Production Outlook Reports for Un-Registered Renewable Fuels Producers

Production Outlook Reports for Un-Registered Renewable Fuel Producers (Renewal)

rfs0900 final - 5900-283

Production Outlook Reports for Un-Registered Renewable Fuels Producers

OMB: 2060-0660

Document [docx]
Download: docx | pdf

Renewable Fuel Standard (RFS2) Report Instructions

RFS2 Production Outlook Report

Report Form ID: RFS0900

OMB Control No. 2060-0660

Expires May 31, 2014


The RFS0900 RFS2 Production Outlook Report is required for registered RIN generating renewable fuel producers and importers to provide expected renewable fuel production or imports at each registered and planned facility, pursuant to §80.1449.


The report is used to submit renewable fuel volume production and import expectations, and RIN generation expectations. Parties are required to provide renewable fuel volumes and RINs on separate rows of this report. Parties may only report one D code, feedstock, and fuel type per row.


Reports indicating zero projected production value are required to be filed for any registered RIN

generator.


This report is due annually on March 31.


The following fields have been updated:


All fields have been updated to reflect that the information must be reported for both VOL and RIN submissions.Field 13: Feedstocks: all feedstocks must be reported on separate rows of this report, regardless of the D code.

Fields 16 through 27: Projected renewable fuel production or RIN generation for the month is required.

Fields 28 through 31: Projected renewable fuel production or RIN generation total for the year is required.






Please check the RFS reporting web site for updated instructions and templates:

http://epa.gov/otaq/regs/fuels/rfsforms.htm


For information on submitting this report using EPA’s Central Data Exchange (CDX) visit:

http://epa.gov/otaq/regs/fuels/cdxinfo.htm


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

1.

Report Form ID


AAAAAAA; Character.


RFS0900: Form ID for the RFS2 Production Outlook

Report

2.

Report Type


A; Character. Indicate whether this is the original report or a resubmission. Submit only one Original report, submit any corrections or updates as Resubmission(s):


O: Original

R: Resubmission


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

3.

CBI


A; Character. Specify if the data contained within the report is being claimed as Confidential Business Information (CBI) under 40 CFR Part 2, subpart B:


Y: Confidential Business Information

N: Non-Confidential Business Information

4.

Report Date


MM/DD/YYYY; Date. Enter the date the original or resubmitted report is submitted.

5.

Report Year


YYYY; Character. Indicate the compliance period (year)

of the report.

6.

Company/Entity ID


9999; Number. Enter the four-digit, EPA-assigned company/entity ID.

#### : The four digit EPA-assigned company ID

7.

Company Name


AAAAAAA; Character (125 Max). The reporting partys name (Your company name).

8.

Facility ID


99999; Number. Producers and Importers who generate

RINs must reference individual facility ID numbers. Please include all preceding zeros in five digit facility ID numbers.

##### : The five digit EPA-assigned facility ID

99999: If facility is unregistered and still in planning stage

9.

Report Information

Type


AAA; Character. Indicate the report information type for

the specific row of data:



VOL: Volume Information

RIN: RIN quantity Information


Note: Parties are required to provide renewable fuel volumes and RINs on separate rows of the report.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

10.

Fuel D Code


AA; Character. Indicate the Fuel D Code. Only one D

code may be entered per row.



3: Cellulosic biofuel

4: Biomass-based diesel

5: Advanced biofuel

6: Renewable fuel

7: Cellulosic diesel

NA: At least one of the following:

Not an approved pathway or does not appear in

Table 1 in 40 CFR 80.1426- No D Code assigned;

Volume Exceeds Baseline and does not qualify for a D code; or

VOL entered in line 9

Note: If VOL entered in line 9, enter NA. This field is required for both VOL” and RIN”


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

11.

Fuel Type


999; Number. Indicate code corresponding to the Fuel

Type. Only one Fuel Type may be entered per row.



