Supporting Statement Tables 1-34

Chromium Tables 1-34 ROCIS 12-18-12 (2).pdf

Hexavalent Chromium Standards for General Industry (29 CFR 1910.1026), Shipyard Employment (29 CFR 1915.1026), and Construction (29 CFR 1926.1126)

Supporting Statement Tables 1-34

OMB: 1218-0252

Document [pdf]
Download: pdf | pdf
Table 1

Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for an IH Technician to Perform Initial Exposure Monitoring
This table calculates the contract cost for the employer to have an outside  industrial hygiene technician perform initial exposure 
monitoring by collecting personal breathing‐zone air samples to characterize full‐shift exposure for each job classification in each 
work area during each shift.  To determine the number of new employers that may need to conduct initial monitoring OSHA 
multiplied the number of existing plants by 5%.
Cost = (INITCONTTIME  * CONTCOST * #INIT * %INITADD * (%LEARN + %CONT) * (#PLANTS* 5%))
Variable

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

* INITCONTTIME =  Time, in hours, for an outside contractor (industrial hygiene technician) 
                                                  to conduct the initial monitoring.
* CONTCOST =  Cost per hour for an outside industrial hygiene contractor =$106.73
* # INIT =  Number of initial exposure measurements initial plus confirmation.
* % INITADD =  Percent of plants that have not satisified initial monitoring requirement
* % LEARN =  Percent of plants that will develop in‐house monitoring capability
* % CONT =  Percent of plants that will continue to use an outside contractor for monitoring
* # PLANTS =  Number of plants represented by the model output * 5% (new employers)

Sector 1. Electroplating
Large

20 * $    106.73 *

2

* 25% * ( 0% + 100% ) *

930

47

=

$49,648

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 100% ) *

1,751
448

88
22

=
=

$56,062
$14,352

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

843
508

42
25

=
=

$27,006
$16,252

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

955
448

48
22

=
=

$30,591
$14,352

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

843
509

42
25

=
=

$27,006
$16,312

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *

959
930

48
47

=
=

$30,705
$29,789

1,751

88

=

$56,062

)*

3,560

178

=

$102,579

* ( 0% + 100% ) *
* ( 0% + 90% ) *

3,989
2,611

199
131

=
=

$127,713
$75,245

* ( 0% + 100% ) *
* ( 0% + 90% ) *

2,925
791

146
40

=
=

$93,667
$22,792

* ( 0% + 100% ) *
* ( 0% + 90% ) *

886
316

44
16

=
=

$28,377
$9,111

* ( 0% + 100% ) *
* ( 0% + 90% ) *

354
79

18
4

=
=

$11,338
$2,271

* ( 0% + 100% ) *

89

4

=

$2,835

Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
Small
12 * $    106.73 * 2 * 25%
Sector 2. Welding                                                                       GENERAL INDUSTRY
Large
12 * $    106.73 * 2 * 25%
SMAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
GMAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
TIG
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
SAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
Plasma Cutting
Small
12 * $    106.73 * 2 * 25%

Page 1

*(

0

+ 100% ) *

* ( 0% +

90%

90%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

Large

12 * $    106.73 *

2

* 25% * ( 0% +

)*

79

4

=

$2,271

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 90% ) *

89
475

4
24

=
=

$2,835
$13,681

Small

12 * $    106.73 *

532

27

=

$17,039

Large

2 * 25% * ( 0% + 100% ) *
MARITIME
12 * $    106.73 * 2 * 75% * ( 0% + 50% ) *

18

1

=

$841

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

10
24

0
1

=
=

$841
$1,168

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

14
6

1
0

=
=

$1,177
$280

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

3
117

0
6

=
=

$252
$5,607

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

66
4

3
0

=
=

$5,719
$187

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
2

0
0

=
=

$168
$93

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

1
4

0
0

=
=

$84
$187

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
2

0
0

=
=

$168
$93

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

1
0

0
0

=
=

$84
$0

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
0

0
0

=
=

$0
$0

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
16

0
1

=
=

$0
$748

Small

90%

)*

9

0

=

$757

Large

12 * $    106.73 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $    106.73 * 2 * 25% * ( 0% +

95%

)*

202

10

=

$6,155

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

1,620
3

81
0

=
=

$51,864
$89

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

21
41

1
2

=
=

$685
$1,243

Small
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

324
20

16
1

=
=

$10,373
$621

Local
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

162
4

8
0

=
=

$5,202
$118

Local

12 * $    106.73 *

2

* 25% * ( 0% + 100% ) *

32

2

=

$1,028

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 2

State

GOVERNMENT
12 * $    106.73 * 2 * 25% * ( 0% +

Local
State

12 * $    106.73 *
12 * $    106.73 *

Local
State

95%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

)*

19

1

=

$592

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

594
0

30
0

=
=

$19,032
$0

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

8
4

0
0

=
=

$249
$118

Local
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

119
2

6
0

=
=

$3,800
$59

Local
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

59
1

3
0

=
=

$1,900
$30

12

1

=

$374

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local
12 * $    106.73 * 2 * 25%
Sector 2. Mild Steel Welding                                                   GENERAL INDUSTRY
Large
12 * $    106.73 * 2 * 25%
SMAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
GMAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
TIG
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
SAW
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
Plasma Cutting
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
Plasma Welding
Small
12 * $    106.73 * 2 * 25%
Large
12 * $    106.73 * 2 * 25%
Resistance Welding
Small
12 * $    106.73 * 2 * 25%
MARITIME
Large
12 * $    106.73 * 2 * 75%
SMAW
Small
12 * $    106.73 * 2 * 75%
Large
12 * $    106.73 * 2 * 75%
GMAW
Small
12 * $    106.73 * 2 * 75%
Large
12 * $    106.73 * 2 * 75%
TIG
Small
12 * $    106.73 * 2 * 75%
Large
12 * $    106.73 * 2 * 75%
FCAW
Small
12 * $    106.73 * 2 * 75%
Large
12 * $    106.73 * 2 * 75%
Plasma Cutting
Small
12 * $    106.73 * 2 * 75%

Page 3

* ( 0% + 100% ) *
* ( 0% +

90%

)*

4,773

239

=

$137,538

* ( 0% + 100% ) *
* ( 0% + 90% ) *

4,859
3,500

243
175

=
=

$155,592
$100,869

* ( 0% + 100% ) *
* ( 0% + 90% ) *

3,563
1,060

178
53

=
=

$114,101
$30,558

* ( 0% + 100% ) *
* ( 0% + 90% ) *

1,080
424

54
21

=
=

$34,576
$12,223

* ( 0% + 100% ) *
* ( 0% + 90% ) *

432
106

22
5

=
=

$13,830
$3,056

* ( 0% + 100% ) *
* ( 0% + 90% ) *

108
106

5
5

=
=

$3,458
$3,056

* ( 0% + 100% ) *
* ( 0% + 90% ) *

108
636

5
32

=
=

$3,458
$18,335

* ( 0% + 100% ) *

648

32

=

$20,746

* ( 0% +

50%

)*

37

2

=

$1,776

* ( 0% +
* ( 0% +

90%
50%

)*
)*

21
54

1
3

=
=

$1,850
$2,570

* ( 0% +
* ( 0% +

90%
50%

)*
)*

30
13

2
1

=
=

$2,607
$607

* ( 0% +
* ( 0% +

90%
50%

)*
)*

7
251

0
13

=
=

$589
$12,055

* ( 0% +
* ( 0% +

90%
50%

)*
)*

142
8

7
0

=
=

$12,279
$374

* ( 0% +

90%

)*

5

0

=

$421

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

Large

12 * $    106.73 *

2

* 75% * ( 0% +

50%

)*

3

0

=

$140

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
8

0
0

=
=

$168
$374

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

5
3

0
0

=
=

$421
$140

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

2
1

0
0

=
=

$168
$47

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
1

0
0

=
=

$0
$47

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
50%

)*
)*

0
33

0
2

=
=

$0
$1,589

Small

90%

)*

18

1

=

$1,598

Large

12 * $    106.73 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $    106.73 * 2 * 25% * ( 0% +

95%

)*

304

15

=

$9,233

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

2,293
4

115
0

=
=

$73,420
$118

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

30
60

2
3

=
=

$966
$1,835

Small
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

458
30

23
2

=
=

$14,671
$917

Local
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *

230
6

11
0

=
=

$7,351
$178

Small

12 * $    106.73 *

2

* 25% * ( 0% + 100% ) *

46

2

=

$1,464

Large

12 * $    106.73 *

2

* 25% * ( 0% +

25%

)*

50

2

=

$398

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
25%

)*
)*

63
331

3
17

=
=

$1,502
$2,651

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
25%

)*
)*

1,458
101

73
5

=
=

$35,013
$810

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

75%
10%

)*
)*

18
294

1
15

=
=

$442
$941

Small
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

90%
25%

)*
)*

508
765

25
38

=
=

$14,643
$6,124

Small
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 25% * ( 0% +
* 25% * ( 0% +

50%
25%

)*
)*

4,067
16

203
1

=
=

$65,119
$130

Local

12 * $    106.73 *

2

* 25% * ( 0% +

25%

)*

899

45

=

$7,196

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
General Industry (Aerospace)

General Industry (Autobody)

General Industry (Coil Coating)

Maritime

Construction

Government

Page 4

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

SECTOR 4.  Producers of Chromates
Large

12 * $    106.73 *

2

* 100% * ( 0% + 100% ) *

2

0

=

$267

* $    106.73 *

2

*

)*

0

0

=

$0

* $    106.73 *

2

* 25% * ( 0% + 100% ) *

2

0

=

$106

* $    106.73 *

2

* 25% * ( 0% + 100% ) *

1

0

=

$32

* $    106.73 *

2

* 25% * ( 0% + 100% ) *

3

0

=

$82

* $    106.73 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    106.73 *

2

* 25% * ( 0% +

20%

)*

5

0

=

$78

* $    106.73 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    106.73 *

2

* 25% * ( 0% +

75%

)*

87

4

=

$2,100

* $    106.73 *

2

* 25% * ( 0% +

75%

)*

137

7

=

$3,299

* $    106.73 *

2

* 100% * ( 0% +

90%

)*

3

0

=

$347

* $    106.73 *

2

* 100% * ( 0% +

90%

)*

10

1

=

$1,157

* $    106.73 *

2

* 25% * (

0

+ 100% ) *

86

4

=

$2,755

* $    106.73 *

2

* 25% * (

0

+ 100% ) *

42

2

=

$1,347

* $    106.73 *

2

* 75% * ( 0% +

80%

)*

4

0

=

$339

* $    106.73 *

2

* 75% * ( 0% +

75%

)*

3

0

=

$212

* $    106.73 *

2

* 100% * ( 0% + 100% ) *

1

0

=

$299

* $    106.73 *

2

*

* ( 0% +

0%

)*

0

0

=

$0

* $    106.73 *

2

* 75% * ( 0% +

90%

)*

37

2

=

$5,369

* $    106.73 *
* $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

12
112

1
6

=
=

$1,033
$16,108

* $    106.73 *

2

* 75% * ( 0% +

90%

)*

35

2

=

$3,039

* $    106.73 *

2

* 75% * ( 0% +

90%

)*

37

2

=

$3,161

* $    106.73 *

2

* 75% * ( 0% +

90%

)*

34

2

=

$2,978

* $    106.73 *

2

* 25% * ( 0% +

90%

)*

178

9

=

$11,984

* $    106.73 *

2

* 25% * ( 0% +

90%

)*

130

6

=

$3,735

* $    106.73 *

2

* 25% * ( 0% + 100% ) *

3

0

=

$95

* $    106.73 *

2

* 25% * ( 0% + 100% ) *

1

0

=

$32

ALL
Small
12
SECTOR 5. Chromate Pigment Procedures
Large
20
ALL
Small
12
SECTOR 6. CCA Producers
Large
12
ALL
Small
12
SECTOR 7.  Chromium Catalyst Producers
Large
28
ALL
Small
12
SECTOR 8.  Paint and Coating Producers
Large
12
ALL
Small
12
SECTOR 9.  Printing Ink Producers
Large
12
ALL
Small
12
SECTOR 10.  Plastic Colorant Producers and Users
Large
12
ALL
Small
12
SECTOR 11.  Plating Mixture Producers
Large
12
ALL
Small
12
SECTOR 13.  Chromium Metal Producers
Large
28
ALL
Small
12
SECTOR 14.  Iron and Steel Mills
Large
20
Alloy Stainless Steel
Small
12
Large
20
Carbon Steel
Small
12
14.B Forging Industry
Large
12
Reshaping
Small
12
SECTOR 15.  Iron and Steel Foundries
Large
28
ALL
Small
12
SECTOR 17.  Chromium Dye Producers
Large
12
ALL
Small
12

Page 5

0%

0%

0%

0%

* ( 0% +

0%

SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service 
Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incerneration
Large
General Industry
Small
State
Government
Local

* ( 0% +

0%

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

12 * $    106.73 *

2

*

)*

0

0

=

$0

12 * $    106.73 *

2

* 100% * ( 0% + 100% ) *

5

0

=

$667

12 * $    106.73 *

2

* 75% * ( 0% + 100% ) *

207

10

=

$19,877

12 * $    106.73 *

2

* 75% * ( 0% + 100% ) *

1,561

78

=

$149,984

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

347

17

=

$29,956

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

703

35

=

$60,793

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

5

0

=

$469

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

17
78

1
4

=
=

$1,485
$6,721

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

5

0

=

$391

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

92

5

=

$7,938

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

367

18

=

$31,752

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

164

8

=

$14,214

12 * $    106.73 *
12 * $    106.73 *

2
2

* 0% * ( 0% +
* 75% * ( 0% +

90%
90%

)*
)*

0
21

0
1

=
=

$0
$1,831

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

4

0

=

$349

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

6

0

=

$509

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

0

0

=

$0

12 * $    106.73 *

2

* 75% * ( 0% + 100% ) *

175

9

=

$16,778

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

93
38

5
2

=
=

$8,972
$3,694

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

34
1,290

2
64

=
=

$3,254
$123,890

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *

5,162
16

258
1

=
=

$495,893
$1,560

12 * $    106.73 *

2

* 75% * ( 0% + 100% ) *

59

3

=

$5,641

20 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

48

2

=

$6,941

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
25%

)*
)*

58
0

3
0

=
=

$4,998
$0

12 * $    106.73 *

2

* 75% * ( 0% +

90%

)*

29

1

=

$2,499

Page 6

0%

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large
Industrial Rehabilitation 

Hazardous Waste‐site Work

28 * $    106.73 *

2

* 75% * ( 0% + 100% ) *

12 * $    106.73 *

2

*

0%

* ( 0% +

12 * $    106.73 *

2

*

0%

Small
State

12 * $    106.73 *
12 * $    106.73 *

Local
Large

 Item 13 COSTS

 # PLANTS

 # PLANTS

 % CONT

 % LEARN

 % INITADD

 # INIT

  CONTCOST 

 INITCONTTIME

Table 1

18

1

=

$3,958

)*

0

0

=

$0

* ( 0% + 100%

*

55

3

=

$0

2
2

* 0% * ( 0% + 100%
* 100% * ( 0% + 100%

*
*

196
16

10
1

=
=

$0
$2,049

12 * $    106.73 *
12 * $    106.73 *

2
2

* 100% * ( 0% + 100%
* 75% * ( 0% + 90%

*
*

74
44

4
2

=
=

$9,446
$3,764

Small
State

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 75% * ( 0% +

90%
90%

*
*

143
1

7
0

=
=

$12,369
$77

Local
Large

12 * $    106.73 *
12 * $    106.73 *

2
2

* 75% * ( 0% +
* 0% * ( 0% +

90%
90%

*
*

201
48

10
2

=
=

$17,362
$0

Small

12 * $    106.73 *

2

*

90%
Total

*

148
77,770

0%

Refractory Brick Restoration

Page 7

0%

* ( 0% +

7
=
3,888

$0
$3,048,250

Table 2

Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for a Laboratory to Conduct Analysis of Initial
Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples 
collected during initial exposure monitoring.  To determine the number of new employers that may need to 
conduct initial monitoring OSHA multiplied the number of existing plants by 5%.

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Cost = (SAMPCOST  * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD)* #PLANTS
Variables
* SAMPCOST =  Variable cost per sample = $68
* JOBCAT =  Number of job categories (covering each work area).
* SHIFTS = Number of work shifts
* #SAMPS =  Number of samples per exposure measurement
*#INIT =  Number of initial exposure measurements required to be satisfied equals 2
%INITADD =  Percent of plants that have not satisified initial monitoring requirement 
* #PLANTS = Number of plants represented by the model output * 5%

Sector 1. Electroplating
Large ( $68 * 7 * 2 * 3 *

2

* 25% ) *

930

47

=

$66,488

Small ( $68 * 7 * 1 * 3 *
Large ( $68 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

1,751
448

88
22

=
=

$62,566
$4,576

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

843
508

42
25

=
=

$4,306
$5,182

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

955
448

48
22

=
=

$4,877
$4,576

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

843
509

42
25

=
=

$4,306
$5,201

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *

2
2

* 25% ) *
* 25% ) *

959
930

48
47

=
=

$4,895
$9,498

Small

( $68 * 1 * 1 * 3 *

88

=

$8,938

Large

2 * 25% ) *
1,751
GENERAL INDUSTRY
( $68 * 1 * 3 * 2 * 2 * 25% ) *    3,560

178

=

$36,342

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *    3,989
* 25% ) *    2,611

199
131

=
=

$20,361
$26,658

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *    2,925
* 25% ) *       791

146
40

=
=

$14,933
$8,075

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *       886
* 25% ) *       316

44
16

=
=

$4,524
$3,228

Small

( $68 * 1 * 1 * 3 *

2

* 25% ) *       354

18

=

$1,808

Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome Plater

Job Shop Plater

Captive Shop Plater

Operator
Sector 2. Welding
SMAW

GMAW

TIG

SAW

Page 8

S

1 El

l i

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

( $68 * 1 * 3 * 2 *

2

* 25% ) *           79

4

=

$805

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *         89
* 25% ) *           79

4
4

=
=

$452
$805

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *         89
* 25% ) *         475

4
24

=
=

$452
$4,847

Small

2

* 25% ) *       532

27

=

$2,716

Large

( $68 * 1 * 1 * 3 *
MARITIME
( $68 * 1 * 3 * 1 *

2

* 75% ) *         18

1

=

$268

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *         10
* 75% ) *         24

0
1

=
=

$99
$372

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *         14
* 75% ) *            6

1
0

=
=

$139
$89

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            3
* 75% ) *       117

0
6

=
=

$30
$1,788

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *         66
* 75% ) *            4

3
0

=
=

$675
$60

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            2
* 75% ) *            2

0
0

=
=

$20
$30

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            1
* 75% ) *            4

0
0

=
=

$10
$60

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            2
* 75% ) *            2

0
0

=
=

$20
$30

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            1
* 75% ) *
0

0
0

=
=

$10
$0

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *
* 75% ) *

0
0

0
0

=
=

$0
$0

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *
0
* 75% ) *         16

0
1

=
=

$0
$238

Small

* 75% ) *            9

0

=

$89

Large

( $68 * 1 * 2 * 1 * 2
CONSTRUCTION
( $68 * 1 * 3 * 1 * 2

* 25% ) *       202

10

=

$1,033

Small
Large

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *    1,620
* 25% ) *            3

81
0

=
=

$2,756
$15

Small

( $68 * 1 * 1 * 1 *

2

* 25% ) *         21

1

=

$36

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

Page 9

S

1 El

l i
GMAW

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

( $68 * 1 * 3 * 1 *

2

* 25% ) *         41

2

=

$209

Small
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *       324
* 25% ) *         20

16
1

=
=

$551
$104

Local
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *       162
* 25% ) *            4

8
0

=
=

$276
$20

Local

* 25% ) *         32

2

=

$55

State

( $68 * 1 * 1 * 1 * 2
GOVERNMENT
( $68 * 1 * 1 * 1 * 2

* 25% ) *         19

1

=

$33

Local
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 25% ) *       594
* 25% ) *
0

30
0

=
=

$1,011
$0

Local
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 25% ) *            8
* 25% ) *            4

0
0

=
=

$13
$7

Local
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 25% ) *       119
* 25% ) *            2

6
0

=
=

$202
$3

Local
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 25% ) *         59
* 25% ) *            1

3
0

=
=

$101
$2

Local

( $68 * 1 * 1 * 1 *

2

1

=

$20

Large

( $68 * 1 * 3 * 2 *

2

* 25% ) *         12
GENERAL INDUSTRY
* 25% ) *    4,773

239

=

$48,728

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *    4,859
* 25% ) *    3,500

243
175

=
=

$24,806
$35,736

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *    3,563
* 25% ) *    1,060

178
53

=
=

$18,191
$10,826

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *    1,080
* 25% ) *       424

54
21

=
=

$5,512
$4,330

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *       432
* 25% ) *         106

22
5

=
=

$2,205
$1,083

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *       108
* 25% ) *         106

5
5

=
=

$551
$1,083

Small
Large

( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *

2
2

* 25% ) *       108
* 25% ) *         636

5
32

=
=

$551
$6,496

Small

( $68 * 1 * 1 * 3 *

2

* 25% ) *       648

32

=

$3,307

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 2. Mild Steel Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

Page 10

S

1 El

l i

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

MARITIME
( $68 * 1 * 3 * 1 *

2

* 75% ) *           37

2

=

$566

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *         21
* 75% ) *           54

1
3

=
=

$219
$819

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *         30
* 75% ) *           13

2
1

=
=

$308
$194

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            7
* 75% ) *         251

0
13

=
=

$70
$3,844

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *       142
* 75% ) *             8

7
0

=
=

$1,450
$119

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            5
* 75% ) *             3

0
0

=
=

$50
$45

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            2
* 75% ) *             8

0
0

=
=

$20
$119

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            5
* 75% ) *             3

0
0

=
=

$50
$45

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *            2
* 75% ) *             1

0
0

=
=

$20
$15

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *
0
* 75% ) *             1

0
0

=
=

$0
$15

Small
Large

( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 75% ) *
0
* 75% ) *           33

0
2

=
=

$0
$507

Small

* 75% ) *         18

1

=

$189

Large

( $68 * 1 * 2 * 1 * 2
CONSTRUCTION
( $68 * 1 * 3 * 1 * 2

* 25% ) *         304

15

=

$1,549

Small
Large

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *    2,293
* 25% ) *             4

115
0

=
=

$3,902
$20

Small
Large

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *         30
* 25% ) *           60

2
3

=
=

$51
$308

Small
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *

2
2

* 25% ) *       458
* 25% ) *           30

23
2

=
=

$780
$154

Local

( $68 * 1 * 1 * 1 *

2

* 25% ) *       230

11

=

$391

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Page 11

S

1 El

l i

State

( $68 * 1 * 3 * 1 *

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

2

* 25% ) *             6

0

=

$30

* 1 * 1 * 1 *

2

* 25% ) *         46

2

=

$78

* 2 * 3 * 3 *

2

* 25% ) *         50

2

=

$1,521

* 2 * 1 * 3 *
* 2 * 1 * 1 *

2
2

* 25% ) *         63
* 25% ) *       331

3
17

=
=

$639
$1,127

* 2 * 1 * 1 *
* 2 * 2 * 3 *

2
2

* 25% ) *    1,458
* 25% ) *       101

73
5

=
=

$4,962
$2,066

* 2 * 1 * 3 *
* 3 * 3 * 1 *

2
2

* 25% ) *         18
* 25% ) *       294

1
15

=
=

$188
$4,501

* 3 * 1 * 1 *
* 3 * 3 * 1 *

2
2

* 25% ) *       508
* 25% ) *       765

25
38

=
=

$2,594
$11,717

* 3 * 1 * 1 *
* 2 * 3 * 1 *

2
2

* 25% ) *    4,067
* 25% ) *         16

203
1

=
=

$20,764
$166

* 2 * 1 * 1 *

2

* 25% ) *       899

45

=

$3,060

* 4 * 3 * 3 *

2

* 100% ) *            2

0

=

$510

* 0 * 1 * 3 *

2

*

0

=

$0

* 9 * 2 * 3 *

2

* 25% ) *            2

0

=

$182

* 1 * 1 * 3 *

2

* 25% ) *            1

0

=

$5

* 4 * 3 * 3 *

2

* 25% ) *            3

0

=

$157

* 0 * 3 * 0 *

2

*

0

=

$0

* 14 * 3 * 3 *

2

* 25% ) *            5

0

=

$1,116

* 0 * 1 * 3 *

2

*

0

=

$0

* 4 * 2 * 3 *

2

* 25% ) *         87

4

=

$3,571

* 4 * 2 * 3 *

2

* 25% ) *       137

7

=

$5,611

* 5 * 1 * 9 *

2

* 100% ) *            3

0

=

$923

* 3 * 1 * 5 *

2

* 100% ) *         10

1

=

$1,025

* 4 * 3 * 3 *

2

* 25% ) *         86

4

=

$5,270

* 1 * 1 * 3 *

2

* 25% ) *         42

2

=

$215

Metallizing
Local ( $68
SECTOR 3.  PAINTING ‐ General Industry
Large ( $68
AEROSPACE
Small ( $68
Large ( $68
General Industry (Autobody)
Small ( $68
Large ( $68
General Industry (Coil Coating)
Small ( $68
Large ( $68
Maritime
Small ( $68
Large ( $68
Construction
Small ( $68
State ( $68
Government
Local ( $68
SECTOR 4.  Producers of Chromates
Large ( $68
ALL
Small ( $68
SECTOR 5. Chromate Pigment Procedures
Large ( $68
ALL
Small ( $68
SECTOR 6. CCA Producers
Large ( $68
ALL
Small ( $68
SECTOR 7.  Chromium Catalyst Producers
Large ( $68
ALL
Small ( $68
SECTOR 8.  Paint and Coating Producers
Large ( $68
ALL
Small ( $68
SECTOR 9.  Printing Ink Producers
Large ( $68
ALL
Small ( $68
SECTOR 10.  Plastic Colorant Producers and Users
Large ( $68
ALL
Small ( $68
SECTOR 11.  Plating Mixture Producers

Page 12

0%

0%

0%

)*

)*

)*

0

0

0

S

1 El

l i
 ALL 

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

Large

( $68 * 3 * 1 * 3 *

2

* 75% ) *            4

0

=

$203

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
14.B Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small

( $68 * 3 * 1 * 3 *

2

* 75% ) *            3

0

=

$135

( $68 * 16 * 3 * 3 *

2

* 100% ) *            1

0

=

$980

( $68 * 0 * 1 * 1 *

2

*

0

=

$0

( $68 * 8 * 3 * 3 *

2

* 75% ) *         37

2

=

$13,697

( $68 * 4 * 1 * 3 *
( $68 * 8 * 3 * 3 *

2
2

* 75% ) *         12
* 75% ) *       112

1
6

=
=

$732
$41,090

( $68 * 4 * 1 * 1 *

2

* 75% ) *         35

2

=

$718

( $68 * 5 * 1 * 3 *

2

* 75% ) *         37

2

=

$2,800

( $68 * 2 * 1 * 3 *

2

* 75% ) *         34

2

=

$1,055

( $68 * 9 * 3 * 5 *

2

* 25% ) *       178

9

=

$40,941

( $68 * 5 * 1 * 5 *

2

* 25% ) *       130

6

=

$5,514

( $68 * 7 * 1 * 21 *

2

* 25% ) *            3

0

=

$742

( $68 * 5 * 1 * 7 *

2

* 25% ) *            1

0

=

$59

( $68 * 0 * 1 * 3 *

2

*

0

=

$0

( $68 * 2 * 1 * 3 *

2

* 100% ) *            5

0

=

$213

( $68 * 1 * 1 * 3 *

2

* 75% ) *       207

10

=

$3,169

( $68 * 1 * 1 * 3 *

2

* 75% ) *    1,561

78

=

$23,912

( $68 * 3 * 3 * 3 *

2

* 75% ) *       347

17

=

$47,759

( $68 * 2 * 1 * 2 *

2

* 75% ) *       703

35

=

$14,359

( $68 * 3 * 3 * 12 *

2

* 75% ) *            5

0

=

$2,990

( $68 * 2 * 1 * 4 *
( $68 * 5 * 1 * 1 *

2
2

* 75% ) *         17
* 75% ) *         78

1
4

=
=

$701
$1,984

( $68 * 1 * 1 * 1 *

2

* 75% ) *            5

0

=

$23

( $68 * 3 * 3 * 2 *

2

* 75% ) *         92

5

=

$8,437

( $68 * 2 * 1 * 2 *

2

* 75% ) *       367

18

=

$7,499

Page 13

0%

0%

)*

)*

0

0

S
1 El
l i
SECTOR 24.  Chromium Catalyst Users
Large (
Catalyst Users
Small (
Large (
Chromium Catalyst Service 
Companies
Small (
SECTOR 25.  Refractory Brick Producers
Large (
ALL
Small (
SECTOR 26.  Woodworking
Large (
General Industry
Small (
Large (
Maritime
Small (
Large (
Construction
Small (
State (
Government
Local (
SECTOR 27.  Solid Waste Incerneration
Large (
General Industry
Small (
State (
Government
Local (
SECTOR 30.  Superalloy Producers and Users
Large (
ALL
Small (
SECTOR 31.  Construction 
Large (
Industrial Rehabilitation 

Hazardous Waste‐site Work

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

$68 * 2 * 3 * 3 *

2

* 75% ) *       164

8

=

$15,108

$68 * 0 * 1 * 3 *
$68 * 0 * 3 * 3 *

2
2

* 0% ) *
0
* 75% ) *         21

0
1

=
=

$0
$0

$68 * 0 * 1 * 3 *

2

* 75% ) *            4

0

=

$0

$68 * 9 * 1 * 15 *

2

* 75% ) *            6

0

=

$4,056

$68 * 0 * 1 * 0 *

2

* 75% ) *

0

=

$0

$68 * 1 * 1 * 2 *

2

* 75% ) *       175

9

=

$1,783

$68 * 1 * 1 * 2 *
$68 * 1 * 1 * 1 *

2
2

* 75% ) *         93
* 75% ) *         38

5
2

=
=

$954
$196

$68 * 1 * 1 * 1 *
$68 * 1 * 1 * 1 *

2
2

* 75% ) *         34
* 75% ) *    1,290

2
64

=
=

$173
$6,584

$68 * 1 * 1 * 1 *
$68 * 1 * 1 * 1 *

2
2

* 75% ) *    5,162
* 75% ) *         16

258
1

=
=

$26,353
$83

$68 * 1 * 1 * 1 *

2

* 75% ) *         59

3

=

$300

$68 * 6 * 3 * 15 *

2

* 75% ) *         48

2

=

$66,397

$68 * 6 * 1 * 3 *
$68 * 0 * 3 * 15 *

2
2

* 75% ) *         58
* 75% ) *
0

3
0

=
=

$5,312
$0

$68 * 6 * 1 * 3 *

2

* 75% ) *         29

1

=

$2,656

$68 * 12 * 3 * 3 *

2

* 75% ) *         18

1

=

$9,735

$68 * 0 * 3 * 3 *

2

*

0%

)*

0

=

$0

$68 * 1 * 1 * 1 *

2

*

0%

) *         55

3

=

$0

Small
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 0% ) *       196
* 100% ) *         16

10
1

=
=

$0
$109

Local
Large

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 100% ) *         74
* 75% ) *         44

4
2

=
=

$502
$222

Small
State

( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *

2
2

* 75% ) *       143
* 75% ) *            1

7
0

=
=

$730
$5

Local

( $68 * 1 * 1 * 1 *

2

* 75% ) *       201

11

=

$1,123

Page 14

0

0

S

1 El

l i

Large

( $68 * 1 * 1 * 1 *

2

*

Small

( $68 * 1 * 1 * 1 *

2

*

0%

) *         48

Item 13 COSTS

 # PLANTS 

  # PLANTS 

 % INITADD

 # INIT

 # SAMPS

 SHIFTS

 JOBCAT

 SAMPCOST

Table 2

2

=

$0

7
3,889

=
=

$0
$935,200

Refractory Brick Restoration

Page 15

0% ) *       148
Total
77,770

Table 3

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Employee Time and Cost to Conduct Semi‐Annual Exposure Monitoring       
This table calculates the burden hours and cost of employee time to conduct semi‐annual exposure monitoring.  When initial 
monitoring results equal or exceed the AL and are at or below the PEL, employers must continue to monitor employees at 
least every 6 months to ensure that exposures remain at or below the PEL. 

Item 12 COST

TOTAL HOURS

RESPONSES

0% +

0% ) *

930

) =

$0

0

0

0.50 * $      25.49 *
0.50 * $      25.49 *

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

49.00%
11.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

1,751
448

) =
) =

$0
$0

0
0

0

0.50 * $      25.49 *
0.50 * $      25.49 *

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

11.00%
14.00%

*(
*(

0% +
0% +

0) *
0% ) *

843
508

) =
) =

$0
$0

0
0

0
0

0.50 *
*
0.50
0.50 *
0.50 *

$      25.49 *
$      25.49 *

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

14.00%
10.00%

*(
*(

0% +
0% +

0) *
0% ) *

955
448

) =
) =

$0
$0

0
0

0
0

$      25.49 *
$      25.49 *

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

10.00%
13.00%

*(
*(

0% +
0% +

0) *
0% ) *

843
509

) =
) =

$0
$0

0
0

0
0

0.50 * $      25.49 *
0.50 * $      25.49 *

1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

13.00%
16.00%

*(
*(

0% +
0% +

0) *
0% ) *

959
930

) =
) =

$0
$0

0
0

0
0

0.50 * $      25.49 *

0) *

1,751

) =

$0

0

0

0.50 * $      25.10 *

0% +
1 * 1 * 3 * 2 * 100% * 16.00% * (
General Industry
1 * 3 * 2 * 2 * 100% *
0.92%
* ( 10% +

0% ) *

3,560

) =

$493

20

39

1.00 * $      25.10 *
0.50 * $      25.10 *

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.92%
0.73%

*(
*(

0% +
10% +

0% ) *
0% ) *

3,989
2,611

) =
) =

$0
$287

0
11

0
23

1.00 * $      25.10 *
0.50 * $      25.10 *

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.73%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

2,925
791

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

1 * 1 * 3 * 2 * 100% *
0 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

886
316

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

0 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

354
79

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

89
79

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *

1 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

89

) =

$0

0

0

%ABOVEAL
Page 16

#PLANTS

%LEARN

*(

%NOTSEMI

%INHOUSE

SEMI‐ANNUALLY

49.00%

SHIFTS
#SAMPS

1 * 2 * 3 * 2 * 100% *

JOBAL

0.50 * $      25.49 *

ADMINTIME
Sector 1. Electroplating
Large (
Hard Chrome
Small (
Large (
Job Shop 
Chrome Plater
Small (
Large (
Captive Shop 
Chrome Plater
Small (
Large (
Job Shop Plater
Small (
Large (
Captive Shop 
Plater
Small (
Large (
Operator
Small (
Sector 2. Welding
Large (
SMAW
Small (
Large (
GMAW
Small (
Large (
TIG
Small (
Large (
SAW
Small (
Large (
Plasma Cutting
Small (
Large (
Plasma 
Welding
Small (

NONSUPEWAGE

COST = BURDEN HOURS * NON SUPEWAGE
HOURS =  (ADMINTIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * (%INHOUSE + %LEARN) * #PLANTS)
Variables
* ADMINTIME =             In‐house administrative time (e.g., for pump calibration and report writing) per sample, in hours.
* NONSUPEWAGE =     Non‐suppervisory wage rate. $/hr.
* JOBAL =                       Number of job categories exposed at or above the AL
* SHIFTS =                      Number of work shifts.
* #SAMPS =                    Number of samples per exposure measurement
* 2 =                                  # times per year (semi‐annually)
* %NOTSEMI =               Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL =             Percent of plants that have an employee in at least one job category at or above the AL.
* %INHOUSE =              Percent of plants already with in‐house monitoring capabilities.
* %LEARN =                   Percent of plants that will develop in‐house monitoring capability.
* #PLANTS =                  Number of plants represented by the model input.

TOTAL HOURS

RESPONSES

10% +

0% ) *

475

) =

$0

0

0

Small ( 1.00 * $      25.10 *

*(

0% +

0% ) *

532

) =

$0

0

0

Large ( 0.50 * $      25.10 *

0.00%
1 * 1 * 3 * 2 * 100% *
MARITIME
1 * 3 * 1 * 2 * 100% *
0.00%

*(

50% +

0% ) *

18

) =

$0

0

0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

10
24

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

14
6

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

3
117

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

66
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
2

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

1
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

2
2

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

1
0

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
0

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
16

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *

*(

10% +

0% ) *

9

) =

$0

0

0

Large ( 0.50 * $      25.10 *

0.00%
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
1 * 3 * 1 * 2 * 100% *
0.00%

*(

5% +

0% ) *

202

) =

$0

0

0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

1,620
3

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

21
41

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
State ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

324
20

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $      25.10 *
State ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

162
4

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $      25.10 *

*(

0% +

0% ) *

32

) =

$0

0

0

State ( 0.50 * $      25.10 *

0.00%
1 * 1 * 1 * 2 * 100% *
GOVERNMENT
1 * 1 * 1 * 2 * 100% *
0.00%

*(

5% +

0% ) *

19

) =

$0

0

0

Local ( 1.00 * $      25.10 *

1 * 1 * 1 * 2 * 100% *

*(

0% +

0% ) *

594

) =

$0

0

0

%LEARN

%INHOUSE

%ABOVEAL

#PLANTS

*(

%NOTSEMI

Item 12 COST

SEMI‐ANNUALLY

0.00%

SHIFTS
#SAMPS

1 * 3 * 2 * 2 * 100% *

JOBAL

Large ( 0.50 * $      25.10 *

ADMINTIME
Resistance 
Welding

NONSUPEWAGE

Table 3

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small (
Thermal Spray  Large (
Tungsten 
Small (
Cutting
Large (
SAW
Small (

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW
0.00%

Page 17

Item 12 COST

TOTAL HOURS

RESPONSES

5% +

0% ) *

0

) =

$0

0

0

Local ( 1.00 * $      25.10 *
State ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

8
4

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $      25.10 *
State ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

119
2

) =
) =

$0
$0

0
0

0
0

Local ( 1.00 * $      25.10 *
State ( 0.50 * $      25.10 *

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

59
1

) =
) =

$0
$0

0
0

0
0

0.00%
*(
Local ( 1.00 * $      25.10 * 1 * 1 * 1 * 2 * 100% *
Sector 2. Mild Steel Welding                                                                        GENERAL INDUSTRY     
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
SMAW
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
0.00%
*(
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
GMAW
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
TIG
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
SAW
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Plasma Cutting
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Plasma 
Welding
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Resistance 
Welding
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 1 * 3 * 2 * 100% *
MARITIME
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
SMAW
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
0.00%
*(
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
GMAW
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
TIG
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
FCAW
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Plasma Cutting
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Plasma 
Welding
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Oxy‐fuel 
Cutting
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $      25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Air Carbon Arc 
Cutting
0.00%
*(
Small ( 1.00 * $      25.10 * 0 * 2 * 1 * 2 * 100% *

0% +

0% ) *

12

) =

$0

0

0

10% +

0% ) *

4,773

) =

$0

0

0

0% +
10% +

0% ) *
0% ) *

4,859
3,500

) =
) =

$0
$0

0
0

0
0

0% +
10% +

0% ) *
0% ) *

3,563
1,060

) =
) =

$0
$0

0
0

0
0

0% +
10% +

0% ) *
0% ) *

1,080
424

) =
) =

$0
$0

0
0

0
0

0% +
10% +

0% ) *
0% ) *

432
106

) =
) =

$0
$0

0
0

0
0

0% +
10% +

0% ) *
0% ) *

108
106

) =
) =

$0
$0

0
0

0
0

0% +
10% +

0% ) *
0% ) *

108
636

) =
) =

$0
$0

0
0

0
0

0% +

0% ) *

648

) =

$0

0

0

50% +

0% ) *

37

) =

$0

0

0

10% +
50% +

0% ) *
0% ) *

21
54

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

30
13

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

7
251

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

142
8

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

5
3

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

2
8

) =
) =

$0
$0

0
0

0
0

10% +
50% +

0% ) *
0% ) *

5
3

) =
) =

$0
$0

0
0

0
0

10% +

0% ) *

2

) =

$0

0

0

%ABOVEAL

#PLANTS

%LEARN

*(

%NOTSEMI

0.00%

SHIFTS
#SAMPS

1 * 1 * 1 * 2 * 100% *

JOBAL

State ( 0.50 * $      25.10 *

ADMINTIME

%INHOUSE

SEMI‐ANNUALLY

NONSUPEWAGE

Table 3

Plasma Cutting

GMAW

Brazing

Metallizing

Page 18

TOTAL HOURS

RESPONSES

0% ) *

1

) =

$0

0

0

1.00 * $      25.10 *
0.50 * $      25.10 *

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
1

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *
0.50 * $      25.10 *

0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
50% +

0% ) *
0% ) *

0
33

) =
) =

$0
$0

0
0

0
0

1.00 * $      25.10 *

*(

10% +

0% ) *

18

) =

$0

0

0

Large ( 0.50 * $      25.10 *

0.00%
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
0 * 3 * 1 * 2 * 100% *
0.00%

*(

5% +

0% ) *

304

) =

$0

0

0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

2,293
4

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

30
60

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

458
30

) =
) =

$0
$0

0
0

0
0

Small ( 1.00 * $      25.10 *
Large ( 0.50 * $      25.10 *

0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
5% +

0% ) *
0% ) *

230
6

) =
) =

$0
$0

0
0

0
0

*

0 * 1 * 1 * 2 * 100% *

0.00%

*(

0% +

0% ) *

46

) =

$0

0

0

*

1 * 3 * 3 * 2 * 100% *

28.00%

*(

75% +

0% ) *

50

) =

$2,974

94

188

*
*

1 * 1 * 3 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

9.00%
5.00%

*(
*(

25% +
75% +

0% ) *
0% ) *

63
331

) =
) =

$268
$393

*
*

1 * 1 * 1 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *

5.00%
8.00%

*(
*(

25% +
75% +

0% ) *
0% ) *

1,458
101

) =
) =

$1,155
$1,154

36
36

36
73

*
*

1 * 1 * 3 * 2 * 100% *
2 * 3 * 1 * 2 * 100% *

8.00%
36.00%

*(
*(

25% +
90% +

0% ) *
0% ) *

18
294

) =
) =

$70
$18,098

2
571

2
1143

*
*

0 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

36.00%
22.00%

*(
*(

10% +
75% +

0% ) *
0% ) *

508
765

) =
) =

$0
$11,997

0
379

0
757

*
*

1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *

22.00%
12.00%

*(
*(

50% +
75% +

0% ) *
0% ) *

4,067
16

) =
) =

$28,347
$139

895
4

895
9

*

1 * 1 * 1 * 2 * 100% *

12.00%

*(

75% +

0% ) *

899

) =

$5,126

162

162

*

3 * 3 * 3 * 2 * 100% *

45.00%

*(

0% +

0% ) *

2

) =

$0

0

0

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

*

5 * 2 * 3 * 2 * 100% *

71.00%

*(

0% +

0% ) *

2

) =

$0

0

0

*

1 * 1 * 3 * 2 * 100% *

50.00%

*(

0% +

0% ) *

1

) =

$0

0

0

*

1 * 3 * 3 * 2 * 100% *

33.00%

*(

0% +

0% ) *

3

) =

$0

0

0

*

0 * 3 * 0 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

Small (
Thermal Spray  Large (
Tungsten 
Cutting
Small (
Large (
SAW
Small (

%LEARN

%INHOUSE

%ABOVEAL

#PLANTS

50% +

%NOTSEMI

Item 12 COST

SEMI‐ANNUALLY

*(

Large ( 0.50 * $      25.10 *

SHIFTS
#SAMPS

0.00%

JOBAL

0 * 3 * 1 * 2 * 100% *

ADMINTIME
Electric Torch 
Cutting

NONSUPEWAGE

Table 3

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Small ( 1.00 * $      25.10
SECTOR 3.  PAINTING
Large ( 0.50 * $      31.68
AEROSPACE
Small ( 1.00 * $      31.68
General 
Large ( 0.50 * $      31.68
Industry 
(Autobody) Small ( 1.00 * $      31.68
General 
Large ( 0.50 * $      31.68
Industry (Coil 
Small ( 1.00 * $      31.68
Coating)
Large ( 0.50 * $      31.68
Maritime
Small ( 1.00 * $      31.68
Large ( 0.50 * $      31.68
Construction
Small ( 1.00 * $      31.68
State ( 0.50 * $      31.68
Government
Local ( 1.00 * $      31.68
SECTOR 4.  Producers of Chromates
Large ( 0.50 * $      37.06
ALL
Small ( 1.00 * $      37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $      36.12
ALL
Small ( 1.00 * $      36.12
SECTOR 6. CCA Producers
Large ( 0.50 * $      30.60
ALL
Small ( 1.00 * $      30.60

Page 19

8
8
12 24.836256

SECTOR 7.  Chromium Catalyst Producers
Large ( 0.50 * $      37.06 * 6
ALL
Small ( 1.00 * $      37.06 * 0
SECTOR 8.  Paint and Coating Producers
Large ( 0.50 * $      27.60 * 1
ALL
Small ( 1.00 * $      27.60 * 1
SECTOR 9.  Printing Ink Producers
Large ( 0.50 * $      27.65 * 3
ALL
Small ( 0.50 * $      27.65 * 2
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.50 * $      30.64 * 2
Small ( 1.00 * $      30.64
ALL
SECTOR 11.  Plating Mixture Producers
Large ( 0.50 * $      27.50
ALL
Small ( 1.00 * $      27.50
SECTOR 13.  Chromium Metal Producers
Large ( 0.5 * $      37.17
ALL
1 * $      37.17
Small (
SECTOR 14.  Iron and Steel Mills
Large ( 0.50 * $      37.17
Alloy and 
Stainless Steel
Small ( 1.00 * $      37.17
Large ( 0.50 * $      37.17
Carbon Steel
Small ( 1.00 * $      37.17
SECTOR 14B.  Forging Industry
Large ( 0.50 * $      37.17
Reshaping
Small ( 1.00 * $      37.17
SECTOR 15.  Iron and Steel Foundries
Large ( 0.50 * $      27.12
ALL
Small ( 1.00 * $      27.12
SECTOR 17.  Chromium Dye Producers
Large ( 0.50 * $      36.12
ALL
Small ( 1.00 * $      36.12
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.5 * $      39.76
ALL
Small ( 0.5 * $      39.76
SECTOR 19.  Chemical Distributors
Large ( 0.50 * $      28.67
ALL
Small ( 0.50 * $      28.67
SECTOR 20.  Textile Dyeing
Large ( 0.50 * $      19.13

* 3 * 3 * 2 * 100% *

100.00% * (

80% +

0% ) *

5

) =

$8,331

RESPONSES

TOTAL HOURS

Item 12 COST

#PLANTS

%LEARN

%INHOUSE

%ABOVEAL

%NOTSEMI

SEMI‐ANNUALLY

SHIFTS
#SAMPS

JOBAL

NONSUPEWAGE

ADMINTIME

Table 3

225 449.64706

* 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

* 2 * 3 * 2 * 100% *

13.00%

*(

25% +

0% ) *

87

) =

$471

17

34

* 2 * 3 * 2 * 100% *

13.00%

*(

25% +

0% ) *

137

) =

$1,479

54

54

* 1 * 9 * 2 * 100% *

69.00%

*(

10% +

0% ) *

3

) =

$155

6

11

* 1 * 5 * 2 * 100% *

69.00%

*(

10% +

0% ) *

10

) =

$192

7

14

* 3 * 3 * 2 * 100% *

51.00%

*(

0

+

0

)*

86

)=

$0

0

0

*

2 * 1 * 3 * 2 * 100% *

51.00%

*(

0

+

0

)*

42

)=

$0

*

1 * 1 * 3 * 2 * 100% *

100.00% * (

20% +

0% ) *

4

) =

$73

*

1 * 1 * 3 * 2 * 100% *

100.00% * (

25% +

0% ) *

3

) =

$122

*

2 * 3 * 3 * 2 * 100% *

100.00% * (

0% +

0% ) *

1

) =

$0

0

0

*

0 * 1* 1* 2*

0% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

*

3 * 3 * 3 * 2 * 100% *

38.00%

*(

10% +

0% ) *

37

) =

$1,421

38

76

*
*

1 * 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *

38.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

12
112

) =
) =

$101
$0

3
0

3
0

*

0 * 1 * 1 * 2 * 100% *

0.00%

*(

10% +

0% ) *

35

) =

$0

0

0

*

4 * 1 * 3 * 2 * 100% *

63.00%

*(

10% +

0% ) *

37

) =

$1,028

28

79

*

2 * 1 * 3 * 2 * 100% *

63.00%

*(

10% +

0% ) *

34

) =

$968

26

26

*

6 * 3 * 5 * 2 * 100% *

100.00% * (

10% +

0% ) *

178

) =

$43,504 1,604 3208.0045

*

5 * 1 * 5 * 2 * 100% *

100.00% * (

10% +

0% ) *

130

) =

$17,578

*

6 * 1 * # * 2 * 100% *

38.00%

*(

0% +

0% ) *

3

) =

$0

0

0

*

6 * 1 * 7 * 2 * 100% *

38.00%

*(

0% +

0% ) *

1

) =

$0

0

0

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

*

1 * 1 * 3 * 2 * 100% *

27.00%

*(

0% +

0% ) *

5

) =

$0

0

0

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

207

) =

$0

0

0

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

1,561

) =

$0

0

0

*

0 * 3 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

347

) =

$0

0

0

0.00%

*(

10% +

0% ) *

703

) =

$0

0

0

0

0
3

5

4 4.4178039

648 648.08173

ALL
Small

(

0.50

* $      19.13 *

0

* 1 * 2 * 2 * 100% *

Page 20

TOTAL HOURS

RESPONSES

0% ) *

5

) =

$135

5

10

0.00%
20.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

17
78

) =
) =

$0
$129

0
5

0
12

* 1 * 1 * 2 * 100% *

0.00%

*(

10% +

0% ) *

5

) =

$0

0

0

0 * 3 * 2 * 2 * 100% *

0.00%

*(

10% +

0% ) *

92

) =

$0

0

0

* 1 * 2 * 2 * 100% *

0.00%

*(

10% +

0% ) *

367

) =

$0

0

0

2 * 3 * 3 * 2 * 100% *

9.00%

*(

10% +

0% ) *

164

) =

$830

27

53

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

0
21

) =
) =

$0
$0

0
0

0
0

* 1 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

4

) =

$0

0

0

0 * 1 * # * 2 * 100% *

0.00%

*(

10% +

0% ) *

6

) =

$0

0

0

* 1 * 0 * 2 * 100% *

0.00%

*(

10% +

0% ) *

0

) =

$0

0

0

*

0 * 1 * 2 * 2 * 100% *

0.00%

*(

0% +

0% ) *

175

) =

$0

0

0

*
*

0
* 1 * 2 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

93
38

) =
) =

$0
$0

0
0

0
0

*
*

0 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

0.00%
22.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

34
1,290

) =
) =

$0
$0

0
0

0
0

*
*

1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *

22.00%
22.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

5,162
16

) =
) =

$0
$0

0
0

0
0

*

1 * 1 * 1 * 2 * 100% *

22.00%

*(

0% +

0% ) *

59

) =

$0

0

0

*

0 * 3 * # * 2 * 100% *

0.00%

*(

10% +

0% ) *

48

) =

$0

0

0

*
*

0
* 1 * 3 * 2 * 100% *
0 * 3 * # * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

58
0

) =
) =

$0
$0

0
0

0
0

*

0 * 1 * 3 * 2 * 100% *

0.00%

*(

10% +

0% ) *

29

) =

$0

0

0

*
*

*
*

0

* 1 * 4 * 2 * 100% *
3 * 1 * 1 * 2 * 100% *
0

%LEARN

%INHOUSE

%ABOVEAL

1 * 3 * # * 2 * 100% *

#PLANTS

10% +

%NOTSEMI

*(

*

SHIFTS
#SAMPS

25.00%

JOBAL

Item 12 COST

SECTOR 21.  Colored Glass Producers
Large ( 0.50 * $      27.66
General 
Industry
Small 1.00
(
* $      27.66
Large ( 0.50 * $      27.66
Fiber, Flat, 
Container Glass
Small 1.00
(
* $      27.66
SECTOR 22.  Printing
Large ( 0.5 * $      19.97

SEMI‐ANNUALLY

NONSUPEWAGE

ADMINTIME

Table 3

ALL
Small
( 0.5 * $      19.97 *
SECTOR 24.  Chromium Catalyst Users
Large ( 0.5 * $      31.14 *

0

Catalyst Users
Small

(
Large (

Chromium 
Catalyst Service 
Companies Small

1.0 * $      31.14 *
0.5 * $      31.14 *

( 1.0 * $      31.14 *
SECTOR 25.  Refractory Brick Producers
Large ( 0.5 * $      24.56 *

0

* 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *
0

ALL
Small
( 0.5 * $      24.56
SECTOR 26.  Woodworking
Large ( 0.50 * $      30.76
General 
Industry
Small
(
1 * $      30.76
Large ( 0.50 * $      30.76
Maritime
1 * $      30.76
Small (
Large ( 0.50 * $      30.76
Construction
1 * $      30.76
Small (
State ( 0.50 * $      30.76
Government
1 * $      30.76
Local (
SECTOR 27.  Solid Waste Incerneration
Large ( 0.50 * $      26.09
General 
Industry
Small
(
1 * $      26.09
State ( 0.50 * $      26.09
Government
1 * $      26.09
Local (

*

0

Page 21

Item 12 COST

TOTAL HOURS

RESPONSES

0% +

0% ) *

18

) =

$0

0

0

* 3 * 3 * 2 * 100% *

0.00%

*(

0% +

0% ) *

0

) =

$0

0

0

0 * 1 * 1 * 2 * 100% *

0.00%

*(

0% +

0% ) *

55

) =

$0

0

0

%ABOVEAL

0 * 3 * 3 * 2 * 100% *

#PLANTS

*(

%NOTSEMI

%LEARN

SEMI‐ANNUALLY

0.00%

SHIFTS
#SAMPS

%INHOUSE

SECTOR 30.  Superalloy Producers and Users
Large ( 0.5 * $      26.75 *

JOBAL

NONSUPEWAGE

ADMINTIME

Table 3

ALL
Small

(
1 * $      26.75 *
SECTOR 31.  Construction Cement Workers
Large ( 0.5 * $      30.79 *

0

Industrial  Small (
Rehabilitation  State (

1.0 * $      30.79 *
0.5 * $      30.79 *

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
0% +

0% ) *
0% ) *

196
16

) =
) =

$0
$0

0
0

0
0

Local (
Large (

1.0 * $      30.79 *
0.5 * $      30.79 *

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

0% +
10% +

0% ) *
0% ) *

74
44

) =
) =

$0
$0

0
0

0
0

Small (
State (

1.0 * $      30.79 *
0.5 * $      30.79 *

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
0.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

143
1

) =
) =

$0
$0

0
0

0
0

Local (
Large (

1.0 * $      30.79 *
0.5 * $      30.79 *

0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *

0.00%
60.00%

*(
*(

10% +
10% +

0% ) *
0% ) *

201
48

) =
) =

$0
$0

0
0

0
0

Small (

1.0 * $      30.79 *

0 * 1 * 1 * 2 * 100% *

60.00%

*(

10% +

0% ) *
Total

Hazardous 
Waste‐site 
Work
Refractory 
Brick 
Restoration

Page 22

148
) =
77,770

$0
0
0
$147,017 4,930         8,048

Table 4

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for an IH Technician to Perform Semi‐Annual 
Exposure Monitoring 
This table calculates the contract cost for the employer to have an outside industrial hygiene technician 
perform semi‐annual exposure monitoring.  

