Download:
pdf |
pdfWildlife Tracs
The User Instructions guide contains essential information and guidance for the
user to make full use of the Wildlife Tracking and Reporting Actions for the
Conservation of Species (Wildlife TRACS). The instruction guide includes step-bystep procedures for system access and use.
Table of Contents
Introduction ......................................................................................................................................... 4
Need
.................................................................................................................................................. 5
Glossary ................................................................................................................................................ 6
Point of Contacts ............................................................................................................................... 11
System Manager .............................................................................................................................. 11
Training ........................................................................................................................................... 11
Help Desk......................................................................................................................................... 11
Chapter 1 – User Management ....................................................................................................... 12
Guidelines ........................................................................................................................................ 12
Access Procedures FrequentlyAsked Questions .......................................................................... 13
Requesting Access to Wildlife TRACS............................................................................................ 15
Forgot Password .............................................................................................................................. 19
Change Password............................................................................................................................. 23
Approving User Request (User Administrator Only) ..................................................................... 25
Role and Group Assignment ........................................................................................................... 30
Creating a New Group .................................................................................................................... 32
Viewing the New Group .................................................................................................................. 35
Create New Subgroup for an Existing Group ................................................................................ 37
Review and Verification of New User Setup ................................................................................... 40
Deleting a Group ............................................................................................................................. 43
Edit Profile and Permissions ........................................................................................................... 45
Disabling A User .............................................................................................................................. 50
Chapter 2 – Dashboard and Mapper ............................................................................................. 53
Navigating the Mapper.................................................................................................................... 55
Mapper Toolbar .............................................................................................................................. 56
Navigation Tool ............................................................................................................................... 57
Feature Editor and Explorer Tools ................................................................................................. 58
Layer Manager Tool ........................................................................................................................ 59
Adding Reference Layers ................................................................................................................ 61
Chapter 3- Plan ................................................................................................................................. 67
Frequently Asked Questions ........................................................................................................... 67
July 2013
Page 1
Creating a Plan ................................................................................................................................ 68
Plan - Properties .............................................................................................................................. 71
Plan - Objectives .............................................................................................................................. 76
Chapter 4 - Project ........................................................................................................................... 83
Frequently Asked Questions ........................................................................................................... 83
Creating a Project............................................................................................................................ 86
Project - Properties.......................................................................................................................... 89
Project - Categories ..................................................................................................................... 90
Project - Contacts ........................................................................................................................ 91
Project - Create New Contact ...................................................................................................... 92
Project - Partner Type ................................................................................................................. 93
Project – Public Description ........................................................................................................ 94
Project - Description .................................................................................................................... 95
Project - Related Projects ............................................................................................................ 96
Project - Groups........................................................................................................................... 97
Project - Attachments ...................................................................................................................... 99
Create Project Statements ............................................................................................................. 102
Project Statement - Properties .................................................................................................. 103
Project Statement - Create New Contact .................................................................................. 104
Project Statement - Other Funding Source ............................................................................... 105
Create New Other Funding Source ........................................................................................... 107
Other Funding Source - Agencies.............................................................................................. 108
Other Funding Source - Partners .............................................................................................. 109
Other Funding Source - Third-Party ........................................................................................ 110
Other Funding Source - Creating a New Agency...................................................................... 111
Other Funding Source - Partner ............................................................................................... 113
Other Funding Source - Third-Party ........................................................................................ 115
Project Statement - Need Statement ............................................................................................. 117
Project Statement - Approach ....................................................................................................... 118
Project Statement - Expected Results ........................................................................................... 119
Project Statement - Additional Elements ...................................................................................... 120
Project Statement - Scope Deviations ........................................................................................... 121
July 2013
Page 2
Project Statement - Objectives ..................................................................................................... 122
Objectives - Inherit from Plan................................................................................................... 129
Objectives - Qualitative Indicators............................................................................................ 131
Project Statement - Editing ........................................................................................................... 134
Project Statement - Deleting.......................................................................................................... 135
Chapter 6 –Application Report .................................................................................................... 136
Chapter 7 – Associate a Funding Source .................................................................................... 141
Edit Funding Source ...................................................................................................................... 141
Funding Source - Grantee and Grantor .................................................................................... 149
Funding Source - Subgrantees................................................................................................... 150
Funding Source - Third-Parties ................................................................................................ 151
Chapter 8-Actions ........................................................................................................................... 152
Frequently Asked Questions ......................................................................................................... 152
Creating Actions ............................................................................................................................ 154
Action - Properties ..................................................................................................................... 157
Action - Categories..................................................................................................................... 158
Action - Contacts........................................................................................................................ 159
Action - Objectives Addressed................................................................................................... 160
Action – Interim Measures Addressed ...................................................................................... 162
Action - Habitat ......................................................................................................................... 163
Action - Species .......................................................................................................................... 164
Actions - Related Actions ........................................................................................................... 166
Action - Attachments ..................................................................................................................... 167
Chapter 9 – Estimated Cost .......................................................................................................... 170
Enter Estimated Cost .................................................................................................................... 170
Chapter 10 – Submit Performance Reports ............................................................................... 173
Chapter 11 – Legacy Data ............................................................................................................. 174
July 2013
Page 3
Introduction
Wildlife TRACS (Tracking and Reporting on Actions for the Conservation of Species) is a
geospatial tracking, reporting and decision-support tool that will demonstrate the effectiveness of
grants administered by the Wildlife and Sport Fish Restoration (WSFR) Program of the US Fish
and Wildlife Service (FWS). TRACS will be used for all grants administered through WSFR and
address the needs of policy makers, appropriators and the public to determine the relevant
outcomes and performance of the WSFR Program, and provide decision support to the FWS and
the States to facilitate strategic and effective investment of public funds in the conservation of
species and other mandated uses.
July 2013
Page 4
Need
The need for Wildlife TRACS originated from the need to demonstrate to the Congress and to
the Office of Management and Budget (OMB) the efficacy of State Wildlife Grants at addressing
the needs of Species of Greatest Conservation Need (SGCN). In 2009, the US Fish and Wildlife
Service formed a pilot group with representatives from sixteen state fish and wildlife agencies
and partner NGOs to develop a new system to track accomplishments of the SWG Program and
to indicate the effectiveness of federal expenditures in reversing declines in SGCNs and
preventing those species from being listed under the federal Endangered Species Act.
Reporting on accomplishments with WSFR administered funds has traditionally focused on units
of outputs such as acres of habitat or miles of stream improved. Although this information is
important for conservation practitioners to track progress and efficiencies of projects, how these
outputs contribute to desired conservation outcomes have not necessarily been quantified or
tracked – or, for that matter, clearly explained. For example, when SWG funds have been used to
restore native grasslands, conservationists have inferred from the number of acres restored the
benefits to grassland birds. Inference, however, is neither a measurement of improvement for
grassland birds nor, more importantly, a quantification of how restored acres of native grassland
may have contributed to sustainable populations of grassland birds.
The tracking of outputs has also been traditional for projects funded by Pittman-Robertson (PR)
Wildlife Restoration Act and Dingell-Johnson (DJ) Sport Fish Restoration Act grants. Indeed,
measures just of output served the conservation community well for decades. Today, things are
changing. The recreational shooting, archery, fishing, and boating industries that fund PR and DJ
want to know more than just outputs; they also want to know if the outputs are increasing hunter
and angler recruitment and retention and if the excise taxes they pay are benefitting their
financial bottom lines.
Wildlife TRACS will provide the WSFR program an opportunity to expand tracking and
reporting for all WSFR administered grant programs beyond historic output-based
accomplishment reports to reports that include performance and outcomes of WSFR-funded fish
and wildlife conservation programs.
July 2013
Page 5
Glossary
Access
Priviledges
Precise statements that define the extent, to which an individual can access
computer systems; use the programs and data on a system, and under what
circumstances this access will be allowed.
Account
A combination of username and password or other authentication
combination which allows access to a system.
Account
Management
Involves (1) the process of requesting, access, group and role assignment
and deactivating user accounts; (2) tracking users and their respective
Access authorizations; and (3) managing these functions.
Action
An action is an intervention undertaken by a project team to reduce threats,
capitalize on opportunities, or restore natural species and ecosystems
(equivalent to a "strategy" in the CMP Open Standards). An action is user
defined and can be represented spatially by polygon(s) on the TRACS
mapper. Projects contain one or more actions; and, actions are used as the
reporting mechanism for grants.
Activity
A specific descriptor of an action used for very specific reporting needs.
This level of detail is optional with some exceptions. For those programs for
which this level of detail is required, outputs are also required. Estimated
costs are optional at this level.
Approach
A plan to solve a situation or problem that leads to a desired outcome.
Basemap
A map depicting background reference information such as landforms,
roads, landmarks, and political boundaries, onto which other thematic
information is placed. A basemap is used for locational reference and often
includes a geodetic control network as part of its structure.
Bookmarks
A TRACS map tool that enables a user to quickly access frequently used
geographic locations.
Bundles
A collection of projects rolled up together in a package for submittal (e.g.
projects are grouped into an application bundle before being submitted to
WSFR for approval).
Category
A category is a generic descriptor that determines the type of action. This is
a pick list in TRACS. Estimated costs are required at this level. Category is
used as a basis for aggregating like actions for reporting purposes.
Converted Data
Data from legacy systems or remote databases that has been translated into a
structure that is compatible with TRACS.
July 2013
Page 6
Data Ingestion
The process of consuming data from remote systems in a format that is
compatible with TRACS.
