Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. IC14–13–000 and IC14–15–
000]

Commission Information Collection
Activities (FERC–510 and FERC–549B)
Comment Request
Federal Energy Regulatory
Commission.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 USC
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting its information
collection FERC–510 (Application for
Surrender of Hydropower License) and
FERC–549B (Gas Pipeline Rates:
Capacity Reports and Index of
Customers) to the Office of Management
and Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued notices in the Federal
Register for FERC–510 (79 FR 32925,
6/9/2014) and FERC–549B (79 FR
32929, 6/9/2014) requesting public
comments. The Commission received no
comments on these collections and is
making this notation in its submittal to
OMB.

SUMMARY:

Note: The Commission issued both 60-day
notices for both the FERC–510 and FERC–
549B separately under different docket
numbers. Both docket numbers (IC14–13–000
and IC14–15–000) are combined in this
notice. This combination has no effect on the
requirements within each information
collection.

Comments on the collection of
information are due by September 22,
2014.

DATES:

Comments filed with OMB,
identified by the OMB Control No.
1902–0068 (FERC–510) or 1902–0169
(FERC–549B) should be sent via email
to the Office of Information and
Regulatory Affairs:
oira_submission@omb.gov. Attention:
Federal Energy Regulatory Commission
Desk Officer. The Desk Officer may also

mstockstill on DSK4VPTVN1PROD with NOTICES

ADDRESSES:

VerDate Mar<15>2010

17:18 Aug 20, 2014

Jkt 232001

be reached via telephone at 202–395–
4718.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC14–13–000 or IC14–15–000, by
either of the following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION: Ellen Brown
may be reached by email at
DataClearance@FERC.gov, by telephone
at (202) 502–8663, and by fax at (202)
273–0873.
SUPPLEMENTARY INFORMATION:
Type of Request: Three-year extension
of the information collection
requirements for all collections
described below with no changes to the
current reporting requirements. Please
note that each collection is distinct from
the next.
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
of information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
FERC–510, Application for Surrender
of Hydropower License
OMB Control No.: 1902–0068.

PO 00000

Frm 00014

Fmt 4703

Sfmt 4703

Abstract: The information collected
under the requirements of FERC–510 is
used by the Commission to implement
the statutory provisions of sections 4(e),
6 and 13 of the Federal Power Act (FPA)
(16 U.S.C. sections 797(e), 799 and 806).
Section 4(e) gives the Commission
authority to issue licenses for the
purposes of constructing, operating and
maintaining dams, water conduits,
reservoirs, powerhouses, transmission
lines or other power project works
necessary or convenient for developing
and improving navigation, transmission
and utilization of power using bodies of
water over which Congress has
jurisdiction. Section 6 gives the
Commission the authority to prescribe
the conditions of licenses including the
revocation or surrender of the license.
Section 13 defines the Commission’s
authority to delegate time periods for
when a license must be terminated if
project construction has not begun.
Surrender of a license may be desired by
a licensee when a licensed project is
retired or not constructed or natural
catastrophes have damaged or destroyed
the project facilities.
FERC–510 is the application for the
surrender of a hydropower license. The
information is used by Commission staff
to determine the broad impact of such
surrender. The Commission will issue a
notice soliciting comments from the
public and other agencies and conduct
a careful review of the application
before issuing an order for Surrender of
a License. The order is the result of an
analysis of the information produced,
i.e., economic, environmental concerns,
etc., which is examined to determine if
the application for surrender is
warranted. The order implements the
existing regulations and is inclusive for
surrender of all types of hydropower
licenses issued by FERC and its
predecessor, the Federal Power
Commission. The Commission
implements these mandatory filing
requirements in the Code of Federal
Regulations (CFR) under 18 CFR 6.1–
6.4.
Type of Respondent: Private or
Municipal Hydropower Licensees.
Estimate of Annual Burden: The
Commission estimates the annual public
reporting burden for the information
collection as:

E:\FR\FM\21AUN1.SGM

21AUN1

49505

Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices
FERC–510, APPLICATION FOR SURRENDER OF HYDROPOWER LICENSE
Annual
number of
responses per
respondent
(2)

Number of respondents
(1)

16 .........................................................................................