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Cost = (SEMICONTTIME  * CONTCOST * SEMI‐ANNUALLY * %NOTSEMI * %ABOVE AL *%CONT) * #PLANTS)         
Variables:
* SEMICONTTIME =  Time, in hours, for an outside contractor (industrial hygiene technician) 
    to conduct semi‐annual monitoring
* CONTCOST =  Cost per hour for an outside industrial hygiene contractor
* 2 =  2 times per year semi‐annually
* %NOTSEMI =  Percent of plants not performing semi‐annual monitoring requirements
* %ABOVEAL =  Percent of plants that have an employee in at least one job category at or above the AL
* %CONT =  Percent of plants that will continue to use an outside contractor for monitoring
* #PLANTS =  Number of plants represented by the model input

Sector 1. Electroplating
Large

( 12 * $      106.73 * 2 * 100% * 49.00% * 100% ) *

930

=

$1,167,712

Small
Large

( 12 * $      106.73 * 2 * 100% * 49.00% * 100% ) *
( 12 * $      106.73 * 2 * 100% * 11.00% * 100% ) *

1,751
448

=
=

$2,197,640
$126,301

Small
Large

( 12 * $      106.73 * 2 * 100% * 11.00% * 100% ) *
( 12 * $      106.73 * 2 * 100% * 14.00% * 100% ) *

843
508

=
=

$237,652
$182,019

Small
Large

( 12 * $      106.73 * 2 * 100% * 14.00% * 100% ) *
( 12 * $      106.73 * 2 * 100% * 10.00% * 100% ) *

955
448

=
=

$342,625
$114,819

Small
Large

( 12 * $      106.73 * 2 * 100% * 10.00% * 100% ) *
( 12 * $      106.73 * 2 * 100% * 13.00% * 100% ) *

843
509

=
=

$216,048
$169,646

Small
Large

( 12 * $      106.73 * 2 * 100% * 13.00% * 100% ) *
( 12 * $      106.73 * 2 * 100% * 16.00% * 100% ) *

959
930

=
=

$319,334
$381,294

* 16.00% * 100% ) *

1,751

=

$717,597

*

0.92%

*

)*

3,560

=

$75,498

*
*

0.92%
0.73%

* 100% ) *
* 90% ) *

3,989
2,611

=
=

$93,997
$43,943

*
*

0.73%
0.00%

* 100% ) *
* 90% ) *

2,925
791

=
=

$54,701
$0

*

0.00%

* 100% ) *

886

=

$0

Hard Chrome
Job Shop Chrome 
Plater
Captive Shop Chrome 
Plater
Job Shop Plater

Captive Shop Plater

Operator
( 12 * $      106.73 * 2 * 100%
Small
Sector 2. Welding                                                         GENERAL INDUSTRY
Large
( 12 * $      106.73 * 2 * 100%
SMAW
( 12 * $      106.73 * 2 * 100%
Small
Large
( 12 * $      106.73 * 2 * 100%
GMAW
( 12 * $      106.73 * 2 * 100%
Small
Large
( 12 * $      106.73 * 2 * 100%
TIG
( 12 * $      106.73 * 2 * 100%
Small

Page 23

90%

90%

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

Large

( 0 * $      106.73 * 2 * 100% *

0.00%

*

)*

316

=

$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

354
79

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

89
79

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

89
475

=
=

$0
$0

Small

0.00%

* 100% ) *

532

=

$0

Large

( 12 * $      106.73 * 2 * 100% *
MARITIME
( 12 * $      106.73 * 2 * 100% *

0.00%

*

50%

)*

18

=

$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

10
24

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

14
6

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

3
117

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

66
4

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
2

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

1
4

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
2

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

1
0

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

0
0

=
=

$0
$0

Small

( 0 * $      106.73 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray 
Tungsten Cutting

Page 24

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

Large

( 0 * $      106.73 * 2 * 100% *

0.00%

*

50%

)*

16

=

$0

Small

0.00%

*

90%

)*

9

=

$0

Large

( 0 * $      106.73 * 2 * 100% *
CONSTRUCTION
( 12 * $      106.73 * 2 * 100% *

0.00%

*

95%

)*

202

=

$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

1,620
3

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

21
41

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

324
20

=
=

$0
$0

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

162
4

=
=

$0
$0

Small

0.00%

* 100% ) *

32

=

$0

State

( 12 * $      106.73 * 2 * 100% *
GOVERNMENT
( 12 * $      106.73 * 2 * 100% *

0.00%

*

)*

19

=

$0

Local
State

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

594
0

=
=

$0
$0

Local
State

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

8
4

=
=

$0
$0

Local
State

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

119
2

=
=

$0
$0

Local
State

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

59
1

=
=

$0
$0

*

0.00%

* 100% ) *

12

=

$0

*

0.00%

*

)*

4,773

=

$0

*
*

0.00%
0.00%

* 100% ) *
* 90% ) *

4,859
3,500

=
=

$0
$0

*
*

0.00%
0.00%

* 100% ) *
* 90% ) *

3,563
1,060

=
=

$0
$0

*

0.00%

* 100% ) *

1,080

=

$0

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

95%

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
( 12 * $      106.73 * 2 * 100%
Local
Sector 2. Mild Steel Welding                                       GENERAL INDUSTRY
Large
( 12 * $      106.73 * 2 * 100%
SMAW
( 0 * $      106.73 * 2 * 100%
Small
Large
( 0 * $      106.73 * 2 * 100%
GMAW
( 0 * $      106.73 * 2 * 100%
Small
Large
( 0 * $      106.73 * 2 * 100%
TIG
( 0 * $      106.73 * 2 * 100%
Small

Page 25

90%

90%

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

Large

( 0 * $      106.73 * 2 * 100% *

0.00%

*

)*

424

=

$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

432
106

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

108
106

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

108
636

=
=

$0
$0

Small

0.00%

* 100% ) *

648

=

$0

Large

( 0 * $      106.73 * 2 * 100% *
MARITIME
( 0 * $      106.73 * 2 * 100% *

0.00%

*

50%

)*

37

=

$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

21
54

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

30
13

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

7
251

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

142
8

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

5
3

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
8

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

5
3

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

2
1

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
50%

)*
)*

0
1

=
=

$0
$0

Small

( 0 * $      106.73 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting
Thermal Spray 
Tungsten Cutting

Page 26

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

Large

( 0 * $      106.73 * 2 * 100% *

0.00%

*

50%

)*

33

=

$0

Small

0.00%

*

90%

)*

18

=

$0

Large

( 0 * $      106.73 * 2 * 100% *
CONSTRUCTION
( 0 * $      106.73 * 2 * 100% *

0.00%

*

95%

)*

304

=

$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

2,293
4

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

30
60

=
=

$0
$0

Small
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

458
30

=
=

$0
$0

Small
State

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 95% ) *

230
6

=
=

$0
$0

Local

( 0 * $      106.73 * 2 * 100% *

0.00%

* 100% ) *

46

=

$0

Large

( 12 * $      106.73 * 2 * 100% * 28.00% *

25%

*

50

=

$8,907

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

9.00%
5.00%

*
*

75%
25%

)*
*

63
331

=
=

$10,815
$10,603

Small
Large

( 12 * $      106.73 * 2 * 100% *
( 12 * $      106.73 * 2 * 100% *

5.00%
8.00%

*
*

75%
25%

)*
*

1,458
101

=
=

$140,052
$5,184

Small
Large

( 12 * $      106.73 * 2 * 100% * 8.00% *
( 12 * $      106.73 * 2 * 100% * 36.00% *

75%
10%

)*
*

18
294

=
=

$2,828
$27,101

Small
Large

( 12 * $      106.73 * 2 * 100% * 36.00% *
( 12 * $      106.73 * 2 * 100% * 22.00% *

90%
25%

)*
*

508
765

=
=

$421,714
$107,791

Small
State

( 12 * $      106.73 * 2 * 100% * 22.00% *
( 12 * $      106.73 * 2 * 100% * 12.00% *

50%
25%

)*
*

4,067
16

=
=

$1,146,094
$1,248

899

=

$69,086

2

=

$2,400

0

=

$0

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE
General Industry 
(Autobody)
General Industry (Coil 
Coating)
Maritime

Construction

Government
( 12 * $      106.73 * 2 * 100% * 12.00% * 25% ) *
Local
SECTOR 4.  Producers of Chromates
Large
( 12 * $      106.73 * 2 * 100% * 45.00% * 100% ) *
ALL
( 0 * $      106.73 * 2 * 100% * 0.00% * 0% ) *
Small

Page 27

SECTOR 5. Chromate Pigment Procedures
Large
( 12 * $      106.73
ALL
( 12 * $      106.73
Small
SECTOR 6. CCA Producers
Large
( 12 * $      106.73
ALL
( 0 * $      106.73
Small
SECTOR 7.  Chromium Catalyst Producers
Large
( 20 * $      106.73
ALL
( 0 * $      106.73
Small
SECTOR 8.  Paint and Coating Producers
Large
( 12 * $      106.73
ALL
( 12 * $      106.73
Small
SECTOR 9.  Printing Ink Producers
Large
( 12 * $      106.73
ALL
( 12 * $      106.73
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
( 12 * $      106.73
ALL
( 12 * $      106.73
Small
SECTOR 11.  Plating Mixture Producers
Large
( 12 * $      106.73
ALL
( 12 * $      106.73
Small
SECTOR 13.  Chromium Metal Producers
Large
( 12 * $      106.73
ALL
( 0 * $      106.73
Small
SECTOR 14.  Iron and Steel Mills
Large
( 12 * $      106.73
Alloy and Stainless 
Steel
( 12 * $      106.73
Small
Large
( 0 * $      106.73
Carbon Steel
( 0 * $      106.73
Small
SECTOR 14B.  Forging Industry
Large
( 12 * $      106.73
Reshaping
( 12 * $      106.73
Small

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

* 2 * 100% * 71.00% * 100% ) *

2

=

$3,596

* 2 * 100% * 50.00% * 100% ) *

1

=

$1,266

* 2 * 100% * 33.00% * 100% ) *

3

=

$2,161

* 2 * 100% *

0.00%

*

0%

)*

0

=

$0

* 2 * 100% *

100%

*

20%

)*

5

=

$4,444

* 2 * 100% *

0.00%

*

0%

)*

0

=

$0

* 2 * 100% * 13.00% *

75%

)*

87

=

$21,836

* 2 * 100% * 13.00% *

75%

)*

137

=

$34,314

* 2 * 100% * 69.00% *

90%

)*

3

=

$4,792

* 2 * 100% * 69.00% *

90%

)*

10

=

$15,972

* 2 * 100% * 51.00% * 100% ) *

86

=

$112,392

* 2 * 100% * 51.00% * 100% ) *

42

=

$54,974

* 2 * 100% *

100%

*

80%

)*

4

=

$9,053

* 2 * 100% *

100%

*

75%

)*

3

=

$5,658

* 2 * 100% *

100%

* 100% ) *

1

=

$2,562

* 2 * 0%

0.00%

*

0%

)*

0

=

$0

* 2 * 100% * 38.00% *

90%

)*

37

=

$32,646

* 2 * 100% * 38.00% *
* 2 * 100% * 0.00% *

90%
90%

)*
)*

12
112

=
=

$10,471
$0

* 2 * 100% *

*

90%

)*

35

=

$0

* 2 * 100% * 63.00% *

90%

)*

37

=

$53,102

* 2 * 100% * 63.00% *

90%

)*

34

=

$50,039

Page 28

*

0.00%

SECTOR 15.  Iron and Steel Foundries
Large
( 20 *
ALL
( 12 *
Small
SECTOR 17.  Chromium Dye Producers
Large
( 12 *
ALL
( 12 *
Small
SECTOR 18.  Chromium Sulfate Producers
Large
( 0 *
ALL
( 12 *
Small
SECTOR 19.  Chemical Distributors
Large
( 0 *
ALL
( 0 *
Small
SECTOR 20.  Textile Dyeing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 21.  Colored Glass Producers
Large
( 12 *
General Industry
( 0 *
Small
Large ( 12 *
Fiber, Flat, Container 
Glass
Small ( 12 *
SECTOR 22.  Printing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 24.  Chromium Catalyst Users
Large
( 12 *
Catalyst Users
( 0 *
Small
Large
( 12 *
Chromium Catalyst 
Service Companies
( 12 *
Small
SECTOR 25.  Refractory Brick Producers
Large
( 0 *
ALL
( 0 *
Small

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

$      106.73 * 2 * 100% *

100%

*

90%

)*

178

=

$684,794

$      106.73 * 2 * 100% *

100%

*

90%

)*

130

=

$298,819

$      106.73 * 2 * 100% * 38.00% * 100% ) *

3

=

$2,887

$      106.73 * 2 * 100% * 38.00% * 100% ) *

1

=

$962

$      106.73 * 2 * 100% *

)*

0

=

$0

$      106.73 * 2 * 100% * 27.00% * 100% ) *

5

=

$3,599

0.00%

*

0%

$      106.73 * 2 * 100% *

0.00%

* 100% ) *

207

=

$0

$      106.73 * 2 * 100% *

0.00%

* 100% ) *

1,561

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

347

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

703

=

$0

$      106.73 * 2 * 100% * 25.00% *

90%

)*

5

=

$3,126

$      106.73 * 2 * 100% * 0.00% *
$      106.73 * 2 * 100% * 20.00% *

90%
90%

)*
)*

17
78

=
=

$0
$35,844

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

5

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

92

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

367

=

$0

$      106.73 * 2 * 100% *

9.00%

*

90%

)*

164

=

$34,115

$      106.73 * 2 * 100% *
$      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
90%

)*
)*

0
21

=
=

$0
$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

4

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

6

=

$0

$      106.73 * 2 * 100% *

0.00%

*

90%

)*

0

=

$0

Page 29

SECTOR 26.  Woodworking
Large
( 0 * $      106.73
General Industry
( 0 * $      106.73
Small
Large
( 0 * $      106.73
Maritime
( 0 * $      106.73
Small
Large
( 12 * $      106.73
Construction
( 12 * $      106.73
Small
State
( 12 * $      106.73
Government
( 12 * $      106.73
Local
SECTOR 27.  Solid Waste Incerneration
Large
( 0 * $      106.73
General Industry
( 0 * $      106.73
Small
State
( 0 * $      106.73
Government
( 0 * $      106.73
Local
SECTOR 30.  Superalloy Producers and Users
Large
( 0 * $      106.73
ALL
( 0 * $      106.73
Small
SECTOR 31.  Construction
Large
( 0 * $      106.73

 Item 13 COST

 # PLANTS

 % CONT

 % ABOVEAL

 % NOTSEMI

SEMI ‐ ANNUALLY

  CONTCOST 

 SEMICONTTIME

Table 4

* 2 * 100% *

0.00%

* 100% ) *

175

=

$0

* 2 * 100% *
* 2 * 100% *

0.00%
0.00%

* 100% ) *
* 100% ) *

93
38

=
=

$0
$0

* 2 * 100% * 0.00% * 100% ) *
* 2 * 100% * 22.00% * 100% ) *

34
1,290

=
=

$0
$726,821

* 2 * 100% * 22.00% * 100% ) *
* 2 * 100% * 22.00% * 100% ) *

5,162
16

=
=

$2,909,238
$9,154

* 2 * 100% * 22.00% * 100% ) *

59

=

$33,095

* 2 * 100% *

0.00%

*

90%

)*

48

=

$0

* 2 * 100% *
* 2 * 100% *

0.00%
0.00%

*
*

90%
25%

)*
)*

58
0

=
=

$0
$0

* 2 * 100% *

0.00%

*

90%

)*

29

=

$0

* 2 * 100% *

0.00%

* 100% ) *

18

=

$0

* 2 * 100% *

0.00%

*

)*

0

=

$0

* 2 * 100% *

0.00%

* 100% ) *

55

=

$0

Small
State

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 100% ) *

196
16

=
=

$0
$0

Local
Large

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

* 100% ) *
* 90% ) *

74
44

=
=

$0
$0

Hazardous Waste‐site  Small
Work
State

( 0 * $      106.73 * 2 * 100% *
( 0 * $      106.73 * 2 * 100% *

0.00%
0.00%

*
*

90%
90%

)*
)*

143
1

=
=

$0
$0

Local
Large

( 0 * $      106.73 * 2 * 100% * 0.00% *
( 0 * $      106.73 * 2 * 100% * 60.00% *

90%
90%

)*
)*

201
48

=
=

$0
$0

Small

( 0 * $      106.73 * 2 * 100% * 60.00% *

90%
Total

)*

148
77,770

Industrial 
Rehabilitation 

Refractory Brick 
Restoration

Page 30

0%

=
$0
= $13,556,384

Table 5

Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for a Laboratory to Conduct Analysis 
of Semi‐Annual Exposure Monitoring Air Samples 
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples 
collected during semi‐annual exposure monitoring.   

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Cost = (SAMPCOST  * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVE AL) * #PLANTS
Variables:
* SAMPCOST = Variable cost per sample = $68
* JOBAL =  Number of job categories exposed at or above the AL.
* SHIFTS =  Number of work shifts.
* #SAMPS =  Number of samples per exposure measurement.
* 2 =  2 times per year (semi‐annual).
* %NOTSEMI =  Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL =  Percent of plants that have an employee in at least one job category at or above the AL.
* #PLANTS =  Number of plants represented by the model input.

Sector 1. Electroplating
Large (

$68 * 1 * 2 * 3 * 2 * 100% *

49%

) *

930

=

$372,335

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *

49%
11%

) *

1,751
448

=

$350,368
$40,272

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *

11%
14%

) *

843
508

=

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *

14%
10%

) *

955
448

=

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *

10%
13%

) *

843
509

=

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *

13%
16%

) *

959
930

=

) *

=

$50,911
$121,579

Small (

$68 * 1 * 1 * 3 * 2 * 100% *

16%

) *

1,751

=

$114,406

Sector 2. Welding
SMAW

Large (

$68 * 1 * 3 * 2 * 2 * 100% *

0.92%

) *

3,560

=

$26,748

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *

0.92%
0.73%

) *

3,989
2,611

=

GMAW

$14,986
$15,568

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *

0.73%
0%

) *
) *

2,925
791

=

TIG

Small (
Large (

=

$8,721
$0

Small (

$68 * 1 * 1 * 3 * 2 * 100 *

0%

) *

886

=

$0

Hard Chrome
) *

=

Job Shop Chrome Plater
Captive Shop Chrome 
Plater

) *

) *

=

=

$37,889
$58,038
$54,624
$36,611

Job Shop Plater
) *

=

$34,444
$54,093

Captive Shop Plater
Operator

General Industry

Page 31

) *

=

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$68 * 0 * 3 * 2 * 2 * 100% *

0%

) *

316

=

$0

Small (
Large (

$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

354
79

=

$0
$0

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

89
79

=

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *

0%
0%

) *

89
475

=

) *

=

$0
$0

$68 * 1 * 1 * 3 * 2 * 100% *
Maritime
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%

) *

532

=

$0

0%

) *

18

=

$0

Small (
Large (

$68 * 1 * 2 * 1 * 2 * 100% *
$68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

10
24

=

$0
$0

Small (
Large (

$68 * 1 * 2 * 1 * 2 * 100% *
$68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

14
6

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

3
117

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

66
4

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
2

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

1
4

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
2

=

Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

1
0

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
0

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
16

=

) *

=

$0
$0

Small ( $68 * 0 * 2 * 1 * 2 * 100% *

0%

) *

9

=

$0

SAW
) *

=

Plasma Cutting
) *

=

$0
$0

Plasma Welding

Resistance Welding
Small (

SMAW
) *

=

GMAW
) *

=

$0
$0

TIG
) *

=

$0
$0

FCAW
) *

=

$0
$0

Plasma Cutting
) *

=

$0
$0

Plasma Welding
) *

=

$0
$0

Oxy‐fuel Cutting
) *

=

$0
$0

Air Carbon Arc Cutting
) *

=

$0
$0

Electric Torch Cutting
Thermal Spray Tungsten 
Cutting

) *

=

$0
$0

SAW

Page 32

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

CONSTRUCTION
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%

) *

202

=

$0

Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

1,620
3

=

$0
$0

Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

21
41

=

Small ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

324
20

=

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *

0%
0%

) *

162
4

=

) *

=

$0
$0

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
GOVERNMENT
State ( $68 * 1 * 1 * 1 * 2 * 100% *

0%

) *

32

=

$0

0%

) *

19

=

$0

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

594
0

=

$0
$0

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

8
4

=

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

119
2

=

Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *

0%
0%

) *

59
1

=

) *

=

$0
$0

* 100% *

0%

) *

12

=

$0

* 100% *

0%

) *

4,773

=

$0

* 100% *

0%
0%

) *

4,859
3,500

=

$0
$0

0%
0%

) *

3,563
1,060

=

) *
) *

1,080
424

=

* 100% *

0%
0%

=

$0
$0

* 100% *

0%

) *

432

=

$0

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing
Local ( $68 * 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding                                   GENERAL INDUSTRY
Large ( $68 * 0 * 3 * 2 * 2
SMAW
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
GMAW
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
TIG
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
SAW
Small ( $68 * 0 * 1 * 3 * 2

Page 33

* 100% *
* 100% *
* 100% *
* 100 *

) *

) *

=

=

$0
$0

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$68 * 0 * 3 * 2 * 2 * 100% *

0%

) *

106

=

$0

Small (
Large (

$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 0 * 3 * 2 * 2 * 100% *

0%
0%

) *

108
106

=

$0
$0

Small (
Large (

$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 0 * 3 * 2 * 2 * 100% *

0%
0%

) *

108
636

=

) *

=

$0
$0

$68 * 0 * 1 * 3 * 2 * 100% *
Maritime
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%

) *

648

=

$0

0%

) *

37

=

$0

Small (
Large (

$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

21
54

=

$0
$0

Small (
Large (

$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

30
13

=

Small (
Large (

$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

7
251

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

142
8

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

5
3

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
8

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

5
3

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2
1

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
1

=

Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

0
33

=

) *

=

$0
$0

Small ( $68 * 0 * 2 * 1 * 2 * 100% *

0%

) *

18

=

$0

Plasma Cutting
) *

=

Plasma Welding

Resistance Welding
Small (

SMAW
) *

=

GMAW
) *

=

$0
$0

TIG
) *

=

$0
$0

FCAW
) *

=

$0
$0

Plasma Cutting
) *

=

$0
$0

Plasma Welding
) *

=

$0
$0

Oxy‐fuel Cutting
) *

=

$0
$0

Air Carbon Arc Cutting
) *

=

$0
$0

Electric Torch Cutting
Thermal Spray Tungsten 
Cutting

) *

=

$0
$0

SAW

Page 34

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

CONSTRUCTION
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%

) *

304

=

$0

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

2,293
4

=

$0
$0

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

30
60

=

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

458
30

=

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *

0%
0%

) *

230
6

=

) *

=

$0
$0

Small ( $68 * 0 * 1 * 1 * 2 * 100% *

0%

) *

46

=

$0

Large (

$68 * 1 * 3 * 3 * 2 * 100% *

28%

) *

50

=

$17,040

Small (
Large (

$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 1 * 1 * 2 * 100% *

9%
5%

) *

63
331

=

$2,299
$2,254

Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 2 * 3 * 2 * 100% *

5%
8%

) *

1,458
101

=

Small ( $68 * 1 * 1 * 3 * 2 * 100% *
Large ( $68 * 2 * 3 * 1 * 2 * 100% *

8%
36%

) *

18
294

=

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *

36%
22%

) *

508
765

=

Small ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *

22%
12%

) *

4,067
16

=

) *

=

$121,814
$796

* 1 * 1 * 1 * 2 * 100% *

12%

) *

899

=

$14,686

* 3 * 3 * 3 * 2 * 100% *

45%

) *

2

=

$3,443

* 0 * 1 * 3 * 2 * 100% *

0%

) *

0

=

$0

* 5 * 2 * 3 * 2 * 100% *

71%

) *

2

=

$5,733

* 1 * 1 * 3 * 2 * 100% *

50%

) *

1

=

$202

SMAW
) *

=

Plasma Cutting
) *

=

$0
$0

GMAW
) *

=

$0
$0

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE
General Industry 
(Autobody)
General Industry (Coil 
Coating)

) *

) *

) *

=

=

=

$9,924
$6,612
$601
$86,414

Maritime
) *

=

$0
$68,740

Construction

Government
Local ( $68
SECTOR 4.  Producers of Chromates
Large ( $68
ALL
Small ( $68
SECTOR 5. Chromate Pigment Procedures
Large ( $68
ALL
Small ( $68

Page 35

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

SECTOR 6. CCA Producers
Large (

$68 * 1 * 3 * 3 * 2 * 100% *

33%

) *

3

=

$1,034

*

3 * 0 * 2 * 100% *

0%

) *

0

=

$0

*

3 * 3 * 2 * 100% *

100%

) *

5

=

$38,256

*

1 * 3 * 2 * 100% *

0%

) *

0

=

$0

*

2 * 3 * 2 * 100% *

13%

) *

87

=

$9,284

*

2 * 3 * 2 * 100% *

13%

) *

137

=

$14,588

*

1 * 9 * 2 * 100% *

69%

) *

3

=

$7,639

*

1 * 5 * 2 * 100% *

69%

) *

10

=

$9,431

*

3 * 3 * 2 * 100% *

51%

) *

86

=

$107,511

*

1 * 3 * 2 * 100% *

51%

) *

42

=

$17,529

*

1 * 3 * 2 * 100% *

100%

) *

4

=

$1,804

*

1 * 3 * 2 * 100% *

100%

) *

3

=

$1,203

*

3 * 3 * 2 * 100% *

100%

) *

1

=

$2,450

*

1 * 1 * 2 *

*

0%

) *

0

=

$0

*

3 * 3 * 2 * 100% *

38%

) *

37

=

$52,047

*

1 * 3 * 2 * 100% *
3 * 3 * 2 * 100% *

38%
0%

) *
) *

12
112

=

*

=

$1,855
$0

*

1 * 1 * 2 * 100% *

0%

) *

35

=

$0

*

1 * 3 * 2 * 100% *

63%

) *

37

=

$37,627

*

1 * 3 * 2 * 100% *

63%

) *

34

=

$17,728

*

3 * 5 * 2 * 100% *

100%

) *

178

=

$2,183,523

*

1 * 5 * 2 * 100% *

100%

) *

130

=

$441,116

ALL
$68 * 0
SECTOR 7.  Chromium Catalyst Producers
Large ( $68 * 6
ALL
Small ( $68 * 0
SECTOR 8.  Paint and Coating Producers
Large ( $68 * 1
ALL
Small ( $68 * 1
SECTOR 9.  Printing Ink Producers
Large ( $68 * 3
ALL
Small ( $68 * 2
SECTOR 10.  Plastic Colorant Producers and Users
Large ( $68 * 2
ALL
Small ( $68 * 2
SECTOR 11.  Plating Mixture Producers
Large ( $68 * 1
ALL
Small ( $68 * 1
SECTOR 13.  Chromium Metal Producers
Large ( $68 * 2
ALL
Small ( $68 * 0
SECTOR 14.  Iron and Steel Mills
Large ( $68 * 3
Alloy Stainless Steel
Small ( $68 * 1
Large ( $68 * 0
Carbon Steel
Small ( $68 * 0
14B. Forging Industry
Large ( $68 * 4
Forging Industry
Small ( $68 * 2
SECTOR 15.  Iron and Steel Foundries
Large ( $68 * 6
ALL
Small ( $68 * 5
Small (

Page 36

0%

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

SECTOR 17.  Chromium Dye Producers
Large (

$68 * 6 * 1 * 21 * 2 * 100% *

38%

) *

3

=

$19,331

* 6 * 1 * 7 * 2 * 100% *

38%

) *

1

=

$2,148

* 0 * 1 * 3 * 2 * 100% *

0%

) *

0

=

$0

* 1 * 1 * 3 * 2 * 100% *

27%

) *

5

=

$574

* 0 * 1 * 3 * 2 * 100% *

0%

) *

207

=

$0

* 0 * 1 * 3 * 2 * 100% *

0%

) *

1,561

=

$0

* 0 * 3 * 3 * 2 * 100% *

0%

) *

347

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

703

=

$0

* 1 * 3 * 12 * 2 * 100% *

25%

) *

5

=

$6,645

* 0 * 1 * 4 * 2 * 100% *
* 3 * 1 * 1 * 2 * 100% *

0%
20%

) *

17
78

=

) *

=

$0
$6,350

* 0 * 1 * 1 * 2 * 100% *

0%

) *

5

=

$0

* 0 * 3 * 2 * 2 * 100% *

0%

) *

92

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

367

=

$0

* 2 * 3 * 3 * 2 * 100% *

9%

) *

164

=

$36,259

* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 3 * 2 * 100% *

0%
0%

) *

=

) *

0
21

=

$0
$0

* 0 * 1 * 3 * 2 * 100% *

0%

) *

4

=

$0

* 0 * 1 * 15 * 2 * 100% *

0%

) *

6

=

$0

* 0 * 1 * 0 * 2 * 100% *

0%

) *

0

=

$0

* 0 * 1 * 2 * 2 * 100% *

0%

) *

175

=

$0

* 0 * 1 * 2 * 2 * 100% *
* 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

93
38

=

) *

=

$0
$0

* 0 * 1 * 1 * 2 * 100% *

0%

) *

34

=

$0

ALL
$68
SECTOR 18.  Chromium Sulfate Producers
Large ( $68
ALL
Small ( $68
SECTOR 19.  Chemical Distributors
Large ( $68
ALL
Small ( $68
SECTOR 20.  Textile Dyeing
Large ( $68
ALL
Small ( $68
SECTOR 21.  Colored Glass Producers
Large ( $68
General Industry
Small ( $68
Large ( $68
Fiber, Flat, and Container 
Glass
Small ( $68
SECTOR 22.  Printing
Large ( $68
ALL
Small ( $68
SECTOR 24.  Chromium Catalyst Users
Large ( $68
Catalyst User
Small ( $68
Large ( $68
Chromium Catalyst Service 
Companies
Small ( $68
SECTOR 25.  Refractory Brick Producers
Large ( $68
ALL
Small ( $68
SECTOR 26.  Woodworking
Large ( $68
General Industry
Small ( $68
Large ( $68
Maritime
Small ( $68
Small (

Page 37

Item 13 COST

#PLANTS

%ABOVEAL

%NOTSEMI

SEMI

#SAMPS

SHIFTS

JOBAL

SAMPCOST

Table 5

Large (

$68 * 1 * 1 * 1 * 2 * 100% *

22%

) *

1,290

=

$38,626

Small (
State (

$68 * 1 * 1 * 1 * 2 * 100% *
$68 * 1 * 1 * 1 * 2 * 100% *

22%
22%

) *

5,162
16

=

) *

=

$154,606
$486

1 * 1 * 1 * 2 * 100% *
2
0 * 3 * 15 * 2 * 100% *

22%

) *

59

=

$1,759

0%

) *

48

=

$0

0 * 1 * 3 * 2 * 100% *
0 * 3 * 15 * 2 * 100% *

0%
0%

) *

58
0

=

) *

=

$0
$0

0 * 1 * 3 * 2 * 100% *
2
0 * 3 * 3 * 2 * 100% *

0%

) *

29

=

$0

0%

) *

18

=

$0

0 * 3 * 3 * 2 * 100% *

0%

) *

0

=

$0

0 * 1 * 1 * 2 * 100% *

0%

) *

55

=

$0

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
State ( $68 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

196
16

=

$0
$0

Local ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

74
44

=

Small ( $68 * 0 * 1 * 1 * 2 * 100% *
State ( $68 * 0 * 1 * 1 * 2 * 100% *

0%
0%

) *

143
1

=

Local ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 1 * 1 * 2 * 100% *

0%
60%

) *

201
48

=

Small ( $68 * 0 * 1 * 1 * 2 * 100% *

60%
TOTAL

) *

Construction

Government
Local ( $68 *
SECTOR 27.  Solid Waste Incerneration
Large ( $68 *
General Industry
Small ( $68 *
State ( $68 *
Government
Local ( $68 *
SECTOR 30.  Superalloy Producers and Users
Large ( $68 *
ALL
Small ( $68 *
SECTOR 31.  Construction
Large ( $68 *

Industrial Rehabilitation 

Hazardous Waste‐site 
Work

Refractory Brick 
Restoration

Page 38

) *

) *

) *

) *

=

=

=

=

148
=
77,770

$0
$0
$0
$0
$0
$0
$0
$4,943,561

Table 6

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Employee Time and Cost to Conduct Quarterly Exposure Monitoring       
When initial monitoring results exceed the PEL, periodic monitoring every three months allows the employer to maintain an accurate 
profile of employee exposures.  If the employer installs or upgrades controls, quarterly monitoring will demonstrate whether the controls 
are working properly.  
HOURS = (ADMINTIME * JOBPEL * SHIFTS * #SAMPS * 4* %NOTQUART * %ABOVEPEL * (%INHOUSE + %LEARN)) * 
#PLANTS
COST = (NONSUPEWAGE * BURDEN HOURS)

RESPONSES

=

0

0

* ( 0% + 0% )) *
* ( 0% + 0% )) *

1,751
448

=
=

$0
$0

=
=

0
0

0
0

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

843
508

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

955
448

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

843
509

=
=

$0
$0

=
=

0
0

0
0

Small ( 0.50 * $        25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

959
930

=
=

$0
$0

=
=

0
0

0
0
0

0

Small ( 0.50 * $        25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 * 100% *

0%
0%

Small ( 0.50 * $        25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 * 100% *

 # SAMPS

* ( 0% +

 SHIFTS

0%

 JOBPEL

*

 # PLANTS

$0

 % LEARN

=

  % INHOUSE 

930

 % ABOVEPEL

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

In‐house administrative time
Non‐supervisory wage rate, $/hr
Number of job categories exposed above the PEL
Number of work shifts.
Number of samples per exposure measurement.
Four times per year (Quarterly).
Percent of plants not performing quarterly monitoring requirements.
Percent of plants that have an employee in at least one job category above the PEL.
Percent of plantsalready with in‐house monitoring capabilities.
Percent of plants that will develop in house monitoring capability.
Number of plants represented by the model output.

 ADMINTIME

Variable
*ADMINTIME =
* NONSUPEWAGE = 
* JOBPEL = 
* SHIFTS = 
* #SAMPS = 
*4 = 
* %NOTQUART = 
* %ABOVEPEL = 
* %INHOUSE = 
* %LEARN = 
* #PLANTS = 

Sector 1. Electroplating
Large ( 0.50 * $        25.49 * 0 * 2 * 3 * 4 *

)) *

Hard Chrome
Job Shop Chrome 
Plater
Captive Shop 
Chrome Plater
Job Shop Plater

Captive Shop Plater

Operator
Small
Sector 2. Welding                  
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small

( 0.50 * $        25.49 * 1 * 1 * 3 * 4 * 100% *

0% * ( 0% + 0% )) *
GENERAL INDUSTRY
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% * 4.85% * ( 10% + 0% )) *

1,751

=

$0

=

0

3,560

=

$130,519

=

5,200

414

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% * 4.84% * ( 0% + 0% )) *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% * 0.37% * ( 10 + 0% )) *

3,989
2,611

=
=

$0
$730,387

=
=

0
29,099

0
2,180

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% * 0.38% * ( 0% + 0% )) *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% * 0% * ( 10% + 0% )) *

2,925
791

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 0 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

886
316

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

354
79

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

89

=

$0

=

0

0

Page 39

RESPONSES

0

0

Small ( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

89
475

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% * 0%

* ( 0% + 0% )) *

532

=

$0

=

0

0

* ( 50% + 0% )) *

18

=

$0

=

0

0

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

79

 # SAMPS

* ( 10% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

Plasma Welding

Resistance Welding

SMAW
Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

10
24

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

14
6

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

3
117

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

66
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
2

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

1
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
2

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

1
0

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
0

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
16

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% * 0%

* ( 10% + 0% )) *

9

=

$0

=

0

0

* ( 5% + 0% )) *

202

=

$0

=

0

0

Small ( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

1,620
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

21
41

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

324
20

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

162
4

=
=

$0
$0

=
=

0
0

0
0

Local

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

32

=

$0

=

0

0

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 40

RESPONSES

0

0

Local
State

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

594
0

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

8
4

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

119
2

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

59
1

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 1 * 4 * 100% *

12

=

$0

=

0

0

( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0% * ( 0% + 0% )) *
General Industry
0% * ( 10% + 0% )) *

4,773

=

$0

=

0

0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

4,859
3,500

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

3,563
1,060

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 0 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

1,080
424

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

432
106

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

108
106

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $        25.10 * 1 * 3 * 2 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 10% + 0% )) *

108
636

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        25.10 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% * 0%

* ( 0% + 0% )) *

648

=

$0

=

0

0

* ( 50% + 0% )) *

37

=

$0

=

0

0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

21
54

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

30
13

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

7
251

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

142
8

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

5
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

2

=

$0

=

0

0

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

19

 # SAMPS

* ( 5% + 0% )) *

 SHIFTS

GOVERNMENT
( 0.50 * $        25.10 * 1 * 1 * 1 * 4 * 100% * 0%

 JOBPEL

State

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local
Sector 2. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Page 41

RESPONSES

$0

=

0

0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

5
3

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

2
1

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
1

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 50% + 0% )) *

0
33

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% * 0%

* ( 10% + 0% )) *

18

=

$0

=

0

0

* ( 5% + 0% )) *

304

=

$0

=

0

0

Small ( 1.00 * $        25.10 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

2,293
4

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

30
60

=
=

$0
$0

=
=

0
0

0
0

Small ( 1.00 * $        25.10 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

458
30

=
=

$0
$0

=
=

0
0

0
0

Local
State

( 1.00 * $        25.10 * 0 * 1 * 1 * 4 * 100% *
( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 5% + 0% )) *

230
6

=
=

$0
$0

=
=

0
0

0
0

Local

( 1.00 * $        25.10 * 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

46

=

$0

=

0

0

Large ( 0.50 * $        31.68 * 1 * 3 * 3 * 4 * 100% *

28%

* ( 75% + 0% )) *

50

=

$188,424

=

5,948

390

Small ( 1.00 * $        31.68 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        31.68 * 0 * 1 * 1 * 4 * 100% *

9%
5%

* ( 25% + 0% )) *
* 75% + 0%
*

63
331

=
=

$16,948
$0

=
=

535
0

17
50

Small ( 1.00 * $        31.68 * 2 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        31.68 * 0 * 2 * 3 * 4 * 100% *

5%
8%

*
*

25% + 0%
75% + 0%

*
*

1,458
101

=
=

$146,312
$0

=
=

4,619
0

146
150

Small ( 1.00 * $        31.68 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $        31.68 * 1 * 3 * 1 * 4 * 100% *

8%
36%

*
*

25% + 0%
90% + 0%

*
*

18
294

=
=

$0
$573,329

=
=

0
18,098

0
1,143

Small ( 1.00 * $        31.68 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        31.68 * 1 * 3 * 1 * 4 * 100% *

36%
22%

*
*

10% + 0%
75% + 0%

*
*

508
765

=
=

$73,427
$760,110

=
=

2,318
23,995

73
2,056

Small ( 1.00 * $        31.68 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        31.68 * 1 * 3 * 1 * 4 * 100% *

22%
12%

*
*

50% + 0%
75% + 0%

*
*

4,067
16

=
=

$1,795,985
$8,802

=
=

56,694
278

1,790
18

* 1 * 1 * 1 * 4 * 100% *

12%

*

75% + 0%

*

899

=

$324,784

=

10,253

324

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

2

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 1 * 2 * 3 * 4 * 100% *

77%

* ( 0% + 0% )) *

2

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1

=

$0

=

0

0

 % LEARN

  % INHOUSE 

 # PLANTS
=

 % ABOVEPEL

8

 # SAMPS

* ( 50% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        25.10 * 0 * 3 * 1 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE

AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
Small ( 1.00 * $        31.68
SECTOR 4.  Producers of Chromates
Large ( 0.50 * $        37.06
ALL
Small ( 1.00 * $        37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $        36.12
ALL
Small ( 1.00 * $        36.12

Page 42

$0

=

0

0

* 0 * 3 * 0 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 80% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 2 * 3 * 4 * 100% *

0%

* ( 25% + 75% )) *

87

=

$0

=

0

0

* 0 * 2 * 3 * 4 * 100% *

0%

* ( 25% + 75% )) *

137

=

$0

=

0

0

* 0 * 1 * 9 * 4 * 100% *

0%

* ( 10% + 0% )) *

3

=

$0

=

0

0

* 0 * 1 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

10

=

$0

=

0

0

* 3 * 3 * 3 * 4 * 100% *

36%

* ( 0% + 0% )) *

86

=

$0

=

0

0

* 5 * 1 * 3 * 4 * 100% *

36%

* ( 0% + 0% )) *

42

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 20% + 0% )) *

4

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 25% + 0% )) *

3

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1

=

$0

=

0

0

* 0 * 1 * 1 * 4 * 0% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

37

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

12
112

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

35

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

63%

* ( 10% + 0% )) *

37

=

$0

=

0

28

* 0 * 1 * 3 * 4 * 100% *

63%

* ( 10% + 0% )) *

34

=

$0

=

0

0

* 0 * 3 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

178

=

$0

=

0

0

* 0 * 1 * 5 * 4 * 100% *

0%

* ( 10% + 0% )) *

130

=

$0

=

0

0

* 7 * 1 * 21 * 4 * 100% *

62%

* ( 0% + 0% )) *

3

=

$0

=

0

0

* 5 * 1 * 7 * 4 * 100% *

62%

* ( 0% + 0% )) *

1

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

207

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

1,561

=

$0

=

0

0

Page 43

 # PLANTS
=

 % LEARN

3

  % INHOUSE 

* ( 0% + 0% )) *

 % ABOVEPEL

RESPONSES

 Item 12 COSTS

 % NOTQUART

0%

 # SAMPS

* 0 * 3 * 3 * 4 * 100% *

 SHIFTS

TOTAL HOURS

SECTOR 6. CCA Producers
Large ( 0.50 * $        30.60
ALL
Small ( 1.00 * $        30.60
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.50 * $        37.06
ALL
Small ( 1.00 * $        37.06
SECTOR 8.  Paint and Coating Producers
Large ( 0.50 * $        27.60
ALL
Small ( 1.00 * $        27.60
SECTOR 9.  Printing Ink Producers
Large ( 0.50 * $        27.65
ALL
Small ( 0.50 * $        27.65
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.50 * $        30.64
ALL
Small ( 1.00 * $        30.64
SECTOR 11.  Plating Mixture Producers
Large ( 0.50 * $        27.50
ALL
Small ( 1.00 * $        27.50
SECTOR 13.  Chromium Metal Producers
Large ( 0.50 * $        37.17
ALL
Small ( 1.00 * $        37.17
SECTOR 14.  Iron and Steel Mills
Large ( 0.50 * $        37.17
Alloy and Stainless 
Steel
Small ( 1.00 * $        37.17
Large ( 0.50 * $        37.17
Carbon Steel
Small ( 1.00 * $        37.17
SECTOR 14B.  Forging Industry
Large ( 0.50 * $        37.17
Reshaping
Small ( 1.00 * $        37.17
SECTOR 15.  Iron and Steel Foundries
Large ( 0.50 * $        27.12
ALL
Small ( 1 * $        27.12
SECTOR 17.  Chromium Dye Producers
Large ( 0.50 * $        36.12
ALL
Small ( 1 * $        36.12
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.50 * $        39.76
ALL
Small ( 0.50 * $        39.76
SECTOR 19.  Chemical Distributors
Large ( 0.50 * $        28.67
ALL
Small ( 0.50 * $        28.67