Effectiveness
Measure
A metric of accomplishment that describes how successfully the objectives
of a project are met through the implementation of specific actions
(quantitatively or qualitatively). An accomplishment and outcome
assessment that quantifies the extent to which a project process produces
intended results. The effective measurement process quantifies how well the
project provides timely, accurate, and useful information to decision makers.
Expected
Results
Describes specifically the expected effects of the completed effort on people
or resources.
Indicator
A method of measuring the desired future state of an objective. In particular,
TRACS uses indicators to assess whether a given conservation action is
leading to a desired objective and ultimate impact. Indicators may be
standard (i.e. measurable by action outputs) or custom (i.e. measurable only
by the end user via periodic progress reports).
Feature Editor
A TRACS tool allowing the user to create and edit plan, project, and action
shapes.
Feature
Explorer
A TRACS tool allowing users to view, create, and edit plan, project and
action attributes such as properties, cost, objectives, and attachments.
Feature Search
Allows users to search for a plan, project, or action.
Federal Funding
Source
Award information from FBMS can only be associated with a project
statement by the WFRS grant specialist
Geospatial Data
Information that identifies the specific location and characteristics of natural
or constructed features as well as boundaries on the earth.
Grant
An award of financial assistance made by the Federal Government to an
eligible grantee allowing fulfillment of one or more approved projects.
Grantee
A person or group to whom a grant is made. Recipients of grant proposals
receive funds.
Group
Layers
A group is a collection of users assigned to a specific entity. By default,
Data TRACS has top-level groups that correspond to state and federal
Agencies. A top-level group can have one or more sub-groups that
correspond to state fish and wildlife agencies or regional offices. A subgroup can have one or more-sub groups of its own that correspond to
regional boundaries, departments, jurisdictions, or areas of responsibility.
The workload associated with user management necessarily increase as
July 2013
Page 7
more-sub-groups are defined.
Data TRACS users participate in one or more groups and are assigned one
or more roles that pertain to one or more entities. For example:
User: John Doe
Group: Washington Department of Fish and Game
Role: State Editor
Entity: Project
Additional spatial datasets that are superimposed onto a base map.
Map
A graphical representation of the spatial relationships of entities within an
area.
Map Legend
Allows users to view symbology information for all visible features on a
map (e.g. figures, shapes, lines and places).
Multipurpose
Project
A grant-funded project that carries out the purpose of a single grant
program and also carries out either the purpose of another grant program, or
an activity unrelated to a grant.
Need Statement
A statement that describes a specific problem and cites research or data to
support the description.
Objective
The specific and measurable desired future state of the purpose or target
(e.g. “decrease the number of hunting accidents” or “increase the population
of species x by 30%). Objectives consist of specific statements of what
exactly will be accomplished by a plan, project, or action. Objectives may
be expressed as a quantity, a deadline, and/or the required quality of
accomplishment.
Output Measure
A metric of accomplishment quantifying the amount of work, activity, or
production completed by a group of practitioners during a given time frame.
Plan
A defined and accepted strategy for achieving specific goals within a
defined geographic region. Plans are optional in TRACS, but they are
helpful to show linkages between work and strategic planning efforts.
Polygon
A flat shape consisting of straight lines that are joined to define the borders
of a project.
Project
A user defined boundary in which a set of actions and/or activities are
performed by a team of practitioners to achieve specific goals and
objectives.
July 2013
Page 8
Project
Narrative
A description that highlights the project’s benefits, purpose, species, and
implementation techniques and, is used internally and externally.
Project
Description
A narrative that highlights the project’s purpose, benefits, impacts, and
implementation techniques and, is available internally and externally.
Purpose/Target
The intended outcome of a project in general terms.
Role
A role is the permissions that are associated with a particular user function
or operation.
Symbols
Indicates the field is required
Description of the field
Information is display in public reports
Strategy
A specific descriptor that can be used to generate more specific aggregations
for reporting purposes. This is a pick list in TRACS. Estimated costs are
options at this level; output measures are required.
Threat
A negative force or pressure acting upon a specific resource and requiring a
specific response.
TRACS User
Includes user profiles, groups, permissions, etc.
Need
The lack of something that is wanted or deemed necessary as it relates to a
specific resource.
Vertice
Polygon points that segment polygon lines; multiple points are
called vertices or corners. Vertices can be used as handles to move and
adjust a polygon’s lines.
Wildlife TRACS
Tracking and Reporting Actions for Conservation of Species (TRACS).
TRACS is an online data management tool to facilitate WSFR tracking and
reporting accomplishments related to federal assistance grants. It is
comprised of two parts: Data TRACS and State TRACS.
Workflow
A set of tasks carried out in a certain order to achieve a goal.
July 2013
Page 9
Keys
July 2013
Page 10
Point of Contacts
System Manager
Daniel Hogan
Chief, Program Accomplishment Reporting Branch
U.S. Fish and Wildlife Service, Wildlife Sports Fish Restoration
6550 Gateway Road, Building 121
Commerce City, Colorado 80022
Phone: 303-289-0393
E-mail Address: dan_hogan@fws.gov
Training
Ronald Cross
U.S. Fish and Wildlife Service, Wildlife Sports Fish Restoration
6550 Gateway Road, Building 121
Commerce City, Colorado 80022
(Phone Number)
E-Mail Address: : ronald_cross@fws.gov
Matthew August
U.S. Fish and Wildlife Service, Wildlife Sports Fish Restoration
6550 Gateway Road, Building 121
Commerce City, Colorado 80022
(Phone Number)
E-Mail Address: : matthew_august@fws.gov
Help Desk
tracs-helpdesk@fws.gov
Debra Wircenske
U.S. Fish and Wildlife Service, Wildlife Sports Fish Restoration
6550 Gateway Road, Building 121
Commerce City, Colorado 80022
Phone: 303-275-2350
E-Mail Address: debbie_wircenske@fws.gov
July 2013
Page 11
Chapter 1 – User Management
Guidelines
Account Establishment and Duration. Each Account shall be for the individual use
of an identified user. Accounts remain valid for the duration the individual maintains the
relevant status with the U.S. Fish and Wildlife Service or state agency or until the account is
deactivated.
Each user must have a unique identifier and to be successfully authenticated to gain
access.
Records of processed and denied requests for the creation and/or modification of user
accounts will be kept for auditing purposes. Records will be retained for one year.
The creation of a user account must be initiated through an on-line request form and be
authorized by pertinent levels of management.
If a user is servicing multiple offices, a separate Wildlife TRACS User Access Request must be
authorized by their supervisor and submitted for each individual office.
To retain an “Active” status on your Wildlife TRACS account simply log into the Wildlife
TRACS application system every 60 days. Infrequent users are responsible for keeping their
user account with an “Active” status.
July 2013
Page 12
Access Procedures FrequentlyAsked Questions
Who should use Data TRACS?
Persons responsible for inputting or managing WSFR grant program projects and performance
data, especially state wildlife agency coordinators, program specialists, project leaders, and
WSFR grant specialists.
Who should approve new user requests?
New user requests are approved by the User Administrator for the office or agency to which the
user belongs. The User Administrator is informed of new user requests via email and is
responsible for approving or denying access within a reasonable time frame. User Adminstrators
are responsible for verifying the accuracy and validity of new user requests prior to approval.
The TRACS Help Desk via tracs-helpdesk@fws.gov can assist offices with the initial
registration of User Administrators.
What happens when an employee no longer requires access?
TRACS User are responsible for deactivating end-user accounts when access is no longer
needed. End-user passwords expire every 60 days as a security measure. Regional office and
state agencies should review all system accounts and privileges on an annual basis.
What is a role?
A role is the permission associated with a particular user function or operation. Data TRACS
defines the following roles:
Account Holder: The individual which is assigned an account.
User Administrator: Individual who is responsible for administering user access requests,
group and role assignments, and account deactivation.
State Editor: Responsible for entry of specific data elements (e.g. plans, projects, actions).
State Review: Responsible for review of system outputs and reports.
State Approver: Responsible for approval of system outputs and reports.
Federal Reviewer: Responsible for review of system outputs and reports.
Federal Approver: Responsible for approval of system outputs and reports.
July 2013
Page 13
What is a group?
A group is a collection of users assigned to a specific entity. By default, Data TRACS has toplevel groups that correspond to state and federal agencies. A top-level group can have one or
more sub-groups that correspond to state agencies or regional offices. A sub-group can have one
or more sub-groups of its own that correspond to regional boundaries, departments, jurisdictions,
or areas of responsibility. The workload associated with user management necessarily increases
as more sub-groups are defined within a parent group.
How are permissions handled in Data TRACS?
Permissions in Data TRACS are group based. State and Federal agencies are assigned a toplevel group (e.g., Group = Montana; Group = Department of the Interior). Within each top-level
group, sub-groups are created to correspond to state fish and wildlife agencies, Federal
bureaus,and regional offices. Sub-groups can have additional sub-groups to accommodate
various office, departmental, or jurisdictional organization schemes.
End-users belong to one or more groups and have specific permissions (i.e. the operations or
functions the user can perform). Permissions are inherited in a top-down hierarchy. For
example,a user with permission to edit project data in the Department of Interior (DOI) group
automatically has permission to edit project data in the U.S. Fish & Wildlife Service (USFWS)
group. However, a user who is in the USFWS group does not have implicit permission to edit
data in the DOI group. It is important to keep track of which end-users belong to a specific
group in order to ensure that unintended access is not available through group inheritance. Data
TRACS will include user management tools that display group participation and end-user
permissions.
Federal end-users of Data TRACS are managed by the appropriate regional WSFR office.
Management of state, tribal, and territorial users is the responsibility of the appropriate State
agency. State agencies will identify one or more User Administrators during the registration
process who are responsible for approving, managing, and deactivating end-user accounts at the
appropriate level.
