In accordance
with 5 CFR 1320, the information collection is approved for three
years. In future collections, costs and time burden estimates
should be rounded to the appropriate number of significant digits.
If "reading instructions" are provided as potential time or cost
burdens, then the location of the instructions or the instructions
themselves should be provided. Also, the burden for refreshing on
instructions should be included, as appropriate.
Inventory as of this Action
Requested
Previously Approved
04/30/2018
36 Months From Approved
04/30/2015
54
0
18
3,961
0
3,853
9,000
0
9,000
Sources are owners/ operators of
facilities which produce polymers and resins from epichlorohydrin
and sources which manufacture epichlorohydrin-modified non-nylon
polyamide resins. EPA and delegated states will use the information
identify new, modified, reconstructed, or existing sources, or
process changes which may affect the source's status and to ensure
that affected sources are meeting the standards.
There in an adjustment increase
in the respondent burden and a decrease in the Agency burden. In
addition, there is an increase in the total number of responses.
This is not due to program changes. These changes occurred because
the previous ICR did not consistently account for the respondent
reporting requirements. This ICR corrected the number and frequency
of each report, including semiannual SSM reports, quarterly excess
emission reports, and annual CMS summary reports, to ensure that
all burden calculations are consistent with the regulatory
requirement. The previous ICR also included several reporting
burden under Table 1, Section 5 Recordkeeping Requirements. This
has been corrected in the current ICR.
$9,639
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970
yellin.patrick@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.