 JOBPEL

 NONSUPEWAGE

 ADMINTIME

Table 6

TOTAL HOURS

RESPONSES

 Item 12 COSTS

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

703

=

$0

=

0

0

* 0 * 3 * 12 * 4 * 100% *

0%

* ( 10% + 0% )) *

5

=

$0

=

0

0

* 0 * 1 * 4 * 4 * 100% *
* 1 * 1 * 1 * 4 * 100% *

0%
20%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

17
78

=
=

$0
$2,379

=
=

0
86

0
6

* 1 * 1 * 1 * 4 * 100% *

0%

* ( 10% + 0% )) *

5

=

$0

=

0

0

* 0 * 3 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

92

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 10% + 0% )) *

367

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

164

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

0
21

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 10% + 0% )) *

4

=

$0

=

0

0

* 0 * 1 * 15 * 4 * 100% *

0%

* ( 10% + 0% )) *

6

=

$0

=

0

0

* 0 * 1 * 0 * 4 * 100% *

0%

* ( 10% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *

0%

* ( 0% + 0% )) *

175

=

$0

=

0

0

* 0 * 1 * 2 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

93
38

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

0%
22%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

34
1,290

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *

22%
22%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

5,162
16

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 1 * 4 * 100% *

22%

* ( 0% + 0% )) *

59

=

$0

=

0

0

* 0 * 3 * 15 * 4 * 100% *

0%

* ( 10% * 0% )) *

48

=

$0

=

0

0

* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 15 * 4 * 100% *

0%
0%

* ( 10% * 0% )) *
* ( 10% * 0% )) *

58
0

=
=

$0
$0

=
=

0
0

0
0

* 0 * 1 * 3 * 4 * 100% *

0%

* ( 10% * 0% )) *

29

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

18

=

$0

=

0

0

* 0 * 3 * 3 * 4 * 100% *

0%

* ( 0% + 0% )) *

0

=

$0

=

0

0

* 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

55

=

$0

=

0

0

Small ( 1.00 * $        30.79 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 0% + 0% )) *
* ( 0% + 0% )) *

196
16

=
=

$0
$0

=
=

0
0

0
0

( 1.00 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

0%

* ( 0% + 0% )) *

74

=

$0

=

0

0

Local

Page 44

 # PLANTS

0

 % LEARN

=

  % INHOUSE 

$0

 % ABOVEPEL

=

 # SAMPS

347

 SHIFTS

* ( 10% + 0% )) *

 JOBPEL

0%

 ADMINTIME

* 0 * 3 * 3 * 4 * 100% *

SECTOR 20.  Textile Dyeing
Large ( 0.50 * $        19.13
ALL
Small ( 0.50 * $        19.13
SECTOR 21.  Colored Glass Producers
Large ( 0.50 * $        27.66
ALL
Small ( 1.00 * $        27.66
Large ( 0.50 * $        27.66
Fiber, Flat, Container 
Glass
Small ( 1.00 * $        27.66
SECTOR 22.  Printing
Large ( 0.50 * $        19.97
ALL
Small ( 0.50 * $        19.97
SECTOR 24.  Chromium Catalyst Users
Large ( 0.50 * $        31.14
Catalyst Users
Small ( 1.00 * $        31.14
Large ( 0.50 * $        31.14
Chromium Catalyst 
Service Companies
Small ( 1.00 * $        31.14
SECTOR 25.  Refractory Brick Producers
Large ( 0.50 * $        24.56
ALL
Small ( 0.50 * $        24.56
SECTOR 26.  Woodworking
Large ( 0.50 * $        30.76
General Industry
Small ( 1.00 * $        30.76
Large ( 0.50 * $        30.76
Maritime
Small ( 1.00 * $        30.76
Large ( 0.50 * $        30.76
Construction
Small ( 1.00 * $        30.76
STATE ( 0.50 * $        30.76
Government
LOCAL ( 1.00 * $        30.76
SECTOR 27.  Solid Waste Inceneration
Large ( 0.50 $        26.09
GENERAL INDUSTRY
Small ( 1.00 $        26.09
STATE ( 0.50 $        26.09
GOVERNMENT
LOCAL ( 1.00 $        26.09
SECTOR 30.  Superalloy Producers and Users
Large ( 0.50 * $        26.75
ALL
Small ( 1.00 * $        26.75
SECTOR 31.  Construction
Large ( 0.50 * $        30.79
Industrial 
Rehabilitation 

 % NOTQUART

 NONSUPEWAGE

Table 6

RESPONSES

0

0

Hazardous Waste‐ Small ( 1.00 * $        30.79 * 0 * 1 * 1 * 4 * 100% *
site Work
State ( 0.50 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

0%
0%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

143
1

=
=

$0
$0

=
=

0
0

0
0

Local ( 1.00 * $        30.79 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

0%
60%

* ( 10% + 0% )) *
* ( 10% + 0% )) *

201
48

=
=

$0
$0

=
=

0
0

0
12

Small ( 1.00 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

60%

* ( 10% + 0% )) *
148
=
Total
   77,770

$0
$4,751,407

=

0
157,122

Refractory Brick 
Restoration

Page 45

 # PLANTS

=

 % LEARN

$0

  % INHOUSE 

=

 % ABOVEPEL

44

 # SAMPS

* ( 10% + 0% )) *

 SHIFTS

0%

 JOBPEL

Large ( 0.50 * $        30.79 * 0 * 1 * 1 * 4 * 100% *

 ADMINTIME

TOTAL HOURS

 Item 12 COSTS

 % NOTQUART

 NONSUPEWAGE

Table 6

0
8,795

Table 7

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for an IH Technician to Perform Quarterly 
Exposure Monitoring 
This table calculates the contract cost for the employer to have an outside  industrial hygiene 
technician perform quarterly exposure monitoring.  
COST =

(QUARTCONTTIME*CONTCOST*4*%NOTQUART*%ABOVEPEL*%CONT)
* #PLANTS

Variable

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTCONTTIME

* CONTCOST = 
* 4 =
* %NOTQUART = 
*%ABOVEPEL=
%CONT=
#PLANTS=

QUARTERLY

Time, in hours, for an outside contractor (industrial hygiene technician) to conduct 
quarterly‐annual monitoring
Cost per hour for an outside industrial hygiene contractor
4 times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Percent of plants that will continue to use an outside contractor for monitoring
Number of plants represented by the model output

  CONTCOST 

* QUARTCONTTIME = 

Sector 1. Electroplating
(

0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *

930

=

$0

(
(

0
0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) * 1,751 =
* $  106.73 * 4 * 100% * ( 0.00% * 100% ) * 448 =

$0
$0

(
(

12
0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *

843
508

=
=

$0
$0

(
(

0
0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *

955
448

=
=

$0
$0

(
(

12
0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *

843
509

=

$0

=

$0

(
(

0
0

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $  106.73 * 4 * 100% * ( 0.00% * 100% ) *

959
930

=

$0

=

$0

(

12

* $  106.73 * 4 * 100% * ( 0.00% * 100% ) * 1,751 =

$0

(

12

* $  106.73 * 4 * 100% * (

4.85% *

) * 3,560 =

$796,011

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

4.84% * 100% ) * 3,989 =
0.37% * 90% ) * 2,611 =

$989,012

(

12

* $  106.73 * 4 * 100% * (

0.38% * 100% ) * 2,925 =

$56,949

Hard Chrome

Job Shop Chrome Plater

Captive Shop Chrome

Job Shop Plater

Captive Shop Plater

Operator
Sector 2. Welding
90%

SMAW
$44,545

GMAW

Page 46

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

12

* $  106.73 * 4 * 100% * (

0.00% *

) *

791

=

$0

(
(

12
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

886
316

=

$0

=

$0

(

0
12

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

* $  106.73 * 4 * 100% * (

0.00% *

354
79

=
=

$0
$0

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

(

12
12

* $  106.73 * 4 * 100% * (

0.00% *

) *

89
79

=
=

$0
$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

89
475

=
=

$0
$0

(

12

* $  106.73 * 4 * 100% * (
MARITIME

0.00% * 100% ) *

532

=

$0

(

12

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

18

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

10
24

=
=

$0
$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

14
6

=

$0

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

3
117

=
=

$0
$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

66
4

=
=

$0
$0

(

12
12

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

2
2

=
=

$0
$0

12
12

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

1
4

=
=

$0
$0

12
12

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

2
2

=
=

$0
$0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

(

12
0

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

1
0

=
=

$0
$0

(

0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

90%

TIG

SAW
(

90%

) *

Plasma Cutting
(

90%

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting
(

Plasma Welding
(
(

Oxy‐fuel Cutting
(
(

Air Carbon Arc Cutting
(

Electric Torch Cutting

Page 47

Thermal Spray Tungsten 
Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

0

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

0

=

$0

(
(

0
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

0
16

=
=

$0
$0

(

0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

9

=

$0

(

12

* $  106.73 * 4 * 100% * (

0.00% *

95%

) *

202

=

$0

(
(

12
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) * 1,620 =
0.00% * 95% ) *
3
=

$0

(
(

12
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

21
41

=
=

$0
$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

324
20

=

$0

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

162
4

=
=

$0
$0

(

12

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

32

=

$0

SAW
CONSTRUCTION
SMAW
$0

Plasma Cutting

GMAW

Brazing

Metallizing
GOVERNMENT
(

12

* $  106.73 * 4 * 100% * (

0.00% *

) *

19

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

594
0

=

$0

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

8
4

=
=

$0
$0

(

12
12

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

* $  106.73 * 4 * 100% * (

0.00% *

119
2

=
=

$0
$0

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

(

12
12

* $  106.73 * 4 * 100% * (

0.00% *

) *

59
1

=
=

$0
$0

(

12

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

12

=

$0

(

12

* $  106.73 * 4 * 100% * (

0.00% *

) * 4,773 =

$0

(

12
12

* $  106.73 * 4 * 100% * (

(

* $  106.73 * 4 * 100% * (

0.00% * 100% ) * 4,859 =
0.00% * 90% ) * 3,500 =

$0
$0

(

12

* $  106.73 * 4 * 100% * (

0.00% * 100% ) * 3,563 =

$0

95%

SMAW

Plasma Cutting

GMAW
(

95%

) *

Brazing
(

95%

Metallizing
Sector 2. Mild Steel Welding
90%

SMAW

GMAW

Page 48

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

12

* $  106.73 * 4 * 100% * (

0.00% *

) * 1,060 =

$0

(
(

12
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) * 1,080 =
0.00% * 90% ) * 424 =

$0

(

0
0

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

* $  106.73 * 4 * 100% * (

0.00% *

* $  106.73 * 4 * 100% * (

0.00% * 100% ) *

(

0
0

* $  106.73 * 4 * 100% * (

0.00% *

(
(

0
0

(

90%

TIG
$0

SAW

432
106

=
=

$0
$0

) *

108
106

=
=

$0
$0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

108
636

=
=

$0
$0

0

* $  106.73 * 4 * 100% * (
MARITIME

0.00% * 100% ) *

648

=

$0

(

12

* $  106.73 * 4 * 100% * (

0.00% *

50%

) *

37

=

$0

(
(

12
12

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

21
54

=
=

$0
$0

(
(

12
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

30
13

=

$0

=

$0

(
(

0
0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

7
251

=
=

$0
$0

(
(

* $  106.73 * 4 * 100% * (
0
0.00 * $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

142
8

=
=

$0
$0

(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

5
3

=
=

$0
$0

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

2
8

=
=

$0
$0

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *

90%

) *

0.00% *

50%

) *

5
3

=
=

$0
$0

0.00% *

90%

) *

(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *

50%

) *

2
1

=
=

$0
$0

(

0.00 * $  106.73 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

(

90%

) *

Plasma Cutting
(

90%

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting
(

Plasma Welding
(
(

Oxy‐fuel Cutting
(
(

Air Carbon Arc Cutting
(

Electric Torch Cutting

Page 49

Thermal Spray Tungsten 
Cutting

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

(

0.00 * $  106.73 * 4 * 100% * (

0.00% *

50%

) *

1

=

$0

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
50%

) *
) *

0
33

=

$0

=

$0

(

0.00 * $  106.73 * 4 * 100% * (
CONSTRUCTION
0.00 * $  106.73 * 4 * 100% * (

0.00% *

90%

) *

18

=

$0

0.00% *

95%

) *

304

=

$0

( 12.00 * $  106.73 * 4 * 100% * (
( 0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) * 2,293 =
0.00% * 95% ) *
4
=

$0

(

SAW

(

SMAW
$0

Plasma Cutting
0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *

(

) *

30
60

=
=

$0
$0

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

458
30

=

$0

=

$0

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 95% ) *

230
6

=
=

$0
$0

( 12.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *

46

=

$0

0.00% *

95%

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
( 12.00 * $  106.73 * 4 * 100% * (

28.00% *

25%

) *

50

=

$17,814

( 12.00 * $  106.73 * 4 * 100% * (
( 12.00 * $  106.73 * 4 * 100% * (

9.00% *
5.00% *

75%
25%

) *
) *

63
331

=
=

$21,631
$21,207

( 12.00 * $  106.73 * 4 * 100% * (
( 12.00 * $  106.73 * 4 * 100% * (

5.00% *
36.00% *

75%
10%

) * 1,458 =
) * 101 =

$280,104
$18,662

( 12.00 * $  106.73 * 4 * 100% * (
( 12.00 * $  106.73 * 4 * 100% * (

36.00% *
8.00% *

90%
25%

) *
) *

18
294

=
=

$30,538
$30,112

( 12.00 * $  106.73 * 4 * 100% * (
( 12.00 * $  106.73 * 4 * 100% * (

8.00% *

75%

) *

=

$156,190

22.00% *

25%

) *

508
765

=

$215,582

( 12.00 * $  106.73 * 4 * 100% * (
( 12.00 * $  106.73 * 4 * 100% * (

22.00% *
12.00% *

50%
25%

) * 4,067 =
) *
16 =

( 12.00 * $  106.73 * 4 * 100% * (
SECTOR 4.  Producers of Chromates
( 0.00 * $  106.73 * 4 * 100% * (
ALL
( 0.00 * $  106.73 * 4 * 100% * (
SECTOR 5. Chromate Pigment Procedures

12.00% *

25%

) *

AEROSPACE

AUTOBODY

MARITIME

COIL COATING

CONSTRUCTION
$2,292,189
$2,497

GOVERNMENT

Page 50

899

=

$138,173

0.00% * 100% ) *

2

=

$0

0.00% *

0

=

$0

0%

) *

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

( 12.00 * $  106.73 * 4 * 100% * (

77.00% * 100% ) *

2

=

$7,800

( 12.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *

1

=

$0

( 12.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *

3

=

$0

* 4 * 100% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

20%

) *

5

=

$0

* 4 * 100% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

75%

) *

87

=

$0

* 4 * 100% * (

0.00% *

75%

) *

137

=

$0

* 4 * 100% * (

0.00% *

90%

) *

3

=

$0

* 4 * 100% * (

0.00% *

90%

) *

10

=

$0

* 4 * 100% * (

36.00% * 100% ) *

86

=

$158,671

* 4 * 100% * (

36.00% * 100% ) *

42

=

$77,611

ALL
SECTOR 6. CCA Producers
ALL
( 12.00 * $  106.73
SECTOR 7.  Chromium Catalyst Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 8.  Paint and Coating Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 9.  Printing Ink Producers
( 0.00 * $  106.73
ALL
( 0.00 * $  106.73
SECTOR 10.  Plastic Colorant Producers and Users
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 11.  Plating Mixture Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 13.  Chromium Metal Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 14.  Iron and Steel Mills
( 0.00 * $  106.73
ALLOY AND STAINLESS 
STEEL
( 0.00 * $  106.73
( 0.00 * $  106.73
CARBON STEEL
( 0.00 * $  106.73
SECTOR 14B.  FORGING INDUSTRY
( 0.00 * $  106.73
RESHAPING
( 0.00 * $  106.73

* 4 * 100% * (

0.00% *

80%

) *

4

=

$0

* 4 * 100% * (

0.00% *

75%

) *

3

=

$0

* 4 * 100% * (

0.00% * 100% ) *

1

=

$0

* 4 *

0% * (

0.00% *

0%

) *

0

=

$0

* 4 * 100% * (

0.00% *

90%

) *

37

=

$0

* 4 * 100% * (
* 4 * 100% * (

0.00% *
0.00% *

90%
90%

) *
) *

12
112

=

$0

=

$0

* 4 * 100% * (

0.00% *

90%

) *

35

=

$0

* 4 * 100% * (

63.00% *

90%

) *

37

=

$0

* 4 * 100% * (

63.00% *

90%

) *

34

=

$0

Page 51

SECTOR 15.  Iron and Steel Foundries
( 0.00 * $  106.73
ALL
( 0.00 * $  106.73
SECTOR 17.  Chromium Dye Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 18.  Chromium Sulfate Producers
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 19.  Chemical Distributors
( 12.00 * $  106.73
ALL
( 12.00 * $  106.73
SECTOR 20.  Textile Dyeing
( 0.00 * $  106.73
ALL
( 0.00 * $  106.73
SECTOR 21.  Colored Glass Producers
( 0.00
General Industry
( 0.00
( 12.00
Fiber, Flat and Container 
Glass
( 12.00
SECTOR 22.  Printing
( 0.00
ALL
( 0.00
SECTOR 24.  Chromium Catalyst Users
( 12.00
CATALYST USER
( 12.00
( 12.00

CATALYST SERVICE 
COMPANIES

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

* 4 * 100% * (

0.00% *

90%

) *

178

=

$0

* 4 * 100% * (

0.00% *

90%

) *

130

=

$0

* 4 * 100% * (

62.00% * 100% ) *

3

=

$9,421

* 4 * 100% * (

62.00% * 100% ) *

1

=

$3,140

* 4 * 100% * (

0.00% *

) *

0

=

$0

* 4 * 100% * (

0.00% * 100% ) *

5

=

$0

* 4 * 100% * (

0.00% * 100% ) *

207

=

$0

* 4 * 100% * (

0.00% * 100% ) * 1,561 =

$0

* 4 * 100% * (

0.00% *

90%

) *

347

=

$0

* 4 * 100% * (

0.00% *

90%

) *

703

=

$0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

5

=

$0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
20.00% *

90%
90%

) *
) *

17
78

=

$0

=

$71,689

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

5

=

$0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

92

=

$0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

367

=

$0

* $  106.73 * 4 * 100% * (

0.00% *

90%

) *

164

=

$0

* $  106.73 * 4 * 100% * (
* $  106.73 * 4 * 100% * (

0.00% *
0.00% *

90%
90%

) *
) *

0
21

=

$0

=

$0

$  106.73 * 4 * 100% * (

0.00% *

90%

) *

4

=

$0

$  106.73 * 4 * 100% * (

0.00% *

90%

) *

6

=

$0

$  106.73 * 4 * 100% * (

0.00% *

90%

) *

0

=

$0

$  106.73 * 4 * 100% * (

0.00% * 100% ) *

175

=

$0

$  106.73 * 4 * 100% * (

0.00% * 100% ) *

93

=

$0

( 12.00 *
SECTOR 25.  Refractory Brick Producers
( 0.00 *
ALL
( 0.00 *
SECTOR 26.  Woodworking
( 0.00 *
ALL
( 0.00 *

Page 52

0%

(

0.00 * $  106.73 * 4 * 100% * (

(
(
(
(

Item 13 COSTS

PLANTS

%CONT

*%ABOVEPEL

%NOTQUART

QUARTERLY

  CONTCOST 

QUARTCONTTIME

Table 7

0.00% * 100% ) *

38

=

$0

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

34 =
0.00% * 100% ) *
22.00% * 100% ) * 1,290 =

$0

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

22.00% * 100% ) * 5,162 =
22.00% * 100% ) *
16 =

$0

MARITIME
$0

CONSTRUCTION
$0

GOVERNMENT
( 0.00 * $  106.73
SECTOR 27.  Solid Waste Incerneration
( 0.00 * $  106.73
GENERAL INDUSTRY
( 0.00 * $  106.73
( 0.00 * $  106.73
GOVERNMENT
( 0.00 * $  106.73
SECTOR 30.  Superalloy Producers and Users
( 0.00 * $  106.73
ALL
( 0.00 * $  106.73
SECTOR 31.  Construction
( 0.00 * $  106.73

Industrial Rehabilitation 

* 4 * 100% * (

22.00% * 100% ) *

=

$0

* 4 * 100% * (

0.00% *

90%

) *

48

=

$0

* 4 * 100% * (
* 4 * 100% * (

0.00% *
0.00% *

90%
25%

) *
) *

58
0

=
=

$0
$0

* 4 * 100% * (

0.00% *

90%

) *

29

=

$0

* 4 * 100% * (

0.00% * 100% ) *

18

=

$0

* 4 * 100% * (

0.00% *

) *

0

=

$0

* 4 * 100% * (

0.00% * 100% ) *

55

=

$0

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 100% ) *

196
16

=
=

$0
$0

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% * 100% ) *
0.00% * 90% ) *

74
44

=
=

$0
$0

0.00% *
0.00% *

90%
90%

) *
) *

143
1

=

$0

=

$0

201
48

=
=

$0
$0

148

=

$0
$5,439,545

Hazardous Waste‐site  ( 0.00 * $  106.73 * 4 * 100% * (
Work
( 0.00 * $  106.73 * 4 * 100% * (

Refractory Brick 
Restoration

59

0%

(
(

0.00 * $  106.73 * 4 * 100% * (
0.00 * $  106.73 * 4 * 100% * (

0.00% *
60.00% *

90%
90%

) *
) *

(

0.00 * $  106.73 * 4 * 100% * (

60.00% *

90%

) *

Total

77,770

Page 53

Table 8

Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for a Laboratory to Conduct Analysis 
of Quarterly Exposure Monitoring 
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples collected 
during quarterly exposure monitoring.   
(SAMPCOST  * JOBPEL * SHIFTS * #SAMPS * 4 * %NOTQUART * %ABOVEPEL) * #PLANTS

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

(

$68 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

930

=

$0

Small

(
(

$68 * 0
$68 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,751
448

=
=

$0
$0

(
(

$68 * 0
$68 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

843
508

=
=

$0
$0

(
(

$68 * 0
$68 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

955
448

=
=

$0
$0

(
(

$68 * 0
$68 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

843
509

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 2 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

959
930

=
=

$0
$0

Small

3

* 4

* 100% *

0.00%

)*

1,751

=

$0

Large

( $68 * 1 * 1 *
GENERAL INDUSTRY
( $68 * 1 * 3 *

2

* 4

* 100% *

4.85%

)*

3,560

=

$282,016

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

4.84%
0.37%

)*
)*

3,989
2,611

=
=

$157,677
$15,782

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.38%
0.00%

)*
)*

2,925
791

=
=

$9,079
$0

Small
Large

(
(

$68 * 1
$68 * 0

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

886
316

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

354
79

=
=

$0
$0

Small

(

$68 * 1

* 1 *

3

* 4

* 100% *

0.00%

)*

89

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

Large

 JOBPEL

 SHIFTS

Variable cost per sample 
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
four times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Number of plants represented by the model output

 SAMPCOST

Cost = 
Variables
* SAMPCOST = 
* JOBPEL = 
* SHIFTS = 
* #SAMPS = 
*4 = 
* %NOTQUART =
* %ABOVEPEL = 
* #PLANTS =

Sector 1. Electroplating
Hard Chrome

Job Shop Chrome Plater

Large
Small

Captive Shop Chrome Plater

Large
Small

Job Shop Plater

Large
Small

Captive Shop Plater

Large

Operator
Sector 2. Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Page 54

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$68 * 1

* 3 *

2

* 4

* 100% *

0.00%

)*

79

=

$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

89
475

=
=

$0
$0

Small

(

$68 * 1

* 4

* 100% *

0.00%

)*

532

=

$0

Large (

$68 * 1

* 1 * 3
MARITIME
* 3 * 1

* 4

* 100% *

0.00%

)*

18

=

$0

Small (
Large (

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

10
24

=
=

$0
$0

Small (
Large (

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

14
6

=
=

$0
$0

Small (
Large (

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

3
117

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

66
4

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
2

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1
4

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
2

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1
0

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
0

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
16

=
=

$0
$0

Small

(

$68 * 0

* 100% *

0.00%

)*

9

=

$0

Large

(

* 2 * 1 * 4
CONSTRUCTION
$68 * 1 * 3 * 1 * 4

* 100% *

0.00%

)*

202

=

$0

Small
Large

(
(

$68 * 1
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,620
3

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

21
41

=
=

$0
$0

Small

(

$68 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

324

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

Plasma Welding

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Page 55

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$68 * 1

* 3 *

1

* 4

* 100% *

0.00%

)*

20

=

$0

Local
State

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

162
4

=
=

$0
$0

Local

(

$68 * 1

* 100% *

0.00%

)*

32

=

$0

Large

(

* 1 * 1 * 4
GOVERNMENT
$68 * 1 * 1 * 1 * 4

* 100% *

0.00%

)*

19

=

$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

594
0

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

8
4

=
=

$0
$0

Small
State

(
(

$68 * 1
$68 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

119
2

=
=

$0
$0

Local
State

(
(

$68 * 1
$68 * 1

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

59
1

=
=

$0
$0

Local

(

$68 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

12

=

$0

Large

(

$68 * 1

* 3 *

2

* 4

* 100% *

0.00%

)*

4,773

=

$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

4,859
3,500

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

3,563
1,060

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

1,080
424

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

432
106

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

108
106

=
=

$0
$0

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

3
2

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

108
636

=
=

$0
$0

Small

(

$68 * 1

* 4

* 100% *

0.00%

)*

648

=

$0

Large (

$68 * 0

* 1 * 3
MARITIME
* 3 * 1

* 4

* 100% *

0.00%

)*

37

=

$0

Small (
Large (

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

21
54

=
=

$0
$0

Small (

$68 * 0

* 2 *

1

* 4

* 100% *

0.00%

)*

30

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

State

 SAMPCOST

 SHIFTS

Table 8

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 2. Mild Steel Welding
SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding

Resistance Welding

SMAW

GMAW

Page 56

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

* 3 *

1

* 4

* 100% *

0.00%

)*

13

=

$0

Small (
Large (

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

7
251

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

142
8

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

5
3

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
8

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

5
3

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2
1

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
1

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 2 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
33

=
=

$0
$0

Small

(

$68 * 0

* 100% *

0.00%

)*

18

=

$0

Large

(

* 2 * 1 * 4
CONSTRUCTION
$68 * 0 * 3 * 1 * 4

* 100% *

0.00%

)*

304

=

$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

2,293
4

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

30
60

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

458
30

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 3 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

230
6

=
=

$0
$0

Small

(

$68 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

46

=

$0

Large

(

$68 * 1

* 3 *

3

* 4

* 100% * 28.00% ) *

50

=

$34,080

Small
Large

(
(

$68 * 1
$68 * 0

* 1 *
* 1 *

3
1

* 4
* 4

* 100% *
* 100% *

9.00%
5.00%

)*
)*

63
331

=
=

$4,598
$0

Small

(

$68 * 2

* 1 *

1

* 4

* 100% *

5.00%

)*

1,458

=

$39,695

 #PLANTS

 Item 13 COST

 #SAMPS

$68 * 0

 JOBPEL

Large (

 SAMPCOST

 SHIFTS

Table 8

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting

Air Carbon Arc Cutting

Electric Torch Cutting

Thermal Spray Tungsten Cutting

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
SECTOR 3.  PAINTING
AEROSPACE

AUTOBODY

Page 57

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$68 * 0

* 2 *

3

* 4

* 100% *

8.00%

)*

101

=

$0

Small
Large

(
(

$68 * 0
$68 * 1

* 1 *
* 3 *

3
1

* 4
* 4

* 100% * 8.00% ) *
* 100% * 36.00% ) *

18
294

=
=

$0
$86,414

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% * 36.00% ) *
* 100% * 22.00% ) *

508
765

=
=

$49,803
$137,480

Small
Large

(
(

$68 * 1
$68 * 1

* 1 *
* 3 *

1
1

* 4
* 4

* 100% * 22.00% ) *
* 100% * 12.00% ) *

4,067
16

=
=

$243,628
$1,592

Small

(

$68 * 1

* 1 *

1

* 4

* 100% * 12.00% ) *

899

=

$29,372

Large

(

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

2

=

$0

Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7.  Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8.  Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9.  Printing Ink Producers
Large (
ALL
Small (
SECTOR 10.  Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11.  Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13.  Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14.  Iron and Steel Mills
Large (
ALLOY AND STAINLESS STEEL
Small (

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

$68 * 1

* 2 *

3

* 4

* 100% * 77.00% ) *

2

=

$2,487

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

1

=

$0

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

3

=

$0

$68 * 0

* 3 *

0

* 4

* 100% *

0.00%

)*

0

=

$0

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

5

=

$0

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

$68 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

87

=

$0

$68 * 0

* 2 *

3

* 4

* 100% *

0.00%

)*

137

=

$0

$60 * 0

* 1 *

9

* 4

* 100% *

0.00%

)*

3

=

$0

$60 * 0

* 1 *

5

* 4

* 100% *

0.00%

)*

10

=

$0

$68 * 3

* 3 *

3

* 4

* 100% * 36.00% ) *

86

=

$227,671

$68 * 5

* 1 *

3

* 4

* 100% * 36.00% ) *

42

=

$61,867

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

4

=

$0

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

3

=

$0

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

1

=

$0

$68 * 0

* 1 *

1

* 4

*

*

0.00%

)*

0

=

$0

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

37

=

$0

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

12

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

COIL COATING

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

Page 58

0%

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

112

=

$0

Small

(

$68 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

35

=

$0

Large

(

$68 * 0

* 1 *

3

* 4

* 100% * 63.00% ) *

37

=

$0

Small

(

$68 * 0

* 1 *

3

* 4

* 100% * 63.00% ) *

34

=

$0

Large

(

$68 * 0

* 3 *

5

* 4

* 100% *

0.00%

)*

178

=

$0

Small

(

$68 * 0

* 1 *

5

* 4

* 100% *

0.00%

)*

130

=

$0

Large

(

$68 * 7

* 1 * 21 * 4

* 100% * 62.00% ) *

3

=

$73,595

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Users
Small
Large
Chromium Catalyst Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small

(

$68 * 5

* 1 *

7

* 4

* 100% * 62.00% ) *

1

=

$5,841

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

5

=

$0

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

207

=

$0

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

1,561

=

$0

(

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

347

=

$0

(

$68 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

703

=

$0

(

$68 * 0

* 3 * 12 * 4

* 100% *

0.00%

)*

5

=

$0

(
(

$68 * 0
$68 * 1

* 1 *
* 1 *

4
1

* 4
* 4

* 100% * 0.00% ) *
* 100% * 20.00% ) *

17
78

=
=

$0
$4,233

(

$68 * 1

* 1 *

1

* 4

* 100% *

0.00%

)*

5

=

$0

(

$68 * 0

* 3 *

2

* 4

* 100% *

0.00%

)*

92

=

$0

(

$68 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

367

=

$0

(

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

164

=

$0

(
(

$68 * 0
$68 * 0

* 1 *
* 3 *

3
3

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

0
21

=
=

$0
$0

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

4

=

$0

(

$68 * 0

* 1 * 15 * 4

* 100% *

0.00%

)*

6

=

$0

(

$68 * 0

* 1 *

* 100% *

0.00%

)*

0

=

$0

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

CARBON STEEL
14b. FORGING INDUSTRY
Reshaping
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL

Page 59

0

* 4

 QUARTERLY

 %NOTQUART

 %ABOVEPEL

$68 * 0

* 1 *

2

* 4

* 100% *

0.00%

)*

175

=

$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

2
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

93
38

=
=

$0
$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 22% *

0.00%
0.00%

)*
)*

34
1,290

=
=

$0
$0

Small
State

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

*
*

22% *
22% *

0.00%
0.00%

)*
)*

5,162
16

=
=

$0
$0

Local

(

$68 * 0

* 1 *

1

* 4

*

22% *

0.00%

)*

59

=

$0

Large

(

$68 * 0

* 3 * 15 * 4

* 100% *

0.00%

)*

48

=

$0

Small
Large

(
(

$68 * 0
$68 * 0

* 1 * 3 * 4
* 3 * 15 * 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

58
0

=
=

$0
$0

Small
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

$68 * 0

* 1 *

3

* 4

* 100% *

0.00%

)*

29

=

$0

(

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

18

=

$0

(

$68 * 0

* 3 *

3

* 4

* 100% *

0.00%

)*

0

=

$0

(

$68 * 0

* 1 *

1

* 4

* 100% *

0.00%

)*

55

=

$0

Small
State

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

196
16

=
=

$0
$0

Local
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

74
44

=
=

$0
$0

Small
State

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% *
* 100% *

0.00%
0.00%

)*
)*

143
1

=
=

$0
$0

Local
Large

(
(

$68 * 0
$68 * 0

* 1 *
* 1 *

1
1

* 4
* 4

* 100% * 0.00% ) *
* 100% * 60.00% ) *

201
48

=
=

$0
$0

Small

(

$68 * 0

* 1 *

1

* 4

* 100% * 60.00% ) *

 #PLANTS

 Item 13 COST

 #SAMPS

(

 JOBPEL

Large

 SAMPCOST

 SHIFTS

Table 8

SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incerneration
GENERAL INDUSTRY

GOVERNMENT

Industrial Rehabilitation 

Hazardous Waste‐site Work

Refractory Brick Restoration
Total

Page 60

148
=
$0
77,770
$1,466,910

Table 9

Employer Time and Cost to Notify Employees of Quarterly Monitoring Results
HOURS =  ((NOTETIME * JOBPEL * SHIFTS * # SAMPS * 4) * %NOTQUART * %ABOVEPEL) * #PLANTS
COST = (SUPWAGE) * BURDEN HOURS

Item 12 Cost

Responses

$0

0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

1,751
448

0 $  34.98
0 $  34.98

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

843
508

0 $  34.98
0 $  34.98

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

955
448

0 $  34.98
0 $  34.98

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

843
509

0 $  34.98
0 $  34.98

$0
$0

0
0

0.25 * 0 *
0.25 * 0 *

1*
2*

3 * 4 * 100% *
3 * 4 * 100% *

0.00%
0.00%

*
*

959
930

0 $  34.98
0 $  34.98

$0
$0

0
0

0.25 * 0 *

1*

3 * 4 * 100% *

0.00%

*

1,751

0 $  34.98

$0

0

0.25 * 1 *

3*

2 * 4 * 100% *

4.85% *

3,560

1,036 $  34.43

$35,669

4143

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

4.84% *
0.37% *

3,989
2,611

579 $  34.43
58 $  34.43

$19,943
$1,996

2317
232

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.38% *
0.00% *

2,925
791

33 $  34.43
0 $  34.43

$1,148
$0

133
0

0.25 * 1 *
0.25 * 0 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

886
316

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 0 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

354
79

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

89
79

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1 *

1*

3 * 4 * 100% *

0.00% *

89

0 $  34.43

$0

0

Page 61

#PLANTS

SUPWAGE
0 $  34.98

Hours

930

%ABOVEPEL
*

4

0.00%

#SAMPS

3 * 4 * 100% *

SHIFTS
2*

JOBPEL

0.25 * 0 *

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop Chrome 
Plater
Small
Large
Captive Shop 
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small

%NOTQUART

ASSUMPTIONS:
* SUPWAGE = Supervisory wage rate, $/hr.
* NOTETIME = Time, in hours, to notify an employee of the exposure monitoring results
* JOBPEL = Number of job categories exposed above the PEL
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* 4 = 4 times per year (quarterly)
* %NOTQUART = Percent of plants not performing quarterly monitoring requirements
* %ABOVEPEL = Percent of plants that have an employee in at least one job category above the PEL
* #PLANTS = Number of plants represented by the model input

Item 12 Cost

Responses

0 $  34.43

$0

0

Small

0.25 * 1 *

1*

0.00% *

532

0 $  34.43

$0

0

Large

0.25 * 1 *

1*

3 * 4 * 100% *
MARITIME
1 * 4 * 100% *

0.00% *

18

0 $  34.43

$0

0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

10
24

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

14
6

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

3
117

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

66
4

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

2
2

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1
4

0 $  34.43
0 $   34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

2
2

0 $  34.43
0 $   34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1
0

0 $  34.43
0 $   34.43

$0
$0

0
0

Small
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

0
0

0 $  34.43
0 $   34.43

$0
$0

0
0

Small
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

0
16

0 $  34.43
0 $   34.43

$0
$0

0
0

Small

0.00% *

9

0 $  34.43

$0

0

Large

0.25 * 0 * 1 * 1 * 4 * 100% *
CONSTRUCTION
0.25 * 1 * 3 * 1 * 4 * 100% *

0.00% *

202

0 $  34.43

$0

0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

1,620
3

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

21
41

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
State

0.25 * 1 *
0.25 * 1 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

324
20

0 $  34.43
0 $  34.43

$0
$0

0
0

Local
State

0.25 * 1 *
0.25 * 1 *

1*
3*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

162
4

0 $  34.43
0 $  34.43

$0
$0

0
0

Local

0.25 * 1 *

1*

1 * 4 * 100% *

0.00% *

32

0 $  34.43

$0

0

SUPWAGE

475

Hours

#PLANTS

0.00% *

4

2 * 4 * 100% *

#SAMPS

3*

SHIFTS

0.25 * 1 *

JOBPEL

Large

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Resistance Welding

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

Page 62

Item 12 Cost

Responses

19

0 $  34.43

$0

0

Small
Large

0.25 * 1 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

594
0

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

8
4

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
State

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

119
2

0 $  34.43
0 $  34.43

$0
$0

0
0

Local
State

0.25 * 1 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

59
1

0 $  34.43
0 $   34.43

$0
$0

0
0

Local
2A. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small

0.25 * 1 *

1*

1 * 4 * 100% *

0.00% *

12

0 $  34.43

$0

0

0.25 * 0 *

1*

1 * 4 * 100% *

0.00% *

4,773

0 $  34.43

$0

0

0.25 * 1 * 1 * 1 * 4 * 100% *
0.25 * 1 * 1 * 1 * 4 * 100% *

0.00% *
0.00% *

4,859
3,500

0 $  34.43
0 $  34.43

$0

0
0

SHIFTS

SUPWAGE

0.00% *

Hours

#PLANTS

GOVERNMENT
1 * 4 * 100% *

4

1*

#SAMPS

0.25 * 1 *

JOBPEL

Large

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

3,563
1,060

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

1,080
424

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1
0.25 * 0

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

432
106

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

108
106

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1
0.25 * 1

* 1
* 1

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

108
636

0 $  34.43
0 $  34.43

$0
$0

0
0

0.25 * 1

* 1

* 1

0.00% *

648

0 $  34.43

$0

0

Large

0.25 * 0 *

* 4 * 100% *
MARITIME
1 * 4 * 100% *

0.00% *

37

0 $  34.43

$0

0

Small
Large

0.25 * 0 * 2 * 1 * 4 * 100% *
0.25 * 0 * 3 * 1 * 4 * 100% *

0.00% *
0.00% *

21
54

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

30
13

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

7
251

0 $  34.43
0 $  34.43

$0
$0

0
0

Small

0.25 * 0

* 2

* 1

* 4 * 100% *

0.00% *

142

0 $  34.43

$0

0

3*

SMAW

GMAW

TIG

FCAW

Page 63

Item 12 Cost

Responses

0.00% *

8

0 $  34.43

$0

0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

5
3

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2
8

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

5
3

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2
1

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

0
1

0 $  34.43
0 $   34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

0
33

0 $  34.43
0 $   34.43

$0
$0

0
0

Small

0.25 * 0

* 2

* 1

0.00% *

18

0 $  34.43

$0

0

Large

0.25 * 0

* 3

* 1

* 4 * 100% *
CONSTRUCTION
* 4 * 100% *

0.00% *

304

0 $  34.43

$0

0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

2,293
4

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
Large

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

30
60

0 $  34.43
0 $  34.43

$0
$0

0
0

Small
State

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

458
30

0 $  34.43
0 $  34.43

$0
$0

0
0

Local
State

0.25 * 0
0.25 * 0

* 2
* 3

* 1
* 1

* 4 * 100% *
* 4 * 100% *

0.00% *
0.00% *

230
6

0 $  34.43
0 $  34.43

$0
$0

0
0

Local

0.25 * 0

* 2

* 1

* 4 * 100% *

0.00% *

46

0 $  34.43

$0

0

Large

0.25 * 1 *

3*

3 * 4 * 100% *

28.00% *

50

125 $  43.34

$5,425

501

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

9.00% *
5.00% *

63
331

17 $  43.34
149 $  43.34

$732
$6,459

68
596

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

5.00% *
8.00% *

1,458
101

219 $  43.34
73 $  43.34

$9,479
$3,158

875
291

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

8.00% *
36.00% *

18
294

4 $  43.34
952 $  43.34

$191
$41,269

18
3809

Small
Large

0.25 * 1 *
0.25 * 1 *

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

36.00% *
22.00% *

508
765

549 $  43.34
1,515 $  43.34

$23,784
$65,656

2195
6060

Small

0.25 * 1 *

1*

3 * 4 * 100% *

22.00% *

4,067

2,685 $  43.34

$116,349

10738

SHIFTS

SUPWAGE

* 4 * 100% *

Hours

#PLANTS

* 1

4

* 3

#SAMPS

0.25 * 0

JOBPEL

Large

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Sector 3. Painting
AEROSPACE

AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

Page 64

%NOTQUART

70

*

3 * 4 * 100% *

12.00% *

899

324 $  43.34

$14,027

1295

*

3 * 4 * 100% *

0.00% *

2

0 $  50.86

$0

0

*

3 * 4 * 100% *

0.00% *

0

0 $  50.86

$0

0

*

3 * 4 * 100% *

77.00% *

2

9 $  49.57

$453

37

*

3 * 4 * 100% *

0.00% *

1

0 $  49.57

$0

0

*

3 * 4 * 100% *

0.00% *

3

0 $  41.98

$0

0

*

0 * 4 * 100% *

0.00% *

0

0 $  41.98

$0

0

*

3 * 4 * 100% *

0.00% *

5

0 $  50.86

$0

0

*

3 * 4 * 100% *

0.00% *

0

0 $  50.86

$0

0

*

3 * 4 * 100% *

0.00% *

87

0 $  37.87

$0

0

*

3 * 4 * 100% *

0.00% *

137

0 $  37.87

$0

0

*

9 * 4 * 100% *

0.00% *

3

0 $  37.94

$0

0

*

5 * 4 * 100% *

0.00% *

10

0 $  37.94

$0

0

*

3 * 4 * 100% *

36.00% *

86

836 $  42.04

$35,151

3345

*

3 * 4 * 100% *

36.00% *

42

227 $  42.04

$9,552

909

*

3 * 4 * 100% *

0.00% *

4

0 $  37.72

$0

0

*

3 * 4 * 100% *

0.00% *

3

0 $  37.72

$0

0

*

3 * 4 * 100% *

0.00% *

1

0 $  51.02

$0

0

*

1* 4*

0% *

0.00% *

0

0 $  51.02

$0

0

*

3 * 4 * 100% *

0.00% *

37

0 $  51.02

$0

0

*
*

3 * 4 * 100% *
3 * 4 * 100% *

0.00% *
38.00% *

12
112

0 $  51.02
1,147 $  51.02

$0
$58,523

0
4588

*

3 * 4 * 100% *

38.00% *

35

40 $  51.02

$2,045

160

*

3 * 4 * 100% *

38.00% *

37

375 $  51.02

$19,140

1500

*

3 * 4 * 100% *

38.00% *

34

39 $  51.02

$2,004

157

SHIFTS

SUPWAGE

$760

Hours

18 $  43.34

#PLANTS
16

%ABOVEPEL
12.00% *

3*

4

3 * 4 * 100% *

#SAMPS

Responses

0.25 * 1 *

Item 12 Cost

Large

JOBPEL

NOTETIME

Table 9

GOVERNMENT
0.25 * 1 * 1
Small
Sector 4. Producers of Chromates
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 5. Chromate Pigment Procedures
Large
0.25 * 1 * 2
ALL
0.25 * 0 * 1
Small
Sector 6. CCA Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 3
Small
Sector 7. Chromium Catalyst Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 8. Paint and Coating Producers
Large
0.25 * 0 * 2
ALL
0.25 * 0 * 2
Small
Sector 9. Printing Ink Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 10. Plastic Colorant Producers and Users
Large
0.25 * 3 * 3
ALL
0.25 * 5 * 1
Small
Sector 11. Plating Mixture Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 13. Chromium Metal Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 14. Iron and Steel Mills
Large
0.25 * 0 * 3
ALLOY AND 
STAINLESS STEEL
0.25 * 0 * 1
Small
Large
0.25 * 3 * 3
CARBON STEEL
0.25 * 1 * 1
Small
14B. Forging Industry
Large
0.25 * 3 * 3
FORGING 
INDUSTRY
0.25 * 1 * 1
Small

Page 65

Item 12 Cost

Responses

178

0 $  37.21

$0

0

*

1*

5 * 4 * 100% *

0.00% *

130

0 $  37.21

$0

0

*

1 * 21 * 4 * 100% *

62.00% *

3

270 $  49.57

$13,398

1081

*

1*

7 * 4 * 100% *

62.00% *

1

21 $  49.57

$1,063

86

*

1*

3 * 4 * 100% *

0.00% *

0

0 $  54.55

$0

0

*

1*

3 * 4 * 100% *

0.00% *

5

0 $  54.55

$0

0

*

1*

3 * 4 * 100% *

0.00% *

207

0 $  39.35

$0

0

*

1*

3 * 4 * 100% *

0.00% *

1,561

0 $  39.35

$0

0

*

3*

3 * 4 * 100% *

0.00% *

347

0 $  26.25

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

703

0 $  26.25

$0

0

0*

3 * 12 * 4 * 25% *

0.00% *

5

0 $  37.96

$0

0

0*
1*

1*
3*

4 * 4 * 0% *
1 * 4 * 25% *

0.00% *
0.00% *

17
78

0 $  37.96
0 $  37.96

$0
$0

0
0

0*

1*

1* 4*

0% *

0.00% *

5

0 $  37.96

$0

0

0*

3*

2 * 4 * 100% *

0.00% *

92

0 $  27.39

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

367

0 $  27.39

$0

0

0*

3*

3 * 4 * 100% *

13.00% *

164

0 $  42.72

$0

0

0*
2*

1*
3*

3 * 4 * 100% *
3 * 4 * 100% *

0.00% *
13.00% *

0
21

0 $  42.72
50 $  42.72

$0
$2,118

0
198

0*

1*

3 * 4 * 100% *

0.00% *

4

0 $  42.72

$0

0

0*

1 * 15 * 4 * 100% *

0.00% *

6

0 $  33.72

$0

0

0*

1*

0 * 4 * 100% *

0.00% *

0

0 $  33.72

$0

0

0*

1*

2 * 4 * 100% *

0.00% *

175

0 $  30.34

$0

0

0*
0*

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

93
38

0 $  30.34
0 $  30.34

$0
$0

0
0

0*
1*

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

34
1,290

0 $  30.34
0 $  30.34

$0
$0

0
0

1*

1*

2 * 4 * 100% *

0.00% *

5,162

0 $  30.34

$0

0

Page 66

SHIFTS

SUPWAGE

#PLANTS

0.00% *

Hours

%ABOVEPEL

0.25 *
Small
Sector 21. Colored Glass Producers
Large
0.25 *
ALL
0.25 *
Small
Large
0.25 *
Fiber, Flat, and 
Container Glass
0.25 *
Small
Sector 22. Printing
Large
0.25 *
ALL
0.25 *
Small
Sector 24. Chromium Catalyst Users
Large
0.25 *
Catalyst Users
0.25 *
Small
Large
0.25 *
Catalyst Companies
0.25 *
Small
Sector 25. Refractory Brick Producers
Large
0.25 *
ALL
0.25 *
Small
Sector 26. Woodworking
Large
0.25 *
General Industry
0.25 *
Small
Large
0.25 *
Maritime
0.25 *
Small
Large
0.25 *
Construction
0.25 *
Small

%NOTQUART

5 * 4 * 100% *

4

3*

Sector 15. Iron and Steel Foundries
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 17. Chromium Dye Producers 
Large
0.25 * 7
ALL
0.25 * 5
Small
Sector 18. Chromium Sulfate Producers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 19. Chemical Distributers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 20. Textile Dyeing
Large
0.25 * 0
ALL