July 2013
Page 14
Requesting Access to Wildlife TRACS
New users request access to the Data TRACS application at https://tracs.fws.gov site using the
Register link.
Step 1
• Click on the Register link located on the bottom far left side located under the Notice
Figure 1
(Figure 1)
Step 2
• Complete the Profile Information using only your official contact information
Figure 2
(Figure 2)
July 2013
Page 15
Step 3
• Select the appropriate Agency Type from the drop down list. i.e., Federal, Tribal, State
Note: The Agency drop down list values are determined by the Agency Type selected by the
requesting user.
Figure 3
(Figure 3 Federal)
Data TRACS will use your e-mail address as your username; therefore, if your e-mail changes
you should register for a new access account and your old account will be disabled.
Step 4
• Type in your full official e-mail address and confirm
• Create and enter password and confirm
Hint: Your password should be a minimum of 12 characters with a combination of lower,
upper case and contain one non alphanumeric character such as #@. Numeric numbers
are optional. Passwords should change by at least two characters. Passwords cannot be reused within 365 calendar days.
Note: Change your password if you believe it has been compromised and report the incident to
the Wildlife TRACS Help Desk at tracs-helpdesk@fws.gov. If a user account name and
password are keyed in five (5) consecutive times without correctly accessing the system, the
account will be automatically locked for 15 minutes.
•
•
•
Click on the “Rules of Behavior for Users of the Wildlife TRACS System” link. Close
out of your browser by selecting the
located in the upper right hand corner of
your desktop.
Select the Rules of Behavior box indicating that you have read and agree to comply with
the rules of behavior.
Type the Verification Code as shown on your screen.
Hint: If you unable to read the verification code select the
side of the Verification Code to generate a new code.
July 2013
button located on the right
Page 16
•
Click the Register button
Figure 4
(Figure 4)
Note: User Administrators will receive a system generated e-mail “New TRACS Registeration
Request Waiting for Your Approval” when the requesting user has successfully completed the
registration process.
July 2013
Page 17
Note: Requesting users will receive a system generated e-mail “TRACS Registration Request
Approved” when the User Administrator has successfully approved the TRACS registration.
Wildlife TRAC users can log into Wildlife TRACS via url address https://tracs.fws.gov
Step 5
• Type in your username which is your official e-mail address and the password that you
created.
•
Select the Agree and Log In button
Figure 5
(Figure 5 )
Congratulations you have successfully logged into Wildlife TRACS!
July 2013
Page 18
Forgot Password
Users can select the “Forgot Password” link to reset their password.
Note: If your account has been deactivated by the User Administrator, you will need to complete
the registration process again.
Step 1
• Select the Forgot Password? link located on the left side under the Password field in the
Wildlife TRACS Log in Screen
Figure 1
(Figure 1)
Step 2
• Enter your official e-mail address ONLY (e.g. user@stateagency.gov).
• Enter the Verification Code.
• Click the Retrieve Password button.
Note: Passwords can only be changed one (1) time during a 24 hour period.
July 2013
Page 19
Figure 2
(Figure 2 )
You will receive a system generated e-mail via tracs-helpdesk@fws.gov.
Step 3
• Select the link contained within the e-mail.
Note: The link in the e-mail will re-direct you to the Reset TRACS Password Screen.
Figure 3
(Figure 3)
July 2013
Page 20
Step 4
•
•
•
•
Enter your official e-mail address and confirm.
Create and enter your password and confirm.
Type the Verification Code.
Select the Change Password button.
Figure 4
(Figure 4)
Note: A system generated notification that the password has been successfully changed will be
sent to the user email address.
Step 5
• Select the login to TRACS link
Figure 5
(Figure 5)
You will be re-directed to the TRAC Log In Screen.
July 2013
Page 21
Step 6
• Type in your username which is your e-mail address and your new password.
• Select the Agree and Log In button.
Figure 6
(Figure 6)
July 2013
Page 22
Change Password
Users can reset their passwords using the Data TRACS Dashboad tool known as Profile. A
current password is required and the user account must be active.
Step 1
• Select “Profile” located to the right of your username.
(Figure 1)
(Figure 1)
July 2013
Page 23
Step 2
• Select the Change Password tab.
• Enter your current password, new password and confirm your password.
• Select the Change Password button.
Figure 2
(Figure 2)
July 2013
Page 24
Approving User Request (User Administrator Only)
If you are a User Administrator, a system generated e-mail notification “New TRACS
Registration Request Waiting for Your Approval” will be received when a user successfully
completes the registration process.
Step 1
• Log into Wildlife TRACS via url address https://tracs.fws.gov
• Enter your username and password.
•
Click the Agree and Log In button.
Figure 1
(Figure 1)
User Administrators will directed to the Wildlife TRACS dashboard.
July 2013
Page 25
Step 2
• Place your cursor over the User Management module and left click.
Note: The User Management button will expand to display a nested submenu to the right of the
User Management module.
•
Select Manage Access Requests.
Note: A list of Requesting Users is displayed for users who have been identified as an
Administrator for their respective agency.
Figure 2
(Figure 2)
Step 3
• Select the Manage button located on the right side under the Controls column and left
click.
July 2013
Page 26
Figure 3
(Figure 3)
The Manage Access Request form contains the user profile information and the type of access
requested by the user.
Step 4
• Select the Start Approval button located on the bottom left hand side of the form.
Figure 4
(Figure 4)
User Administrators will be redirected to the Approve Access Request form.
July 2013
Page 27
Step 5
• Verify the user information, role, and group and select the Finish Approval button
Note: Should you need to add/edit the group and role assignments refer to Role and Group
Assignment.
Figure 5
(Figure 5)
Step 6
• Select the OK button
Figure 6
(Figure 6)
Congratulations you have successfully approved a requesting user!
July 2013
Page 28
The requesting user will receive a system notification entitled “TRACS Registeration Request
Approved”.
July 2013
Page 29
Role and Group Assignment
The Approve Access Request form allows the User Administrator to assign or change role(s) and
groups for the requesting user.
The “Requested Role” is the default role assigned to the requesting user. The default role is
identified from the Agency Type selected by the requesting user when registering for access to
Data TRACS. The default role for users associated with a Federal agency is Federal Reviewer.
The default role for users associated with a State or Tribal agency is State Editor.
The Editor role enables a requesting user to create and edit plans, projects, and actions
within their group assigment and initiate workflow actions.
The Reviewer role enables a requesting user to create and edit plans, projects and actions
within their group assignment and complete reviewer functions in the workflow.
The Federal and State Approval role enables a requesting user to create and edit plans,
projects and actions within their group assignment and complete approval functions in the
workflow.
A group is a collection of users assigned to a specific group or subgroup. By default, Data
TRACS has top-level groups that correspond to state and federal agencies. A top-level group
can have one or more sub-groups that correspond to state fish and wildlife agencies or regional
offices. A sub-group can have one or more sub-groups of its own that correspond to regional
boundaries, departments, jurisdictions, or areas of responsibility.
Federal: In this example, a user is assigned to a Federal Agency, U.S. Fish and Wildlife Service,
Headquarters (subgroup of U.S. Fish and Wildlife Service), Division of Ecological Services
(subgroup of Headquarters). The Federal Reviewer role is assigned by default.
July 2013
Page 30
State: In this example, John Doe is assigned to a State Agency, Mississippi, Mississippi
Department of Wildlife Fisheries (subgroup of Mississippi), and Parks (subgroup of State of
Mississippi). The State Editor role is assigned by default.
July 2013
Page 31
Creating a New Group
Step 1
• Select the Manage Group submenu from the User Management module.
Figure
(Figure 1)
July 2013
Page 32
Step 2
•
Select the Create New Group button
Figure 2
(Figure 2)
The Create A New Group window will open.
Step 3
Select the
for a drop down list to select i.e., Headquarters (U.S. Fish and Wildlife Service)
• Type in a Custom Name (e.g. Fun in the Sun).
• Select the Grant Program.
• Click the
button.
July 2013
Page 33
Figure 3
(Figure 3)
July 2013
Page 34
Viewing the New Group
Step 1
•
Expand TRACS by selecting the plus sign.
Figure 1
(Figure 1)
July 2013
Page 35
A new group “Fun In the Sun” has been successfully created under U.S. Department of Interior,
Headquarters.
July 2013
Page 36
Create New Subgroup for an Existing Group
Step 1
•
•
•
Select the Create New Group button.
Select the parent group in which the subgroup will reside.
Complete the required fields and click Save.
Note: A new subgroup can also be created by highlighting a parent group node and clicking the
plus sign.
Figure 1
(Figure 1)
Step 2
• Expand TRACS-> U.S. Department of The Interior->Headquarters by clicking the plus
signs.
• Click the plus sign located to the right of Ecological Services.
July 2013
Page 37
Figure 2
(Figure 2)
Step 3
• Select the parent group in which the subgroup will reside.
• Enter the name of the new subgroup (e.g. Turtle) and click Save.
Figure 3
(Figure 3)
July 2013
Page 38
A new subgroup layer “Turtle” has been created under -> U.S. Department of The Interior>Headquarters->Ecological Services
July 2013
Page 39
Review and Verification of New User Setup
Step 1
• Select the Manage Other User submenu from the User Management module
Figure 1
(Figure 1)
Step 2
• Type in the first three letters of the user’s first or last name
Note: The Manage Other User tool cannot be used to manage your account. Use the Profile tool
instead to manage the details of your account.
