RESERVED

004-1

000

001
003

004-1.1

000

001

004-1.2

000

001
RESERVED

004-1.3

000

001
RESERVED

004-1.4

000

001
RESERVED

004-1.5

000

001
RESERVED

004-1.6

000

001
RESERVED

004-2

000

001
002.1
003

004-2.1

000

001
003

004-2.2
004-3

001
RESERVED
000

001
003

004-3.1

000

001

004-4

000

001
003
RESERVED

004-4.1

000

001
RESERVED

004-4.2

000

001
RESERVED

004-5

000

001

Report of the North American Energy Standards Board, September 18, 2012
Page 188

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
004-6

000

001
003

004-6.1

000

001
003

004-6.1.1

001

004-6.1.2

001

004-6.1.3

003

004-6.2

000

001
RESERVED

004-7

000

001

003

003
004-7.1

000

001
RESERVED

004-8

000

001
003

004-8.1

000

001
003
RESERVED

004-8.2

000

001
003
RESERVED

004-8.3

000

001
RESERVED

004-9

000

001
003

004-10

000

001
003

004-11

000

001
003

004-11.1

000

001
003

Report of the North American Energy Standards Board, September 18, 2012
Page 189

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

004-11.2

001

003

004-11.2.1

001

003
RESERVED

004-11.3

001

001

Interpretation Number
( ) – indicates reference

003
004-11.4

003

004-12

000

001
003

004-13

000

001
003

004-14

001

003

004-14.1

001

003

004-15

001

003

004-16

001

003

004-17

001

003

004-17.1

001

003

004-17.2

001

003

004-17.3

003

004-18

002.1

003

004-18.1

002.1

003

004-18.2

002.1

003

004-19

003

004-19.1

003

004-19.2

003

004-A

000

001
002.0
002.1
003

004-B

000

001
Report of the North American Energy Standards Board, September 18, 2012
Page 190

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

002.0
003
004-C

000

001
002.0
003

004-D

000

001
002.0
002.1
003

WEQ-005 Area Control Error (ACE) Equation Special Cases Business Practice Standards

Introduction

000

002.0

Applicability

000

Definition of Terms

000

005-0

000

001
RESERVED

005-0.1

000

001
003
RESERVED

005-0.2

000

001
003
RESERVED

005-0.3

000

001
003
RESERVED

005-0.4

000

001
003
RESERVED

005-0.5

000

001
003
RESERVED

005-0.6

000

001
003
RESERVED

005-0.7

000

001
Report of the North American Energy Standards Board, September 18, 2012
Page 191

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
RESERVED
005-0.8

000

001
003
RESERVED

005-0.9

000

001
003
RESERVED

005-0.10

000

001
003
RESERVED

005-0.11

000

001
003
RESERVED

005-1

000

005-1.1

000

005-1.2

000

005-1.2.1

000

005-1.2.2

000

005-2

000

005-2.1

000

005-2.1.1

000

005-2.1.1.1

000

005-2.1.1.2

000

005-3

000

005.3.1

000

005-3.1.1

000

005-3.1.2

000

005-3.1.3

000

005-A

000

002.0

WEQ-006 Manual Time Error Correction Business Practice Standards

Introduction

000

002.0
Report of the North American Energy Standards Board, September 18, 2012
Page 192

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Applicability

000

Definition of Terms

000

006-0

000

001
RESERVED

006-0.1

000

001

Interpretation Number
( ) – indicates reference

003
RESERVED
006-0.2

000

001
003
RESERVED

006-0.3

000

001
003
RESERVED

006-0.4

000

001
003
RESERVED

006-0.5

000

001
003
RESERVED

006-0.6

000

001
003
RESERVED

006-0.7

000

001
003
RESERVED

006-0.8

000

001
002.0
003
RESERVED

006-0.9

000

001
003
RESERVED

006-0.10

000

001
003
RESERVED

006-1

000

003

Report of the North American Energy Standards Board, September 18, 2012
Page 193

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

006-1.1

000

003

006-2

000

003

006-3

000

002.0

Interpretation Number
( ) – indicates reference

003
006-4

000

001
002.0
003

006-5

000

001
002.0
003

006-6

000

003

006-7

000

003

006-7.1

000

003

006-7.2

000

003

006-8

000

003

006-9

000

003

006-10

000

003

006-11

000

003

006-12

000

003

WEQ-007 Inadvertent Interchange Payback Business Practice Standards

Introduction

000

002.0

Applicability

000

Definition of Terms

000

007-0

000

001
RESERVED

007-0.1

000

001
003
RESERVED

007-0.2

000

001

Report of the North American Energy Standards Board, September 18, 2012
Page 194

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
RESERVED
007-0.3

000

001
003
RESERVED

007-0.4

000

001
003
RESERVED

007-0.5

000

001
003
RESERVED

007-0.6

000

001
003
RESERVED

007-0.7

000

001
003
RESERVED

007-0.8

000

001
003
RESERVED

007-0.9

000

001
003
RESERVED

007-0.10

000

001
003
RESERVED

007-1

000

007-1.1

000

007-1.1.1

000

007-1.1.1.1

000

007-1.1.1.2

000

007-1.1.2

000

007-2

000

007-A

000

001
002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 195

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

WEQ-008 Transmission Loading Relief (TLR) - Eastern Interconnection Business Practice Standards

Introduction

000

002.0

Applicability

000

Definition of Terms

000

008-0

000

001
RESERVED

008-0.1

001

003
RESERVED

008-0.2

001

003
RESERVED

008-0.3

001

003
RESERVED

008-0.4

001

003
RESERVED

008-0.5

001

003
RESERVED

008-0.6

001

003
RESERVED

008-0.7

001

003
RESERVED

008-0.8

001

003
RESERVED

008-0.9

001

003
RESERVED

008-0.10

001

003
RESERVED

008-0.11

001

003
RESERVED

008-0.12

001

003
RESERVED

008-0.13

001

003
RESERVED

008-0.14

001

003
RESERVED

008-0.15

001

003
RESERVED

008-0.16

001

003
RESERVED

008-0.17

001

003
RESERVED

008-0.18

001

003
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 196

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

008-0.19

001

003
RESERVED

008-0.20

001

002.1

Interpretation Number
( ) – indicates reference

003
RESERVED
008-0.21

001

003
RESERVED

008-0.22

001

003
RESERVED

008-0.23

001

003
RESERVED

008-0.24

001

003
RESERVED

008-0.25

001

003
RESERVED

008-0.26

001

003
RESERVED

008-0.27

001

003
RESERVED

008-0.28

001

003
RESERVED

008-0.29

001

003
RESERVED

008-0.30

001

003
RESERVED

008-0.31

001

003
RESERVED

008-0.32

001

003
RESERVED

008-0.33

001

003
RESERVED

008-0.34

001

003
RESERVED

008-0.35

001

003
RESERVED

008-0.36

001

003
RESERVED

008-0.37

001

003
RESERVED

008-0.38

001

003
RESERVED

008-0.39

001

003
RESERVED

008-0.40

001

003
RESERVED
Report of the North American Energy Standards Board, September 18, 2012
Page 197

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

008-0.41

001

003
RESERVED

008-0.42

001

003
RESERVED

008-0.43

001

003
RESERVED

008-1

001

008-1.1

001

008-1.2

001

008-1.2.1

001

008-1.3

001

008-1.3.1

001

008-1.3.1.1

001

008-1.3.2

001

008-1.4

001

Interpretation Number
( ) – indicates reference

001
002
002.1

008-1.5

001

008-1.6

001

008-1.7

003

003
RESERVED

008-1.7.1

003

003
RESERVED

008-1.7.1.1

003

003
RESERVED

008-1.7.1.1.1

003

003
RESERVED

008-1.7.1.1.2

003

003
RESERVED

008-1.7.1.2

003

003
RESERVED

008-2

001

008-2.1

001

008-2.1.1

001

008-2.1.2

001

Report of the North American Energy Standards Board, September 18, 2012
Page 198

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

008-2.1.3

001

008-2.1.4

001

008-2.1.5

001

008-2.1.6

001

008-2.1.7

001

002.0

008-2.1.8

001

002.1

008-2.2

001

008-2.2.1

001

008-2.2.1.1

001

008-2.2.1.2

001

008-2.3

001

008-2.3.1

001

008-2.3.1.1

001

008-2.3.1.2

001

008-2.4

001

008-2.4.1

001

008-2.4.2

001

008-2.4.3

001

008-2.4.4

001

008-3

001

008-3.1

001

008-3.2

001

008-3.2.1

001

008-3.2.1.1

001

008-3.2.1.2

001

008-3.2.2

001

008-3.2.3

001

008-3.2.4

001

Interpretation Number
( ) – indicates reference

002.1

Report of the North American Energy Standards Board, September 18, 2012
Page 199

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

008-3.2.5

001

008-3.3

001

008-3.3.1

001

008-3.3.1.1

001

008-3.3.1.2

001

008-3.3.2

001

008-3.3.2.1

001

008-3.3.2.1.1

001

008-3.3.2.2

001

008-3.3.2.3

001

008-3.3.2.4

001

008-3.3.2.5

001

008-3.3.2.6

001

008-3.3.2.6.1

001

008-3.3.3

001

008-3.3.3.1

001

008-3.3.4

001

008-3.3.5

001

008-3.3.5.1

001

008-3.3.5.2

001

008-3.3.5.3

001

008-3.3.5.4

001

008-3.4

001

008-3.4.1

001

008-3.4.1.1

001

008-3.4.1.2

001

008-3.4.2

001

008-3.4.3

001

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 200

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Interpretated
Version/Adopted/Revised

008-3.4.4

001

008-3.5

001

008-3.5.1

001

008-3.5.2

001

008-3.5.2.1

001

008-3.5.3

Revised

Interpretation Number
( ) – indicates reference

002.1

008-3.6

001

008-3.6.1

001

008-3.6.2

001

002.1

008-3.6.2.1

001

002.1

008-3.6.2.1.1

001

008-3.6.2.2

001

002.1

008-3.6.2.3

001

002.1

008-3.6.2.3.1

001

008-3.6.2.3.2

001

008-3.7

001

002.1

008-3.7.1

001

002.1

008-3.7.1.1

001

002.1

008-3.7.1.1.1

001

002.1

008-3.7.1.2

001

002.1

008-3.7.1.3

001

008-3.7.1.3.1

001

008-3.7.1.3.2

001

008-3.8

001

008-3.9

001

008-3.9.1

001

008-3.10

001

008-3.11

001

Report of the North American Energy Standards Board, September 18, 2012
Page 201

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

008-3.11.1

001

008-3.11.1.1

001

008-3.11.2

001

008-3.11.2.1

001

008-3.11.2.1.1

001

008-3.11.2.1.2

001

008-3.11.2.1.3

001

008-3.11.2.1.4

001

008-3.11.2.2

001

008-3.11.2.2.1

001

008-3.11.2.2.2

001

008-3.11.2.2.3

001

008-3.11.2.2.4

001

008-3.11.2.3

001

008-3.11.2.4

001

008-3.11.2.4.1

001

008-3.11.2.4.2

001

008-3.11.2.5

001

008-3.11.2.6

001

008-3.11.2.7

001

008-3.11.2.8

001

008-A

001

002.0

008-B

001

002.0

008-C

001

002.0

Interpretation Number
( ) – indicates reference

002.1
008-D

001

001
002
002.1

Report of the North American Energy Standards Board, September 18, 2012
Page 202

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

WEQ-009 Standards of Conduct for Electric Transmission Providers Business Practice Standards

Applicability

000

001
RESERVED

Definition of Terms

000

001
RESERVED

009-0

000

001
RESERVED

009-1

000

001
RESERVED

009-2

000

001
RESERVED

009-3

000
RESERVED

009-4

000

001
RESERVED

009-5

000

001
RESERVED

009-6

001

001
RESERVED

WEQ-010 Contracts Related Business Practice Standards

010-1

000

WEQ-011 Gas / Electric Coordination Business Practice Standards

Introduction

001

Applicability

003

Definition of Terms

001

002.0

011-0.1

001

003
RESERVED

011-0.2

001

003
RESERVED

011-0.3

001

003
RESERVED

011-1.1

001

003

011-1.2

001

003

011-1.3

001

003

011-1.4

001

003

011-1.5

001

003

011-1.6

001

003

003

001 / 002.0 / 003

011-INT1
(C07001)

Report of the North American Energy Standards Board, September 18, 2012
Page 203

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard
011-INT1

Adopted

Revised

Interpretated
Version/Adopted/Revised

002.0

Interpretation Number
( ) – indicates reference

003

WEQ-012 Public Key Infrastructure (PKI) Business Practice Standards

Recommended
Standard
Introduction

001

Certification

001

Scope

001

Commitment to
Open Standards

001

Definition of Terms

001

012-0.1

001

003
RESERVED

012-0.2

001

003
RESERVED

012-0.3

001

003
RESERVED

012-0.4

001

003
RESERVED

012-0.5

001

003
RESERVED

012-0.6

001

003
RESERVED

012-0.7

001

003
RESERVED

012-0.8

001

003
RESERVED

012-0.9

001

003
RESERVED

012-0.10

001

003
RESERVED

012-0.11

001

003
RESERVED

012-0.12

001

003
RESERVED

012-0.13

001

003
RESERVED

012-0.14

001

003
RESERVED

012-0.15

001

003
RESERVED

012-1

001

012-1.1

001
Report of the North American Energy Standards Board, September 18, 2012
Page 204

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

012-1.2

001

012-1.2.1

001

012-1.2.2

001

012-1.3

001

012-1.3.1

001

012-1.3.2

001

012-1.3.3

001

012-1.3.4

001

012-1.4

001

012-1.4.1

001

012-1.4.2

001

012-1.4.3

001

012-1.4.4

001

012-1.4.5

001

012-1.5

001

012-1.6

001

012-1.6.1

001

012-1.7

001

012-1.8

001

012-1.9

001

012-1.9.1

001

012-1.9.2

001

012-1.9.3

001

012-1.9.4

001

012-1.9.5

001

012-1.10

001

012-1.11

001

012-1.12

001

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 205

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

012-1.13

001

012-1.14

001

012-1.15

001

012-1.16

001

012-1.17

001

012-1.18

001

012-1.18.1

001

012-1.18.2

001

012-1.18.3

001

012-1.19

001

012-1.19.1

001

012-1.19.2

001

012-1.19.3

001

012-1.19.4

001

012-1.19.5

001

012-1.19.6

001

012-1.19.7

001

012-1.19.8

001

012-1.20

001

012-1.21

001

012.1.21.1

001

012-1.21.2

001

012-1.21.3

001

012-1.21.4

001

012-1.22

001

012-1.22.1

001

012-1.22.2

001

012-1.22.3

001

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 206

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

012-1.23

001

012-1.23.1

001

012-1.23.2

001

012-1.23.3

001

012-1.23.4

001

012-1.23.5

001

012-1.24

001

012-1.25

001

012-1.26

001

012-1.26.1

001

012-1.26.2

001

012-1.26.3

001

012-1.26.4

001

012-1.26.5

001

012 End Notes

001

Interpretation Number
( ) – indicates reference

002.0

WEQ-013 Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 2.0

Title

002.0

Introduction

001

002.0

Applicability

003

Definition of Terms

001

002.0

013-0.1

001

003
RESERVED

013-0.2

001

003
RESERVED

013-0.3

001

003
RESERVED

013-0.4

001

003
RESERVED

013-0.5

001

003
RESERVED

013-0.6

002.0

003
RESERVED

Report of the North American Energy Standards Board, September 18, 2012
Page 207

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Interpretated
Version/Adopted/Revised

013-1

001
RESERVED

013-1.1

001
RESERVED

013-2

Revised

001

Interpretation Number
( ) – indicates reference

002.0
003

013-2.1

001

002.0
002.1

013-2.2

001

002.0
003

013-2.2.1

002.0

013-2.2.2

002.0

013-2.3

001

003

002.0
003

013-2.4

001

013-2.4.1

001

013-2.4.2

001

013-2.5

001

013-2.6

001

013-2.6.1

001

002.0

002.0

002.0
003

013-2.6.1.1

001

002.0
003

013-2.6.1.2

001

002.0
003

013-2.6.1.3

002.0

002.0
003

013-2.6.1.4
013-2.6.2

002.0
001

002.0
002.1
Report of the North American Energy Standards Board, September 18, 2012
Page 208

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
013-2.6.3

001

002.0
003

013-2.6.4

001

002.0

013-2.6.5

001

003

013-2.6.5.1

001

002.0
003

013-2.6.5.2

001

002.0

013-2.6.6

001

002.0

013-2.6.7

001

013-2.6.7.1

001

002.0

013-2.6.7.2

001

002.0

013-2.6.8

002.0

013-2.6.8.1

002.0

003

013-2.6.8.2

002.0

002.1
003

013-2.6.9

003

013-3

001

013.3.1

001

013-3.2

001

002.0
002.1
003

013-3.3

002.0

013-3.3.1

002.0

013-3.3.2

002.0

013-3.4

002.0

013-3.4.1

002.0

013-3.4.2

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 209

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

013-3.5

002.0

013-3.6

002.0

013-3.7

002.0

013-3.8

002.0

003

013-4

001

003

013-4.1

001

003

013-4.1.1

001

002.0

Interpretation Number
( ) – indicates reference

003
013-4.1.2

001

002.0
002.1
003

013-4.1.3

001

002.0
003

013-4.1.4

001

002.0
003

013-4.1.5

001

002.0
003

013-4.1.6

001

003

013-4.1.6.1

001

003

013-4.1.6.2

001

003

013-4.1.6.3

001

003

013-4.1.6.4

001

003

013-4.1.6.5

001

003

013-4.1.6.6

001

003

013-4.1.7

001

003

013-4.1.7.1

001

002.0
003

013-4.1.7.2

001

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 210

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

Interpretation Number
( ) – indicates reference

003
013-4.1.8

002.0

013-4.1.9

003

013-4.2

001

013-5.10.2

003

003

002.0

013-101

003

013-101.1

003

013-101.2

003

013-101.3

003

013-101.4

003

013-101.5

003

013-101.6

003

013-101.7

003

013-102

003

013-102.1

003

013-102.2

003

013-102.3

003

013-102.4

003

013-102.5

003

013-102.6

003

013-102.7

003

013-103

003

013-103.1

003

013-104

003

013-104.1

003

013-104.1.1

003

013-104.1.2

003

013-104.1.3

003

Report of the North American Energy Standards Board, September 18, 2012
Page 211

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Interpretated
Version/Adopted/Revised

013-104.1.4

003

013-104.1.5

003

013-104.1.6

003

013-104.1.7

003

013-104.1.8

003

013-104.2

003

013-104.2.1

003

013-104.2.2

003

013-104.2.3

003

013-104.3

003

013-104.3.1

003

013-104.3.2

003

013-104.3.3

003

013-104.3.4

003

013-104.3.5

003

013-104.3.6

003

013-104.3.7

003

013-104.3.8

003

013-104.4

003

013-104.4.1

003

013-104.4.2

003

013-104.4.3

003

013-104.4.4

003

013-105

003

013-105.1

003

013-105.2

003

013-106

003

013-A

Revised

Interpretation Number
( ) – indicates reference

002.0

Report of the North American Energy Standards Board, September 18, 2012
Page 212

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

013-B

002.0

013-C

003

013-D

003

013-E

003

Interpretation Number
( ) – indicates reference

WEQ-014 WEQ / WGQ eTariff Related Business Practice Standards

014-0.1

002.0

003
RESERVED

014-0.2

002.0

003
RESERVED

014-0.3

002.0

003
RESERVED

014-0.4

002.0

003
RESERVED

014-0.5

002.0

003
RESERVED

014-1

002.0

014-2

002.0

014-A

002.0

002.1
003

WEQ-015 Measurement and Verification of Wholesale Electricity Demand Response Business Practice Standards

Introduction

003

Applicability

003

Overview

003

Performance
Evaluation
Methodology

003

015-1.0

003

015-1.0.1

003

015-1.0.2

003

015-1.0.3

003

015-1.0.4

003

015-1.0.5

003

015-1.0.6

003

Report of the North American Energy Standards Board, September 18, 2012
Page 213

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.0.7

003

015-1.0.8

003

015-1.1

003

015-1.1.1

003

015-1.1.2

003

015-1.1.3

003

015-1.1.4

003

015-1.1.5

003

015-1.1.6

003

015-1.1.7

003

015-1.2

003

015-1.2.1

003

015-1.2.2

003

015-1.2.3

003

015-1.2.4

003

015-1.2.5

003

015-1.2.6

003

015-1.2.7

003

015-1.2.8

003

015-1.3

003

015-1.3.1

003

015-1.4

003

015-1.4.1

003

015-1.4.2

003

015-1.4.3

003

015-1.4.4

003

015-1.4.5

003

015-1.4.6

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 214

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.4.7

003

015-1.4.8

003

015-1.5

003

015-1.5.1

003

015-1.5.2

003

015-1.5.3

003

015-1.5.4

003

015-1.5.5

003

015-1.5.6

003

015-1.5.7

003

015-1.6

003

015-1.6.1

003

015-1.6.2

003

015-1.6.3

003

015-1.6.4

003

015-1.6.5

003

015-1.6.6

003

015-1.6.7

003

015-1.6.8

003

015-1.7

003

015-1.7.1

003

015-1.8

003

015-1.8.1

003

015-1.8.2

003

015-1.8.3

003

015-1.8.4

003

015-1.8.5

003

015-1.8.6

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 215

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.8.7

003

015-1.8.8

003

015-1.9

003

015-1.9.1

003

015-1.9.2

003

015-1.9.3

003

015-1.9.4

003

015-1.9.5

003

015-1.9.6

003

015-1.9.7

003

015-1.10

003

015-1.10.1

003

015-1.10.2

003

015-1.10.3

003

015-1.10.4

003

015-1.10.5

003

015-1.10.6

003

015-1.10.7

003

015-1.10.8

003

015-1.11

003

015-1.11.1

003

015-1.12

003

015-1.12.1

003

015-1.12.2

003

015-1.12.3

003

015-1.12.4

003

015-1.12.5

003

015-1.12.6

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 216

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.12.7

003

015-1.12.8

003

015-1.13

003

015-1.13.1

003

015-1.13.2

003

015-1.13.3

003

015-1.13.4

003

015-1.13.5

003

015-1.13.6

003

015-1.13.7

003

015-1.14

003

015-1.14.1

003

015-1.14.2

003

015-1.14.3

003

015-1.14.4

003

015-1.14.5

003

015-1.14.6

003

015-1.14.7

003

015-1.14.8

003

015-1.15

003

015-1.15.1

003

015-1.16

003

015-1.17

003

015-1.17.1

003

015-1.17.2

003

015-1.17.3

003

015-1.17.4

003

015-1.18

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 217

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.19

003

015-1.19.1

003

015-1.19.2

003

015-1.19.3

003

015-1.19.4

003

015-1.19.5

003

015-1.19.6

003

015-1.20

003

015-1.20.1

003

015-1.20.2

003

015-1.20.3

003

015-1.20.4

003

015-1.21

003

015-1.21.1

003

015-1.21.2

003

015-1.22

003

015-1.22.1

003

015-1.22.2

003

015-1.22.3

003

015-1.22.4

003

015-1.22.5

003

015-1.22.6

003

015-1.23

003

015-1.23.1

003

015-1.23.2

003

015-1.23.3

003

015-1.23.4

003

015-1.24

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 218

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

015-1.24.1

003

015-1.24.2

003

015-1.25

003

015-1.25.1

003

015-1.25.2

003

015-1.25.3

003

015-1.25.4

003

015-1.25.5

003

015-1.25.6

003

015-1.26

003

015-1.26.1

003

015-1.26.2

003

015-1.26.3

003

015-1.26.4

003

015-1.27

003

015-1.28

003

015-1.29

003

015-1.29.1

003

015-1.29.2

003

015-1.29.3

003

015-1.29.4

003

015-1.30

003

Interpretation Number
( ) – indicates reference

WEQ-016 Specifications for Common Electricity Product and Pricing Definition Business Practice Standards

Executive Summary

003

Introduction

003

Abbreviations,
Acronyms and
Definition of Terms

003

016-1

003

Report of the North American Energy Standards Board, September 18, 2012
Page 219

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

016-1.1

003

016-1.2

003

016-1.2.1

003

016-1.2.2

003

016-1.2.2.1

003

016-1.2.2.2

003

016-2

003

016-2.1

003

016-2.2

003

016-2.3

003

Appendix A

003

Interpretation Number
( ) – indicates reference

WEQ-017 Specifications for Common Schedule Communication Mechanism for Energy Transactions Business Practice Standards

Executive Summary

003

Introduction

003

Abbreviations,
Acronyms and
Definition of Terms

003

017-1

003

017-1.1

003

017-2

003

017-2.1

003

017-2.1.1

003

017-A

003

WEQ-018 Specifications for Wholesale Standard Demand Response Signals Business Practice Standards

Executive Summary

003

Introduction

003

Abbreviations,
Acronyms and
Definition of Terms

003

018-1

003

018-1.1

003
Report of the North American Energy Standards Board, September 18, 2012
Page 220

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

018-1.2

003

018-1.3

003

018-1.4

003

018-1.4.1

003

018-1.4.2

003

018-1.4.3

003

018-1.4.4

003

018-1.4.5

003

018-1.4.6

003

018-1.4.7

003

018-A

003

018-B

003

Interpretation Number
( ) – indicates reference

WEQ-019 Customer Energy Usage Information Communication Business Practice Standards

Executive Summary

003

Introduction

003

Abbreviations,
Acronyms and
Definition of Terms

003

Business Processes
and Practices Overview

003

019-1

003

019-1.1

003

019-1.1.1

003

019-1.1.2

003

019-1.1.3

003

019-1.1.4

003

019-1.1.5

003

019-1.1.6

003

019-1.1.7

003

019-2

003
Report of the North American Energy Standards Board, September 18, 2012
Page 221

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

019-2.1

003

019-2.1.1

003

019-2.1.2

003

019-2.1.3

003

019-2.1.4

003

019-2.1.5

003

019-2.1.6

003

019-2.2

003

019-2.3

003

019-2.3.1

003

019-2.3.2

003

019-2.3.3

003

019-2.3.4

003

019-2.3.5

003

019-2.3.6

003

019-2.4

003

019-2.4.1

003

019-2.4.2

003

019-2.4.3

003

019-3

003

019-3.1

003

019-3.1.1

003

019-3.1.2

003

019-3.1.3

003

019-3.1.4

003

019-3.1.5

003

019-3.1.6

003

019-3.1.7

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 222

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

019-3.1.8

003

019-3.1.9

003

019-3.1.10

003

019-3.1.11

003

019-3.1.12

003

019-3.1.13

003

019-3.1.14

003

019-3.1.15

003

019-3.1.16

003

019-3.1.17

003

019-3.1.18

003

019-3.1.19

003

019-3.1.20

003

019-3.1.21

003

019-3.1.22

003

019-3.1.23

003

019-3.1.24

003

019-3.1.25

003

019-3.1.26

003

019-3.1.27

003

019-3.1.28

003

019-3.1.29

003

019-3.1.30

003

019-3.1.31

003

019-3.1.32

003

019-3.1.33

003

019-3.1.34

003

019-3.1.35

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 223

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

019-3.1.36

003

019-3.1.37

003

019-3.1.38

003

019-3.1.39

003

019-3.1.40

003

019-3.1.41

003

019-3.1.42

003

Interpretation Number
( ) – indicates reference

WEQ-020 Smart Grid Standards Data Elements Table Business Practice Standards

Introduction

003

020-1

003

020-1.1

003

020-1.2

003

WEQ-021 Measurement and Verification of Energy Efficiency Products Business Practice Standards

021-1

003

021-1.1

003

021-2

003

021-2.1.1

003

021-2.1.2

003

021-2.1.3

003

021-3

003

021-3.1.1

003

021-3.1.2

003

021-3.1.3

003

021-3.1.4

003

021-3.2

003

021-3.2.1

003

021-3.2.2

003

021-3.2.3

003

Report of the North American Energy Standards Board, September 18, 2012
Page 224

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

021-3.2.4

003

021-3.2.5

003

021-3.2.6

003

021-3.2.7

003

021-3.2.8

003

021-3.2.9

003

021-3.2.10

003

021-3.2.11

003

021-3.3

003

021-3.3.1

003

021-3.3.2

003

021-3.4

003

021-3.4.1

003

021-3.5

003

021-3.5.1

003

021-3.6

003

021-3.6.1

003

021-3.6.1.1

003

021-3.6.1.2

003

021-3.6.1.3

003

021-3.6.1.4

003

021-3.6.2

003

021-3.7

003

021-3.7.1

003

021-3.7.1.1

003

021-3.7.1.2

003

021-3.7.1.3

003

021-3.7.1.4

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 225

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

021-3.7.2

003

021-3.7.3

003

021-3.8

003

021-3.8.1

003

021-3.8.2

003

021-3.8.3

003

021-3.8.4

003

021-3.8.5

003

021-3.8.6

003

021-3.9

003

021-3.9.1

003

021-3.9.2

003

021-3.10

003

021-3.10.1

003

021-3.10.2

003

021-3.11

003

021-3.11.1

003

021-3.11.1.1

003

021-3.11.1.2

003

021-3.11.1.3

003

021-3.11.1.4

003

021-3.11.1.5

003

021-3.11.1.6

003

021-3.11.1.7

003

021-3.11.1.8

003

021-3.11.1.9

003

021-3.11.1.10

003

021-3.11.1.11

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 226

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Business Practice
Standard

Adopted

Revised

Interpretated
Version/Adopted/Revised

021-3.11.1.12

003

021-3.11.1.13

003

021-3.11.1.14

003

021-11.1.15

003

021-3.12

003

021-3.12.1

003

021-3.12.1.1

003

021-3.12.1.2

003

021-3.12.1.3

003

021-3.12.1.4

003

021-3.12.1.5

003

021-3.12.1.6

003

Interpretation Number
( ) – indicates reference

Report of the North American Energy Standards Board, September 18, 2012
Page 227

Report of the North American Energy Standards Board
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
September 18, 2012

Appendices:
A. Executive Committee Meeting Minutes, Comments and Voting
Records Links ......................................................................................229
B. Ratification Ballots and Results Links ..................................................259
C. List of Available Meeting Transcripts ..................................................269
D. Cross Reference of Business Practice Standards Adopted in Version
003 to FERC Action on those Business Practice Standards.................272
E. NAESB Process for Standards Development........................................276
F. 2008 WEQ Annual Plan .......................................................................279
G. 2009 WEQ Annual Plan .......................................................................297
H. 2010 WEQ Annual Plan .......................................................................308
I.
2011 WEQ Annual Plan .......................................................................321
J.
2012 WEQ Annual Plan .......................................................................332
K. Minor Corrections Applied for Versions 002.1 and 003 ......................342

Report of the North American Energy Standards Board, September 18, 2012
Page 228

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012

Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

01-27-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec012709fm.doc
Notational ballot results 02-10-09:
http://www.naesb.org/pdf4/weq_ec012709ballot_re
sults.doc

DR and DSM-EE programs:
Recommendation 2008 WEQ Annual Plan Item No. 5.a
(Redline): http://www.naesb.org/pdf4/weq_ec012709a1.doc
Recommendation 2008 WEQ Annual Plan Item No. 5.a
(Clean): http://www.naesb.org/pdf4/weq_ec012709a2.doc