#SAMPS

*

JOBPEL

NOTETIME

Table 9

Item 12 Cost

Responses

$0

0

0.25 * 1 *
Small
Sector 27. Solid Waste Incerneration
Large
0.25 * 0 *
General Industry
0.25 * 0 *
Small

1*

2 * 4 * 100% *

0.00% *

59

0 $  30.34

$0

0

3 * 15 * 4 * 100% *

0.00% *

48

0 $  35.80

$0

0

SUPWAGE
0 $  30.34

Hours

#PLANTS
16

4

0.00% *

#SAMPS

2 * 4 * 100% *

SHIFTS
1*

Large

JOBPEL

0.25 * 1 *

NOTETIME

%ABOVEPEL

%NOTQUART

Table 9

Government

1*

3 * 4 * 100% *

0.00% *

$0

0

0.25 *

0*

3*

15 * 4 * 100% *

0.00% *

58
0

0 $  35.80

State

0 $   35.80

$0

0

Local

0.25 *

0*

1*

3 * 4 * 100% *

0.00% *

29

0 $   35.80

$0

0

3*

3 * 4 * 100% *

0.00% *

18

0 $  36.71

$0

0

3*

3 * 4 * 100% *

0.00% *

0

0 $  36.71

$0

0

1*

3 * 4 * 100% *

0.00% *

55

0 $  42.25

$0

0

Government

Sector 30. Superalloy Producers and Users
Large
0.25 * 0 *
ALL
0.25 * 0 *
Small
Sector 31. Construction
Large
0.25 * 0 *
Small
State

0.25 * 0 *
0.25 * 0 *

1*
1*

2 * 4 * 100% *
2 * 4 * 100% *

0.00% *
0.00% *

196
16

0 $  42.25
0 $  42.25

$0
$0

0
0

Local
Large

0.25 * 0 *
0.25 * 0 *

1*
1*

3 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

74
44

0 $  42.25
0 $  42.25

$0
$0

0
0

Hazardous Waste‐ Small
site Work
State

0.25 * 0 *
0.25 * 0 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
0.00% *

143
1

0 $  42.25
0 $  42.25

$0
$0

0
0

Local
Large

0.25 * 0 *
0.25 * 1 *

1*
1*

1 * 4 * 100% *
1 * 4 * 100% *

0.00% *
60.00% *

201
48

0 $  42.25
29 $  42.25

$0
$1,216

0
115

Small

0.25 * 1 *

1*

1 * 4 * 100% *

60.00% *
Total

148
89 $  42.25
77,770 11,468

$3,739
$494,447

354
45,870

Industrial 
Rehabilitation 

Refractory Brick 
Restoration

Page 67

Table 9a (Remand)

Employer Time and Cost to Notify Employees of Initial Monitoring Results 
Hours = (NOTETIME * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD * #PLANTS)
Cost = BURDEN HOURS * NONSUPWAGE 

# INIT

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

*

2

* 25% *

930

47

=

$6,226

244

977

Job Shop Chrome  Large
Plater
Small
Large
Captive Shop 
Chrome Plater
Small

( 0.25 * $         25.49
( 0.25 * $         25.49

7 * 1 *
1 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

1,751
448

88
22

=
=

$5,858
$429

230
17

919
67

( 0.25 * $         25.49
( 0.25 * $         25.49

1 * 1 *
1 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

843
508

42
25

=
=

$403
$485

16
19

63
76

Job Shop Plater

Large

( 0.25 * $         25.49
( 0.25 * $         25.49

1 * 1 *
1 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

955
448

48
22

=
=

$457
$429

18
17

72
67

Small

( 0.25 * $         25.49
( 0.25 * $         25.49

1 * 1 *
1 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

843
509

42
25

=
=

$403
$487

16
19

63
76

Captive Shop 
Plater

Large
Small
Large

( 0.25 * $         25.49
( 0.25 * $         25.49

1 * 1 *
1 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

959
930

48
47

=
=

$458
$889

18
35

72
140

1,751

88

=

$837

33

131

# SAMPS
3

SHIFTS

7 * 2 *

JOBCAT

( 0.25 * $         25.49

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small

 NONSUPEWAGE

           * NOTETIME =  Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 minutes).
 NONSUPWAGE =  Non‐supervisory wage rate, $/hr.
* JOBCAT =  Number of job categories (covering each work area)
* SHIFTS =  Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* #INIT =  Equals two, reflecting that initial monitoring will have to be conducted twice — with readings below the action level 
    in order for the requirement of semi‐annual monitoring to be waived.  
* %INITADD =  Percent of plants that have not satisified initial monitoring requirement
* #PLANTS * 5% = Number of plants represented by the model output * 5%

Operator
Small ( 0.25 * $         25.49 1 * 1 * 3 * 2 * 25% *
Sector 2. Welding                                                                      GENERAL INDUSTRY
Large

( 0.25 * $         25.10

1 * 3 *

2

*

2

* 25% *

3,560

178

=

$3,350

133

534

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

3,989
2,611

199
131

=
=

$1,877
$2,458

75
98

299
392

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

2,925
791

146
40

=
=

$1,377
$744

55
30

219
119

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

886
316

44
16

=
=

$417
$298

17
12

66
47

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

354
79

18
4

=
=

$167
$74

7
3

27
12

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

89
79

4
4

=
=

$42
$74

2
3

7
12

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

3
2

*
*

2
2

* 25% *
* 25% *

89
475

4
24

=
=

$42
$447

2
18

7
71

Small

( 0.25 * $         25.10

1 * 1 *

3

*

2

* 25% *

532

27

=

$250

10

40

SMAW

GMAW

TIG

SAW

Plasma Cutting

Plasma Welding
Resistance 
Welding

Page 68

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

1

4

* 75% *
* 75% *

10
24

0
1

=
=

$9
$34

0
1

1
5

2
2

* 75% *
* 75% *

14
6

1
0

=
=

$13
$8

1
0

2
1

*
*

2
2

* 75% *
* 75% *

3
117

0
6

=
=

$3
$165

0
7

0
26

1
1

*
*

2
2

* 75% *
* 75% *

66
4

3
0

=
=

$62
$5

2
0

10
1

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

2
2

0
0

=
=

$2
$3

0
0

0
0

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

1
4

0
0

=
=

$1
$5

0
0

0
1

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

2
2

0
0

=
=

$2
$3

0
0

0
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

1
0

0
0

=
=

$1
$0

0
0

0
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

0
0

0
0

=
=

$0
$0

0
0

0
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

0
16

0
1

=
=

$0
$22

0
1

0
4

Small

( 0.25 * $         25.10

1 * 2 *

1

9

0

=

$8

0

1

Large

( 0.25 * $         25.10

1 * 3 *

* 2 * 75% *
CONSTRUCTION
1 * 2 * 25% *

202

10

=

$95

4

15

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

1,620
3

81
0

=
=

$254
$1

10
0

40
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

21
41

1
2

=
=

$3
$19

0
1

1
3

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

324
20

16
1

=
=

$51
$10

2
0

8
2

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

162
4

8
0

=
=

$25
$2

1
0

4
0

Small

( 0.25 * $         25.10

1 * 1 *

1

32

2

=

$5

0

1

State

( 0.25 * $         25.10

1 * 1 *

1

* 2 * 25% *
GOVERNMENT
* 2 * 25% *

19

1

=

$3

0

0

Local

( 0.25 * $         25.10

1 * 1 *

1

*

594

30

=

$93

4

15

# INIT

% INITADD

$25

# SAMPS

=

SHIFTS

1

JOBCAT

18

NOTETIME

 # PLANTS

 NONSUPEWAGE

Table 9a (Remand)

MARITIME
2 * 75% *

Large

( 0.25 * $         25.10

1 * 3 *

1

*

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

Small
Large

SMAW

GMAW

TIG

FCAW

Plasma Cutting

Plasma Welding

Oxy‐fuel Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting
SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

SMAW
2

* 25% *

Page 69

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

1

*

2

* 25% *

0

0

=

$0

0

0

Local
State

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 25% *
* 25% *

8
4

0
0

=
=

$1
$1

0
0

0
0

Local
State

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 25% *
* 25% *

119
2

6
0

=
=

$19
$0

1
0

3
0

Local
State

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 25% *
* 25% *

59
1

3
0

=
=

$9
$0

0
0

1
0

*

12

1

=

$2

0

0

*

4,773

239

=

$4,492

179

716

*
*

4,859
3,500

243
175

=
=

$2,287
$3,295

91
131

364
525

*
*

3,563
1,060

178
53

=
=

$1,677
$998

67
40

267
159

*
*

1,080
424

54
21

=
=

$508
$399

20
16

81
64

*
*

432
106

22
5

=
=

$203
$100

8
4

32
16

*
*

108
106

5
5

=
=

$51
$100

2
4

8
16

*
*

108
636

5
32

=
=

$51
$599

2
24

8
95

*

648

32

=

$305

12

49

*

37

2

=

$52

2

8

*
*

21
54

1
3

=
=

$20
$76

1
3

3
12

*
*

30
13

2
1

=
=

$28
$18

1
1

5
3

*
*

7
251

0
13

=
=

$6
$354

0
14

1
56

*
*

142
8

7
0

=
=

$134
$11

5
0

21
2

*
*

5
3

0
0

=
=

$5
$4

0
0

1
1

*
*

2
8

0
0

=
=

$2
$11

0
0

0
2

*

5

0

=

$5

0

1

# SAMPS

1 * 1 *

SHIFTS

( 0.25 * $         25.10

JOBCAT

State

NOTETIME

# INIT

 NONSUPEWAGE

Table 9a (Remand)

Plasma Cutting

GMAW

Brazing

Metallizing
( 0.25 * $         25.10 1 * 1 * 1 * 2 * 25%
Local
Sector 2. Mild Steel Welding                                                   GENERAL INDUSTRY
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
SMAW
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
GMAW
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
TIG
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
SAW
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
Plasma Cutting
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
Plasma Welding
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $         25.10 1 * 3 * 2 * 2 * 25%
Resistance 
Welding
Small ( 0.25 * $         25.10 1 * 1 * 3 * 2 * 25%
MARITIME
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
SMAW
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
GMAW
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
TIG
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
FCAW
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
Plasma Cutting
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
Plasma Welding
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $         25.10 1 * 3 * 1 * 2 * 75%
Oxy‐fuel Cutting
Small ( 0.25 * $         25.10 1 * 2 * 1 * 2 * 75%

Page 70

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

1

*

2

* 75% *

3

0

=

$4

0

1

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

2
1

0
0

=
=

$2
$1

0
0

0
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

0
1

0
0

=
=

$0
$1

0
0

0
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 2 *
1 * 3 *

1
1

*
*

2
2

* 75% *
* 75% *

0
33

0
2

=
=

$0
$47

0
2

0
7

Small

( 0.25 * $         25.10

1 * 2 *

1

18

1

=

$17

1

3

Large

( 0.25 * $         25.10

1 * 3 *

* 2 * 75% *
CONSTRUCTION
1 * 2 * 25% *

304

15

=

$143

6

23

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

2,293
4

115
0

=
=

$360
$2

14
0

57
0

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

30
60

2
3

=
=

$5
$28

0
1

1
5

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

458
30

23
2

=
=

$72
$14

3
1

11
2

Small
Large

( 0.25 * $         25.10
( 0.25 * $         25.10

1 * 1 *
1 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

230
6

11
0

=
=

$36
$3

1
0

6
0

Small ( 0.25 * $         25.10
SECTOR 3.  PAINTING
Large ( 0.25 * $         31.68
General Industry 
(Aerospace)
Small ( 0.25 * $         31.68
Large ( 0.25 * $         31.68
General Industry 
(Autobody)
Small ( 0.25 * $         31.68
Large ( 0.25 * $         31.68
General Industry 
(Coil Coating)
Small ( 0.25 * $         31.68
Large ( 0.25 * $         31.68
Maritime
Small ( 0.25 * $         31.68
Large ( 0.25 * $         31.68
Construction
Small ( 0.25 * $         31.68
State
( 0.25 * $         31.68
Government
( 0.25 * $         31.68
Local
SECTOR 4.  Producers of Chromates
Large ( 0.25 * $         37.06
ALL
Small ( 0.25 * $         37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $         36.12
ALL
Small ( 0.25 * $         36.12
SECTOR 6. CCA Producers

1 * 1 *

1

*

2

* 25% *

46

2

=

$7

0

1

2 * 3 *

3

*

2

* 25% *

50

2

=

$177

6

22

1 * 1 *
2 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

63
331

3
17

=
=

$37
$787

1
25

5
99

2 * 1 *
2 * 2 *

3
3

*
*

2
2

* 25% *
* 25% *

1,458
101

73
5

=
=

$1,732
$240

55
8

219
30

2 * 1 *
3 * 3 *

3
1

*
*

2
2

* 25% *
* 25% *

18
294

1
15

=
=

$22
$524

1
17

3
66

3 * 1 *
3 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

508
765

25
38

=
=

$302
$1,363

10
43

38
172

3 * 1 *
2 * 3 *

1
1

*
*

2
2

* 25% *
* 25% *

4,067
16

203
1

=
=

$2,416
$19

76
1

305
2

2 * 1 *

1

*

2

* 25% *

899

45

=

$356

11

45

4 * 3 *

3

*

2

* 100% *

2

0

=

$69

2

7

0 * 1 *

3

*

2

*

*

0

0

=

$0

0

0

9 * 2 *

3

*

2

* 25% *

2

0

=

$24

1

3

1 * 1 *

3

*

2

* 25% *

1

0

=

$1

0

0

Electric Torch 
Cutting
Thermal Spray 
Tungsten Cutting

# SAMPS

1 * 3 *

SHIFTS

( 0.25 * $         25.10

Air Carbon Arc 
Cutting

JOBCAT

Large

NOTETIME

# INIT

 NONSUPEWAGE

Table 9a (Remand)

SAW

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing

0%

Page 71

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

3

0

=

$18

1

2

Small ( 0.25 * $         30.60 0 * 3 * 0 *
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 * $         37.06 14 * 3 * 3 *
ALL
Small ( 0.25 * $         37.06 0 * 1 * 3 *
SECTOR 8.  Paint and Coating Producers
Large ( 0.25 * $         27.60 4 * 2 * 3 *
ALL
Small ( 0.25 * $         27.60 4 * 2 * 3 *
SECTOR 9.  Printing Ink Producers
Large ( 0.25 * $         27.65 5 * 1 * 9 *
ALL
Small ( 0.25 * $         27.65 3 * 1 * 5 *
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 * $         30.64 4 * 3 * 3 *
ALL
Small ( 0.25 * $         30.64 1 * 1 * 3 *
SECTOR 11.  Plating Mixture Producers
Large ( 0.25 * $         27.50 3 * 1 * 3 *
ALL
Small ( 0.25 * $         27.50 3 * 1 * 3 *
SECTOR 13.  Chromium Metal Producers
Large ( 0.25 * $         37.17 16 * 3 * 3 *
ALL
Small ( 0.25 * $         37.17 0 * 1 * 1 *
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 * $         37.17 8 * 3 * 3 *
Alloy Stainless 
Steel
Small ( 0.25 * $         37.17 4 * 1 * 3 *
Large ( 0.25 * $         37.17 8 * 3 * 3 *
Carbon Steel
Small ( 0.25 * $         37.17 4 * 1 * 3 *
14.B Forging 
Large ( 0.25 * $         37.17 5 * 1 * 3 *
Forging Industry
Small ( 0.25 * $         37.17 2 * 1 * 1 *
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 * $         27.12 9 * 3 * 5 *
ALL
Small ( 0.25 * $         27.12 5 * 1 * 5 *
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 * $         36.12 7 * 1 * 21 *
ALL
Small ( 0.25 * $         36.12 5 * 1 * 7 *
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 * $         39.76 0 * 1 * 3 *
ALL
Small ( 0.25 * $         39.76 2 * 1 * 3 *
SECTOR 19.  Chemical Distributors
Large ( 0.25 * $         28.67 1 * 1 * 3 *
ALL
Small ( 0.25 * $         28.67 1 * 1 * 3 *

2

*

*

0

0

=

$0

0

0

2

* 25% *

5

0

=

$152

4

16

2

*

*

0

0

=

$0

0

0

2

* 25% *

87

4

=

$362

13

52

2

* 25% *

137

7

=

$569

21

82

2

* 100% *

3

0

=

$94

3

14

2

* 100% *

10

1

=

$104

4

15

2

* 25% *

86

4

=

$593

19

77

2

* 25% *

42

2

=

$24

1

3

2

* 75% *

4

0

=

$21

1

3

2

* 75% *

3

0

=

$14

0

2

2

* 100% *

1

0

=

$134

4

14

2

*

*

0

0

=

$0

0

0

2

* 75% *

37

2

=

$1,870

50

201

2
2

* 75% *
* 75% *

12
112

1
6

=
=

$100
$5,610

3
151

11
604

2

* 75% *

35

2

=

$294

8

32

2

* 75% *

37

2

=

$382

10

41

2

* 75% *

34

2

=

$48

1

5

2

* 25% *

178

9

=

$4,079

150

602

2

* 25% *

130

6

=

$549

20

81

2

* 25% *

3

0

=

$98

3

11

2

* 25% *

1

0

=

$8

0

1

2

*

*

0

0

=

$0

0

0

2

* 100% *

5

0

=

$31

1

3

2

* 75% *

207

10

=

$334

12

47

2

* 75% *

1,561

78

=

$2,518

88

351

4 * 3 *

# SAMPS

* 25% *

( 0.25 * $         30.60

SHIFTS

2

Large

JOBCAT

*

NOTETIME

# INIT

 NONSUPEWAGE

Table 9a (Remand)

3

ALL
0%

0%

0%

0%

Page 72

# SAMPS

# INIT

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

SECTOR 20.  Textile Dyeing
Large ( 0.25 * $         19.13 3 *
ALL
Small ( 0.25 * $         19.13 2 *
SECTOR 21.  Colored Glass Producers
Large ( 0.25 * $         27.66 3 *
General Industry
Small ( 0.25 * $         27.66 2 *
Large ( 0.25 * $         27.66 3 *
Fiber, Flat and 
Container Glass
Small ( 0.25 * $         27.66 2 *
SECTOR 22.  Printing
Large ( 0.25 * $         19.97 3 *
ALL
Small ( 0.25 * $         19.97 2 *
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 * $         31.14 2 *
Catalyst Users
Small ( 0.25 * $         31.14 0 *
Chromium 
Large ( 0.25 * $         31.14 2 *
Catalyst Service 
Small ( 0.25 * $         31.14 0 *
Companies
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 * $         24.56 9 *
ALL
Small ( 0.25 * $         24.56 0 *
SECTOR 26.  Woodworking
Large ( 0.25 * $         22.11 1 *
General Industry 
Small ( 0.25 * $         22.11 1 *
Large ( 0.25 * $         22.11 1 *
Maritime
Small ( 0.25 * $         22.11 1 *
Large ( 0.25 * $         30.76 1 *
Construction
Small ( 0.25 * $         22.11 1 *
State
( 0.25 * $         30.76 1 *
Government
( 0.25 * $         22.11 1 *
Local
SECTOR 27.  Solid Waste Incerneration
Large ( 0.25 * $         26.09 6 *
General Industry 
Small ( 0.25 * $         26.09 6 *
State
( 0.25 * $         26.09 0 *
Government
( 0.25 * $         26.09 6 *
Local
SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 * $         26.75 12 *
ALL
Small ( 0.25 * $         26.75 0 *

SHIFTS

JOBCAT

 NONSUPEWAGE

NOTETIME

Table 9a (Remand)

3 *

3

*

2

* 75% *

347

17

=

$3,355

175

702

1 *

2

*

2

* 75% *

703

35

=

$1,009

53

211

3 * 12 *

2

* 75% *

5

0

=

$304

11

44

1 * 4 *
3 * 12 *

2
2

* 75% *
* 75% *

17
78

1
4

=
=

$71
$4,354

3
157

10
630

1 *

4

*

2

* 75% *

5

0

=

$19

1

3

3 *

2

*

2

* 75% *

92

5

=

$619

31

124

1 *

2

*

2

* 75% *

367

18

=

$550

28

110

3 *

3

*

2

* 75% *

164

8

=

$1,728

55

222

1 *
3 *

3
3

*
*

2
2

* 0% *
* 75% *

0
21

0
1

=
=

$0
$223

0
7

0
29

1 *

3

*

2

*

*

4

0

=

$0

0

0

1 * 15 *

2

* 75% *

6

0

=

$366

15

60

1 *

0

*

2

* 75% *

0

0

=

$0

0

0

1 *

1

*

2

* 75% *

175

9

=

$72

3

13

1 *
1 *

1
1

*
*

2
2

* 75% *
* 75% *

93
38

5
2

=
=

$39
$16

2
1

7
3

1 *
1 *

1
1

*
*

2
2

* 75% *
* 75% *

34
1,290

2
64

=
=

$14
$744

1
24

3
97

1 *
1 *

1
1

*
*

2
2

* 75% *
* 75% *

5,162
16

258
1

=
=

$2,141
$9

97
0

387
1

1 *

1

*

2

* 75% *

59

3

=

$24

1

4

3 * 15 *

2

* 75% *

48

2

=

$6,362

244

975

1 * 3 *
3 * 15 *

2
2

* 75% *
* 75% *

58
0

3
0

=
=

$509
$0

20
0

78
0

1 *

3

*

2

* 75% *

29

1

=

$254

10

39

3 *

3

*

2

* 75% *

18

1

=

$957

36

143

3 *

3

*

2

*

0

0

=

$0

0

0

0%

0%

Page 73

*

% INITADD

 # PLANTS

#PLANTS * 5%

Item 12 COSTS

HOURS

RESPONSES

3

*

2

* 75% *

55

3

=

$382

12

50

# SAMPS

4 * 1 *

SHIFTS

# INIT

SECTOR 31.  Construction ‐ Cement Workers
Large ( 0.25 * $         30.79

JOBCAT

 NONSUPEWAGE

NOTETIME

Table 9a (Remand)

Industrial 
Small
rehabilitation  State

( 0.25 * $         30.79
( 0.25 * $         30.79

4 * 1 *
1 * 1 *

2
1

*
*

2
2

* 75% *
* 100% *

196
16

10
1

=
=

$907
$12

29
0

118
2

Local
Large

( 0.25 * $         30.79
( 0.25 * $         30.79

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 100% *
* 75% *

74
44

4
2

=
=

$57
$25

2
1

7
3

Hazardous Waste‐ Small
site Work
State

( 0.25 * $         30.79
( 0.25 * $         30.79

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 75% *
* 75% *

143
1

7
0

=
=

$83
$1

3
0

11
0

Local
Large

( 0.25 * $         30.79
( 0.25 * $         30.79

1 * 1 *
1 * 1 *

1
1

*
*

2
2

* 75% *
* 0% *

201
48

10
2

=
=

$116
$0

4
0

15
0

Small
Large

( 0.25 * $         30.79
( 0.25 * $         30.79

1 * 1 *
4 * 1 *

1
3

*
*

2
2

* 0% *
* 75% *

148
9,592

7
480

=
=

$0
$66,441

0
2158

0
8633

Small
State

( 0.25 * $         30.79
( 0.25 * $         30.79

4 * 1 *
4 * 1 *

2
3

*
*

2
2

* 75% *
* 75% *

76,673
23

3,834
1

=
=

$354,072
$160

11501
5

46004
21

( 0.25 * $         30.79
Local
SECTOR 32.  Pre‐Cast Concrete Products
Large ( 0.25 * $         26.42
ALL
Small ( 0.25 * $         26.42
SECTOR 32A.  Ready Mix Concrete
Large ( 0.25 * $         26.42
ALL
Small ( 0.25 * $         26.42
Total

4 * 1 *

2

*

2

* 75% *

616

31

=

$2,844

92

369

7 * 1 * 11 *

2

* 75% *

1,330

66

=

$50,715

1920

7678

5 * 1 *

*

2

* 75% *

2,187

109

=

$32,504

1230

4921

7 * 1 * 11 *

2

* 75% *

1,994

100

=

$76,073

2879

11517

5 * 1 *

2

* 75% *

4,653
174,838

233
=
    8,742

$69,157
$749,837

2618
       26,091

10470
104,365

Refractory Brick 
Restoration

Cement Workers

6

6

*

Page 74

Table 9b

Employer Time and Cost to Notify Employees of Semi‐Annual Monitoring Results
COST = BURDEN HOURS * NON SUPEWAGE
HOURS =  (NOTETIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * #PLANTS)
Variables 
         * NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 mintues).

TOTAL HOURS

RESPONSES
5470

( 0.25 * $     25.49 * 1 * 1 *
( 0.25 * $     25.49 * 1 * 2 *

3 * 2 * 100% * 49.00% * 1,751 ) =
3 * 2 * 100% * 11.00% * 448 ) =

$32,806
$3,771

1,287
148

5148
592

( 0.25 * $     25.49 * 1 * 1 *
( 0.25 * $     25.49 * 1 * 2 *

3 * 2 * 100% * 11.00% *
3 * 2 * 100% * 14.00% *

843
508

)=
)=

$3,548
$5,434

139
213

557
853

( 0.25 * $     25.49 * 1 * 1 *
( 0.25 * $     25.49 * 1 * 2 *

3 * 2 * 100% * 14.00% *
3 * 2 * 100% * 10.00% *

955
448

)=
)=

$5,115
$3,428

201
134

803
538

( 0.25 * $     25.49 * 1 * 1 *
( 0.25 * $     25.49 * 1 * 2 *

3 * 2 * 100% * 10.00% *
3 * 2 * 100% * 13.00% *

843
509

)=
)=

$3,225
$5,065

127
199

506
795

( 0.25 * $     25.49 * 1 * 1 *
( 0.25 * $     25.49 * 1 * 2 *

3 * 2 * 100% * 13.00% *
3 * 2 * 100% * 16.00% *

959
930

)=
)=

$4,767
$11,384

187
447

748
1786

( 0.25 * $     25.49 * 1 * 1 *

$10,712

420

1681

( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% * 16.00% * 1,751 ) =
General Industry
2 * 2 * 100% * 0.92% * 3,560 ) =

$2,466

98

393

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.92%
0.73%

* 3,989 ) =
* 2,611 ) =

$1,382
$1,435

55
57

220
229

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.73%
0.00%

* 2,925 ) =
* 791 ) =

$804
$0

32
0

128
0

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 0 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

886
316

)=
)=

$0
$0

0
0

0
0

( 0.25 * $     25.10 * 0 * 1 *
( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

354
79

)=
)=

$0
$0

0
0

0
0

( 0.25 * $     25.10 * 1 * 1 *

3 * 2 * 100% *

0.00%

*

89

)=

$0

0

0

Page 75

#PLANTS

%ABOVEAL

1,368

%NOTSEMI

ITEM 12 COST

SEMI‐ANNUALLY

$34,863

#SAMPS

)=

SHIFTS

3 * 2 * 100% * 49.00% *

JOBAL

( 0.25 * $     25.49 * 1 * 2 *

NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop 
Chrome Plater
Small
Large
Captive Shop 
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop 
Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small

 NONSUPEWAGE

* NONSUPEWAGE = Non‐supervisory wage rate. $/hr.
                * JOBAL = Number of job categories exposed at or above the AL
                * SHIFTS =  Number of work shifts.
               * #SAMPS =  Number of samples per exposure measurement
                            * 2 = # times per year (semi‐annually)
       * %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
      * %ABOVEAL = Percent of plants that have an employee in at least one job category above the AL.

930

TOTAL HOURS

RESPONSES

)=

$0

0

0

Small ( 0.25 * $     25.10 * 1 * 1 *
Large ( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% *
2 * 2 * 100% *

0.00%
0.00%

*
*

89
475

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 1 *

0.00%

*

532

)=

$0

0

0

Large ( 0.25 * $     25.10 * 1 * 3 *

3 * 2 * 100% *
MARITIME
1 * 2 * 100% *

0.00%

*

18

)=

$0

0

0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

10
24

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

14
6

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

3
117

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

66
4

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
2

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

1
4

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
2

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

1
0

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *
* $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
0

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *
* $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
16

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *

*

9

)=

$0

0

0

Large ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% * 0.00%
CONSTRUCTION
1 * 2 * 100% * 0.00%

*

202

)=

$0

0

0

Small ( 0.25 * $     25.10 * 1 * 1 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

* 1,620 ) =
*
3
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% *

0.00%

*

$0

0

0

#PLANTS

%ABOVEAL

79

%NOTSEMI

ITEM 12 COST

Resistance 
Welding

SEMI‐ANNUALLY

*

#SAMPS

0.00%

SHIFTS

2 * 2 * 100% *

JOBAL

Large ( 0.25 * $     25.10 * 1 * 3 *

NOTETIME
Plasma 
Welding

 NONSUPEWAGE

Table 9b

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small ( 0.25
Thermal Spray  Large ( 0.25
Tungsten 
Small ( 0.25
Cutting
Large ( 0.25
SAW
Small ( 0.25

SMAW

Plasma Cutting

Page 76

21

)=

TOTAL HOURS

RESPONSES

41

)=

$0

0

0

Small ( 0.25 * $     25.10 * 1 * 1 *
State ( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

324
20

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

162
4

)=
)=

$0
$0

0
0

0
0

Local

( 0.25 * $     25.10 * 1 * 1 *

*

32

)=

$0

0

0

State

( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% * 0.00%
GOVERNMENT
1 * 2 * 100% * 0.00%

*

19

)=

$0

0

0

Local
State

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

594
0

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

8
4

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

119
2

)=
)=

$0
$0

0
0

0
0

Local
State

( 0.25 * $     25.10 * 1 * 1 *
( 0.25 * $     25.10 * 1 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

59
1

)=
)=

$0
$0

0
0

0
0

*

0.00%

*

12

)=

$0

0

0

*

0.00%

* 4,773 ) =

$0

0

0

*
*

0.00%
0.00%

* 4,859 ) =
* 3,500 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

* 3,563 ) =
* 1,060 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

* 1,080 ) =
* 424 ) =

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

432
106

)=
)=

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

108
106

)=
)=

$0
$0

0
0

0
0

*
*

0.00%
0.00%

*
*

108
636

)=
)=

$0
$0

0
0

0
0

*

0.00%

*

648

)=

$0

0

0

#PLANTS

%NOTSEMI

%ABOVEAL
*

#SAMPS

0.00%

SHIFTS

1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     25.10 * 1 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

GMAW

Brazing

Metallizing

SMAW

Plasma Cutting

GMAW

Brazing

Metallizing
Local ( 0.25 * $     25.10 * 1 * 1 * 1 * 2 * 100%
Sector 2. Mild Steel Welding                                        GENERAL INDUSTRY
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
SMAW
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
GMAW
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
TIG
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
SAW
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
Plasma Cutting
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
Plasma 
Welding
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $     25.10 * 0 * 3 * 2 * 2 * 100%
Resistance 
Welding
Small ( 0.25 * $     25.10 * 0 * 1 * 3 * 2 * 100%

Page 77

TOTAL HOURS

RESPONSES

)=

$0

0

0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

21
54

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

30
13

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

7
251

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

142
8

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

5
3

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
8

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

5
3

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 2 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

2
1

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *
* $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
1

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *
* $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

0
33

)=
)=

$0
$0

0
0

0
0

* $     25.10 * 0 * 2 *

1 * 2 * 100% *

0.00%

*

18

)=

$0

0

0

304

#PLANTS

%ABOVEAL

37

%NOTSEMI

*

#SAMPS

0.00%

SHIFTS

MARITIME
1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     25.10 * 0 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

SMAW

GMAW

TIG

FCAW

Plasma Cutting
Plasma 
Welding
Oxy‐fuel 
Cutting
Air Carbon Arc 
Cutting
Electric Torch 
Cutting

Small ( 0.25
Thermal Spray  Large ( 0.25
Tungsten 
Cutting
Small ( 0.25
Large ( 0.25
SAW
Small ( 0.25

CONSTRUCTION
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *

0.00%

*

)=

$0

0

0

Small ( 0.25 * $     25.10 * 0 * 1 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

* 2,293 ) =
*
4
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 1 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

30
60

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 1 *
Large ( 0.25 * $     25.10 * 0 * 3 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

458
30

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     25.10 * 0 * 1 *

1 * 2 * 100% *

0.00%

*

230

)=

$0

0

0

SMAW

Plasma Cutting

GMAW

Brazing

Page 78

TOTAL HOURS

RESPONSES

)=

$0

0

0

* 1*

1 * 2 * 100% *

0.00%

*

46

)=

$0

0

0

* 3*

3 * 2 * 100% * 28.00% *

50

)=

$1,983

63

250

* 1*
* 1*

3 * 2 * 100% *
1 * 2 * 100% *

9.00%
5.00%

*
*

63
331

)=
)=

$268
$262

8
8

34
33

* 1*
* 2*

1 * 2 * 100% *
3 * 2 * 100% *

5.00%
8.00%

* 1,458 ) =
* 101 ) =

$1,155
$769

36
24

146
97

* 1*
* 3*

3 * 2 * 100% * 8.00% *
1 * 2 * 100% * 36.00% *

18
294

)=
)=

$70
$10,055

2
317

9
1270

* 1*
* 3*

1 * 2 * 100% * 36.00% *
1 * 2 * 100% * 22.00% *

508
765

)=
)=

$0
$7,998

0
252

0
1010

* 1*
* 3*

1 * 2 * 100% * 22.00% * 4,067 ) =
1 * 2 * 100% * 12.00% * 16 ) =

$14,174
$93

447
3

1790
12

* 1*

1 * 2 * 100% * 12.00% *

899

)=

$1,709

54

216

* 3*

3 * 2 * 100% * 45.00% *

2

)=

$469

13

51

* 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 2*

3 * 2 * 100% * 71.00% *

2

)=

$761

21

84

* 1*

3 * 2 * 100% * 50.00% *

1

)=

$27

1

3

* 3*

3 * 2 * 100% * 33.00% *

3

)=

$116

4

15

* 3*

0 * 2 * 100% *

*

0

)=

$0

0

0

* 3*

3 * 2 * 100% * 100.00% *

5

)=

$5,207

141

562

* 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 2*

3 * 2 * 100% * 13.00% *

87

)=

$941

34

136

* 2*

3 * 2 * 100% * 13.00% *

137

)=

$1,479

54

214

* 1*

9 * 2 * 100% * 69.00% *

3

)=

$776

28

112

* 1*

5 * 2 * 100% * 69.00% *

10

)=

$958

35

139

* 3 * 3 * 2 * 100% * 51.00% *

86

)=

$12,101

395

1580

Small ( 0.25 * $     30.64 * 2 * 1 * 3 * 2 * 100% * 51.00% *
ALL
SECTOR 11.  Plating Mixture Producers

42

)=

$1,973

64

258

#PLANTS

%ABOVEAL

6

%NOTSEMI

*

#SAMPS

0.00%

SHIFTS

1 * 2 * 100% *

JOBAL

Large ( 0.25 * $     25.10 * 0 * 3 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

Metallizing
Small ( 0.25 * $     25.10 * 0
SECTOR 3.  PAINTING
Large ( 0.25 * $     31.68 * 1
AEROSPACE
Small ( 0.25 * $     31.68 * 1
General 
Large ( 0.25 * $     31.68 * 1
Industry 
(Autobody) Small ( 0.25 * $     31.68 * 1
General 
Large ( 0.25 * $     31.68 * 1
Industry (Coil 
Small ( 0.25 * $     31.68 * 1
Coating)
Large ( 0.25 * $     31.68 * 2
Maritime
Small ( 0.25 * $     31.68 * 0
Large ( 0.25 * $     31.68 * 1
Construction
Small ( 0.25 * $     31.68 * 1
State ( 0.25 * $     31.68 * 1
Government
Local ( 0.25 * $     31.68 * 1
SECTOR 4.  Producers of Chromates
Large ( 0.25 * $     37.06 * 3
ALL
Small ( 0.25 * $     37.06 * 0
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $     36.12 * 5
ALL
Small ( 0.25 * $     36.12 * 1
SECTOR 6. CCA Producers
Large ( 0.25 * $     30.60 * 1
ALL
Small ( 0.25 * $     30.60 * 0
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 * $     37.06 * 6
ALL
Small ( 0.25 * $     37.06 * 0
SECTOR 8.  Paint and Coating Producers
Large ( 0.25 * $     27.60 * 1
ALL
Small ( 0.25 * $     27.60 * 1
SECTOR 9.  Printing Ink Producers
Large ( 0.25 * $     27.65 * 3
ALL
Small ( 0.25 * $     27.65 * 2
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 * $     30.64 * 2

Page 79

0.00%

0.00%

0.00%

TOTAL HOURS

RESPONSES

7

27

* 1 * 1*

3 * 2 * 100% * 100.00% *

3

)=

$122

4

18

* 2 * 3*

3 * 2 * 100% * 100.00% *

1

)=

$335

9

36

* 0 * 1*

1* 2*

*

0

)=

$0

0

0

* 3 * 3*

3 * 2 * 100% * 38.00% *

37

)=

$7,107

191

765

* 1 * 1*
* 0 * 3*

3 * 2 * 100% * 38.00% *
3 * 2 * 100% * 0.00% *

12
112

)=
)=

$253
$0

7
0

27
0

* 0 * 1*

1 * 2 * 100% *

*

35

)=

$0

0

0

* 4 * 1*

3 * 2 * 100% * 63.00% *

37

)=

$5,138

138

553

* 2 * 1*

3 * 2 * 100% * 63.00% *

34

)=

$2,421

65

260

* 6 * 3*

5 * 2 * 100% * 100.00% *

178

)=

$217,522

8,020

32080

* 5 * 1*

5 * 2 * 100% * 100.00% *

130

)=

$43,944

1,620

6481

* 6 * 1 * 21 * 2 * 100% * 38.00% *

3

)=

$2,564

71

284

* 6 * 1*

7 * 2 * 100% * 38.00% *

1

)=

$285

8

32

* 0 * 1*

3 * 2 * 100% *

*

0

)=

$0

0

0

* 1 * 1*

3 * 2 * 100% * 27.00% *

5

)=

$84

2

8

* 0 * 1*

3 * 2 * 100% *

0.00%

*

207

)=

$0

0

0

* 0 * 1*

3 * 2 * 100% *

0.00%

* 1,561 ) =

$0

0

0

* 0 * 3*

3 * 2 * 100% *

0.00%

*

347

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

703

)=

$0

0

0

* 1 * 3 * 12 * 2 * 100% * 25.00% *

5

)=

$675

24

98

* 0 * 1*

17

)=

$0

0

0

#PLANTS

%ABOVEAL

$182

%NOTSEMI

)=

#SAMPS

4

SHIFTS

3 * 2 * 100% * 100.00% *

JOBAL

Large ( 0.25 * $     27.50 * 1 * 1 *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

ALL
Small ( 0.25 * $     27.50
SECTOR 13.  Chromium Metal Producers
Large ( 0.25 * $     37.17
ALL
Small ( 0.25 * $     37.17
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 * $     37.17
Alloy and 
Stainless Steel
Small ( 0.25 * $     37.17
Large ( 0.25 * $     37.17
Carbon Steel
Small ( 0.25 * $     37.17
SECTOR 14B.  Forging Industry
Large ( 0.25 * $     37.17
Reshaping
Small ( 0.25 * $     37.17
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 * $     27.12
ALL
Small ( 0.25 * $     27.12
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 * $     36.12
ALL
Small ( 0.25 * $     36.12
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 * $     39.76
ALL
Small ( 0.25 * $     39.76
SECTOR 19.  Chemical Distributors
Large ( 0.25 * $     28.67
ALL
Small ( 0.25 * $     28.67
SECTOR 20.  Textile Dyeing
Large ( 0.25 * $     19.13
ALL
Small ( 0.25 * $     19.13
SECTOR 21.  Colored Glass Producers
Large ( 0.25 * $     27.66
General 
Industry
Small ( 0.25 * $     27.66

0% *

4 * 2 * 100% *

Page 80

0.00%

0.00%

0.00%

0.00%

*

RESPONSES

23

93

* 0 * 1*

1 * 2 * 100% *

0.00%

*

5

)=

$0

0

0

* 0 * 3*

2 * 2 * 100% *

0.00%

*

92

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

367

)=

$0

0

0

* 2 * 3*

3 * 2 * 100% *

9.00%

*

164

)=

$4,148

133

533

* 0 * 1*
* 0 * 3*

3 * 2 * 100% *
3 * 2 * 100% *

0.00%
0.00%

*
*

0
21

)=
)=

$0
$0

0
0

0
0

* 0 * 1*

3 * 2 * 100% *

0.00%

*

4

)=

$0

0

0

* 0 * 1 * 15 * 2 * 100% *

0.00%

*

6

)=

$0

0

0

* 0 * 1*

0 * 2 * 100% *

0.00%

*

0

)=

$0

0

0

* 0 * 1*

2 * 2 * 100% *

0.00%

*

175

)=

$0

0

0

* 0 * 1*
* 0 * 1*

2 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

93
38

)=
)=

$0
$0

0
0

0
0

* 0 * 1*
* 1 * 1*

1 * 2 * 100% * 0.00% * 34 ) =
1 * 2 * 100% * 22.00% * 1,290 ) =

$0
$4,364

0
142

0
567

* 1 * 1*
* 1 * 1*

1 * 2 * 100% * 22.00% * 5,162 ) =
1 * 2 * 100% * 22.00% * 16 ) =

$17,469
$55

568
2

2271
7

* 1 * 1*

1 * 2 * 100% * 22.00% *

#PLANTS

%ABOVEAL

$645

%NOTSEMI

TOTAL HOURS

Small ( 0.25 * $     27.66
SECTOR 22.  Printing
Large ( 0.25 * $     19.97
ALL
Small ( 0.25 * $     19.97
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 * $     31.14
Catalyst Users
Small ( 0.25 * $     31.14
Chromium  Large ( 0.25 * $     31.14
Catalyst Service 
Small ( 0.25 * $     31.14
Companies
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 * $     24.56
ALL
Small ( 0.25 * $     24.56
SECTOR 26.  Woodworking
Large ( 0.25 * $     30.76
General 
Industry
Small ( 0.25 * $     30.76
Large ( 0.25 * $     30.76
Maritime
Small ( 0.25 * $     30.76
Large ( 0.25 * $     30.76
Construction
Small ( 0.25 * $     30.76
State ( 0.25 * $     30.76
Government
Local ( 0.25 * $     30.76
SECTOR 27.  Solid Waste Incerneration
Large ( 0.25 * $     26.09
General 
Industry
Small ( 0.25 * $     26.09
State ( 0.25 * $     26.09
Government
Local ( 0.25 * $     26.09

SEMI‐ANNUALLY

)=

Large ( 0.25 * $     27.66 * 3 * 1 *

#SAMPS

78

SHIFTS

1 * 2 * 100% * 20.00% *

JOBAL

ITEM 12 COST

Fiber, Flat, 
Container Glass

 NONSUPEWAGE

NOTETIME

Table 9b

59

)=

$199

6

26

* 0 * 3 * 15 * 2 * 100% *

0.00%

*

48

)=

$0

0

0

* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 15 * 2 * 100% *

0.00%
0.00%

*
*

58
0

)=
)=

$0
$0

0
0

0
0

* 0 * 1*

0.00%

*

29

)=

$0

0

0

3 * 2 * 100% *

Page 81

TOTAL HOURS

RESPONSES

$0

0

0

3 * 2 * 100% *

0.00%

*

0

)=

$0

0

0

1 * 2 * 100% *

0.00%

*

55

)=

$0

0

0

Industrial  Small ( 0.25 * $     30.79 * 0 * 1 *
Rehabilitation  State ( 0.25 * $     30.79 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

196
16

)=
)=

$0
$0

0
0

0
0

Local ( 0.25 * $     30.79 * 0 * 1 *
Large ( 0.25 * $     30.79 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

74
44

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     30.79 * 0 * 1 *
State ( 0.25 * $     30.79 * 0 * 1 *

1 * 2 * 100% *
1 * 2 * 100% *

0.00%
0.00%

*
*

143
1

)=
)=

$0
$0

0
0

0
0

Local ( 0.25 * $     30.79 * 0 * 1 *
Large ( 0.25 * $     30.79 * 0 * 1 *

1 * 2 * 100% * 0.00% *
1 * 2 * 100% * 60.00% *

201
48

)=
)=

$0
$0

0
0

0
0

Small ( 0.25 * $     30.79 * 0 * 1 *

1 * 2 * 100% * 60.00% *

$0
0
$466,191     16,790

0
67,160

Hazardous 
Waste‐site 
Work
Refractory 
Brick 
Restoration

Page 82

#PLANTS

%ABOVEAL

)=

%NOTSEMI

18

SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 * $     26.75 * 0 * 3 *
ALL
Small ( 0.25 * $     26.75 * 0 * 3 *
SECTOR 31.  Construction Cement Workers
Large ( 0.25 * $     30.79 * 0 * 1 *

#SAMPS

*

SHIFTS

0.00%

JOBAL

3 * 2 * 100% *

NOTETIME

ITEM 12 COST

SEMI‐ANNUALLY

 NONSUPEWAGE

Table 9b

148 ) =
77,770

Table 10

Respiratory‐Protection Program:  Qualitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2)); 
Employee and Industrial Hygiene Technician Time and Cost to Conduct Qualitative Fit Testing 
This table calculates the burden hours and cost of employee and industrial hygienist time to conduct fit‐testing. The time, in hours, for an employee
to be qualitative fit‐tested is multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
COST = BURDEN HOURS * NONSUPEWAGE 
*ASSUMPTIONS:

Item 12 COST

RESPONSES

 NONSUPEWAGE

0.25 ) *

5,447 *

71%

*

1

) =

1,934 * $       25.49 =

$49,294

3,867

Small ( 0.25 +

0.25 ) *

1,188 *

97%

*

1

) =

576 * $       25.49 =

$14,683

1,152

Large ( 0.25 +

0.25 ) *

2,874 *

81%

*

1

) =

1,164 * $       25.10 =

$29,213

2,328

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

2,101 *
2,345 *

98%
55%

*
*

1
1

) =
) =

1,030 * $       25.10 =
645 * $       25.10 =

$25,844
$16,190

2,059
1,290

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

55 *
3,247 *

95%
88%

*
*

1
1

) =
) =

26 * $       25.10 =
1,429 * $       25.10

$661
$35,863

53
2,858

Small ( 0.25 +
State ( 0.25 +

0.25 ) *
0.25 ) *

2,511 *
15 *

99%
88%

*
*

1
1

) =
) =

1,243 * $       25.10 *
6 * $       25.10 *

$31,196
$161

2,486
13

( 0.25 +

0.25 ) *

74 *

99%

*

1

) =

37 * $       25.10 *

$919

73

( 0.25 +

0.25 ) *

696 *

81%

*

1

) =

282 * $       25.10 =

$7,071

563

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

2,101 *
17 *

98%
55%

*
*

1
1

) =
) =

1,030 * $       25.10 =
5 * $       25.10 =

$25,844
$114

2,059
9

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

0*
662 *

95%
88%

*

1
1

) =
)

0 * $       25.10 =
291 $       25.10

$0
$7,317

0
583

( 0.25 +
( 0.25 +

0.25 ) *
0.25 ) *

533 *
15 *

99%
88%

*
*

1
1

) =
) =

264
6

$       25.10 =
$       25.10 =

$6,624
$161

528
13

( 0.25 +

0.25 ) *

74 *

99%

*

1

) =

37

$       25.10 =

$919

73

( 0.25 +

0.25 ) *            46 *

81%

*

50

) =

925 * $       31.68 =

$29,311

1,851

( 0.25 +

0.25 ) *              0 *

98%

*

63

) =

4 * $       31.68 =

$125

8

#PLANTS

1‐%FITBASE

QLFITEMP

Large ( 0.25 +

QLFITTIME

QLFITTECH

BURDEN HOURS  

* QLFITTIME = Time, in hours, for an employee to be qualitative fit‐tested
* QLFITTECH = Time, in hours, for a technician to conduct one qualitative fit test
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* NONSUPEWAGE = Non‐Supervisory wage rate
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Local
Sector 2A. Mild Steel Welding
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
SECTOR 3.  Painting
Large
GENERAL INDUSTRY 
(AEROSPACE)
Small

Page 83

Item 12 COST

RESPONSES

 NONSUPEWAGE

81%

*

) =

123 * $       31.68 =

$3,908

247

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *              0 *
0.25 ) *              2 *

98%
81%

* 1,458 ) =
* 101 ) =

151 * $       31.68 =
75 * $       31.68 =

$4,788
$2,388

302
151

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *              1 * 98% *
0.25 ) *              3 * 55.00% *

18
294

) =
) =

8 * $       31.68 =
235 * $       31.68 =

$263
$7,430

17
469

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *              1 *
0.25 ) *          471 *