July 2013
Page 40
Figure 2
(Figure 2)
Step 3
• Select the user from the drop down list
Figure 3
(Figure 3)
Step 4
• Expand the TRACS group tree to view the groups in which the user participates.
July 2013
Page 41
Figure 4
(Figure 4)
Figure 5
(Figure 5)
July 2013
Page 42
Deleting a Group
A group can be deleted by a User Administrator; however, a group cannot be deleted if user(s)
are assigned to the group.
Step 1
• Select Manage Other Users.
• Click the plus sign to open all applicable groups and subgroups
• Select the
located to the right of the group and or subgroup.
Figure 1
(Figure 1)
The Delete Group warning message will appear. Click the
July 2013
button.
Page 43
Figure 2
(Figure 2)
Subgroup “Fun In the Sun” has been successfully deleted.
July 2013
Page 44
Edit Profile and Permissions
Additional access can be assigned by a User Administrator in the Edit Profile -> Edit
Permissions form. A user can request the additional access by submitting a request from the
Profile form but it is not required.
Note: A user can submit a request for access to an additional group or to be assigned a particular
role using the Profile tool. Click the Request Access link to initiate a new request.
Step 1
•
Select Manage Other Users from the User Management Module
Figure 1
(Figure 1)
July 2013
Page 45
Step 2
• Type the first three letters of the requesting user’s first or last name
• Select the applicable requesting user from the drop down list.
Figure 2
(Figure 2)
Step 3
• Click the Edit Permissions link.
Figure 3
(Figure 3)
July 2013
Page 46
Step 4
• Select the applicable Group.
• Click the Add Selected Permission button and select the applicable role.
• Click the Save
button
Figure 4
(Figure 4)
Note: Select the Advanced View if the requesting user requires access to a group outside his/her
regional/state jurisdiction for a specific task.
July 2013
Page 47
Step 5
• Select the applicable Entity to which the selected Role applies. TRACS has four major
data entities (e.g. Plan, Project, Population, Federal Funding Source).
Figure 5
(Figure 5)
Step 6
• Click the Add Selected Permission button.
(Figure 6)
July 2013
Page 48
Step 7
• Click the Save button.
Placeholder for addtl screen shot when error message has been fixed
Placeholder need to show Profile info when error message is fixed
July 2013
Page 49
Disabling A User
User Administrators are responsible for deactivating end-user accounts when access is no longer
needed.
Note: A user account that has been disabled can be reactivated by the User Adminstrator using
the Manager Other User tool. The deactivated user does not need to submit a new access
request.
Step 1
• Select the Manage Other User from the User Management Module
Figure 1
(Figure 1)
July 2013
Page 50
Step 2
• Type in first three letters of the user’s first or last name.
• Select the applicable user from the drop down list.
• Click the Edit Profile link.
Figure 2
(Figure 2)
July 2013
Page 51
Step 3
• Check the Account Disabled box located under the Agency field.
• Click the
button.
Figure 3
(Figure 2)
July 2013
Page 52
Chapter 2 – Dashboard and Mapper
The Willdife TRACS dashboard is a central point of access to the Data TRACS application. The
Wildlife TRACS dashboard consists of modules, tools, reports and functions.
Users who have successfully logged into DataTRACS will be directed to the Wildlife TRACS
dashboard.
Users will notice that some of the Data TRACS application modules are temporarily greyed out.
The greyed out modules are in the development phase and will be made available to users as they
are completed.
The Data TRACS modules currently available to users include Workflow, User Management,
and Legacy Data.
Figure 1
(Figure 1)
The Workflow Manager allows Wildlife TRAC users to view and manage the status of their
project(s) within the project or grant lifecyle.
July 2013
Page 53
User Management allows User Administrators the ability to approve access requests for Data
TRACS, edit and create user groups, and assign roles and permissions.
Legacy Data allows WSFR Wildife TRACS users to view and manage legacy records from the
Federal Aid Information System (FAIMS).
Located in the upper right hand of the Wildlife TRACS dashboard are links that include Profile,
Help Desk, and Log Out.
Figure 2
(Figure 2)
The Profile tool allows Wildlife TRACS end-users to view their Wildlife TRACS profile, roles,
and permissions and provides the capability for users to change their password.
The Help Desk function allows Wildlife TRACS end-users to submit a help desk ticket. Help
desk tickets can also be submitted directly to tracs-helpdesk@fws.gov.
The Log Out function allows end-users to close the Wildlife TRACS application and end the
session.
The Mapper tool allows Wildlife TRAC users to access the mapper to view and manage project
data.
Figure 3
(Figure 3)
July 2013
Page 54
Navigating the Mapper
The Wildlife TRACS mapper allows end-users to view and manage project data in a geographic
context. The data created by Wildlife TRACS end-users in the mapper identifies the specific
geographic location of plans, projects, and actions.
•
Select the Mapper button located in the upper right hand corner of the Wildlife TRACS
dashboard
Figure 1
(Figure 1)
The mapper will be displayed on your desktop.
Figure 2
(Figure 2)
July 2013
Page 55
Mapper Toolbar
The toolbar located in the top middle of the mapper is referred to as the Mapper Toolbar. The
toolbar is dimmed by default until the mouse cursor hovers over it.
Figure 3
(Figure 3)
The components of the Mapper Toolbar are listed below with a brief description.
Returns end-users to the Wildlife TRACS dashboard.
Displays a list of available basemaps in Wildlife TRACS. The Bing Hybrid map is
visible by default. Basemaps are used to display specific location by features and characteristics.
For example, a road basemap reflects the features (small-scale) and characteristics of roads for a
specific location. A topographic basemap reflects the features (large-scale) and charasteristics
present at a specific geographic location (e.g. elevation).
Help Desk. End-users can submit a Help Desk request to the TRACS support team.
Log out of Wildlife TRACS and end the current session.
Guided Process Tool guides an end-user through the data entry workflow.
Identify Visible Map Features allows end-users to view summary information for map
features that are visible on the map.
Toggle Map Navigation allows end-users to lock the basemap so it does not move when
using the cursor to draw a feature.
Reverse Geocode allows end-users to obtain geographic coordinates and street address
for a specific location.
July 2013
Page 56
Search location allows end-users to search for specific geospatial location by
street, address, latitude / longitude, survey data, street address, county, state, etc.
Navigation Tool
The Navigation Tool is located in the upper left hand corner under the Mapper Toolbar.
Figure 4
(Figure 4)
The components of the Navigation tools are listed below with a brief description
Pan mode allows end-users the ability to grab and move the map in any direction by left
clicking on the map.
Zoom In allows end-users to zoom in on a particular map area by drawing a box.
Zoom Out allows end-users to zoom out on the map by drawing a box.
July 2013
Page 57
Show Map Scale allows end-users to toggle the map scale located at the center bottom
of the basemap.
Show Mouse Coordinates displays the latitude/longitude at the end-user’s mouse cursor
location.
Show Overview Map allows end-users to view a world street map superimposed on the
current basemap. This is useful for determining street location when viewing sattelite imagery.
Feature Editor and Explorer Tools
The tools located on the far left side of the Mapper are referred to as the Feature Editor dock.
Figure 5
(Figure 5)
The components of the Feature Editor dock are listed below with a brief description.
Restore Dock opens and miminizes the Feature Editor and Feature Explorer tools.
Feature Editor allows end-users to create and edit plans, projects, and actions.
Feature Explorer allows end-users to navigate, browse, and edit data includinng plans,
projects, and actions.
July 2013
Page 58
Feature Search allows end-users to search for existing plans, project, or actions. Searches
can be performed using the feature name or ID number.
Layer Manager Tool
The dock located on the far right side of the Mapper is referred to as the Layer Manager tool.
Figure 6
(Figure 6)
The components of the Layer Manager tool are listed below with a brief description.
Restore Dock opens or closes the dock.
Layer Manager allows end-users to control the visibility of reference layers (e.g.
external datasets and TRACS features) on the mapper.
Note: Reference layers can assist with creating features like plans, projects, and actions.
Bookmarks allows end-users to bookmark geographic locations for quick reference in
the future (e.g. project location, region, state, county). Bookmarks are specific to a individual
user account but can be shared.
July 2013
Page 59
Map Legend allows end-users to view symbology and labels for reference layers and
TRACS features. Specific colors and shapes are used to identify items of interest (e.g. habitat
types).
Note: The Map Legend is empty unless a reference layer is made visible using the Layer
Manager.
July 2013
Page 60
Adding Reference Layers
Step 1
• Navigate to the Wildlife TRACS dashboard.
• Select the Mapper button
located on the Wildlife TRACS dashboard
Figure 1
(Figure 1)
July 2013
Page 61
Step 2
• Select the Restore Dock icon
corner
located in the Layer Manager Panel in the right hand
Figure 2
(Figure 2)
Hint: TRACS Data is the default.
Step 3
• Select the Reference Tab
Figure 3
(Figure 3)
July 2013
Page 62
Step 4
• Select the plus sign
using the left button on your mouse to expand available layers
and select U.S. States (ESRI) and States
Figure 4
(Figure 4)
July 2013
Page 63
Step 5
• Select the Organize tab to arrange and increase layer transparency
Figure 5
(Figure 5)
Hint: U.S. State borders on the map are less defined as the transparency increases.
Repeat the process to display additional reference layers.
July 2013
Page 64
Step 6
• Select NatureServe Habitat and expand to include Broad Habitat Types (low res)
Figure 6
(Figure 6)
Use the Legend tool to determine what the shaded colors represent.