Total number
of responses
(1)*(2)=(3)

1

Average
burden & cost
per response 1
(4)

Total annual
burden hours
& total annual
cost
(3)*(4)=(5)

10
$705

160
$11,280

16

Cost per
respondent
($)
(5)÷(1)
$705

1 We estimate that the salary and skill mix is similar to that of Commission employees. The average hourly cost of $70.50 (for salary plus benefits) is used. The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $70.50 per
Hour = Average Cost per Response.

mstockstill on DSK4VPTVN1PROD with NOTICES

FERC–549B, Gas Pipeline Rates:
Capacity Reports and Index of
Customers
OMB Control No.: 1902–0169
Abstract: The information collected
under the requirements of FERC–549B
includes both the Index of Customers
(IOC) report under Commission
regulations at 18 Code of Federal
Regulations (CFR) 284.13(c) and three
capacity reporting requirements. One of
these is in Commission regulations at 18
CFR 284.13(b) and requires reports on
firm and interruptible services. The
second is at 18 CFR 284.13(d)(1) and
requires pipelines make information on
capacity and flow information available
on their Internet Web sites. The third is
at 18 CFR 284.13(d)(2) and requires an
annual filing of peak day capacity.
Capacity Reports Under 284.13(b) and
284.13(d)(1)
On April 4, 1992, in Order No. 636
(RM91–11–000), the Commission
established a capacity release
mechanism under which shippers could
release firm transportation and storage
capacity on either a short- or long-term
basis to other shippers wanting to obtain
capacity. Pipelines posted available firm
and interruptible capacity information
on their electronic bulletin boards
(EBBs) to inform potential shippers.
On August 3, 1992, in Order No. 636–
A (RM91–11–002), the Commission
determined through staff audits, that the
efficiency of the capacity release
mechanism could be enhanced by
standardizing the content and format of
capacity release information and the
methods by which shippers accessed
this information, which pipelines
posted to their EBBs
On March 29, 1995, through Order
577 (RM95–5–000), the Commission
amended § 284.243(h) of its regulations
to allow shippers the ability to release
capacity without having to comply with
the Commission’s advance posting and
bidding requirements.
On February 9, 2000, in Order No. 637
(RM98–10–000), to create greater
substitution between different forms of

VerDate Mar<15>2010

17:18 Aug 20, 2014

Jkt 232001

capacity and to enhance competition
across the pipeline grid, the
Commission revised its capacity release
regulations regarding scheduling,
segmentation and flexible point rights,
penalties, and reporting requirements.
This resulted in more reliable capacity
information availability and price data
that shippers needed to make informed
decisions in a competitive market as
well as to improve shipper’s and the
Commission’s ability to monitor the
market for potential abuses.
Peak Day Annual Capacity Report
Under 284.13(d)(2)
18 CFR 284.13(d)(2) requires an
annual peak day capacity report of all
interstate pipelines, including natural
gas storage only companies. This report
is generally a short report showing the
peak day design capacity or the actual
peak day capacity achieved, with a short
explanation, if needed. The regulation
states:
An interstate pipeline must make an
annual filing by March 1 of each year
showing the estimated peak day
capacity of the pipeline’s system, and
the estimated storage capacity and
maximum daily delivery capability of
storage facilities under reasonably
representative operating assumptions
and the respective assignments of that
capacity to the various firm services
provided by the pipeline.
This annual report/filing is publicly
available, while other more specific
interstate pipeline and storage capacity
details are filed as CEII, such as the
Annual System Flow Diagram (FERC–
567) which are not publicly available.
Index of Customers Under 284.13(c)
In Order 581, issued September 28,
1995 (Docket No. RM95–4–000), the
Commission established the IOC
quarterly information requirement. This
Order required the reporting of five data
elements in the IOC filing: the customer
name, the rate schedule under which
service is rendered, the contract
effective date, the contract termination
date, and the maximum daily contract

PO 00000

Frm 00015

Fmt 4703

Sfmt 4703

quantity, for either transportation or
storage service, as appropriate.
In a notice issued separate from Order
581 in Docket No. RM95–4–000, issued
February 29, 1996, the Commission,
through technical conferences with
industry, determined that the IOC data
reported should be in tab delimited
format on diskette and in a form as
proscribed in Appendix A of the
rulemaking. In a departure from past
practice, a three-digit code, instead of a
six-digit code, was established to
identify the respondent.
In Order 637, issued February 9, 2000
(Docket Nos. RM98–10–000 and RM98–
12–000), the Commission required the
filing of: the receipt and delivery points
held under contract and the zones or
segments in which the capacity is held,
the common transaction point codes,
the contract number, the shipper
identification number, an indication
whether the contract includes
negotiated rates, the names of any
agents or asset managers that control
capacity in a pipeline rate zone, and any
affiliate relationship between the
pipeline and the holder of capacity. It
was stated in the Order that the changes
to the Commission’s reporting
requirements would enhance the
reliability of information about capacity
availability and price that shippers need
to make informed decisions in a
competitive market as well as improve
shippers’ and the Commission’s ability
to monitor marketplace behavior to
detect, and remedy anti-competitive
behavior. Order 637 required a pipeline
post the information quarterly on its
Internet Web sites instead of on the
outdated EBBs.
Type of Respondent: Respondents for
this data collection are interstate
pipelines subject to FERC regulation
under the Natural Gas Act and those
entities defined as Hinshaw Pipelines
under the Natural Gas Policy Act.
Estimate of Annual Burden: The
Commission estimates the annual public
reporting burden for the information
collection as:

E:\FR\FM\21AUN1.SGM

21AUN1

49506

Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices
FERC–549B (GAS PIPELINE RATES: CAPACITY REPORTS AND INDEX OF CUSTOMERS)
Number of respondents
(1)

Annual number of responses per
respondent
(2)

Total number
of responses
(1)*(2)=(3)

Average burden & cost per
response 2
(4)

Total annual
burden hours
& total annual
cost
(3)*(4)=(5)

Cost per respondent
($)
(5)÷(1)

Capacity Reports under 284.13(b) &
284.13(d)(1) ..........................................

185

6

1,110

145
$10,222.50

160,950
$11,346,975

61,335

93049344Peak Day Annual Capacity Report under 284.13(d)(2) ........................

185

1

185

185

4

740

1,850
$130,425
2,220
$156,510

705

Index of Customers under 284.13(c) .......

10
$705
3
$211.50

Total ..................................................

........................

........................

2,035

........................

165,020
$11,633,910

62,886

846

2 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $70.50 per hour. This
cost is based on the average FERC employee salary. We assume (based upon consultation of subject matter experts for this industry) that respondents to this collection are similarly compensated in terms of salary and benefits.

Dated: August 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19863 Filed 8–20–14; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

mstockstill on DSK4VPTVN1PROD with NOTICES

Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–116–000.
Applicants: American Electric Power
Service Corporation, AEP Ohio
Transmission Company, Inc.
Description: Amendment to July 25,
2014 Application Under Section 203 of
the Federal Power Act of American
Electric Power Service Corporation on
behalf of AEP Ohio Transmission
Company, Inc.
Filed Date: 8/14/14.
Accession Number: 20140814–5087.
Comments Due: 5 p.m. ET 9/4/14.
Docket Numbers: EC14–117–000.
Applicants: American Electric Power
Service Corporation.
Description: Amendment to July 25,
2014 Application Under Section 203 of
the Federal Power Act of American
Electric Power Service Corporation on
behalf of AEP Ohio Transmission
Company, Inc.
Filed Date: 8/14/14.
Accession Number: 20140814–5092.
Comments Due: 5 p.m. ET 9/4/14.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–2233–003.

VerDate Mar<15>2010

17:18 Aug 20, 2014

Jkt 232001

Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–08–14 Order 764
Amended Compliance to be effective 6/
30/2015.
Filed Date: 8/14/14.
Accession Number: 20140814–5083.
Comments Due: 5 p.m. ET 9/4/14.
Docket Numbers: ER14–2361–000.
Applicants: Sunwave Gas & Power
New York, Inc.
Description: Amendment and
supplement to July 3, 2014 Sunwave
Gas & Power New York, Inc. tariff filing.
Filed Date: 8/7/14.
Accession Number: 20140807–5100.
Comments Due: 5 p.m. ET 8/28/14.
Docket Numbers: ER14–2655–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–08–14_SA 2684
Substitute Original GRE–MP Ortman T–
T to be effective 8/14/2014.
Filed Date: 8/14/14.
Accession Number: 20140814–5082.
Comments Due: 5 p.m. ET 9/4/14.
Docket Numbers: ER14–2656–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc’s
2nd Quarter 2014 Capital Budget
Report.
Filed Date: 8/13/14.
Accession Number: 20140813–5161.
Comments Due: 5 p.m. ET 9/3/14.
Docket Numbers: ER14–2657–000.
Applicants: El Paso Electric Company.
Description: Tariff Updates to Reflect
Recent Triennial Grant of Authorization
to be effective 10/13/2014.
Filed Date: 8/14/14.
Accession Number: 20140814–5058.
Comments Due: 5 p.m. ET 9/4/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.

PO 00000

Frm 00016

Fmt 4703

Sfmt 4703

Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 14, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–19858 Filed 8–20–14; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–124–000.
Applicants: Integrys Energy Group,
Inc., Integrys Energy Services, Inc.,
Integrys Energy Services of New York,
Inc., Exelon Generation Company, LLC.
Description: Joint Application for
Authorization under Section 203 of the
FPA and Requests for Confidential
Treatment and Waivers of Exelon
Generation Company, LLC, Integrys
Energy Group, Inc., et al.
Filed Date: 8/12/14.

E:\FR\FM\21AUN1.SGM

21AUN1


File Typeapplication/pdf
File Modified2014-08-21
File Created2014-08-21

© 2024 OMB.report | Privacy Policy