According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-NEW. The time required to complete this information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.




CERTIFICATE OF COMPLETION

(Including Installation)








PROJECT DESIGNATION



I, the undersigned Engineer of the above-designated Rural Utilities Service Project do hereby certify that:




1. The installation of equipment provided for pursuant to Contract No.


dated


,


including all approved amendments, (hereinafter called the ''Project'') between



(Buyer) and


(Seller) has been completed as of


and is in all respects in strict compliance

with all the provisions of the Loan Contract, including specifications drawings, and all modifications thereof.




2. The Seller has delivered to the Buyer a Certificate of Seller certifying that all persons who have furnished labor in connection with the Project have been paid in full; that all manufacturers, materialmen and subcontractors which furnished any materials or services, or both, for the Project have been paid in full; that no lien has been filed against the Project and no person has any right to claim any lien against the Project.




3. All the required acceptance tests have been made on the equipment; results were satisfactory, and the Seller has furnished in writing to the Buyer the results of all tests.




4. All defects in workmanship and materials reported during the period of construction of the Project have been corrected.




5. The total cost of the Project as completed is



Dollars

(

$


)






Dated this


day of



20



.







NAME OF BUYER



NAME OF ENGINEER





By




By



BUYER’S SIGNATURE




ENGINEER’S SIGNATURE







RUS FORM 395a (Issued )

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleDEPARTMENT OF AGRICULTURE
Authornorberto.esteves
File Modified0000-00-00
File Created2021-01-28

© 2024 OMB.report | Privacy Policy