Step 7
•
Select the Map Legend
from the Layer Manager Tool
(Figure 7)
July 2013
Page 65
Step 8
• Select the Minimize Dock icon
•
•
Go back to the Layer Manager and Select the Reference Tab
Unselect the NatureServe Habitat Types and Broad Habitat Types (low res)
Figure 8
(Figure 8)
Step 9
• Select the Minimize Dock icon
You are now ready to proceed with creating a TRACS feature.
July 2013
Page 66
Chapter 3- Plan
Frequently Asked Questions
What is a Plan?
A Plan is a defined and accepted strategy for achieving specific goals within a defined
geographic region. Plans are optional in TRACS. Plans allow end-users to establish linkages
between strategic planning objectives and projects implemented.
Can Plan objectives be inherited by Projects?
Plan objectives can be inherited by projects. Under Project Statement Objectives, the "Inherit
from Plan" button allow end-users to choose a plan and objectives to inherit.
Who should enter Plan information for a Federal or inter-state plan?
It is highly recommended that a WSFR staff member enter information from a federal or interstate Plan for maximum efficiency. The exception is if a State wants to inherit specific
objectives pertinent to their project(s). In this scenario, it is helpful for the State to enter the Plan
objectives even though more general information for the Plan may have been entered into Data
TRACS by someone else.
Note: Specific TRACS features should be set to visible using the Layer Manager prior to
creating a plan, project, or action. Plans are NOT visible by default and should be toggled to
visible prior to defining a new Plan.
July 2013
Page 67
Creating a Plan
Step 1
• Open the Feature Editor dock.
Step 2
•
Select the
icon as the drawing tool. (The example is a statewide plan.)
Figure 1
(Figure 1)
Hints: Feature Drawing Tools
The Freehand Polygon allows end-users to capture specific location areas which are
contoured. e.g., habitat area, forested area. Freehand Polygon is created by holding down
the left mouse button and moving the cursor until the desired polygon is visible and then
releasing the left mouse button.
July 2013
Page 68
Geometic Polygon allows end-users to capture specific location areas which are linear
(point-to-point). Geometic Polygon areas are created by left left clicking the mouse of the
map to a single vertex. Continue clicking the left mouse button at each vertice of change in
drection until the desired polygon is visible. Double click the left mouse button to complete
the feature.
Select an Existing Boundary allows end-users to capture specific location areas which
have pre-determined boundary types. e.g, States, Counties, Congressional Districts. Select
this tool if a plan and project is Statewide or for a specific County.
Import Shape Files allows end-users to import shape files from a local source. A
shape file contains spatial features which represent a specific type of location. e.g., rivers
and lakes.
Figure 2
(Figure 2)
July 2013
Page 69
Step 3
• Highlight Arizona and click the Select button
Figure 3
(Figure 3)
Note: The plan polygon for the State of Arizona is outlined in red.
The Feature Editor will be displayed select the Plan Properties.
July 2013
Page 70
Plan - Properties
Step 1
• Select the Properties link from the Feature Editor.
• Enter the Plan Name i.e., Arizona Wildlife Conservation Implementation.
• Enter or copy a description of the Plan.
Hint: You can use the Ctrl+V to cut and paste from other source documents. The
Description field accepts an unlimited number of characters.
•
•
•
•
•
Select the Plan Type from the drop down list i.e., CMS Plan.
Enter the first three letters of the first or last name and select from the drop down list (e.g.
“deb” for Debbie.)
Enter the first three letters of the Agency (e.g. U.S. Fish and Wildlife Service).
Select the Agency Type (e.g. Federal).
Select the calendar and select the start and end date
Hint: Dates can be selected from the calendar located to the right of the Start and End Date
fields or manually entered as MM/DD/YEAR.
Figure 1
(Figure 1)
July 2013
Page 71
Note: If no matches are found for the Agency, click the Create New Agency button.
.
Step 2
•
•
•
•
•
Select the Agency type (e.g.Federal, State, Tribe) from the drop down list.
Select the Agenc Name from the drop down list.
Enter an Agency Abbreviation and Description.
Select the State from the drop down menu.
Select the Parent Agency if applicable.
Figure 2
(Figure 2)
Step 3
• Click the Save button to save the new Agency.
Step 4
• You are returned to the Plan form.
July 2013
Page 72
Figure 4
(Figure 4)
Note: If Related Plans are applicable proceed to Step 5.
Step 5
•
•
•
•
•
Select the Related Plans tab.
Select the Parent Plan from the drop down list.
Select the Add Related Plan from the drop down list.
Select the Save button.
Select the Close button.
July 2013
Page 73
Figure 5
(Figure 5)
July 2013
Page 74
Step 6
• Click the Save button to save the Plan.
Figure 6
(Figure 6)
Note: At the bottom of the Feature Explorer window, under the Feature Summary tab, you can
view summary information about the Plan. Additional summary information can be viewed by
using the scoll bar to the right side.
July 2013
Page 75
Plan - Objectives
Step 1
• Select the Plan Objectives for in the Feature Explorer.
• Click the New Need/Threat or New Purpose Target button.
Note: The New Need/Threat button was selected.
•
Select a Level 1 and 2 Need/Threat Type from the drop down menu.
Note: Level 3 is optional.
•
•
•
Complete the Need/Threat Description field.
Select the Save button .
Select the OK button.
Figure 1
(Figure 1)
July 2013
Page 76
Step 2
• Highlight the Need/Threat in the navigation panel.
• Click the New Objective button.
Figure 2
(Figure 2)
Step 3
• Enter an Objective ID.
Note: The objective id can be a combination of alpha and numeric characters.
•
•
Enter the Objective Name.
Enter the Objective Statement.
July 2013
Page 77
Figure 3
(Figure 3)
Step 4
• Select the Quantitative or Qualitative Indicators Tab.
Note: The Quanitative tab was selected.
•
•
•
•
•
•
Select the Cateogy from the drop down list.
Select the Strategy from the drop down list.
Enter the Desired Value.
Enter the Base Value (optional).
Select the Deadline.
Click the Add button to add the indicator.
July 2013
Page 78
Figure 4
(Figure 4)
July 2013
Page 79
Step 5
• Select the Save button to save the objective.
• Select the OK button to close the objective form.
Figure 5
(Figure 5)
July 2013
Page 80
The Quantitative Indicators and Objective have been added to the Project Objective successfully.
Note: Adding an attachment to a Plan is optional.
Step 6
•
•
•
•
Select the Attachment from the Feature Editor.
Select the Attachment Type from the drop down list.
Chose a file from your local system by clicking the Browse button.
Enter a Tilte and Author.
Note: If a link to the attachment should be included in performance reports select Yes.
•
Click the Save button.
July 2013
Page 81
Figure 6
(Figure 6)
Congratulations you have successfully created a Plan!
July 2013
Page 82
Chapter 4 - Project
Frequently Asked Questions
What is a Project?
A Project is user defined to describe one or more related actions undertaken by a group of
practitioners to achieve specific goals and objectives. A Project is geographically represented by
a point and polygon(s) independent of scale and can be related to both parent and/or child
projects. Associated data include fields required by WSFR grant program regulations
including: goals, objectives, needs, results or benefits expected, approach, estimated costs, etc.
How does a Project relate to a Plan?
Projects can be nested under Plans and inherit objectives from a Plan.
Can Projects be related to other Projects?
Yes. In the properties box under a Project there is a tab called "Related Projects". You can easily
search for Parent Projects or just Related Projects that are funded by WSFR grants and have been
entered into Data TRACS. Other non-WSFR funded projects that may have been entered into
State TRACS would not be available through this vehicle.
What are the benefits of relating Projects to other Projects in TRACS?
There are natural resource conservation and management efficiencies afforded by identifying
relationships among Projects. It can help in identifying species and habitats that are
receiving sufficient or insufficient attention across larger landscapes. TRACS will have the
ability to include hyperlinks that users can employ to easily investigate related Projects.
Is a Project required?
Yes, just as it is stated in 50 CFR 80.82. A Project is the basis for entering data into TRACS.
How does a Project relate to a Grant?
Projects are related to Grants as they are now. There could be one project under a Grant or many
projects under a Grant. The Project(s) inherit the funding source(s) identified at the grant
level and are active within the starting and ending dates of the grant.
Can a Project be funded by more than one Grant or Grant Program?
July 2013
Page 83
Yes. TRACS has the capability to identify multiple funding sources for a Project. These
funding sources could be from different Grants or from different Grant programs within the same
Grant.
Is there a limit on the size of a Project?
There is no limit on the geographic size of a Project. It could be an entire state or multiple states.
Is there a limit on the duration of a Project?
Many Projects have a defined duration needed to achieve specific objectives (e.g., three
years). Other Projects that are conducted as part of a fish and wildlife management plan should
adopt that Plan duration (e.g., perhaps six years). However, for Projects intended to continue
indefinitely (e.g., basic hunter education or fish population monitoring) the recommended
maximum duration is five years to afford greater ease of use in the system.
When in the grants process is Project information entered?
Project information is added when you are writing your grant proposals. TRACS includes a grant
application report that contains all Project information needed for the grant which includes:
• a map (i.e., the polygon you created to add a project into TRACS);
• the information in the project statement that includes the typical
narrative requirements found in 50 CFR 80.82;
• objectives found in the project statement; and
• attachments if added
Can a Project be copied and edited to create a second Project?
Yes.
Can two different Projects in TRACS have the same name?
Yes. This will be important as WSFR work that continues year-after-year is documented in
TRACS as Projects with defined, instead of infinite, time periods.
What are best practices for structuring a grant as Project(s) and Actions(s) in TRACS?