Comments Submitted by the NAESB Standards Review
Subcommittee: http://www.naesb.org/pdf4/weq_120408_srs.doc
Comments Submitted by A. Breidenbaugh, EnerNoc:
http://www.naesb.org/pdf4/weq_120408_enernoc.pdf
Comments Submitted by the IRC SRC:
http://www.naesb.org/pdf4/weq_120408_src.doc
Attachment to Comments Submitted by the IRC SRC:
http://www.naesb.org/pdf4/weq_120408_src_attachment.doc
Comments Submitted by J. Cowan, EVO:
http://www.naesb.org/pdf4/weq_120408_evo.pdf
Comments Submitted by J. Hughes, ELCON:
http://www.naesb.org/pdf4/weq_120408_elcon.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_120408_entergy.doc
Attachment A to Comments Submitted by Entergy:
http://www.naesb.org/pdf4/weq_120408_entergyA.doc
Attachment B to Comments Submitted by Entergy:
http://www.naesb.org/pdf4/weq_120408_entergyB.doc
Comments Submitted by E. Futoryan, Con Edison:
http://www.naesb.org/pdf4/weq_120408_conedison.doc
Comments Submitted by D. McGee, Southern Company
Transmission:
http://www.naesb.org/pdf4/weq_120408_southernco.pdf

Report of the North American Energy Standards Board, September 18, 2012
Page 229

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Comments Submitted by Townsley and Saxonis, NYS
Department of Public Service:
http://www.naesb.org/pdf4/weq_120408_nys_psc.doc
Comments Submitted by G. Smith, Energy Curtailment
Specialists, Inc.:
http://www.naesb.org/pdf4/weq_120408_energy_csi.pdf
Late Comments Submitted by P. McCurley, National Rural
Electric Cooperative Association (NRECA):
http://www.naesb.org/pdf4/weq_120408_nreca.pdf

02-03-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec020309fm.doc

05-12-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec051209fm.doc

Order 717, Standards of Conduct:
Recommendation 2009 WEQ Annual Plan Item No. 3(d)
(Redline): http://www.naesb.org/pdf4/weq_ec051209a2.doc
Recommendation 2009 WEQ Annual Plan Item No. 3(d)
(Clean): http://www.naesb.org/pdf4/weq_ec051209a3.doc

Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_032709_entergy.doc
Comments Submitted by the NAESB Standards Review
Subcommittee: http://www.naesb.org/pdf4/weq_032709_srs.doc
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_032709_southern.doc
Comments Submitted by A. Pritchard, Duke Energy:
http://www.naesb.org/pdf4/weq_032709_duke_energy.doc

06-08-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec060809fm.doc
Notational ballot results 06-23-09:
http://www.naesb.org/pdf4/weq_ec060809ballot_re
sults.doc
WEQ EC Notational Ballot Submitted by E. Skiba
from Midwest ISO with Comments :
http://www.naesb.org/pdf4/weq_ec060809ballot_m
iso_comments.pdf

Rollover Rights on Redirect on a Firm Basis:
Recommendation 2009 WEQ Annual Plan Item No. 2.a.ii.3
(Redline): http://www.naesb.org/pdf4/weq_ec051209a4.doc
Recommendation 2009 WEQ Annual Plan Item No. 2.a.ii.3
(Clean): http://www.naesb.org/pdf4/weq_ec051209a5.doc

Comments Submitted by B. Green, EPSA:
http://www.naesb.org/pdf4/weq_041309_ess_its_epsa.doc
Comments Submitted by P. Sorenson, OATI:
http://www.naesb.org/pdf4/weq_041309_ess_its_oati.doc
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_041309_ess_its_srs.doc
Additional Comments Submitted by P. Sorenson, OATI:
http://www.naesb.org/pdf4/weq_041309_ess_its_oati2.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 230

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Comments Submitted by B. Rehman, BPA:
http://www.naesb.org/pdf4/weq_041309_ess_its_bpa.doc
Comments Submitted by M. Knox, Midwest ISO:
http://www.naesb.org/pdf4/weq_041309_ess_its_miso.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_041309_ess_its_entergy.doc
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_041309_ess_its_southern_wood
.doc
Comments Submitted by D. McGee, Southern Company:
http://www.naesb.org/pdf4/weq_041309_ess_its_southern_mcge
e.doc
Group Comments Submitted by B. Lion behalf of MISO, PJM,
SPP, ISO-NE, NYISO, ERCOT and IESO:
http://www.naesb.org/pdf4/weq_041309_ess_its_src.doc
Comments Submitted by the WEQ ESS/ITS Chairs:
http://www.naesb.org/pdf4/weq_041309_ess_its_chairs.doc
Late Comments Submitted by the WEQ ESS/ITS Subcommittee
- Recommendation Revised:
http://www.naesb.org/pdf4/weq_041309_ess_its_late_subcom_re
c_rev.doc
Late Comments Submitted by the WEQ ESS/ITS Subcommittee
- Recommendation with all Formal Comments Shown:
http://www.naesb.org/pdf4/weq_041309_ess_its_late_subcom_re
c_with_comments.doc
Late Comments Submitted by the WEQ ESS/ITS Subcommittee
- Additional Justification:
http://www.naesb.org/pdf4/weq_041309_ess_its_late_subcom_a
dditional_justification.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 231

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Formal Comments Submitted by E. Skiba, Midwest ISO in
response to the Late Formal Comments submitted by the
ESS/ITS:
http://www.naesb.org/pdf4/weq_041309_ess_its_late_miso_skib
a.doc

08-18-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec081809fm.doc

10-27-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102709fm.doc

Modifications to WEQ-004 Coordinate Interchange:
Recommendation 2009 WEQ Annual Plan Item Nos. 1.a,
3.a.vii / R05020 (Redline):
http://www.naesb.org/pdf4/weq_ec102709a3.doc
Attachment (Redline):
http://www.naesb.org/pdf4/weq_ec102709a4.doc
Recommendation 2009 WEQ Annual Plan Item Nos. 1.a,
3.a.vii / R05020 (Clean):
http://www.naesb.org/pdf4/weq_ec102709a5.doc
Attachment (Clean):
http://www.naesb.org/pdf4/weq_ec102709a6.doc

Request for Comments on 1.8.1 e-Tag Specifications and schema
(only):
Comments Submitted by D. Landers, New Brunswick System
Operator:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409nbso.pdf
Comments Submitted by S. Ashbaker, WECC:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409wecc_1.doc
Redlines Submitted by S. Ashbaker, WECC:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409wecc_2.doc
Comments Submitted by T. Kannel, MCG Energy:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409mcg_energy.doc
Comments Submitted by J. Ray, OATI:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409oati.pdf
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_2009_api_1a_3avii_r05020_090
409weq_srs.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 232

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Request for Comments on Recommendation and Attachments:
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_090909weq_srs.doc
Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_090909miso.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_090909entergy.doc
Comments Submitted by J. Ray, OATI:
http://www.naesb.org/pdf4/weq_090909oati.pdf
Comments Submitted by C. Wesley, PJM:
http://www.naesb.org/pdf4/weq_090909pjm.doc
Comments by the WEQ JESS on WEQ-004 Coordinate
Interchange: http://www.naesb.org/pdf4/weq_ec102709w4.doc
Comments by the WEQ JESS on 1.8.1 e-Tag Specifications:
http://www.naesb.org/pdf4/weq_ec102709w5.doc

12-03-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec120309fm.doc

02-02-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec020210fm.doc

Modify NAESB definitions to address internal
inconsistencies and inconsistencies with the NERC glossary:
Recommendation 2009 WEQ Annual Plan Item No. 5.b
(Redline):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
022210_2009_weq_ap5b_rec_redline.doc
Recommendation 2009 WEQ Annual Plan Item No. 5.b
(Clean):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
022210_2009_weq_ap5b_rec_clean.doc

Comments Submitted by B. Kedrowski, We Energies:
http://www.naesb.org/pdf4/weq_111209_we_energies.doc
Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_111209_miso.doc
Late Joint Comments Submitted by ERCOT, MISO, NE-ISO,
PJM and SPP:
http://www.naesb.org/pdf4/weq_111209_joint_ercot_miso_neiso
_pjm_spp.doc
Late Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_111209_weq_srs_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 233

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

05-04-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec050410fm.doc

06-04-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_wgq_ec060410fm.
doc

Gas / Electric Coordination:
Recommendation 2009 WEQ Annual Plan Item Nos. 5.a.2 /
R08004 and 5.i / R09011:
http://www.naesb.org/pdf4/weq_wgq_ec060410a1.doc
Attachment (Redline):
http://www.naesb.org/pdf4/weq_wgq_ec060410a2.doc
Attachment (Clean):
http://www.naesb.org/pdf4/weq_wgq_ec060410a3.doc

Request for comments due 11-02-09:
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_100209weq_srs.doc
Comments Submitted by M. Kulas, Consumers Energy
Company:
http://www.naesb.org/pdf4/weq_100209consumers.doc
Late Comments in Response to the Consumers Energy
Comments Submitted by the WEQ and WGQ BPS Co-Chairs:
http://www.naesb.org/pdf4/weq_100209_weq_wgq_bps_late.doc
Request for comments due 04-29-10:
No comments received

06-16-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_req_ec061610fm.d
oc
Notational ballot results 06-25-10:
http://www.naesb.org/pdf4/weq_ec061610ballot_re
sults.doc
Notational Ballot and Comments Submitted by L.
Westerfield, Idaho PUC representing NARUC:
http://www.naesb.org/pdf4/weq_ec061610ballot_id
aho_puc_comments.doc

2010 WEQ Annual Plan Item No. 6.a - PAP03 as Revised by
the WEQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a1.doc
2010 WEQ Annual Plan Item No. 6.b - PAP04 as Revised by
the WEQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a2.doc
2010 WEQ Annual Plan Item No. 6.c - PAP09 Wholesale as
Revised by the WEQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a3.doc
2010 REQ Annual Plan Item No. 9.a - PAP03 as Approved
by the REQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a4.doc
2010 Retail Annual Plan Item No. 9.b - PAP04 as Approved
by the REQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a5.doc

Revised Smart Grid Standards Task Force Response to
Comments on Recommendation 2010 WEQ Annual Plan Item
No. 6.a / 2010 REQ Annual Plan Item No. 9.a; Requirements
Specification for Common Electricity Product and Pricing
Definition – for NIST PAP03:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w1.doc
Revised Smart Grid Standards Task Force Proposed
Modifications to 2010 WEQ Annual Plan Item No. 6.a / 2010
REQ Annual Plan Item No. 9.a; Requirements Specification for
Common Electricity Product and Pricing Definition – for NIST
PAP03:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w2.doc
Revised Smart Grid Standards Task Force Response to
Comments on Recommendation 2010 Retail Annual Plan Item
No. 9.c; Requirements Specifications for Retail Standard DR
Signals – for NIST PAP09:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w3.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 234

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

2010 Retail Annual Plan Item No. 9.c - PAP09 Retail as
Approved by the REQ EC on June 16, 2010:
http://www.naesb.org/pdf4/weq_req_ec061610a6.doc

Revised Smart Grid Standards Task Force Response to
Comments on Recommendation 2010 WEQ Annual Plan Item
No. 6.b / 2010 Retail Annual Plan Item No. 9.b; Requirements
Specifications for Common Scheduling Mechanism for Energy
Transactions – for NIST PAP04:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w4.doc
Revised Smart Grid Standards Task Force Response to
Comments on Recommendation 2010 WEQ Annual Plan Item
No. 6.c; Requirements Specifications for Wholesale Standard
DR Signals – for NIST PAP09:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w5.doc
Smart Grid Standards Task Force Proposed Modifications to
Requirement Specification for Common Scheduling Mechanism
for Energy Transactions - for NIST PAP04:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w6.doc
Smart Grid Standards Task Force Proposed Modifications to
Requirement Specification for Retail Standard DR Signals - for
NIST PAP09:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w7.doc
Smart Grid Standards Task Force Proposed Modifications to
Requirement Specification for Wholesale Standard DR Signals for NIST PAP09:
http://www.naesb.org/pdf4/weq_req_ec060710_061610w8.doc
Late Comments received 6/15/10 from E. Skiba, Midwest ISO
for PAP03:
http://www.naesb.org/pdf4/weq_req_ec061610w1.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 235

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Comments received 6/15/10 from E. Skiba, Midwest ISO
for Wholesale PAP09:
http://www.naesb.org/pdf4/weq_req_ec061610w2.doc
Late Comments received 6/15/10 from E. Skiba, Midwest ISO
for PAP04:
http://www.naesb.org/pdf4/weq_req_ec061610w3.doc
Late Comments received 6/16/10 from A. Marino, PA PUC for
PAP03:
http://www.naesb.org/pdf4/weq_req_ec061610w4.doc

07-07-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec070710fm.doc

Requirements Specifications for Common Electricity Product
and Pricing Definition (NIST PAP03):
Recommendation 2010 WEQ Annual Plan Item No. 6.a
(Redline): http://www.naesb.org/pdf4/weq_ec070710a1.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.a
(Clean): http://www.naesb.org/pdf4/weq_ec070710a2.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_req_030910_pap03_weq_srs.do
c
Comments Submitted by B. Rehman, BPA:
http://www.naesb.org/pdf4/weq_req_030910_pap03_bpa.doc
Comments Submitted by K. York, TVA:
http://www.naesb.org/pdf4/weq_req_030910_pap03_tva.doc
Cover Letter Submitted by S. Gabel, Honeywell:
http://www.naesb.org/pdf4/weq_req_030910_pap03_honeywell_
cover.pdf
Comments Submitted by S. Gabel, Honeywell:
http://www.naesb.org/pdf4/weq_req_030910_pap03_honeywell.
doc
Comments Submitted by the ISO/RTO Council:
http://www.naesb.org/pdf4/weq_req_030910_pap03_irc.doc
Late Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_req_030910_pap03_miso_late.d
oc
Late Comments Submitted by the NAESB Smart Grid Standards
Task Force:
http://www.naesb.org/pdf4/weq_req_030910_pap03_sgstf_late.d
oc

Report of the North American Energy Standards Board, September 18, 2012
Page 236

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Requirements Specifications for Common Scheduling
Mechanism for Energy Transactions (NIST PAP04):
Recommendation 2010 WEQ Annual Plan Item No. 6.b
(Redline): http://www.naesb.org/pdf4/weq_ec070710a3.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.b
(Clean): http://www.naesb.org/pdf4/weq_ec070710a4.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_req_030910_pap04_weq_srs.do
c
Comments Submitted by B. Rehman, BPA:
http://www.naesb.org/pdf4/weq_req_030910_pap04_bpa.doc
Comments Submitted by K. York, TVA:
http://www.naesb.org/pdf4/weq_req_030910_pap04_tva.doc
Cover Letter Submitted by S. Gabel, Honeywell:
http://www.naesb.org/pdf4/weq_req_030910_pap04_honeywell_
cover.pdf
Comments Submitted by S. Gabel, Honeywell:
http://www.naesb.org/pdf4/weq_req_030910_pap04_honeywell.
doc
Comments Submitted by the ISO/RTO Council:
http://www.naesb.org/pdf4/weq_req_030910_pap04_irc.doc
Late Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_req_030910_pap04_miso_late.d
oc
Late Comments Submitted by the NAESB Smart Grid Standards
Task Force:
http://www.naesb.org/pdf4/weq_req_030910_pap04_sgstf_late.d
oc

Requirements Specifications for Wholesale Standard DR
Signals(PAP09):
Recommendation 2010 WEQ Annual Plan Item No. 6.c
(Redline): http://www.naesb.org/pdf4/weq_ec070710a5.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.c
(Clean): http://www.naesb.org/pdf4/weq_ec070710a6.doc

Comments Submitted by B. Rehman, BPA:
http://www.naesb.org/pdf4/weq_030910_pap09_bpa.doc
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_030910_pap09_weq_srs.doc
Comments Submitted by K. York, TVA:
http://www.naesb.org/pdf4/weq_030910_pap09_tva.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 237

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Comments Submitted by the ISO/RTO Council:
http://www.naesb.org/pdf4/weq_030910_pap09_irc.doc
Late Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_030910_pap09_miso_late.doc
Late Comments Submitted by the NAESB Smart Grid Standards
Task Force:
http://www.naesb.org/pdf4/weq_030910_pap09_sgstf_late.doc

10-22-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_req_ec102210fm.d
oc - approved by notational ballot 10-29-10

Standardized Energy Usage Information (NIST PAP10):
Recommendation 2010 WEQ Annual Plan Item No. 6.d
(Redline):
http://www.naesb.org/pdf4/weq_req_ec102210a3.doc
Recommendation 2010 WEQ Annual Plan Item 6.d (Clean):
http://www.naesb.org/pdf4/weq_req_ec102210a4.doc

Comments Submitted by A. Jones, Schneider Electric:
http://www.naesb.org/pdf4/req_weq_090110_schneider_electric.
doc
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_090110_weq_srs_file1.doc
Redlined Recommendation Submitted by the NAESB Standards
Review Subcommittee:
http://www.naesb.org/pdf4/weq_090110_weq_srs_file2.doc
Comments Submitted by A. Fishman, Edison Electric Institute:
http://www.naesb.org/pdf4/req_weq_090110_eei.pdf
Comments Submitted by B. Lion behalf of the signing members
of The IRC Standards Review Committee:
http://www.naesb.org/pdf4/weq_090110_irc_standards_review_c
ommittee_file1.doc
Redlined Recommendation Submitted by B. Lion behalf of the
signing members of The IRC Standards Review Committee:
http://www.naesb.org/pdf4/weq_090110_irc_standards_review_c
ommittee_file2.doc
Comments Submitted by S. Neumann on behalf of the IEC
61968-9 Team:
http://www.naesb.org/pdf4/req_weq_090110_iec_619689team_fi
le1.xls

Report of the North American Energy Standards Board, September 18, 2012
Page 238

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
UML Class Diagram Submitted by S. Neumann on behalf of the
IEC 61968-9 Team:
http://www.naesb.org/pdf4/req_weq_090110_iec_619689team_fi
le2.jpg
Comments Submitted by A. Johnson, NRG:
http://www.naesb.org/pdf4/weq_090110_nrg.pdf
Comments Submitted by J. Reiley, Exelon Corp:
http://www.naesb.org/pdf4/weq_090110_exelon.doc
Cover Letter Submitted by L. Tillman, Southern Companies:
http://www.naesb.org/pdf4/req_weq_090110_southern_cover_let
ter.pdf
Comments Submitted by L. Tillman, Southern Companies:
http://www.naesb.org/pdf4/weq_090110_southern.doc
WEQ PAP10 Late Comments of the Smart Grid Standards
Subcommittee on Priority Action Plan 10:
http://www.naesb.org/pdf4/weq_090110_sgss_late_comments.do
c
Late Comments Submitted by E. Skiba, MISO in response to the
“WEQ PAP10 Late Comments of the Smart Grid Standards
Subcommittee on Priority Action Plan 10”:
http://www.naesb.org/pdf4/weq_090110_miso_late.doc
Additional Late Comments Submitted by E. Skiba, MISO comments are associated to the October 18th WEQ PAP-10
Recommendation:
http://www.naesb.org/pdf4/weq_090110_miso_additional_late.d
oc
Late Comments Submitted by L. Tillman, Southern Companies:
http://www.naesb.org/pdf4/weq_090110_southern_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 239

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

10-26-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102610fm.doc approved by notational ballot on 11-03-10

Interim Solution for Parallel Flow Visualization:
Recommendation 2010 WEQ Annual Plan Item No. 1.a.i
(Redline): http://www.naesb.org/pdf4/weq_ec102610a1.doc
Recommendation 2010 WEQ Annual Plan Item No. 1.a.i
(Clean): http://www.naesb.org/pdf4/weq_ec102610a2.doc

Comments Submitted by the NAESB WEQ BPS:
http://www.naesb.org/pdf4/weq_072910_weq_bps.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_072910_entergy.doc
Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_072910_weq_srs.doc
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_072910_southern.doc
Comments Submitted by T. Mallinger on behalf of the Midwest
ISO, PJM and SPP:
http://www.naesb.org/pdf4/weq_072910_miso_pjm_spp.doc
Late Comments Submitted by B. Green on behalf of EPSA:
http://www.naesb.org/pdf4/weq_072910_epsa_late.doc
Late Comments Submitted by the NAESB WEQ BPS:
http://www.naesb.org/pdf4/weq_072910_weq_bps_late.doc

12-06-10

Notational Ballot Results 12-20-10:
http://www.naesb.org/pdf4/weq_ec120610ballot_re
sults.doc

Motion to adopt Harmonization of Defined Terms
procedures.

12-06-10

Notational Ballot Results 12-20-10:
http://www.naesb.org/pdf4/weq_wgq_ec120610bal
lot_results.doc

Motion to adopt joint WEQ/WGQ minor correction
MC10041 for NAESB WEQ Business Practice Standard
WEQ-014-A Version 002.1 and WGQ Standard No. 11.4.1
Version 2.0 (Implementation Guide for Electronic Tariff
Filing).

Report of the North American Energy Standards Board, September 18, 2012
Page 240

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

02-01-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec020111fm.doc approved by notational ballot 02-18-11

Phase Two Requirements Specification for Common
Electricity Product and Pricing Definition (NIST PAP03):
Recommendation 2010 WEQ Annual Plant Item No. 6.a.ii:
http://www.naesb.org/pdf4/weq_ec020111a3.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_111510_weq_srs.doc
Comments Submitted by R. Sahib, CAISO:
http://www.naesb.org/pdf4/weq_111510_caiso.doc
WEQ Comments Submitted by S. Dinges, Trane-IngersollRand
(Phase 2 - PAP03):
http://www.naesb.org/pdf4/weq_111510_trane_ingersollrand_6a.
xls
REQ and WEQ Comments Submitted by S. Dinges, TraneIngersollRand(Terms):
http://www.naesb.org/pdf4/req_weq_111510_trane_ingersollran
d_terms.xls
WEQ Comments Submitted by California ISO, ERCOT, IESO,
ISO New England, Midwest ISO, New York ISO, PJM and SPP
(Phase 2 - PAP03, PAP04, PAP09 and Data Requirements):
http://www.naesb.org/pdf4/weq_111510_iso_rto.doc
WEQ Comments Submitted by L. Tillman on behalf of Southern
Companies (Phase 2 - PAP03):
http://www.naesb.org/pdf4/weq_111510_southernco_6a.doc
Comments Submitted by W. Cox, Cox Software Architects LLC
(REQ and WEQ Phase 2 - PAP03, PAP04, PAP 09 and Data
Requirements):
http://www.naesb.org/pdf4/req_weq_111510_cox.xls
Late Comments on PAP 03 Submitted by D. Pratt, J. Phillips and
B. Bartell:
http://www.naesb.org/pdf4/weq_111510_pratt_phillips_bartell_3
_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 241

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Master Data Elements List for Business Practice Standards
associated with NIST PAP 03 and PAP 09:
Recommendation 2010 WEQ Annual Plan Item Nos. 6.a-c:
http://www.naesb.org/pdf4/weq_ec020111a2.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_111510_weq_srs.doc
Comments Submitted by R. Sahib, CAISO:
http://www.naesb.org/pdf4/weq_111510_caiso.doc
REQ and WEQ Comments Submitted by S. Dinges, TraneIngersollRand(Terms):
http://www.naesb.org/pdf4/req_weq_111510_trane_ingersollran
d_terms.xls
WEQ Comments Submitted by California ISO, ERCOT, IESO,
ISO New England, Midwest ISO, New York ISO, PJM and SPP
(Phase 2 - PAP03, PAP04, PAP09 and Data Requirements):
http://www.naesb.org/pdf4/weq_111510_iso_rto.doc
WEQ Comments Submitted by L. Tillman on behalf of Southern
Companies (Phase 2 - Data Requirements):
http://www.naesb.org/pdf4/weq_111510_southernco_6.doc
Comments Submitted by W. Cox, Cox Software Architects LLC
(REQ and WEQ Phase 2 - PAP03, PAP04, PAP 09 and Data
Requirements):
http://www.naesb.org/pdf4/req_weq_111510_cox.xls
Late Comments on Data Requirements Submitted by D. Pratt, J.
Phillips and B. Bartell:
http://www.naesb.org/pdf4/weq_111510_pratt_phillips_bartell_d
ata_requirements_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 242

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Phase Two - Requirements Specifications for Common
Schedule Communication Mechanism for Energy
Transactions (NIST PAP04):
Recommendation 2010 WEQ Annual Plan Item No. 6.b.ii:
http://www.naesb.org/pdf4/weq_ec020111a4.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_111510_weq_srs.doc
Comments Submitted by R. Sahib, CAISO:
http://www.naesb.org/pdf4/weq_111510_caiso.doc
WEQ Comments Submitted by S. Dinges, Trane-IngersollRand
(Phase 2 - PAP04):
http://www.naesb.org/pdf4/weq_111510_trane_ingersollrand_6b
.xls
REQ and WEQ Comments Submitted by S. Dinges, TraneIngersollRand(Terms):
http://www.naesb.org/pdf4/req_weq_111510_trane_ingersollran
d_terms.xls
WEQ Comments Submitted by California ISO, ERCOT, IESO,
ISO New England, Midwest ISO, New York ISO, PJM and SPP
(Phase 2 - PAP03, PAP04, PAP09 and Data Requirements):
http://www.naesb.org/pdf4/weq_111510_iso_rto.doc
WEQ Comments Submitted by L. Tillman on behalf of Southern
Companies (Phase 2 - PAP04):
http://www.naesb.org/pdf4/weq_111510_southernco_6b.doc
Comments Submitted by W. Cox, Cox Software Architects LLC
(REQ and WEQ Phase 2 - PAP03, PAP04, PAP 09 and Data
Requirements):
http://www.naesb.org/pdf4/req_weq_111510_cox.xls
Late Comments on PAP 04 Submitted by D. Pratt, J. Phillips and
B. Bartell:
http://www.naesb.org/pdf4/weq_111510_pratt_phillips_bartell_4
_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 243

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Phase Two Requirements Specification for Wholesale
Standard DR Signals (NIST PAP09):
Recommendation 2010 WEQ Annual Plan Item No. 6.c.ii:
http://www.naesb.org/pdf4/weq_ec020111a5.doc

Comments Submitted by the NAESB Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_111510_weq_srs.doc
Comments Submitted by R. Sahib, CAISO:
http://www.naesb.org/pdf4/weq_111510_caiso.doc
REQ and WEQ Comments Submitted by S. Dinges, TraneIngersollRand(Terms):
http://www.naesb.org/pdf4/req_weq_111510_trane_ingersollran
d_terms.xls
WEQ Comments Submitted by California ISO, ERCOT, IESO,
ISO New England, Midwest ISO, New York ISO, PJM and SPP
(Phase 2 - PAP03, PAP04, PAP09 and Data Requirements):
http://www.naesb.org/pdf4/weq_111510_iso_rto.doc
WEQ Comments Submitted by L. Tillman on behalf of Southern
Companies (Phase 2 - PAP09):
http://www.naesb.org/pdf4/weq_111510_southernco_6c.doc
Comments Submitted by W. Cox, Cox Software Architects LLC
(REQ and WEQ Phase 2 - PAP03, PAP04, PAP 09 and Data
Requirements):
http://www.naesb.org/pdf4/req_weq_111510_cox.xls
Late Comments on PAP 09 Submitted by D. Pratt, J. Phillips and
B. Bartell:
http://www.naesb.org/pdf4/weq_111510_pratt_phillips_bartell_9
_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 244

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Phase Two DR and DSM-EE programs:
Recommendation 2010 WEQ Annual Plan Item Nos. 4.a and
4.b: http://www.naesb.org/pdf4/weq_ec020111a1.doc

Comments Submitted by G. Fry, Northeast Utilities:
http://www.naesb.org/pdf4/weq_011411_northeast_utilities.doc
Comments Submitted by B. Sailers, Duke Energy:
http://www.naesb.org/pdf4/weq_120810_duke_energy.doc
Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_120810_weqsrs_4a4b_memo.do
c
Recommendation Redline to Comments Submitted by the WEQ
Standards Review Subcommittee:
http://www.naesb.org/pdf4/weq_120810_weqsrs_4a4b.doc
Comments Submitted by C. Wesley on behalf of the ISO/RTOS ERCOT, IESO, ISO-NE, Midwest ISO, NYISO, PJM, SPP,
CAISO:
http://www.naesb.org/pdf4/weq_120810_iso_rtos_4a4b.doc
Comments Submitted by A. Breidenbaugh, ENERNOC:
http://www.naesb.org/pdf4/weq_120810_enernoc.pdf
Comments Submitted by M. Pieniazek, Energy Curtailment
Specialists, Inc.:
http://www.naesb.org/pdf4/weq_120810_ecs_4a4b.pdf
Late Comments Submitted by Hamilton Consulting on behalf of
Southern California Edison:
http://www.naesb.org/pdf4/weq_120810_sce_4a4b_late.doc
Late Comments Submitted by G. Fry, Northeast Utilities:
http://www.naesb.org/pdf4/weq_011411_northeast_utilities_late.
doc
Late Comments Submitted by the Wholesale Demand Response
Working Group:
http://www.naesb.org/pdf4/weq_011411_dsmee_group3_late.do
c

Report of the North American Energy Standards Board, September 18, 2012
Page 245

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

03-21-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec032111fm.doc approved by notational ballot on 04-08-11

Measurement and Verification of Energy Efficiency
Products:
Recommendation 2010 WEQ Annual Plan Item No. 4.d
(Redline): http://www.naesb.org/pdf4/weq_ec032111a1.doc
Recommendation 2010 WEQ Annual Plan Item No. 4.d
(Clean): http://www.naesb.org/pdf4/weq_ec032111a2.doc

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_120810_weqsrs_4d_memo.doc
Recommendation Redline to Comments Submitted by the WEQ
Standards Review Subcommittee:
http://www.naesb.org/pdf4/weq_120810_weqsrs_4d.doc
Comments Submitted by C. Wesley on behalf of the ISO/RTOS ERCOT, IESO, ISO-NE, Midwest ISO, NYISO, PJM, SPP,
CAISO:
http://www.naesb.org/pdf4/weq_120810_iso_rtos_4d.doc
Recommendation Redlines to Comments Submitted by C.
Wesley on behalf of the ISO/RTOS - ERCOT, IESO, ISO-NE,
Midwest ISO, NYISO, PJM, SPP, CAISO:
http://www.naesb.org/pdf4/weq_120810_iso_rtos_4d_redline.do
c
Late Comments Submitted by Hamilton Consulting on behalf of
Southern California Edison:
http://www.naesb.org/pdf4/weq_120810_sce_4d_late.doc
Late Comments Submitted by G. Fry, Northeast Utilities:
http://www.naesb.org/pdf4/weq_011411_northeast_utilities_late.
doc
Late Comments Submitted by E. Titus, NEEP:
http://www.naesb.org/pdf4/weq_120810_neep_4d_late.doc
Late Comments Submitted by D. Korn, the Cadmus Group:
http://www.naesb.org/pdf4/weq_120810_cadmus_group_4d_late
.doc
Additional Late Comments Submitted by G. Fry, Northeast
Utilities:
http://www.naesb.org/pdf4/weq_120810_northeast_utilities_4d_l
ate_additional.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 246

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Comments Submitted by G. Epstein, ERS:
http://www.naesb.org/pdf4/weq_120810_ers_4d_late.doc
Late Comments Submitted by D. Jacobson, National Grid:
http://www.naesb.org/pdf4/weq_120810_ngrid_4d_late.pdf
Late Comments Submitted by M. Schuldt, SBW Consulting:
http://www.naesb.org/pdf4/weq_120810_sbw_4d_late.pdf
Late Comments Submitted by A. Stevens, DMI:
http://www.naesb.org/pdf4/weq_120810_dmi_4d_late.pdf
Additional Late Comments Submitted by R. Hamilton on behalf
of Southern California Edison:
http://www.naesb.org/pdf4/weq_120810_sce_4d_late_additional.
doc
Late Comments Submitted by the WEQ EE Work Group Redlined Recommendation:
http://www.naesb.org/pdf4/weq_120810_weq_ee_workgroup_4d
_late_rec_redline.doc
Late Comments Submitted by the WEQ EE Work Group - Clean
Recommendation:
http://www.naesb.org/pdf4/weq_120810_weq_ee_workgroup_4d
_late_rec_clean.doc
Late Comments Submitted by K. Cooney, Navigant Consulting:
http://www.naesb.org/pdf4/weq_120810_navigant_4d_late.pdf
Late Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_120810_miso_4d_late.doc
Late Comments Submitted by J. Stoops, KEMA:
http://www.naesb.org/pdf4/weq_120810_kema_4d_late.doc
Late Comments Submitted by S. Kromer, EVO:
http://www.naesb.org/pdf4/weq_120810_evo_4d_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 247

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

03-25-11

WEQ EC Notational Ballot Results 04-08-11:
http://www.naesb.org/pdf4/weq_ec032511ballot_re
sults.doc

Motion to adopt minor corrections:
MC11009 - minor correction to Business Practice Standard
WEQ-000 – diagram for Meter Before/Meter After Definition
MC11011 - minor correction to Business Practice Standard
WEQ-006 (Manual Time Error Correction) to suspend the
NAESB Business Practice Standards for Business Practice
Standards WEQ-006-12 based on the motion approved by the
NERC Operating Committee at their March 9, 2011 meeting.