95%
0%

*
*

508
1

) =
) =

243 * $       31.68 =
0 * $       31.68 =

$7,700
$0

486
0

Small ( 0.25 +
State ( 0.25 +

0.25 ) *          593 *
0.25 ) *            43 *

0%
0%

*
*

1
1

) =
) =

0 * $       31.68 =
0 * $       31.68 =

$0
$0

0
0

*          186 *

0%

*

1

) =

0 * $       31.68 =

$0

0

*              7 *

37%

*

2

) =

3 * $       37.06 =

$104

6

*

0*

93%

*

0

) =

0 * $       37.06 =

$0

0

*              9 *

37%

*

2

) =

3 * $       36.12 =

$118

7

*              1 *

93%

*

1

) =

0 * $       36.12 =

$16

1

*              2 *

37%

*

3

) =

1 * $       30.60 =

$25

2

*

0*

93%

*

0

) =

0 * $       30.60 =

$0

0

*            12 *

37%

*

5

) =

12 * $       37.06 =

$446

24

*

0*

93%

*

0

) =

0 * $       37.06 =

$0

0

*              1 *

37%

*

87

) =

17 * $       27.60 =

$465

34

*

0*

93%

*

137

) =

0 * $       27.60 =

$0

0

*            12 *

37%

*

3

) =

7 * $       27.65 =

$186

13

*              3 *

93%

*

10

) =

14 * $       27.65 =

$389

28

*          361 *

54%

*

1

) =

97 * $       30.64 =

$2,986

195

*            36 *

95%

*

1

) =

17 * $       30.64 =

$531

35

*              3 *

37%

*

4

) =

2 * $       27.50 =

$67

5

*              1 *

93%

*

3

) =

1 * $       27.50 =

$38

3

#PLANTS

QLFITEMP

1‐%FITBASE

0.25 ) *              1 *

QLFITTECH

Large ( 0.25 +

QLFITTIME
GENERAL INDUSTRY 
(AUTO BODY REPAIR)

BURDEN HOURS  

Table 10

331

COIL COATING

MARITIME

CONSTRUCTION

Local ( 0.25 + 0.25 )
SECTOR 4.  Producers of Chromates
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 6. CCA Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 7.  Chromium Catalyst Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 8.  Paint and Coating Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 9.  Printing Ink Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 11.  Plating Mixture Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )

Page 84

RESPONSES

*

1

) =

2 * $       37.17 =

$83

4

0.25 ) *

0*

95%

*

0

) =

0 * $       37.17 =

$0

0

0.25 ) *            30 *

56%

*

37

) =

308 * $       37.17 =

$11,454

616

0.25 ) *              1 *
0.25 ) *              1 *

95%
56%

*
*

12
112

) =
) =

8 * $       37.17 =
22 * $       37.17 =

$297
$818

16
44

0.25 ) *              1 *

95%

*

35

) =

23 * $       37.17 =

$873

47

Large ( 0.25 +

0.25 ) *              3 *

56%

*

37

) =

29 * $       37.17 =

$1,070

58

Small ( 0.25 +
SECTOR 15.  Iron and Steel Foundries
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 17.  Chromium Dye Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 18.  Chromium Sulfate Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 19.  Chemical Distributors
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 20.  Textile Dyeing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 21.  Colored Glass Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
FIBER, FLAT, AND 
CONTAINER GLASS
Small ( 0.25 +
SECTOR 22.  Printing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 24.  Chromium Catalyst Users
Large ( 0.25 +
Chromium Catalyst 
Users
Small ( 0.25 +

0.25 ) *              1 *

95%

*

34

) =

12 * $       37.17 =

$428

23

0.25 ) *            19 *

56%

*

178

) =

943 * $       27.12 =

$25,584

1,887

0.25 ) *              5 *

95%

*

130

) =

277 * $       27.12 =

$7,515

554

0.25 ) *            32 *

37%

*

3

) =

17 * $       36.12 =

$627

35

0.25 ) *              7 *

93%

*

1

) =

3 * $       36.12 =

$115

6

0.25 ) *

0*

37%

*

0

) =

0 * $       39.76 =

$0

0

0.25 ) *

0*

93%

*

5

) =

0 * $       39.76 =

$0

0

0.25 ) *

0*

92%

*

207

) =

0 * $       28.67 =

$0

0

0.25 ) *

0*

99%

* 1,561 ) =

0 * $       28.67 =

$0

0

0.25 ) *

0*

89%

*

347

) =

0 * $       19.13 =

$0

0

0.25 ) *

0*

99%

*

703

) =

0 * $       19.13 =

$0

0

0.25 ) *              1 *

76%

*

5

) =

2 * $       27.66 =

$52

4

0.25 ) *
0*
0.25 ) *              8 *

97%
76%

*
*

17
78

) =
) =

0 * $       27.66 =
240 * $       27.66 =

$0
$6,647

0
481

0.25 ) *              2 *

97%

*

5

) =

4 * $       27.66 =

$110

8

0.25 ) *

0*

98%

*

92

) =

0 * $       19.97 =

$0

0

0.25 ) *

0 * 99.70% *

367

) =

0 * $       19.97 =

$0

0

#PLANTS

QLFITEMP

1‐%FITBASE
56%

SECTOR 13.  Chromium Metal Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 14.  Iron and Steel Mills
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
CARBON STEEL
Small ( 0.25 +

QLFITTECH

0.25 ) *              8 *

QLFITTIME

Item 12 COST

 NONSUPEWAGE

BURDEN HOURS  

Table 10

14b. FORGING INDUSTRY

RESHAPING INDUSTRY

0.25 ) *              1 *

67%

*

1

) =

0 * $       31.14 =

$11

1

0.25 ) *

97%

*

0

) =

0 * $       31.14 =

$0

0

0*

Page 85

RESPONSES

0*

0%

*

1

) =

0 * $       31.14 =

$0

0

Small ( 0.25 +
SECTOR 25.  Refractory Brick Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 26.  Woodworking
GENERAL INDUSTRY Large ( 0.25 +

0.25 ) *

0*

0%

*

1

) =

0 * $       31.14 =

$0

0

0.25 ) *

0*

76%

*

6

) =

0 * $       24.56 =

$0

0

0.25 ) *

0*

97%

*

0

) =

0 * $       24.56 =

$0

0

0.25 ) *

0*

94%

*

1

) =

0 * $       30.76 =

$0

0

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
55%

*

1
38

) =
) =

0 * $       30.76 =
0 * $       30.76 =

$0
$0

0

MARITIME

CONSTRUCTION

Small ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

95%
88%

34
1

) =
) =

0 * $       30.76 =
0 * $       30.76 =

$0
$0

0

Small ( 0.25 +
State ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

1
1

) =
) =

0 * $       30.76 =
0 * $       30.76 =

$0
$0

0
0

0*

88%

*

1

) =

0 * $       30.76 =

$0

0

) *              6 *

59%

*

48

) =

87 * $       26.09 =

$2,273

174

) *              1 *
) *
0*

96%
59%

*
*

58
0

) =
) =

24 * $       26.09 =
0 * $       26.09 =

$634
$0

49

) *

0*

96%

*

29

) =

0 * $       26.09 =

$0

0

) *

0*

56%

*

18

) =

0 * $       26.75 =

$0

0

) *

0*

95%

*

0

) =

0 * $       26.75 =

$0

0

) *

0*

88%

*

55

) =

0 * $       30.79 =

$0

0

INDUSTRIAL 
Small ( 0.25 +
REHABILITATION AND 
State ( 0.25 +
MAINTENANCE

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

196
16

) =
) =

0 * $       30.79 =
0 * $       30.79 =

$0
$0

0
0

Local ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

88%
88%

*
*

74
1

) =
) =

0 * $       30.79 =
0 * $       30.79 =

$0
$0

0
0

HAZARDOUS WASTE‐ Small ( 0.25 +
SITE WORK
State ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

99%
88%

*
*

1
1

) =
) =

0 * $       30.79 =
0 * $       30.79 =

$0
$0

0
0

Local ( 0.25 +
Large ( 0.25 +

0.25 ) *
0.25 ) *

0*
0*

88%
88%

*
*

1
48

) =
) =

0 * $       30.79 =
0 * $       30.79 =

$0
$0

0
0

Small ( 0.25 +

0.25 ) *

0*

99%
Total

*

148 ) =
7,853

0 * $       30.79 =
13,947

$0
$371,946

0
27,894

#PLANTS

QLFITEMP

1‐%FITBASE

0.25 ) *

Catalyst Service 
Companies

QLFITTECH

Large ( 0.25 +

QLFITTIME

Item 12 COST

 NONSUPEWAGE

BURDEN HOURS  

Table 10

 GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 27.  Solid Waste Incineration
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
State ( 0.25 + 0.25
 GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 30.  Superalloy Producers and Users
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
SECTOR 31.  Construction
Large ( 0.25 + 0.25

REFRACTORY BRICK 
RESTORATION 

) *

Page 86

Table 11
Respiratory‐Protection Program: Cost of Materials for Qualitative Fit Testing 
This table calculates the contract cost  of the materials used for qualitative fit‐testing by multiplying the number of 
employees  who require qualitative fit‐testing by the cost of materials per fit‐test.
COST = ((QLFITMTRLS * QLFITEMP) * 1‐%FITBASE * #PLANTS)

#PLANTS

 Item 13 Cost 

71%

*

1

= $                 307

Small ( $    0.08 * 1,188 ) *

97%

*

1

= $                   91

Large ( $    0.08 * 2,874 ) *

81%

*

1

= $                 185

Small ( $    0.08 * 2,101 ) *
Large ( $    0.08 * 2,345 ) *

98%
55%

*
*

1
1

= $                 164
= $                 102

55 ) *
Small ( $    0.08 *
Large ( $    0.08 * 3,247 ) *

95%
88%

*
*

1
1

= $                     4
= $                 227

Small ( $    0.08 * 2,511 ) *
15 ) *
State ( $    0.08

99%
88%

*
*

1
1

= $                 197
= $                     1

Local ( $    0.08

74

) *

99%

*

1

= $                     6

Large ( $    0.08 *

696

) *

81%

*

1

= $                   45

Small ( $    0.08 * 2,101 ) *
17 ) *
Large ( $    0.08 *

98%
55%

*
*

1
1

= $                 164
= $                     1

Small ( $    0.08 *
Large ( $    0.08 *

0
662

) *
) *

95%
88%

*
*

1
1

=
0
= $                   46

Small ( $    0.08 *
State ( $    0.08 *

533
15

) *
*

99%
88%

*
*

1
1

= $                   42
= $                     1

Local ( $    0.08 *

74

*

99%

*

1

= $                     6

Large ( $    0.08 *

46

) *

81%

*

50

= $                 147

Small ( $    0.08 *
Large ( $    0.08 *

0
1

) *
) *

98%
81%

*
*

63
331

= $                     1
= $                   20

Small ( $    0.08 *

0

) *

98%

*

1,458

= $                   24

QLFITEMP

1‐%FITBASE

Large ( $    0.08 * 5,447 ) *

 QLFITMTRLS 

Variables

* QLFITMTRLS = Cost of materials per qualitative fit‐testing
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)

GENERAL INDUSTRY (AUTO BODY REPAIR)

Page 87

 Item 13 Cost 

101

= $                   12

1
) *
98%
*
Small ( $    0.08 *
Large ( $    0.08 *          1 ) * 55.00% *

18
294

= $                     1
= $                   13

Small ( $    0.08 *          0 ) *
Large ( $    0.08 * 471 ) *

95%
0.00%

*
*

508
1

= $                   13
=
0

Small ( $    0.08 *
State ( $    0.08 *

593
43

) *
) *

0.00%
0.00%

*
*

1
1

=
=

0
0

Local ( $     0.08 *

186

) *

0.00%

*

1

=

0

Large ( $    0.08 *

7

) *

37%

*

2

= $                0.45

Small ( $    0.08 *

0

) *

93%

*

0

=

Large ( $    0.08 *

9

) *

37%

*

2

= $                     1

Small ( $    0.08 *

1

) *

93%

*

1

= $                     0

Large ( $    0.08 *          4 ) *

37%

*

3

= $                0.32

Small ( $    0.08 *

0) *

93%

*

0

=

Large ( $    0.08 *

QLFITEMP

1‐%FITBASE
*

 QLFITMTRLS 

#PLANTS

Variables

Table 11

2

) *

81%

COIL COATING

MARITIME

CONSTRUCTION

SECTOR 4.  Producers of Chromates
ALL
0

SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
0

SECTOR 7.  Chromium Catalyst Producers
Large ( $    0.08 *

12

) *

37%

*

5

= $                     2

Small ( $    0.08 *

0

) *

93%

*

0

=

Large ( $    0.08 *

1

) *

37%

*

87

= $                     3

Small ( $    0.08 *

0

) *

93%

*

137

=

Large ( $    0.08 *

12

) *

37%

*

3

= $                     1

( $    0.08 *

3

) *

93%

*

10

= $                     2

( $    0.08 *

361

) *

54%

*

1

= $                   15

( $    0.08 *

36

) *

95%

*

1

= $                     3

( $    0.08 *

3

) *

37%

*

4

= $                0.39

( $    0.08 *

1

) *

93%

*

3

= $                0.22

ALL
0

SECTOR 8.  Paint and Coating Producers
ALL
0

SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small

Page 88

#PLANTS

 Item 13 Cost 

8

) *

56%

*

1

= $                0.36

Small ( $    0.08 *

0

) *

95%

*

0

=

Large ( $    0.08 *

30

) *

56%

*

37

= $                   49

Small ( $    0.08 *
Large ( $    0.08 *

1
1

) *
) *

95%
56%

*
*

12
112

= $                     1
= $                     3

Small ( $    0.08 *

1

) *

95%

*

35

= $                     4

Large ( $    0.08 *

3

) *

56%

*

37

= $                     5

Small ( $    0.08 *

1

) *

95%

*

34

= $                     2

Large ( $    0.08 *

19

) *

56%

*

178

= $                 150

Small ( $    0.08 *

5

) *

95%

*

130

= $                   44

Large ( $    0.08 *

32

) *

37%

*

3

= $                     3

Small ( $    0.08 *

7

) *

93%

*

1

= $                0.51

0) *

37%

*

0

=

Small ( $    0.08 *          1 ) *

93%

*

5

= $                0.40

Large ( $    0.08 *

0

) *

92%

*

207

=

0

Small ( $    0.08 *

0

) *

99%

*

1,561

=

0

Large ( $    0.08 *

0

) *

89%

*

347

=

0

Small ( $    0.08 *

0

) *

99%

*

703

=

0

Large ( $    0.08 *

1

) *

76%

*

5

= $                0.30

Small ( $    0.08 *
Large ( $    0.08 *

0
8

) *
) *

97%
76%

*
*

17
78

=
0
= $             38.17

Small ( $    0.08 *

2

) *

97%

*

5

= $                     1

Large ( $    0.08 *

0

) *

98%

*

92

=

0

Small ( $    0.08 *

0

) * 99.70% *

367

=

0

QLFITEMP

1‐%FITBASE

Large ( $    0.08 *

 QLFITMTRLS 

Variables

Table 11

SECTOR 13.  Chromium Metal Producers
ALL
0

SECTOR 14.  Iron and Steel Mills
ALLOY AND STAINLESS STEEL

Carbon Steel
14b. FORGING INDUSTRY

RESHAPING INDUSTRY
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
Large ( $    0.08 *

0

ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL

Page 89

#PLANTS

 Item 13 Cost 

67%

*

1

= $                0.05

0
) *
Small ( $    0.08 *
Large ( $    0.08 *          1 ) *

97%
67%

*
*

0
1

=
0
= $                0.05

Small ( $    0.08 *

0) *

97%

*

1

=

0

QLFITEMP

1‐%FITBASE
) *

 QLFITMTRLS 

Variables

Table 11

SECTOR 24.  Chromium Catalyst Users
Large ( $    0.08 *

1

CHROMIUM CATALYST USERS

CHROMIUM CATALYST COMPANIES
SECTOR 25.  Refractory Brick Producers
Large ( $    0.08 *

0

) *

76%

*

6

=

0

Small ( $    0.08 *

0

) *

97%

*

0

=

0

Large ( $    0.08 *

0

) *

94%

*

1

=

0

Small ( $    0.08 *
Large ( $    0.08 *

0
0

) *
) *

99%
55%

*
*

1
38

=
=

0
0

Small ( $    0.08 *
Large ( $    0.08 *

0
0

) *
) *

95%
88%

*
*

34
1

=
=

0
0

Small ( $    0.08 *
State ( $    0.08 *

0
0

) *
) *

99%
88%

*
*

1
1

=
=

0
0

Local ( $    0.08 *

0

) *

88%

*

1

=

0

Large ( $    0.08 *

6

) *

59%

*

48

= $                   14

Small ( $    0.08 *
State ( $    0.08 *

1
0

) *
) *

96%
59%

*
*

58
0

= $                     4
=
0

Local ( $     0.08 *

0

) *

96%

*

29

=

0

Large ( $     0.08 +

0) *

56%

*

18 =

0

Small ( $     0.08 +

0) *

95%

*

0=

0

ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

Large ( $    0.08 *

0

) *

88%

*

55

=

0

Small ( $    0.08 *
State ( $    0.08 *

0
0

) *
) *

99%
88%

*
*

196
16

=
=

0
0

Local ( $    0.08 *
Large ( $    0.08 *

0
0

) *
) *

88%
88%

*
*

74
1

=
=

0
0

Small ( $    0.08 *
State ( $    0.08 *

0
0

) *
) *

99%
88%

*
*

1
1

=
=

0
0

Local ( $    0.08 *

0

) *

88%

*

1

=

0

Page 90

 Item 13 Cost 

#PLANTS

1‐%FITBASE

QLFITEMP

 QLFITMTRLS 

Variables

Table 11

Large ( $    0.08 *

0

) *

88%

*

48

=

0

Small ( $    0.08 *

0

) *

99%
Total

*

148
=
7,853

0
$             2,166

REFRACTORY BRICK RESTORATION

Page 91

Table 12

Respirator Protection Program: Quantitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2)); 
Employee Time and Cost to Conduct Quantitative Fit Testing 
This table calculates the burden hour and cost of employee time to be fit‐tested. The time, in hours, for an employee to be quantitative fit‐tested is 
multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
BURDEN HOURS = (QNFITTIME + QNFITTEMP) * 1‐%FITBASE * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE 

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

Large

(

0.5 *

0

) *

71%

*

1

) =

0 * $  25.49 =

$0

0

Small

(

0.5 *

0

) *

97%

*

1

) =

0 * $  25.49 =

$0

0

Large

(

0.5 *

0

) *

81%

*

1

) =

0 * $  25.10 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
55%

*
*

1
1

) =
) =

0 * $  25.10 =
0 * $  25.10 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
88%

*

1
1

) =
) =

0 * $  25.10 =
0 * $  25.10 =

$0
$0

0
0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

1
1

) =
) =

0 * $  25.10 =
0 * $  25.10 =

$0
$0

0
0

Local

(

0.5 *

0

) *

99%

1

) =

0 * $  25.10 =

$0

0

Large

(

0.5 *

0

) *

81%

*

1

) =

0 * $  25.10 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
55%

*

1
1

) =
) =

0 * $  25.10 =
0 * $  25.10 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
82%

1
1

) =
) =

0 * $  25.10 =
0 * $  25.10 =

$0
$0

0
0

Small

(

0.5 *

0

) *

99%

1

) =

0 * $  25.10 =

$0

0

Large

(

0.5 *

0

) *

81%

*

50

) =

0 * $  31.68 =

$0

0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
81%

*
*

63
331

) =
) =

0 * $  31.68 =
0 * $  31.68 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

98%
81%

*
*

1,458
101

) =
) =

0 * $  31.68 =
0 * $  31.68 =

$0
$0

0
0

Small
Large

(
(

0.5 *
0.5 *

0
0

) * 98% *
) * 55.00%

18
294

) =
) =

0 * $  31.68 =
0 * $  31.68 =

$0
$0

0
0

Small

(

0.5 *

0

) *

508

) =

0 * $  31.68 =

$0

0

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

* QNFITTIME = Time, in hours, for an employee to be quantitative fit‐tested
* QNFITTEMP = Number of employees requiring annual quantitative fit‐testing
* 1‐%FITBASE  (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
* NONSUPEWAGE = Non‐Supervisory wage rate

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY 
REPAIR
COIL COATING

MARITIME
95%

Page 92

QNFITEMP

1‐%FITBASE

#PLANTS

Item 12 COST

Responses

 NONSUPEWAGE

QNFITTIME

BURDEN HOURS  

Table 12

Large

(

0.5 *

0

) *

0%

1

) =

0 * $  31.68 =

$0

0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

0%
0%

1
1

) =
) =

0 * $  31.68 =
0 * $  31.68 =

$0
$0

0
0

Local

(

0.5 *

0

) *

0%

1

) =

0 * $  31.68 =

$0

0

Large

(

0.5 *

0

) *

37%

*

2

) =

0 * $  37.06 =

$0

0

(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8.  Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9.  Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11.  Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13.  Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14.  Iron and Steel Mills
Large
(
ALLOY AND STAINLESS STEEL
(
Small
Large
(
CARBON STEEL
(
Small
14b. FORGING INDUSTRY
Large
(
RESHAPING INDUSTRY
(
Small

0.5 *

0

) *

93%

*

0

) =

0 * $  37.06 =

$0

0

0.5 *

0

) *

37%

*

2

) =

0 * $  36.12 =

$0

0

0.5 *

0

) *

93%

*

1

) =

0 * $  36.12 =

$0

0

0.5 *

0

) *

37%

*

3

) =

0 * $  30.60 =

$0

0

0.5 *

0

) *

93%

*

0

) =

0 * $  30.60 =

$0

0

0.5 *

0

) *

37%

*

5

) =

0 * $  37.06 =

$0

0

0.5 *

0

) *

93%

*

0

) =

0 * $  37.06 =

$0

0

0.5 *

0

) *

37%

*

87

) =

0 * $  27.60 =

$0

0

0.5 *

0

) *

93%

*

137

) =

0 * $  27.60 =

$0

0

0.5 *

0

) *

37%

*

3

) =

0 * $  27.65 =

$0

0

0.5 *
*
0.5 *

0

) *

93%

*

10

) =

0 * $  27.65 =

$0

0

0

) *

54%

*

1

) =

0 * $  30.64 =

$0

0

0.5 *

0

) *

95%

*

1

) =

0 * $  30.64 =

$0

0

0.5 *

0

) *

37%

*

4

) =

0 * $  27.50 =

$0

0

0.5 *

0

) *

93%

*

3

) =

0 * $  27.50 =

$0

0

0.5 *

0

) *

56%

*

1

) =

0 * $  37.17 =

$0

0

0.5 *

0

) *

95%

*

0

) =

0 * $  37.17 =

$0

0

0.5 *

0

) *

56%

*

37

) =

0 * $  37.17 =

$0

0

0.5 *
0.5 *

0
0

) *
) *

95%
56%

*
*

12
112

) =
) =

0 * $  37.17 =
0 * $  37.17 =

$0
$0

0
0

0.5 *

0

) *

95%

*

35

) =

0 * $  37.17 =

$0

0

0.5 *

0

) *

56%

*

37

) =

0 * $  37.17 =

$0

0

0.5 *

0

) *

95%

*

34

) =

0 * $  37.17 =

$0

0

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

Page 93

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

Large

(

0.5 *

0

) *

56%

*

178

) =

0 * $  27.12 =

$0

0

Small

(

0.5 *

0

) *

95%

*

130

) =

0 * $  27.12 =

$0

0

Large

(

0.5 *

0

) *

37%

*

3

) =

0 * $  36.12 =

$0

0

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small

(

0.5 *

0

) *

93%

*

1

) =

0 * $  36.12 =

$0

0

(

0.5 *

0

) *

37%

*

0

) =

0 * $  39.76 =

$0

0

(

0.5 *

0

) *

93%

*

5

) =

0 * $  39.76 =

$0

0

(

0.5 *

0

) *

92%

*

207

) =

0 * $  28.67 =

$0

0

(

0.5 *

0

) *

99%

*

1,561

) =

0 * $  28.67 =

$0

0

(

0.5 *

0

) *

89%

*

347

) =

0 * $  19.13 =

$0

0

(

0.5 *

0

) *

99%

*

703

) =

0 * $  19.13 =

$0

0

(

0.5 *

0

) *

76%

*

5

) =

0 * $  27.66 =

$0

0

(
(

0.5 *
0.5 *

0
0

) *
) *

97%
76%

*
*

17
78

) =
) =

0 * $  27.66 =
0 * $  27.66 =

$0
$0

0
0

(

0.5 *

0

) *

97%

*

5

) =

0 * $  27.66 =

$0

0

(

0.5 *

0

) *

98%

*

92

) =

0 * $  19.97 =

$0

0

(

0.5 *

0

) * 99.70% *

367

) =

0 * $  19.97 =

$0

0

(

0.5 *

0

) *

67%

*

1

) =

0 * $  31.14 =

$0

0

(
(

0.5 *
0
) *
0.5 *     109 ) *

97%
67%

*
*

0
1

) =
) =

0 * $  31.14 =
36 * $  31.14 =

$0
$1,137

0
73

(

0.5 *

10 ) *

97%

*

1

) =

5 * $  31.14 =

$152

10

(

0.5 *

0

) *

76%

*

6

) =

0 * $  24.56 =

$0

0

(

0.5 *

0

) *

97%

*

0

) =

0 * $  24.56 =

$0

0

(

0.5 *

0

) *

94%

*

1

) =

0 * $  30.76 =

$0

0

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
55%

*
*

1
38

) =
) =

0 * $  30.76 =
0 * $  30.76 =

$0
$0

0
0

(
(

0.5 *
0.5 *

0
0

) *
) *

95%
88%

*
*

34
1

) =
) =

0 * $  30.76 =
0 * $  30.76 =

$0
$0

0
0

(

0.5 *

0

) *

99%

*

1

) =

0 * $  30.76 =

$0

0

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

Table 12

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL

Page 94

Item 12 COST

Responses

 NONSUPEWAGE

QNFITEMP

State 

(

0.5 *

0

) *

88%

*

1

) =

0 * $  30.76 =

$0

0

Local

(

0.5 *

0

) *

88%

*

1

) =

0 * $  30.76 =

$0

0

Large

(

0.5 *

0

) *

59%

*

48

) =

0 * $  26.09 =

$0

0

Small
State 

(
(

0.5 *
0.5 *

0
0

) *
) *

96%
59%

*
*

58
0

) =
) =

0 * $  26.09 =
0 * $  26.09 =

$0
$0

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0.5 *

0

) *

96%

*

29

) =

0 * $  26.09 =

$0

0

(

0.5 *

0

) *

56%

*

18

) =

0 * $  26.75 =

$0

0

(

0.5 *

0

) *

95%

*

0

) =

0 * $  26.75 =

$0

0

(

0.5 *

0

) *

88%

*

55

) =

0 * $  30.79 =

$0

0

Small
State

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

*
*

196
16

) =
) =

0 * $  30.79 =
0 * $  30.79 =

$0
$0

0
0

Local
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

88%
88%

*
*

74
1

) =
) =

0 * $  30.79 =
0 * $  30.79 =

$0
$0

0
0

Small
State

(
(

0.5 *
0.5 *

0
0

) *
) *

99%
88%

*
*

1
1

) =
) =

0 * $  30.79 =
0 * $  30.79 =

$0
$0

0
0

Local
Large

(
(

0.5 *
0.5 *

0
0

) *
) *

88%
88%

*
*

1
48

) =
) =

0 * $  30.79 =
0 * $  30.79 =

$0
$0

0
0

Small

(

0.5 *

0

) *

99%
Total

*

148
) =
7,851

0 * $  30.79 =
41

$0
$1,289

0
83

#PLANTS

1‐%FITBASE

QNFITTIME

BURDEN HOURS  

Table 12

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 95

Table 13

Respiratory Protection Program: Contract Cost for an Industrial Hygienist to Conduct  Quantitative Fit Testing for Respirators
This table calculates the contract cost  for the industrial hygiene technician to conduct quantitative fit‐testing.
COST = ((QNFITCOST * QNFITEMP) * 1‐%FITBASE * #PLANTS)

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

* QNFITCOST = $34.00 hourly cost for a industrial hygiene technician * # of hours
* QNFITTEMP = # Employees requiring annual quantitative fit‐test
* 1‐%FITBASE = Percent of plants not conducting fit‐testing (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the 
baseline)
* #PLANTS = Number of plants represented by the model input

Sector 1. Electroplating
Large

(

$0

0

*

0

*

71%

*

1

) = $                   ‐

Small

(

$0

0

*

0

*

97%

*

1

) = $                   ‐

Large

(

$68

2

*

0

*

81%

*

1

) = $                   ‐

Small
Large

(
(

$68
$0

2
0

*
*

0
0

*
*

98%
55%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

95%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

0
0

*
*

0
0

*
*

99%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Local

(

$0

0

*

0

*

99%

*

1

) = $                   ‐

Large

(

$68

2

*

0

*

81%

*

1

) = $                   ‐

MARITIME

Small
Large

(
(

$68
$0

2
0

*
*

0
0

*
*

98%
81%

*
*

1
1

) = $                   ‐
) = $                   ‐

CONSTRUCTION

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

98%
81%

*
*

1
1

) = $                   ‐
) = $                   ‐

Small

(

$0

0

*

0

*

98%

*

1

) = $                   ‐

Large

(

$0

0

*

0

*

81%

*

50

) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

98%
81%

*
*

63
331

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

98%
81%

*
*

1,458
101

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

* 98% *
* 55.00% *

18
294

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

95%
0%

*
*

508
1

) = $                   ‐
) = $                   ‐

Small

(

$0

0

*

0

*

0%

*

1

) = $                   ‐

ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE

GENERAL INDUSTRY AUTOBODY

COIL COATING

MARITIME

CONSTRUCTION

Page 96

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

State

(

$0

0

*

0

*

0%

*

1

) = $                   ‐

Local

(

$0

0

*

0

*

0%

*

1

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

2

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

1

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

3

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

5

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

87

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

137

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

3

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

10

) = $                   ‐

Large

(

$0

0

*

0

*

54%

*

1

) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

1

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

4

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

3

) = $                   ‐

Large

(

$0

0

*

0

*

56%

*

1

) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

56%

*

37

) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

95%
56%

*
*

12
112

) = $                   ‐
) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

35

) = $                   ‐

Large

(

$0

0

*

0

*

56%

*

37

) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

34

) = $                   ‐

Large

(

$0

0

*

0

*

56%

*

178

) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

130

) = $                   ‐

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

CARBON STEEL
14b. RESHAPING INDUSTRY 
RESHAPING
SECTOR 15.  Iron and Steel Foundries
ALL

Page 97

Item 13 COST

#PLANTS

1‐%FITBASE

QNFITEMP

QNFITCOST

Variables

Table 13

SECTOR 17.  Chromium Dye Producers
Large

(

$0

0

*

0

*

37%

*

3

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

1

) = $                   ‐

Large

(

$0

0

*

0

*

37%

*

0

) = $                   ‐

Small

(

$0

0

*

0

*

93%

*

5

) = $                   ‐

Large

(

$0

0

*

0

*

92%

*

207

) = $                   ‐

Small

(

$0

0

*

0

*

99%

*

1,561

) = $                   ‐

Large

(

$0

0

*

0

*

89%

*

347

) = $                   ‐

Small

(

$0

0

*

0

*

99%

*

703

) = $                   ‐

Large

(

$0

0

*

0

*

76%

*

5

) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

97%
76%

*
*

17
78

) = $                   ‐
) = $                   ‐

Small

(

$0

0

*

0

*

97%

*

5

) = $                   ‐

Large

(

$0

0

*

0

*

98%

*

92

) = $                   ‐

Small

(

$0

0

*

0

* 99.70% *

367

) = $                   ‐

Large

(

$0

0

*

0

*

67%

*

1

) = $                   ‐

Small
Large

(
(

$0
$123

0
4

*
*

0
30

*
*

97%
100%

*
*

0
1

) = $                   ‐
) = $              3,676

Small

(

$11

0

*

30

*

100%

*

1

) = $                  340

Large

(

$0

0

*

0

*

76%

*

6

) = $                   ‐

Small

(

$0

0

*

0

*

97%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

94%

*

1

) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

99%
55%

*
*

1
38

) = $                   ‐
) = $                   ‐

Small
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

95%
88%

*
*

34
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

0
0

*
*

0
0

*

99%
88%

*

1
1

) = $                   ‐
) = $                   ‐

Local

(

$0

0

*

0

1

) = $                   ‐

$0

0

*

0

*

59%

*

48

) = $                   ‐

$0

0

*

0

*

96%

*

58

) = $                   ‐

ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Carbon, Flat, and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

88%

SECTOR 27.  Solid Waste Incineration
Large
ALL
Small

(
(

Page 98

#PLANTS

Item 13 COST

1‐%FITBASE

State

(

$0

0

*

0

59%

0

) = $                   ‐

Local

(

$0

0

*

0

96%

29

) = $                   ‐

Large

(

$0

0

*

0

*

56%

*

18

) = $                   ‐

Small

(

$0

0

*

0

*

95%

*

0

) = $                   ‐

Large

(

$0

0

*

0

*

88%

*

55

) = $                   ‐

Small
State

(
(

$0
$0

0
0

*
*

0
0

*
*

99%
88%

*
*

196
16

) = $                   ‐
) = $                   ‐

Local
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

88%
88%

*
*

74
1

) = $                   ‐
) = $                   ‐

Small
State

(
(

$0
$0

0
0

*
*

0
0

*
*

99%
88%

*
*

1
1

) = $                   ‐
) = $                   ‐

Local
Large

(
(

$0
$0

0
0

*
*

0
0

*
*

88%
88%

*
*

1
48

) = $                   ‐
) = $                   ‐

Small

(

$0

0

*

0

*

99%
Total

*

148
) = $                   ‐
7,851
$              4,016

QNFITCOST

QNFITEMP

Variables

Table 13

GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION AND 
MAINTENANCE

Page 99

Table 14

Respiratory‐Protection Program:  Medical  Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Questionnaire for Respirator Use 
This table calculates the burden hours and cost of employee time to complete a medical questionnaire.  The hours and cost is determined by the 
number of employees who are at or above the action level and at or below the PEL by the time it takes to fill our the medical questionnaire and by non‐
supervisory wage rate.
Hours = (EMPAL * MEDHISTTIME * 1‐%FITBASE * #PLANTS)
Cost = Hours x NONSUPEWAGE

RESPONSES

71%

*

1

)

=

657.44 * $     25.49 = $   16,760

3,867

Small (

1,188 * 0.17 *

97%

*

1

)

=

195.82 * $     25.49 = $     4,992

1,152

Large (

0 * 0.17 *

81%

*

1

)

=

Small (
Large (

0 * 0.17 *
2,345 * 0.17 *

98%
55%

*
*

1
1

)
)

Small (
Large (

55 * 0.17 *
3,247 * 0.17 *

95%
88%

*
*

1
1

Small (
State (

2,511 * 0.17 *
15 * 0.17 *

99%
88%

*
*

Local (

74 * 0.17 *

99%

Large (

0 * 0.17 *

Small (
Large (

Hours

#PLANTS

1‐%FITBASE

5,447 * 0.17 *

MEDHISTTIME

Large (

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Variables:
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
 in the model plant
* MEDHISTTIME = Employee time to complete medical history questionnaire
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate

Sector 1. Electroplating
ALL
Sector 2. Welding
0.00 * $     25.10 =

0

0

=
=

0.00 * $     25.10 =
0
219.30 * $     25.10 = $     5,505

0
1,290

)
)

=
=

8.96 * $     25.10 = $         225
485.80 * $     25.10 = $   12,194

53
2,858

1
1

)
)

=
=

422.58 * $     25.10 = $   10,607
2.18 * $     25.10 = $           55

2,486
13

*

1

)

=

12.44 * $     25.10 = $         312

73

55%

*

1

)

=

0.00 * $     25.10 =

0

0

0 * 0.17 *
17 * 0.17 *

95%
88%

*
*

1
1

)
)

=
=

0.00 * $     25.10 =
0
2.47 * $     25.10 = $           62

0
15

Small (
Large (

0 * 0.17 *
662 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     25.10 =
0
99.11 * $     25.10 = $     2,488

0
583

Small (

533 * 0.17 *

99%

*

1

)

=

89.72 * $     25.10 = $     2,252

528

Large (          32 * 0.17 *

81%

*

50

)

=

220.21 * $     31.68 = $     6,976

1,295

0 * 0.17 *
Small (
Large (            1 * 0.17 *

98%
81%

*
*

63
331

)
)

=
=

0.00 * $     31.68 =
0
41.95 * $     31.68 = $     1,329

0
247

0 * 0.17 *
Small (
Large (            2 * 0.17 *

98%
81%

* 1,458 )
* 101 )

=
=

0.00 * $     31.68 =
0
25.63 * $     31.68 = $         812

0
151

Small (            1 * 0.17 *

98%

*

=

2.82 * $     31.68 = $           89

17

GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY 
REPAIR
COIL COATING

Page 100

18

)

RESPONSES

)

=

25.16 * $     31.68 = $         797

148

1 * 0.17 *
Small (
Large (       471 * 0.17 *

95%
0%

*
*

508
1

)
)

=
=

82.06 * $     31.68 =
0.00 * $     31.68 =

2599.584
0

483
0

Small (       593 * 0.17 *
State (          43 * 0.17 *

0%
0%

*
*

1
1

)
)

=
=

0.00 * $     31.68 =
0.00 * $     31.68 =

0
0

0
0

Local (       186 * 0.17 *

0%

*

1

)

=

0.00 * $     31.68 =

0

0

Large (            7 * 0.17 *

37%

*

2

)

=

0.95 * $     37.06 = $           35

6

* 0.17 *

93%

*

0

)

=

0.00 * $     37.06 =

0

0

* 0.17 *

37%

*

2

)

=

0.00 * $     36.12 =

0

5

* 0.17 *

93%

*

1

)

=

0.00 * $     36.12 =

0

1

* 0.17 *

37%

*

3

)

=

0.00 * $     30.60 =

0

2

* 0.17 *

93%

*

0

)

=

0.00 * $     30.60 =

0

0

* 0.17 *

37%

*

5

)

=

4.09 * $     37.06 = $         152

24

* 0.17 *

93%

*

0

)

=

0.00 * $     37.06 =

0

0

* 0.17 *

37%

*

87

)

=

5.72 * $     27.60 = $         158

34

* 0.17 *

93%

*

137

)

=

0.00 * $     27.60 =

0

0

* 0.17 *

37%

*

3

)

=

2.28 * $     27.65 = $           63

13

* 0.17 *

93%

*

10

)

=

4.78 * $     27.65 = $         132

28

* 0.17 *

54%

*

1

)

=

33.14 * $     30.64 = $     1,015

195

* 0.17 *

95%

*

1

)

=

5.89 * $     30.64 = $         180

35

* 0.17 *

37%

*

4

)

=

0.61 * $     27.50 = $           17

4

* 0.17 *

93%

*

3

)

=

0.34 * $     27.50 = $             9

2

* 0.17 *

56%

*

1

)

=

0.76 * $     37.17 = $           28

4

* 0.17 *

95%

*

0

)

=

0.00 * $     37.17 =

0

0

* 0.17 *

56%

*

37

)

=

104.76 * $     37.17 = $     3,894

616

* 0.17 *
* 0.17 *

95%
56%

*
*

12
112

)
)

=
=

2.71 * $     37.17 = $         101
7.48 * $     37.17 = $         278

16
44

* 0.17 *

95%

*

35

)

=

7.98 * $     37.17 = $         297

47

* 0.17 *

56%

*

37

)

=

9.79 * $     37.17 = $         364

58

* 0.17 *

95%

*

34

)

=

3.91 * $     37.17 = $         145

23

Hours

#PLANTS

1‐%FITBASE

294

MEDHISTTIME

Large (            1 * 0.17 * 55.00% *

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Table 14

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
0
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
6
ALL
1
Small (
SECTOR 6. CCA Producers
Large (            2
ALL
0
Small (
SECTOR 7.  Chromium Catalyst Producers
Large (          12
ALL
0
Small (
SECTOR 8.  Paint and Coating Producers
Large (            1
ALL
0
Small (
SECTOR 9.  Printing Ink Producers
Large (          12
ALL
Small (            3
SECTOR 10.  Plastic Colorant Producers and Users
Large (       361
ALL
Small (          36
SECTOR 11.  Plating Mixture Producers
Large (            2
ALL
Small (            1
SECTOR 13.  Chromium Metal Producers
Large (            8
ALL
0
Small (
SECTOR 14.  Iron and Steel Mills
Large (          30
ALL
Small (            1
Large (            1
CARBON STEEL
Small (            1
14b. RESHAPING
Large (            3
RESHAPING
Small (            1

Page 101

RESPONSES

*

178

)

=

320.71 * $     27.12 = $     8,698

1,887

Small (            5 * 0.17 *

95%

*

130

)

=

94.21 * $     27.12 = $     2,555

554

Large (          32 * 0.17 *

37%

*

3

)

=

5.90 * $     36.12 = $         213

35

(            7 * 0.17 *

93%

*

1

)

=

1.08 * $     36.12 = $           39

6

(

0 * 0.17 *

37%

*

0

)

=

0.00 * $     39.76 =

0

0

(

1 * 0.17 *

93%

*

5

)

=

0.86 * $     39.76 = $           34

5

(

0 * 0.17 *

92%

*

207

)

=

0.00 * $     28.67 =

0

0

(

0 * 0.17 *

99%

* 1,561 )

=

0.00 * $     28.67 =

0

0

(

0 * 0.17 *

89%

*

347

)

=

0.00 * $     19.13 =

0

0

(

0 * 0.17 *

99%

*

703

)

=

0.00 * $     19.13 =

0

0

(            1 * 0.17 *

76%

*

5

)

=

0.63 * $     27.66 = $           18

4

(
0 * 0.17 *
(            6 * 0.17 *

97%
76%

*
*

17
78

)
)

=
=

0
0.00 * $     27.66 =
63.55 * $     27.66 = $     1,758

0
374

(            1 * 0.17 *

97%

*

5

)

=

0.67 * $     27.66 = $           19

4

(

0 * 0.17 *

98%

*

92

)

=

0.00 * $     19.97 =

0

0

(

0 * 0.17 * 99.70% *

367

)

=

0.00 * $     19.97 =

0

0

Hours

#PLANTS

1‐%FITBASE
56%

MEDHISTTIME

Large (          19 * 0.17 *

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Table 14

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, CONTAINER GLASS
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local

(

1

* 0.17 *

67%

*

1

)

=

0.11 * $     31.14 = $             4

1

(
(

0 * 0.17 *
109 * 0.17 *

97%
0%

*
*

0
1

)
)

=
=

0.00 * $     31.14 =
0.00 * $     31.14 =

0
0

0
0

(

0 * 0.17 *

0%

*

1

)

=

0.00 * $     31.14 =

0

0

(

0 * 0.17 *

76%

*

6

)

=

0.00 * $     24.56 =

0

0

(

0 * 0.17 *

97%

*

0

)

=

0.00 * $     24.56 =

0

0

(

0 * 0.17 *

94%

*

1

)

=

0.00 * $     30.76 =

0

0

(
(

0 * 0.17 *
0 * 0.17 *

99%
55%

*
*

1
38

)
)

=
=

0.00 * $     30.76 =
* $     30.76 =

0
0

0
0

(
(

0 * 0.17 *
0 * 0.17 *

95%
88%

*
*

34
1

)
)

=
=

0.00 * $     30.76 =
0.00 * $     30.76 =

0
0

0
0

(
(

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     30.76 =
0.00 * $     30.76 =

0
0

0
0

(

0 * 0.17 *

88%

*

1

)

=

0.00 * $     30.76 =

0

0

Page 102

RESPONSES

59%

*

48

)

=

0.00 * $     26.09 =

0

0

Small (
State (

0 * 0.17 *
0 * 0.17 *

96%
59%

*
*

58
0

)
)

=
=

0.00 * $     26.09 =
0.00 * $     26.09

0
0

0
0

(

0 * 0.17 *

96%

*

29

)

=

0.00 * $     26.09

0

0

(

0 * 0.17 *

56%

*

18

)

=

0.00 * $     26.75 =

0

0

(

0 * 0.17 *

95%

*

0

)

=

0.00 * $     26.75 =

0

0

(

0 * 0.17 *

88%

*

55

)

=

0.00 * $     30.79 =

0

0

INDUSTRIAL REHABILITATION AND  Small (
MAINTENANCE
State (

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

196
16

)
)

=
=

0.00 * $     30.79 =
0.00 * $     30.79 =

0
0

0
0

Local (
Large (

0 * 0.17 *
0 * 0.17 *

88%
88%

*
*

74
1

)
)

=
=

0.00 * $     30.79 =
0.00 * $     30.79 =

0
0

0
0

Small (
State (

0 * 0.17 *
0 * 0.17 *

99%
88%

*
*

1
1

)
)

=
=

0.00 * $     30.79 =
0.00 * $     30.79 =

0
0

0
0

Local (
Large (

0 * 0.17 *
0 * 0.17 *

88%
88%

*
*

1
48

)
)

=
=

0.00 * $     30.79 =
0.00 * $     30.79 =

0
0

0
0

Small (

0 * 0.17 *

99%

*

148 )
7,851

=

0.00 * $     30.79 =
0
3,277
$   88,261

0
19,281

Hours

#PLANTS

1‐%FITBASE

0 * 0.17 *

MEDHISTTIME

Large (

EMPAL

 Item 12 COST 

 NONSUPEWAGE

Variables

Table 14

SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 
Total

Page 103

Table 15

Respiratory Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Contract Cost for a PLHCP to Review the Medical Questionnaire for Respirator Use 
This table calculates the contract cost of the medical questionnaire and review by the licensed physician.
COST = (EMPAL * MEDHISTCOST * 1‐%FITBASE * #PLANTS)

Item 13 COST

(

5,447 * $      40.31 *

71%

*

1

) = $         155,873.17

Small

(

1,188 * $      40.31 *

97%

*

1

) = $           46,428.29

Large

(

0 * $      40.31 *

81%

*

1

) = $                       ‐

MARITIME

Small
Large

(
(

0 * $      40.31 *
2,345 * $      40.31 *

98%
55%

*
*

1
1

) = $                       ‐
) = $           51,995.14

CONSTRUCTION

Small
Large

(
(

55 * $      40.31 *
3,247 * $      40.31 *

95%
88%

*
*

1
1

) = $             2,123.25
) = $         115,178.61

Small
State

(
(

2,511 * $      40.31 *
15 * $      40.31 *

99%
88%

*
*

1
1

) = $         100,190.38
) = $                 517.58

Local

(

74 * $      40.31 *

99%

*

1

) = $             2,950.20

Large

(

0 * $      40.31 *

81%

*

1

) = $                       ‐

MARITIME

Small
Large

(
(

0 * $      40.31 *
17 * $      40.31 *

98%
55%

*
*

1
1

) = $                       ‐
) = $                 366.62

CONSTRUCTION

Small
Large

(
(

0 * $      40.31 *
662 * $      40.31 *

95%
88%

*
*

1
1

) = $                       ‐
) = $           23,498.09

Small

(

533 * $      40.31 *

99%

*

1

) = $           21,272.50

Large

(

32 * $      40.31 *

81%

*

50

) = $           52,210.56

Small
Large

(
(

0 * $      40.31 *
1 * $      40.31 *

98%
81%

*
*

63
331

) = $                       ‐
) = $             9,944.87

Small
Large

(
(

0 * $      40.31 *
2 * $      40.31 *

98%
81%

*
*

1,458
101

) = $                       ‐
) = $             6,077.42

Small
Large

(
(

1 * $      40.31 * 98% *
1 * $      40.31 * 55.00% *

18
294

) = $                 668.45
) = $             6,514.91

Small

(

1

508

) = $           19,456.17

Sector 1. Electroplating
ALL

Sector 2. Welding
GENERAL INDUSTRY

1‐%FITBASE

Large

EMPAL

#PLANTS

 MEDHISTCOST 

Variables

* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL 
 in the model plant
* MEDHISTCOST = Cost of medical history questionnaire to be reviewed by a PLHCP.
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
                                                                                                                                       

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)

GENERAL INDUSTRY (AUTOBODY REPAIR)

GENERAL INDUSTRY (COIL COATING)
MARITIME

$      40.31 *

Page 104

95%

*

Item 13 COST

#PLANTS

1‐%FITBASE

 MEDHISTCOST 

EMPAL

Variables

Table 15

Large

(

471 * $      40.31 *

0%

*

1

) = $                       ‐

Small
State

(
(

593 * $      40.31 *
43 * $      40.31 *

0%
0%

*
*

1
1

) = $                       ‐
) = $                       ‐

Local

(

186 * $      40.31 *

0%

*

1

) = $                       ‐

Large

(

7 * $      40.31 *

37%

*

2

) = $                 226.19

Small

(

0 * $      40.31 *

93%

*

0

) = $                       ‐

Large

(

6 * $      40.31 *

37%

*

2

) = $                 184.15

Small

(

1 * $      40.31 *

93%

*

1

) = $                   38.57

Large

(

2 * $      40.31 *

37%

*

3

) = $                   64.99

Small

(

0 * $      40.31 *

93%

*

0

Large

(

12 * $      40.31 *

37%

*

5

) = $                       ‐
$                       ‐
) = $                 969.38