There are a variety of ways for structuring grants as Project(s) in TRACS. This will be part of
the WSFR and state training on TRACS. A template has been developed to assist in
diagramming this out prior to data entry. In general, grantees should consider a structure that
will provide them with the most information, yet be efficient for performance
reporting. Consider lumping instead of splitting. For example, if a species restoration project
July 2013
Page 84
includes a monitoring component, it is not necessary to have monitoring as a separate
Action. The major Action is species restoration.
July 2013
Page 85
Creating a Project
Step 1
•
Select the Mapper
button on the Wildlife TRACS dashboard.
Note: Navigate the map to a desired geographical location using the Navigation Tool. Be sure
the mapper is zoomed in or zoomed out enough to enable an accurate representation of the entire
project area.
The example is a statewide project scale of 1:18,489,298.
•
Select the Guided Process Tool from the Mapper Tool and click the New Project link.
Figure 1
(Figure 1)
The Feature Editor is displayed on the mapper.
July 2013
Page 86
Step 2
• Select the project Freehand Polygon button.
• Draw the project boundary by holding down the left mouse button while drawing a shape.
Release the left mouse button to complete the shape.
Figure 2
(Figure 2)
Note: The Project Polygon is displayed in blue.
July 2013
Page 87
Step 3
•
Select the Save button located on the Feature Editor.
Figure 3
(Figure 3)
Note: The project is automatically assigned a system generated ID number.
July 2013
Page 88
Project - Properties
Step 1
• Enter the Project Name (e.g. Invertebrate Conservation and Recovery).
• Select the Primary Agency from the drop down list by typing the first few letters of the
agency name.
• Select the Project Status (e.g. Draft or Active)
• Select the Project Start and End Date.
• Enter the address of an external Project Website, if applicable.
Note: If the project is sensitive (i.e. related to a listed species, private landowner, or land
acquisition), check the Project Sensitive checkbox. The spatial boundary of a sensitive project is
automatically buffered.
Figure 1
(Figure 1)
Proceed to the Categories Tab.
Note: The Save button is not activated until required data has been entered in the Projects,
Categories, Contacts and Description tabs.
July 2013
Page 89
Project - Categories
Step 2
• Select one or more Project Categories from the drop down list (e.g.
Conservation/Management).
• Select one or more Action Cateogories from the drop down list (e.g. Data Collection and
Analysis). The Action Categories you select determine the objective and action types
that can be created later.
Figure 2
(Figure 2)
July 2013
Page 90
Project - Contacts
Step 3
• Select the Search Contacts drop down list (e.g. Jeff Sorensen).
Note: If no matches are found select the Create New Contact button. Refer to Create New
Contact.
•
Select the Search Partner drop down list i.e. Department of Marine and Wildlife
Resources if applicable.
Note: If no mataches are found click the Create New Partner button. Refer to Create New
Partner.
Figure 3
(Figure 3)
July 2013
Page 91
Project - Create New Contact
Step 4
• Enter First and Last Name, Title, and Email Address.
• Select the contact Agency from the drop down list.
• Select the Save button.
Figure 4
(Figure 4)
July 2013
Page 92
Project - Partner Type
Step 5
• Select the Partner Type (e.g. Agency).
Figure 5
(Figure 5)
Step 6
•
•
•
•
•
Select the Agency Type from the drop down list (e.g. Federal, State, Tribe).
Select the Agency Name from drop down list (e.g. Arizona Mollusk Natural Resources).
Enter Agency Abbreviation and Description (optional).
Select the State and Parent Agency from the drop down list.
Select the Save button.
Figure 6
(Figure 6)
July 2013
Page 93
Project – Public Description
Step 1
• Enter or perform a copy and paste
Hint: Use the Ctrl+V to perform a copy and paste from another document source
Note: The information entered under the Public Description will be visible to the public and
should be written as an abstract using common terms and language.
Figure 1
(Figure 1)
July 2013
Page 94
Project - Description
Step 2
• Enter or perform a copy and paste.
Hint: Use the Ctrl+V to perform a copy and paste from another document source.
•
Select the Save button
Note: The Save button is now highlighted
Figure 2
(Figure 2)
.
To associate the project to a Related Project, or to assign the project to a specific user Group,
procced to Steps 3 & 4.
July 2013
Page 95
Project - Related Projects
Step 4
• Select a Parent Project or search Related Projects from the drop down lists.
Note: The Reason for Relation and Project Start fields should describe the reason for creating a
relationship between projects.
•
Click the Save and Close buttons.
Figure 4
(Figure 4)
July 2013
Page 96
Project - Groups
Step 5
• Select a Project Group from the drop down menu.
Note: The Project Group list only contains the groups to which you have edit permission in
TRACS. If you only participate in a single group, no other options will be available.
•
Select the Save button.
Figure 5
(Figure 5)
July 2013
Page 97
Step 6
• Select the OK button on the confirmation dialogue box.
• Select the Save and Close buttons to close the project form.
Figure 6
(Figure 6)
You will be directed back to the Guided Process Tool.
July 2013
Page 98
Project - Attachments
Step 1
• Click the Enter Project Data link located in the Tasks panel.
• Select the Upload Project Attachment link located on the Edit Project Data panel.
Figure 1
(Figure 1)
Step 2
•
Click the Add Attachment button.
Figure 2
(Figure 2)
July 2013
Page 99
Step 3
• Select the Attachment type (e.g. document, map, photo, video).
• Click the Browse button to locate the local source file.
• Enter the Title, Author and Abstract.
Note: If the attachment should be included in performance reports as a link, check the
Performance Related checkbox.
•
Click the Save button.
Figure 3
(Figure 3)
July 2013
Page 100
The document is successfully uploaded when it appears in the list of attachments.
Select the OK button to close the form.
July 2013
Page 101
Create Project Statements
Step 1
• Click the Create Project Statements link located in the Guided Process Tool Tasks panel.
• Click the Create New Project Statement button located in the Create Project Statements
panel.
Figure 1
(Figure 1)
The Project Statement form will be displayed.
July 2013
Page 102
Project Statement - Properties
Step 1
• Enter the Name of the project statement.
• Select the Principal Investigator from the drop down list by typing the first few letters of
the investigator’s name.
Note: If no matches are found select the Create New Contact button. Refer to Create New
Contact.
•
Enter the Est WSFR Federal Cost, Non-WSFR Cost and Other Cost.
Note: Total Est Other Cost includes funds received from Partners.
•
Select the Sub-Accounts from the drop down menu.
Note: ALL RELATED SUB ACCOUNTS MUST BE ENTERED. State users will not be able
to update this information once an award is associated with the project statement.
Figure 1
(Figure 1)
Note: The Save button is not active until required data is entered under the Properties, Other
Funds, Need Statement, Approach, Expected Results.
July 2013
Page 103
Project Statement - Create New Contact
Step 1
• Enter the contact First and Last Name.
• Enter the Title, Phone, and E-Mail Address.
• Select an agency from the Search Agency drop down list by typing the first three letters
of the agency name (e.g. Arizona Game and Fish Department).
• Click the Save button.
Figure 1
(Figure 1)
July 2013
Page 104
Project Statement - Other Funding Source
Step 1
• Click the Search Non-WSFR Funding Sources button.
Figure 1
(Figure 1)
The Search for Non-WSFR Funding Sources form will be displayed.
Step 2
•
•
•
•
Enter the funding source Name.
Enter the funding source Amount.
Enter a Start and End Date.
Click the Search button to search for the funding source.
July 2013
Page 105
Figure 2
(Figure 2)
July 2013
Page 106
Create New Other Funding Source
Step 1
•
•
•
•
Enter the Funding Source Name (e.g. Arizona Partners).
Enter the Start Date and End Date.
Enter the Amount and applicable Notes.
Click the Save button to save the funding source.
Note: Enter Agencies, Partners, or Third-parties associated with the funding source if applicable;
otherwise, click the Close button to close the New Funding Source form.
Figure 1
(Figure 1)
July 2013
Page 107
Other Funding Source - Agencies
Step 2
• Select an Agency from the drop down list by typing the first three letters of the agency
name (e.g. Arizona Mollusk and Nature Resources).
Note: If no matches are found, click the Create New Agency button. Refer to Create New
Agency.
•
Click the Save button to save the Other Funding Source.
(Figure 2)
(Figure 2)
July 2013
Page 108
Other Funding Source - Partners
Step 3
• Select a Partner from the drop down menu by typing the first three letters of the partner
name (e.g. Arizona Mollusk and Nature Resources).
Note: If no matches are found, click the Create New Partner button. Refer to Create New
Partners.
•
Click the Save button to save the Other Funding Source.
Figure 3
(Figure 3)
July 2013
Page 109
Other Funding Source - Third-Party
Step 4
• Select a Third Party from the drop down menu by typing the first three letters of the third
party name (e.g. Maritime Administration).
Note: If no matches are found, click the Create New Third Party button. Refer to Create New
Third Party.
•
Click the Save button to save the Other Funding Source.
Figure 4
(Figure 4)
July 2013
Page 110
Other Funding Source - Creating a New Agency
Step 1
•
•
•
•
Select the Agency Type from the drop down list (e.g. Federal, State, Tribal).
Enter the Agency Name, Agency Abbreviation, and Agency Description.
Select the State and Parent Agency from the drop down lists.
Click the Save button to save the new Agency record.
Figure 1
(Figure 1)
July 2013
Page 111
Step 2
• Click the OK button to save the Other Funding Source.
• Click the Close button to close the Other Funding Source form.
Figure 2
(Figure 2)
July 2013
Page 112
Other Funding Source - Partner
Step 1
• Choose a Partner type.
Figure 1
(Figure 1)
Step 2
• Enter the partner First and Last Name.