05-06-11

WEQ EC Notational Ballot Results 05-20-11:
http://www.naesb.org/pdf4/weq_ec052011ballot_re
sults.doc

Motion to adopt minor corrections:
MC11015 - minor correction to NAESB WEQ Electronic
Tagging – Functional Specifications, Version 1.8.1 - Correct
links to e-Tag 1.8.1 XML Schema and WECC web site in
NAESB WEQ Electronic Tagging – Functional
Specifications, Version 1.8.1
MC11016 - joint WEQ/WGQ minor correction to the
NAESB WEQ/WGQ Implementation Guide for Electronic
Tariff Filing to correspond to modifications made by FERC
to its Implementation Guide for Electronic Filing of Parts 25,
154, 284, 300, and 241 Tariff Filings as noted in the FERC
eTariff RSS Feed(s), dated April 18, 2011.

06-30-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec063011fm.doc approved by notational ballot 07-08-11

Service Across Multiple Transmission Systems (SAMTS):
Recommendation 2011 WEQ Annual Plan Item Nos. 2.a.iii.1
through 2.a.iii.3:
http://www.naesb.org/pdf4/weq_ec063011a1.doc

Link to Comments Submitted During Formal Comment Period

Comments Submitted by A. Pritchard, Duke Energy:
http://www.naesb.org/pdf4/weq_051111_duke_energy.docx
Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_051111_weq_srs.doc
Comments Submitted by J. Manning, North Carolina Electric
Membership Corp.:
http://www.naesb.org/pdf4/weq_051111_ncemc.doc
Comments Submitted by E. Cardone, NYISO:
http://www.naesb.org/pdf4/weq_051111_nyiso.doc
Comments Submitted by R. True, ACES Power Marketing:
http://www.naesb.org/pdf4/weq_051111_aces.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 248

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Summary of Comments Submitted by R. True, ACES Power
Marketing:
http://www.naesb.org/pdf4/weq_051111_aces_summary.doc
Comments Submitted by E. Skiba on behalf of ERCOT, IESO,
MISO, NYISO, PJM, and SPP:
http://www.naesb.org/pdf4/weq_051111_iso_rtos.doc
Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_051111_midwest_iso.doc
Comments Submitted by R. Pysh, the United Illuminating
Company: http://www.naesb.org/pdf4/weq_051111_ui.doc
Comments Submitted by P. Lee, Bonneville Power
Administration:
http://www.naesb.org/pdf4/weq_051111_bpa.doc
Comments Submitted by Y. Etheredge, Entergy:
http://www.naesb.org/pdf4/weq_051111_entergy.docx
Late Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_051111_soco_late.doc
Late Comments Submitted by the WEQ OASIS:
http://www.naesb.org/pdf4/weq_051111_weq_oasis_late.doc
Late Formal Comments Submitted by the WEQ OASIS on
06/24/2011:
http://www.naesb.org/pdf4/weq_051111_weq_oasis_2_late.doc
Late Formal Comments (to the Late Formal Comments
Submitted by the OASIS Subcommittee) Submitted by E. Skiba,
Midwest ISO:
http://www.naesb.org/pdf4/weq_051111_midwest_iso_late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 249

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

08-16-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec081611fm.doc

10-25-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102511fm.docx

01-20-12

WEQ EC Notational Ballot Results 02-02-12:
http://www.naesb.org/pdf4/weq_wgq_ec012012bal
lot_results.doc

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Make consistency changes to Version 2.2 (published as
Version 003):
Recommendation 2011 WEQ Annual Plan Item No. 5.a /
R08001 / R08002 / R08003 / R08005 (Redline):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
102611_weq_2011_api_5a_r08001_r08002_r08003_r08005_
rec_redline.doc
Recommendation 2011 WEQ Annual Plan Item No. 5.a /
R08001 / R08002 / R08003 / R08005 (Clean):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
102611_weq_2011_api_5a_r08001_r08002_r08003_r08005_
rec_clean.doc

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_080911_weq_srs.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_080911_entergy.docx
Comments Submitted by the IESO, New England ISO, Midwest
ISO, PJM and SPP:
http://www.naesb.org/pdf4/weq_080911_ieso_isone_miso_pjm_
spp.docx
Late Comments Submitted by the WEQ OASIS Subcommittee:
http://www.naesb.org/pdf4/weq_080911_weq_oasis_late.doc

Review of Business Practice Standards WEQ-001-14.1.3 and
WEQ-001-15.1.2 based on FERC Order No. 676-E:
Recommendation 2011 WEQ Annual Plan Item No. 7.a
(Redline):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
102611_weq_2011_api_7a_rec_redline.doc
Recommendation 2011 WEQ Annual Plan Item No. 7.a
(Clean):
http://www.naesb.org/member_login_check.asp?doc=weq_rat
102611_weq_2011_api_7a_rec_clean.doc

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_080911_7a_weq_srs.doc
Comments Submitted by the IESO, New England ISO, Midwest
ISO, PJM and SPP:
http://www.naesb.org/pdf4/weq_080911_7a_ieso_isone_miso_pj
m_spp.docx
Late Comments Submitted by the WEQ OASIS Subcommittee:
http://www.naesb.org/pdf4/weq_080911_7a_weq_oasis_late.doc

Motion to adopt minor correction:
MC11032 - joint WEQ/WGQ minor correction to the
NAESB WEQ/WGQ Implementation Guide for Electronic
Tariff Filing to correspond to modifications made by FERC
to its Implementation Guide for Electronic Filing of Parts 25,
154, 284, 300, and 341 Tariff Filings as noted by FERC, on
December 22, 2011.

Report of the North American Energy Standards Board, September 18, 2012
Page 250

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

01-31-12

WEQ EC Notational Ballot Results 02-03-12:
http://www.naesb.org/pdf4/weq_ec013112ballot_re
sults.doc

Question for the WEQ EC -- Shortened Comment Period to
two weeks for recommendations:
2012 WEQ Annual Plan Item No. 5.a – Add AFC and TFC
Values to the “System_Attribute” Data Element,
http://naesb.org/pdf4/weq_2012_api_5a_rec.docx
2012 WEQ Annual Plan Item No. 5.e – Supporting Crediting
Redirect Requests with the Capacity of the Parent
Reservation:
http://naesb.org/pdf4/weq_2012_api_5e_rec.docx

02-21-12

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec022112dm.docx

Clarify if WEQ-001-9.1 can support a modification of only
the source or sink for a long-term firm reservation:
Recommendation C11004 (Redline):
http://www.naesb.org/member_login_check.asp?doc=pd_weq
_ec022112a2.docx
Recommendation C11004 (Clean):
http://www.naesb.org/member_login_check.asp?doc=pd_weq
_ec022112a3.docx

Comments Submitted by R. Bean, Arizona Public Service
Company:
http://www.naesb.org/pdf4/weq_121211_c11004_aps.doc
Comments Submitted by A. Pritchard, Duke Energy:
http://www.naesb.org/pdf4/weq_121211_c11004_duke.docx
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_121211_c11004_southern.doc
Comments Submitted by P. Merville, Public Service Company of
New Mexico:
http://www.naesb.org/pdf4/weq_121211_c11004_pucnm.doc

Revised Bulk Electric System Definition:
Recommendation 2012 WEQ Annual Plan Item No. 1.d
(Redline):
http://www.naesb.org/member_login_check.asp?doc=pd_weq
_ec022112a4.doc
Recommendation 2012 WEQ Annual Plan Item No. 1.d
(Clean):
http://www.naesb.org/member_login_check.asp?doc=pd_weq
_ec022112a5.doc

ISOs/RTOs Comments Submitted by M. Goldberg, ISO New
England: http://www.naesb.org/pdf4/weq_011812_iso_rto.docx
Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_011812_weq_srs.doc
Comments Submitted by R. Kelley, BPA:
http://www.naesb.org/pdf4/weq_011812_bpa.doc
Comments Submitted by E. Davis, Entergy:
http://www.naesb.org/pdf4/weq_011812_entergy.doc
Comments Submitted by A. Johnson, NRG Power Marketing:
http://www.naesb.org/pdf4/weq_011812_nrg.docx

Report of the North American Energy Standards Board, September 18, 2012
Page 251

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

04-30-12
thru
05-01-12

Link to Minutes and Executive Committee Voting
Records

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec043012dm.docx

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period

Support Crediting Redirect Requests with the Capacity of the
Parent Reservation:
Recommendation 2012 WEQ Annual Plan Item No. 5.e:
http://www.naesb.org/member_login_check.asp?doc=pd_weq
_ec022112a6.docx

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_020612_weq_srs_5e.doc
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_020612_southern_5e.doc

Network Service on OASIS (NITS):
Recommendation 2011 WEQ Annual Plan Item Nos. 2.a.i.18, 2.b and 3.a.i:
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a1.doc
Attachment 1 (WEQ-000):
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a2.doc
Attachment 2 (WEQ-001):
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a3.doc
Attachment 3 (WEQ-002):
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a4.doc
Attachment 4 (WEQ-003):
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a5.doc
Attachment 5 (WEQ-013):
http://www.naesb.org/member_login_check.asp?doc=weq_ec
043012a6.doc

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_121311_weq_srs.doc
Comments Submitted by J. Manning, NCEMC:
http://www.naesb.org/pdf4/weq_121311_ncemc.docx
Comments Submitted by E. Davis, Entergy on Attachment 1:
http://www.naesb.org/pdf4/weq_121311_entergy_attach1.doc
Comments Submitted by E. Davis, Entergy on Attachment 2:
http://www.naesb.org/pdf4/weq_121311_entergy_attach2.doc
Comments Submitted by E. Davis, Entergy on Attachment 3:
http://www.naesb.org/pdf4/weq_121311_entergy_attach3.doc
Comments Submitted by E. Davis, Entergy on Attachment 4:
http://www.naesb.org/pdf4/weq_121311_entergy_attach4.doc
Comments Submitted by E. Davis, Entergy on Attachment 5:
http://www.naesb.org/pdf4/weq_121311_entergy_attach5.doc
Comments Submitted by JT Wood, Southern Company:
http://www.naesb.org/pdf4/weq_121311_soco.doc
Comments Submitted by JT Wood, Southern Company on
Attachment 1:
http://www.naesb.org/pdf4/weq_121311_soco_attach1.doc
Comments Submitted by JT Wood, Southern Company on
Attachment 2:
http://www.naesb.org/pdf4/weq_121311_soco_attach2.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 252

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Comments Submitted by JT Wood, Southern Company on
Attachment 3:
http://www.naesb.org/pdf4/weq_121311_soco_attach3.doc
Comments Submitted by JT Wood, Southern Company on
Attachment 4:
http://www.naesb.org/pdf4/weq_121311_soco_attach4.doc
Comments Submitted by JT Wood, Southern Company on
Attachment 5:
http://www.naesb.org/pdf4/weq_121311_soco_attach5.doc
Comments Submitted by E. Cardone, NYISO:
http://www.naesb.org/pdf4/weq_121311_nyiso.docx
Comments Submitted by J. Cummings, PPL Energy Plus:
http://www.naesb.org/pdf4/weq_121311_pplenergyplus.doc
Comments Submitted by P. Lee, BPA on Attachment 1:
http://www.naesb.org/pdf4/weq_121311_bpa_attach1.doc
Comments Submitted by P. Lee, BPA on Attachment 2:
http://www.naesb.org/pdf4/weq_121311_bpa_attach2.doc
Comments Submitted by P. Lee, BPA on Attachment 3:
http://www.naesb.org/pdf4/weq_121311_bpa_attach3.doc
Comments Submitted by P. Lee, BPA on Attachment 4:
http://www.naesb.org/pdf4/weq_121311_bpa_attach4.doc
Comments Submitted by P. Lee, BPA on Attachment 5:
http://www.naesb.org/pdf4/weq_121311_bpa_attach5.doc
Comments Submitted by E. Skiba, Midwest ISO:
http://www.naesb.org/pdf4/weq_121311_miso.doc
Comments Submitted by E. Skiba, Midwest ISO on Attachment
1: http://www.naesb.org/pdf4/weq_121311_miso_attach1.doc
Comments Submitted by E. Skiba, Midwest ISO on Attachment
2: http://www.naesb.org/pdf4/weq_121311_miso_attach2.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 253

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Comments Submitted by E. Skiba, Midwest ISO on Attachment
3: http://www.naesb.org/pdf4/weq_121311_miso_attach3.doc
Comments Submitted by E. Skiba, Midwest ISO on Attachment
5: http://www.naesb.org/pdf4/weq_121311_miso_attach5.doc
Comments Submitted by J. Womack, SPP on Attachment 2:
http://www.naesb.org/pdf4/weq_121311_spp_attach2.doc
Comments Submitted by J. Womack, SPP on Attachment 3:
http://www.naesb.org/pdf4/weq_121311_spp_attach3.doc
Comments Submitted by J. Womack, SPP on Attachment 4:
http://www.naesb.org/pdf4/weq_121311_spp_attach4.doc
Comments Submitted by J. Womack, SPP on Attachment 5:
http://www.naesb.org/pdf4/weq_121311_spp_attach5.doc
Late Comments Submitted by WEQ OASIS:
http://www.naesb.org/pdf4/weq_121311_oasis_late.doc
Late Comments Submitted by WEQ OASIS on Attachment 1:
http://www.naesb.org/pdf4/weq_121311_oasis_attach1_late.doc
Late Comments Submitted by WEQ OASIS on Attachment 2:
http://www.naesb.org/pdf4/weq_121311_oasis_attach2_late.doc
Late Comments Submitted by WEQ OASIS on Attachment 3:
http://www.naesb.org/pdf4/weq_121311_oasis_attach3_late.doc
Late Comments Submitted by WEQ OASIS on Attachment 4:
http://www.naesb.org/pdf4/weq_121311_oasis_attach4_late.doc
Late Comments Submitted by WEQ OASIS on Attachment 5:
http://www.naesb.org/pdf4/weq_121311_oasis_attach5_late.doc
Late Comments Submitted by WEQ OASIS on BPA Attachment
1 Comments:
http://www.naesb.org/pdf4/weq_121311_bpa_attach1_oasis_late
.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 254

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Comments Submitted by WEQ OASIS on BPA Attachment
2 Comments:
http://www.naesb.org/pdf4/weq_121311_bpa_attach2_oasis_late
.doc
Late Comments Submitted by WEQ OASIS on BPA Attachment
3 Comments:
http://www.naesb.org/pdf4/weq_121311_bpa_attach3_oasis_late
.doc
Late Comments Submitted by WEQ OASIS on BPA Attachment
4 Comments:
http://www.naesb.org/pdf4/weq_121311_bpa_attach4_oasis_late
.doc
Late Comments Submitted by WEQ OASIS on BPA Attachment
5 Comments:
http://www.naesb.org/pdf4/weq_121311_bpa_attach5_oasis_late
.doc
Late Comments Submitted by WEQ OASIS on Entergy
Attachment 1 Comments:
http://www.naesb.org/pdf4/weq_121311_entergy_attach1_oasis_
late.doc
Late Comments Submitted by WEQ OASIS on Entergy
Attachment 2 Comments:
http://www.naesb.org/pdf4/weq_121311_entergy_attach2_oasis_
late.doc
Late Comments Submitted by WEQ OASIS on Entergy
Attachment 3 Comments:
http://www.naesb.org/pdf4/weq_121311_entergy_attach3_oasis_
late.doc
Late Comments Submitted by WEQ OASIS on Entergy
Attachment 4 Comments:
http://www.naesb.org/pdf4/weq_121311_entergy_attach4_oasis_
late.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 255

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Comments Submitted by WEQ OASIS on Entergy
Attachment 5 Comments:
http://www.naesb.org/pdf4/weq_121311_entergy_attach5_oasis_
late.doc
Late Comments Submitted by WEQ OASIS on Midwest ISO
Comments:
http://www.naesb.org/pdf4/weq_121311_miso_oasis_late.doc
Late Comments Submitted by WEQ OASIS on Midwest ISO
Attachment 1 Comments:
http://www.naesb.org/pdf4/weq_121311_miso_attach1_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Midwest ISO
Attachment 2 Comments:
http://www.naesb.org/pdf4/weq_121311_miso_attach2_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Midwest ISO
Attachment 3 Comments:
http://www.naesb.org/pdf4/weq_121311_miso_attach3_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Midwest ISO
Attachment 5 Comments:
http://www.naesb.org/pdf4/weq_121311_miso_attach5_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on NCEMC
Comments:
http://www.naesb.org/pdf4/weq_121311_ncemc_oasis_late.docx
Late Comments Submitted by WEQ OASIS on NYISO
Comments:
http://www.naesb.org/pdf4/weq_121311_nyiso_oasis_late.docx
Late Comments Submitted by WEQ OASIS on PPL Energy Plus
Comments:
http://www.naesb.org/pdf4/weq_121311_pplenergyplus_oasis_la
te.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Comments:

Report of the North American Energy Standards Board, September 18, 2012
Page 256

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
http://www.naesb.org/pdf4/weq_121311_soco_oasis_late.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Attachment 1 Comments:
http://www.naesb.org/pdf4/weq_121311_soco_attach1_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Attachment 2 Comments:
http://www.naesb.org/pdf4/weq_121311_soco_attach2_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Attachment 3 Comments:
http://www.naesb.org/pdf4/weq_121311_soco_attach3_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Attachment 4 Comments:
http://www.naesb.org/pdf4/weq_121311_soco_attach4_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on Southern
Company Attachment 5 Comments:
http://www.naesb.org/pdf4/weq_121311_soco_attach5_oasis_lat
e.doc
Late Comments Submitted by WEQ OASIS on SPP Attachment
2 Comments:
http://www.naesb.org/pdf4/weq_121311_spp_attach2_oasis_late.
doc
Late Comments Submitted by WEQ OASIS on SPP Attachment
3 Comments:
http://www.naesb.org/pdf4/weq_121311_spp_attach3_oasis_late.
doc

Report of the North American Energy Standards Board, September 18, 2012
Page 257

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix A: Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
September 18, 2012
Appendix A – Links to Executive Committee Meeting Minutes, Comments and Voting Record Links
Date of
Meeting

Link to Minutes and Executive Committee Voting
Records

Recommendations that Resulted in Version 003 Business
Practice Standards or Standard modifications

Link to Comments Submitted During Formal Comment Period
Late Comments Submitted by WEQ OASIS on SPP Attachment
4 Comments:
http://www.naesb.org/pdf4/weq_121311_spp_attach4_oasis_late.
doc
Late Comments Submitted by WEQ OASIS on SPP Attachment
5 Comments:
http://www.naesb.org/pdf4/weq_121311_spp_attach5_oasis_late.
doc
Late Comments Submitted by WEQ OASIS on WEQ SRS
Comments:
http://www.naesb.org/pdf4/weq_121311_weq_srs_oasis_late.doc

Business Practice Standards WEQ-013-2.6.8.1 and WEQ013-2.6.8.2 FULL and PART TRANSER:
Recommendation R11022:
http://www.naesb.org/member_login_check.asp?doc=r11022
_rec_050112.docx

Comments Submitted by the WEQ Standards Review
Subcommittee:
http://www.naesb.org/pdf4/weq_022112_weq_srs.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 258

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications

Link to Ballot

Link to Ratification Results

02-12-09

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat021209ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq031609tally.xls
Comments Submitted by A. Breidenbaugh,
EnerNOC, Inc.:
http://www.naesb.org/pdf4/weq_rat031609_e
nernoc.doc

Recommendation 2008 WEQ Annual Plan Item No. 5.a:
http://www.naesb.org/member_login_check.asp?doc=weq_rat021209_weq_2008_api5a_r
ec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat021209_weq_2008_api5a_r
ec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2008_api5a.doc

05-15-09

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat051509ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq061509tally.xls

Recommendation 2009 WEQ Annual Plan Item No. 3.d:
http://www.naesb.org/member_login_check.asp?doc=weq_rat051509_weq_2009_api3d_r
ec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat051509_weq_2009_api3d_r
ec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api_3d.doc

06-26-09

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat062609ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq072709tally.xls
Comments Submitted by E. Skiba, Midwest
ISO:
http://www.naesb.org/pdf4/weq_rat072709_
miso.pdf

Recommendation 2009 WEQ Annual Plan Item No. 2.a.ii.3:
http://www.naesb.org/member_login_check.asp?doc=weq_rat062609_weq_2009_ap_2aii
3_rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat062609_weq_2009_ap_2aii
3_rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_ap_2aii3.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 259

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications

Link to Ballot

Link to Ratification Results

11-12-09

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat111209ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq121409tally.xls

Recommendation 2009 WEQ Annual Plan Item Nos. 1.a, 3.a.vii / R05020:
http://www.naesb.org/member_login_check.asp?doc=weq_rat111209_2009_weq_api_1a_
3avii_r05020_rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat111209_2009_weq_api_1a_
3avii_r05020_rec_clean.doc (Clean)
Attachment:
http://www.naesb.org/member_login_check.asp?doc=weq_rat111209_2009_weq_api_1a_
3avii_r05020_attach_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat111209_2009_weq_api_1a_
3avii_r05020_attach_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api_1a_3avii_r05020
.doc
Attachment:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api_1a_3avii_r05020
_attach.doc

12-09-09

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat120909ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq010810tally.xls
Late Ballot submitted by ERCOT on
01/12/2010 (Not included in tally):
http://www.naesb.org/member_login_check.
asp?doc=weq_rat010810_lateballot_ercot.pd
f

Revisions to the WEQ Procedures:
http://www.naesb.org/member_login_check.asp?doc=weq_rat120909ballot.doc

02-22-10

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat022210ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq032410tally.xls

Recommendation 2009 WEQ Annual Plan Item No. 5.b:
http://www.naesb.org/member_login_check.asp?doc=weq_rat022210_2009_weq_ap5b_re
c_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat022210_2009_weq_ap5b_re
c_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api5b.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 260

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
06-15-10

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat061510ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq071510tally.xls

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2009 WEQ Annual Plan Item Nos. 5.a.2 / R08004 and 5.i / R09011:
http://www.naesb.org/member_login_check.asp?doc=weq_rat061510_weq_2009_api_5a2
_5i_r08004_r09011_rec.doc
Attachment:
http://www.naesb.org/member_login_check.asp?doc=weq_rat061510_weq_2009_api_5a2
_5i_r08004_r09011_rec_attach1_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat061510_weq_2009_api_5a2
_5i_r08004_r09011_rec_attach1_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api_5a2_5i_r08004_r
09011.doc
Attachment:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2009_api_5a2_5i_r08004_r
09011_attach1.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 261

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
07-21-10

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat072110ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq082010tally.xls
Comments Submitted by E. Skiba, Midwest
ISO:
http://www.naesb.org/pdf4/weq_rat082010_
miso.pdf

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2010 WEQ Annual Plan Item No. 6.a:
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6a_
rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6a_
rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6a.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.b:
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6b_
rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6b_
rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6b.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.c:
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6c_
rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat072110_weq_2010_api_6c_
rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6c.doc

10-29-10

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat102910ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq112910tally.xls
Comments Submitted by E. Skiba, Midwest
ISO:
http://www.naesb.org/pdf4/weq_rat112910_
miso.pdf

Recommendation 2010 WEQ Annual Plan Item No. 6.d:
http://www.naesb.org/member_login_check.asp?doc=weq_rat102910_weq_2010_ap_6d_
rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_ap_6d.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 262

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
11-04-10

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat110410ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq120610tally.xls

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2010 WEQ Annual Plan Item No. 1.a.i:
http://www.naesb.org/member_login_check.asp?doc=weq_rat110410_weq_2010_api_1ai
_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_1ai.doc
Final Action with minor correction MC12025 applied effective July 31, 2012:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_1ai_mc12025_07
3112.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 263

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
02-18-11

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat021811ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq032111tally.xls
Comments Submitted by E. Skiba, Midwest
ISO on WEQ 2010 Annual Plan Items 4(a)
and 4(b):
http://www.naesb.org/pdf4/weq_rat032111_
miso.pdf

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2010 WEQ Annual Plan Item No. 6.a.ii (Phase Two):
http://www.naesb.org/member_login_check.asp?doc=weq_rat021811_2010_weq_api_6_a
_ii_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_6_a_ii.doc

Recommendation 2010 WEQ Annual Plan Item No. 6.a-c:
http://www.naesb.org/member_login_check.asp?doc=weq_rat021811_2010_weq_api_6_a
-c_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_6_a-c.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.b.ii (Phase Two):
http://www.naesb.org/member_login_check.asp?doc=weq_rat021811_2010_weq_api_6_b
_ii_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_6_b_ii.doc
Recommendation 2010 WEQ Annual Plan Item No. 6.c.ii (Phase Two):
http://www.naesb.org/member_login_check.asp?doc=weq_rat021811_2010_weq_api_6_c
_ii_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_6_c_ii.doc
Recommendation 2010 WEQ Annual Plan Item Nos. 4.a and 4.b:
http://www.naesb.org/member_login_check.asp?doc=weq_rat021811_2010_weq_api_4a_
4b_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4a_4b.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 264

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications

Link to Ballot

Link to Ratification Results

04-13-11

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat041311ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq051311tally.xls

Recommendation 2010 WEQ Annual Plan Item No. 4.d:
http://www.naesb.org/member_login_check.asp?doc=weq_rat041311_2010_weq_api_4d_
rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4d.doc
Final Action with minor correction MC12020 applied effective July 16, 2012:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4d_mc12020_06
1612.doc

07-11-11

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat071111ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq081111tally.xls

Recommendation 2011 WEQ Annual Plan Item Nos. 2.a.iii.1 through 2.a.iii.3:
http://www.naesb.org/member_login_check.asp?doc=weq_rat071111_weq_2011_ap_2aiii
1_to_2aiii3_rec.doc
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2011_ap_2aiii1_to_2aiii3.d
oc

Report of the North American Energy Standards Board, September 18, 2012
Page 265

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
10-26-11

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat102611ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq112811tally.xls

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2011 WEQ Annual Plan Item No. 5.a / R08001 / R08002 / R08003 /
R08005:
http://www.naesb.org/member_login_check.asp?doc=weq_rat102611_weq_2011_api_5a_
r08001_r08002_r08003_r08005_rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat102611_weq_2011_api_5a_
r08001_r08002_r08003_r08005_rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2011_api_5a_r08001_r080
02_r08003_r08005.doc
Final Action with minor correction MC12003 applied effective March 30, 2012:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2011_api_5a_r08001_r080
02_r08003_r08005_mc033012.doc
Recommendation 2011 WEQ Annual Plan Item No. 7.a:
http://www.naesb.org/member_login_check.asp?doc=weq_rat102611_weq_2011_api_7a_
rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat102611_weq_2011_api_7a_
rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2011_api_7a.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 266

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
02-24-12

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat022412ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq032612tally.xls

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation C11004:
http://www.naesb.org/member_login_check.asp?doc=weq_rat022412_c11004_rec_redlin
e.docx (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat022412_c11004_rec_clean.
docx (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_c11004.docx
Recommendation 2012 WEQ Annual Plan Item No. 1.d:
http://www.naesb.org/member_login_check.asp?doc=weq_rat022412_2012_weq_api_1d_
rec_redline.doc (Redline)
http://www.naesb.org/member_login_check.asp?doc=weq_rat022412_2012_weq_api_1d_
rec_clean.doc (Clean)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2012_weq_api_1d.doc
Recommendation 2012 WEQ Annual Plan Item No. 5.e:
http://www.naesb.org/member_login_check.asp?doc=weq_rat022412_2012_weq_api_5e_
rec.docx
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2012_weq_api_5e.docx

Report of the North American Energy Standards Board, September 18, 2012
Page 267

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix B: Links to Ratification Ballots and Ratification Results
September 18, 2012
Appendix B – Links to Ratification Ballots and Ratification Results
Date of
Ballot
05-10-12

Link to Ballot

Link to Ratification Results

http://www.naesb.org/member_login_chec
k.asp?doc=weq_rat051012ballot.doc

http://www.naesb.org/member_login_check.
asp?doc=rat_weq061112tally.xls

Recommendations Ratified that Resulted in V003 Business Practice Standards or Business
Practice Standard modifications
Recommendation 2011 WEQ Annual Plan Item Nos. 2.a.i.1-8, 2.b, and 3.a.i:
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec.doc
Attachments:
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec_attach1.doc (WEQ-000)
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec_attach2.doc (WEQ-001)
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec_attach3.doc (WEQ-002)
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec_attach4.doc (WEQ-003)
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_2011_weq_api_2ai
1-8_2b_3ai_rec_attach5.doc (WEQ-013)
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai.doc
Attachments:
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai_attach_weq000.doc (WEQ-000)
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai_attach_weq001.doc (WEQ-001)
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai_attach_weq002.doc (WEQ-002)
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai_attach_weq003.doc (WEQ-003)
http://www.naesb.org/member_login_check.asp?doc=fa_2011_weq_api_2ai18_2b_3ai_attach_weq013.doc (WEQ-013)
Recommendation R11022:
http://www.naesb.org/member_login_check.asp?doc=weq_rat051012_r11022_rec.docx
Final Action:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_r11022.docx

Report of the North American Energy Standards Board, September 18, 2012
Page 268

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix C: List of Available Transcripts
September 18, 2012
Appendix C –List of Available Transcripts
Date of
Meeting

Meeting and Minutes

Transcription Service

How to obtain transcripts1

01-27-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec012709fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

02-03-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec020309fm.doc

Preferred Legal

Call Preferred Legal 800-405-4056

05-12-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec051209fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

06-08-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec060809fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

08-18-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec081809fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

10-27-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec102709fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

12-03-09

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec120309fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

02-02-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec020210fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

1

The Federal Energy Regulatory Commission and other regulatory agencies may contact the NAESB office to obtain electronic copies of the transcripts. All others can contact the transcription service and order the
transcripts for a nominal fee.