20: Biodiesel (EV 1.5)

21: Biodiesel (EV 1.6)

80: Biogas

70: Butanol

30: Cellulosic Diesel

60: Cellulosic Ethanol

90: Cellulosic Jet Fuel

100: Cellulosic Heating Oil

110: Cellulosic Naphtha

10: Non-cellulosic Ethanol

140: Non-cellulosic Jet Fuel

40: Non-ester Renewable Diesel (EV 1.7)

41: Non-ester Renewable Diesel (EV 1.6)

130: Naphtha

150: Heating Oil (EV 1.6)

151: Heating Oil (EV 1.1)

152: Heating Oil (EV 1.2)

888: Other



Note: This field is required for both VOL” and RIN.

12.

Other Fuel Type

Description


AAAA; Character (125 max). If888” is listed in line 11,

enter a description of the fuel type. If not applicable, enter

NA.”



Note: This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

13.

Feedstock(s)


999; Number. Indicate code(s) corresponding to the

feedstock(s) for fuel. Each feedstock must be entered on a separate row, regardless of the D code.



Biodiesel and/or Non-ester Renewable Diesel

230: Algal Oil

360: Canola Oil

200: Non-food grade corn oil

240: Oil from Annual Covercrops

210: Soybean Oil

160: Waste Oils/Fats/Greases

Cellulosic (Diesel, Ethanol, Heating Oil, Jet Fuel, and/or

Naphtha)

70: Cellulosic Biomass Agricultural Residues

250: Cellulosic Biomass Annual Cover Crops

260: Cellulosic Biomass - Forest Product Residues

270: Cellulosic Biomass - Forest Thinnings

90: Cellulosic Biomass Miscanthus

220: Cellulosic Biomass - Separated Municipal Solid

Waste

280: Cellulosic Biomass - Separated Food Wastes

140: Cellulosic Biomass - Separated Yard Wastes

290: Cellulosic Biomass Slash

80: Cellulosic Biomass Switchgrass

Ethanol and/or Butanol

300: Starch - Agricultural Residues

310: Starch - Annual Covercrops

10: Starch Corn

120: Sugarcane

Biogas

320: Manure Digesters

330: Landfills

340: Sewage and Waste Treatment Plants


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

13.

Feedstock(s) (ctd.)


Ethanol, Renewable Diesel, Heating oil, Jet Fuel, and/or

Naphtha

350: Non-Cellulosic Portions of Separated Food Wastes

Other

888: Other


Note: This field is required for both VOL” and RIN.

14.

Other Feedstock

Description


AAAA; Character (125 max). If feedstock is not listed and 888” is listed in line 14, enter a description of the feedstock. If not applicable, enter NA.”


Note: This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

15.

Production

Process


999; Number: Indicate code corresponding to the

Production Process. Only one Production Process may be entered per row.



Biodiesel (mono-alkyl ester)

180: Transesterification, Dedicated Renewable Biomass

Facility

870: Transesterification, Co-processing Facility

Cellulosic (Diesel, Ethanol, Heating Oil, Jet Fuel, and/or

Naptha)

280: Cellulosic Production Process

290: Fischer-Tropsch Process

Ethanol and/or Butanol

300: Dry Mill, Biogas Fired (50% or less of DGS dried annually)

310: Dry Mill, Biogas Fired (CHP, 65% or less of DGS

dried annually)

320: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation)

330: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction)

340: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation)

350: Dry Mill, Biogas Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

360: Dry Mill, Biogas Fired (Corn Oil Extraction, 65% or less of DGS dried annually)

370: Dry Mill, Biogas Fired (Corn Oil Extraction, Membrane Separation)

380: Dry Mill, Biogas Fired (Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

390: Dry Mill, Biogas Fired (Corn Oil Fractionation, 65% or less of DGS dried annually)

400: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn

Oil Extraction)

410: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn

Oil Extraction, Membrane Separation)


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

15.

Production

Process (ctd.)