• Enter the Title, Phone and E-Mail Address.
• Select an agency from the Search Agency drop down list by typing the first three letters
of the Agency name (e.g. U.S. Fish and Wildlife Service).
• Click the Save button to save the new Partner.
July 2013
Page 113
Figure 2
(Figure 2)
Step 3
• Click the OK button to save the Other Funding Source.
• Click the Close button to close the Other Funding Source form.
Figure 3
(Figure 3)
July 2013
Page 114
Other Funding Source - Third-Party
Step 1
• Choose the Partner Type.
Figure 1
(Figure 1)
Step 2
• Enter the third party First and Last Name.
• Enter the third party Title, Phone and E-Mail Address.
• Select an agency from the Search Agency drop down list by typing the first three letters
of the agency name (e.g. U.S. Fish and Wildlife Service).
• Click the Save button to save the new Third Party.
July 2013
Page 115
Figure 2
(Figure 2)
Step 3
• Click the OK button to save the Other Funding Source.
• Click the Close button to close the Other Funding Source form.
Figure 3
(Figure 3)
July 2013
Page 116
Project Statement - Need Statement
Step 1
• Enter the Need Statement.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
Figure 1
(Figure 1)
Proceed to the Approach tab.
July 2013
Page 117
Project Statement - Approach
Step 1
• Enter the Approach.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
Figure 1
(Figure 1)
July 2013
Page 118
Project Statement - Expected Results
Step 1
• Enter the Expected Results.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
•
Click the Save button to save the Project Statement.
Note: The Save button is activated once all of the required fields have been filled in.
Note: If the Additional Elements and Scope Deviation tabs are not applicable, click the Close
button.
Figure 1
(Figure 1)
July 2013
Page 119
Project Statement - Additional Elements
Step 1
• Enter information into the additional element fields as applicable.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
•
Select the Save and OK button to save the Project Statement.
Note: If the Scope Deviations tab is not applicable, click the Close button.
Figure 1
(Figure 1)
July 2013
Page 120
Project Statement - Scope Deviations
Step 1
• Enter the Scope Deviation if applicable.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
•
•
Click the Save and OK button to save the Project Statement.
Click the Close button to close the Project Statement form.
Figure 1
(Figure 1)
July 2013
Page 121
Project Statement - Objectives
Step 1
• Click the Create Project Statements link located in the Guided Process Tool tasks panel.
• Click the Edit Statement Objectives button located in the Create Project Statements panel
Figure 1
(Figure 1)
Step 2
• Click the Create SMART Objectives button.
Figure 2
July 2013
Page 122
(Figure 2)
Step 3
• Click the New Need/Threat button.
• Select a Level 1 and 2 Need/Threat type from the drop down list.
Note: Level 3 is optional.
•
Enter the Need/Threat Description field
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
Note: Entry of the Need/Threat Description fields activates the Save button.
•
Select the Save button
Figure 3
July 2013
Page 123
(Figure 3)
Step 4
• Expand the project statement tree in the left panel by clicking the plus sign.
• Click the newly created Need/Threat in the left panel.
Figure 4
(Figure 4)
Step 5
July 2013
Page 124
•
Click the New Objective button at the top of the form.
Hint: To inherit objectives from a Plan (optional), click the Inherit from Plan button.
Refer to Inherit from Plan.
Figure 5
(Figure 5)
Step 6
• Enter the Objective ID, Name, and Description.
Hint: You can use Ctrl+V to cut and paste from other source documents. The Description
field will accept unlimited characters.
Figure 6
July 2013
Page 125
(Figure 6)
Step 7
• Click the Quantitative Indicators or Qualitative Indicators tab.
Note: In this example, Quantitative Indicator has been selected. Refer to Qualitative Indicators.
•
Click the New Standard Indicator button.
Figure 7
(Figure 7)
July 2013
Page 126
Step 8
• Select a Category from the drop down list.
• Select a Strategy from the drop down list.
Note: The Standard Output for an indicator is automatically determined by the selected strategy.
•
•
•
Enter the Desired Value and Base Value.
Enter the Deadline date.
Click the Add button to add the indicator to the objective.
Figure 8
(Figure 8)
July 2013
Page 127
The indicator table has been added when it appears in the grid.
Step 9
• Click the Save button to save the objective.
• Click the OK button to close the objective form.
Figure 9
(Figure 9)
July 2013
Page 128
Objectives - Inherit from Plan
Step 1
•
•
•
•
Click the Inherit from Plan button locate at the top right of the Objectives form.
Select a Plan from the drop down list by typing the first three letters of the plan name.
Plan objectives will be displayed in the right panel.
Drag and drop a Need/Threat, Purpose/Target, or Objective to the appropriate tree node
in the left frame.
Note: You can inherit an entire Need/Threat or Purpose/Target and its Objectives, or an
individual Objective within a Need/Threat or Purpose/Target. The inherited item must be
dragged and dropped onto the name of the item to which it will be added in the left frame.
Figure 1
(Figure 1)
July 2013
Page 129
A Need/Threat, Purpose/Target, or Objective has been inherited when it appears in the left frame
with the inherited symbol.
July 2013
Page 130
Objectives - Qualitative Indicators
Step 1
• Click the Qualitative Indicator tab on the Objective form.
• Click the New Custom Indicator button.
Figure 1
(Figure 1)
Step 2
• Enter the Custom Output for the indicator.
• Enter the Deadline date.
• Click the Add button.
July 2013
Page 131
Figure 2
(Figure 2)
The Qualitative Indicator is added to the grid.
Step 3
• Click the Save button to save the Indicator and Objective.
• Click the OK button to close the Objective form.
July 2013
Page 132
Figure 3
(Figure 3)
July 2013
Page 133
Project Statement - Editing
You can edit any component of the Project Statements prior to approval by clicking the Edit
Statement Properties link or the Edit Statement Objectives link located under the Create Project
Statements panel.
July 2013
Page 134
Project Statement - Deleting
You can delete a Project Statement prior to approval by clicking the Delete Statement link
located under the Create Project Statements panel.
July 2013
Page 135
Chapter 6 –Application Report
Step 1
• Click the Generate Application Report link located in the Tasks panel.
• Click on the Workflow link located in the Generate Application Bundle panel.
Figure 1
(Figure 1)
July 2013
Page 136
Step 2
• Select the Workflow type from the drop down list (e.g. Interim Statement Workflow
(WSFR Only) or Standard Statement Workflow).
Note: The Interim Statement Workflow is to be used by WSFR staff to manage the grant
application workflow durinng the transition period. The Standard Statement Workflow is to be
used when both State and WSRFshare in the responsbility of managing the grant application
workflow through the approval process.
Figure 2
(Figure 2)
July 2013
Page 137
Step 3
• Click the appropriate Available Workflow Action.
• Click the Apply Action button to execute the selected workflow action.
Note: Continue to click the Available Workflow Actions and the Apply Action button until all
applicable actions have been executed. Refer to the Interim Statement Workflow and Standard
Statement Workflow diagrams.
•
Select the OK button to close the workflow form.
Figure 3
(Figure 3)
July 2013
Page 138
Interim Statement Workflow (WSFR only) Diagram
Standard Statement Workflow
You can view the workflow diagram by clicking the Workflow Diagram link located to the far
right of the Current Project Statement Workflow Status label.
July 2013
Page 139
Click the Log tab to view a log of executed workflow actions. Click the OK button to close the
Workflow form.
July 2013
Page 140
Chapter 7 – Associate a Funding Source
Edit Funding Source
Step 1
• Click the Associate Funding Source link located in the Guided Process Tool Tasks panel.
• Select the Edit Funding Source link displayed in the Associate Funding Source panel.
Figure 1
(Figure 1)
July 2013
Page 141
Step 2
• Select the Find Grant button
The Search for WSFR Grant form is displayed.
Step 3
• Select the Funding Program from the drop down list (e.g. 5721).
• Select the State from the drop down list (e.g. Arizona).
• Click the Search button to search for the award.
July 2013
Page 142
Figure 3
(Figure 3)
Step 4
• Click the desired funding source from the results list. If the desired award is not found,
click the Criteria tab to modify your search parameters and search again.
• Click the the Select button when the award is highlighted.
July 2013
Page 143
Figure 4
(Figure 4)
The Project Statement Funding Source form is displayed.
Step 5
• Enter the Est. WSFR Non-Federal Match dollar amount.
• Click the Save button
Note: The Funding Source form data is shared by all Project Statements that utilize the selected
funding source. Edits have the potential to impact other Projects.
July 2013
Page 144
Figure 5
(Figure 5)
Step 6
• Click the Grantees and Grantors tab.
• Select the Grantors and Grantees from the drop down lists by typing the first three letters
of the grantor name and grantee name.
Note: If no matches exist, select the Create New Grantor button and or Create New Grantee
button. Refer to Create New Grantor and New Grantee.
•
Click the Save button.
July 2013
Page 145
Figure 6
(Figure 6)
Step 7
• Select the Seach Sub-Grantees drop down list by typing in the first three letters of the
sub-grantee name.
Note: If no matches found select the Crate New Sub-Grantee button. Refer to Create New Sub
Grantee.
•
•
Click the Save button to save the Funding Source form.
Click the OK button to confirm.
July 2013
Page 146
Figure 7
(Figure 7)
Step 8
• Select the Seach Third-parties drop down list by typing the first three letters of the thirdparty name.
Note: If no matches found select the Create New Third-parties. Refer to Create New Thirdparties.
•
•
Click the Save button to save the Funding Source form.
Click the OK button to confirm.