Report of the North American Energy Standards Board, September 18, 2012
Page 269

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix C: List of Available Transcripts
September 18, 2012
Appendix C –List of Available Transcripts
Date of
Meeting

Meeting and Minutes

Transcription Service

How to obtain transcripts1

05-04-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec050410fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

06-04-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_wgq_ec060410fm.doc

U.S. Legal

Call U.S. Legal 713-653-7100

06-16-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_req_ec061610fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

07-07-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec070710fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

08-17-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec081710fm.doc

Agren Blando Court Reporting

Agren Blando Court Reporting
216 16th Street, Suite 6500
Denver, CO 80202

10-22-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_req_ec102210fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

10-26-10

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec102610fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

02-01-11

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec020111fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

Report of the North American Energy Standards Board, September 18, 2012
Page 270

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix C: List of Available Transcripts
September 18, 2012
Appendix C –List of Available Transcripts
Date of
Meeting

Meeting and Minutes

Transcription Service

How to obtain transcripts1

03-21-11

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec032111fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

05-04-511

WEQ EC Meeting
http://www.naesb.org/pdf4/retail_ec050411fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

06-30-11

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec063011fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

08-16-11

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec081611fm.doc

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

10-25-11

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec102511fm.docx

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

02-21-12

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec022112dm.docx

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

04-30 to
05-01-12

WEQ EC Meeting
http://www.naesb.org/pdf4/weq_ec043012dm.docx

Jill Webb

Jill Webb, CSR
1803 Rustic Oak Ln
Seabrook, Texas 77586
281-853-6807

Report of the North American Energy Standards Board, September 18, 2012
Page 271

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
September 18, 2012
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
Date
Issuance
11-24-09

FERC Order and related NAESB Status Reports

Recommendations that include the Business Practice Standards incorporated by reference

Docket No. RM05-5-013, FERC Order No. 676-5: FERC action of
NAESB WEQ Business Practice Standards, Version 002.1:
http://www.naesb.org/pdf4/ferc112409_order_676E.doc
Related NAESB Minor Corrections Filed with the Commission:

Errata to Version 002.1 NAESB Wholesale Electric Quadrant (WEQ) Business Practice Standards WEQ001 Open Access Same-Time Information Systems (OASIS) as approved by the NAESB WEQ Executive
Committee on October 27, 2009: http://www.naesb.org/pdf4/weq_mc111209_attach1_revised.doc (revised
to include comments to background information)



12-16-09 – Standards for Business Practices of Public Utilities
(Docket No. RM05-5 et al):
http://www.naesb.org/pdf4/ferc121609_weq_version2.1_errata.pdf



06-20-11 – Standards for Business Practices of Public Utilities
(Docket Nos. RM01-5-000 and RM05-5-000):
http://www.naesb.org/pdf4/ferc_062011_weq_minor_corrections_v00
2.1.pdf

MC10019 – errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-014-A –
Implementation Guide for Electronic Tariff Filing to correspond to modifications made by FERC to its
Implementation Guide for Electronic Filing of Parts 35, 154, 284, 300, and 341 Tariff Filings a approved by
the WEQ Executive Committee on August 19, 2010:
http://www.naesb.org/pdf4/wgq_weq_mc10019_revised.doc
MC10032 – errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-007 (Inadvertent
Interchange Payback) add defined terms ‘On-Peak’ and ‘Off-Peak’ as approved by the WEQ Executive
Committee on October 26, 2010: http://www.naesb.org/pdf4/weq_mc10032_102610.doc
MC10033 – errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-003 OASIS Data
Dictionary (Version 1.5) correction definition of ANNULLED to read: ANNULLED – assigned by the
Seller when, by mutual agreement with the Customer, a reservation or pre-confirmed request is to be
voided, or assigned unilaterally by the Primary Provider when a resale reservation is to be voided. (Final
state) as approved by the WEQ Executive Committee on October 26, 2010:
http://www.naesb.org/pdf4/weq_mc10033_102610.doc
MC10041 - errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-014-A –
Implementation Guide for Electronic Tariff Filing to correspond to modifications made by FERC to its
Implementation Guide for Electronic Filing of Parts 35, 154, 284, 300, and 341 Tariff Filings as noted in
the FERC eTariff RSS Feed(s), dated October 8, 2010 and approved by the WEQ Executive Committee via
notational ballot on December 20, 2010: http://www.naesb.org/pdf4/weq_wgq_mc10041_122010.doc
MC11011 – errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-006 (Manual Time
Error Correction), suspend the NAESB WEQ Business Practice Standards for WEQ-006-1 through WEQ006-12 by adding the following language before the ‘Introduction’ section of the standards: ‘The following
standards are suspended from the start the NERC Time Error Correction Field Trial until either a) the test is
halted, or b) modifications to the appropriate standards are made, up to and including the retirement of the
corresponding Standards’ as approved by the WEQ Executive Committee via notational ballot on April 8,
2011: http://www.naesb.org/pdf4/weq_mc11011_rec_040811.doc
MC11016 - errata to Version 002.1 NAESB WEQ Business Practice Standards WEQ-014-A –
Implementation Guide for Electronic Tariff Filing to correspond to modifications made by FERC to its
Report of the North American Energy Standards Board, September 18, 2012
Page 272

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
September 18, 2012
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
Date
Issuance

FERC Order and related NAESB Status Reports

Recommendations that include the Business Practice Standards incorporated by reference
Implementation Guide for Electronic Filing of Parts 35, 154, 284, 300, and 341 Tariff Filings as noted in
the FERC eTariff RSS Feed(s), dated April 18, 2011 a approved by the WEQ Executive Committee via
notational ballot on May 20, 2011: http://www.naesb.org/pdf4/weq_wgq_mc11016_052011.doc

04-15-10

Docket No. RM05-5-017, FERC Order 676-F:
http://www.naesb.org/pdf4/ferc041510_final_rule_dr_phase1_mv_standard
s.doc
Related NAESB Filing with the Commission:


10-7-11

2008 WEQ Annual Plan Item No. 5.a Final Action – Review and develop Business Practice Standards to
support DR and DSM-EE programs as approved by the WEQ Executive Committee on February 10, 2009
and ratified by the WEQ Membership on March 16, 2009:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2008_api5a.doc

04-17-09 -Measurement and Verification of Demand Response
Products Business Practice Standards (Phase I), (Docket No. RM05-5000): http://www.naesb.org/pdf4/ferc041709_dsm_filing.pdf

NAESB Filing with the Commission:
Submittal for NAESB WEQ Business Practice Standards Development to
Support Coordination of Request for Transmission Service Across Multiple
Transmission Systems (SAMTS), (Docket No. RM05-5-013, Order No.
676-E): http://www.naesb.org/pdf4/ferc_100711_samts.pdf

2011 WEQ Annual Plan Item Nos. 2.a.iii.1 through 2.a.iii.3 Final Action – Service Across Multiple
Transmission Systems (SAMTS) as approved by the WEQ Executive Committee via notational ballot on
July 8, 2011 and ratified by the WEQ Membership on August 11, 2011:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2011_ap_2aiii1_to_2aiii3.doc

Related NAESB Filing with the Commission:

MC11029 – Minor correction as approved by the WEQ Executive Committee via notational ballot on
October 25, 2011 to 2011 WEQ Annual Plan Item Nos. 2.a.iii.1 through 2.a.iii.3 Final Action – Service
Across Multiple Transmission Systems (SAMTS) as approved by the WEQ Executive Committee via
notational ballot on July 8, 2011 and ratified by the WEQ Membership on August 11, 2011:
http://www.naesb.org/pdf4/weq_mc11029_102511.doc



01-25-12 - Submittal for NAESB WEQ Business Practice Standards
Development to Support Coordination of Request for Transmission
Service Across Multiple Transmission Systems (SAMTS), (Docket
No. RM05-5-013, Order No. 676-E):
http://www.naesb.org/pdf4/ferc_012512_weq_minor_corrections_sam
ts.pdf

Report of the North American Energy Standards Board, September 18, 2012
Page 273

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
September 18, 2012
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
Date
Issuance
07-07-11

FERC Order and related NAESB Status Reports

Recommendations that include the Business Practice Standards incorporated by reference

NAESB Filing with the Commission:
Submittal NAESB WEQ Smart Grid Related Business Practice Standards,
(Docket No. RM05-5-000, et-al):
http://www.naesb.org/pdf4/ferc_070711_smartgrid_standards.pdf

2010 WEQ Annual Plan Item No. 6.a Final Action – Requirements Specifications for Common Electricity
Product and Pricing Definition for NIST PAP03 as approved by the WEQ EC on July 7, 2010 and ratified
by the WEQ Membership on August 20, 2010:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6a.doc
2010 WEQ Annual Plan Item No. 6.b Final Action – Requirements Specifications for Common Scheduling
Mechanism for Energy Transactions for NIST PAP04 as approved by the WEQ EC on July 7, 2010 and
ratified by the WEQ Membership on August 20, 2010:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6b.doc
2010 WEQ Annual Plan Item No. 6.c Final Action – Requirements Specifications for Wholesale Standard
DR Signals for NITS PAP09 as approved by the WEQ EC on July 7, 2010 and ratified by the WEQ
Membership on August 20, 2010:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_api_6c.doc
2010 WEQ Annual Plan Item No. 6.d Final Action – Business Practices and Information Models to Support
Priority Action Plan 10 – Standardized Energy Usage Information as approved by the WEQ EC on October
29, 2010 and ratified by the WEQ Membership on November 29, 2010:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_ap_6d.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 274

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
September 18, 2012
Appendix D: Cross Reference of Business Practice Standards Adopted in Version 003 to FERC action on those Business Practice Standards
Date
Issuance
04-19-12

FERC Order and related NAESB Status Reports

Recommendations that include the Business Practice Standards incorporated by reference

Docket No. RM05-5-000, Notice of Proposed Rulemaking regarding
Measurement and Verification of Demand Response Products and Energy
Efficiency Products Business Practice Standards:
http://www.naesb.org/member_login_check.asp?doc=fa_weq_2010_ap_6d.
doc
Related NAESB Filing with the Commission:

2010 WEQ Annual Plan Item Nos. 4.a and 4.b Final Action – Review and develop Business Practice
Standards to support DR and DSM-EE Programs (Phase II) as approved by the WEQ Executive Committee
on February 18, 2011 and ratified by WEQ Membership on March 21, 2011:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4a_4b.doc
2010 WEQ Annual Plan Item No. 4.d Final Action – Business Practice Standards for Measurement and
Verification of Energy Efficiency Products as approved by the WEQ Executive Committee via notational
ballot on April 8, 2011 and ratified by the WEQ Membership on May 13, 2011:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4d.doc



06-18-12

04-30-11 – Measurement and Verification of Demand Response
Products Business Practice Standards (Phase II), (Docket No. RM055-000)
http://www.naesb.org/pdf4/ferc_043011_weq_demand_response_stan
dards.pdf :

Docket No. RM05-5-000, FERC issued an extension to the Notice of
Proposed Rulemaking regarding Measurement and Verification of Demand
Response Products and Energy Efficiency Products Business Practice
Standards:
http://www.naesb.org/member_login_check.asp?doc=fa_2010_weq_api_4a
_4b.doc
Related NAESB Filing with the Commission:


MC12020 – errata to 2010 WEQ Annual Plan Item No. 4.d Final Action – Business Practice Standards for
Measurement and Verification of Energy Efficiency Products and NAESB WEQ-000 Abbreviations,
Acronyms and Definition of Terms as approved by the WEQ Executive Committee via notational ballot on
June 15, 2012: http://www.naesb.org/pdf4/weq_mc12020_061512.docx

07-17-12 – Errata to Measurement and Verification of Energy
Efficiency Products Business Practice Standards (Docket Nos. RM055-000, and RM05-5-020):
http://www.naesb.org/pdf4/ferc_071712_weq_minor_correction_mc1
2020.pdf

Report of the North American Energy Standards Board, September 18, 2012
Page 275

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix E: NAESB Process to Develop and Adopt Standards
September 18, 2012

The NAESB Standards Development Process
NAESB is focused on proposing, considering, and adopting voluntary standards and model business practices
that will have a significant and lasting impact on all aspects of the natural gas and electricity marketplaces. As a
result of the standards NAESB adopts, it is expected that the industry will operate more efficiently and effectively,
benefiting both the industry and its customers. At the same time, it must be acknowledged that NAESB standards
may constitute a change in the way parties do business, with an accompanying effect on the use and allocation of
resources.
NAESB’s policy is to move at a deliberate pace, consistent with its annual plan(s), thus permitting those
affected by its standards, especially those standards adopted as regulations by the Federal Energy Regulatory
Commission (FERC) or other regulatory bodies, to assimilate them as part of their business practices. To this end,
NAESB will carefully consider whether proposed standards are both timely and necessary. In particular, it will try to
avoid adopting and implementing new standards, however beneficial, before the industry is able to reasonably make
use of them.
The standards development process is governed by the annual plan, and items can be included in the plan or
modified only with Board approval. The plan typically reflects requests from NAESB members, government
agencies, and other interested parties. In approving the annual plan, the Board considers the availability of resources,
including the NAESB budget and staff and the availability of industry volunteers. New requests received throughout
the year are either considered part of the existing annual plan or as new items that require Board approval.
The standards development process begins with an annual plan item or a triaged and approved request. Triage is
a process used by each quadrant of the Executive Committee (EC) to determine whether a request is within scope,
which quadrant(s) it applies to, which subcommittee(s) it should be referred to, and what priority it should be
assigned. Triage is carried out by EC members appointed by the EC chair. Triage recommendations are submitted to
the en banc EC and require EC approval, and may also require Board approval if there are scope questions or if a
modification of the annual plan is required.
Once the triage process is completed, the subcommittees—more than one are normally involved in standards
recommendations—review the request, compare it to existing standards, and prepare recommendations that may
take the form of new or modified standards or interpretations. Participation in EC subcommittees is open to any
interested party regardless of membership status. All subcommittee participants may vote; voting is balanced by
segment and quadrant. All votes are public.
When the recommendation is complete, it is made available for a thirty-day industry comment period. The
recommendation and comments are then forwarded to the EC, which considers the recommendation, makes any
changes it deems necessary, and takes a vote. A recommendation must receive an affirmative vote of at least 67
percent from each applicable quadrant EC and 40 percent from each of the segments of the applicable quadrant(s).
After passage by the EC, the recommendation must be ratified by the NAESB members. An affirmative vote of
67 percent of the members of the applicable quadrant(s) is required for ratification. After ratification, standards and
modifications are considered final actions and will be published in the next version of NAESB standards.
All NAESB quadrants follow the same development process described herein. The process has been followed
by the WGQ since 1994 and has been used to develop more than five hundred standards that have been incorporated
by reference into federal regulations.

Report of the North American Energy Standards Board, September 18, 2012
Page 276

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix E: NAESB Process to Develop and Adopt Standards
September 18, 2012

North American Energy Standards Board
Standards Development Process Flow Chart

Request For Standard is forwarded to the NAESB
Office from any group. The request may include
fully developed recommended standards.

Board provides approved Annual
Plan to the EC

Triage Subcommittee considers request and
prepares a triage disposition

Executive Committee (EC) approves triage
disposition and specific Quadrant EC(s) to
which the work is assigned, directs its work
or directs work on the annual plan item.

EC Subcommittees consider request or
Annual Plan Item as directed by EC.

Recommendations including new or
modified standards are prepared by EC
Subcommittees

Industry comment on EC Subcommittee(s)
recommendations

Executive Committee for approval of
recommendation

Membership Ratification

Posting as Final Action, Publication of
Standards, Filings with FERC

Report of the North American Energy Standards Board, September 18, 2012
Page 277

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix E: NAESB Process to Develop and Adopt Standards
September 18, 2012

Flexibility
NAESB recognizes that flexibility is necessary as standards are developed to address regional concerns or to
incorporate variances to accommodate operational or structural differences. Several WEQ standards incorporate
regional or operational differences for both Version 0 and Version 1. There is a high threshold for incorporating
such variances in a standard; the subcommittee(s) in drafting the standard, the EC in approving the subcommittee
recommendation, and the membership in approving the standard must all agree that such variance is necessary.
Nonetheless, NAESB procedures are well suited to take into account operational and regional differences.
Transparency
All NAESB meetings are open for attendance and participation by any interested party, with the exception of
executive sessions of the Board or Managing Committee for purposes of discussing personnel, compensation or
legal issues. Meeting announcements and agendas are posted in advance to permit the widest possible participation.
Conference-calling capability is available for all meetings and web casting is available for most. Those intending to
attend a meeting in person or by telephone are asked to notify NAESB by a specific date to permit adequate meeting
planning.
Transcripts are made of all Board of Directors and EC meetings, and may also be made of other meetings that
are expected to be controversial. Transcripts are maintained in the NAESB office and are provided to regulatory
agencies for their internal use. All other interested parties can purchase transcripts from the relevant transcription
service.
Coordination with NERC
For business practice standards development for the WEQ, if it is determined by NERC and NAESB Executive
Management that joint development is needed by NERC and NAESB, the NERC-NAESB Coordination Joint
Development Process is implemented.1 This process requires that the appropriate NAESB Subcommittee and
NERC Standards drafting team work together to develop reliability standards and business practices. This process is
currently being implemented by the NAESB WEQ BPS and ESS/ITS with the NERC ATC Standards drafting team
to develop reliability standards and business practice standards to address Commission Order No. 890.
The Joint Interface Committee of NAESB, NERC and the ISO-RTO Council (“JIC”) was dissolved as part of
the agreement to create the Independent Grid Operator segment of the WEQ. The joint development process
between NAESB and NERC is being used to ensure appropriate coordination. The ISOs and RTOs have strong
decision-making roles in both NERC and NAESB, and thus with the use of the joint development process, the JIC
was no longer necessary.

1
The NERC-NAESB Coordination Joint Development Process was submitted to the Commission on February 17, 2006 in Attachment C of the
Progress Report on NAESB Activities impacting Docket No. RM05-5-000, “Standards for Business Practices and Communication Protocols for
Public Utilities”: http://www.naesb.org/doc_view2.asp?doc=ferc021706.pdf.

Report of the North American Energy Standards Board, September 18, 2012
Page 278

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
1

Completion1

Assignment2

Develop business practices standards as needed to complement reliability standards
Develop business practice standards to support and complement NERC reliability standards, NERC policies and NERC
standards authorization requests (SARs) using the NERC/NAESB Coordination Joint Standards Development Process as
appropriate. Current NAESB activities underway to develop business practice standards that are supportive of this annual
plan item are:
a)

Make version 2 changes to business practices as requested.
i)

Make changes to business practices as related to inclusion of the NERC
Reliability Functional Model functional model entities as NERC undertakes the
same efforts.
Status: No requests

As requested

BPS

ii)

Continuous support of TLR Procedure in alignment with NERC efforts on TLR
Phase II and Phase III which would be included in version 2 development.3
Status: Complete
The “Continuous Support of TLR Procedure in Alignment with NERC Efforts
on Phase II and Phase III” recommendation was approved by the BPS to post
for the formal comment period. For 2009 specific items for TLR coordination
with NERC will be added as needed.

3rd Q, 2008

BPS

3rd Q, 2009

JISWG

4

b)

Develop business practices to support Coordinate Interchange – R05020 “Include a
guideline for rounding schedules with partial mWh's in the coordinate interchange
business practice WEQ BPS-002-000”
Status: Underway

c)

Operate Within Limits (R03017) as coordinated with the NERC schedule on the same development for reliability
standards
i)

Review the need to develop business practice standards to support Operate
Within Limits (R03017)
Status: Completed

1st Q, 2008

SRS

ii)

Develop business practice standards to support Operate Within Limits
(R03017)
Status: Completed
No standards are needed at this time

2nd Q, 2008

BPS

6

d)

Prepare recommendations for future path for TLR in concert with NERC, which may
include alternative congestion management procedures5
Status: Underway

2009

BPS

e)

Conduct analysis as to whether standards can be developed which outline a
standardized process for the coordination and execution of emergency energy
schedules. These would be complementary standards to EOP-002-2 Requirements R4
and R6 (SRS Analysis of EOP-002-2 R4 & R6)
Status: Not Started

1st Q, 2009

JISWG

Report of the North American Energy Standards Board, September 18, 2012
Page 279

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

2

Completion1

Assignment2

f)

Review Market System Back-Up existing language and review of existing back-up
language
Status: Completed
Per the guidance from the WEQ Executive Committee after presenting the Request
for Executive Committee Guidance on WEQ 2008 Provisional Item 5 the SRS
developed and approved a “no action” recommendation to close out this annual plan
item

4th Q, 2008

SRS

g)

Provide complementary business practice standards to support Coordinate Operations
Standards Authorization Request assigned to NERC (R03014)
Status: Completed
Based on the SRS review of related documents and EC updates to the WEQ Annual
Plan in May 2004 where R03014 was noted as completed the SRS approved a “no
action” recommendation to close out this standards request.

3rd Q, 2008

SRS

Develop business practice standards in support of the FERC RM05-25-000 and RM05-17-000 (OATT Reform)
a)

Develop version 2 business practice standards to better coordinate the use of the transmission system among
neighboring transmission providers. Such business practice standards would be based on recommendations from
NERC's Long Term ATC/AFC Task Force and would involve revised procedures for the ATC calculation and/or
revised protocols as determined by the final order.
Status: Underway
Development is using joint standards development process with NERC. Request R050004 was expanded to include the
Order No. 890 (Docket Nos. RM05-25-000 and RM05-17-000) and Order No. 890-A (Docket Nos. RM05-17-001, 002
and RM05-25-001, 002), “Preventing Undue Discrimination and Preference in Transmission Services”, issued April 11,
2007).
i)

Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service;
And Preconfirmation Priority
1.

Conditional Firm, Annotations For ATC; Load Forecast And Actual Load;
Re-Bid Of Partial Service; And Preconfirmation Priority S&CP
Requirements
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

4th Q, 2007

ESS/ITS

2.

Conditional Firm Business Practice Standards associated with S&CP
Requirements completed in 2(a)(i)(1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

3rd Q, 2008

ESS/ITS

3.

Annotations For ATC Business Practice Standards associated with S&CP
Requirements completed in 2(a)(i)(1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

BPS, ESS/ITS

Report of the North American Energy Standards Board, September 18, 2012
Page 280

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

ii)

Completion1

Assignment2

4.

Load Forecast And Actual Load Business Practice Standards associated
with S&CP Requirements completed in 2(a)(i)(1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

BPS, ESS/ITS

5.

Re-Bid Of Partial Service Business Practice Standards on a Single
Transmission Provider’s System associated with S&CP Requirements
completed in 2(a)(i)(1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

ESS/ITS

6.

Preconfirmation Priority Business Practice Standards associated with
S&CP Requirements completed in 2(a)(i)(1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

ESS/ITS

7.

OASIS Exemptions Appendix
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

4th Q, 2007

ESS/ITS

Group 2: Metrics; Redispatch Cost Posting
1.

Metrics Related to Provision of Transmission Service (Paragraph 413 of
Order 890)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

ESS/ITS

2.

Metrics Related to Performance of Transmission Studies (Paragraphs
1308 through 1317 of Order 890
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

ESS/ITS

3.

Redispatch Cost Posting

1st Q, 2008

ESS/ITS



Monthly average cost of redispatch


A high and low redispatch for the month
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.
iii)

Group 3: Network Service On OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 281

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

iv)

Completion1

Assignment2

1.

Use of OASIS to Make Electronic Requests to Designate and Terminate
Network Resource
Status: Underway

1St Q, 2009

ESS/ITS

2.

Ability to Query Requests to Designate and Terminate Network
Resources and Allow for Queries of All Information Provided with
Designation Requests
Status: Underway

1St Q, 2009

ESS/ITS

3.

Masking of Designated Network Resource Operating Restrictions and
Generating Cost Information
Status: Underway

1St Q, 2009

ESS/ITS

4.

Procedural Requirements for Submitting Designations over new OASIS
Functionality
Status: Underway

1St Q, 2009

ESS/ITS

5.

Specify How Designated Network Service Informational Postings are
Posted on OASIS
Status: Underway

1St Q, 2009

ESS/ITS

6.

Set Forth the Treatment of OASIS Requests when the Customer Fails to
Provide the Necessary Attestation
Status: Underway

1St Q, 2009

ESS/ITS

7.

Procedural Requirements for Submitting Both Temporary and Indefinite
Terminations of Network Resources
Status: Underway

1St Q, 2009

ESS/ITS

8.

Procedures for Submitting and Processing Requests for Concomitant
Evaluations of Transmission Requests and Temporary Terminations
Status: Underway

1St Q, 2009

ESS/ITS

Group 4: Pre-Emption; Request No. R05019; and Revisions to Standard 9.7
1.

Pre-Emption
Status: Not Started

2nd Q, 2009

ESS/ITS

2.

Request No. R05019
Status: Not Started

2nd Q, 2009

ESS/ITS

3.

Revisions to Standard 9.7
Status: Underway
This item also addresses work in 2006 WEQ AP 3a(x).

2009

EC Task
Force

Report of the North American Energy Standards Board, September 18, 2012
Page 282

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
4.

v)

vi)

Posting of Existing Transmission Commitments (ETC) (moved from
Group 1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

Completion1

Assignment2

2nd Q, 2008

BPS, ESS/ITS

Group 5: Paragraph 1377
1.

Paragraph 1377
Status: Not Started

2nd Q, 2009

ESS/ITS

2.

Re-Bid Of Partial Service across Multiple Transmission Providers’
Systems
Status: Not Started

2nd Q, 2009

ESS/ITS

Group 6: Miscellaneous (Paragraphs 1390 and 1627 of Order 890)
1.

Paragraph 1390 of Order 890
Status: Not Started

2nd Q, 2009

ESS/ITS

2.

Paragraphs 1627 of Order 890
Status: Not Started

2nd Q, 2009

ESS/ITS

3.

Redispatch Cost Posting to allow for posting of third party offers of
planning redispatch services.
Status: Not Started

2nd Q, 2009

ESS/ITS

4.

Posting of Existing Transmission Commitments (ETC) (moved from
Group 1)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

2nd Q, 2008

ESS/ITS

vii) Group 7: Tagging for Conditional Firm Service
1.

b)

Tagging for Conditional Firm Service
Status: Completed
Published Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

2nd Q,
2008

Develop the needed business practices as companion to the NERC standards for ATC related efforts.
i)

ESS/ITS

7

Develop standards to support existing Request No. R05004.

Report of the North American Energy Standards Board, September 18, 2012
Page 283

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

ii)

Completion1

Assignment2

1.

The processing of transmission service requests, which use
TTC/ATC/AFC, in coordination with NERC changes to MOD 001 where
the allocation of flowgate capability based on historical Network Native
Load impacts the evaluation of transmission service requests, requiring
the posting of those allocation values in conjunction with queries of
service offerings on OASIS
Status: Underway

1St Q, 2009

ESS/ITS

2.

Remaining requirements documented in R05004 and R05004A.
Status: Completed

3rd Q, 2008

BPS, ESS/ITS

Develop Business Practice Standards for Existing Transmission
Commitments (ETC)
1.

Develop the Business Practice Standards complementary to NERC
Reliability Standards for Existing Transmission Commitments (ETC)
to create a “consistent approach for determining the amount of transfer
capability a transmission provider may set aside for its native load and
other committed uses”, including the elements of ETC for full
implementation of the NERC MOD-001 reliability standard.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

2nd Q, 2008

BPS, ESS/ITS

2.

Business practice standards for accounting for counterflows. These
standards will be included in the ATC business practice standards.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the
FERC as part of the Version 002 filing, August 29, 2008.

June 1, 2008

BPS ESS/ITS

Report of the North American Energy Standards Board, September 18, 2012
Page 284

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
iii)

Assignment2

Capacity Benefit Margin (CBM) Business Practices
3rd Q, 2008

BPS, ESS/ITS

2. Business practice standards that include an OASIS mechanism to “allow
for auditing of CBM usage.”
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed

3rd Q, 2008

BPS, ESS/ITS

3. Any additional business practice standards needed to complement the
NERC CBM reliability standards (MOD004) created as a result of this
effort.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed

3rd Q, 2008

BPS, ESS/ITS

April 8, 2008

BPS, ESS/ITS

1.

iv)

Completion1

Determine if business practice standards are needed, and if so, develop
them to set forth “how the CBM value shall be determined, allocated
across transmission paths, and used” and how transmission providers will
“reflect the set-aside of transfer capability as CBM in the development of
the rate for point-to-point transmission service.”
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
The NAESB subcommittees have determined the CBM requirements have
been documented in the NERC MOD-004 to address this item, so no
further action is required by NAESB. Please note that when the related
NERC reliability standards are adopted, the subcommittee leadership will
review to determine if additional action by NAESB is needed.

Transmission Reliability Margin Business Practices:
1. Transmission Reliability Margin (TRM): Business Practice Standards to
complement the NERC reliability standards for TRM.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
The NAESB subcommittees have determined TRM requirements have been
documented in previously submitted recommendations, so no further action
is required by NAESB.

Report of the North American Energy Standards Board, September 18, 2012
Page 285

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

v)

Completion1

Assignment2

2. The business practice standards will include specification of the
appropriate uses of TRM and when transmission providers may set aside
TRM.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development
Status: Completed
The NAESB subcommittees have determined TRM requirements have been
documented in previously submitted recommendations, so no further action
is required by NAESB.

April 8, 2008

BPS, ESS/ITS

3. Any additional business practice standards needed to complement the
NERC TRM reliability standards (MOD008) created as a result of this
effort.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
The NAESB subcommittees have determined TRM requirements have been
documented in previously submitted recommendations, so no further action
is required by NAESB.

April 8, 2008

BPS, ESS/ITS

Business Practice Standards for ATC and AFC Calculation Methodologies to complement the NERC reliability
standards created for ATC and AFC Methodologies (NERC MOD001 (Available Transfer Capability); NERC
MOD028 (Network Response Available Transfer Capability); NERC MOD029 (Rated System Path Available
Transfer Capability); and NERC MOD030 (Flowgate Network Response Available Transfer Capability)):
1. Business practice standards to address the frequency and posting
requirements for all ATC components that are complementary to the
related NERC reliability standards.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
The subcommittee determined no additional standards are required from
what is already documented in the “ATC Information Link (2008 Annual
Plan 2.b.vii)” recommendation and what is required for ATC postings
under the previously ratified recommendation “Modifications to WEQ-001
to comply with modifications to 18 C.F.R. 37.6 and 37.7 within Order 890
with Minor Corrections applied on February 27, 2008.”

April 23,
2008

BPS/ESS/ITS

2. Business practice standards for data exchange for ATC modeling
complementary to the related NERC reliability standards including any
OASIS posting requirements to achieve the data exchange.
The business practices developed to address this item will require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
The NAESB subcommittees have determined the data exchange
requirements have already been documented in the NERC standards, so no
further action is required by NAESB.