Small

(

0 * $      40.31 *

93%

*

0

) = $                       ‐

Large

(

1 * $      40.31 *

37%

*

87

) = $             1,357.14

Small

(

0 * $      40.31 *

93%

*

137

) = $                       ‐

Large

(

12 * $      40.31 *

37%

*

3

) = $                 541.26

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL

(

3 * $      40.31 *

93%

*

10

) = $             1,133.73

(

361 * $      40.31 *

54%

*

1

) = $             7,856.30

Small

(

36 * $      40.31 *

95%

*

1

) = $             1,396.45

Large

(

2 * $      40.31 *

37%

*

4

) = $                 145.53

Small

(

1 * $      40.31 *

93%

*

3

) = $                   81.29

Large

(

8 * $      40.31 *

56%

*

1

) = $                 180.57

Small

(

0 * $      40.31 *

95%

*

0

) = $                       ‐

Large

(

30 * $      40.31 *

56%

*

37

) = $           24,838.26

Small
Large

(
(

1 * $      40.31 *
1 * $      40.31 *

95%
56%

*
*

12
112

) = $                 643.59
) = $             1,774.16

Small

(

1 * $      40.31 *

95%

*

35

) = $             1,892.92

Large

(

3 * $      40.31 *

56%

*

37

) = $             2,320.92

Small

(

1 * $      40.31 *

95%

*

34

) = $                 927.53

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL

SECTOR 5. Chromate Pigment Procedures
ALL

SECTOR 6. CCA Producers
ALL

SECTOR 7.  Chromium Catalyst Producers
ALL

SECTOR 8.  Paint and Coating Producers
ALL

SECTOR 9.  Printing Ink Producers
ALL

SECTOR 11.  Plating Mixture Producers
ALL

SECTOR 13.  Chromium Metal Producers
ALL

SECTOR 14.  Iron and Steel Mills
Alloy and Stainless Steel

Carbon Steel

14b. RESHAPING INDUSTRY
Reshaping Industry

Page 105

Item 13 COST

(

19 * $      40.31 *

56%

*

178

) = $           76,038.56

Small

(

5 * $      40.31 *

95%

*

130

) = $           22,336.62

Large

(

32 * $      40.31 *

37%

*

3

) = $             1,399.31

Small

(

7 * $      40.31 *

93%

*

1

) = $                 256.46

Large

(

0 * $      40.31 *

37%

*

0

) = $                       ‐

Small

(

1 * $      40.31 *

93%

*

5

) = $                 203.05

Large

(

0 * $      40.31 *

92%

*

207

) = $                       ‐

Small

(

0 * $      40.31 *

99%

*

1,561

) = $                       ‐

Large

(

0 * $      40.31 *

89%

*

347

) = $                       ‐

Small

(

0 * $      40.31 *

99%

*

703

) = $                       ‐

Large

(

1 * $      40.31 *

76%

*

5

) = $                 150.18

Small
Large

(
(

0 * $      40.31 *
6 * $      40.31 *

97%
76%

*
*

17
78

) = $                       ‐
) = $           15,068.24

Small

(

1 * $      40.31 *

97%

*

5

) = $                 159.73

Large

(

0 * $      40.31 *

98%

*

92

) = $                       ‐

Small

(

0 * $      40.31 * 99.70% *

367

) = $                       ‐

Large

(

1 * $      40.31 *

67%

*

1

) = $                   27.24

Small
Large

(
(

0 * $      40.31 *
109 $      40.31 *

97%
0%

*
*

0
1

) = $                       ‐
) = $                       ‐

Small

(

0

$      40.31 *

0%

*

1

) = $                       ‐

Large

(

0 * $      40.31 *

76%

*

6

) = $                       ‐

Small

(

0 * $      40.31 *

97%

*

0

) = $                       ‐

Large

(

0 * $      40.31 *

94%

*

1

) = $                       ‐

Small
Large

(
(

0 * $      40.31 *
0 * $      40.31 *

99%
55%

*
*

1
38

) = $                       ‐
) = $                       ‐

Small
Large

(
(

0 * $      40.31 *
0 * $      40.31 *

95%
88%

*
*

34
1

) = $                       ‐
) = $                       ‐

Small

(

0 * $      40.31 *

99%

*

1

) = $                       ‐

1‐%FITBASE

Large

EMPAL

#PLANTS

 MEDHISTCOST 

Variables

Table 15

SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

FIBER, FLAT AND CONTAINER GLASS
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

Page 106

Item 13 COST

#PLANTS

1‐%FITBASE

 MEDHISTCOST 

EMPAL

Variables

Table 15

State

(

0 * $      40.31 *

88%

*

1

) = $                       ‐

Local

(

0 * $      40.31 *

88%

*

1

) = $                       ‐

Large

(

0

59%

48

$                       ‐

Small
State

(
(

0 * $      40.31 *
0 $      40.31

96%
59%

58
0

) = $                       ‐
$                       ‐

Local

(

0

96%

29

$                       ‐

Large

(

0 * $      40.31 *

56%

*

18

) = $                       ‐

Small

(

0 * $      40.31 *

95%

*

0

) = $                       ‐

Large

(

0 * $      40.31 *

88%

*

55

) = $                       ‐

Small
State

(
(

0 * $      40.31 *
0 * $      40.31 *

99%
88%

*
*

196
16

) = $                       ‐
) = $                       ‐

Local
Large

(
(

0 * $      40.31 *
0 * $      40.31 *

88%
88%

*
*

74
1

) = $                       ‐
) = $                       ‐

Small
State

(
(

0 * $      40.31 *
0 * $      40.31 *

99%
88%

*
*

1
1

) = $                       ‐
) = $                       ‐

Local
Large

(
(

0 * $      40.31 *
0 * $      40.31 *

88%
88%

*
*

1
48

) = $                       ‐
) = $                       ‐

Small

(

0 * $      40.31 *

99%
Total

*

148
) = $                       ‐
7,851
$              777,479

Government
SECTOR 27.  Solid Waste Incineration
$      40.31

ALL
*

Government
$      40.31

SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 107

Table 16

Respiratory Protection Program:  Follow‐up Medical Examination for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Examination for Respirator Use
This table calculates the burden hour and cost estimate for employees that "fail" the medical history 
questionnaire.  It is estimated that 23% (EMPMEDXAM) will not pass the medial questionnaire
BURDEN HOURS = (EMPAL * RESPEXAMTIME * %EMPMEDEXAM * 1‐%FITBASE * PLANTS)
COST = BURDEN HOURS * NONSUPEWAGE

Item 12 COST

Responses

5,447 *

3*

23% *

71%

*

1

=

2668.42 * $     25.49 $    68,025.07

889

Small

(

1,188 *

3*

23% *

97%

*

1

=

794.81 * $     21.43 $    17,032.84

265

Large

(

0*

3*

23% *

81%

*

1

=

0.00 * $     21.10 $                ‐

Small
Large

(
(

0*
2,345 *

3*
3*

23% *
23% *

98%
55%

*
*

1
1

=

0.00 * $     21.10 $                ‐
890.11 * $     21.10 $    18,781.38

0
297

Small
Large

(
(

55 *
3,247 *

3*
3*

23% *
23% *

95%
88%

*
*

1
1

=
=

36.35 * $     21.10 $          766.95
1971.76 * $     21.10 $    41,604.14

12
657

Small
State

(
(

2,511 *
15 *

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

1715.17 * $     21.10 $    36,190.18
8.86 * $     21.10 $          186.96

572
3

Local

(

74 *

3*

23% *

99%

*

1

=

50.50 * $     21.10 $      1,065.65

17

Large

(

0*

3*

23% *

81%

*

1

=

0.00 * $     21.10 $                ‐

0

Small
Large

(
(

0*
17 *

3*
3*

23% *
23% *

98%
55%

*
*

1
1

=

0.00 * $     21.10 $                ‐
6.28 * $     21.10 $          132.43

0
2

Small
Large

(
(

0*
662 *

3*
3*

23% *
23% *

95%
88%

*
*

1
1

=
=

0.00 * $     21.10 $                ‐
402.27 * $     21.10 $      8,487.84

0
134

Small

(

533 *

3*

23% *

99%

*

1

=

364.17 * $     21.10 $      7,683.93

121

Large

(

32 *

3*

23% *

81%

*

50

=

893.80 *

26.63 $    23,801.91

298

Small
Large

(
(

0*
1*

3*
3*

23% *
23% *

98%
81%

*
*

63
331

=
=

0.00 *
170.25 *

26.63 $                ‐
26.63 $      4,533.70

0
57

Small
Large

(
(

0*
2*

3*
3*

23% *
23% *

98%
81%

* 1,458 =
* 101 =

0.00 *
104.04 *

26.63 $                ‐
26.63 $      2,770.59

0
35

Small

(

1*

3*

23% *

98%

*

11.44 *

26.63 $          304.73

4

HOURS

EMPAL

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL  
in the model plant
* RESPEXAMTIME = Employee time, in hours, for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
* %EMPMEDEXAM = Percent of employees who "fail" an initial medical exam

Sector 1. Electroplating
ALL
Sector 2. Welding
0

GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY 
REPAIR)
GENERAL INDUSTRY (COIL 
COATING)

Page 108

18

=

Responses

(

1*

3*

23% * 55.00% *

294

=

102.11 *

26.63 $      2,719.17

34

Small
Large

(
(

1*
471 *

3*
3*

23% *
23% *

95%
0%

*
*

508
1

=
=

333.07 *
0.00 *

26.63 $      8,869.74
26.63 $                ‐

111
0

Small
State

(
(

593 *
43

3*
3

23% *
23%

0%
0%

*

1
1

=

0.00 *
0.00

26.63 $                ‐
26.63 $                ‐

0
0

Local

(

186

3

23%

0%

0.00

26.63 $                ‐

0

Large

(

7*

3*

23% *

37%

*

2

=

3.87 *

31.15 $          120.62

1

(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8.  Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9.  Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11.  Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13.  Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14.  Iron and Steel Mills
Large
(
Alloy and Stainless Steel
(
Small
Large
(
Carbon Steel
(
Small

0*

3*

23% *

93%

*

0

=

0.00 *

31.15 $                ‐

0

6*

3*

23% *

37%

*

2

=

3.15 *

30.36 $            95.71

1

1*

3*

23% *

93%

*

1

=

0.66 *

30.36 $            20.05

0

2*

3*

23% *

37%

*

3

=

1.11 *

25.72 $            28.62

0

0*

3*

23% *

93%

*

0

=

0.00 *

25.72 $                ‐

0

12 *

3*

23% *

37%

*

5

=

16.60 *

31.15 $          516.94

6

0*

3*

23% *

93%

*

0

=

0.00 *

31.15 $                ‐

0

1*

3*

23% *

37%

*

87

=

23.23 *

23.20 $          539.01

8

0*

3*

23% *

93%

*

137

=

0.00 *

23.20 $                ‐

0

12 *

3*

23% *

37%

*

3

=

9.27 *

23.24 $          215.34

3

3*

3*

23% *

93%

*

10

=

19.41 *

23.24 $          451.05

6

361 *

3*

23% *

54%

*

1

=

134.49 *

25.76 $      3,464.55

45

36 *

3*

23% *

95%

*

1

=

23.91 *

25.76 $          615.82

8

2*

3*

23% *

37%

*

4

=

2.49 *

23.12 $            57.60

1

1*

3*

23% *

93%

*

3

=

23.12 $            32.17

0

8*

3*

23% *

56%

*

1

=

1.39 *
0.00
3.09 *

31.25 $            96.60

1

0*

3*

23% *

95%

*

0

=

0.00 *

31.25 $                ‐

0

30 *

3*

23% *

56%

*

37

=

425.21 *

31.25 $    13,287.81

142

1*
1*

3*
3*

23% *
23% *

95%
56%

*
*

12
112

=
=

11.02 *
30.37 *

31.25 $          344.30
31.25 $          949.13

4
10

1*

3*

23% *

95%

*

35

=

32.41 *

31.25 $      1,012.66

11

HOURS

#PLANTS

1‐%FITBASE

Large

EMPAL

Item 12 COST

 NONSUPEWAGE

%EMPMEDEXAM

RESPEXAMTIME

Table 16

MARITIME

CONSTRUCTION

GOVERNMENT
1

SECTOR 4.  Producers of Chromates
ALL

Page 109

Item 12 COST

Responses

3*

3*

23% *

56%

*

37

=

39.73 *

31.25 $      1,241.63

13

Small

(

1*

3*

23% *

95%

*

34

=

15.88 *

31.25 $          496.20

5

Large

(

19 *

3*

23% *

56%

*

178

=

1301.72 *

22.8 $    29,679.12

434

Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small

(

5*

3*

23% *

95%

*

130

=

382.38 *

22.8 $      8,718.36

127

(

32 *

3*

23% *

37%

*

3

=

23.95 *

30.36 $          727.27

8

(

7*

3*

23% *

93%

*

1

=

4.39 *

30.36 $          133.29

1

(

0*

3*

23% *

37%

*

0

=

0.00 *

33.42 $                ‐

0

(

1*

3*

23% *

93%

*

5

=

3.48 *

33.42 $          116.17

1

(

0*

3*

23% *

92%

*

207

=

0.00 *

24.1 $                ‐

0

(

0*

3*

23% *

99%

* 1,561 =

0.00 *

24.1 $                ‐

0

(

0*

3*

23% *

89%

*

347

=

0.00 *

16.08 $                ‐

0

(

0*

3*

23% *

99%

*

703

=

0.00 *

16.08 $                ‐

0

(

1*

3*

23% *

76%

*

5

=

2.57 *

23.25 $            59.78

1

(
(

0*
6*

3*
3*

23% *
23% *

97%
76%

*
*

17
78

=
=

0.00 *
257.96 *

23.25 $                ‐
23.25 $      5,997.47

0
86

(

1*

3*

23% *

97%

*

5

=

2.73 *

23.25 $            63.58

1

(

0*

3*

23% *

98%

*

92

=

0.00 *

16.79 $                ‐

0

(

0*

3*

23% * 99.70% *

367

=

0.00 *

16.79 $                ‐

0

(

1*

3*

23% *

67%

*

1

=

0.47 *

26.18 $            12.21

0

(
(

0*
109 *

3*
3*

23% *
23% *

0%
0%

*
*

0
1

=
=

0.00 *
0.00 *

26.18 $                ‐
26.18 $                ‐

0
0

(

0*

3*

23% *

97%

*

1

=

0.00 *

26.18 $                ‐

0

(

0*

3*

23% *

76%

*

6

=

0.00 *

20.65 $                ‐

0

(

0*

3*

23% *

97%

*

0

=

0.00 *

20.65 $                ‐

0

(

0*

3*

23% *

94%

*

1

=

0.00 *

18.59 $                ‐

0

(
(

0*
0*

3*
3*

23% *
23% *

99%
55%

*
*

1
38

=
=

0.00 *
0.00 *

18.59 $                ‐
18.59 $                ‐

0
0

(

0*

3*

23% *

95%

*

34

=

0.00 *

18.59 $                ‐

0

HOURS

EMPAL

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

Table 16

SECTOR 14B.  Forging Industry
RESHAPING INDUSTRY
SECTOR 15.  Iron and Steel Foundries
ALL

Page 110

23% *

88%

*

1

=

0.00 *

18.59 $                ‐

0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

0.00 *
0.00 *

18.59 $                ‐
18.59 $                ‐

0
0

Local

(

0*

3*

23% *

88%

*

1

=

0.00 *

18.59 $                ‐

0

Large

(

0*

3*

23% *

59%

*

48

=

0.00 *

21.93 $                ‐

0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

96%
59%

*
*

58
0

=
=

0.00 *
0.00 *

21.93 $                ‐
21.93 $                ‐

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0*

3*

23% *

96%

*

29

=

0.00 *

21.93 $                ‐

0

(

0*

3*

23% *

56%

*

18

=

0.00 *

22.49 $                ‐

0

(

0*

3*

23% *

95%

*

0

=

0.00 *

22.49 $                ‐

0

(

0*

3*

23% *

88%

*

55

=

0.00

25.88 $                ‐

0

INDUSTRIAL REHABILITATION AND  Small
MAINTENANCE
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

196
16

=
=

0.00
0.00

25.88 $                ‐
25.88 $                ‐

0
0

Local
Large

(
(

0*
0*

3*
3*

23% *
23% *

88%
88%

*
*

74
1

=
=

0.00
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Small
State

(
(

0*
0*

3*
3*

23% *
23% *

99%
88%

*
*

1
1

=
=

0.00 *
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Local
Large

(
(

0*
0*

3*
3*

23% *
23% *

88%
88%

*
*

1
48

=
=

0.00 *
0.00 *

25.88 $                ‐
25.88 $                ‐

0
0

Small

(

0*

3*

23% *

99%
Total

*

148 =
7,851

0.00 *
13,300

HOURS

EMPAL

Responses

3*

Item 12 COST

0*

 NONSUPEWAGE

(

#PLANTS

1‐%FITBASE

Large

RESPEXAMTIME

%EMPMEDEXAM

Table 16

CONSTRUCTION

GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL

GOVERNMENT

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION 

Page 111

25.88 $                ‐
$       312,050

0
4,433

Table 17

Respiratory Protection Program:  Follow‐up Medical Examination for Respirator Use;
Contract Cost for a PLHCP to Conduct the Medical Examination for Respirator Use
Employers must use a PLHCP to conduct the follow‐up medical examination.  The follow‐up medical 
examination allows PLHCPs to obtain additional information that may be useful in arriving at a final medical 
recommendation regarding respirator use.

1‐%FITBASE

#PLANTS

Item 13 Cost

5,447 * $     120.91 *

23% *

71%

*

1

$      107,542.40

Small

1,188 * $     120.91 *

23% *

97%

*

1

$        32,032.51

Large

0 * $     120.91 *

23% *

81%

*

1

$                     ‐

Small
Large

0 * $     120.91 *
2,345 * $     120.91 *

23% *
23% *

98%
55%

*
*

1
1

$                     ‐
$        35,873.28

Small
Large

55 * $     120.91 *
3,247 * $     120.91 *

23% *
23% *

95%
88%

*
*

1
1

$           1,464.91
$        79,465.79

Small
State

2,511 * $     120.91 *
15 * $     120.91 *

23% *
23% *

99%
88%

*
*

1
1

$        69,124.88
$              357.10

Local

74 * $     120.91 *

23% *

99%

*

1

$           2,035.45

Large

0 * $     120.91 *

23% *

81%

*

1

$                     ‐

Small
Large

0 * $     120.91 *
17 * $     120.91 *

23% *
23% *

98%
55%

*
*

1
1

$                     ‐
$              252.94

Small
Large

0 * $     120.91 *
662 * $     120.91 *

23% *
23% *

95%
88%

*
*

1
1

$                     ‐
$        16,212.16

Small

533 * $     120.91 *

23% *

99%

*

1

$        14,676.65

Large

     46 * $     120.91 *

23% *

81%

*

50

$        51,459.87

Small

0 * $     120.91 *

23% *

98%

*

63

$                     ‐

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

COST = (EMPAL * RESPEXAMCOST * %EMPMEDEXAM * 1‐%FITBASE * #PLANTS)
* EMPAL = Number of employees who wear respirators for more than 5 hours/week and who are at or above the AL  
 and at or below the PEL in the model plant
* RESPEXAMCOST = Cost for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output

Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY

MARITIME

CONSTRUCTION
SECTOR 3.  PAINTING
GENERAL INDUSTRY AEROSPACE

Page 112

1‐%FITBASE

#PLANTS

Item 13 Cost

1 * $     120.91 *

23% *

81%

*

331

$           6,861.32

Small
Large

0 * $     120.91 *
2 * $     120.91 *

23% *
23% *

98%
81%

*
*

1,458
101

$                     ‐
$           4,193.03

Small
Large

1 * $     120.91 *
1 * $     120.91 *

23% * 98% *
23% * 55.00% *

18
294

$              461.19
$           4,115.20

Small
Large

1 * $     120.91 *
471 * $     120.91 *

23% *
23% *

95%
0%

*
*

508
1

$        13,423.50
$                     ‐

Small
State

593 * $     120.91 *
43 * $     120.91 *

23% *
23% *

0%
0%

*
*

1
1

$                     ‐
$                     ‐

Local

186 * $     120.91 *

23% *

0%

*

1

Large

7 * $     120.91 *

23% *

37%

*

2

$                     ‐
$                     ‐
$              156.06

0 * $     120.91 *

23% *

93%

*

0

$                     ‐

6 * $     120.91 *

23% *

37%

*

2

$              127.05

1 * $     120.91 *

23% *

93%

*

1

2 * $     120.91 *

23% *

37%

*

3

$                26.61
$                     ‐
$                44.84

0 * $     120.91 *

23% *

93%

*

0

$                     ‐

12 * $     120.91 *

23% *

37%

*

5

$              668.81

0 * $     120.91 *

23% *

93%

*

0

$                     ‐

1 * $     120.91 *

23% *

37%

*

87

$              936.34

0 * $     120.91 *

23% *

93%

*

137

$                     ‐

12 * $     120.91 *

23% *

37%

*

3

$              373.44

3 * $     120.91 *

23% *

93%

*

10

$              782.20

361 * $     120.91 *

23% *

54%

*

1

$           5,420.34

36 * $     120.91 *

23% *

95%

*

1

$              963.46

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

GENERAL INDUSTRY AUTOBODY

COIL COATINGS

MARITIME

CONSTRUCTION

GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small

Page 113

1‐%FITBASE

#PLANTS

Item 13 Cost

2 * $     120.91 *

23% *

37%

*

4

$              100.41

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14B.  Forging Industry
Large
Reshaping Industry
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container
small

1 * $     120.91 *

23% *

93%

*

3

8 * $     120.91 *

23% *

56%

*

1

$                56.08
$                     ‐
$              124.58

0 * $     120.91 *

23% *

95%

*

0

$                     ‐

30 * $     120.91 *

23% *

56%

*

37

$        17,136.79

1 * $     120.91 *
1 * $     120.91 *

23% *
23% *

95%
56%

*
*

12
112

$              444.04
$           1,224.06

1 * $     120.91 *

23% *

95%

*

35

$           1,305.99

3 * $     120.91 *

23% *

56%

*

37

$           1,601.28

1 * $     120.91 *

23% *

95%

*

34

$              639.94

19 * $     120.91 *

23% *

56%

*

178

$        52,461.69

5 * $     120.91 *

23% *

95%

*

130

$        15,410.82

32 * $     120.91 *

23% *

37%

*

3

$              965.43

7 * $     120.91 *

23% *

93%

*

1

$              176.94

0 * $     120.91 *

23% *

37%

*

0

$                     ‐

1 * $     120.91 *

23% *

93%

*

5

$              140.09

0 * $     120.91 *

23% *

92%

*

207

$                     ‐

0 * $     120.91 *

23% *

99%

*

1,561

$                     ‐

0 * $     120.91 *

23% *

89%

*

347

$                     ‐

0 * $     120.91 *

23% *

99%

*

703

$                     ‐

1 * $     120.91 *

23% *

76%

*

5

$              103.62

0 * $     120.91 *
6 * $     120.91 *

23% *
23% *

97%
76%

*
*

17
78

$                     ‐
$        10,396.11

1 * $     120.91 *

23% *

97%

*

5

$              110.21

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

SECTOR 11.  Plating Mixture Producers
ALL

Page 114

23% *

98%

*

92

Small

0 * $     120.91 *

23% * 99.70% *

367

Large

1 * $     120.91 *

23% *

67%

*

1

$                     ‐
$                     ‐
$                18.79

Small
Large

0 * $     120.91 *
109 * $     120.91 *

23% *
23% *

0%
0%

*
*

0
1

$                     ‐
$                     ‐

Small

0 * $     120.91 *

23% *

0%

*

1

$                     ‐

Large

0 * $     120.91 *

23% *

76%

*

6

$                     ‐

Small

0 * $     120.91 *

23% *

97%

*

0

$                     ‐

Large

0 * $     120.91 *

23% *

94%

*

1

$                     ‐

Small
Large

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

99%
55%

*
*

1
38

$                     ‐
$                     ‐

Small
Large

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

95%
88%

*
*

34
1

$                     ‐
$                     ‐

Small
State

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

99%
88%

*
*

1
1

$                     ‐
$                     ‐

Local

0 * $     120.91 *

23% *

88%

*

1

Large

0 * $     120.91 *

23% *

59%

*

48

$                     ‐
$                     ‐
$                     ‐

Small
State

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

96%
59%

*
*

58
0

$                     ‐
$                     ‐

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

0 * $     120.91 *

23% *

96%

*

29

$                     ‐

0 * $     120.91 *

23% *

56%

*

18

$                     ‐

0 * $     120.91 *

23% *

95%

*

0

$                     ‐

0 * $     120.91 *

23% *

88%

*

55

$                     ‐

Small
State

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

99%
88%

*
*

196
16

$                     ‐
$                     ‐

Local

0 * $     120.91 *

23% *

88%

*

74

$                     ‐

#PLANTS

Item 13 Cost

1‐%FITBASE

0 * $     120.91 *

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

SECTOR 22.  Printing

$                     ‐
$                     ‐

ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY

MARITIME

CONSTRUCTION

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

INDUSTRIAL REHABILITATION AND 
MAINTENANCE

Page 115

23% *

88%

*

1

$                     ‐

HAZARDOUS WASTE‐SITE WORK

Small
State

0 * $     120.91 *
0 * $     120.91 *

23% *
23% *

99%
88%

*
*

1
1

$                     ‐
$                     ‐

Local
Large

0 * $     120.91 *
0 * $      120.91 *

23% *
23% *

88%
88%

*
*

1
48

$                     ‐
$                     ‐

Small

0 * $     120.91 *
18,109

23% *

99%

*

148
$                     ‐
7,851 $            551,468

#PLANTS

Item 13 Cost

1‐%FITBASE

0 * $     120.91 *

RESPEXAMCOST

Large

EMPAL

%EMPMEDEXAM

Table 17

REFRACTORY BRICK RESTORATION 
Total

Page 116

Table 18

Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 
1915.1026(g)(2)(iv), and 1926.1126(g)(2)(iv)); Contract Cost to Obtain Cr(VI) Hazard‐Warning Labels for 
Bags or Containers Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
This table calculates the contract cost for purchasing appropriate labels for glove disposal containers.  OSHA estimates 
that 5% of the containers will need new or replacement labels.  The number of replacement gloves used throughout the 
year is divided by 1,602.  The factor of 1,602 is the estimated number of gloves that can fit into a thirty‐gallon garbage 
bag.
Cost = GLOVERPL/1,602 * 5%*$0.32 *#PLANTS

Item 13 Cost

#PLANTS

COST

5% of containers need labels

NOGLOVESCONT

GLOVEREPL

Variables

GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty‐gallon container.
5% of containers need new or replacement labels.
COST = The cost of a label
#PLANTS = Number of model plants
COST = The cost of a label

Sector 1. Electroplating
ALL

Large
Small

54,888,821 / 1,602 1713.13 $0.36
11,970,179 / 1,602 373.60 $0.36

1=
1=

$622
$136

Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT

Large
Small
Large
Small
Large
Small
State
Local

0
0
0
0
0
0
0
0

/
/
/
/
/
/
/
/

1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36

7,911
8,864
191
108
269
2,160
25
793

=
=
=
=
=
=
=
=

$0
$0
$0
$0
$0
$0
$0
$0

Large
Small
Large
Small
Large
Small

0
0
0
0
0
0

/
/
/
/
/
/

1,602
1,602
1,602
1,602
1,602
1,602

0.00
0.00
0.00
0.00
0.00
0.00

$0.36
$0.36
$0.36
$0.36
$0.36
$0.36

10,607
10,797
412
233
405
3,058

=
=
=
=
=
=

$0
$0
$0
$0
$0
$0

125,000 / 1,602
1,000 / 1,602

3.90
0.03

$0.36
$0.36

50 =
63 =

$70
$1

Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY
AEROSPACE

Large
Small

Page 117

1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602

1.90
0.16
0.44
0.09
0.16
0.06
0.44
0.09
0.16
1.84

$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36

Large
Small

75,000 / 1,602
0 / 1,602

2.34
0.00

Large
Small

24,000 / 1,602
3,000 / 1,602

Large
Small

GLOVEREPL

Item 13 Cost

COST

61,000
5,000
14,000
3,000
5,000
2,000
14,000
3,000
5,000
59,000

#PLANTS

5% of containers need labels

Large
Small
Large
Small
Large
Small
Large
Small
State
Local

Variables

NOGLOVESCONT

Table 18

=
=
=
=
=
=
=
=
=
=

$229
$83
$16
$1
$17
$12
$121
$138
$1
$601

$0.36
$0.36

2=
0=

$2
$0

0.75
0.09

$0.36
$0.36

2=
1=

$1
$0

8,760 / 1,602
0 / 1,602

0.27
0.00

$0.36
$0.36

3=
0=

$0
$0

Large
Small

57,000 / 1,602
0 / 1,602

1.78
0.00

$0.36
$0.36

5=
0=

$3
$0

Large
Small

12,000 / 1,602
6,000 / 1,602

0.37
0.19

$0.36
$0.36

87 =
137 =

$12
$9

Large
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
GENERAL INDUSTRY
Small

24,000 / 1,602
480 / 1,602

0.75
0.01

$0.36
$0.36

3=
10 =

$1
$0

583 / 1,602
120 / 1,602

0.02
0.00

$0.36
$0.36

86 =
42 =

$1
$0

14,400 / 1,602
2,880 / 1,602

0.45
0.09

$0.36
$0.36

4=
3=

$1
$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

1=
0=

$0
$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

37 =
12 =

$0
$0

AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT

/
/
/
/
/
/
/
/
/
/

331
1,458
101
18
294
508
765
4,067
16
899

SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

Page 118

COST

Large
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
GENERAL INDUSTRY
Large
Small
MARITIME
Large
Small
CARBON STEEL

$0.36
$0.36

0=
0=

$0
$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

37 =
34 =

$0
$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

178 =
130 =

$0
$0

3,840 / 1,602
840 / 1,602

0.12
0.03

$0.36
$0.36

3=
1=

$0
$0

0 / 1,602
2,000 / 1,602

0.00
0.06

$0.36
$0.36

0=
5=

$0
$0

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

207 =
1,561 =

$0
$0

7,580 / 1,602
240 / 1,602

0.24
0.01

$0.36
$0.36

347 =
703 =

$30
$2

1,000
0
0
0

1,602
1,602
1,602
1,602

0.03
0.00
0.00
0.00

$0.36
$0.36
$0.36
$0.36

5
17
0
0

=
=
=
=

$0
$0
$0
$0

5,460 / 1,602
360 / 1,602

0.17
0.01

$0.36
$0.36

92 =
367 =

$6
$1

1,602
1,602
1,602
1,602

0.06
0.00
0.94
0.47

$0.36
$0.36
$0.36
$0.36

164
0
21
4

=
=
=
=

$4
$0
$7
$1

11,000 / 1,602
0 / 1,602

0.34
0.00

$0.36
$0.36

6=
0=

$1
$0

0.00
0.00
0.00
0.00

$0.36
$0.36
$0.36
$0.36

2,000
0
30,000
15,000

0
0
0
0

Page 119

/
/
/
/

/
/
/
/

/
/
/
/

1,602
1,602
1,602
1,602

#PLANTS

Item 13 Cost

5% of containers need labels
0.00
0.00

NOGLOVESCONT

0 / 1,602
0 / 1,602

GLOVEREPL

Variables

Table 18

175
93
38
34

=
=
=
=

$0
$0
$0
$0

COST

2,000
1,000
1,000
1,000

/
/
/
/

1,602
1,602
1,602
1,602

0.06
0.03
0.03
0.03

$0.36
$0.36
$0.36
$0.36

1,290
5,162
16
59

=
=
=
=

$29
$58
$0
$1

Large
Small
State
Local

20,000
3,000
20,000
3,000

/
/
/
/

1,602
1,602
1,602
1,602

0.62
0.09
0.62
0.09

$0.36
$0.36
$0.36
$0.36

48
58
0
29

=
=
=
=

$11
$2
$0
$1

0 / 1,602
0 / 1,602

0.00
0.00

$0.36
$0.36

18 =
0=

$0
$0

0.00
0.00
0.00
0.00
0.44
0.09
0.06
0.09
0.44
0.03

$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
Total

 GOVERNMENT

#PLANTS

GLOVEREPL
CONSTRUCTION

Item 13 Cost

5% of containers need labels

Large
Small
State
Local

Variables

NOGLOVESCONT

Table 18

SECTOR 27.  Solid Waste Incineration
ALL
 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL

Large
Small

SECTOR 31.  Construction
INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION

Large
Small
State
Local
Large
Small
State
Local
Large
Small

0
0
0
0
14,000
3,000
2,000
3,000
14,000
1,000

Page 120

/
/
/
/
/
/
/
/
/
/

1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602

0
0
0
0
44
143
1
201
48
148
66,329

=
=
=
=
=

=
=
=

$0
$0
$0
$0
$7
$5
$0
$7
$8
$2
$2,258

Table 18a

Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv), 
and 1926.1126(g)(2)(iv)); Clerical Time and Cost to Affix Cr(VI) Hazard‐Warning Labels for Bags or Containers 
Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment

OSHA assumes that it will take 1 minute of clerical employee time to obtain and affix Cr(VI) hazard‐warning labels to glove 
disposal containers.  OSHA assumes the number of labels will be the same as the number of containers needing labels, as 
calculated in Table 18.  

Responses

Item 12 Cost

HCLWage

Burden Hours

 AFFIX

#PLANTS

Variables

5% of containers need labels

5% of containers need new or replacement labels = see Table 18
* HCLWAGE =    Highest clerical wage rate (overestimation)
* AFFIX = 1 minute for a clerical worker to obtain and affix label
#PLANTS = Number of model plants
COST = The cost to obtain and affix the label

Sector 1. Electroplating
ALL

1713.13 *
373.60 *

1 *
1 *

0.02
0.02

=
=

34.26
7.47

*
*

$28.36 =
$28.36 =

$971.69 1713.13
$211.91 373.60

Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

*
*
*
*
*
*
*
*

7,911
8,864
191
108
269
2,160
25
793

*
*
*
*
*
*
*
*

0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

=
=
=
=
=
=
=
=

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

*
*
*
*
*
*
*
*

$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36

=
=
=
=
=
=
=
=

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

*
*
*
*
*
*

10,607
10,797
412
233
405
3,058

*
*
*
*
*
*

0.02
0.02
0.02
0.02
0.02
0.02

=
=
=
=
=
=

0.00
0.00
0.00
0.00
0.00
0.00

*
*
*
*
*
*

$28.36
$28.36
$28.36
$28.36
$28.36
$28.36

=
=
=
=
=
=

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

0.00
0.00
0.00
0.00
0.00
0.00

3.90
0.03
1.90
0.16
0.44
0.09
0.16
0.06
0.44
0.09

*
*
*
*
*
*
*
*
*
*

50
63
331
1,458
101
18
294
508
765
4,067

*
*
*
*
*
*
*
*
*
*

0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

=
=
=
=
=
=
=
=
=
=

3.88
0.04
12.61
4.55
0.88
0.03
0.92
0.63
6.69
7.62

*
*
*
*
*
*
*
*
*
*

$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36

=
=
=
=
=
=
=
=
=
=

$109.92
$1.11
$357.60
$129.05
$25.08
$0.98
$26.01
$17.99
$189.62
$216.02

193.79
1.95
630.47
227.52
44.21
1.72
45.86
31.72
334.31
380.85

Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY
AEROSPACE
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION

Page 121

Responses

Item 12 Cost

HCLWage

Burden Hours

 AFFIX

#PLANTS

Variables

5% of containers need labels

Table 18a

0.16
1.84

*
*

16 *
899 *

0.02
0.02

=
=

0.05
33.11

*
*

$28.36 =
$28.36 =

2.34
0.00

*
*

2 *
0 *

0.02
0.02

=
=

0.10
0.00

*
*

$28.36 =
$28.36 =

$2.76
$0.00

4.87
0.00

0.75
0.09

*
*

2 *
1 *

0.02
0.02

=
=

0.03
0.00

*
*

$28.36 =
$28.36 =

$0.84
$0.05

1.48
0.09

0.27
0.00

*
*

3 *
0 *

0.02
0.02

=
=

0.01
0.00

*
*

$28.36 =
$28.36 =

$0.40
$0.00

0.70
0.00

1.78
0.00

*
*

5 *
0 *

0.02
0.02

=
=

0.19
0.00

*
*

$28.36 =
$28.36 =

$5.25
$0.00

9.26
0.00

0.37
0.19

*
*

87 *
137 *

0.02
0.02

=
=

0.65
0.51

*
*

$28.36 =
$28.36 =

$18.57
$14.59

32.75
25.73

0.75
0.01
SECTOR 10.  Plastic Colorant Producers and Users
0.02
ALL
0.00
SECTOR 11.  Plating Mixture Producers
0.45
ALL
0.09
SECTOR 13.  Chromium Metal Producers
0.00
ALL
0.00
SECTOR 14.  Iron and Steel Mills
0.00
GENERAL INDUSTRY
0.00
0.00
CARBON STEEL
0.00
SECTOR 14b. Alloy Stainless Steel Forging Industry
0.00
RESHAPING INDUSTRY
0.00
SECTOR 15.  Iron and Steel Foundries
0.00
ALL
0.00
SECTOR 17.  Chromium Dye Producers
0.12
ALL
0.03

*
*

3 *
10 *

0.02
0.02

=
=

0.05
0.00

*
*

$28.36 =
$28.36 =

$1.28
$0.09

2.26
0.15

*
*

86 *
42 *

0.02
0.02

=
=

0.03
0.00

*
*

$28.36 =
$28.36 =

$0.89
$0.09

1.57
0.16

*
*

4 *
3 *

0.02
0.02

=
=

0.04
0.01

*
*

$28.36 =
$28.36 =

$1.13
$0.15

1.99
0.26

*
*

1 *
0 *

0.02
0.02

=
=

0.00
0.00

*
*

$28.36 =
$28.36 =

$0.00
$0.00

0.00
0.00

GOVERNMENT

$1.44
2.53
$938.99 1655.48

SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

*
*
*
*

37
12
0
0

*
*
*
*

0.02
0.02
0.02
0.02

=
=
=
=

0.00
0.00
0.00
0.00

*
*
*
*

$28.36
$28.36
$28.36
$28.36

=
=
=
=

$0.00
$0.00
$0.00
$0.00

0.00
0.00
0.00
0.00

*
*

37 *
34 *

0.02
0.02

=
=

0.00
0.00

*
*

$28.36 =
$28.36 =

$0.00
$0.00

0.00
0.00

*
*

178 *
130 *

0.02
0.02

=
=

0.00
0.00

*
*

$28.36 =
$28.36 =

$0.00
$0.00

0.00
0.00

*
*

3 *
1 *

0.02
0.02

=
=

0.01
0.00

*
*

$28.36 =
$28.36 =

$0.20
$0.01

0.36
0.03

Page 122

Responses

*
*

0 *
5 *

0.02
0.02

=
=

0.00
0.01

*
*

$28.36 =
$28.36 =

$0.00
$0.18

0.00
0.32

0.00
0.00

*
*

207 *
1,561 *

0.02
0.02

=
=

0.00
0.00

*
*

$28.36 =
$28.36 =

$0.00
$0.00

0.00
0.00

0.24
0.01

*
*

347 *
703 *

0.02
0.02

=
=

1.64
0.11

*
*

$28.36 =
$28.36 =

$46.50
$2.99

81.97
5.27

0.03
0.00
0.00
0.00

*
*
*
*

5
17
0
0

*
*
*
*

0.02
0.02
0.02
0.02

=
=
=
=

0.00
0.00
0.00
0.00

*
*
*
*

$28.36
$28.36
$28.36
$28.36

=
=
=
=

$0.10
$0.00
$0.00
$0.00

0.17
0.00
0.00
0.00

0.17
0.01

*
*

92 *
367 *

0.02
0.02

=
=

0.31
0.08

*
*

$28.36 =
$28.36 =

$8.87
$2.34

15.65
4.13

0.06
0.00
0.94
0.47

*
*
*
*

164
0
21
4

*
*
*
*

0.02
0.02
0.02
0.02

=
=
=
=

0.21
0.00
0.40
0.04

*
*
*
*

$28.36
$28.36
$28.36
$28.36

=
=
=
=

$5.82
$0.00
$11.25
$1.07

10.26
0.00
19.83
1.89

0.34
0.00

*
*

6 *
0 *

0.02
0.02

=
=

0.04
0.00

*
*

$28.36 =
$28.36 =

$1.15
$0.00

2.02
0.00

0.00
0.00
0.00
0.00
0.06
0.03
0.03
0.03

*
*
*
*
*
*
*
*

175
93
38
34
1,290
5,162
16
59

*
*
*
*
*
*
*
*

0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

=
=
=
=
=
=
=
=

0.00
0.00
0.00
0.00
1.61
3.22
0.01
0.04

*
*
*
*
*
*
*
*

$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36

=
=
=
=
=
=
=
=

$0.00
$0.00
$0.00
$0.00
$45.66
$91.39
$0.29
$1.04

0.00
0.00
0.00
0.00
80.51
161.12
0.51
1.83

0.62
0.09
0.62
0.09

*
*
*
*

48
58
0
29

*
*
*
*

0.02
0.02
0.02
0.02

=
=
=
=

0.60
0.11
0.00
0.05

*
*
*
*

$28.36
$28.36
$28.36
$28.36

=
=
=
=

$17.06
$3.07
$0.00
$1.54

30.07
5.41
0.00
2.71

0.00
0.00

*
*

18 *
0 *

0.02
0.02

=
=

0.00
0.00

*
*

$28.36 =
$28.36 =

$0.00
$0.00

0.00
0.00

 AFFIX

HCLWage

Item 12 Cost

Burden Hours

0.00
0.06

#PLANTS

Variables

5% of containers need labels

Table 18a

SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL
FIBER, FLAT, AND CONTAINER GLASS
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Chromium Catalyst Users
Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
 GOVERNMENT
SECTOR 27.  Solid Waste Incineration
ALL
 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL

Page 123

Responses

Item 12 Cost

HCLWage

Burden Hours

 AFFIX

#PLANTS

Variables

5% of containers need labels

Table 18a

SECTOR 31.  Construction
INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total

0.00
0.00
0.00
0.00
0.44
0.09
0.06
0.09
0.44
0.03

*
*
*
*
*
*
*
*
*
*

0
0
0
0
44
143
1
201
48
148
66,329

*
*
*
*
*
*
*
*
*
*

Page 124

0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

=
=
=
=
=

=
=
=

0.00
0.00
0.00
0.00
0.38
0.27
0.00
0.38
0.42
0.09
124.39

*
*
*
*
*
*
*
*
*
*

$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36

=
=
=
=
=

=
=
=

$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$10.79
19.03
$7.60
13.40
$0.03
0.06
$10.67
18.80
$11.89
20.97
$2.61
4.60
$3,527.60 6219.32

Table 19

Protective Work Clothing and Equipment, Cleaning and Replacement (§§ 1910.1026(h)(3)(iii), 
1915.1026(g)(3)(iii), and 1926.1126(g)(3)(iii)) 
Employer Time and Cost to Inform Laundry Contractor About Cr(VI)‐Contaminated Protective Clothing or Equipment 
The laundering company will be informed of the presence of hexavalent chromium in the laundry at the commencement of the laundering 
agreement.  Laundering facilities typically collect dirty uniforms for cleaning.  It is estimated that the laundering facility will assume the cost burden 
for labeling the contaminated laundry and include the cost in their laundering fee.   For purposes of calculating burden hours, OSHA assumes that it 
will take a maximum of five minutes to notify the laundry, and that 25% of the plants will need to annually notify or reinform the laundry.