July 2013
Page 147
Figure 8
(Figure 8)
July 2013
Page 148
Funding Source - Grantee and Grantor
Step 1
•
•
•
•
•
Select the Agency Type (e.g. Federal, State, Tribal).
Enter the Agency Name, Agency Abbreviation, and Agency Description.
Select the State.
Select the Parent Agency from the drop down list by typing the first three letters of the
agency name.
Click the Save button to save the Grantor or Grantee.
Figure 1
(Figure 1)
July 2013
Page 149
Funding Source - Subgrantees
Step 1
•
•
•
•
•
Select the Agency Type e.g. (Federal, State, Tribal).
Enter the Agency Name, Agency Abbreviation, and Agency Description.
Select the State from the drop down list.
Select the Parent Agency from the drop down list by typing the first three letters of the
Agency name.
Click the Save button to save the Subgrantee.
Figure 1
(Figure 1)
July 2013
Page 150
Funding Source - Third-Parties
Step 1
•
•
•
•
•
Select the Agency Type (e.g. Federal, State, Tribal).
Enter Agency Name, Agency Abbreviation, and Agency Description.
Select the State from the drop down list.
Select the Parent Agency from the drop down list by typing the first three letters of the
agency name.
Click the Save button to save the Third-Party.
Figure 1
(Figure 1)
July 2013
Page 151
Chapter 8-Actions
Frequently Asked Questions
What is an Action?
An Action is an intervention undertaken by a project team to reduce threats, capitalize on
opportunities, or restore natural species and ecosystems (equivalent to a "strategy" in the CMP
Open Standards). Actions occur within a Project and are used as the reporting mechanism for
grants. Known Action information can be added when writing the grant proposal but is optional
until required for performance reports.
An Action is user defined and can be represented spatially by a polygon(s) independent of
scale. An action is also described by Category, Strategy, and sometimes Activity.
•
•
•
A Category is a generic descriptor that determines the type of action. This is a pick list in
TRACS. Estimated costs are required at this level. This is used as a basis for aggregating
like actions for reporting purposes.
A Strategy is a more specific descriptor that can be used to generate more specific
aggregations for reporting purposes. This is a pick list in TRACS. Estimated costs are
options at this level; output measures are required.
An Activity is a specific descriptor intended for very specific reporting needs. This level
of detail is optional for all programs except Boating Access and Hunter Education. For
programs for which this level of detail is required, outputs are also required. Estimated
costs are optional at this level.
How does an Action relate to a Project?
Actions are the actual work that happens under a project. Information on Actions will be used as
the reporting mechanism for Projects and Grants.
Is an Action required?
Yes, at least one Action is required per project. Again, this is the reporting mechanism for
Projects and Grants.
What is the duration of an Action?
The recommended duration for an Action is one year or whatever time period that matches the
grant interim or final performance reporting period.
Can an Action cover a multi-year period?
July 2013
Page 152
Yes. Since it is possible to report on interim measures in Data TRACS, it is possible that an
Action can span a multi-year period.
Can an Action be repeated?
Yes. An Action can be copied and repeated in another year.
When in the grants process is Action information entered?
Action information can be entered when project information is entered for the grant proposal, but
is not necessary. Typically, Action information will be entered for reporting purposes after each
year of accomplishments.
Can an Action be copied and edited to create a second Action?
Yes.
Can information from a Project be copied and edited to create an Action, particularly for a
Project with just one Action?
Yes. Several types of information can be copied from the Project to create an Action, including
the Project polygon and Contacts.
What are best practices for structuring Action(s) in TRACS?
There are a variety of ways for structuring Action(s) under a Project. Examples from different
grant programs will be included in the Grant Translation Examples portion of this procedures
manual.
July 2013
Page 153
Creating Actions
Step 1
• Click the Enter Action Data link in the Guided Process Tool Tasks panel.
• Click the Create New Action link located in the Enter Action Data panel.
Figure 1
(Figure 1)
Step 2
• Select the Edit Action Location.
Note: Feature Editor and mapper will be displayed.
July 2013
Page 154
Figure 2
(Figure 2)
Step 3
• Select the Freehand Polygon for Action Area
Figure 3
(Figure 3)
July 2013
Page 155
Note: The Action polygon is green.
Step 4
• Click the Save button in the Feature Editor when the polygon is complete.
Figure 4
(Figure 4)
July 2013
Page 156
Action - Properties
Step 1
• Enter the Action Name (e.g. Survey and Monitoring)
• Select an Action Status (e.g. Draft, Cancelled).
• Enter the Action Start and End Date.
Figure 1
(Figure 1)
Proceed to the Categories tab.
July 2013
Page 157
Action - Categories
Step 2
• Select the Category from the drop down list (e.g. Data Collection and Analysis).
• Select the Strategy from the drop down list (e.g. Reseach, survey or monitoring-fish and
wildlife populations).
• Enter the output associated with the selected Strategy unit (e.g. 20 projects, 1 database,
etc.).
• Select the Activity from the drop down list (e.g. Abudance determination).
• Select the Save button to save the Action.
Figure 2
(Figure 2)
July 2013
Page 158
Action - Contacts
Step 1
• Select a Contact from the Search Contacts drop down list by typing the first three letters
of the Contact name (e.g. Jeff Sorenson).
• Select a Partner from the Search Partner drop down list by typing the first three letters of
the Partner name (e.g. Arizona Mollusk and Nature Resources).
• Click the Save button to save the Action form.
• Click the OK button to confirm.
Figure 1
(Figure 1)
July 2013
Page 159
Action - Objectives Addressed
Step 1
• Select a Project Statement from the drop down list (e.g. Approved Statement:
Determining SGCN Mollusk Status and Research).
• Select an Indicator from the drop down list (e.g. 20 Projects 07/30/2014).
Note: Step 2 will populate the Addressed Objective Field.
Figure 1
(Figure 1)
Step 2
•
•
•
•
Enter the Date Reported.
Enter the Value Reported.
Enter the Result.
Click the Add button to add the progress report.
July 2013
Page 160
Figure 2
(Figure 2)
Step 3
• Click the Save button to save the Action form.
Figure 3
(Figure 3)
July 2013
Page 161
Action – Interim Measures Addressed
Step 1
• Select an Interim Measure from the drop down list (e.g. Determining SGCN Mollusk
Status and Research).
• Select an Indicator from the drop down list (e.g. 2 Projects 07/30/2014).
Note: Step 2 will populate the Addressed Interim Measures field.
Figure 1
(Figure 1)
Step 2
•
•
•
•
Enter the Date Reported.
Enter the Value Reported.
Enter the Result.
Click the Add button to add the progress report.
July 2013
Page 162
Action - Habitat
Step 1
•
•
•
•
Click the Habitat tab.
Select the Current Broad Habitat from drop down list (e.g. Desert Scrub).
Click the Save button to save the Action form.
Click the OK button to confirm.
Figure 1
(Figure 1)
July 2013
Page 163
Action - Species
Step 1
• Click the Select Species button to add a Directly Benefitted Species.
Figure 1
(Figure 1)
Step 2
•
•
•
•
Enter the species common or scientific name to search for the species.
Click a species name to select it.
Click the plus sign located to the right of the species name
to add it to the Action.
Click the OK button to close the species form.
July 2013
Page 164
Figure 2
(Figure 2)
July 2013
Page 165
Actions - Related Actions
Step 1
• Select a Parent Action from the drop down list by typing the first three letters of the
Parent Action.
• Select a Related Actions from the drop down list by typing the first three letters of the
Related Action.
Figure 1
(Figure 1)
July 2013
Page 166
Action - Attachments
Step 1
• Click the Enter Action Data link located on the Tasks panel.
• Click the Upload Action Attachment link located on the Edit Project Data panel.
Figure 1
(Figure 1)
Step 2
• Click the Add Attachment link.
Figure 2
(Figure 2)
July 2013
Page 167
Step 3
• Select the Attachment type (e.g. document, map, video).
• Select a file to upload from your local system using the file Browse button.
• Enter the Title, Author, and Abstract.
Note: Indicate if the attachment is Performance Related by selecting “Yes.” A link to the
attachment will be included in the performance report.
•
Click the Save button.
Figure 3
(Figure 3)
July 2013
Page 168
The attachment will be listed in the attachment grid once it is successfully uploaded. Click the
OK button to close the Attachment form.
July 2013
Page 169
Chapter 9 – Estimated Cost
Enter Estimated Cost
Step 1
• Click the Enter Estimate Cost link located in the Guided Process Tool Tasks panel.
• Click the Edit Project Estimated Cost link located in the Enter Estimated Cost panel.
Figure 1
(Figure 1)
Step 2
• Under the Action Cateogry column, click the Split Costs button to distribute costs across
actions on a percentage basis.
Figure 2
(Figure 2)
July 2013
Page 170
Step 3
• Enter the estimated cost breadown of Federal Amount and Non Federal amount across all
actions for each funding source.
Note: Cost estimates at the Strategy and Activity levels are optional. To apportion costs evenly
between actions or by custom percentages, use the Split Costs button in the Tools column.
Note: Species cost estimates are only required for directly benefitted species.
•
Click the Done button to close the Split Costs form.
Figure 3
(Figure 3)
July 2013
Page 171
Step 4
• Click the Save button to save the Estimated Costs form.
• Click the Close button.
Figure 4
(Figure 4)
July 2013
Page 172
Chapter 10 – Submit Performance Reports
July 2013
Page 173
Chapter 11 – Legacy Data
July 2013
Page 174
File Type | application/pdf |
Subject | Wildlife Tracs |
Author | Wircenske, Debbie |
File Modified | 2013-12-13 |
File Created | 2013-07-12 |