1st Q, 2008

BPS/ESS/ITS

Report of the North American Energy Standards Board, September 18, 2012
Page 286

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Completion1

Assignment2

3. Business practice standards that will set forth how transmission providers
will post “explanations of the reason for a change in monthly and yearly
ATC values on a constrained path.” The standards will include a
requirement that that the transmission provider posts the reason for the
change in a narrative form. The posted information will include “the (1)
specific events which gave rise to the change and (2) new values for ATC
on that path (as opposed to all points on the network).”
The business practices developed to address this item will not require to
coordination with the NERC Order 890 reliability standards development.
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC
as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

BPS/ESS/ITS

4. Business practice standards for posting on OASIS of the “underlying load
forecast assumptions for all ATC calculations”.
The business practices developed to address this item will not require to
coordination with the NERC Order 890 reliability standards development
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC
as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

BPS/ESS/ITS

5. Business practice standards for posting on OASIS of the “actual daily peak
load for the prior day.”
The business practices developed to address this item will not require to
coordination with the NERC Order 890 reliability standards development
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC
as part of the Version 002 filing, August 29, 2008.

1st Q, 2008

BPS/ESS/ITS

Business practice standards to complement NERC reliability standards for
Transfer Capability in response to new NERC Supplemental SAR: Revisions
to Existing Standards MOD001-MOD009, FAC12-13
This item was added as a result of the Supplemental SAR NERC created in
case additional business practices are needed as a result of the work on this
SAR by NERC. It does not have a cite in Order 890. This item will require
coordination with the NERC Order 890 reliability standards development.
Status: Completed

May 1, 2008

BPS, ESS/ITS

Item Description

vi)

Report of the North American Energy Standards Board, September 18, 2012
Page 287

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
vii)

c)

3

Business practice standards to set forth the procedure for input on TTC and
ATC methodologies and values. (During the Order 890 NERC and NAESB
joint standards development effort, it was determined that the standards
contained in MOD003 should be business practice standards instead of
reliability standards. NERC has requested that NAESB adopt the standards as
business practices via correspondence to Ms. McQuade, NAESB President.)
This item will require coordination with the NERC Order 890 reliability
standards development because the language to address this item is contained
within a draft standards that addresses items that are dependent on NERC
deliverables, i.e., the requirements to create an “ATC Information Link” on
OASIS. There is no Order 890 cite for this item.
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC as
part of the Version 002 filing, August 29, 2008.

Develop version 1 business practice standards to support transparency reporting and
related functions that may be required as a result of the final order.
Status: Completed
The Executive Committee did not approve the recommendation submitted by the EC
Task Force. Instead, they approved a “No Action” Recommendation for this annual
plan item at their October 6, 2008 meeting

Completion1

Assignment2

1st Q, 2008

BPS, ESS/ITS

3rd Q 2008

EC Task
Force

Develop business practices standards to improve the current operation of the wholesale electric market and develop
and maintain business practice and communication standards for OASIS and Electronic Scheduling
a)

Develop and/or maintain business practice standards as needed for OASIS and electronic scheduling. Specific items to
address include:
i)

Develop OASIS S&CP changes to support OASIS business practices.
Status: Completed
Dependent on development of OASIS business practices

3rd Q 2008

ESS/ITS

1st Q, 2009

ESS/ITS

ii)

Network Services: Determine and develop needed business practice standards
or other support is needed to support use of OASIS for Network Service
transactions (R04006E). (Related to AP 2(a)(iii))
Status: Underway

iii)

Registry (TSIN): Determine and develop needed business practice standards to support the registry functions
currently supported by NERC (R04037, R06027).
Status: Underway
1)

Work with the NAESB counsel to develop a confidentiality agreement,
(R07013)

2009

BPS

2)

Transition the TSIN Registry from NERC to NAESB.

2009

NAESB Staff

3)

Review and correct the Coordinate interchange Business Practice
Standard as noted during the development of the e-Tag 1.8 development
process.

3rd Q, 2009

JISWG

Report of the North American Energy Standards Board, September 18, 2012
Page 288

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
v)

Document procedures used to implement the displacement/interruption terms of
the Pro Forma tariff (R05019).
Status: Not Started

vi)

Make incremental enhancements to OASIS as an outgrowth of the NAESB
March 29, 2005 conference on the future of OASIS (R05026).
Scoping statement completed by SRS and assignments made to BPS, ESS/ITS
and JISWG.

vii)

Completion1
3rd Q, 2009

Assignment2
ESS/ITS

1)

Represent ALL pre-Order 888 (“grandfathered”) transmission and
ancillary services in current use in OASIS
Status: Completed

3rd Q, 2008

BPS,
ESS/ITS

2)

Eliminate Masking of TSR tag source and sink when requested status
is denied, withdrawn refused, displaced, invalid, declined, annulled
or retracted
Status: Not Started

3rd Q, 2009

ESS/ITS

3)

Initiate standard that requires ALL historical transmission service
reservations to be available for review up to a number of years in the
past.
Status: Completed

3rd Q, 2008

ESS/ITS

4)

Initiate standard that eliminates the disparity of posting “sensitive”
information. This standard should also include procedures of user
certification that allows access to this class of information.
Status: Not Started

2009

ESS/ITS

5)

Enhance the TSR result postings to allow showing of (i) limiting
transmission elements and (ii) available generation dispatch options
that would allow acceptance of reservation request.
Status: Not Started

2009

ESS/ITS

6)

Standardize the availability of TSR study result postings, eliminating
practice of some Transmission Owners that charge for viewing these
documents.
Status: Completed
This item was completed with Recommendation (2008 AP Item
2.a.i.5, 2008 AP Item 2.a.i.6, and 2008 AP Items 2.a.ii.1-3) WEQ001 Changes for Rebid of Partial Service, Preconfirmation Priority,
and Group 2: Metrics; Redispatch Cost Posting.

1st Q, 2008

ESS/ITS

Respond to issues in FERC Order No. 676 (Docket No. RM05-5-000) –
NAESB WEQ Standards 001 9.7, (paragraph 51 of the order).
Status: Underway
Item was assigned to group 4, reference 2007 WEQ AP item 2(a)(iv)(3).

2009

EC Task
Force

Report of the North American Energy Standards Board, September 18, 2012
Page 289

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
b)

4

Assignment2

Develop and/or maintain standard communication protocols and cyber-security business practices as needed.
i)

Address the surety assessment findings on NAESB PKI standards.
Status: Completed
Item will be provided as a response to the U.S. DoE upon completion by the
WGQ for their response to the findings.

1st Q, 2008

JISWG

ii)

Develop PKI standards for OASIS.
Status: Not Started

2009

ESS/ITS

iii)

Develop PKI Standards for e-tagging (Develop Implementation Plan).
Status: Underway
eTagging items are linked to the transition of the Registry from NERC to
NAESB.

2nd Q 2009

JISWG

iv)

Develop enhanced Electric Industry Registry (EIR), (R06027)
Status: Underway

2009

NAESB Staff

c)

Develop needed business practice standards for organization/company codes for
NAESB standards – and address current issues on the use of DUNs numbers.
Status: Underway
Common code usage is linked to the transition of the Registry from NERC to NAESB.

2009

NAESB Staff
with WEQ
support

d)

Develop business practice standards in support of FERC Order 717
Status: Not Started

2nd Q, 2009

ESS/ITS

1st Q, 2008

Joint
WEQ/WGQ
e-Tariff
Subcommittee

Review and develop business practices standards to support e-Tariff program
Develop business practices as needed to support the e-Tariff program including
submittal of tariffs and metadata. (Docket No RM05-1-000)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC as part of
the Version 002 filing, August 29, 2008.

5

Completion1

Review and develop business practices standards to Demand Response, Demand Side Management and Energy
Efficiency Programs
Review and develop needed model business practices for a standardized method for quantifying benefits, savings, cost
avoidance and/or the reduction in energy demand and usage derived from the implementation of demand side management
and energy efficiency programs. This effort will include demand side response, energy efficiency programs and metering,
including the 'curtailment service provider' program.
a)

Develop matrix and business practice standards for measurement and verification for
demand response programs in ISO/RTO footprint areas.
Status: Completed

4th Q, 2008

Joint
WEQ/Retail
DSM-EE
Subcommittee

Report of the North American Energy Standards Board, September 18, 2012
Page 290

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

6

Completion1

Assignment2

b)

Develop matrix and business practice standards for measurement and verification for
demand response programs in non-ISO/RTO footprint areas.
Status: Underway

TBD

Joint
WEQ/Retail
DSM-EE
Subcommittee

c)

Develop preamble for business practice standards for measurement and verification for
demand response and energy efficiency programs.
Status: Underway

2009

Joint
WEQ/Retail
DSM-EE
Subcommittee

d)

Develop glossary for business practice standards
Status: Underway

2009

Joint
WEQ/Retail
DSM-EE
Subcommittee

e)

Support retail development of matrix and model business practice standards for
measurement and verification for demand response programs
Status: Underway

2009

Joint
WEQ/Retail
DSM-EE
Subcommittee

f)

Develop business practice standards to measure and verify energy reductions that are
made to comply with a Renewable Portfolio Standard that included energy efficiency
or a stand-alone Energy Efficiency Portfolio Standard.
Status: Not Started

Phase 2

Joint
WEQ/Retail
DSM-EE
Subcommittee

g)

Develop business practice standards to factor Demand Control and Energy Efficiency
programs into reliability / supply decisions at the wholesale level for generation and
transmission planning and operations.
Status: Not Started

Phase 2

Joint
WEQ/Retail
DSM-EE
Subcommittee

h)

Develop business practice standards for cap and trade programs for green house gas
Status: Not Started

Phase 2

Joint
WEQ/Retail
DSM-EE
Subcommittee

Maintain existing body of Version 1 standards
a)

Review/revise WEQ 006 to remove/revise mandatory requirements for
Interconnection Time Monitor (R07019)
Status: Completed
Published in Version 002, September 30, 2008 and forwarded to the FERC as part of
the Version 002 filing, August 29, 2008.

2nd Q, 2008

BPS

b)

Develop a NAESB time and inadvertent management business practice that provides
additional inadvertent payback options and improved time control (R07020)
Status: Complete

3rd Q, 2008

BPS

c)

Make consistency changes to Version 1.0 standards as directed by the WEQ
Leadership Committee on December 12, 2007 (R08001 – BPS, ESS/ITS, R08002 ESS/ITS, R08003 - ESS/ITS - BPS, R08004, R08005 - ESS/ITS)

Report of the North American Energy Standards Board, September 18, 2012
Page 291

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

Completion1

Assignment2

1)

OASIS Consistency Changes (R08001, R08002, R08003, R08005)
Status: Not Started

2009

ESS/ITS

2)

Gas / Electric Communication Consistency Changes (R08004)
Status: Underway

2009

BPS

d)

Modify WEQ-001 to reflect in the definition of certain ancillary services that such
ancillary services may be provided by non-generation resources such as demand
resources. (http://www.naesb.org/pdf3/weq_ec051308w2.doc)
Status: Completed
To be published in Version 002, September 30, 2008 and forwarded to the FERC as
part of the Version 002 filing, August 29, 2008.

July 2008

BPS, ESS/ITS

e)

Modify NAESB definitions to address internal inconsistencies and inconsistencies
with the NERC glossary, (http://www.naesb.org/pdf3/weq_ec051308w3.doc)
Status: Underway
Subcommittee co-chairs are developing WEQ-000 Definition of Terms/Acronyms to
replace definitions being included in each NAESB Business Practice.

1st Q, 2009

BPS, SRS,
ESS/ITS

f)

Review and evaluate whether to cutoff or put a size limit on the entities for which
the standards apply
Status: Completed
After review of FERC Order 676, the subcommittee determined this annual plan
item was outside of NAESB’s scope. Waivers for standards based on an entity’s
size should be addressed by FERC rather than through standards at NAESB.

3rd Q, 2008

SRS

g)

Investigate and review possible modifications to the WGQ Intraday Nominations,
Confirmation Scheduling, and Gas Day standards, including possible standards for
coordination of wholesale electric and wholesale gas scheduling. (R03031, R03031
revised, Interim Report, Final Report)
Status: Completed
The subcommittee reviewed the standards request and documentation developed by
the Gas Electric Coordination Task Force and determined no additional work was
required. The subcommittee approved a “no action” recommendation to close out
this standards request.

3rd Q, 2008

SRS

h)

Develop standards to allow for registered Market Operators to request changes to the 1st Q 2009
Market Level profile of Implemented Interchange (R06006)
Status: Underway
This request may be more of a clean-up in nature as it was requested in May 2006
but has not been addressed or presented as completed with the requisite
documentation.

i)

Modify the timing chart for the Western Interconnection in WEQBPS-006 to an
initiation of manual time error at +/-5 seconds. (R06010)
Status: Completed
The BPS developed a No Action recommendation for this request since the scope of
the request had been addressed through a minor correction in 3rd Quarter 2006.

3rd Q, 2008

JISWG

BPS

Report of the North American Energy Standards Board, September 18, 2012
Page 292

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description

Completion1

Assignment2

j)

Develop a standard mechanism to implement a “RECALL” of transmission capacity
from an existing confirmed transmission service reservation/Specify the technical
requirements for implementation of a new OASIS request type, RECALL. (R07001)
Status: Completed
This request was originally assigned to the ESS/ITS in February 2007.

3rd Q, 2008

ESS/ITS

k)

Clarify the S&CP implementation of the DEFERRAL request. (R07003)
Status: Completed
This request was originally assigned to the ESS/ITS in February 2007.

3rd Q, 2008

ESS/ITS

l)

Develop business practice and technical standards for assigning, tracking, and
limiting rollover rights. (R07004)
Status: Completed
This Standards Request was assigned to the ESS/ITS in February 2007.

3rd Q, 2008

ESS/ITS

m)

Update the Timing Table to Reflect the Categories (On-time, Late, After-the-fact,
and Pre-late) used in the latest E-Tag Specification with respect to receipt of an
Arranged Interchange (RFI). (R07007)
Status: Completed

4th Q, 2008

JISWG

n)

Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the
“System_Attribute” data element of the NAESB Standard WEQ-003: OASIS S&CP
Data Dictionaries. (R08011)
Status: Not Started
This Standards Request was assigned to the ESS/ITS in May 2008.

2009

ESS/ITS

o)

Provide for Enhanced Granularity for Public Utilities in Identifying Critical
Operational Flow Orders. (R08020)
Status: Not Started. This Standards Request was assigned to the BPS in August
2008.

2009

BPS jointly
with WGQ
BPS

PROVISIONAL ITEMS
1

Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission
Adequacy and Inadvertent Interchange Data Standards BAL-006 revisions.
Status: In review of the NERC development effort, Balancing Authority Controls (Project 2007-05), with Mr. Akens (TVA,
NERC Drafting Team Leader) and Mr. Rodriquez (NERC Manager, Business Practice Coordination), it was determined that
no changes would be required to NAESB standards. As such, NAESB leadership is not at this time determining if any
development would be undertaken, which would then initiate a joint development effort. A letter to this effect was sent to
NERC management. This assessment may however change as the NERC drafting team proceeds further in its development,
so the provisional item remains on the 2008 WEQ Annual Plan.

2

Develop business practice standards as requested by the regional and state advisory groups.

3

Develop business practice standards as related to the Effectiveness Study of Competitive Wholesale Markets (Congressional
Mandate), Electric Energy Market Competition Task Force, Docket No. AD05-17-000, issued by the FERC on October 13,
2005.

Report of the North American Energy Standards Board, September 18, 2012
Page 293

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
NORTH AMERICAN ENERGY STANDARDS BOARD
2008 WEQ Annual Plan Approved by the Board of Directors on December 18, 2008
Item Description
4

Completion1

Assignment2

Develop and/or maintain business practice standards to support gas-electric interdependencies


Respond to requests as received that are related to Docket No. RM05-28-000.



Respond directives related to the conclusions of the NAESB reports submitted in FERC Order No. 698, Docket
Nos. RM05-5-001 and RM96-1-027.

5

Develop business practices for allocating capacity among requests received during a submittal window Order 890-A (Docket
Nos. RM05-17-001, 002 and RM05-25-001, 002 - Paragraph 805).

6

Determine any needed NAESB action in support of the Interchange Distribution Calculator (IDC) and develop any necessary
standards.

Report of the North American Energy Standards Board, September 18, 2012
Page 294

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012
Wholesale Electric Quadrant
Executive Committee (WEQ EC)

Standards Review Subcommittee (SRS)
Scoping
Interpretations Subcommittee

Business Practices Subcommittee (BPS)

Electronic Scheduling Subcommittee (ESS)

Information Technology Subcommittee (ITS)
Development
Joint Interchange Scheduling Working Group
(JISWG)

E-Tariff Joint WEQ/WGQ Subcommittee

DSM-EE Retail/WEQ Subcommittee

Task Forces & Working Groups

NAESB WEQ EC and Subcommittee Leadership:
Executive Committee: Kathy York (WEQ EC Chair) and Clay Norris (WEQ EC Vice Chair)
Standards Review Subcommittee: Narinder Saini, Ed Skiba
Interpretations Subcommittee: Robert Schwermann
Business Practices Subcommittee & Task Forces: Jim Busbin (TLR), Ed Skiba
Electronic Scheduling Subcommittee/Information Technology Subcommittee & Task Forces: Paul Sorenson, J.T.
Wood, Marcie Otondo
Joint Interchange Scheduling Working Group (JISWG): Bob Harshbarger (NAESB), Jim Hansen (NERC)
e-Tariff Joint WEQ/WGQ Subcommittee (e-Tariff): Jane Daly (WEQ), Keith Sappenfield (WGQ)
DSM-EE Joint Retail/WEQ Subcommittee: Ruth Kiselewich and David Koogler (Retail), Roy True and Paul Wattles
(WEQ)

Report of the North American Energy Standards Board, September 18, 2012
Page 295

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix F: 2008 Wholesale Electric Quadrant Annual Plan
September 18, 2012

End Notes WEQ 2008 Annual Plan:
1

Dates in the completion column are by end of the quarter for completion by the assigned committee. The dates do not
necessarily mean that the standards are fully staffed to be implementable by the industry, and/or ratified by membership. If one
item is completed earlier than planned, another item can begin earlier and possibly complete earlier than planned. There are no
begin dates on the plan.

2

The assignments are abbreviated. The abbreviations and committee structure can be found at the end of the annual plan
document.
3 For additional information, please see: http://www.naesb.org/pdf3/weq_bps100407w4.ppt for Phase II changes and
http://www.naesb.org/pdf2/weq_bps070907w4.doc for Phase III changes.
4 Joint Development Procedure is to be used by the NERC TLR Drafting Team and NAESB BPS.
5 5 For additional information, please see comments submitted by PJM and MISO for this Annual Plan Item:
http://www.naesb.org/pdf3/weq_aplan102907w1.pdf.
6

Joint Development Procedure is to be used by the NERC TLR Drafting Team and NAESB BPS.

7

The June 1, 2008 dates included in this Annual Plan Item are assigned as a result of FERC extending deadlines to both NERC
and NAESB on ATC related Order No. 890 items.

Report of the North American Energy Standards Board, September 18, 2012
Page 296

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
1

Completion8 Assignment9, 10

Develop business practices standards as needed to complement reliability standards
Develop business practice standards to support and complement NERC reliability standards, NERC policies and NERC
standards authorization requests (SARs) using the NERC/NAESB Coordination Joint Standards Development Process as
appropriate. Current NAESB activities underway to develop business practice standards that are supportive of this annual
plan item are:
3rd Q, 2009

a)

Develop business practices to support Coordinate Interchange – R05020 “Include a
guideline for rounding schedules with partial MWh's in the coordinate interchange
business practice WEQ BPS-002-000” the rounding standard recommendation
Status: Completed. Recommendation was voted out of the JESS on September 2,
2009. Formal comment period closed on October 8, 2009.

b)

Continuous support of TLR Procedure in alignment with NERC efforts on TLR Phase II and Phase III development.
i)

Parallel Flow Visualization/Mitigation for Reliability Coordinators in the
Eastern Interconnection.
Note: Activity is dependent on NERC approval of SAR expected in 2nd Q,
2009. Upon approval of the SAR and NAESB action on this item, consideration
should be given to provisional item 4.
Status: Started

ii)

Update WEQ-008 Appendix D to include the Market Flow Threshold
Percentage recommended by NERC working group/task force
Status: Completed. The WEQ BPS voted a minor correction out of
subcommittee on August 12, 2009

2010

3rd Q, 2009

JESS

BPS

BPS

c)

Conduct analysis as to whether standards can be developed which outline a
standardized process for the coordination and execution of emergency energy
schedules. These would be complementary standards to EOP-002-2 Requirements R4
and R6 (SRS Analysis of EOP-002-2 R4 & R6)
Status: Completed and as a result item (3)(a)(viii) has been added to the plan

1st Q, 2009

d)

Time Error and Inadvertent (BAL-004 and BAL-006) Coordination with NERC
Status: Monitor. (Upon initiation of this item by NAESB. a completion date will be
determined. Based on discussions with NERC staff regarding the Balancing Authority
Controls Standards Drafting Team’s timeline the completion date has been changed to
tbd.)

TBD

TIMTF

e)

DCS and AGC (BAL-002 and BAL-005) Coordination with NERC
Status Monitor. (Upon initiation of this item by NAESB. a completion date will be
determined. Based on discussions with NERC staff regarding the Balancing Authority
Controls Standards Drafting Team’s timeline the completion date has been changed to
tbd.)

TBD

TIMTF

JESS

Report of the North American Energy Standards Board, September 18, 2012
Page 297

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
2

8

Completion

Assignment9, 10

Develop business practice standards in support of the FERC RM05-25-000 and RM05-17-000 (OATT Reform)
a)

Develop version 2 business practice standards to better coordinate the use of the transmission system among neighboring
transmission providers. Such business practice standards would be based on recommendations from NERC's Long Term
ATC/AFC Task Force and would involve revised procedures for the ATC calculation and/or revised protocols as
determined by the final order.
Status: Underway
Development is using joint standards development process with NERC. Request R050004 was expanded to include the
Order No. 890 (Docket Nos. RM05-25-000 and RM05-17-000) and Order No. 890-A (Docket Nos. RM05-17-001, 002
and RM05-25-001, 002), “Preventing Undue Discrimination and Preference in Transmission Services,” issued April 11,
2007).
i)

Group 3: Network Service On OASIS
1st Q, 2010

OASIS

10. Ability to Query Requests to Designate and Terminate Network
Resources and Allow for Queries of All Information Provided with
Designation Requests
Status: Underway

1st Q, 2010

OASIS

11. Masking of Designated Network Resource Operating Restrictions and
Generating Cost Information
Status: Underway

1st Q, 2010

OASIS

12. Procedural Requirements for Submitting Designations over new OASIS
Functionality
Status: Underway

1st Q, 2010

OASIS

13. Specify How Designated Network Service Informational Postings are
Posted on OASIS
Status: Underway

1st Q, 2010

OASIS

14. Develop standards for the treatment of OASIS Requests when the
Customer Fails to Provide the Necessary Attestation
Status: Underway

1st Q, 2010

OASIS

15. Procedural Requirements for Submitting Both Temporary and Indefinite
Terminations of Network Resources
Status: Underway

1st Q, 2010

OASIS

16. Procedures for Submitting and Processing Requests for Concomitant
Evaluations of Transmission Requests and Temporary Terminations
Status: Underway

1st Q, 2010

OASIS

9.

Use of OASIS to Make Electronic Requests to Designate and Terminate
Network Resource
Status: Underway

Report of the North American Energy Standards Board, September 18, 2012
Page 298

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
ii)

iii)

iv)

b)

8

Completion

Assignment9, 10

Group 4: Pre-Emption; Request No. R05019; and Revisions to Standard 9.7
5.

Pre-Emption
Status: Not Started

3rd Q, 2010

OASIS

6.

Request No. R05019
Status: Not Started

3rd Q, 2010

OASIS

7.

Modify WEQ-001-9.7 Rollover Rights for Redirect on a Firm Basis
Status: Completed

2nd Q, 2009

OASIS

Group 5: Paragraph 1377 – Group 5 work should precede group 4 work
3.

Paragraph 1377
Status: Not Started

2nd Q, 2010

OASIS

4.

Re-Bid Of Partial Service across Multiple Transmission Providers’
Systems
Status: Not Started

2nd Q, 2010

OASIS

5.

Group DNR requests from a system with point-to-point requests on other
systems for synchronization
Status: Not Started

2nd Q, 2010

OASIS

Group 6: Miscellaneous (Paragraphs 1390 and 1627 of Order 890)
5.

Paragraph 1390 of Order 890
Status: Not Started

4th Q, 2010

OASIS

6.

Paragraphs 1627 of Order 890
Status: Not Started

4th Q, 2010

OASIS

7.

Redispatch Cost Posting to allow for posting of third party offers of
planning redispatch services.
Status: Not Started

4th Q, 2010

OASIS

Develop the needed business practices as companion to the NERC standards for ATC related efforts
i)

Develop standards to support existing Request No. R05004.
1.

The processing of transmission service requests, which use
TTC/ATC/AFC, in coordination with NERC changes to MOD 001 where
the allocation of flowgate capability based on historical Network Native
Load impacts the evaluation of transmission service requests, requiring
the posting of those allocation values in conjunction with queries of
service offerings on OASIS
Status: Underway

1st Q, 2010

OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 299

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
3

8

Completion

Assignment9, 10

Develop business practices standards to improve the current operation of the wholesale electric market and develop
and maintain business practice and communication standards for OASIS and Electronic Scheduling
a)

Develop and/or maintain business practice standards as needed for OASIS and electronic scheduling. Specific items to
address include:
1st Q, 2010

i)

Network Services: Determine and develop needed business practice standards
or other support is needed to support use of OASIS for Network Service
transactions (R04006E). (Related to AP 2(a)(iii))
Status: Underway

OASIS

ii)

Registry (TSIN): Determine and develop needed business practice standards to support the registry functions
currently supported by NERC (R04037, R06027).
1.

Work with the NAESB counsel to develop a confidentiality agreement,
(R07013)
Status: Completed

4th Q, 2009

JESS

2.

Transition the TSIN Registry from NERC to NAESB as the enhanced
Electric Industry Registry (EIR), (R06027).
Status: Underway

2010

NAESB/NER
C
Administratio
n, JESS

2011

OASIS

iii)

Document procedures used to implement the displacement/interruption terms of
the Pro Forma tariff (R05019).
Status: Deleted as a duplicate of 2009 AP item 2.a.ii.2

iv)

Make remaining incremental enhancements to OASIS as an outgrowth of the NAESB March 29, 2005
conference on the future of OASIS (R05026).
Scoping statement completed by SRS and assignments made to BPS and OASIS.
1.

Eliminate Masking of TSR tag source and sink when requested status is
denied, withdrawn refused, displaced, invalid, declined, annulled or
retracted
Status: Not Started

2011

OASIS

2.

Initiate standard that eliminates the disparity of posting “sensitive”
information. This standard should also include procedures of user
certification that allows access to this class of information.
Status: Underway (upon further development of this item by NAESB, a
completion date will be determined)

2011

OASIS

3.

Enhance the TSR result postings to allow showing of (i) limiting
transmission elements and (ii) available generation dispatch options that
would allow acceptance of reservation request.
Status: Not Started (upon initiation of this item by NAESB, a
completion date will be determined)

2011

OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 300

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description

b)

8

Completion

Assignment9, 10

v)

Develop, coordinate interoperability testing, and implement e-Tag version 1.8.1
Status: Underway – 20090716 discussed rough time frames laid out needs test
plans drafted

1st Q, 2010

JESS

vi)

Transition e-Tag Specification and schema to NAESB
Status: Complete. Version 1.8.1 will be identified as the NAESB Electronic
Tagging Functional Specification

1st Q, 2009

JESS

vii)

Review and correct the WEQ-004 Coordinate interchange Business Practice
Standard as noted during the development of the e-Tag 1.8 development
process.
Status: Completed. Recommendation was voted out of the JESS on September
2, 2009. Formal comment period closed on October 8, 2009.

3rd Q, 2009

JESS

viii)

Review and correct WEQ-004 Coordinate Interchange Business Practice
Standard as needed based on activities in NERC Project 2008-12, Coordinate
Interchange Standards Revisions and supporting EOP-002-2 R4 and R6. [note:
this is a new item]
Status: Not started – dependent on NERC activity (upon initiation of this item
by NAESB, a completion date will be determined)

2010

JESS

Develop and/or maintain standard communication protocols and cyber-security business practices as needed.
i)

Develop PKI certification program for e-Tag and OASIS
Status: Not Started (upon initiation of this item by NAESB, a completion date
will be determined)

2010

Board
Certification
Program
Committee

ii)

Develop PKI standards for OASIS.
Status: Not Started (upon initiation of this item by NAESB, a completion date
will be determined)

2011

OASIS

iii)

Develop Industry Implementation Plan for meeting PKI Standard requirements
for e-tagging.
Status: Underway. Full e-Tag implementation (server & client side) is linked
to the transition of the Registry from NERC to NAESB and NAESB
implementation. 20090716 – server-side certificate underway – change TSIN to
accept https URLs with a September 2009 target.

TBD –
dependent on
item above
(i) and EIR

JESS

c)

Develop needed business practice standards for organization/company codes for
NAESB standards – and address current issues on the use of DUNs numbers.
Status: Underway (upon further development of this item by NAESB, a completion
date will be determined)
Common code usage is linked to the transition of the Registry from NERC to NAESB

2009

NAESB Staff
with WEQ
support

d)

Develop business practice standards in support of FERC Order No. 717
Status: Completed

1st Q, 2009

BPS

Report of the North American Energy Standards Board, September 18, 2012
Page 301

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
4

8

Completion

Assignment9, 10

Review and develop business practices standards to Demand Response, Demand Side Management and Energy
Efficiency Programs
Review and develop needed model business practices for a standardized method for quantifying benefits, savings, cost
avoidance and/or the reduction in energy demand and usage derived from the implementation of demand side management
and energy efficiency programs. This effort will include demand side response, energy efficiency programs and metering,
including the 'curtailment service provider' program.
4th Q, 2008

a)

Develop matrix and business practice standards for measurement and verification for
demand response products and services in ISO/RTO footprint areas.
Status: Completed

b)

Develop more detailed technical standards for the measurement and verification of
demand response products and services in ISO-RTO footprint areas, including
examples to be developed to support item 4(a) above.
Status: In Progress

c)

Develop preamble for business practice standards for measurement and verification for
demand response and energy efficiency programs.
Status: Completed

3rd Q, 2009

Joint
WEQ/REQ
DSM-EE
Subcommittee

d)

Develop glossary for business practice standards
Status: Ongoing

Ongoing

Joint
WEQ/REQ
DSM-EE
Subcommittee

e)

Support retail development of matrix and model business practice standards for
measurement and verification for demand response programs
Status: Completed

3rd Q, 2009

Retail Section
of Joint
WEQ/REQ
DSM-EE
Subcommittee

f)

Develop business practice standards to measure and verify energy reductions that are
made to comply with a Renewable Portfolio Standard that included energy efficiency
or a stand-alone Energy Efficiency Portfolio Standard.
Status: Upon further review, the task force has determined this work will be
completed under Annual Plan Item 4g.