0.08
0.08

=
=

*
*
*
*
*
*
*
*

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

=
=
=
=
=
=
=
=

158.22
177.29
3.81
2.16
5.39
43.19
0.51
15.86

*
*
*
*
*
*
*
*

$       34.43
$       34.43
$       34.43
$       34.43
$       34.43
$       34.43
$       34.43
$       34.43

=
=
=
=
=
=
=
=

$         5,448.31
$         6,104.90
$            131.32
$               74.37
$            185.59
$         1,487.36
$               17.42
$            546.04

7,911
8,864
191
108
269
2,160
25
793

2651.7
2699.4
102.88
58.37
101.17
764.4

*
*
*
*
*
*

0.08
0.08
0.08
0.08
0.08
0.08

=
=
=
=
=
=

212.13
215.95
8.23
4.67
8.09
61.15

*
*
*
*
*
*

$       34.43
$       34.43
$       34.43
$       34.43
$       34.43
$       34.43

=
=
=
=
=
=

$         7,304.84
$         7,436.15
$            283.40
$            160.80
$            278.71
$         2,105.76

10,607
10,797
412
233
405
3,058

12.418
15.638
82.788
364.5
25.296
4.5993
73.472
127.03
191.27
1016.9
4.0608
224.75

*
*
*
*
*
*
*
*
*
*
*
*

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

=
=
=
=
=
=
=
=
=
=
=
=

0.99
1.25
6.62
29.16
2.02
0.37
5.88
10.16
15.30
81.35
0.32
17.98

*
*
*
*
*
*
*
*
*
*
*
*

$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34
$       43.34

=
=
=
=
=
=
=
=
=
=
=
=

$               43.06
$               54.22
$            287.05
$         1,263.80
$               87.71
$               15.95
$            254.75
$            440.45
$            663.19
$         3,525.73
$               14.08
$            779.28

50
63
331
1,458
101
18
294
508
765
4,067
16
899

Large
Small

2 0.5204 *
0
0*

0.08
0.08

=
=

0.04 * $       50.86 = $                 2.12
0.00 * $       50.86 = $                   ‐

2
0

Large
Small

2 0.4943 *
1 0.2472 *

0.08
0.08

=
=

0.04 * $       49.57 = $                 1.96
0.02 * $       49.57 = $                 0.98

2
1

RESPONSES

0.02 * $       34.98 = $                 0.70
0.02 * $       34.98 = $                 0.70

1
1

SUPWAGE

Item 12 Cost

BURDEN HOURS  

NOTIME

0.25 *
0.25 *

#PLANTS

# of PLANTS *25%

Hours = #PLANTS * NOTTIME
Cost = Hours * SUPEWAGE
#PLANTS = Number of plants represented by the model plant * 25% need to notify or reinform.
NOTIME = Time to notify the laundry.
SUPEWAGE = Supervisory Wage Rate

Sector 1. Electroplating
ALL

Large
Small

1
1

Large
Small
Large
Small
Large
Small
State
Local

7,911
8,864
191
108
269
2,160
25
793

1977.8
2216.1
47.669
26.996
67.368
539.92
6.3234
198.21

Large
Small
Large
Small
Large
Small

10,607
10,797
412
233
405
3,058

Large
Small
Large
Small
Large
Small
Large
Small
Large
Small
State
Local

50
63
331
1,458
101
18
294
508
765
4,067
16
899

Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3.  Painting
GENERAL INDUSTRY
AEROSPACE
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL

Page 125

Table 19

SECTOR 6. CCA Producers
Large
Small

3 0.6392 *
0
0*

0.08
0.08

=
=

0.05 * $       41.98 = $                 2.15
0.00 * $       41.98 = $                   ‐

3
0

Large
Small

5 1.3011 *
0
0*

0.08
0.08

=
=

0.10 * $       50.86 = $                 5.29
0.00 * $       50.86 = $                   ‐

5
0

Large
Small

87 21.858 *
137 34.348 *

0.08
0.08

=
=

1.75 * $       37.87 = $               66.23
2.75 * $       37.87 = $            104.07

87
137

Large
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
GENERAL INDUSTRY
Small
Large
CARBON STEEL
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking

3 0.7531 *
10 2.5102 *

0.08
0.08

=
=

0.06 * $       37.94 = $                 2.29
0.20 * $       37.94 = $                 7.62

3
10

86 21.508 *
42 10.52 *

0.08
0.08

=
=

1.72 * $       42.04 = $               72.33
0.84 * $       42.04 = $               35.38

86
42

4 1.1045 *
3 0.7363 *

0.08
0.08

=
=

0.09 * $       37.72 = $                 3.33
0.06 * $       37.72 = $                 2.22

4
3

1
0

0.25 *
0*

0.08
0.08

=
=

0.02 * $       51.02 = $                 1.02
0.00 * $       51.02 = $                   ‐

1
0

37 9.3161 *
12 2.9882 *
0
0*
0
0*

0.08
0.08
0.08
0.08

=
=
=
=

0.75
0.24
0.00
0.00

$               38.03
$               12.20
$                   ‐
$                   ‐

37
12
0
0

37 9.1404 *
34 8.613 *

0.08
0.08

=
=

0.73 * $       51.02 = $               37.31
0.69 * $       51.02 = $               35.16

37
34

178 44.556 *
130 32.404 *

0.08
0.08

=
=

3.56 * $       37.21 = $            132.63
2.59 * $       37.21 = $               96.46

178
130

3 0.7415 *
1 0.2472 *

0.08
0.08

=
=

0.06 * $       49.57 = $                 2.94
0.02 * $       49.57 = $                 0.98

3
1

0
0*
5 1.3011 *

0.08
0.08

=
=

0.00 * $       54.55 = $                   ‐
0.10 * $       54.55 = $                 5.68

0
5

207 51.732 *
1,561 390.34 *

0.08
0.08

=
=

4.14 * $       39.35 = $            162.87
31.23 * $       39.35 = $         1,228.93

207
1,561

347 86.625 *
703 175.8 *

0.08
0.08

=
=

6.93 * $       26.25 = $            181.92
14.06 * $       26.25 = $            369.20

347
703

5 1.3559 *
17 4.2937 *
0
0*
0
0*

0.08
0.08
0.08
0.08

=
=
=
=

0.11
0.34
0.00
0.00

$                 4.12
$               13.04
$                   ‐
$                   ‐

5
17
0
0

92 22.954 *
367 91.817 *

0.08
0.08

=
=

1.84 * $       27.39 = $               50.30
7.35 * $       27.39 = $            201.22

92
367

164 41.104 *
0
0*
21 5.2957 *
4 1.0087 *

0.08
0.08
0.08
0.08

=
=
=
=

3.29
0.00
0.42
0.08

$            140.49
$                   ‐
$               18.10
$                 3.45

164
0
21
4

6 1.4714 *
0
0*

0.08
0.08

=
=

0.12 * $       33.72 = $                 3.97
0.00 * $       33.72 = $                   ‐

6
0

ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

Page 126

*
*
*
*

*
*
*
*

*
*
*
*

$       51.02
$       51.02
$       51.02
$       51.02

$       37.96
$       37.96
$       37.96
$       37.96

$       42.72
$       42.72
$       42.72
$       42.72

=
=
=
=

=
=
=
=

=
=
=
=

Table 19

GENERAL INDUSTRY
MARITIME
CONSTRUCTION
 GOVERNMENT

Large
Small
Large
Small
Large
Small
State
Local

175
93
38
34
1,290
5,162
16
59

43.666
23.351
9.6131
8.4687
322.43
1290.6
4.0608
14.682

*
*
*
*
*
*
*
*

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

=
=
=
=
=
=
=
=

3.49
1.87
0.77
0.68
25.79
103.25
0.32
1.17

*
*
*
*
*
*
*
*

$       42.20
$       42.20
$       42.20
$       42.20
$       42.20
$       42.20
$       42.20
$       42.20

=
=
=
=
=
=
=
=

$            147.41
$               78.83
$               32.45
$               28.59
$         1,088.49
$         4,356.89
$               13.71
$               49.56

175
93
38
34
1,290
5,162
16
59

Large
Small
State
Local

48 12.043 *
58 14.452 *
0
0*
29 7.2259 *

0.08
0.08
0.08
0.08

=
=
=
=

0.96
1.16
0.00
0.58

*
*
*
*

$       35.80
$       35.80
$       35.80
$       35.80

=
=
=
=

$               34.49
$               41.39
$                   ‐
$               20.69

48
58
0
29

Large
Small

18 4.4143 *
0
0*

0.08
0.08

=
=

0.35 * $       36.71 = $               12.96
0.00 * $       36.71 = $                   ‐

18
0

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

=
=
=
=
=
=
=
=
=
=

SECTOR 27.  Solid Waste Incineration
ALL
 GOVERNMENT
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction
INDUSTRIAL REHABILITATION AND 
MAINTENANCE

HAZARDOUS WASTE‐SITE WORK

REFRACTORY BRICK RESTORATION
Total

Large
Small
State
Local
Large
Small
State
Local
Large
Small

0
0
0
0
44
143
1
201
48
148

0
0
0
0
10.885
35.767
0.2222
50.207
11.996
36.877
16,582

*
*
*
*
*
*
*
*
*

Page 127

0.00
0.00
0.00
0.00
0.87
2.86
0.02
4.02
0.96
2.95
1,327

*
*
*
*
*
*
*

$       42.27
$       42.27
$       42.27
$       42.27
$       42.27
$       42.27
$       42.27
$       42.27
* $       42.27
* $       42.27

=
=
=
=
=
=

$                   ‐
$                   ‐
$                   ‐
$                   ‐
$               36.81
$            120.94
$                 0.75
$170
= $               40.57
= $            124.70
$48,440.60

0
0
0
0
44
143
1
201
48
148
66,329

Table 20

Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(1)(i)(A), (i)(3)(i), and  
(i)(3)(ii))
Employee Time and Cost to Complete the Initial  Medical Examination
This table calculates the burden hours and costs of employee time to complete the initial medical examinations for those employees who are potentially 
exposed to airborne hexavalent chromium at or above the action level or who show "signs or symptoms" of exposure to hexavalent chromium before 
the implementation of engineering controls.   For purposes of estimating the ICR costs, the Agency assumes that: all initial monitoring is completed, 
existing employers will experience a 5% turnover of potentially exposed employees with initial medical examinations,  and new employers will have no 
employees requiring an initial medical examination.
Hours = POTEXEMP*MEDEXAMTIME * #PLANTS
Cost = POTEXEMP* MEDEXAMTIME *NONSUPWAGE * #PLANTS

RESPONSES

1,885 =

1,574 * $25.49

$40,128

10,494

Small

1 0.0464 * 3 *

3,547 =

494 * $25.49

$12,583

3,291

Large

2 0.0973 * 3 *

7,911 =

2,309 * $25.10

$57,952

15,392

Small
Large

0
0
* 3 *
18 0.9242 * 3 *

8,864 =
191 =

0 * $25.10
529 * $25.10

$0
$13,269

0
3,524

Small
Large

1 0.0486 * 3 *
50 2.4807 * 3 *

108 =
269 =

16 * $25.10
2,005 * $25.10

$396
$50,337

105
13,370

Small
Local

5 0.2432 * 3 *
2 0.0973 * 3 *

2,160 =
25 =

1,576 * $25.10
7 * $25.10

$39,551
$185

10,505
49

State

0

* 3 *

793 =

0 * $25.10

$0

0

0.0486 * 3 *

10,607 =

1,548 * $25.10

$38,849

10,319

* 3 *
* 3 *

10,797 =
412 =

0 * $25.10
0 * $25.10

$0
$0

0
0

0.0486 * 3 *
0.9242 * 3 *

233 =
405 =

34 * $25.10
1,122 * $25.10

$855
$28,163

227
7,480

*

3,058 =

892 * $25.10

$22,398

5,949

*

50 =

350 * $31.68

$11,073

2,330

*
*

63 =
331 =

9 * $31.68
594 * $31.68

$273
$18,817

58
3,960

*
*

1,458 =
101 =

201 * $31.68
28 * $31.68

$6,373
$885

1,341
186

*
*

18 =
294 =

3 * $31.68
121 * $31.68

$80
$3,836

17
807

*

508 =

70 * $31.68

$2,211

465

Hours

6 0.2783 * 3 *

#PLANTS

Large

POTEXEMP

Item 12 Cost

 NONSUPEWAGE

MEDEXAMTIME

POTEXEMP * 5%

Variables

* POTEXEMP * 5% = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* MEDEXAMTIME = Employee time, in hours, for a medical examination.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants 

Sector 1. Electroplating
ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
0

Sector 2. Mild Steel Welding
Large

1

Small
Large

0
0

Small
Large

1
18

General Industry
0
0

Maritime

Construction
2
0.0973 * 3
Small
SECTOR 3.  PAINTING                                                                        GENERAL INDUSTRY
Large
47 2.3456 * 3
AEROSPACE
1
0.046 * 3
Small
Large
12 0.5979 * 3
Autobody
1
0.046 * 3
Small
Large
2
0.092 * 3
Coil Coating
1
0.046 * 3
Small
Large
3
0.1373 * 3
Maritime 
1
0.0458 * 3
Small

Page 128

RESPONSES

0.1087 * 3 *

765 =

249 * $31.68

$7,902

1,663

Small
Local

1
9

0.0362 * 3 *
0.4373 * 3 *

4,067 =
16 =

442 * $31.68
21 * $31.68

$14,003
$675

2,947
142

State

1

0.0312 * 3 *

899 =

84 * $31.68

$2,669

562

Large

7

0.3643 * 3 *

2=

2 * $37.06

$84

15

* 3 *

0=

0 * $37.06

$0

0

Large

25 1.249 * 3 *

2=

7 * $36.12

$268

49

Small

3 0.1561 * 3 *

1=

0 * $36.12

$17

3

0.1278 * 3 *

3=

1 * $30.60

$30

7

* 3 *

0=

0 * $30.60

$0

0

1.3531 * 3 *

5=

21 * $37.06

$783

141

Hours

2

#PLANTS

Large

POTEXEMP

Item 12 Cost

 NONSUPEWAGE

MEDEXAMTIME

POTEXEMP * 5%

Variables

Table 20

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
0

Small
SECTOR 5. Chromate Pigment Procedures
ALL

0

SECTOR 6. CCA Producers
Large

3

ALL
0

Small

0

SECTOR 7.  Chromium Catalyst Producers
Large

27

ALL
Small

0

0

* 3 *

0=

0 * $37.06

$0

0

Large

5 0.2602 * 3 *

87 =

68 * $27.60

$1,884

455

Small

2 0.1041 * 3 *

137 =

43 * $27.60

$1,184

286

Large

0

0

* 3 *

3=

0 * $27.65

$0

0

Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small

0

0

* 3 *

10 =

0 * $27.65

$0

0

0

0

* 3 *

86 =

0 * $30.64

$0

0

0

0

* 3 *

42 =

0 * $30.64

$0

0

2

0.1104 * 3 *

4=

1 * $27.50

$40

10

1

0.0736 * 3 *

3=

1 * $27.50

$18

4

SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL

13

0.65

* 3 *

1=

2 * $37.17

$72

13

0

* 3 *

0=

0 * $37.17

$0

0

40

2.0039 * 3 *

37 =

224 * $37.17

$8,328

1,493

1
10

0.0703 * 3 *
0.4922 * 3 *

12 =
112 =

3 * $37.17
165 * $37.17

$94
$6,136

17
1,100

1

0.0703 * 3 *

35 =

7 * $37.17

$276

49

3

0.1406 * 3 *

37 =

15 * $37.17

$573

103

* 3 *

34 =

0 * $37.17

$0

0

1.3502 * 3 *

178 =

722 * $27.12

$19,579

4,813

0

0
27

0

5

0.27

* 3 *

130 =

105 * $27.12

$2,848

700

0

0

* 3 *

3=

0 * $36.12

$0

0

0

0

* 3 *

1=

0 * $36.12

$0

0

Page 129

Item 12 Cost

RESPONSES

 NONSUPEWAGE

0

* 3 *

0=

0 * $39.76

$0

0

Small

3 0.1561 * 3 *

5=

2 * $39.76

$97

16

Large

0

0

* 3 *

207 =

0 * $28.67

$0

0

Small

0

0

* 3 *

1,561 =

0 * $28.67

$0

0

Large

0

0

* 3 *

347 =

0 * $19.13

$0

0

Small

0

0

* 3 *

703 =

0 * $19.13

$0

0

0.0452 * 3 *

5=

1 * $27.66

$20

5

Hours

0

#PLANTS

MEDEXAMTIME

Large

POTEXEMP

POTEXEMP * 5%

Variables

Table 20

SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
Large

1

Small
Large

10

0
* 3 *
0.4972 * 3 *

17 =
78 =

0 * $27.66
116 * $27.66

$0
$3,207

0
773

Small

2

0.0904 * 3 *

5=

1 * $27.66

$34

8

ALL
0

Fiber, Flat and Container Glass
SECTOR 22.  Printing
Large

0

0

* 3 *

92 =

0 * $19.97

$0

0

Small

0

0

* 3 *

367 =

0 * $19.97

$0

0

0.0504 * 3 *

164 =

25 * $31.14

$775

166

Small
Large

0
0
* 3 *
10 0.5043 * 3 *

0=
21 =

0 * $31.14
32 * $31.14

$0
$998

0

Small

5 0.2522 * 3 *

4=

3 * $31.14

$95

20

Large

0

0

* 3 *

6=

0 * $24.56

$0

0

Small

0

0

* 3 *

0=

0 * $24.56

$0

0

Large

1 0.0467 * 3 *

175 =

24 * $30.76

$753

163

Small
Large

0
0

* 3 *
* 3 *

93 =
38 =

0 * $30.76
0 * $30.76

$0
$0

0
0

Small
Large

0
0
* 3 *
3 0.1299 * 3 *

34 =
1,290 =

0 * $30.76
503 * $30.76

$0
$15,465

0
3,351

Small
State

1 0.0433 * 3 *
1 0.0312 * 3 *

5,162 =
16 =

671 * $30.76
2 * $30.76

$20,633
$47

4,472
10

Local

1 0.0312 * 3 *

59 =

6 * $30.76

$169

37

Large

0

0

* 3 *

48 =

0 * $26.09

$0

0

Small
State

0
0

0
0

* 3 *
* 3 *

58 =
0=

0 * $26.09
0 * $26.09

$0
$0

0
0

Local

0

0

* 3 *

29 =

0 * $26.09

$0

0

Large

2 0.0981 * 3 *

18 =

5 * $26.75

$139

35

Small

0

0=

0 * $26.75

$0

0

ALL
SECTOR 24.  Chromium Catalyst Users
Large

1

Catalyst Users

Chromium Catalyst Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry
0
0

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
0

* 3 *

Page 130

Item 12 Cost

RESPONSES

 NONSUPEWAGE

0

0

* 3 *

55 =

0 * $30.79

$0

0

Small
State Gov't

0
0

0
0

* 3 *
* 3 *

196 =
16 =

0 * $30.79
0 * $30.79

$0
$0

0
0

Local Gov't
Large

0
0

0
0

* 3 *
* 3 *

74 =
44 =

0 * $30.79
0 * $30.79

$0
$0

0
0

Small
State Gov't

0
0

0
0

* 3 *
* 3 *

143 =
1=

0 * $30.79
0 * $30.79

$0
$0

0
0

Local Gov't
Large

0
0
* 3 *
9 0.4443 * 3 *

201 =
48 =

0 * $30.79
64 * $30.79

$0
$1,969

0
426

Small

1 0.0444 * 3 *

148 =
72,329

20 * $30.79

$605
$460,684

131
114,055

Hours

#PLANTS

MEDEXAMTIME

Large

POTEXEMP

POTEXEMP * 5%

Variables

Table 20

SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration
Total

Page 131

17,140

Table 21

Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 
1926.1126(i)(1)(i)(A), (i)(3)(i), and  (i)(3)(ii)) 
Contract Cost for a PLHCP to Conduct the Initial Medical Examination
This table calculates the cost for a contractor PLHCP to conduct initial medical examinations.

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

COST = POTEXEMP * MEDEXAMCOST * # PLANTS
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" 
                              before the implementation of engineering controls * 5%
*MEDEXAMCOST = Cost of medical exam
* #PLANTS = Number of Plants 

Sector 1. Electroplating
Large

6 0.2783 *

$142 *

1,885 =

$74,404

Small

1 0.0464 *

$142 *

3,547 =

$23,331

Large

2 0.0973 *

$142 *

7,911 =

$109,132

Small
Large

0 0.0000 *
18 0.9242 *

$142 *
$142 *

8,864 =
191 =

$0
$24,988

Small
Large

1 0.0486 *
50 2.4807 *

$142 *
$142 *

108 =
269 =

$745
$94,792

Small
State

5 0.2432 *
2 0.0973 *

$142 *
$142 *

2,160 =
25 =

$74,481
$349

Local

0 0.0000 *

$142 *

793 =

$0

Large

1 0.0486 *

$142 *

10,607 =

$73,159

Small
Large

0 0.0000 *
0 0.0000 *

$142 *
$142 *

10,797 =
412 =

$0
$0

Small
Large

1 0.0486 *
18 0.9242 *

$142 *
$142 *

233 =
405 =

$1,610
$53,036

*

$142 *

3,058 =

$42,179

*

$142 *

50 =

$16,522

*
*

$142 *
$142 *

63 =
331 =

$408
$4,319

*
*

$142 *
$142 *

1,458 =
101 =

$9,509
$1,320

*

$142 *

18 =

$120

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
2 0.0973
Small
SECTOR 3.  PAINTING                                                  General Industry
Large
47 2.3456
AEROSPACE
1 0.0460
Small
Large
   2 0.0920
Auto Body
1 0.0460
Small
Large
2 0.0920
Coil Coating
1 0.0460
Small

Page 132

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

3 0.1373 *

$142 *

294 =

$5,723

Small
Large

1 0.0458 *
2 0.1087 *

$142 *
$142 *

508 =
765 =

$3,298
$11,791

Small
State

1 0.0362 *
9 0.4373 *

$142 *
$142 *

4,067 =
16 =

$20,894
$1,007

Local

1 0.0312 *

$142 *

899 =

$3,982

Large

7 0.3643 *

$142 *

2=

$108

Small

0 0.0000 *

$142 *

0=

$0

Large

25 1.2490 *

$142 *

2=

$350

Small

3 0.1561 *

$142 *

1=

$22

Large

3 0.1278 *

$142 *

3=

$46

Small

0 0.0000 *

$142 *

0=

$0

Large

27 1.3531 *

$142 *

5=

$999

Small

0 0.0000 *

$142 *

0=

$0

Large

5 0.2602 *

$142 *

87 =

$3,226

Small

2 0.1041 *

$142 *

137 =

$2,028

Large

0 0.0000 *

$142 *

3=

$0

Small

0 0.0000 *

$142 *

10 =

$0

Large

0 0.0000 *

$142 *

86 =

$0

Small

0 0.0000 *

$142 *

42 =

$0

Large

2 0.1104 *

$142 *

4=

$69

Small

1 0.0736 *

$142 *

3=

$31

Large

13 0.6500 *

$142 *

1=

$92

Small

0 0.0000 *

$142 *

0=

$0

Large

40 2.0039 *

$142 *

37 =

$10,589

Small

1 0.0703 *

$142 *

12 =

$119

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
General Industry

Page 133

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

10 0.4922 *

$142 *

112 =

$7,802

Small

1 0.0703 *

$142 *

35 =

$351

Large

3 0.1406 *

$142 *

37 =

$729

Small

0 0.0000 *

$142 *

34 =

$0

Large

27 1.3502 *

$142 *

178 =

$34,122

Small

5 0.2700 *

$142 *

130 =

$4,963

Large

0 0.0000 *

$142 *

3=

$0

Small

0 0.0000 *

$142 *

1=

$0

Large

0 0.0000 *

$142 *

0=

$0

Small

3 0.1561 *

$142 *

5=

$115

Large

0 0.0000 *

$142 *

207 =

$0

Small

0 0.0000 *

$142 *

1,561 =

$0

Large

0 0.0000 *

$142 *

347 =

$0

Small

0 0.0000 *

$142 *

703 =

$0

Large

1 0.0452 *

$142 *

5=

$35

Small
Large

0 0.0000 *
10 0.4972 *

$142 *
$142 *

17 =
78 =

$0
$5,481

Small

2 0.0904 *

$142 *

5=

$58

Large

0 0.0000 *

$142 *

92 =

$0

Small

0 0.0000 *

$142 *

367 =

$0

Large

1 0.0504 *

$142 *

164 =

$1,176

Small

0 0.0000 *

$142 *

0=

$0

Carbon Steel
SECTOR 14B. Forging Industry
Reshaping
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
General Industry

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Page 134

COST

#PLANTS

MEDEXAMCOST

POTEXEMP*5%

Variables

POTEXEMP

Table 21

Large

10 0.5043 *

$142 *

21 =

$1,515

Small

5 0.2522 *

$142 *

4=

$144

Large

0 0.0000 *

$142 *

6=

$0

Small

0 0.0000 *

$142 *

0=

$0

Large

1 0.0467 *

$142 *

175 =

$1,157

Small
Large

0 0.0000 *
0 0.0000 *

$142 *
$142 *

93 =
38 =

$0
$0

Small
Large

0 0.0000 *
3 0.1299 *

$142 *
$142 *

34 =
1,290 =

$0
$23,762

Small
State

1 0.0433 *
1 0.0312 *

$142 *
$142 *

5,162 =
16 =

$31,703
$72

Local

1 0.0312 *

$142 *

59 =

$260

Large

0 0.0000 *

$142 *

48 =

$0

Small
State

0 0.0000 *
1 0.0438 *

$142 *
$142 *

58 =
0=

$0
$0

Local

0 0.0000 *

$142 *

29 =

$0

Large

2 0.0981 *

$142 *

18 =

$246

Small

0 0.0000 *

$142 *

0=

$0

Large

0 0.0000 *

$142 *

55 =

$0

Small
State

0 0.0000 *
0 0.0000 *

$142 *
$142 *

196 =
16 =

$0
$0

Local
Large

0 0.0000 *
0 0.0000 *

$142 *
$142 *

74 =
44 =

$0
$0

Small
State

0 0.0000 *
0 0.0000 *

$142 *
$142 *

143 =
1=

$0
$0

Local
Large

0 0.0000 *
9 0.4443 *

$142 *
$142 *

201 =
48 =

$0
$3,023

Small

1 0.0444 *

$142 *

148 =
72,329

$929
$786,420

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Total

Page 135

Table 22

Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); 
and 1926.1126(i)(2)(ii), (i)(3)(i), and  (i)(3)(ii))
Employee Time and Cost to Complete the Annual Medical Examination 
This table calculates the burden hours and costs associated with employee time to complete the annual medical examination in the year after the initial medical 
examination is completed.  These hours and costs are for existing emplyoees who are potentially exposed at or above the action level or who show "signs and 
symptoms" of exposure.  The Agency assumes that a varying percentage of existing plants will have employees who will complete these exams; these percentages 
are specific to each sector and plant size (large or small).  Employees who work for employers who conduct annual examinations, %BASEMED, will incur a 
incremental medical exam time of 3 hours.  Employees who are not working for employers providing annual medical examinations (1‐%BASEMED) will incur three 
hours for a full limited medical exam. 
COST = (LIMEMPAL + MEDEXAMADDERM)*(LIMPARTIME * %BASEMED)+(LIMFULLTIME*(1‐%BASEMED))*PLANTS
Hours= Burden Hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                               after the implementation of engineering controls.
LIMPARTIME = Incremental employee time, in hours, for a partial limited exam
%BASEMED = Percentage of employers who are providing annual medical examinations

Responses

(

3+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1,885 =

15,741

$25.49

$401,282

5,247

Small

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

3,547 =

0

$25.49

$0

0

Large

(

0+

0.000000 ) * ( ( 3 *

5.00%

) +(

3.00 * (

1 ‐

5.00%

) ) *

7,911 =

0

$25.10

$0

0

Small
Large

(
(

0+
14 +

0.000000 ) * ( ( 3 *
2.918484 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,864 =
191 =

0
9,460

$25.10
$25.10

$0
$237,451

0
3,153

Small
Large

(
(

1+
26 +

0.000000 ) * ( ( 3 *
2.918484 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

108 =
269 =

315
23,594

$25.10
$25.10

$7,910
$592,202

105
7,865

Small
State

(
(

3+
0+

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,160 =
25 =

18,909
0

$25.10
$25.10

$474,617
$0

6,303
0

Local

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

793 =

0

$25.10

$0

0

Large

(

0+

0.000000 ) * ( ( 3 *

5.00%

) +(

3.00 * (

1 ‐

5.00%

) ) * 10,607 =

0

$25.10

$0

0

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) * 10,797 =
) ) *
412 =

0
0

$25.10
$25.10

$0
$0

0
0

Small
Large

(
(

0+
10 +

0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *

0.00%
5.00%

) +(
) +(

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

233 =
405 =

0
11,811

$25.10
$25.10

$0
$296,457

0
3,937

Small

(

1+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

3,058 =

8,924

$25.10

$223,982

2,975

Large

(   46 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

50 =

6,854

$31.68

$217,117

2,285

Small
Large

(
0+
(     1 +

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

63 =
331 =

0
914

$31.68
$31.68

$0
$28,949

0
305

Small
Large

(
0+
(     2 +

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,458 =
101 =

0
558

$31.68
$31.68

$0
$17,691

0
186

Small
Large

(     1 +
(     2 +

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
294 =

51
0

$31.68
$31.68

$1,608
$0

17
538

Small
Large

(
1+
(     2 +

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

508 =
765 =

1,396
4,989

$31.68
$31.68

$44,211
$158,041

465
1,663

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 100.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (
3.00 * (

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

4,067 =
16 =

0
0

$31.68
$31.68

$0
$0

0
0

Local

(     9 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

899 =

23,589

$31.68

$747,276

7,863

Large

(     7 +

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

2=

46

$37.06

$1,686

15

Small

(

0.000000 ) * ( ( 3 *

3.00 * (

1 ‐

0.00%

0=

0

$37.06

$0

0

Hours

Large

#PLANTS

Cost

 NONSUPEWAGE

1‐%BASEMED

LIMPFULLTIME

%BASEMED

LIMPARTIME

 MEDEXAMADDERM

LIMEMPAL

Variables

LIMITFULLTIME = Employee time, in hours, for a full limited medical exam
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Auto Body

Coil Coating

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
ALL
0+

0.00%

) +(

Page 136

) ) *

9+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

2=

56

$36.12

$2,007

19

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

3

$36.12

$111

1

(     2 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

3=

13

$30.60

$400

4

(

0.000000 ) * ( ( 3 *

) +(

3.00 * (

1 ‐

) ) *

0=

0

$30.60

$0

0

(   12 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

5=

195

$37.06

$7,226

65

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

0=

0

$37.06

$0

0

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

87 =

273

$27.60

$7,535

91

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

137 =

0

$27.60

$0

0

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

3=

0

$27.65

$0

0

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

10 =

0

$27.65

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

86 =

0

$30.64

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

42 =

0

$30.64

$0

0

(     2 +

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

4=

29

$27.50

$805

10

(     1 +

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

3=

7

$27.50

$179

2

(     8 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

24

$37.17

$892

8

(

0.000000 ) * ( ( 3 *

) +(

3.00 * (

1 ‐

0.00%

) ) *

0=

0

$37.17

$0

0

(   30 + 0.006497

) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

37 =

3,302

$37.17

$122,751

1,101

(     1 + 0.000309
(     1 + 0.000155

) * ( ( 3 * 30.00% ) + (
) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

12 =
112 =

50
236

$37.17
$37.17

$1,875
$8,768

17
79

(     1 + 0.000309

) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

35 =

148

$37.17

$5,514

49

0+

0+

0.00%

0.00%

0.00%

Hours

(

#PLANTS

Responses

 NONSUPEWAGE

1‐%BASEMED

LIMPFULLTIME

%BASEMED

LIMPARTIME

Cost

SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 22

(

0+

0.000619 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

37 =

0

$37.17

$3

0

(

0+

0.000155 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

34 =

0

$37.17

$1

0

(   19 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

178 =

10,106

$27.12

$274,112

3,369

(     5 +

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

130 =

1,750

$27.12

$47,465

583

(

0 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

3=

0

$36.12

$0

0

(

0 +

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

1=

0

$36.12

$0

0

(

0+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

0=

0

$39.76

$0

0

(

1+

0.000000 ) * ( ( 3 * 100.00% ) + (

3.00 * (

1 ‐ 100.00% ) ) *

5=

16

$39.76

$646

5

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

207 =

0

$28.67

$0

0

(

0+

0.000000 ) * ( ( 3 *

0.00%

) +(

3.00 * (

1 ‐

0.00%

) ) *

1,561 =

0

$28.67

$0

0

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

347 =

0

$19.13

$0

0

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

703 =

0

$19.13

$0

0

(     1 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

5=

15

$27.66

$407

5

(
0+
(     8 +

0.000000 ) * ( ( 3 * 10.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

10.00% ) ) *
80.00% ) ) *

17 =
78 =

0
1,897

$27.66
$27.66

$0
$52,476

0
632

(     2 +

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

5=

25

$27.66

$678

8

Page 137

Cost

Responses

 NONSUPEWAGE

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

92 =

0

$19.97

$0

0

Small

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

367 =

0

$19.97

$0

0

Large

(

0 +

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

164 =

0

$31.14

$0

0

Small
Large

(
(

0+
5+

0.000000 ) * ( ( 3 * 80.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
21 =

0
321

$31.14
$31.14

$0
$9,982

0
107

Small

(

3+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

4=

37

$31.14

$1,141

12

Large

(

0+

0.000000 ) * ( ( 3 * 80.00% ) + (

3.00 * (

1 ‐

80.00% ) ) *

6=

0

$24.56

$0

0

Small

(

0+

0.000000 ) * ( ( 3 * 10.00% ) + (

3.00 * (

1 ‐

10.00% ) ) *

0=

0

$24.56

$0

0

Large

(

0+

0.000000 ) * ( ( 3 * 25.00% ) + (

3.00 * (

1 ‐

25.00% ) ) *

175 =

0

$30.76

$0

0

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 25.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

93 =
38 =

0
0

$30.76
$30.76

$0
$0

0
0

Small
Large

(
(

0+
1+

0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

34 =
1,290 =

0
3,351

$30.76
$30.76

$0
$103,097

0
1,117

Small
State

(
(

1+
1+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

5,162 =
16 =

13,415
30

$30.76
$30.76

$412,664
$937

4,472
10

Local

(

1+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

59 =

110

$30.76

$3,386

37

Large

(

0+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

48 =

0

$26.09

$0

0

Small
State

(
(

0+
1+

0.000000 ) * ( ( 3 * 30.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

58 =
0=

0
0

$26.09
$26.09

$0
$0

0
0

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

29 =

0

$26.09

$0

0

(

2+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

18 =

104

$26.75

$2,780

35

(

0+

0.000000 ) * ( ( 3 * 30.00% ) + (

3.00 * (

1 ‐

30.00% ) ) *

0=

0

$26.72

$0

0

(

0+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

55 =

0

$30.79

$0

0

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

196 =
16 =

0
0

$30.79
$30.79

$0
$0

0
0

Local
Large

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

74 =
44 =

0
0

$30.79
$30.79

$0
$0

0
0

Small
State

(
(

0+
0+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

143 =
1=

0
0

$30.79
$30.79

$0
$0

0
0

Local
Large

(
(

0+
1+

0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (
3.00 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

201 =
48 =

0
128

$30.79
$30.79

$0
$3,938

0
43

Small

(

1+

0.000000 ) * ( ( 3 * 50.00% ) + (

3.00 * (

1 ‐

50.00% ) ) *

148 =
72,329

393
163,184

$30.79

Hours

#PLANTS

0+

%BASEMED

(

LIMPARTIME

Large

LIMEMPAL

1‐%BASEMED

LIMPFULLTIME

 MEDEXAMADDERM

Variables

Table 22

SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27. Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Total

Page 138

$12,106
131
$4,534,363 54,933

Table 23

Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and 
1926.1126(i)(2)(ii), (i)(3)(i), and  (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination 
This table calculates the cost for a contractor PLHCP to conduct the annual medical examination.  Employers who were providing annual examinations (%BASEMED) will incur a partial 
medical exam cost  per employee.  Employers who were NOT providing annual medical examinations (1‐%BASEMED) will incur the full cost of a medical exam  per employee.
COST = (LIMEMPAL + MEDEXAMADDERM)*((PARTFULLCOST*%BASEMED)+(LIMFULLCOST *(1‐%BASEMED))*PLANTS
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls.
PARTFULLCOST = The cost of a partial medical exam for employers who are providing annual medical examinations.
%BASEMED = Percentage of employers who are providing annual medical examinations

 COST 

#PLANTS

1‐%BASEMED

LIMFULLCOST

%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

LIMEMPAL

Variables

LIMITFULLCOST = The cost of a medical examination for employers who are not providing annual medical examinations
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

1,885 =

$             634,456

Small

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

3,547 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 120.92 *

5.00%

) +(

$142 * (

1 ‐

5.00%

) ) *

7,911 =

$                     ‐

Small
Large

(
(

0+
14 +

0.000000 ) * ( ( 120.92 *
2.918484 ) * ( ( 120.92 *

0.00%
5.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,864 =
191 =

$                     ‐
$             443,863

Small
Large

(
(

1+
26 +

0.000000 ) * ( ( 120.92 *
2.918484 ) * ( ( 120.92 *

0.00%
5.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

108 =
269 =

$               14,896
$         1,106,993

Small
State

(
(

3+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

0.00%
5.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,160 =
25 =

$            893,774
$                      ‐

Local

(

0+

0.000000 ) * ( ( 120.92 *

0.00%

) +(

$142 * (

1 ‐

0.00%

) ) *

793 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 120.92 *

5.00%

) +(

$142 * (

1 ‐

5.00%

) ) *

10,607 =

$                     ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

0.00%
5.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,797 =
412 =

$                     ‐
$                      ‐

Small
Large

(
(

0+
10 +

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

0.00%
5.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

233 =
405 =

$                     ‐
$            554,162

) +(

$142 * (

1 ‐

0.00%

) ) *

3,058 =

$            421,792

) +(

$142 * (

1 ‐

80.00% ) ) *

50 =

$             285,789

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

63 =
331 =

$                     ‐
$               38,105

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,458 =
101 =

$                     ‐
$               23,287

) +(
) +(

$142 * (
$142 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
294 =

$                 2,223
$               65,069

) +(
) +(

$142 * (
$121 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

508 =
765 =

$               61,109
$            201,081

) +(
) +(

$121 * (
$121 * (

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

4,067 =
16 =

) +(

$121 * (

1 ‐ 100.00% ) ) *

899 =

$            950,787

) +(

$142 * (

1 ‐

50.00% ) ) *

2=

$                 1,992

) +(

$142 * (

1 ‐

0.00%

0=

$                     ‐

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
(
1+
0.000000 ) * ( ( 120.92 *
0.00%
Small
SECTOR 3.  PAINTING                                                                                                                  General Industry
Large
( 46 +
0.000000 ) * ( ( 120.92 *
80.00%
AEROSPACE
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
1+
0.000000 ) * ( ( 120.92 *
80.00%
Auto Body
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 120.92 *
80.00%
Coil Coating
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 120.92 * 100.00%
Maritime
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
Small
(
2+
0.000000 ) * ( ( 120.92 * 100.00%
Large
Construction
(
0+
0.000000 ) * ( ( 120.92 * 100.00%
Small
(
0+
0.000000 ) * ( ( 120.92 * 100.00%
State
Government
(
9+
0.000000 ) * ( ( 120.92 * 100.00%
Local
SECTOR 4.  Producers of Chromates
Large
(
7+
0.000000 ) * ( ( 120.92 *
50.00%
ALL
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
Small

Page 139

) ) *

$                     ‐
$                     ‐

 COST 

#PLANTS

1‐%BASEMED

LIMFULLCOST

%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 23

SECTOR 5. Chromate Pigment Procedures
Large

(

9+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

2=

$                 2,240

Small

(

1+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

1=

$                     124

Large

(

2+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

3=

$                     527

Small

(

0+

0.000000 ) * ( ( 120.92 *

0.00%

) +(

$142 * (

1 ‐

) ) *

0=

$                     ‐

Large

(

12 +

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

5=

$                 7,860

Small

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

0=

$                     ‐

Large

(

1+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

87 =

Small

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

137 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

3=

$                      ‐

(

0+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

10 =

$                     ‐

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

86 =

$                      ‐

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

42 =

$                     ‐

(

2+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

4=

$                 1,282

(

1+

0.000000 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

3=

$                     294

(

8+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

1=

$                     967

(

0+

0.000000 ) * ( ( 120.92 *

0.00%

) +(

$142 * (

1 ‐

0.00%

) ) *

0=

$                     ‐

(

30 +

0.006497 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

37 =

$             144,585

(
(

1+
1+

0.000309 ) * ( ( 120.92 *
0.000155 ) * ( ( 120.92 *

30.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

12 =
112 =

$                 2,279
$               10,327

(

1+

0.000309 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

35 =

$                 6,702

(

0+

0.000619 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

37 =

$                         3

(

0+

0.000155 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

34 =

$                         1

(

19 +

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

178 =

$             421,421

(

5+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

130 =

$               81,501

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

3=

$                      ‐

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

1=

$                     ‐

(

0+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

0=

$                      ‐

(

1+

0.000000 ) * ( ( 120.92 *

100.00%

) +(

$142 * (

1 ‐ 100.00% ) ) *

5=

$                     655

(

0+

0.000000 ) * ( ( 120.92 *

0.00%

) +(

$142 * (

1 ‐

0.00%

) ) *

207 =

$                      ‐

(

0+

0.000000 ) * ( ( 120.92 *

0.00%

) +(

$142 * (

1 ‐

0.00%

) ) *

1,561 =

$                     ‐

(

0+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

347 =

$                      ‐

(

0+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

703 =

$                     ‐

(

1+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

5=

(

0+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

17 =

ALL
SECTOR 6. CCA Producers
ALL
0.00%

SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
$               11,004

ALL
SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small

Page 140

$                     613
$                     ‐

8+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

78 =

$               79,116

Small

(

2+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

5=

$                 1,142

Large

(

0+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

92 =

$                      ‐

Small

(

0+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

367 =

$                     ‐

Large

(

0+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

164 =

$                      ‐

Small
Large

(
(

0+
5+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

80.00%
80.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
21 =

$                     ‐
$               13,364

Small

(

3+

0.000000 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

4=

$                 1,655

Large

(

0+

0.000000 ) * ( ( 120.92 *

80.00%

) +(

$142 * (

1 ‐

80.00% ) ) *

6=

$                      ‐

Small

(

0+

0.000000 ) * ( ( 120.92 *

10.00%

) +(

$142 * (

1 ‐

10.00% ) ) *

0=

$                     ‐

Large

(

0+

0.000000 ) * ( ( 120.92 *

25.00%

) +(

$142 * (

1 ‐

25.00% ) ) *

175 =

$                      ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

0.00%
25.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

93 =
38 =

$                     ‐
$                      ‐

Small
Large

(
(

0+
1+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

0.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

34 =
1,290 =

$                     ‐
$             146,745

Small
State

(
(

1+
1+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

50.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

5,162 =
16 =

$            587,375
$                 1,333

Local

(

1+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

59 =

$                 4,819

Large

(

0+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

48 =

$                      ‐

Small
State

(
(

0+
1+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

30.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

58 =
0=

$                     ‐
$                      ‐

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

29 =

$                     ‐

(

2+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

18 =

$                 4,551

(

0+

0.000000 ) * ( ( 120.92 *

30.00%

) +(

$142 * (

1 ‐

30.00% ) ) *

0=

$                     ‐

(

0+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *

55 =

$                      ‐

Small
State

(
(

0+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

50.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

196 =
16 =

$                     ‐
$                      ‐

Local
Large

(
(

0+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

50.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

74 =
44 =

$                     ‐
$                      ‐

Small
State

(
(

0+
0+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

50.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

143 =
1=

$                     ‐
$                      ‐

Local
Large

(
(

0+
1+

0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *

50.00%
50.00%

) +(
) +(

$142 * (
$142 * (

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

201 =
48 =

$                     ‐
$                 5,601

Small

(

1+

0.000000 ) * ( ( 120.92 *

50.00%

) +(

$142 * (

1 ‐

50.00% ) ) *
Total

148 =
72,329

$               17,218
$         7,254,681

%BASEMED

 COST 

#PLANTS

(

LIMFULLCOST

Large

LIMEMPAL

1‐%BASEMED

LIMPPARTCOST

 MEDEXAMADDERM

Variables

Table 23

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
General Industry

Chromium Service Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 

Page 141

Table 24

Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and  1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost for Complete Initial Medical Examination with Additional Tests
The burden hour and cost equation is for the employee time to receive additional tests after the employee is found to have abnormal initial 
medical exam results.  The Agency assumes that .5% of employees  potentially exposed employees at or above the AL and workers with "signs 
and symptoms" will be found to have abnormal exam results and will receive additional testing.  
BURDEN HOURS = POTEXEMP * 5% * %PREVABN * MEDEXAMADDAL * #PLANTS
COST = Burden Hours *  NONSUPWAGE

Responses

0.50% *

4

*

1,885 =

10 *

$25.49

$268

3

Small

0.0464 *

0.50% *

4

*

3,547 =

3*

$25.49

$84

1

Large

0.0973 *

0.50% *

4

*

7,911 =

15 *

$25.10

$386

4

Small
Large

0.0000 *
0.9242 *

0.50% *
0.50% *

4
4

*
*

8,864 =
191 =

0*
4*

$25.10
$25.10

$0
$88

0
1

Small
Large

0.0486 *
2.4807 *

0.50% *
0.50% *

4
4

*
*

108 =
269 =

0*
13 *

$25.10
$25.10

$3
$336

0
3

Small
State

0.2432 *
0.0973 *

0.50% *
0.50% *

4
4

*
*

2,160 =
25 =

11 *
0*

$25.10
$25.10

$264
$1

3
0

Local

0.0000 *

0.50% *

4

*

793 =

0*

$25.10

$0

0

Large

0.0486 *

0.50% *

4

*

10,607 =

10 *

$25.10

$259

3

Small
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

10,797 =
412 =

0*
0*

$25.10
$25.10

$0
$0

0
0

Small
Large

0.0486 *
0.9242 *

0.50% *
0.50% *

4
4

*
*

233 =
405 =

0*
7

$25.10
$25.10

$6
$188

0
2

Small

0.0973 *

0.50% *

4

*

3,058 =

6

$25.10

$149

1

Large

2.3456 *

0.50% *

4

*

50 =

2*

$31.68

$74

1

Small

0.0460 *

0.50% *

4

*

63 =

0*

$31.68

$2

0

 NONSUPEWAGE

0.2783 *

Hours

Cost

Sector 1. Electroplating

#PLANTS

MEDEXAMADDAL

     
Large

POTEXEMP * 5%

%PREVABN

Variables

* POTEXEMP * 5% = Total number of  employees potentially exposed at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDEXAMADDAL = Employee time for medical examination with additional testing
#PLANTS = Number of Plants 
NONSUPEWAGE = Nonsupervisory wage rate.

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE

Page 142

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

331 =

1*

$31.68

$19

0

Small
Large

0.0460 *
0.0920 *

0.50% *
0.50% *

4
4

*
*

1,458 =
101 =

1*
0*

$31.68
$31.68

$42
$6

0
0

Small
Large

0.0460 *
0.1373 *

0.50% *
0.50% *

4
4

*
*

18 =
294 =

0*
1*

$31.68
$31.68

$1
$26

0
0

Small
Large

0.0458 *
0.1087 *

0.50% *
0.50% *

4
4

*
*

508 =
765 =

0*
2*

$31.68
$31.68

$15
$53

0
0

Small
State

0.0362 *
0.4373 *

0.50% *
0.50% *

4
4

*
*

4,067 =
16 =

3*
0*

$31.68
$31.68

$93
$5

1
0

Local

0.0312 *

0.50% *

4

*

899 =

1*

$31.68

$18

0

Large

0.3643 *

0.50% *

4

*

2=

0*

$37.06

$1

0

0.0000 *

0.50% *

4

*

0=

0*

$37.06

$0

0

1.2490 *

0.50% *

4

*

2=

0*

$36.12

$2

0

0.1561 *

0.50% *

4

*

1=

0*

$36.12

$0

0

0.1278 *

0.50% *

4

*

3=

0*

$30.60

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$30.60

$0

0

1.3531 *

0.50% *

4

*

5=

0*

$37.06

$5

0

0.0000 *

0.50% *

4

*

0=

0*

$37.06

$0

0

0.2602 *

0.50% *

4

*

87 =

0*

$27.60

$13

0

0.1041 *

0.50% *

4

*

137 =

0*

$27.60

$8

0

0.0000 *

0.50% *

4

*

3=

0*

$27.65

$0

0

0.0000 *

0.50% *

4

*

10 =

0*

$27.65

$0

0

0.0000 *

0.50% *

4

*

86 =

0*

$30.64

$0

0

0.0000 *

0.50% *

4

*

42 =

0*

$30.64

$0

0

0.1104 *

0.50% *

4

*

4=

0*

$27.50

$0

0

0.0736 *

0.50% *

4

*

3=

0*

$27.50

$0

0

0.6500 *

0.50% *

4

*

1=

0*

$37.17

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$37.17

$0

0

Hours

0.0920 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

AUTOBODY REPAIR

COIL COATING

Maritime

Construction

Government
SECTOR 4.  Producers of Chromates
All
Small
SECTOR 5. Chromate Pigment Procedures
Large
All
Small
SECTOR 6. CCA Producers
Large
All
Small
SECTOR 7.  Chromium Catalyst Producers
Large
All
Small
SECTOR 8.  Paint and Coating Producers
Large
All
Small
SECTOR 9.  Printing Ink Producers
Large
All
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
All
Small
SECTOR 11.  Plating Mixture Producers
Large
All
Small
SECTOR 13.  Chromium Metal Producers
Large
All
Small

Page 143

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

37 =

1*

$37.17

$56

0
0

Small
Large

0.0703 *
0.4922 *

0.50% *
0.50% *

4
4

*
*

12 =
112 =

0*
1*

$37.17
$37.17

$1
$41

0
0

Small

0.0703 *

0.50% *

4

*

35 =

0*

$37.17

$2

0

Large

0.1406 *

0.50% *

4

*

37 =

0*

$37.17

$4

0

Small

0.0000 *

0.50% *

4

*

34 =

0*

$37.17

$0

0

Large

1.3502 *

0.50% *

4

*

178 =

5*

$27.12

$131

1

Small

0.2700 *

0.50% *

4

*

130 =

1*

$27.12

$19

0

Large

0.0000 *

0.50% *

4

*

3=

0*

$36.12

$0

0

Small
SECTOR 18.  Chromium Sulfate Producers
Large
All
Small
SECTOR 19.  Chemical Distributors
Large
All
Small
SECTOR 20.  Textile Dyeing
Large
All
Small
SECTOR 21.  Colored Glass Producers
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
All
Small
SECTOR 24.  Chromium Catalyst Users
Large
All
Small
Large
Catalyst Service Companies
Small

0.0000 *

0.50% *

4

*

1=

0*

$36.12

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$39.76

$0

0

0.1561 *

0.50% *

4

*

5=

0*

$39.76

$1

0

0.0000 *

0.50% *

4

*

207 =

0*

$28.67

$0

0

0.0000 *

0.50% *

4

*

1,561 =

0*

$28.67

$0

0

0.0000 *

0.50% *

4

*

347 =

0*

$19.13

$0

0

0.0000 *

0.50% *

4

*

703 =

0*

$19.13

$0

0

0.0452 *

0.50% *

4

*

5=

0*

$27.66

$0

0

0.0000 *
0.4972 *

0.50% *
0.50% *

4
4

*
*

17 =
78 =

0*
1*

$27.66
$27.66

$0
$21

0
0

0.0904 *

0.50% *

4

*

5=

0*

$27.66

$0

0

0.0000 *

0.50% *

4

*

92 =

0*

$19.97

$0

0

0.0000 *

0.50% *

4

*

367 =

0*

$19.97

$0

0

0.0504 *

0.50% *

4

*

164 =

0*

$31.14

$5

0

0.0000 *
0.5043 *

0.50% *
0.50% *

4
4

*
*

0=
21 =

0*
0*

$31.14
$31.14

$0
$7

0
0

0.2522 *

0.50% *

4

*

4=

0*

$31.14

$1

0

Hours

2.0039 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

SECTOR 14.  Iron and Steel Mills
All

Carbon Steel
14B. 
Reshaping Industry
SECTOR 15.  Iron and Steel Foundries
All
SECTOR 17.  Chromium Dye Producers
All

Page 144

 NONSUPEWAGE

Cost

Responses

0.50% *

4

*

6=

0*

$24.56

$0

0

Small

0.0000 *

0.50% *

4

*

0=

0*

$24.56

$0

0

Large

0.0467 *

0.50% *

4

*

175 =

0*

$30.76

$5

0

Small
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

93 =
38 =

0*
0*

$30.76
$30.76

$0
$0

0
0

Small

0.0000 *

0.50% *

4

*

34 =

0*

$30.76

$0

0

Large

0.1299 *

0.50% *

4

*

1,290 =

3*

$30.76

$103

1

Small
Local

0.0433 *
0.0312 *

0.50% *
0.50% *

4
4

*
*

5,162 =
16 =

4*
0*

$30.76
$30.76

$138
$0

1
0

State

0.0312 *

0.50% *

4

*

59 =

0*

$30.76

$1

0

Large

0.0000 *

0.50% *

4

*

48 =

0*

$30.76

$0

0

Small
Local

0.0000 *

0.50% *

4

*

58 =

0*

$30.76

$0

0

0.0438 *

0.50% *

4

*

0=

0*

$26.09

$0

0

State
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

0.0000 *

0.50% *

4

*

29 =

0*

$26.09

$0

0

0.0981 *

0.50% *

4

*

18 =

0*

$26.75

$0

0

0.0000 *

0.50% *

4

*

0=

0*

$26.75

$0

0

0.0000 *

0.50% *

4

*

55 =

0*

$30.79

$0

0

Small
State Gov't

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

196 =
16 =

0*
0*

$30.79
$30.79

$0
$0

0
0

Local Gov't
Large

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

74 =
44 =

0*
0*

$30.79
$30.79

$0
$0

0
0

Small
State Gov't

0.0000 *
0.0000 *

0.50% *
0.50% *

4
4

*
*

143 =
1=

0*
0*

$30.79
$30.79

$0
$0

0
0

Local Gov't
Large

0.0000 *
0.4443 *

0.50% *
0.50% *

4
4

*
*

201 =
48 =

0*
0*

$30.79
$30.79

$0
$13

0
0

Small

0.0444 *

0.50% *
Total

4

*

148 =
72,329

0*
111

$30.79

$4
$2,964

0
28

Hours

0.0000 *

#PLANTS

MEDEXAMADDAL

Large

POTEXEMP * 5%

%PREVABN

Variables

Table 24

SECTOR 25.  Refractory Brick Producers
All
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration & 
Maintenance

Page 145

Table 25

Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and  1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual 
medical examination results. 