420: Dry Mill, Biogas Fired (Corn Oil Fractionation, Corn

Oil Extraction, Membrane Separation, Raw Starch

Hydrolysis)

430: Dry Mill, Biogas Fired (Membrane Separation, 65%

or less of DGS dried annually)

440: Dry Mill, Biogas Fired (Membrane Separation, Raw

Starch Hydrolysis)

450: Dry Mill, Biogas Fired (Raw Starch Hydrolysis, 65%

or less of DGS dried annually)

460: Dry Mill, Biomass Fired (50% or less of DGS dried annually)

470: Dry Mill, Biomass Fired (CHP, 65% or less of DGS

dried annually)

480: Dry Mill, Biomass Fired (CHP, Corn Oil

Fractionation)

490: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction)

500: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation)

510: Dry Mill, Biomass Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

520: Dry Mill, Biomass Fired (Corn Oil Extraction, 65% or less of DGS dried annually)

530: Dry Mill, Biomass Fired (Corn Oil Extraction, Membrane Separation)

540: Dry Mill, Biomass Fired (Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

550: Dry Mill, Biomass Fired (Corn Oil Fractionation, 65%

or less of DGS dried annually)

560: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn

Oil Extraction)

570: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn

Oil Extraction, Membrane Separation)

580: Dry Mill, Biomass Fired (Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

15.

Production

Process (ctd.)


590: Dry Mill, Biomass Fired (Membrane Separation, 65%

or less of DGS dried annually)

600: Dry Mill, Biomass Fired (Membrane Separation, Raw

Starch Hydrolysis)

610: Dry Mill, Biomass Fired (Raw Starch Hydrolysis, 65%

or less of DGS dried annually)

620: Dry Mill, Natural Gas Fired (50% or less of DGS

dried annually)

20: Dry Mill, Natural Gas Fired (CHP, 65% or less of DGS

dried annually)

630: Dry Mill, Natural Gas Fired (CHP, Corn Oil

Fractionation)

640: Dry Mill, Natural Gas Fired (CHP, Corn Oil

Fractionation, Corn Oil Extraction)

650: Dry Mill, Natural Gas Fired (CHP, Corn Oil

Fractionation, Corn Oil Extraction, Membrane Separation)

660: Dry Mill, Natural Gas Fired (CHP, Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

670: Dry Mill, Natural Gas Fired (Corn Oil Extraction, 65%

or less of DGS dried annually)

680: Dry Mill, Natural Gas Fired (Corn Oil Extraction, Membrane Separation)

690: Dry Mill, Natural Gas Fired (Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

700: Dry Mill, Natural Gas Fired (Corn Oil Fractionation,

65% or less of DGS dried annually)

710: Dry Mill, Natural Gas Fired (Corn Oil Fractionation, Corn Oil Extraction)

720: Dry Mill, Natural Gas Fired (Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation)

730: Dry Mill, Natural Gas Fired (Corn Oil Fractionation, Corn Oil Extraction, Membrane Separation, Raw Starch Hydrolysis)

740: Dry Mill, Natural Gas Fired (Membrane Separation,

65% or less of DGS dried annually)

750: Dry Mill, Natural Gas Fired (Membrane Separation, Raw Starch Hydrolysis)


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

15.

Production

Process (ctd.)


760: Dry Mill, Natural Gas Fired (Raw Starch Hydrolysis,

65% or less of DGS dried annually)

770: Wet Mill, Biomass Fired

780: Wet Mill, Biogas Fired

790: Fermentation (Sugarcane only)

800: Fermentation using biomass for process energy

810: Fermentation using natural gas for process energy

820: Fermentation using biogas for process energy

830: Grandfathered (Dry Mill, Biogas Fired)

110: Grandfathered (Dry Mill, Biomass Fired)

60: Grandfathered (Dry Mill, Coal Fired)

10: Grandfathered (Dry Mill, Natural Gas Fired)

840: Grandfathered (Wet Mill, Biogas Fired)

140: Grandfathered (Wet Mill, Biomass Fired)