Combined
with 4g

WEQ
Section/Joint
WEQ/REQ
DSM-EE
Subcommittee

g)

Develop business practice standards used to measure and verify reductions in energy
and demand from energy efficiency in wholesale and retail markets.66
Status: Underway (An estimated completion date will be established in 4th Q after the
new working group has been formalized)

2010

WEQ
Section/Joint
WEQ/REQ
DSM-EE
Subcommittee

2010

WEQ Section
of the Joint
WEQ/REQ
DSM-EE
Subcommittee
WEQ Section
of the Joint
WEQ/REQ
DSM-EE
Subcommittee

66

Energy efficiency may be a wholesale product, such as capacity. Energy efficiency in retail markets may be from individual
energy efficiency measures at the project level or a portfolio of projects that make up an energy efficiency program.
Report of the North American Energy Standards Board, September 18, 2012
Page 302

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
h)

5

Develop business practice standards for cap and trade programs for green house gas
Status: Moved to Provisional Item 8. This item will not be addressed until Congress
has addressed pending legislation.

Completion

8

Assignment9, 10

Moved to
Provisional
Item 8

Joint
WEQ/REQ
DSM-EE
Subcommittee

Maintain existing body of Version 2 standards
a)

Make consistency changes to Version 1.0 standards as directed by the WEQ Leadership Committee on December 12,
2007 (R08001 – BPS, OASIS, R08002 - OASIS, R08003 - OASIS - BPS, R08004, R08005 - OASIS)
1.

OASIS Consistency Changes (R08001, R08002, R08003, R08005)
Status: Not Started (upon initiation of this item by NAESB, a completion date
will be determined)

2011

OASIS

2.

Gas / Electric Communication Consistency Changes (R08004)
Status: Completed. WEQ BPS coordinated recommendation with WGQ BPS.
WEQ BPS voted recommendation out of subcommittee on September 28,
2009.

3rd Q, 2009

WEQ BPS /
WGQ BPS

b)

Modify NAESB definitions to address internal inconsistencies and inconsistencies
with the NERC glossary. Revise existing NAESB glossary/definition of terms to be
applicable to entire set of WEQ Business Practices.
(http://www.naesb.org/pdf3/weq_ec051308w3.doc)
Status: Completed
Subcommittee co-chairs are developing WEQ-000 Definition of Terms/Acronyms to
replace definitions being included in each NAESB Business Practice.

4th Q, 2009

BPS/OASIS/S
RS/JESS Cochairs

c)

Develop standards to allow for registered Market Operators to request changes to the 1st Q, 2009
Market Level profile of Implemented Interchange (R06006)
Status: Complete

JESS

d)

Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the
“System_Attribute” data element of the NAESB Standard WEQ-003: OASIS S&CP
Data Dictionaries. (R08011)
Status: Not Started
This Standards Request was assigned to the OASIS in May 2008.

2011

OASIS

e)

Provide for Enhanced Granularity for Public Utilities in Identifying Critical
Operational Flow Orders. (R08020)
Status: WEQ Complete/WGQ In Progress. This Standards Request was assigned to
the BPS in August 2008 (upon initiation of this item by NAESB, a completion date
will be determined)

2nd Q, 2009

BPS jointly
with WGQ
BPS

Report of the North American Energy Standards Board, September 18, 2012
Page 303

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as Approved by the Board on December 10, 2009
Item Description
f)

g)
h)

i)

Synchronize Bidding Credit Requirements for FTR, TCC and CRR (R08025)
Posting of collateral is an important issue for financial marketers. Most financial
marketers and smaller entities are required to post cash for FTR transactions, while
most utilities post unsecured credit. Therefore, the timing for posting collateral is
especially crucial to financial marketers. There are two posting periods for FTRs:
1. The Bidding Requirement: Credit must be posted with FTR bids and these
monies are held until bids are cleared.
2. The Holding Requirement: After bids are cleared and FTRs awarded, collateral
is required for the amount of time the FTR is active.
Status: Withdrawn by requester
Correct WEQ 013-2.6.7.2. – Resale off OASIS (R08027)
Status: Not Started
Add language to WEQ-001-4 Online Negotiation and Confirmation process to
clarify Table 4-3 (R09003)
Status: Not Started
Change Power Plant Operator to Power Plant Gas Coordinator (R09011)
Status: Completed. WEQ BPS coordinated recommendation with WGQ BPS.
WEQ BPS voted recommendation out of subcommittee on September 28, 2009.

Completion

8

Assignment9, 10

4th Q, 2009

SRS (Scoping)

TBD

OASIS

TBD

OASIS

4th Q, 2009

WEQ
BPS/WGQ
BPS

Report of the North American Energy Standards Board, September 18, 2012
Page 304

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
NAESB 2009 WEQ Annual Plan as approved by the Board on December 10, 2009

PROVISIONAL ITEMS
1

Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission
Adequacy (Project 2009-05 Resource Adequacy Assessment).

2

Develop business practices for allocating capacity among requests received during a submittal window Order 890-A
(Docket Nos. RM05-17-001, 002 and RM05-25-001, 002 - Paragraph 805).

3

Determine any needed NAESB action in support of the Interchange Distribution Calculator (IDC) and develop any
necessary standards.

4

Prepare recommendations for future path for TLR (equity concerns) in concert with NERC, which may include alternative
congestion management procedures11. Work on this activity is dependent on completing 2009 WEQ Annual Plan 1.c.i
(Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern Interconnection).

5

Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Control, for which a
white paper is expected after the 2009 SAR is processed.

6

Develop NAESB business practices as needed to complement NERC reliability standards for FAC-012 and FAC-013.

7

Determine NAESB action needed to support FERC Action Plan for Smart Grid Technology.

8

Develop business practice standards for cap and trade programs for green house gas (See action item 4h).

9

Conduct assessment to determine if Electric Industry Requirements documented in WEQ-011 Gas / Electric Coordination
should be considered reliability requirements and transition to NERC.

Report of the North American Energy Standards Board, September 18, 2012
Page 305

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

Wholesale Electric Quadrant3
Executive Committee (WEQ EC)

Scoping

Standards Review Subcommittee (SRS)

Interpretations Subcommittee

Business Practices Subcommittee (BPS)

Open Access Same Time Information System
(OASIS)
Development
Joint Electric Scheduling Subcommittee (JESS)

E-Tariff Joint WEQ/WGQ Subcommittee

Smart Grid Standards Task Force (**)

DSM-EE Retail/WEQ Subcommittee
Task Forces & Working Groups

NAESB WEQ EC and Subcommittee Leadership:
Executive Committee: Kathy York (WEQ EC Chair) and Matthew Goldberg (WEQ EC Vice Chair)
Standards Review Subcommittee: Narinder Saini, Ed Skiba
Interpretations Subcommittee: Robert Schwermann
Business Practices Subcommittee & Task Forces: Jim Busbin (TLR), Ed Skiba
Open Access Same Time Information System (OASIS): Paul Sorenson, J.T. Wood, Marcie Otondo
Joint Electric Scheduling Subcommittee (JESS): Bob Harshbarger (NAESB), Jim Hansen (NERC)
e-Tariff Joint WEQ/WGQ Subcommittee (e-Tariff): Jane Daly (WEQ), Keith Sappenfield (WGQ)
DSM-EE Joint Retail/WEQ Subcommittee: Ruth Kiselewich and David Koogler (Retail), Roy True and Paul Wattles
(WEQ)
(**) The Smart Grid Task Force is a joint group of the retail electric and wholesale electric quadrant with other standards development groups
such as OASIS, CalConnect, FIX and UCAIug, and includes other groups. Direction may be given from NIST, DoE or FERC and the group
reports to the NAESB Board Smart Grid Strategic Steering Committee. The group is chaired by Brent Hodges, Wayne Longcore, Joe Zhou and
Robert Burke.

Report of the North American Energy Standards Board, September 18, 2012
Page 306

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix G: 2009 Wholesale Electric Quadrant Annual Plan
September 18, 2012

End Notes WEQ 2009 Annual Plan:
8

Dates in the completion column are by end of the quarter for completion by the assigned committee. The dates do not
necessarily mean that the standards are fully staffed to be implementable by the industry, and/or ratified by membership. If one
item is completed earlier than planned, another item can begin earlier and possibly complete earlier than planned. There are no
begin dates on the plan.

9

The assignments are abbreviated. The abbreviations and committee structure can be found at the end of the annual plan
document.

10

The Electronic Scheduling Subcommittee and Information Technology Subcommittee (ESS/ITS) were merged together
through a decision made at the May 12, 2009 WEQ EC meeting. The new subcommittee is named Open Access Same Time
Information System Subcommittee (OASIS) and is now shown for assignments in this and future annual plans as OASIS.
Similarly the Joint Interchange Scheduling Working Group (JISWG) was renamed the Joint Electric Scheduling Subcommittee
and now reports to the WEQ EC. JESS is now shown for assignments in this and future annual plans rather than JISWG. The
changes took effect on August 1, 2009.
11 For additional information, please see comments submitted by PJM and MISO for this Annual Plan Item:
http://www.naesb.org/pdf3/weq_aplan102907w1.pdf.

Report of the North American Energy Standards Board, September 18, 2012
Page 307

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
1

Completion12

Assignment13

Develop business practices standards as needed to complement reliability standards
Develop business practice standards to support and complement NERC reliability standards, NERC policies and NERC
standards authorization requests (SARs) using the NERC/NAESB Coordination Joint Standards Development Process as
appropriate. Current NAESB activities underway to develop business practice standards that are supportive of this annual
plan item are:
a)

Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern
Interconnection.
Note: Consideration should be given to provisional item 4. Work is being
coordinated with the NERC IDC Working Group.

i)

Interim solution for Parallel Flow Visualization
Status: Completed
Interim solution is needed to support November 1, 2010 NERC
implementation of IDC Change Order 283 into the IDC Staging
Environment.

3rd Q, 2011

BPS

ii)

Permanent solution for Parallel Flow Visualization
Status: Started

2nd Q, 2011

BPS

b)

Time Error and Inadvertent (BAL-004 and BAL-006) Coordination with NERC
Status: Monitor. (Will require coordination with Balancing Authority Reliability
Based Controls Standards Drafting Team (BARCSDT) created in July 2010) –
Moved to provisional item 13

Transferred
to
Provisional
Items67

TIMTF

c)

DCS and AGC (BAL-002 and BAL-005) Coordination with NERC
Status: Monitor. (Will require coordination with Balancing Authority Reliability
Based Controls Group created in July 2010) – Moved to provisional item 14

Transferred
to
Provisional
Items 1

TIMTF

d)

Monitor and develop NAESB business practices as needed to complement NERC
reliability standards for FAC-012 and FAC-013.
Status: Completed

3rd Q, 2010

SRS

67

The activities for the WEQ 2010 Annual Plan Item Nos. 1b, 1c, and 1d are dependent on NERC standards development efforts.
It is probable that this item will not start until 2012 when the field test from NERC is completed.

Report of the North American Energy Standards Board, September 18, 2012
Page 308

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
2

12

Completion

Assignment13

Develop business practice standards in support of the FERC RM05-25-000 and RM05-17-000 (OATT Reform)68
a)

Develop version 2 business practice standards to better coordinate the use of the transmission system among neighboring
transmission providers.
Status: Underway
Request R050004 was expanded to include the Order No. 890 (Docket Nos. RM05-25-000 and RM05-17-000) and
Order No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM0517-03 and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”).
i)

Group 3: Network Service On OASIS
1)

Use of OASIS to Make Electronic Requests to Designate and
Terminate Network Resource
Status: Underway

1st Q, 2011

OASIS

2)

Ability to Query Requests to Designate and Terminate Network
Resources and Allow for Queries of All Information Provided with
Designation Requests
Status: Underway

1st Q, 2011

OASIS

3)

Masking of Designated Network Resource Operating Restrictions
and Generating Cost Information
Status: Underway

1st Q, 2011

OASIS

4)

Procedural Requirements for Submitting Designations over new
OASIS Functionality
Status: Underway

1st Q, 2011

OASIS

5)

Specify How Designated Network Service Informational Postings
are Posted on OASIS
Status: Underway

1st Q, 2011

OASIS

6)

Develop standards for the treatment of OASIS Requests when the
Customer Fails to Provide the Necessary Attestation
Status: Underway

1st Q, 2011

OASIS

1st Q, 2011

OASIS

1st Q, 2011

OASIS

7)

8)

Procedural Requirements for Submitting Both Temporary and
Indefinite Terminations of Network Resources
Status: Underway
Procedures for Submitting and Processing Requests for Concomitant
Evaluations of Transmission Requests and Temporary Terminations
Status: Underway

68 FERC Order No. 890, issued February 16, 2007 can be accessed from the following link http://www.naesb.org/doc_view4.asp?doc=ferc021607.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 309

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
ii)

iii)

12

Completion

Assignment13

Group 4: Pre-Emption; Request No. R05019
8.

Pre-Emption
Status: Not Started

2011

OASIS

9.

Request No. R05019
Status: Not Started

2011

OASIS

Group 5: Paragraph 137769 – Group 5 work should precede group 4 work3
1)

Paragraph 1377-Coordination of Requests Across Multiple
Transmission Systems
Status: Underway, Scoping Group work product approved by the
WEQ EC and sent to the OASIS Subcommittee.

1st Q, 2011

OASIS

2)

Re-Bid Of Partial Service across Multiple Transmission Providers’
Systems
Status: Underway, Scoping Group work product approved by the
WEQ EC and sent to the OASIS Subcommittee

1st Q, 2011

OASIS

3)

Group DNR requests from a system with point-to-point requests on
other systems for synchronization
Status: Underway, Scoping Group work product approved by the
WEQ EC and sent to the OASIS Subcommittee

1st Q, 2011

OASIS

69

Paragraph 1377 of FERC Order No. 890, issued February 16, 2007: The Commission agrees that transmission requests across
multiple transmission systems should be coordinated by the relevant transmission providers. We will not, however, amend the
pro forma OATT to require such coordination. Rather, we require transmission providers working through NAESB to develop
business practice standards related to coordination of requests across multiple transmission systems. In order to provide guidance
to NAESB, we will articulate the principles that should govern processing across multiple systems. All the transmission
providers involved in a request across multiple systems should consider a request that requires studies across multiple systems to
be a single application for purposes of establishing the deadlines for rendering an agreement for service, revising queue status,
eliciting deposits and commencing service. In order to preserve the rights of other transmission customers with studies in the
queue, the priority for the single application should be based on the latest priority across the transmission providers involved in
the multiple system request. We note that regional entities like wesTTrans are already coordinating requests across multiple
transmission systems and we believe such coordination is an acceptable solution to this issue.

Report of the North American Energy Standards Board, September 18, 2012
Page 310

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
iv)

12

Completion

Assignment13

Group 6: Miscellaneous (Paragraphs 139070 and 162771 of FERC Order No. 890)
1)

Paragraph 1390 of Order 890 – Terminations related to: deficient
requests, customer failure to pay required annual reservation fee, and
customer modifications to applications which are meaningfully
different.
Status: Not Started

2011

OASIS

2)

Paragraphs 1627 of Order 890 – Posting of additional information on
OASIS regarding firm transmission curtailments
Status: Not Started

2011

OASIS

3)

Redispatch Cost Posting to allow for posting of third party offers of
planning redispatch services.
Status: Not Started

2011

OASIS

70 Paragraph 1390 of FERC Order No. 890, issued February 16, 2007: We will not modify the pro forma OATT to address
requests to allow the transmission provider to terminate idle transmission service requests. NAESB’s business practice 001-4.11
allows the transmission provider to retract a request if the transmission customer does not respond to an acceptance within the
time established in NAESB business practice standard 001-4.13. Therefore, we interpret TDU Systems comments to refer to
circumstances when a transmission customer fails to respond to the transmission provider’s request for additional information
during the course of a request study. As discussed above, by the time the transmission provider offers a system impact study
agreement, it should have all of the information that it needs to complete the study. Pursuant to section 17.4 of the pro forma
OATT, the transmission provider can deem a transmission service request deficient if the transmission customer does not provide
all of the information the transmission provider needs to evaluate the request for service. We will revise section 17.7 of the pro
forma OATT so that the transmission provider is able to terminate a request for transmission service if a transmission customer
that is extending the commencement of service does not pay the required annual reservation fee within 15 days of notifying the
transmission provider that it would like to extend the commencement of service. We will not change the pro forma OATT to
allow the transmission provider to terminate a transmission service request if the transmission customer changes its application
for service. We believe the existing pro forma OATT is sufficient to allow a transmission provider to manage situations where
the transmission customer modifies its application for service to the point that the customer is requesting transmission service that
is meaningfully different than its initial request.
71
Paragraph 1627 of FERC Order No. 890, issued February 16, 2007: We agree with suggestions for the posting of additional
curtailment information on OASIS and, therefore, require transmission providers, working through NAESB, to develop a detailed
template for the posting of additional information on OASIS regarding firm transmission curtailments. Transmission providers
need not implement this new OASIS functionality and any related business practices until NAESB develops appropriate
standards. These postings must include all circumstances and events contributing to the need for a firm service curtailment,
specific services and customers curtailed (including the transmission provider’s own retail loads), and the duration of the
curtailment. This information is in addition to the Commission’s existing requirements: (1) when any transmission is curtailed or
interrupted, the transmission provider must post notice of the curtailment or interruption on OASIS, and the transmission
provider must state on OASIS the reason why the transaction could not be continued or completed; (2) information to support any
such curtailment or interruption, including the operating status of facilities involved in the constraint or interruption, must be
maintained for three years and made available upon request to the curtailed or interrupted customer, the Commission’s Staff, and
any other person who requests it; and, (3) any offer to adjust the operation of the transmission provider’s system to restore a
curtailed or interrupted transaction must be posted and made available to all curtailed and interrupted transmission customers at
the same time.

Report of the North American Energy Standards Board, September 18, 2012
Page 311

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
b)

Assignment13

Develop the needed business practices as companion to the NERC standards for ATC related efforts3
i)

Develop standards to support existing Request No. R05004.
1)

3

12

Completion

The processing of transmission service requests, which use
TTC/ATC/AFC, in coordination with NERC changes to MOD 001
where the allocation of flowgate capability based on historical
Network Native Load impacts the evaluation of transmission service
requests, requiring the posting of those allocation values in
conjunction with queries of service offerings on OASIS
Status: Underway

1st Q, 2011

OASIS

Develop business practices standards to improve the current operation of the wholesale electric market and develop
and maintain business practice and communication standards for OASIS and Electronic Scheduling
a)

Develop and/or maintain business practice standards as needed for OASIS and electronic scheduling. Specific items to
address include:
1st Q, 2011

i)

Network Services: Determine and develop needed business practice
standards or other support is needed to support use of OASIS for Network
Service transactions (R04006E). (Related to AP 2(a)(iii))3
Status: Underway

ii)

Registry (TSIN): Determine and develop needed business practice standards to support the registry functions
currently supported by NERC (R04037, R06027).
1)

Transition the TSIN Registry from NERC to NAESB as the
enhanced Electric Industry Registry (EIR), (R06027).
Status: Underway, contract signed.

2nd Q, 2011

OASIS

NAESB/NERC
Administration,
JESS

iii)

Document procedures used to implement the displacement/interruption
terms of the Pro Forma tariff (R05019).
Status: Deleted as a duplicate of 2009 AP item 2.a.ii.2

iv)

Make remaining incremental enhancements to OASIS as an outgrowth of the NAESB March 29, 2005
conference on the future of OASIS (R05026).
Scoping statement completed by SRS. There were a number of assignments from the Standards Request. The
outstanding items are included below:.
1)

Eliminate Masking of TSR tag source and sink when requested
status is denied, withdrawn refused, displaced, invalid, declined,
annulled or retracted
Status: Not Started

2012

OASIS

2)

Initiate standard that eliminates the disparity of posting “sensitive”
information. This standard should also include procedures of user
certification that allows access to this class of information.
Status: Underway (upon further development of this item by
NAESB, a completion date will be determined)

2012

OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 312

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
3)

b)

Enhance the TSR result postings to allow showing of (i) limiting
transmission elements and (ii) available generation dispatch
options that would allow acceptance of reservation request.
Status: Not Started (upon initiation of this item by NAESB, a
completion date will be determined)

v)

Develop, coordinate interoperability testing, and implement e-Tag version
1.8.1
Status: Completed.

vi)

Review and correct WEQ-004 Coordinate Interchange Business Practice
Standard as needed based on activities in NERC Project 2008-12,
Coordinate Interchange Standards Revisions and supporting EOP-002-2
R4 and R6. [note: this is a new item]
Status: Underway. Completion date dependent upon coordination
activities with NERC.

12

Completion
2012

1st Q, 2010

2011

Assignment13
OASIS

JESS

JESS

Develop and/or maintain standard communication protocols and cyber-security business practices as needed.
i)

Develop PKI certification program for e-Tag and OASIS
Status: Underway

ii)

Develop PKI standards for OASIS.
Status: Not Started (upon initiation of this item by NAESB, a completion
date will be determined)

iii)

Develop Industry Implementation Plan for meeting PKI Standard
requirements for e-tagging.
Status: Underway. Full e-Tag implementation (server & client side) is
linked to the transition of the Registry from NERC to NAESB and
NAESB implementation.

3rd Q 2011

2012

TBD –
dependent on
item above
(i) and EIR

Board Certification
Program
Committee
OASIS

JESS

Report of the North American Energy Standards Board, September 18, 2012
Page 313

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
4

12

Completion

Assignment13

Review and develop business practices standards to Demand Response, Demand Side Management and Energy
Efficiency Programs
Review and develop needed model business practices for a standardized method for quantifying benefits, savings, cost
avoidance and/or the reduction in energy demand and usage derived from the implementation of demand side management
and energy efficiency programs. This effort will include demand side response, energy efficiency programs and metering,
including the 'curtailment service provider' program.
a)

Review the NAESB Business Practices for Measurement and Verification of
Phase 2 – 4th Q
Wholesale Electricity Demand Response (WEQ-015) in conjunction with the IRC
2010
developed Demand Response Matrix and identify business practice requirements
that could be improved or made clearer through the addition of specific technical
detail. The wholesale and retail demand response work groups and the Smart
Grid Standards Subcommittees should actively and timely communicate and
coordinate work products to ensure consistency between the three work groups.
Each work group should take into account the work products developed by the
other.
Status: Completed

WEQ Section of
the Joint
WEQ/REQ DSMEE Subcommittee

b)

For each performance evaluation type/service type combination identified in
Phase 2 – 4th Q
2010
WEQ-015, using the IRC matrix as a starting point, assess and determine what
standards or guidelines, if any, should be developed to aid all participants in the
use of measurement and verification methods for demand response programs in
organized wholesale electric markets. If the determination is made that standards
or guidelines will be developed, those items will be added as sub-items to 4(b).
Status: Completed

WEQ Section of
the Joint
WEQ/REQ DSMEE Subcommittee

c)

Develop glossary for business practice standards
Status: Ongoing

Ongoing

d)

Develop business practice standards used to measure and verify reductions in
energy and demand from energy efficiency in wholesale and retail markets.14
This includes developing business practice standards to measure and verify
energy reductions that are made to comply with a Renewable Portfolio Standard
that included energy efficiency or a stand-alone Energy Efficiency Portfolio
Standard.
Status: Completed

4th Q, 2010

Joint WEQ/REQ
DSM-EE
Subcommittee

e)

Create common interfaces and data structures necessary for enrolling DR sites
into a DR program (Request No. R10002)
Status: Reassigned to Retail Electric Quadrant Only

4th Q, 2010

REQ portion of the
Joint WEQ/REQ
DSM-EE
Subcommittee with
coordination with
Smart Grid
Standards Task
Force and REQ
BPS

Joint WEQ/REQ
DSM Subcommittee

Report of the North American Energy Standards Board, September 18, 2012
Page 314

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
5

Assignment13

Maintain existing body of Version 2.x standards
a)

Make consistency changes to Version 2.2 standards as directed by the WEQ
Leadership Committee on December 12, 2007 OASIS Consistency Changes
(R08001, R08002, R08003, R08005)
Status: Not Started (upon initiation of this item by NAESB, a completion date
will be determined)

TBD

OASIS

b)

Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the
“System_Attribute” data element of the NAESB Standard WEQ-003: OASIS
S&CP Data Dictionaries. (R08011)
Status: Not Started. This Standards Request was assigned to the OASIS in May
2008.

TBD

OASIS

c
)

Correct WEQ 013-2.6.7.2. – Resale off OASIS (R08027)
Status: Not Started
Add language to WEQ-001-4 Online Negotiation and Confirmation process to
clarify Table 4-3 (R09003)
Status: Not Started
Create a new OASIS mechanism that allows for the merger of like reservations
without the use of the resale mechanism (R09015)
Status: Not Started

TBD

OASIS

TBD

OASIS

TBD

OASIS

d
)
e
)
6.

12

Completion

Develop Smart Grid Wholesale and Retail Electric Standards - The wholesale and retail demand response work groups
and the Smart Grid task force should actively and timely communicate and coordinate work products to ensure consistency
between the three work groups. Each work group should take into account the work products developed by the other.
a
)

Develop requirements and use cases for PAP 03 – Pricing Model
i).

1st Q, 2010

Phase 1
Status: Completed

ii)
b
)

Phase 2
Status: Completed
Develop requirements and use cases for PAP 04 – Scheduling Model

i)
ii)
c
)

4th Q, 2010

1st Q, 2010

Phase 1
Status: Completed

Phase 2
Status: Completed
Develop requirements and use cases for PAP 09 – Demand
Response/Distributed Energy Resources

4th Q, 2010

Joint WEQ/REQ
SGS Subcommittee
Joint WEQ/REQ
SGS Subcommittee

Joint WEQ/REQ
SGS Subcommittee
Joint WEQ/REQ
SGS Subcommittee

Report of the North American Energy Standards Board, September 18, 2012
Page 315

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description

d)

i)

Phase 1
Status: Completed

ii)

Phase 2
Status: Completed

ii)

7
.

1st Q, 2010

4th Q, 2010

Assignment13
WEQ Section of
the Joint
WEQ/REQ SGS
Subcommittee
WEQ Section of
the Joint
WEQ/REQ SGS
Subcommittee

Develop standards to support PAP 10 – Standards Energy Usage Information
i)

e
)

12

Completion

Act as a convener (develop and implement a plan to expedite harmonized
standards development and adoption within the associated standards
bodies) and develop business practice standards as needed and assigned
to NAESB for PAP 10 – Standard Energy Usage Information
Status: Completed
Develop Information Model and related business practices
Status: Complete

Develop standards to support inclusion of OpenADE requirements document
into the NAESB Smart Grid standards (R10008), specifically to standardize the
exchange of Energy Usage Information.
Status: Reassigned to REQ only.

2nd Q, 2010

Joint WEQ/REQ
PAP 10 SGS
Subcommittee

4th Q, 2010

Joint WEQ/REQ
PAP 10 SGS
Subcommittee

4th Q, 2010

REQ section of
the Joint
WEQ/REQ PAP
10 SGS
Subcommittee
Task Force

Develop or modify standards to Support FERC Order No. 676-E, (Docket No. RM 05-5-013)
a
)
b
)

Review standards 001-14.1.3 and 001-15.1.2 based on FERC Order No. 676-E
(See ¶ 3972)
Status: Not Started
Develop standards to support the Transmission Provider right to reassess the
availability of conditional firm (See ¶ 7273)
Status: Not Started

2nd Q,
2011

OASIS

2nd Q,
2011

OASIS

72
39.
In regards to Entergy’s question of whether the transmission provider’s calculated and posted available flowgate
capability values should be used to fulfill the posting requirements set forth in Standard 001-14 and 001-15 in instances where
there is no requirement to convert this calculation to available transfer capability values, we agree with Entergy that this
requirement can be met by the transmission provider posting its available flowgate capability values. As to EPSA’s argument
that Standard 001-15 falls short of the goals of Order No. 890, we find that, with the exception of Standard 001-15.1.2,
compliance with Standard 001-15 provides all of the information required by Order No. 890. However, Standards 001-14.1.3
and 001-15.1.2 permit transmission providers to post an available transfer capability change narrative within five business days
of meeting the criteria under which a narrative is required to be posted. In Order No. 890, the Commission rejected calls for
delays prior to posting data and required posting as soon as possible. We do not find the NAESB standard meets this criterion
and therefore decline to incorporate Standards 001-14.1.3 and 001-15.1.2 by reference. Transmission providers must post their
narratives as soon as feasibly possible. Posting within one day would appear in most cases to be reasonable.

Report of the North American Energy Standards Board, September 18, 2012
Page 316

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
Item Description
c
)

Prepare status reports every six months regarding the development of standards
for the coordination of transmission service requests across multiple
transmission systems (See ¶ 10574). This annual plan item is tied to Annual
Plan Item 2(a)(iii)
Status: Underway – first report filed.

Completion

12

Assignment13

Ongoing

NAESB Office

73

72.
However, we reiterate here the Commission’s finding in Order No. 890 that a transmission provider is permitted to
extend its right to reassess the availability of conditional firm service. Since the Version 002.1 Standards do not specifically
address this issue, we would ask the industry, working through NAESB, to continue to look at additional business practice
standards facilitating a transmission provider’s extension of its right to perform a reassessment
74 105. We agree that insufficient progress has been made on this issue. While we acknowledge that development of standards
addressing this issue is included in NAESB’s 2009 WEQ Annual Plan, we nevertheless urge NAESB to address this issue as
soon as possible. Accordingly, we request that NAESB provide the Commission with a status report concerning its progress on
this issue every six months, counting from the date this final rule is published in the Federal Register, until NAESB’s adoption of
the applicable standard(s).
Report of the North American Energy Standards Board, September 18, 2012
Page 317

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2010 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
As Approved by NAESB Board of Directors on December 9, 2010
PROVISIONAL ITEMS
1

Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission
Adequacy (Project 2009-05 Resource Adequacy Assessment).

2

Develop business practices for allocating capacity among requests received during a submittal window Order 890-A
(Docket Nos. RM05-17-001, 002 and RM05-25-001, 002 - Paragraph 805).75

3

Determine any needed NAESB action in support of the Interchange Distribution Calculator (IDC) and develop any
necessary standards.

4

Prepare recommendations for future path for TLR (equity concerns) in concert with NERC, which may include
alternative congestion management procedures15. Work on this activity is dependent on completing 2010 WEQ Annual
Plan 1.a (Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern Interconnection).

5

Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Control, for which a
white paper is expected after the SAR is authorized to proceed by the NERC Standards Committee.

6

Provisional Item No. 6 was added to the 2010 Annual Plan as Item No. 1(d)

7

Determine NAESB action needed to support FERC Action Plan for Smart Grid Technology.

8

Develop business practice standards for cap and trade programs for green house gas

9

Conduct assessment to determine if Electric Industry Requirements documented in WEQ-011 Gas / Electric
Coordination should be considered reliability requirements and transition to NERC.

10

Develop needed business practice standards for organization/company codes for NAESB standards – and address
current issues on the use of DUNs numbers. Common code usage is linked to the transition of the Registry from NERC
to NAESB.

11

Provisional Item No. 11 was determined to only affect the REQ, and as such was added to the 2010 Retail Annual Plan
as Item No. 3e.

12

Review the need for, and develop standards where appropriate, in response to issues raised by FERC’s National Action
Plan on Demand Response.

13

Coordinate standards development with the NERC Balancing Authority Reliability Based Controls Standards Drafting
Team (BARCSDT- created in July 2010) regarding Time Error and Inadvertent (BAL-004 and BAL-006), which may
require changes to NAESB WEQ standards. (Previously WEQ 2010 Annual Plan Item 1b).

14

Coordinate standards development with the NERC Balancing Authority Reliability Based Controls Standards Drafting
Team (BARCSDT- created in July 2010) regarding DCS and AGC (BAL-002 and BAL-005) which may require
changes to NAESB WEQ standards. (Previously WEQ 2010 Annual Plan Item 1c).

75

805. The Commission recognizes that developing methods to allocate capacity among requests received during a submittal
window may require detailed procedures, particularly when transmission requests received simultaneously exceed available
capacity. As the Commission explained in Order No. 890, however, we believe that each transmission provider is in the best
position to develop allocation procedures that are suitable for its system. This does not preclude transmission providers from
working through NAESB to develop standardized practices, as suggested by Southern. For example, as we pointed out in Order
No. 890, allocation methods such as that used by PJM to allocate monthly firm point-to-point transmission service could provide
useful guidance in developing general allocation procedures.
Report of the North American Energy Standards Board, September 18, 2012
Page 318

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

WHOLESALE ELECTRIC QUADRANT EXECUTIVE COMMITTEE AND SUBCOMMITTEE STRUCTURE
Wholesale Electric Quadrant
Executive Committee (WEQ EC)

Scoping

Standards Review Subcommittee (SRS)

Interpretations Subcommittee

Business Practices Subcommittee (BPS)

OASIS Subcommittee
Development
Joint Electric Scheduling Subcommittee (JESS)

E-Tariff Joint WEQ/WGQ Subcommittee

Smart Grid Standards Development
Subcommittee (**)
PAP 10 Smart Grid Standards Subcommittee
(***)
DSM-EE Retail/WEQ Subcommittee

Task Forces & Working Groups

NAESB WEQ EC and Subcommittee Leadership:
Executive Committee: Kathy York (WEQ EC Chair) and Alan Johnson (WEQ EC Vice Chair)
Standards Review Subcommittee: Narinder Saini, Ed Skiba
Interpretations Subcommittee: Ed Skiba
Business Practices Subcommittee & Task Forces: Jim Busbin (TLR), Ed Skiba
Open Access Same Time Information System (OASIS): Paul Sorenson, J.T. Wood, Marcie Otondo
Joint Electric Scheduling Subcommittee (JESS): Bob Harshbarger (NAESB), Clint Aymond (NERC)
e-Tariff Joint WEQ/WGQ Subcommittee (e-Tariff): Jane Daly (WEQ), Keith Sappenfield (WGQ)
DSM-EE REQ/WEQ Subcommittee: Ruth Kiselewich and David Koogler (Retail), Roy True and Paul Wattles (WEQ)
(**) The Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants with other
standards development groups such as OASIS (Organization for the Advancement of Structured Information Standards, not Open
Access Same Time Information Systems related to NAESB standards and FERC actions), CalConnect, FIX and UCAIug, among
Report of the North American Energy Standards Board, September 18, 2012
Page 319

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix H: 2010 Wholesale Electric Quadrant Annual Plan
September 18, 2012

others. Direction may be given from NIST, DoE or FERC and the group reports jointly to the NAESB Board Smart Grid
Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Brent Hodges, Joe Zhou, Wayne Longcore
and Robert Burke.
(***) The PAP 10 Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants
with other standards development groups such as OASIS, UCAIug, OpenADE, ZigBee, ASHRAE, EIS Alliance, NARUC and
includes other groups. Direction may be given from NIST, DoE or FERC and the group reports jointly to the NAESB Board
Smart Grid Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Brent Hodges, Phil Precht, Cathy
Wesley, Sharon Dinges, David Kaufman, Brad Ramsay, Tobin Richardson and Ed Koch.

End Notes WEQ 2010 Annual Plan:
12

Dates in the completion column are by end of the quarter for completion by the assigned committee, sub-committee or task
force. The dates do not necessarily mean that the standards are fully staffed to be implementable by the industry, and/or ratified
by membership. If one item is completed earlier than planned, another item can begin earlier and possibly complete earlier than
planned. There are no begin dates on the plan.
13

The assignments are abbreviated. The abbreviations and sub-committee structure can be found at the end of the annual plan
document.
14

Energy efficiency may be a wholesale product, such as capacity. Energy efficiency in retail markets may be from individual
energy efficiency measures at the project level or a portfolio of projects that make up an energy efficiency program.

15

For additional information, please see comments submitted by PJM and MISO for this Annual Plan Item:
http://www.naesb.org/pdf3/weq_aplan102907w1.pdf.

Report of the North American Energy Standards Board, September 18, 2012
Page 320

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
1

Completion16

Assignment17

Develop business practices standards as needed to complement reliability standards
Develop business practice standards to support and complement NERC reliability standards, NERC policies and NERC
standards authorization requests (SARs) using the NERC/NAESB Coordination Joint Standards Development Process as
appropriate. Current NAESB activities underway to develop business practice standards that are supportive of this annual
plan item are:

2

a)

Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern
Interconnection – Permanent Solution
Note: Consideration should be given to provisional item 4. Work is being
coordinated with the NERC IDC Working Group.
Status: Started

4th Q, 2011

BPS

b)

Perform consistency review of WEQ-008 Transmission Loading Relief Business
Practice Standards and develop recommendation.76

2012

BPS

c)

DCS and AGC (BAL-002 and BAL-005) Coordination with NERC
Status: Monitor. (Will require coordination with Balancing Authority Reliability
Based Controls Group created in July 2010 NERC Project 2010-14)

TBD2

TIMTF

d)

Coordinate with NERC on the functional model glossary revisions NERC Project
2010-08

TBD

SRS

e)

Coordinate with NERC on changes to the definition of Bulk Electric System
NERC Project 2010-17
Status: Started (Initial review performed to determine whether NAESB should
adopt revised NERC definition or maintain existing definition. Decision was to
recommend adopting revised NERC definition.)

1st Q, 2012

SRS

Develop business practice standards in support of the FERC RM05-25-000 and RM05-17-000 (OATT Reform)77
a)

Develop version 2 business practice standards to better coordinate the use of the transmission system among neighboring
transmission providers.
Status: Underway
Request R050004 was expanded to include the Order No. 890 (Docket Nos.RM05-17-000 and RM02-25-000), (Order
No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM05-17-03
and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”
i)

Group 3: Network Service On OASIS78
9)

Use of OASIS to Make Electronic Requests to Designate and
Terminate Network Resource
Status: Underway

4th Q, 2011

OASIS

76

In some sections of WEQ 008 it appears that the standards are applicable to all of the Interconnections and other it appears that
the standards are only applicable to the Eastern Interconnection. The title indicates the standards are applicable to the Eastern
Interconnection.
77
FERC Order No. 890, issued February 16, 2007 can be accessed from the following link http://www.naesb.org/doc_view4.asp?doc=ferc021607.doc
78
Several group 3 items may be removed from this plan if the 4th quarter completion dates are met.
Report of the North American Energy Standards Board, September 18, 2012
Page 321

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description

ii)

Completion16

Assignment17

10) Ability to Query Requests to Designate and Terminate Network
Resources and Allow for Queries of All Information Provided with
Designation Requests
Status: Underway

4th Q, 2011

OASIS

11) Masking of Designated Network Resource Operating Restrictions
and Generating Cost Information
Status: Underway

4th Q, 2011

OASIS

12) Procedural Requirements for Submitting Designations over new
OASIS Functionality
Status: Underway

4th Q, 2011

OASIS

13) Specify How Designated Network Service Informational Postings are
Posted on OASIS
Status: Underway

4th Q, 2011

OASIS

14) Develop standards for the treatment of OASIS Requests when the
Customer Fails to Provide the Necessary Attestation
Status: Underway

4th Q, 2011

OASIS

15) Procedural Requirements for Submitting Both Temporary and
Indefinite Terminations of Network Resources
Status: Underway

4th Q, 2011

OASIS

16) Procedures for Submitting and Processing Requests for Concomitant
Evaluations of Transmission Requests and Temporary Terminations
Status: Underway

4th Q, 2011

OASIS

Group 4: Pre-Emption; Request No. R05019
10. Pre-Emption
Status: Started

1st Q, 2012

OASIS

11. Request No. R05019
Status: Started

1st Q, 2012

OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 322

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
iii)

Completion16

Assignment17

Group 5: Paragraph 137779 – Group 5 work should precede group 4 work3
4) Paragraph 1377-Coordination of Requests Across Multiple
Transmission Systems
Status: Complete through the OASIS subcommittee, the WEQ EC
approved July 8, 2011, ratification due August 11, 2011.

2nd Q, 2011

OASIS

5)

Re-Bid Of Partial Service across Multiple Transmission Providers’
Systems
Status: Complete through the OASIS subcommittee, the WEQ EC
approved July 8, 2011, ratification due August 11, 2011

2nd Q, 2011

OASIS

6)

2nd Q, 2011

OASIS

Group DNR requests from a system with point-to-point requests on
other systems for synchronization
Status: Complete through the OASIS subcommittee, the WEQ EC
approved July 8, 2011, ratification due August 11, 2011

79

Paragraph 1377 of FERC Order No. 890, issued February 16, 2007: The Commission agrees that transmission requests across
multiple transmission systems should be coordinated by the relevant transmission providers. We will not, however, amend the
pro forma OATT to require such coordination. Rather, we require transmission providers working through NAESB to develop
business practice standards related to coordination of requests across multiple transmission systems. In order to provide guidance
to NAESB, we will articulate the principles that should govern processing across multiple systems. All the transmission
providers involved in a request across multiple systems should consider a request that requires studies across multiple systems to
be a single application for purposes of establishing the deadlines for rendering an agreement for service, revising queue status,
eliciting deposits and commencing service. In order to preserve the rights of other transmission customers with studies in the
queue, the priority for the single application should be based on the latest priority across the transmission providers involved in
the multiple system request. We note that regional entities like wesTTrans are already coordinating requests across multiple
transmission systems and we believe such coordination is an acceptable solution to this issue.

Report of the North American Energy Standards Board, September 18, 2012
Page 323

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
iv)

Completion16

Assignment17

Group 6: Miscellaneous (Paragraphs 139080 and 162781 of FERC Order No. 890)
4)

Paragraph 1390 of Order 890 – Terminations related to: deficient
requests, customer failure to pay required annual reservation fee, and
customer modifications to applications which are meaningfully
different.
Status: Completed

1st Q, 2012

OASIS

5)

Paragraphs 1627 of Order 890 – Posting of additional information on
OASIS regarding firm transmission curtailments
Status: Not Started

1st Q, 2012

OASIS

6)

1st Q, 2012

OASIS

Redispatch Cost Posting to allow for posting of third party offers of
planning redispatch services.
Status: Not Started

80

Paragraph 1390 of FERC Order No. 890, issued February 16, 2007: We will not modify the pro forma OATT to address
requests to allow the transmission provider to terminate idle transmission service requests. NAESB’s business practice 001-4.11
allows the transmission provider to retract a request if the transmission customer does not respond to an acceptance within the
time established in NAESB business practice standard 001-4.13. Therefore, we interpret TDU Systems comments to refer to
circumstances when a transmission customer fails to respond to the transmission provider’s request for additional information
during the course of a request study. As discussed above, by the time the transmission provider offers a system impact study
agreement, it should have all of the information that it needs to complete the study. Pursuant to section 17.4 of the pro forma
OATT, the transmission provider can deem a transmission service request deficient if the transmission customer does not provide
all of the information the transmission provider needs to evaluate the request for service. We will revise section 17.7 of the pro
forma OATT so that the transmission provider is able to terminate a request for transmission service if a transmission customer
that is extending the commencement of service does not pay the required annual reservation fee within 15 days of notifying the
transmission provider that it would like to extend the commencement of service. We will not change the pro forma OATT to
allow the transmission provider to terminate a transmission service request if the transmission customer changes its application
for service. We believe the existing pro forma OATT is sufficient to allow a transmission provider to manage situations where
the transmission customer modifies its application for service to the point that the customer is requesting transmission service that
is meaningfully different than its initial request.
81
Paragraph 1627 of FERC Order No. 890, issued February 16, 2007: We agree with suggestions for the posting of additional
curtailment information on OASIS and, therefore, require transmission providers, working through NAESB, to develop a detailed
template for the posting of additional information on OASIS regarding firm transmission curtailments. Transmission providers
need not implement this new OASIS functionality and any related business practices until NAESB develops appropriate
standards. These postings must include all circumstances and events contributing to the need for a firm service curtailment,
specific services and customers curtailed (including the transmission provider’s own retail loads), and the duration of the
curtailment. This information is in addition to the Commission’s existing requirements: (1) when any transmission is curtailed or
interrupted, the transmission provider must post notice of the curtailment or interruption on OASIS, and the transmission
provider must state on OASIS the reason why the transaction could not be continued or completed; (2) information to support any
such curtailment or interruption, including the operating status of facilities involved in the constraint or interruption, must be
maintained for three years and made available upon request to the curtailed or interrupted customer, the Commission’s Staff, and
any other person who requests it; and, (3) any offer to adjust the operation of the transmission provider’s system to restore a
curtailed or interrupted transaction must be posted and made available to all curtailed and interrupted transmission customers at
the same time.
Report of the North American Energy Standards Board, September 18, 2012
Page 324

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
b)

3

Develop the needed business practices to support existing Request No. R05004:
The processing of transmission service requests, which use TTC/ATC/AFC, in
coordination with NERC changes to MOD 001 where the allocation of flowgate
capability based on historical Network Native Load impacts the evaluation of
transmission service requests, requiring the posting of those allocation values in
conjunction with queries of service offerings on OASIS
Status: Underway

Completion16
4th Q, 2011

Assignment17
OASIS

Develop business practices standards to improve the current operation of the wholesale electric market and develop
and maintain business practice and communication standards for OASIS and Electronic Scheduling
a)

Develop and/or maintain business practice standards as needed for OASIS and electronic scheduling. Specific items to
address include:
i)

Network Services: Determine and develop needed business practice
standards or other support is needed to support use of OASIS for Network
Service transactions (R04006E). (Related to AP 2(a)(iii) and AP 2(a)(i))
Status: Underway.

4th Q, 2011

OASIS

ii)

Registry (TSIN): Determine and develop needed business practice
standards to support the registry functions currently supported by NERC
(R04037, R06027) and transition the TSIN Registry from NERC to
NAESB as the enhanced Electric Industry Registry (EIR).
Status: Underway.

1st Q, 2012

NAESB/NERC
Administration,
JESS

iii)

Make remaining incremental enhancements to OASIS as an outgrowth of the NAESB March 29, 2005
conference on the future of OASIS (R05026).
Scoping statement completed by SRS. There were a number of assignments from the Standards Request. The
outstanding items are included below:
1)

Eliminate Masking of TSR tag source and sink when requested
status is denied, withdrawn refused, displaced, invalid, declined,
annulled or retracted
Status: Not Started

2012

OASIS

2)

Initiate standard that eliminates the disparity of posting “sensitive”
information. This standard should also include procedures of user
certification that allows access to this class of information.
Status: Underway (upon further development of this item by
NAESB, a completion date will be determined)

2012

OASIS

3)

Enhance the TSR result postings to allow showing of (i) limiting
transmission elements and (ii) available generation dispatch
options that would allow acceptance of reservation request.
Status: Not Started (upon initiation of this item by NAESB, a
completion date will be determined)

2012

OASIS

Report of the North American Energy Standards Board, September 18, 2012
Page 325

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
iv)

b)

4

Review and correct WEQ-004 Coordinate Interchange Business Practice
Standard as needed based on activities in NERC Project 2008-12,
Coordinate Interchange Standards Revisions and supporting EOP-002-2
R4 and R6.
Status: Underway. Completion date dependent upon coordination
activities with NERC, and Project 2008-12 is delayed by NERC due to
other higher priority development

Completion16
2012

Assignment17
JESS

Develop and/or maintain standard communication protocols and cyber-security business practices as needed.
i)

Develop PKI certification program for e-Tag and OASIS
Status: Underway

ii)

Develop PKI standards for OASIS.
Status: Not Started (upon initiation of this item by NAESB, a completion
date will be determined)

iii)

Develop Industry Implementation Plan for meeting PKI Standard
requirements for e-tagging.
Status: Underway. Full e-Tag implementation (server & client side) is
linked to the transition of the Registry from NERC to NAESB and
NAESB implementation.

3rd Q, 2011

2012

TBD –
dependent on
item above
(i) and EIR

Board Certification
Program
Committee
OASIS

JESS

Review and develop business practices standards to Demand Response, Demand Side Management and Energy
Efficiency Programs
Review and develop needed model business practices for a standardized method for quantifying benefits, savings, cost
avoidance and/or the reduction in energy demand and usage derived from the implementation of demand side management
and energy efficiency programs. This effort will include demand side response, energy efficiency programs and metering,
including the 'curtailment service provider' program.
a)

Phase 2 – 4th Q
Review the NAESB Business Practices for Measurement and Verification of
Wholesale Electricity Demand Response (WEQ-015) in conjunction with the IRC
2010
developed Demand Response Matrix and identify business practice requirements
that could be improved or made clearer through the addition of specific technical
detail. The wholesale and retail demand response work groups and the Smart
Grid Standards Subcommittees should actively and timely communicate and
coordinate work products to ensure consistency between the three work groups.
Each work group should take into account the work products developed by the
other.
Status: Completed

WEQ Section of
the Joint
WEQ/REQ DSMEE Subcommittee

b)

Phase 2 – 4th Q
For each performance evaluation type/service type combination identified in
WEQ-015, using the IRC matrix as a starting point, assess and determine what
2010
standards or guidelines, if any, should be developed to aid all participants in the
use of measurement and verification methods for demand response programs in
organized wholesale electric markets. If the determination is made that standards
or guidelines will be developed, those items will be added as sub-items to 4(b).
Status: Completed

WEQ Section of
the Joint
WEQ/REQ DSMEE Subcommittee

Report of the North American Energy Standards Board, September 18, 2012
Page 326

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description

5

6.

Completion16

Assignment17

c)

Coordinate glossary updates for business practice standards with the Retail
Electric Quadrant
Status: Ongoing

Ongoing

Joint WEQ/REQ
DSM
Subcommittee and
WEQ SRS and
Retail Glossary

d)

Develop business practice standards used to measure and verify reductions in
energy and demand from energy efficiency in wholesale and retail markets.18
This includes developing business practice standards to measure and verify
energy reductions that are made to comply with a Renewable Portfolio Standard
that included energy efficiency or a stand-alone Energy Efficiency Portfolio
Standard
Status: The WEQ EE standards are completed.

4th Q, 2010

Joint WEQ/REQ
DSM-EE
Subcommittee

Retail
Standards 4th
Q 2011

Maintain existing body of Version 2.x standards
a)

Make consistency changes to Version 2.2 standards as directed by the WEQ
Leadership Committee on December 12, 2007 OASIS Consistency Changes
(R08001, R08002, R08003, R08005)
Status: Completed

3rd Q, 2011

OASIS

b)

Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the
“System_Attribute” data element of the NAESB Standard WEQ-003: OASIS
S&CP Data Dictionaries. (R08011)
Status: Started

1st Q, 2012

OASIS

c)

Correct WEQ 013-2.6.7.2. – Resale off OASIS (R08027)
Status: Not Started

TBD

OASIS

d)

Add language to WEQ-001-4 Online Negotiation and Confirmation process to
clarify Table 4-3 (R09003)
Status: Started

1st Q, 2012

OASIS

e)

Create a new OASIS mechanism that allows for the merger of like reservations
without the use of the resale mechanism (R09015)
Status: Not Started

TBD

OASIS

Develop Smart Grid Wholesale and Retail Electric Standards - The wholesale and retail demand response work groups
and the Smart Grid task force should actively and timely communicate and coordinate work products to ensure consistency
between the three work groups. Each work group should take into account the work products developed by the other.
4th Q, 2010

a)

Develop requirements and use cases for PAP 03 – Pricing Model
Phase 2
Status: Completed

b)

Develop requirements and use cases for PAP 04 – Scheduling Model
Phase 2
Status: Completed

4th Q, 2010

c)

Develop requirements and use cases for PAP 09 – Demand Response/Distributed
Energy Resources
Phase 2
Status: Completed

4th Q, 2010

Joint WEQ/REQ
SGS Subcommittee
Joint WEQ/REQ
SGS Subcommittee

WEQ Section of
the Joint
WEQ/REQ SGS
Subcommittee

Report of the North American Energy Standards Board, September 18, 2012
Page 327

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
Item Description
d)

7.

Completion16

Assignment17

Develop standards to support PAP 10 – Standards Energy Usage Information
i)

Develop Information Model and related business practices
Status: Completed

ii)

Develop standards to support PAP 10 – Standards Energy Usage
Information, Phase 2, Harmonization with CIM and SEP 2.0
Status: Not Started, pending discussions with CIM and SEP 2.0

4th Q, 2010

1st Q, 2012

Joint WEQ/REQ
PAP 10 SGS
Subcommittee
Joint WEQ/REQ
PAP 10 SGS
Subcommittee

Develop or modify standards to Support FERC Order No. 676-E, (Docket No. RM 05-5-013)
a)

Review standards 001-14.1.3 and 001-15.1.2 based on FERC Order No. 676-E
(See ¶ 3982)
Status: Completed

4th Q, 2011

OASIS

b)

Develop standards to support the Transmission Provider right to reassess the
availability of conditional firm (See ¶ 7283)
Status: Started

4th Q, 2011

OASIS

c)

Prepare status reports every six months regarding the development of standards
for the coordination of transmission service requests across multiple transmission
systems (See ¶ 10584). This annual plan item is tied to Annual Plan Item 2(a)(iii)
Status: Completed.

4th Q, 2011

NAESB Office

NORTH AMERICAN ENERGY STANDARDS BOARD
2011 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on 12-8-11
82

39.
In regards to Entergy’s question of whether the transmission provider’s calculated and posted available flowgate
capability values should be used to fulfill the posting requirements set forth in Standard 001-14 and 001-15 in instances where
there is no requirement to convert this calculation to available transfer capability values, we agree with Entergy that this
requirement can be met by the transmission provider posting its available flowgate capability values. As to EPSA’s argument
that Standard 001-15 falls short of the goals of Order No. 890, we find that, with the exception of Standard 001-15.1.2,
compliance with Standard 001-15 provides all of the information required by Order No. 890. However, Standards 001-14.1.3
and 001-15.1.2 permit transmission providers to post an available transfer capability change narrative within five business days
of meeting the criteria under which a narrative is required to be posted. In Order No. 890, the Commission rejected calls for
delays prior to posting data and required posting as soon as possible. We do not find the NAESB standard meets this criterion
and therefore decline to incorporate Standards 001-14.1.3 and 001-15.1.2 by reference. Transmission providers must post their
narratives as soon as feasibly possible. Posting within one day would appear in most cases to be reasonable.
83
72.
However, we reiterate here the Commission’s finding in Order No. 890 that a transmission provider is permitted to
extend its right to reassess the availability of conditional firm service. Since the Version 002.1 Standards do not specifically
address this issue, we would ask the industry, working through NAESB, to continue to look at additional business practice
standards facilitating a transmission provider’s extension of its right to perform a reassessment
84 105. We agree that insufficient progress has been made on this issue. While we acknowledge that development of standards
addressing this issue is included in NAESB’s 2009 WEQ Annual Plan, we nevertheless urge NAESB to address this issue as
soon as possible. Accordingly, we request that NAESB provide the Commission with a status report concerning its progress on
this issue every six months, counting from the date this final rule is published in the Federal Register, until NAESB’s adoption of
the applicable standard(s).
Report of the North American Energy Standards Board, September 18, 2012
Page 328

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

PROVISIONAL ITEMS
1.

Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission
Adequacy (Project 2009-05 Resource Adequacy Assessment).

2.

Develop business practices for allocating capacity among requests received during a submittal window Order 890-A
(Docket Nos. RM05-17-001, 002 and RM05-25-001, 002 - Paragraph 805)85.

3.

Determine any needed NAESB action in support of the Interchange Distribution Calculator (IDC) and develop any
necessary standards.

4.

Prepare recommendations for future path for TLR86 (Phase 2) in concert with NERC, which may include alternative
congestion management procedures19. Work on this activity is dependent on completing 2010 WEQ Annual Plan 1.a
(Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern Interconnection - Phase 1).

5.

Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Control, for which a
white paper is expected after the SAR is authorized to proceed by the NERC Standards Committee.

6.

Determine NAESB action needed to support FERC Action Plan for Smart Grid Technology.

7.

Develop business practice standards for cap and trade programs for greenhouse gas

8.

Conduct assessment to determine if Electric Industry Requirements documented in WEQ-011 Gas / Electric
Coordination should be considered reliability requirements and transition to NERC.

9.

Develop needed business practice standards for organization/company codes for NAESB standards – and address
current issues on the use of DUNs numbers. Common code usage is linked to the transition of the Registry from NERC
to NAESB.

10.

Review the need for, and develop standards where appropriate, in response to issues raised by FERC’s National Action
Plan on Demand Response.

11.

Develop, modify or delete business practices to support Time Error and Inadvertent (BAL-004 and BAL-006) resulting
from the NERC field test under NERC project (NERC Project 2010-14).

12.

Coordinate standards development with the NERC Balancing Authority Reliability Based Controls Standards Drafting
Team (BARCSDT- created in July 2010) regarding DCS and AGC (BAL-002 and BAL-005) which may require
changes to NAESB WEQ standards.

85 805. The Commission recognizes that developing methods to allocate capacity among requests received during a submittal
window may require detailed procedures, particularly when transmission requests received simultaneously exceed available
capacity. As the Commission explained in Order No. 890, however, we believe that each transmission provider is in the best
position to develop allocation procedures that are suitable for its system. This does not preclude transmission providers from
working through NAESB to develop standardized practices, as suggested by Southern. For example, as we pointed out in Order
No. 890, allocation methods such as that used by PJM to allocate monthly firm point-to-point transmission service could provide
useful guidance in developing general allocation procedures.
86 Phase 2 of the Parallel Flow Visualization looks at developing options for and reporting of the most cost
effective alternatives to achieve curtail obligations assigned during Phase 1.”

Report of the North American Energy Standards Board, September 18, 2012
Page 329

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

WHOLESALE ELECTRIC QUADRANT EXECUTIVE COMMITTEE AND SUBCOMMITTEE STRUCTURE
Wholesale Electric Quadrant
Executive Committee (WEQ EC)

Scoping

Standards Review Subcommittee (SRS)

Interpretations Subcommittee

Business Practices Subcommittee (BPS)

OASIS Subcommittee
Development
Joint Electric Scheduling Subcommittee (JESS)

E-Tariff Joint WEQ/WGQ Subcommittee

Smart Grid Standards Subcommittee (**)

PAP 10 Smart Grid Standards Subcommittee
(***)
DSM-EE Retail/WEQ Subcommittee

Task Forces & Working Groups

NAESB WEQ EC and Subcommittee Leadership:
Executive Committee (EC): Kathy York (Chair) and James Castle (Vice Chair)
Standards Review Subcommittee (SRS): Narinder Saini, Ed Skiba
Interpretations Subcommittee: Ed Skiba
Business Practices Subcommittee (BPS) & Time and Inadvertent Management Task Force (TIMTF): Ed Skiba ,
Narinder Saini
Open Access Same Time Information System (OASIS) Subcommittee (OS): Paul Sorenson, J.T. Wood, Alan Pritchard
Joint Electric Scheduling Subcommittee (JESS): Bob Harshbarger (NAESB), Clint Aymond (NERC)
e-Tariff Joint WEQ/WGQ Subcommittee (e-Tariff): Jane Daly (WEQ), Keith Sappenfield (WGQ)
Demand Side Management-Energy Efficiency (DSM-EE) REQ/WEQ Subcommittee: Ruth Kiselewich (Retail), Roy
True and Paul Wattles (WEQ)
(**) The Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants with other
Report of the North American Energy Standards Board, September 18, 2012
Page 330

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix I: 2011 Wholesale Electric Quadrant Annual Plan
September 18, 2012

standards development groups such as OASIS (Organization for the Advancement of Structured Information Standards, not Open
Access Same Time Information Systems related to NAESB standards and FERC actions), CalConnect, FIX and UCAIug, among
others. Direction may be given from NIST, DoE or FERC and the group reports jointly to the NAESB Board Smart Grid
Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Joe Zhou, Wayne Longcore and Robert
Burke.
(***) The PAP 10 Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants
with other standards development groups such as OASIS, UCAIug, OpenADE, ZigBee, ASHRAE, EIS Alliance, NARUC and
includes other groups. Direction may be given from NIST, DoE or FERC and the group reports jointly to the NAESB Board
Smart Grid Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Phil Precht, Cathy Wesley,
Sharon Dinges, David Kaufman, Brad Ramsay, Tobin Richardson and Ed Koch.

End Notes WEQ 2011 Annual Plan:
16

Dates in the completion column are by end of the quarter for completion by the assigned committee, sub-committee or task
force. The dates do not necessarily mean that the standards are fully staffed to be implementable by the industry, and/or ratified
by membership. If one item is completed earlier than planned, another item can begin earlier and possibly complete earlier than
planned. There are no begin dates on the plan.
17

The assignments are abbreviated. The abbreviations and sub-committee structure can be found at the end of the annual plan
document.
18

Energy efficiency may be a wholesale product, such as capacity. Energy efficiency in retail markets may be from individual
energy efficiency measures at the project level or a portfolio of projects that make up an energy efficiency program.

19

For additional information, please see comments submitted by PJM and Midwest ISO for this Annual Plan Item:
http://www.naesb.org/pdf3/weq_aplan102907w1.pdf.

Report of the North American Energy Standards Board, September 18, 2012
Page 331

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description
1

Completion20

Assignment21

Develop business practices standards as needed to complement reliability standards
Develop business practice standards to support and complement NERC reliability standards, NERC policies and NERC
standards authorization requests (SARs) using the NERC/NAESB Coordination Joint Standards Development Process as
appropriate. Current NAESB activities underway to develop business practice standards that are supportive of this annual
plan item are:

2

a)

Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern
Interconnection – Permanent Solution87
Note: Consideration should be given to provisional item 4. Work is being
coordinated with the NERC IDC Working Group.
Status: Started

4th Q, 2012

BPS

b)

Perform consistency review of WEQ-008 Transmission Loading Relief Business
Practice Standards and develop recommendation.88

2013

BPS

c)

Disturbance Control Standard (DCS) (BAL-002) Coordination with NERC
Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls:
Reserves
Status: Monitor.

2013

BPS/TIMTF

d)

Coordinate with NERC on changes to the definition of Bulk Electric System
NERC Project 2010-17 Definition of Bulk Electric System.
Status: Completed. Subcommittee approved recommendation to forward to
Executive Committee on January 17, 2012.