130: Grandfathered (Wet Mill, Coal Fired)

120: Grandfathered (Wet Mill, Natural Gas Fired) Other

888: Grandfathered (other)

Non-ester Renewable Diesel

200: Hydrotreating, Dedicated Renewable Biomass

Facility

190: Hydrotreating, Co-processing Facility

880: Triton Process

890: Triton Process, Co-processing Facility

Biogas

850: Biogas Production

Ethanol, Renewable Diesel, Heating oil, Jet Fuel, and/or

Naphtha

860: Eligible Renewable Fuels From Non-Cellulosic

Portions of Separated Food Wastes Process



Note: This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

16.

Next Calendar January Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in January of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.

17.

Next Calendar February Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN generation expected, in February of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN”

18.

Next Calendar March Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in March of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

19.

Next Calendar April Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in April of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.

20.

Next Calendar May Production/ Generation

(Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in May of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.

21.

Next Calendar June Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in June of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

22.

Next Calendar July Production/ Generation

(Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in July of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.



23.

Next Calendar August Production/ Generation

(Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in August of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.



24.

Next Calendar September Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN generation expected, in September of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

25.

Next Calendar October Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN

generation expected, in October of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.

26.

Next Calendar November Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN generation expected, in November of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.

27.

Next Calendar December Production/ Generation (Current year+1)

Gallons or

RINs

99999999; Number. Indicate the volume of renewable

fuel expected to be produced or imported, or RIN generation expected, in December of the next calendar year.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the month, in gallons.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the month.



This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

28.

Production/ Generation for the Second Future Calendar Year (Current year+2)

Gallons or

RINs

99999999; Number. Indicate the additional volume of

renewable fuel expected to be produced or imported, or

RIN generation expected.



Note: If VOL entered in line 9, indicate the total volume of renewable fuel expected to be produced or imported for the second future calendar year.



If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the

second future calendar year.



This field is required for both VOL” and RIN.

29.

Production/ Generation for the Third Future Calendar Year (Current year+3)

Gallons or

RINs

99999999; Number. Indicate the additional volume of

renewable fuel expected to be produced or imported, or

RIN generation expected.



Note: If VOL entered in line 9, indicate the total volume of renewable fuel expected to be produced or imported for the third future calendar year.


If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the third future calendar year.


This field is required for both VOL” and RIN.

30.

Production/ Generation for the Fourth Future Calendar Year (Current year+4)

Gallons or

RINs

99999999; Number. Indicate the additional volume of

renewable fuel expected to be produced or imported, or

RIN generation expected.



Note: If VOL entered in line 9, indicate the total volume of renewable fuel expected to be produced or imported for the fourth future calendar year.


If RIN entered in line 9, indicate the RIN quantity expected to be generated by the producer or importer for the fourth future calendar year.


This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

31.

Production/ Generation for the Fifth Future Calendar Year (Current year+5)

Gallons or

RINs

99999999; Number. Indicate the additional volume of

renewable fuel expected to be produced or imported, or

RIN generation expected.



Note: If VOL entered in line 9, indicate the volume of renewable fuel expected to be produced or imported for the fifth future calendar year.


If RIN entered in line 9, indicate the total RIN quantity expected to be generated by the producer or importer for the fifth future calendar year.


This field is required for both VOL” and RIN.

32.

Planned

Expansion Date


MM/DD/YYYY; Date. Please enter the projected date of any planned facility expansion in the next five (5) calendar years. If an expansion is unknown or not yet planned, enter NA.

Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

33.

Strategic Planning

Date


MM/DD/YYYY; Date. Please enter in the projected date of any current strategic planning for any planned new construction or expansion in the next five (5) calendar years. If a potential strategic planning date is unknown or not yet planned, enter NA.


Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN.