2nd Q, 2012

SRS

e)

Revise TLR level 5 to be treated similarly to TLR Level 3 in terms of treating the
next hour allocation separately from that of current hour. (R11020)
Status: Not Started

2013

BPS

Develop business practice standards in support of the FERC RM05-25-000 and RM05-17-000 (OATT Reform)89
a)

Develop version 2 business practice standards to better coordinate the use of the transmission system among neighboring
transmission providers.
Status: Underway
Request R050004 was expanded to include the Order No. 890 (Docket Nos.RM05-17-000 and RM02-25-000), (Order
No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM05-17-03
and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”
i)

Group 3: Network Service On OASIS90

87

See AP Item 3.iv., Completion dates may be revisited contingent upon NERC-NAESB coordination of implementation related
to parallel flow visualization
88
In some sections of WEQ 008 it appears that the standards are applicable to all of the Interconnections and other it appears that
the standards are only applicable to the Eastern Interconnection. The title indicates the standards are applicable to the Eastern
Interconnection.
89
FERC Order No. 890, issued February 16, 2007 can be accessed from the following link http://www.naesb.org/doc_view4.asp?doc=ferc021607.doc
90
Several group 3 items may be removed from this plan if the 4th quarter completion dates are met.
Report of the North American Energy Standards Board, September 18, 2012
Page 332

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description

ii)

Completion20

Assignment21

17) Use of OASIS to Make Electronic Requests to Designate and
Terminate Network Resource
Status: Completed

4th Q, 2011

OASIS

18) Ability to Query Requests to Designate and Terminate Network
Resources and Allow for Queries of All Information Provided with
Designation Requests
Status: Completed

4th Q, 2011

OASIS

19) Masking of Designated Network Resource Operating Restrictions
and Generating Cost Information
Status: Completed

4th Q, 2011

OASIS

20) Procedural Requirements for Submitting Designations over new
OASIS Functionality
Status: Completed

4th Q, 2011

OASIS

21) Specify How Designated Network Service Informational Postings are
Posted on OASIS
Status: Completed

4th Q, 2011

OASIS

22) Develop standards for the treatment of OASIS Requests when the
Customer Fails to Provide the Necessary Attestation
Status: Completed

4th Q, 2011

OASIS

23) Procedural Requirements for Submitting Both Temporary and
Indefinite Terminations of Network Resources
Status: Completed

4th Q, 2011

OASIS

24) Procedures for Submitting and Processing Requests for Concomitant
Evaluations of Transmission Requests and Temporary Terminations
Status: Completed

4th Q, 2011

OASIS

12. Pre-Emption
Status: Started

1st Q, 2013

OASIS

13. Request No. R05019
Status: Started

1st Q, 2013

OASIS

Group 4: Pre-Emption; Request No. R05019

Report of the North American Energy Standards Board, September 18, 2012
Page 333

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description
iii)

3

Assignment21

Group 6: Miscellaneous (Paragraph 162791 of FERC Order No. 890)
7)

Paragraphs 1627 of Order 890 – Posting of additional information on
OASIS regarding firm transmission curtailments
Status: Not Started

TBD
(follows the
completion
of AP 1(a))

OASIS

8)

TBD
(follows the
completion
of AP 1(a))

OASIS

Redispatch Cost Posting to allow for posting of third party offers of
planning redispatch services.
Status: Not Started
b)

Completion20

Develop the needed business practices to support existing Request No. R05004:
The processing of transmission service requests, which use TTC/ATC/AFC, in
coordination with NERC changes to MOD 001 where the allocation of flowgate
capability based on historical Network Native Load impacts the evaluation of
transmission service requests, requiring the posting of those allocation values in
conjunction with queries of service offerings on OASIS
Status: Completed

4th Q, 2011

OASIS

Develop business practices standards to improve the current operation of the wholesale electric market and develop
and maintain business practice and communication standards for OASIS and Electronic Scheduling
a)

Develop and/or maintain business practice standards as needed for OASIS and electronic scheduling. Specific items to
address include:
i)

Network Services: Determine and develop needed business practice
standards or other support is needed to support use of OASIS for Network
Service transactions (R04006E). (Related to AP 2(a)(iii) and AP 2(a)(i))
Status: Completed

4th Q, 2011

OASIS

ii)

Registry (TSIN): Determine and develop needed business practice
standards to support the registry functions currently supported by NERC
(R04037, R06027)
Status: Underway

4th Q, 2012

JESS

91
Paragraph 1627 of FERC Order No. 890, issued February 16, 2007: We agree with suggestions for the posting of additional
curtailment information on OASIS and, therefore, require transmission providers, working through NAESB, to develop a detailed
template for the posting of additional information on OASIS regarding firm transmission curtailments. Transmission providers
need not implement this new OASIS functionality and any related business practices until NAESB develops appropriate
standards. These postings must include all circumstances and events contributing to the need for a firm service curtailment,
specific services and customers curtailed (including the transmission provider’s own retail loads), and the duration of the
curtailment. This information is in addition to the Commission’s existing requirements: (1) when any transmission is curtailed or
interrupted, the transmission provider must post notice of the curtailment or interruption on OASIS, and the transmission
provider must state on OASIS the reason why the transaction could not be continued or completed; (2) information to support any
such curtailment or interruption, including the operating status of facilities involved in the constraint or interruption, must be
maintained for three years and made available upon request to the curtailed or interrupted customer, the Commission’s Staff, and
any other person who requests it; and, (3) any offer to adjust the operation of the transmission provider’s system to restore a
curtailed or interrupted transaction must be posted and made available to all curtailed and interrupted transmission customers at
the same time.

Report of the North American Energy Standards Board, September 18, 2012
Page 334

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description

4.

4th Q, 2012

Assignment21

iii)

Registry (TSIN): Transition the TSIN Registry from NERC to NAESB as
the enhanced Electric Industry Registry (EIR).
Status: Underway.

iv)

Make remaining incremental enhancements to OASIS as an outgrowth of the NAESB March 29, 2005
conference on the future of OASIS (R05026).
Scoping statement completed by SRS. There were a number of assignments from the Standards Request. The
outstanding items are included below:

v)

b)

Completion20

NAESB/NERC
Administration,
JESS

1)

Eliminate Masking of TSR tag source and sink when requested
status is denied, withdrawn refused, displaced, invalid, declined,
annulled or retracted
Status: Not Started

2013

OASIS

2)

Initiate standard that eliminates the disparity of posting “sensitive”
information. This standard should also include procedures of user
certification that allows access to this class of information.
Status: Underway (upon further development of this item by
NAESB, a completion date will be determined)

2013

OASIS

3)

Enhance the TSR result postings to allow showing of (i) limiting
transmission elements and (ii) available generation dispatch
options that would allow acceptance of reservation request.
Status: Not Started (upon initiation of this item by NAESB, a
completion date will be determined)

2013

OASIS

Review and correct WEQ-004 Coordinate Interchange Business Practice
Standard as needed based on activities in NERC Project 2008-12,
Coordinate Interchange Standards Revisions and supporting EOP-002-2
R4 and R6.92
Status: Underway. Completion date dependent upon coordination
activities with NERC, and Project 2008-12 is delayed by NERC due to
other higher priority development. It is expected that NERC will begin its
effort in 2nd Q 2013.

2014

JESS

Review e-Tag specifications and make modifications as needed for:
i)

Supporting Network Integration Transmission Service standards

TBD

JESS

ii)

Consistency and clarifications

TBD

JESS

iii)

Regional Implementations supporting WECC efforts (probably of most
impact to the appendices in the e-Tag specifications)

TBD

JESS

Develop and/or maintain standard communication protocols and cyber-security business practices as needed.
a)

Develop PKI standards for OASIS.
Status: Underway

4th Q, 2012

PKI

92
See AP Item 1.a.iv, Completion dates may be revisited contingent upon NERC-NAESB coordination of implementation related
to parallel flow visualization.

Report of the North American Energy Standards Board, September 18, 2012
Page 335

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description
b)

Develop Industry Implementation Plan for meeting PKI Standard requirements
for e-tagging.
Status: Underway. Full e-Tag implementation (server & client side) is linked to
the transition of the Registry from NERC to NAESB and NAESB
implementation.

c)

Develop modifications for WEQ-012 as needed to reflect current market
conditions

d)
5

Completion20

Assignment21

TBD –
dependent on
item above
(a) and EIR

PKI

i)

Authorized Certification Authority Standard and Credentialing Practice
(R11014)
Status: Underway

3rd Q, 2012

PKI

ii)

Technology Review and Upgrade for NAESB Public Key Infrastructure
Standard WEQ-012 (R11015).
Status: Underway

3rd Q, 2012

PKI

iii)

Review and develop standards as needed to support adequate session
encryption (SSL/TLS issues: US-Cert Vulnerability Note VU#864643)
Status: Not Started

3rd Q, 2012

PKI

TBD

PKI/JESS

Review WEQ standards for impact of XML vulnerability exploits and make
modifications as needed to standards and functional specifications

Maintain existing body of Version 3.x standards
4th Q, 2012

OASIS

TBD

OASIS

Add language to WEQ-001-4 Online Negotiation and Confirmation process to
clarify Table 4-3 (R09003)
Status: Started

1st Q, 2013

OASIS

d)

Create a new OASIS mechanism that allows for the merger of like reservations
without the use of the resale mechanism (R09015)
Status: Not Started

TBD

OASIS

e)

Develop standards to support crediting redirect requests with the capacity of the
parent reservation (BPA Comments)
Status: Completed

TBD

OASIS

f)

Modify WEQ Business Practice Standard 013-2.6.8.1 FULL_TRANSFERTransfers of All Capacity and WEQ Business Practice Standard 013-2.6.8.2 –
PART_TRANSFER-Transfer of Partial Capacity. (R11022)
Status: Completed and posted for comments on February 17, 2012.

1st Q, 2012

OASIS

a)

Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the
“System_Attribute” data element of the NAESB Standard WEQ-003: OASIS
S&CP Data Dictionaries. (R08011)
Status: Underway

b)

Correct WEQ 013-2.6.7.2. – Resale off OASIS (R08027)
Status: Not Started

c)

Report of the North American Energy Standards Board, September 18, 2012
Page 336

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
Item Description
6.

Assignment21

Develop Smart Grid Wholesale and Retail Electric Standards - The wholesale and retail demand response work groups
and the Smart Grid task force should actively and timely communicate and coordinate work products to ensure consistency
between the three work groups. Each work group should take into account the work products developed by the other.
a)

7.

Completion20

Develop standards to support PAP 10 – Standards Energy Usage Information,
Phase 2, Harmonization with CIM and SEP 2.0
Status: Underway, dependent on discussions with CIM and SEP 2.0

3rd Q, 2012

Joint WEQ/REQ
PAP 10 SGS
Subcommittee

Develop or modify standards to Support FERC Order No. 676-E, (Docket No. RM 05-5-013)
a)

Develop standards to support the Transmission Provider right to reassess the
availability of conditional firm (See ¶ 7293)
Status: Started

4th Q, 2012

OASIS

93
72.
However, we reiterate here the Commission’s finding in Order No. 890 that a transmission provider is permitted to
extend its right to reassess the availability of conditional firm service. Since the Version 002.1 Standards do not specifically
address this issue, we would ask the industry, working through NAESB, to continue to look at additional business practice
standards facilitating a transmission provider’s extension of its right to perform a reassessment

Report of the North American Energy Standards Board, September 18, 2012
Page 337

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
PROVISIONAL ITEMS
1

Develop business practices standards as needed to complement NERC reliability standards
a)

Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission
Adequacy (NERC Project 2009-05 Resource Adequacy Assessments). NERC expects work on this project to start in
third quarter 2014.

b)

Determine any needed NAESB action in support of the Interchange Distribution Calculator (IDC) and develop any
necessary standards.

c)

Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Planning and Control.
A SAR was finalized in April 2011. NERC project is expected to begin in first quarter 2013.

d)

Develop, modify or delete business practices to support Time Error, Automatic Generation Control (AGC), and
Inadvertent Accounting (BAL-004, BAL-005, and BAL-006) resulting from the NERC field test under NERC project
(NERC Project 2010-14.2 Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and
Inadvertent). NERC expects this project to start in second quarter 2013. The NERC project may impact WEQ-006
Manual Time Error Correction and WEQ-007 Inadvertent Interchange Payback.

e)

Develop complementary standards that align with NERC Project 2010-4 Demand Data. The NERC project may impact
WEQ-015 Business Practices for Measurement and Verification of Wholesale Electricity Demand Response.

f)

Coordinate with NERC on the functional model glossary revisions NERC Project 2010-08 Functional Glossary Model
Revisions. NERC expects this project to start in fourth quarter 2014. The NERC project may impact WEQ-000
Abbreviations, Acronyms, and Definition of Terms.

g)

Coordinate with NERC on NERC Project 2012-05 ATC Revisions - Order 729. NERC expects this project to start in
third quarter 2014. The NERC project may impact the WEQ-001 Open Access Same-Time Information Systems
(OASIS) Standards, WEQ-002 OASIS Standards and Communication Protocol (S&CP), WEQ-003 Open Access
Same-Time Information Systems (OASIS) Data Dictionary, and WEQ-013 OASIS Implementation Guide.

h)

Coordinate with NERC on NERC Project 2012-08 Glossary Updates. NERC has not established a start date for this
project. The NERC project may impact WEQ-000 Abbreviations, Acronyms, and Definition of Terms

i)

Coordinate with NERC on NERC Project 2012-09 IRO Review. NERC has not established a start date for this project.
The NERC project may impact WEQ-008 Transmission Loading Relief – Eastern Interconnection Standards.

j)

Coordinate with NERC on NERC Project 2012-15 Flow Limited Paths. NERC has not established a start date for this
project. The NERC project may impact the WEQ-001 Open Access Same-Time Information Systems (OASIS)
Standards, WEQ-002 OASIS Standards and Communication Protocol (S&CP), WEQ-003 Open Access Same-Time
Information Systems (OASIS) Data Dictionary, and WEQ-013 OASIS Implementation Guide.

2

3

Gas/Electric Coordination
a)

Review and develop standards as needed and requested based on the National Petroleum Council (NPC) findings as
communicated by the NAESB Board of Directors, government agencies or reliability organizations, as applicable. (915-11 NPC Report: Transmittal Letter, Preface, and Executive Summary, Ch 1:Resource and Supply, Ch 2: Operations
and Environment, Ch 3: Demand, Ch 4: Carbon and Other End-Use Emissions, Ch 5: Macroeconomics, Ap A: Request
Letters, Description of the NPC, and NPC membership roster, Ap B: Study Group Rosters , Ap C: Additional
Materials Available Electronically)

b)

Conduct assessment to determine if Electric Industry Requirements documented in WEQ-011 Gas / Electric
Coordination should be considered reliability requirements and transition to NERC.
Optional work to extend existing standards

Report of the North American Energy Standards Board, September 18, 2012
Page 338

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

NORTH AMERICAN ENERGY STANDARDS BOARD
2012 ANNUAL PLAN for the WHOLESALE ELECTRIC QUADRANT
Approved by the Board of Directors on June 21, 2012
PROVISIONAL ITEMS
a)

Prepare recommendations for future path for TLR94 (Phase 2) in concert with NERC, which may include alternative
congestion management procedures95. Work on this activity is dependent on completing 2010 WEQ Annual Plan 1.a
(Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern Interconnection - Phase 1).

b)

Develop needed business practice standards for organization/company codes for NAESB standards – and address
current issues on the use of DUNs numbers. Common code usage is linked to the transition of the Registry from
NERC to NAESB.

c)

Develop business practices for allocating capacity among requests received during a submittal window Order 890-A
(Docket Nos. RM05-17-001, 002 and RM05-25-001, 002 - Paragraph 805)96.

4

Pending Regulatory or Legislative Action
a)

Determine NAESB action needed to support FERC Action Plan for Smart Grid Technology.

b)

Determine NAESB action needed to support FERC Action Plan for Smart Grid Technology.

c)

Develop business practice standards for cap and trade programs for greenhouse gas.

d)

Develop standards as needed based on FERC Order No. 1000. (NAESB Analysis of FERC Order No. 1000)

e)

Develop standards as needed in support of Variable Energy Resources (VERs) final order (RM10-11-000). (NAESB
Comments 3-2-11, FERC NOPR RM10-11-000)

94

Phase 2 of the Parallel Flow Visualization looks at developing options for and reporting of the most cost effective alternatives
to achieve curtail obligations assigned during Phase 1.”

95

For additional information, please see comments submitted by PJM and Midwest ISO for this Annual Plan Item:
http://www.naesb.org/pdf3/weq_aplan102907w1.pdf.
96
805. The Commission recognizes that developing methods to allocate capacity among requests received during a submittal
window may require detailed procedures, particularly when transmission requests received simultaneously exceed available
capacity. As the Commission explained in Order No. 890, however, we believe that each transmission provider is in the best
position to develop allocation procedures that are suitable for its system. This does not preclude transmission providers from
working through NAESB to develop standardized practices, as suggested by Southern. For example, as we pointed out in Order
No. 890, allocation methods such as that used by PJM to allocate monthly firm point-to-point transmission service could provide
useful guidance in developing general allocation procedures.
Report of the North American Energy Standards Board, September 18, 2012
Page 339

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

WHOLESALE ELECTRIC QUADRANT EXECUTIVE COMMITTEE AND SUBCOMMITTEE STRUCTURE
Wholesale Electric Quadrant
Executive Committee (WEQ EC)
Scoping

Standards Review Subcommittee (SRS)

Interpretations Subcommittee

Business Practices Subcommittee (BPS)

OASIS Subcommittee
Development
Joint Electric Scheduling Subcommittee (JESS)

PKI Subcommittee

WEQ/REQ Smart Grid Standards Subcommittee (**)

WEQ/REQ PAP 10 Smart Grid Standards
Subcommittee (***)
REQ/WEQ DSM-EE Subcommittee

Task Forces & Working Groups

NAESB WEQ EC and Active Subcommittee Leadership:
Executive Committee (EC): Kathy York (Chair) and James Castle (Vice Chair)
Standards Review Subcommittee (SRS): Narinder Saini, Ed Skiba
Interpretations Subcommittee: Ed Skiba
Business Practices Subcommittee (BPS) & Time and Inadvertent Management Task Force (TIMTF): Ed Skiba , Narinder Saini
Open Access Same Time Information System (OASIS) Subcommittee: Paul Sorenson, J.T. Wood, Alan Pritchard
Joint Electric Scheduling Subcommittee (JESS): Bob Harshbarger (NAESB), Clint Aymond (NERC)
Demand Side Management-Energy Efficiency (DSM-EE) REQ/WEQ Subcommittee: Ruth Kiselewich (Retail), Roy True and
Paul Wattles (WEQ)
Public Key Infrastructure (PKI) Subcommittee: Jim Buccigross

Report of the North American Energy Standards Board, September 18, 2012
Page 340

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix J: 2012 Wholesale Electric Quadrant Annual Plan
September 18, 2012

Inactive Subcommittees:
e-Tariff Joint WEQ/WGQ Subcommittee (e-Tariff): Jane Daly (WEQ), Keith Sappenfield (WGQ)
(**)

The Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants with other
standards development groups such as OASIS (Organization for the Advancement of Structured Information Standards,
not Open Access Same Time Information Systems related to NAESB standards and FERC actions), CalConnect, FIX and
UCAIug, among others. Direction may be given from NIST, DoE or FERC and the group reports jointly to the NAESB
Board Smart Grid Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Joe Zhou, Wayne
Longcore and Robert Burke.

(***) The PAP 10 Smart Grid Standards Subcommittee is a joint group of the retail electric and wholesale electric quadrants
with other standards development groups such as OASIS, UCAIug, OpenADE, ZigBee, ASHRAE, EIS Alliance,
NARUC and includes other groups. Direction may be given from NIST, DoE or FERC and the group reports jointly to
the NAESB Board Smart Grid Strategic Steering Committee and the WEQ and REQ ECs. The group is chaired by Phil
Precht, Cathy Wesley, Sharon Dinges, David Kaufman, Brad Ramsay, Tobin Richardson and Ed Koch.

End Notes WEQ 2012 Annual Plan:
20

Dates in the completion column are by end of the quarter for completion by the assigned committee, sub-committee or task
force. The dates do not necessarily mean that the standards are fully staffed to be implementable by the industry, and/or ratified
by membership. If one item is completed earlier than planned, another item can begin earlier and possibly complete earlier than
planned. There are no begin dates on the plan.
21

The assignments are abbreviated. The abbreviations and sub-committee structure can be found at the end of the annual plan
document.

Report of the North American Energy Standards Board, September 18, 2012
Page 341

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix K: Minor Corrections Applied to Versions 002.1and 003
September 18, 2012

Appendix K – Minor Corrections Applied to Versions 002.1 and 003
EC
Meeting
Date

EC Meeting Minutes

Minor Corrections

10-27-09

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102709fm.doc

Minor Correction for Business Practice Standard WEQ-001 to be applied to Versions 002.1 and 002.2 (002.2 published as
Version 003):
Minor Correction Recommendation: http://www.naesb.org/pdf4/weq_mc111209_attach1_revised.doc
Comments Submitted by E. Davis, Entergy: http://www.naesb.org/pdf4/weq_mc111209_entergy.doc

08-17-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec081710fm.doc

Joint NAESB WEQ Version 002.1 Business Practice Standard WEQ-014-A and WGQ Version 1.9 Standard No. 11.4.1
(Implementation Guide for Electronic Tariff Filing):
Minor Correction MC10019: http://www.naesb.org/pdf4/wgq_weq_mc10019_revised.doc
Comments Submitted by E. Skiba, MISO:
http://www.naesb.org/pdf4/wgq_mc081110_miso.doc
Comments Submitted by the NAESB WEQ Standards Review Subcommittee:
http://www.naesb.org/pdf4/weq_mc082410_weq_srs_comments.doc
Redline Attachment to Comments Submitted by the NAESB WEQ Standards Review Subcommittee as previously approved
by the WEQ EC on August 17, 2010:
http://www.naesb.org/pdf4/weq_mc082410_weq_srs_attachment.doc
Comments Submitted by R. Pysh, The United Illuminating Company
http://www.naesb.org/pdf4/weq_mc082410_weq_united_illuminating_company_comments.doc
Business Practice Standard WEQ-001 Minor Correction to be applied to version 002.2 (published as Version 003):
Minor Correction MC10031: http://www.naesb.org/pdf4/weq_mc10031_revised.doc

10-26-10

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102610fm.doc

Minor Correction to WEQ 2010 Annual Plan Item No. 1.a.i – Interim Solution for Parallel Flow Visualization:
Minor Correction MC10032: http://www.naesb.org/pdf4/weq_mc10032_102610.doc
Comments Submitted by E. Davis, Entergy: http://www.naesb.org/pdf4/weq_mc10032_comments_entergy.doc
Minor Correction to Version 002.1, Business Practice Standards WEQ-003 OASIS Data Dictionary and WEQ-013 OASIS
Implementation Guide:
Minor Correction MC10033: http://www.naesb.org/pdf4/weq_mc10033_102610.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 342

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix K: Minor Corrections Applied to Versions 002.1and 003
September 18, 2012
Appendix K – Minor Corrections Applied to Versions 002.1 and 003
EC
Meeting
Date

EC Meeting Minutes

Minor Corrections

11-30-10

Notational ballot results 12-20-10:
http://www.naesb.org/pdf4/weq_wgq_mc10041_122010.
doc

Joint WEQ/WGQ Minor Correction to the NAESB WEQ/WGQ Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its Implementation Guide for Electronic Filing of Parts 25, 154, 284, 300, and
241 Tariff Filings as noted in the FERC eTariff RSS Feed(s), dated October 8, 2010:
Minor Correction MC10041: http://www.naesb.org/pdf4/weq_wgq_mc10041_122010.doc

03-25-11

Notational ballot results 04-08-11:
http://www.naesb.org/pdf4/weq_ec032511ballot_results.d
oc

Minor Correction to Diagram for Meter Before/Meter After Definition (Business Practice Standard WEQ-000):
Minor Correction MC11009: http://www.naesb.org/pdf4/weq_mc11009_rec_040811.doc
Minor Correction to Manual Time Error Correction (Business Practice Standard WEQ-006) - to suspend the NAESB
Business Practice Standards for WEQ-006-1 through WEQ-006-12 based on the motion approved by the NERC Operating
Committee at their March 9, 2011 meeting:
Minor Correction MC11011: http://www.naesb.org/pdf4/weq_mc11011_rec_040811.doc

05-06-11

Notational ballot results 05-20-11:
http://www.naesb.org/pdf4/weq_ec052011ballot_results.d
oc

Minor Correction to NAESB WEQ Electronic Tagging – Functional Specifications, Version 1.8.1 - Correct links to e-Tag
1.8.1 XML Schema and WECC web site in NAESB WEQ Electronic Tagging – Functional Specifications, Version 1.8.1:
Minor Correction MC11015: http://www.naesb.org/pdf4/weq_mc11015_052011.doc
Joint WEQ/WGQ Minor Correction to the NAESB WEQ/WGQ Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its Implementation Guide for Electronic Filing of Parts 25, 154, 284, 300, and
241 Tariff Filings as noted in the FERC eTariff RSS Feed(s), dated April 18, 2011:
Minor Correction MC11016: http://www.naesb.org/pdf4/weq_wgq_mc11016_052011.doc

10-25-11

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec102511fm.docx

Correct inadvertent typographical errors found during the application of Final Action 2011 WEQ Annual Plan Item Nos.
2.a.iii.1 through 2.a.iii.3 – Service Across Multiple Transmission Systems (SAMTS), ratified August 11, 2011 by the
NAESB Office for publication in Version 003 of the NAESB WEQ Business Practice Standards:
Minor Correction MC11029: http://www.naesb.org/pdf4/weq_mc11029_102511.doc

01-31-12

Notational ballot results 02-03-12:
http://www.naesb.org/pdf4/weq_ec013112ballot_results.d
oc

Joint WEQ/WGQ Minor Correction to the NAESB WEQ/WGQ Implementation Guide for Electronic Tariff Filing to
correspond to modifications made by FERC to its Implementation Guide for Electronic Filing of Parts 25, 154, 284, 300, and
341 Tariff Filings as noted by FERC, dated December 22, 2011:
Minor Correction MC11032: http://www.naesb.org/pdf4/weq_wgq_mc11032_rec_020312.doc

Report of the North American Energy Standards Board, September 18, 2012
Page 343

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix K: Minor Corrections Applied to Versions 002.1and 003
September 18, 2012
Appendix K – Minor Corrections Applied to Versions 002.1 and 003
EC
Meeting
Date

EC Meeting Minutes

Minor Corrections

02-21-12

WEQ EC Meeting:
http://www.naesb.org/pdf4/weq_ec022112dm.docx

Corrections for the adoption and ratification of 2011 WEQ Annual Plan Item No. 5.a / R08001 / R08002 / R08003 / R08005
- Make consistency changes to Version 002.2 (published as Version 003):
Minor Correction MC12003: http://www.naesb.org/pdf4/weq_mc12003_rec_022112.doc

06-08-12

Notational ballot results 06-15-12:
http://www.naesb.org/pdf4/weq_ec060812results.docx

Correct Business Practice Standards WEQ-000 Abbreviations, Acronyms, and Definition of Terms (Version 003), WEQ-021
Measurement and Verification of Energy Efficiency Products (Version 003), and 2010 WEQ Annual Plan Item No. 4.d Final
Action: Business Practice Standards for Measurement and Verification of Energy Efficiency Products:
Minor Correction MC12020: http://www.naesb.org/pdf4/weq_mc12020_061512.docx

07-02-12

Notational ballot results 07-10-12:
http://www.naesb.org/pdf4/weq_ec070212results.docx

Correct Business Practice Standards WEQ-000 Abbreviations, Acronyms, and Definition of Terms (Version 003), WEQ-008
Transmission Loading Relief - Eastern Interconnection Standards (Version 003), and WEQ 2010 Annual Plan Item No. 1.a.i
Final Action: Interim Solution for Parallel Flow Visualization. - Ratified December 6, 2010:
Minor Correction MC12025: http://www.naesb.org/pdf4/weq_mc12025_rec_071012.docx
Correct WEQ-006 Manual Time Error Correction Standards:
Minor Correction MC12026: http://www.naesb.org/pdf4/weq_mc12026_rec_071012.docx

Report of the North American Energy Standards Board, September 18, 2012
Page 344

Report of the North American Energy Standards Board - Enclosures
Version 003 of the NAESB Wholesale Electric Quadrant Business Practice Standards
Appendix K: Minor Corrections Applied to Versions 002.1and 003
September 18, 2012

Procedures for Minor Corrections as excerpted from the NAESB Operating Procedures
D. Minor Clarifications and Corrections to Standards
Minor clarifications and corrections to existing standards include: (a) clarifications or corrections made by a regulatory agency to
standards that are of a jurisdictional nature, or by the American National Standards Institute or its successor; (b) clarifications or
corrections to the format, appearance, or descriptions of standards in standards documentation; (c) clarifications or corrections to
add code values to tables; and (d) clarifications and corrections that do not materially change a standard. Any request for a minor
clarification or correction to an existing standard should be submitted in writing to the executive director. This request shall
include a description of the minor clarification or correction and the reason the clarification or correction should be implemented.
1. Processing of Requests
The executive director shall promptly notify the EC and any appropriate subcommittee(s) of the receipt of the request. The
members of the applicable quadrant’s EC shall promptly determine whether the request meets the definition of a minor
clarification or correction. Through the decision of the vice chair of the applicable quadrant, this determination may be delegated
to one of the quadrant’s subcommittees, with the concurrence of the subcommittee chair, in which case the subcommittee shall
make a prompt decision.
If the request is determined to meet the definition of minor clarification or correction, the applicable quadrant’s EC, with input
from any subcommittee(s) to which the request has been forwarded, shall act on the request within one month of its receipt. A
meeting to discuss the request is not required; the decision may be made by notational vote. A simple majority of the votes
received shall determine the outcome. The members of the applicable quadrant’s EC shall be given at least three working days to
consider and vote on the request.
2. Public Notice
The results of the vote on the request for a minor clarification or correction shall be posted on the NAESB website and the
members of the applicable quadrant shall be notified of the request by e-mail. If the request has been approved by the applicable
quadrant’s EC, the notification shall include a brief description of the request, the contact name and number of the requester so
that further information can be obtained, and the proposed effective date of the clarification or correction. Any interested party
shall have an opportunity to comment on the request, and the comments shall be posted on the NAESB website. The comment
period is two weeks.
3. Final Disposition of Approved Requests
If no comments are received on an approved request, the standard shall be clarified or corrected as specified in the approved
request on the effective date proposed. If comments are received, they shall be forwarded to the members of the applicable
quadrant’s EC for consideration. Each comment requires a public written response from the applicable quadrant’s EC. The
applicable quadrant’s EC shall determine whether changes are necessary as a result of the comments. Members of the applicable
quadrant’s EC shall be given three working days to consider the comments and determine the outcome, which shall be decided by
a simple majority of the votes received. A meeting to discuss the request is not required; the decision may be made by notational
vote. The standard shall be clarified or corrected in accordance with the outcome of the vote, effective with the completion of
voting, and notice thereof shall be posted on the NAESB website. In the case of minor corrections which are discovered during
the editorial review process of publication of a new version and are categorized as clarifications under (b) or (c) above1, the
proposed effective date may be (i) two weeks from the date of public notice, following simple majority approval by the
applicable Quadrant(s) EC(s) of the shortened effective date, or (ii) one month from the date of the public notice. For all others,
the proposed effective date of the minor clarification or correction shall normally be one month from the date of the public notice
upon simple majority approval of the applicable Quadrant(s) EC(s).

1

Minor clarifications and corrections to existing standards include: (a) clarifications or corrections made by a regulatory agency
to standards that are of a jurisdictional nature, or by the American National Standards Institute or its successor; (b) clarifications
or corrections to the format, appearance, or descriptions of standards in standards documentation; (c) clarifications or corrections
to add code values to tables; and (d) clarifications and corrections that do not materially change a standard.
Report of the North American Energy Standards Board, September 18, 2012
Page 345


File Typeapplication/pdf
File TitleMicrosoft Word - Draft WEQ Ver 003 Report with xref rev _September 18 2012_ rev with Appendices.docx
AuthorDenise Rager
File Modified2012-09-18
File Created2012-09-17

© 2024 OMB.report | Privacy Policy