Description: Strategic planning occurs once upper management has determined that a regulation will affect a facilityit is at this stage that upper management decides on a response to the regulation that will position the company most advantageously relative to its competitors. Input may include order-of-magnitude estimates of what compliance costs could be; or, how the bottom line may

be affected if the decision is made not to comply and to instead shift product into other markets. Specific planning begins once management determines that, strategically, compliance will be necessary and will require the expenditure of significant capital. The decision to hire an outside engineering firm may be made at this time. The length of time required for this stage varies by facility or company, depending on size, complexity, and the number of facilities. It is nearly impossible to precisely project how much time a specific refinery may need to complete this stage.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

34.

Planning/Front-end engineering Date


MM/DD/YYYY; Date. Please enter the projected date of any planning and front-end engineering that has taken place or will take place for any planned new construction or expansion in the next five (5) calendar years. If planning/front-end engineering is unknown or not yet planned, enter NA.


Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN.

Description: Accurate and complete information is gathered during this stage so that preliminary process engineering work can proceed; and initial contacts made with technology vendors to find the best, least expensive

technology options. Detailed engineering cannot begin

until this stage is mostly complete. The length of time required for this stage varies by facility.

35.

Detailed Engineering/ Permitting Date


MM/DD/YYYY; Date. Please enter the projected date of any detailed engineering and permitting that has taken place or will take place for any planned new construction or expansion in the next five (5) calendar years. If detailed engineering/permitting is unknown or not yet planned, enter NA.

Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN. Description: Detailed engineering usually overlaps with

the preceding and the following stages, and includes

construction planning and procuring contracts (since actual construction cannot be started until construction permits are issued).


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

36.


Procurement/ Construction Date


MM/DD/YYYY; Date. Please enter the projected date of any procurement and construction that has taken place or will take place for any planned new construction or expansion in the next five (5) calendar years. If a procurement/ construction date is unknown or not yet planned, enter NA.


Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN.

Description: This stage necessarily overlaps with the preceding stage. Procurement includes purchasing long- lead items necessary for construction of a new facility; once permits are issued, construction can begin in

earnest.

37.

Commissioning/ Start-up Date


MM/DD/YYYY; Date. Please enter the projected date of any commissioning and start-up that has taken place or will take place for any planned expansion or new construction in the next five (5) calendar years. If a commissioning/start-up date is unknown or not yet planned, enter NA.

Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN. Description: Depending on the complexity of the project,

commissioning and startup usually happen together. A

critical part of commissioning and startup is the Occupational Safety and Health Administrations (OSHA) Process Hazard Analysis”, a very complicated and time consuming, multi-part procedure that must be completed and signed-off on before startup can proceed. For this, accurate, final construction and as-built drawings, including complete piping and instrument diagrams, must be completed.

38.

Capital

Commitments


AAAAAAA; Character (1000 max). Please enter in a short narrative of all capital commitments for any planned expansion or new facility. If no additional information, enter NA.

Note: IfRIN” entered in line 9, enter NA. This field is required for both VOL” and RIN.


Field

No.



Field Name



Units



Field Formats, Codes, & Special Instructions

39.

Additional Comments/ Description


AAAAAAA; Character (1000 max). Please enter in any additional comments or planned expansion or

construction description. If no additional comments, enter

NA”.


Note: IfRIN” entered in line 9, enter NA.


Sample report line:

RFS0900,O,Y,03/21/2011,2011,1234,Sample Company Inc”, 23456, RIN,20,NA,210#230,NA,180,4,1,

15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 15000, 180000,

180000,180000,180000,NA,NA,NA,NA,NA,NA, NA, NA


Paperwork Reduction Act Statement


The public reporting and recordkeeping burden for this collection of information is disclosed in the estimates of the individual report form instructions. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing

ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.


Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.

Page 2 of 22

EPA Form 5900-283

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleRenewable Fuel Standard (RFS2) Production Outlook Report -- Instructions
SubjectThis document gives instructions for the Renewable Fuel Standard (RFS) program RFS2 Production Outlook Report used to submit ren
AuthorU.S. EPA
File Modified0000-00-00
File Created2021-01-27

© 2024 OMB.report | Privacy Policy