0.2783

*

0.50% *

$241.82

*

1,885 = $634

Small

0.0464

*

0.50% *

$241.82

*

3,547 = $199

Large

0.0973

*

0.50% *

$241.82

*

7,911 = $931

Small
Large

0.0000
0.9242

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

8,864 = $0
191 = $213

Small
Large

0.0486
2.4807

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

108 = $6
269 = $808

Small
State

0.2432
0.0973

*

0.50% *
0.50% *

$241.82

*

2,160 = $635

*

$241.82

*

25 = $3

Local

0.0000

*

0.50% *

$241.82

*

793 = $0

Large

0.0486

*

0.50% *

$241.82

*

10,607 = $624

Small
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

10,797 = $0
412 = $0

Small
Large

0.0486
0.9242

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

233 = $14
405 = $452

Small

0.0973

*

0.50% *

$241.82

*

3,058 = $360

Large

2.3456

*

0.50% *

$241.82

*

50 = $141

Small
Large

0.0460
0.0920

*

0.50% *
0.50% *

$241.82

*

63 = $3

$241.82

*

331 = $37

Small
Large

0.0460
0.0920

*

0.50% *
0.50% *

$241.82

*

1,458 = $81

*

$241.82

*

101 = $11

Small

0.0460

*

0.50% *

$241.82

*

18 = $1

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

* POTEXEMP * 5% = Total number of new potentially exposed employees at or above the AL and workers with "signs and symptoms" before 
the implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDCOSTADD = Cost for medical examination with additional testing
#PLANTS = Number of Plants

Sector 1. Electroplating
All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE
*

General Industry AUTOBODY

COIL COATING

Page 146

0.1373

*

0.50% *

$241.82

*

294 = $49

Small
Large

0.0458
0.1087

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

508 = $28
765 = $101

Small

0.0362

*

0.50% *

$241.82

*

4,067 = $178

State 

0.4373

*

0.50% *

$241.82

*

16 = $9

Local

0.0312

*

0.50% *

$241.82

*

899 = $34

Large

0.3643

*

0.50% *

$241.82

*

2 = $1

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Large

1.2490

*

0.50% *

$241.82

*

2 = $3

Small

0.1561

*

0.50% *

$241.82

*

1 = $0

Large

0.1278

*

0.50% *

$241.82

*

3 = $0

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Large

1.3531

*

0.50% *

$241.82

*

5 = $9

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Large

0.2602

*

0.50% *

$241.82

*

87 = $28

Small

0.1041

*

0.50% *

$241.82

*

137 = $17

Large

0.0000

*

0.50% *

$241.82

*

3 = $0

Small

0.0000

*

0.50% *

$241.82

*

10 = $0

Large

0.0000

*

0.50% *

$241.82

*

86 = $0

Small

0.0000

*

0.50% *

$241.82

*

42 = $0

Large

0.1104

*

0.50% *

$241.82

*

4 = $1

Small

0.0736

*

0.50% *

$241.82

*

3 = $0

Large

0.6500

*

0.50% *

$241.82

*

1 = $1

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Large

2.0039

*

0.50% *

$241.82

*

37 = $90

Small

0.0703

*

0.50% *

$241.82

*

12 = $1

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

Maritime 

Construction

Governments
SECTOR 4.  Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

Page 147

0.4922

*

0.50% *

$241.82

*

112 = $67

Small

0.0703

*

0.50% *

$241.82

*

35 = $3

Large

0.1406

*

0.50% *

$241.82

*

37 = $6

Small

0.0000

*

0.50% *

$241.82

*

34 = $0

Large

1.3502

*

0.50% *

$241.82

*

178 = $291

Small

0.2700

*

0.50% *

$241.82

*

130 = $42

Large

0.0000

*

0.50% *

$241.82

*

3 = $0

Small

0.0000

*

0.50% *

$241.82

*

1 = $0

Large

0.0000

*

0.50% *

$241.82

*

0 = $0

Small

0.1561

*

0.50% *

$241.82

*

5 = $1

Large

0.0000

*

0.50% *

$241.82

*

207 = $0

Small

0.0000

*

0.50% *

$241.82

*

1,561 = $0

Large

0.0000

*

0.50% *

$241.82

*

347 = $0

Small

0.0000

*

0.50% *

$241.82

*

703 = $0

Large

0.0452

*

0.50% *

$241.82

*

5 = $0

Small
Large

0.0000
0.4972

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

17 = $0
78 = $47

Small

0.0904

*

0.50% *

$241.82

*

5 = $0

Large

0.0000

*

0.50% *

$241.82

*

92 = $0

Small

0.0000

*

0.50% *

$241.82

*

367 = $0

Large

0.0504

*

0.50% *

$241.82

*

164 = $10

Small
Large

0.0000
0.5043

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

0 = $0
21 = $13

Small

0.2522

*

0.50% *

$241.82

*

4 = $1

Large

0.0000

*

0.50% *

$241.82

*

6 = $0

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL
SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat, Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL

Page 148

0.0467

*

0.50% *

$241.82

*

175 = $10

Small
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

93 = $0
38 = $0

Small
Large

0.0000
0.1299

*

0.50% *
0.50% *

$241.82

*

34 = $0

$241.82

*

1,290 = $203

Small
State

0.0433
0.0312

*

0.50% *
0.50% *

$241.82

*

5,162 = $270

*

$241.82

*

16 = $1

Local

0.0312

*

0.50% *

$241.82

*

59 = $2

Large

0.0000

*

0.50% *

$241.82

*

48 = $0

Small
State

0.0000
0.0438

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

58 = $0
0 = $0

Local

0.0000

*

0.50% *

$241.82

*

29 = $0

Large

0.0981

*

0.50% *

$241.82

*

18 = $2

Small

0.0000

*

0.50% *

$241.82

*

0 = $0

Large

0.0000

*

0.50% *

$241.82

*

55 = $0

Small
State Gov't

0.0000
0.0000

*

0.50% *
0.50% *

$241.82

*

196 = $0

*

$241.82

*

16 = $0

Local Gov't
Large

0.0000
0.0000

*
*

0.50% *
0.50% *

$241.82
$241.82

*
*

74 = $0
44 = $0

Small
State Gov't

0.0000
0.0000

*

0.50% *
0.50% *

$241.82

*

143 = $0

$241.82

*

1 = $0

Local Gov't
Large

0.0000
0.4443

*

0.50% *
0.50% *

$241.82

*

201 = $0

*

$241.82

*

Small

0.0444

*

0.50% *

$241.82

*

Cost

MEDCOSTADD

Large

#PLANTS

%PREVABN

POTEXEMP * 5%

Table 25

SECTOR 26.  Woodworking
General Industry

Maritime
*

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

*

48 = $26

Refractory Brick Restoration & Maintenance

Total

Page 149

148 = $8

72,329

$6,706

Table 26

Annual Medical Examination with Additional Tests (1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii) and (i)(3)(i)‐(i)(3)(iii); and 
1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost to Complete the Annual Medical Examination with Additional Tests
This table calculates the burden hours and costs for the time it takes an employee to receive additional tests after the employee is found to 
have abnormal annual medical exam test results. 
Hours = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * ADDMEDTIME * #PLANTS
Cost =Hours *NONSUPWAGE 

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

ADDMEDTIME

%ALABN

 MEDEXAMADDERM

LIMEMPAL

Variables

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the 
implementation of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year  (and therefore requiring a limited or comprehensive 
medical exam who will be found to have abnormal results) 
*ADDMEDTIME = Three hours for an employee to receive additional testing after exam tests are abnormal.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

( 3 +

0.00000 ) *

0.50% * 3 *

1,885 =

79 * $25.49

$2,006

26

Small

( 0 +

0.00000 ) *

0.50% * 3 *

3,547 =

0 * $21.43

$0

0

Large

( 0 +

0.00000 ) *

0.50% * 3 *

7,911 =

0 * $25.10

$0

0

Small
Large

( 0 +
( 14 +

0.00000 ) *
2.91848 ) *

0.50% * 3 *
0.50% * 3 *

8,864 =
191 =

0 * $21.43
47 * $25.10

$0
$1,187

0
16

Small
Large

( 1 +
( 26 +

0.00000 ) *
2.91848 ) *

0.50% * 3 *
0.50% * 3 *

108 =
269 =

2 * $22.43
118 * $25.10

$35
$2,961

1
39

Small
Local

( 3 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

2,160 =
25 =

95 * $23.43
0 * $25.10

$2,215
$0

32
0

State

( 0 +

0.00000 ) *

0.50% * 3 *

793 =

0 * $24.43

$0

0

Large

( 0 +

0.00000 ) *

0.50% * 3 *

10,607 =

0 * $25.10

$0

0

Small
Large

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

10,797 =
412 =

0 * $24.43
0 * $25.10

$0
$0

0
0

Small
Large

( 0 +
( 10 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

233 =
405 =

0 * $25.43
59 * $25.10

$0
$1,482

0
20

*

3,058 =

45 * $26.43

$1,179

15

*

50 =

34 * $31.68

$1,086

11

*
*

63 =
331 =

0 * $26.43
5 * $31.68

$0
$145

0
2

*
*

1,458 =
101 =

0 * $27.43
3 * $31.68

$0
$88

0
1

*

18 =

0 * $28.43

$7

0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
Small ( 1 + 0.00000 ) * 0.50% * 3
SECTOR 3.  PAINTING                                                                             GENERAL INDUSTRY
Large ( 46 + 0.00000 ) * 0.50% * 3
AEROSPACE
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 1 + 0.00000 ) * 0.50% * 3
Autobody
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 2 + 0.00000 ) * 0.50% * 3
Coil Coating
Small ( 1 + 0.00000 ) * 0.50% * 3

Table 26

Large

( 2 +

0.00000 ) *

0.50% * 3 *

294 =

8 * $31.68

$256

3

Small
Large

( 1 +
( 2 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

508 =
765 =

7 * $29.43
25 * $31.68

$205
$790

2
8

Small
Local

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

4,067 =
16 =

0 * $30.43
0 * $31.68

$0
$0

0
0

State

( 9 +

0.00000 ) *

0.50% * 3 *

899 =

118 * $31.43

$3,707

39

Large

( 7 +

0.00000 ) *

0.50% * 3 *

2=

0 * $37.06

$8

0

Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

( 9 +

0.00000 ) *

0.50% * 3 *

2=

0 * $36.12

$10

0

Small

( 1 +

0.00000 ) *

0.50% * 3 *

1=

0 * $31.43

$0

0

Large

( 2 +

0.00000 ) *

0.50% * 3 *

3=

0 * $30.60

$2

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

5=

1 * $37.06

$36

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00378 ) *

0.50% * 3 *

87 =

1 * $27.60

$38

0

+

0.00000 ) *

0.50% * 3 *

137 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

3=

0 * $27.65

$0

0

+

0.00000 ) *

0.50% * 3 *

10 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

86 =

0 * $30.64

$0

0

+

0.00000 ) *

0.50% * 3 *

42 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

4=

0 * $27.50

$4

0

+

0.00000 ) *

0.50% * 3 *

3=

0 * $31.43

$1

0

+

0.00000 ) *

0.50% * 3 *

1=

0 * $37.17

$4

0

+

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

+

0.00650 ) *

0.50% * 3 *

37 =

17 * $37.17

$614

6

+
+

0.00031 ) *
0.00015 ) *

0.50% * 3 *
0.50% * 3 *

12 =
112 =

0 * $31.43
1 * $37.17

$8
$44

0
0

+

0.00031 ) *

0.50% * 3 *

35 =

1 * $31.43

$23

0

+

0.00062 ) *

0.50% * 3 *

37 =

0 * $37.17

$0

0

+

0.00015 ) *

0.50% * 3 *

34 =

0 * $31.43

$0

0

+

0.00000 ) *

0.50% * 3 *

178 =

51 * $27.12

$1,371

17

+

0.00000 ) *

0.50% * 3 *

130 =

9 * $31.43

$275

3

+

0.00000 ) *

0.50% * 3 *

3=

0 * $36.12

$0

0

+

0.00000 ) *

0.50% * 3 *

1=

0 * $31.43

$0

0

Maritime 

Construction

Government
SECTOR 4.  Producers of Chromates
ALL

SECTOR 6. CCA Producers
ALL
Small ( 0
SECTOR 7.  Chromium Catalyst Producers
Large ( 12
ALL
Small ( 0
SECTOR 8.  Paint and Coating Producers
Large ( 1
ALL
Small ( 0
SECTOR 9.  Printing Ink Producers
Large ( 0
ALL
Small ( 0
SECTOR 10.  Plastic Colorant Producers and Users
Large ( 0
ALL
Small ( 0
SECTOR 11.  Plating Mixture Producers
Large ( 2
ALL
Small ( 1
SECTOR 13.  Chromium Metal Producers
Large ( 8
ALL
Small ( 0
SECTOR 14.  Iron and Steel Mills
Large ( 30
Alloy Stainless Steel
Small ( 1
Large ( 1
Carbon Steel
Small ( 1
14B. Alloy Stainless Steel Forging Industry
Large ( 0
Reshaping
Small ( 0
SECTOR 15.  Iron and Steel Foundries
Large ( 19
ALL
Small ( 5
SECTOR 17.  Chromium Dye Producers
Large ( 0
ALL
Small ( 0

Table 26

SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service 
Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large
Industrial Rehabilitation & 
Maintenance

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $39.76

$0

0

( 1 +

0.00000 ) *

0.50% * 3 *

5=

0 * $31.43

$3

0

( 0 +

0.00000 ) *

0.50% * 3 *

207 =

0 * $28.67

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

1,561 =

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

347 =

0 * $19.13

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

703 =

0 * $31.43

$0

0

( 1 +

0.00000 ) *

0.50% * 3 *

5=

0 * $27.66

$2

0

( 0 +
( 8 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

17 =
78 =

0 * $31.43
9 * $27.66

$0
$262

0
3

( 2 +

0.00000 ) *

0.50% * 3 *

5=

0 * $31.43

$4

0

( 0 +

0.00000 ) *

0.50% * 3 *

92 =

0 * $19.97

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

367 =

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

164 =

0 * $31.14

$0

0

( 0 +
( 5 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

0=
21 =

0 * $31.43
2 * $31.14

$0
$50

0
1

( 3 +

0.00000 ) *

0.50% * 3 *

4=

0 * $31.43

$6

0

( 0 +

0.00000 ) *

0.50% * 3 *

6=

0 * $24.56

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $31.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

175 =

0 * $30.76

$0

0

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

93 =
38 =

0 * $31.43
0 * $30.76

$0
$0

0
0

( 0 +
( 1 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

34 =
1,290 =

0 * $31.43
17 * $30.76

$0
$515

0
6

( 1 +
( 1 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

5,162 =
16 =

67 * $31.43
0 * $30.76

$2,108
$5

22
0

( 1 +

0.00000 ) *

0.50% * 3 *

59 =

1 * $31.43

$17

0

( 0 +

0.00000 ) *

0.50% * 3 *

48 =

0 * $26.09

$0

0

( 0 +
( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

58 =
0=

0 * $31.43
0 * $26.09

$0
$0

0
0

( 0 +

0.00000 ) *

0.50% * 3 *

29 =

0 * $32.43

$0

0

(

4 +

0.00000 ) *

0.50% * 3 *

18 =

1 * $26.75

$28

0

(

0 +

0.00000 ) *

0.50% * 3 *

0=

0 * $32.43

$0

0

( 0 +

0.00000 ) *

0.50% * 3 *

55 =

0 * $30.79

$0

0

Small ( 0 +
State Go( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

196 =
16 =

0 * $32.43
0 * $30.79

$0
$0

0
0

Local Go( 0 +

0.00000 ) *

0.50% * 3 *

74 =

0 * $33.43

$0

0

Table 26

Large
Hazardous Waste Site Work

( 0 +

0.00000 ) *

0.50% * 3 *

44 =

0 * $30.79

$0

0

Small ( 0 +
State Go( 0 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

143 =
1=

0 * $34.43
0 * $30.79

$0
$0

0
0

Local Go( 0 +
Large ( 1 +

0.00000 ) *
0.00000 ) *

0.50% * 3 *
0.50% * 3 *

201 =
48 =

0 * $35.43
1 * $30.79

$0
$20

0
0

( 1 +

0.00000 ) *

0.50% * 3 *

148 =
72,329

2 * $36.43

$72
$22,881

1
275

Refractory Brick Restoration
Small
TOTALS 

825

Table 27

Annual Medical Examination with Additional Tests (§§ 1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Annual Medical Examination with Additional Tests  
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual medical examination 
results.  Abnormal results will require additional medical testing "as deemed appropriate by the physician."
COST = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * MEDCOSTADD* #PLANTS

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation 
of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year  (and therefore requiring a limited or comprehensive                                                            
medical exam who will be found to have abnormal results 
#PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3+

0) *

0.50% ) * $241.82 *

1,885 =

$6,344

Small

(

0+

0) *

0.50% ) * $241.82 *

3,547 =

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

7,911 =

$0

Small
Large

(
(

0+
14 +

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

8,864 =
191 =

$0
$3,140

Small
Large

(
(

1+
26 +

0) *
3) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

108 =
269 =

$127
$9,509

Small
State

(
(

3+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

2,160 =
25 =

$7,621
$0

Local

(

0+

0) *

0.50% ) * $241.82 *

793 =

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

10,607 =

$0

Small
Large

(
(

0+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

10,797 =
412 =

$0
$0

Small
Large

(
(

0+
10 +

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

233 =
405 =

$0
$4,760

Small

(

1+

0) *

0.50% ) * $241.82 *

3,058 =

$3,597

Large

(

46 +

0) *

0.50% ) * $241.82 *

50 =

$2,762

Small
Large

(
(

0+
1+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

63 =
331 =

$0
$368

Small
Large

(
(

0+
2+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

1,458 =
101 =

$0
$225

Small
Large

(
(

1+
2+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

18 =
294 =

$20
$651

Small
Large

(
(

1+
2+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

508 =
765 =

$562
$2,011

Small
State 

(

0+

0) *

0.50% ) * $241.82 *

4,067 =

$0

(

0+

0) *

0.50% ) * $241.82 *

16 =

$0

Local

(

9+

0) *

0.50% ) * $241.82 *

899 =

$9,507

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
General Industry AEROSPACE

General Industry AUTOBODY
COIL COATING

Maritime 

Construction

Governments

Page 154

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

SECTOR 4.  Producers of Chromates
Large

(

7+

0) *

0.50% ) * $241.82 *

2=

$18

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

9+

0) *

0.50% ) * $241.82 *

2=

$22

Small

(

1+

0) *

0.50% ) * $241.82 *

1=

$1

Large

(

2+

0) *

0.50% ) * $241.82 *

3=

$5

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

12 +

0) *

0.50% ) * $241.82 *

5=

$79

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

1+

0.00378 ) *

0.50% ) * $241.82 *

87 =

$110

Small

(

0+

0) *

0.50% ) * $241.82 *

137 =

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

3=

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

10 =

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

86 =

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

42 =

$0

Large

(

2+

0) *

0.50% ) * $241.82 *

4=

$12

Small

(

1+

0) *

0.50% ) * $241.82 *

3=

$3

Large

(

8+

0) *

0.50% ) * $241.82 *

1=

$10

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

30 + 0.00650 ) *

0.50% ) * $241.82 *

37 =

$1,331

Small
Large

(
(

1 + 0.00031 ) *
1 + 0.00015 ) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

12 =
112 =

$20
$95

Small

(

1 + 0.00031 ) *

0.50% ) * $241.82 *

35 =

$60

Large

(

0+

0.00062 ) *

0.50% ) * $241.82 *

37 =

$0

Small

(

0+

0.00015 ) *

0.50% ) * $241.82 *

34 =

$0

Large

(

19 +

0) *

0.50% ) * $241.82 *

178 =

$4,073

Small

(

5+

0) *

0.50% ) * $241.82 *

130 =

$705

Large

(

0+

0) *

0.50% ) * $241.82 *

3=

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

1=

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Small

(

1+

0) *

0.50% ) * $241.82 *

5=

$7

Large

(

0+

0) *

0.50% ) * $241.82 *

207 =

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

1,561 =

$0

ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
ALL
SECTOR 9.  Printing Ink Producers
ALL
SECTOR 10.  Plastic Colorant Producers and Users
ALL
SECTOR 11.  Plating Mixture Producers
ALL
SECTOR 13.  Chromium Metal Producers
ALL
SECTOR 14.  Iron and Steel Mills
ALL

Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15.  Iron and Steel Foundries
ALL
SECTOR 17.  Chromium Dye Producers
ALL
SECTOR 18.  Chromium Sulfate Producers
ALL
SECTOR 19.  Chemical Distributors
ALL

Page 155

Cost

Large

(

0+

0) *

0.50% ) * $241.82 *

347 =

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

703 =

$0

Large

(

1+

0) *

0.50% ) * $241.82 *

5=

$6

Small
Large

(
(

0+
8+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

17 =
78 =

$0
$765

Small

(

2+

0) *

0.50% ) * $241.82 *

5=

$10

Large

(

0+

0) *

0.50% ) * $241.82 *

92 =

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

367 =

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

164 =

$0

Small
Large

(
(

0+
5+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

0=
21 =

$0
$129

Small

(

3+

0) *

0.50% ) * $241.82 *

4=

$15

Large

(

0+

0) *

0.50% ) * $241.82 *

6=

$0

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

175 =

$0

Small
Large

(
(

0+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

93 =
38 =

$0
$0

Small
Large

(
(

0+
1+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

34 =
1,290 =

$0
$1,351

Small
State

(
(

1+
1+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

5,162 =
16 =

$5,407
$12

Local

(

1+

0) *

0.50% ) * $241.82 *

59 =

$44

Large

(

0+

0) *

0.50% ) * $241.82 *

48 =

$0

Small
State

(
(

0+
1+

0) *
1) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

58 =
0=

$0
$0

Local

(

0+

0) *

0.50% ) * $241.82 *

29 =

$0

Large

(

2+

2) *

0.50% ) * $241.82 *

18 =

$84

Small

(

0+

0) *

0.50% ) * $241.82 *

0=

$0

Large

(

0+

0) *

0.50% ) * $241.82 *

55 =

$0

(
Small
State Gov't (

0+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

196 =
16 =

$0
$0

Local Gov't (
Large
(

0+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

74 =
44 =

$0
$0

)
Small
State Gov't (

0+
0+

0) *
0) *

0.50% ) * $241.82 *
0.50% ) * $241.82 *

143 =
1=

$0
$0

Local Gov't (

0+

0) *

0.50% ) * $241.82 *

201 =

$0

%ALABN

#PLANTS

MEDCOSTADD

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

SECTOR 20.  Textile Dyeing
ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat, Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
ALL

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
ALL

Government
SECTOR 30.  Superalloy Producers and Users
ALL
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Page 156

Cost

#PLANTS

MEDCOSTADD

%ALABN

MEDEXAMADDERM

Variables

LIMEMPAL

Table 27

Large

(

1+

0) *

0.50% ) * $241.82 *

48 =

$52

Small

(

1+

0) *

0.50% ) * $241.82 *

148 =
72,329

$0
$65,631

Refractory Brick Restoration & Maintenance
Total

Page 157

Table 28

Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), 
and (i)(3)(ii); and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination After Initial Assignment 
This table calculates the  burden hours and cost for those employees who are newly assigned to operations that involve exposure at or above the action level to receive medical 
examinations.  It is estimated that the employee will be provided a comprehensive medical examination. 
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLTIME * (1‐%BASEMED) * #PLANTS
Cost =Hours *NONSUPWAGE 
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or  > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

*COMPFULLTIME = Four hours for an employee to receive a comprehensive medical examination
*NONSUPEWAGE ‐ Non‐supervisory wage rate
(1‐%BASEMED) = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3

+

0.00000 ) * 26.16% *

4

* (

1

‐ 100.00% ) *

1,885 =

0 * $25.49

$0

Small

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 100.00%

*

3,547 =

0 * $25.49

$0

Large

(

0

+

0.00000 ) * 27.24% *

4

* (

1

‐

5.00%

*

7,911 =

0 * $25.10

$0

0

Small
Large

(
(

0
14

+
+

0.00000 ) * 27.24% *
2.91848 ) * 27.24% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

8,864 =
191 =

0 * $25.10
3,264 * $25.10

$0
$81,930

0
816

Small
Large

(
(

1
26

+
+

0.00000 ) * 27.24% *
2.91848 ) * 27.24% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

108 =
269 =

114 * $25.10
8,141 * $25.10

$2,873
$204,333

29
2,035

Small
Local

(
(

3
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

2,160 =
25 =

6,868 * $25.10
0 * $25.10

$172,381
$0

1,717
0

State

(

0

+

0.00000 ) * 27.24% *

4

* (

1

‐

0.00%

*

793 =

0 * $25.10

$0

0

Large

(

0

+

0.00000 ) * 27.24% *

4

* (

1

‐

5.00%

*

10,607 =

0 * $25.10

$0

0

Small
Large

(
(

0
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

10,797 =
412 =

0 * $25.10
0 * $25.10

$0
$0

0
0

Small
Large

(
(

0
10

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐
‐

0.00%
5.00%

*
*

233 =
405 =

0 * $25.10
4,075 * $25.10

$0
$102,290

0
1,072

Small

(

1

+

0.00000 ) * 27.24% *

4

* (

1

‐

0.00%

*

3,058 =

3,241 * $25.10

$81,350

810

Large

(

46

+

0.00000 ) * 27.24% *

4

* (

1

‐ 80.00%

*

50 =

498 * $31.68

$15,771

124

Small
Large

(
(

0
1

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 80.00%

*
*

63 =
331 =

0 * $31.68
66 * $31.68

$0
$2,103

0
17

Small
Large

(
(

0
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 80.00%

*
*

1,458 =
101 =

0 * $31.68
41 * $31.68

$0
$1,285

0
10

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 100.00%

*
*

18 =
294 =

9 * $31.68
0 * $31.68

$292
$0

2
0

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 100.00%

*
*

508 =
765 =

253 * $31.68
0 * $31.68

$8,029
$0

63
0

Small
Local

(
(

0
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

4
4

* (
* (

1
1

‐ 100.00%
‐ 100.00%

*
*

4,067 =
16 =

0 * $31.68
0 * $31.68

$0
$0

0
0

State

(

9

+

0.00000 ) * 27.24% *

4

* (

1

‐ 100.00%

*

899 =

0 * $31.68

$0

0

Large

(

7

+

0.00000 ) * 29.16% *

4

* (

1

‐ 50.00%

*

2=

9 * $37.06

$328

2

Small

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐

*

0=

0 * $37.06

$0

0

0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Autobody

Coil Coating

Maritime 

Construction

Government
SECTOR 4.  Producers of Chromates
ALL

Page 158

0.00%

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 28

SECTOR 5. Chromate Pigment Procedures
Large
ALL

(

9

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

2=

0 * $36.12

$0

0

Small

(

1

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

1=

0 * $36.12

$0

0

Large

(

2

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

3=

0 * $30.60

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐

*

0=

0 * $30.60

$0

0

(

12

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

5=

0 * $37.06

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

0=

0 * $37.06

$0

0

(

1

+

0.00378 ) * 29.16% *

4

* (

1

‐ 100.00%

*

87 =

0 * $27.60

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

137 =

0 * $27.60

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 80.00%

*

3=

0 * $27.65

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 10.00%

*

10 =

0 * $27.65

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

86 =

0 * $30.64

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

42 =

0 * $30.64

$0

0

(

2

+

0.00000 ) * 29.16% *

4

* (

1

‐ 50.00%

*

4=

6 * $27.50

$157

1

(

1

+

0.00000 ) * 29.16% *

4

* (

1

‐ 30.00%

*

3=

2 * $27.50

$49

0

(

8

+

0.00000 ) * 26.16% *

4

* (

1

‐ 100.00%

*

1=

0 * $37.17

$0

0

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐

0.00%

*

0=

0 * $37.17

$0

0

(

30

+

0.00650 ) * 26.16% *

4

* (

1

‐ 50.00%

*

37 =

576 * $37.17

$21,408

144

(
(

1
1

+
+

0.00031 ) * 26.16% *
0.00015 ) * 26.16% *

4
4

* (
* (

1
1

‐ 30.00%
‐ 50.00%

*
*

12 =
112 =

12 * $37.17
41 * $37.17

$458
$1,529

3
10

(

1

+

0.00031 ) * 26.16% *

4

* (

1

‐ 30.00%

*

35 =

36 * $37.17

$1,346

9

(

0

+

0.00062 ) * 26.16% *

4

* (

1

‐ 50.00%

*

37 =

0 * $37.17

$0

0

(

0

+

0.00015 ) * 26.16% *

4

* (

1

‐ 30.00%

*

34 =

0 * $37.17

$0

0

(

19

+

0.00000 ) * 26.16% *

4

* (

1

‐ 80.00%

*

178 =

705 * $27.12

$19,122

176

(

5

+

0.00000 ) * 26.16% *

4

* (

1

‐ 10.00%

*

130 =

549 * $27.12

$14,900

137

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

3=

0 * $36.12

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

1=

0 * $36.12

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

0=

0 * $39.76

$0

0

(

1

+

0.00000 ) * 29.16% *

4

* (

1

‐ 100.00%

*

5=

0 * $39.76

$0

0

(

0

+

0.00000 ) * 26.64% *

4

* (

1

‐

0.00%

*

207 =

0 * $28.67

$0

0

(

0

+

0.00000 ) * 26.64% *

4

* (

1

‐

0.00%

*

1,561 =

0 * $28.67

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 80.00%

*

347 =

0 * $19.13

$0

0

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 10.00%

*

703 =

0 * $19.13

$0

0

(

1

+

0.00000 ) * 29.16% *

4

* (

1

‐ 80.00%

*

5=

1 * $27.66

$32

0

(
(

0
8

+
+

0.00000 ) * 29.16% *
0.00000 ) * 29.16% *

4
4

* (
* (

1
1

‐ 10.00%
‐ 80.00%

*
*

17 =
78 =

0 * $27.66
148 * $27.66

$0
$4,081

0
37

(

2

+

0.00000 ) * 29.16% *

4

* (

1

‐ 10.00%

*

5=

9 * $27.66

$237

2

SECTOR 6. CCA Producers
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small

Page 159

0.00%

RESPONSES

Cost

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 28

SECTOR 22.  Printing
Large

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 80.00%

*

92 =

0 * $19.97

$0

0

Small

(

0

+

0.00000 ) * 29.16% *

4

* (

1

‐ 10.00%

*

367 =

0 * $19.97

$0

0

Large

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 80.00%

*

164 =

0 * $31.14

$0

0

Small
Large

(
(

0
5

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

4
4

* (
* (

1
1

‐ 80.00%
‐ 80.00%

*
*

0=
21 =

0 * $31.14
22 * $31.14

$0
$696

0
6

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

3

+

0.00000 ) * 26.16% *

4

* (

1

‐ 80.00%

*

4=

3 * $31.14

$80

1

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 80.00%

*

6=

0 * $24.56

$0

0

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 10.00%

*

0=

0 * $24.56

$0

0

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 25.00%

*

175 =

0 * $30.76

$0

0

(
(

0
0

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

4
4

* (
* (

1
1

‐ 0.00%
‐ 25.00%

*
*

93 =
38 =

0 * $30.76
0 * $30.76

$0
$0

0
0

(
(

0
1

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

4
4

* (
* (

1
1

‐ 0.00%
‐ 50.00%

*
*

34 =
1,290 =

0 * $30.76
584 * $30.76

$0
$17,980

0
146

(
(

1
1

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

5,162 =
16 =

2,339 * $30.76
5 * $30.76

$71,969
$163

585
1

(

1

+

0.00000 ) * 26.16% *

4

* (

1

‐ 50.00%

*

59 =

19 * $30.76

$591

5

(

0

+

0.00000 ) * 46.92% *

4

* (

1

‐ 50.00%

*

48 =

0 * $26.09

$0

0

(
(

0
0

+
+

0.00000 ) * 46.92% *
0.00000 ) * 46.92% *

4
4

* (
* (

1
1

‐ 30.00%
‐ 50.00%

*
*

58 =
0=

0 * $26.09
0 * $26.09

$0
$0

0
0

(

0

+

0.00000 ) * 46.92% *

4

* (

1

‐ 30.00%

*

29 =

0 * $26.09

$0

0

(

4

+

0.00000 ) * 26.16% *

4

* (

1

‐ 50.00%

*

18 =

36 * $26.75

$970

9

(

0

+

0.00000 ) * 26.16% *

4

* (

1

‐ 30.00%

*

0=

0 * $26.75

$0

0

(

0

+

0.00000 ) * 67.80% *

4

* (

1

‐ 50.00%

*

55 =

0 * $30.79

$0

0

(
Small
State Gov't (

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

196 =
16 =

0 * $30.79
0 * $30.79

$0
$0

0
0

Local Gov't (
Large
(

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

74 =
44 =

0 * $30.79
0 * $30.79

$0
$0

0
0

(
Small
State Gov't (

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

143 =
1=

0 * $30.79
0 * $30.79

$0
$0

0
0

Local Gov't (
Large
(

0
1

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

4
4

* (
* (

1
1

‐ 50.00%
‐ 50.00%

*
*

201 =
48 =

0 * $30.79
58 * $30.79

$0
$1,780

0
14

(

1

+

0.00000 ) * 67.80% *

4

* (

1

‐ 50.00%

*

148 =
72,329

178 * $30.79
31,910

$5,472
$835,984

44
8,031

ALL
SECTOR 24.  Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service 
Companies

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration
Small
TOTAL

Page 160

Table 29

Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii);
and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination After Initial Assignment 
This table calculates the cost for a contractor PLHCP to conduct medical examinations to employees newly assigned to operations that involve exposure at or above the 
action level.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLCOST *(1‐%BASEMED)*#PLANTS
Cost =Hours *NONSUPWAGE 
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of
engineering controls.

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

*COMPFULLCOST = Cost for an employer to administer a comprehensive medical examination
1‐%BASEMED = Percentage of establishments that do not have annual medical surveillance for their employees in the baseline. 
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3

+

0.00000 ) * 26.16% *

$454.63

* (

1

‐

100.00%

) *

1,885 =

$0

Small

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

100.00%

*

3,547 =

$0

Large

(

0

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

5.00%

*

7,911 =

$0

Small
Large

(
(

0
14

+
+

0.00000 ) * 27.24% *
2.91848 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
5.00%

*
*

8,864 =
191 =

$0
$370,991

Small
Large

(
(

1
26

+
+

0.00000 ) * 27.24% *
2.91848 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
5.00%

*
*

108 =
269 =

$13,009
$925,251

Small
Local

(
(

3
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
5.00%

*
*

2,160 =
25 =

$780,565
$0

State

(

0

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

0.00%

*

793 =

$0

Large

(

0

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

5.00%

*

10,607 =

$0

Small
Large

(
(

0
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
5.00%

*
*

10,797 =
412 =

$0
$0

Small
Large

(
(

0
10

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
5.00%

*
*

233 =
405 =

$0
$463,182

Small

(

1

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

0.00%

*

3,058 =

$368,366

Large

(

46

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

80.00%

*

50 =

$56,585

Small
Large

(
(

0
1

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
80.00%

*
*

63 =
331 =

$0
$7,545

Small
Large

(
(

0
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
80.00%

*
*

1,458 =
101 =

$0
$4,611

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
100.00%

*
*

18 =
294 =

$1,048
$0

Small
Large

(
(

1
2

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
100.00%

*
*

508 =
765 =

$28,805
$0

Small
Local

(
(

0
0

+
+

0.00000 ) * 27.24% *
0.00000 ) * 27.24% *

$454.63
$454.63

*
*

1
1

‐
‐

100.00%
100.00%

*
*

4,067 =
16 =

$0
$0

State

(

9

+

0.00000 ) * 27.24% *

$454.63

*

1

‐

100.00%

*

899 =

$0

ALL
Sector 2. Welding
General Industry

Maritime

Construction

GOVERNMENT
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
SECTOR 3.  PAINTING
AEROSPACE

Autobody

Coil Coating

Maritime 

Construction

Government

Page 161

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 29

SECTOR 4.  Producers of Chromates
Large

(

7

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

50.00%

*

2=

$1,005

Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

0.00%

*

0=

$0

(

9

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

2=

$0

Small

(

1

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

1=

$0

Large

(

2

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

3=

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

0.00%

*

0=

$0

(

12

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

5=

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

0=

$0

(

1

+

0.00378 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

87 =

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

137 =

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

80.00%

*

3=

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

10.00%

*

10 =

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

86 =

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

42 =

$0

(

2

+

0.00000 ) *

0 *

$454.63

*

1

‐

50.00%

*

4=

$647

(

1

+

0.00000 ) *

0 *

$454.63

*

1

‐

30.00%

*

3=

$201

(

8

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

100.00%

*

1=

$0

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

0.00%

*

0=

$0

(

30

+

0.00650 ) * 26.16% *

$454.63

*

1

‐

50.00%

*

37 =

$65,452

(
(

1
1

+
+

0.00031 ) * 26.16% *
0.00015 ) * 26.16% *

$454.63
$454.63

*
*

1
1

‐
‐

30.00%
50.00%

*
*

12 =
112 =

$1,400
$4,675

(

1

+

0.00031 ) * 26.16% *

$454.63

*

1

‐

30.00%

*

35 =

$4,117

(

0

+

0.00062 ) * 26.16% *

$454.63

*

1

‐

50.00%

*

37 =

$1

(

0

+

0.00015 ) * 26.16% *

$454.63

*

1

‐

30.00%

*

34 =

$0

(

19

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

80.00%

*

178 =

$80,131

(

5

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

10.00%

*

130 =

$62,440

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

3=

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

1=

$0

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

0=

$0

(

1

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

100.00%

*

5=

$0

(

0

+

0.00000 ) * 26.64% *

$454.63

*

1

‐

0.00%

*

207 =

$0

(

0

+

0.00000 ) * 26.64% *

$454.63

*

1

‐

0.00%

*

1,561 =

$0

ALL

SECTOR 6. CCA Producers
ALL
Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8.  Paint and Coating Producers
Large
ALL
Small
SECTOR 9.  Printing Ink Producers
Large
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small

Page 162

Cost

#PLANTS

1 ‐%BASEMED 

COMPFULLCOST

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 29

SECTOR 20.  Textile Dyeing
Large

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

80.00%

*

347 =

$0

Small

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

10.00%

*

703 =

$0

Large

(

1

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

80.00%

*

5=

$130

Small
Large

(
(

0
8

+
+

0.00000 ) * 29.16% *
0.00000 ) * 29.16% *

$454.63
$454.63

*
*

1
1

‐
‐

10.00%
80.00%

*
*

17 =
78 =

$0
$16,769

Small

(

2

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

10.00%

*

5=

$975

Large

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

80.00%

*

92 =

$0

Small

(

0

+

0.00000 ) * 29.16% *

$454.63

*

1

‐

10.00%

*

367 =

$0

Large

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

80.00%

*

164 =

$0

Small
Large

(
(

0
5

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

$454.63
$454.63

*
*

1
1

‐
‐

80.00%
80.00%

*
*

0=
21 =

$0
$2,541

(

3

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

80.00%

*

4=

$290

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

80.00%

*

6=

$0

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

10.00%

*

0=

$0

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

25.00%

*

175 =

$0

(
(

0
0

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
25.00%

*
*

93 =
38 =

$0
$0

(
(

0
1

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

$454.63
$454.63

*
*

1
1

‐
‐

0.00%
50.00%

*
*

34 =
1,290 =

$0
$66,430

(
(

1
1

+
+

0.00000 ) * 26.16% *
0.00000 ) * 26.16% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
50.00%

*
*

5,162 =
16 =

$265,900
$603

(

1

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

50.00%

*

59 =

$2,182

(

0

+

0.00000 ) * 46.92% *

$454.63

*

1

‐

50.00%

*

48 =

$0

(
(

0
0

+
+

0.00000 ) * 46.92% *
0.00000 ) * 46.92% *

$454.63
$454.63

*
*

1
1

‐
‐

30.00%
50.00%

*
*

58 =
0=

$0
$0

(

0

+

0.00000 ) * 46.92% *

$454.63

*

1

‐

30.00%

*

29 =

$0

(

4

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

50.00%

*

18 =

$4,120

(

0

+

0.00000 ) * 26.16% *

$454.63

*

1

‐

30.00%

*

0=

$0

(

0

+

0.00000 ) * 67.80% *

$454.63

*

1

‐

50.00%

*

55 =

$0

Small
State Gov't

(
(

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
50.00%

*
*

196 =
16 =

$0
$0

Local Gov't
Large

(
(

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
50.00%

*
*

74 =
44 =

$0
$0

Small
State Gov't

(
(

0
0

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
50.00%

*
*

143 =
1=

$0
$0

Local Gov't
Large

(
(

0
1

+
+

0.00000 ) * 67.80% *
0.00000 ) * 67.80% *

$454.63
$454.63

*
*

1
1

‐
‐

50.00%
50.00%

*
*

201 =
48 =

$0
$6,572

Small

(

1

+

0.00000 ) * 67.80% *

$454.63

*

1

‐

50.00%

*

148 =

$20,202

ALL
SECTOR 21.  Colored Glass Producers
ALL

Fiber, Flat and Container Glass
SECTOR 22.  Printing
ALL
SECTOR 24.  Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service 
Companies

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large
Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration

Page 163

Page 164

1 ‐%BASEMED 

#PLANTS

Cost

COMPFULLCOST

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 29

TOTAL
72,329
$3,626,744

Table 30

Medical Examination at the Termination of  Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(2)(vi) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment.  For employers who are providing annual medical testing (%BASEMED) the additional employee 
time will be 3 hours (COMPARTTIME).  For employers who are not providing annual medical testing (1‐%BASEMED) the time for a full comprehensive examination is 4 hours (COMPFULLTIME).  
The employee turnover rate is divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months 
prior to the date of determination.  It is estimated that half of the employee turnover occurs at the beginning of the year and the other half occurs a the end of the year.  Therefore, based on 
this estimation at any time during the year, it has been greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees 
require a medical examination. 

Cost

Responses

 NONSUPEWAGE

Hours

#PLANTS

1‐%BASEMED

COMPFULLTIME

%BASEMED

COMPPARTTIME

Divide
2

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Burden hours = (LIMEMPAL + MEDEXAMADDERM)*(TURNOVER/2)* ((COMPARTTIME*%BASEMED)+(COMPFULLTIME*(1‐%BASEMED)))*#PLANTS
Cost = Burden hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or  > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls.
COMPARTTIME= The time an employee takes for a comprehensive exam  when employed by employers already providing annual medical testing in the baseline.  
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLTIME = The time an employee takes for  a comprehensive exam when employed by employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
NONSUPEWAGE = Non‐supervisory Wage Rate

$52,487.70

686

Sector 1. Electroplating
Large

(

3+

0.000000 ) * ( 26.16% /

2 ) *( (

3 * 100.00% ) + (

Small

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 * 100.00% ) + (

Large

(

0+

0.000000 ) * ( 27.24% /

2 ) *( (

3 *

5.00%

) +(

Small
Large

(
(

0+
14 +

0.000000 ) * ( 27.24% /
2.918484 ) * ( 27.24% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

Small
Large

(
(

1+
26 +

0.000000 ) * ( 27.24% /
2.918484 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

Small
State

(
(

3+
0+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

Local

(

0+

0.000000 ) * ( 67.80% /

2 ) *( (

Large

(

0+

0.000000 ) * ( 27.74% /

2 ) *( (

Small
Large

(
(

0+
0+

0.000000 ) * ( 27.74% /
0.000000 ) * ( 27.74% /

Small
Large

(
(

0+
10 +

0.000000 ) * ( 27.74% /
0.000000 ) * ( 67.80% /

4 *(

1 ‐ 100.00% ) ) *

1,885 =

2,059

$25.49

4 *(

1 ‐ 100.00% ) ) *

3,547 =

$25.49

$0.00

0

4 *(

1 ‐

5.00%

) ) *

7,911 =

0

$25.10

$0.00

0

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,864 =
191 =

0
1,632

$25.10
$25.10

$0.00
$40,973.52

0
429

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

108 =
269 =

57
10,133

$25.10
$25.10

$1,436.51
$254,328.83

14
2,666

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,160 =
25 =

8,547
0

$25.10
$25.10

$214,526.81
$0.00

2,137
0

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

793 =

0

$25.10

$0.00

0

3 *

5.00%

) +(

4 *(

1 ‐

5.00%

) ) *

10,607 =

0

$25.10

$0.00

0

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,797 =
412 =

0
0

$25.10
$25.10

$0.00
$0.00

0
0

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
5.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

233 =
405 =

0
5,072

$25.10
$25.10

$0.00
$127,311.21

0
1,335

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
(
1+
0.000000 ) * ( 67.80% / 2 ) * (
Small
SECTOR 3.  PAINTING                                                                                                                           General Industry
Large
(
46 +
0.000000 ) * ( 27.74% / 2 ) * (
AEROSPACE
(
0
+
0.000000
) * ( 27.74% / 2 ) * (
Small
Large
(
1+
0.000000 ) * ( 27.74% / 2 ) * (
Auto Body
(
0+
0.000000 ) * ( 27.74% / 2 ) * (
Small
Large
(
2+
0.000000 ) * ( 27.74% / 2 ) * (
Coil Coating
(
1+
0.000000 ) * ( 27.74% / 2 ) * (
Small
Large
(
2+
0.000000 ) * ( 27.74% / 2 ) * (
Maritime
(
1
+
0.000000
) * ( 27.74% / 2 ) * (
Small
(
2+
0.000000 ) * ( 67.80% / 2 ) * (
Large
Construction
(
0+
0.000000 ) * ( 67.80% / 2 ) * (
Small
(
0+
0.000000 ) * ( 67.80% / 2 ) * (
State
Government
(
9+
0.000000 ) * ( 67.80% / 2 ) * (
Local
SECTOR 4.  Producers of Chromates
Large
(
7+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
9+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
1+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 6. CCA Producers
Large
(
2+
0.000000 ) * ( 29.16%
2 ) *(
ALL
2 ) *(
(
0+
0.000000 ) * ( 29.16%
Small
SECTOR 7.  Chromium Catalyst Producers
Large
(
12 +
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 8.  Paint and Coating Producers
Large
(
1+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small

(

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

3,058 =

4,033

$25.10

$101,239.90

1,008

(

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

50 =

269

$31.68

$8,515.44

317

(
(

3 *
3 *

50.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

63 =
331 =

0
34

$31.68
$31.68

$0.00
$1,080.43

0
42

(
(

3 *
3 *

50.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
80.00% ) ) *

1,458 =
101 =

0
21

$31.68
$31.68

$0.00
$673.73

0
26

(
(

3 * 50.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
294 =

5
1

$31.68
$31.68

$154.77
$24.14

2
75

(
(

3 * 50.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

508 =
765 =

129
2

$31.68
$31.68

$4,094.04
$70.03

65
564

(
(

3 * 100.00% ) + (
3 * 100.00% ) + (

4 *(
4 *(

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

4,067 =
16 =

0
0

$31.68
$31.68

$0.00
$0.00

0
0

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

899 =

9

$31.68

$281.78

2,666

(

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

2=

6

$37.06

$222.93

2

(

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

0=

0

$37.00

$0.00

0

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

2=

4

$36.12

$147.98

3

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$36.12

$16.44

0

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

3=

1

$30.60

$22.81

1

(

3 *

) +(

4 *(

1 ‐

) ) *

0=

0

$30.60

$0.00

0

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

5=

5

$37.06

$202.44

9

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

0=

0

$37.06

$0.00

0

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

87 =

0

$27.60

$12.56

13

(

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

137 =

0

$27.60

$0.00

0

0.00%

Page 165

0.00%

Table 30

SECTOR 9.  Printing Ink Producers
Large

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

3=

0

$27.65

$0.00

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

10 =

0

$27.65

$0.00

0
0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

86 =

0

$30.64

$0.00

0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

42 =

0

$30.64

$0.00

0

(

2+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

4=

3

$27.50

$91.55

1

(

1+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

3=

1

$27.50

$27.01

0
1

ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25.  Refractory Brick Producers
Large
ALL
Small
SECTOR 26.  Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27.  Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small

(

8+

0.000000 ) * ( 26.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$37.17

$0.00

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

0=

0

$37.17

$0.00

0

(

30 +

0.006497 ) * ( 26.16% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

37 =

294

$37.17

$10,919.35

144

(
(

1+
1+

0.000309 ) * ( 26.16% /
0.000155 ) * ( 26.16% /

2 ) *( (
2 ) *( (

3 *
3 *

30.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

12 =
112 =

6
21

$37.17
$37.17

$235.04
$769.69

2
10

(

1+

0.000309 ) * ( 26.16% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

35 =

18

$37.17

$679.36

6

(

0+

0.000619 ) * ( 26.16% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

37 =

0

$37.17

$0.22

0

(

0+

0.000155 ) * ( 26.16% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

34 =

0

$37.17

$0.07

0

(

19 +

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

178 =

358

$27.12

$9,721.97

441

(

5+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

130 =

275

$27.12

$7,454.95

76

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

3=

0

$36.12

$0.00

0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

1=

0

$36.12

$0.00

0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

0=

0

$39.76

$0.00

0

(

1+

0.000000 ) * ( 29.16% /

2 ) *( (

3 * 100.00% ) + (

4 *(

1 ‐ 100.00% ) ) *

5=

0

$39.76

$18.10

1

(

0+

0.000000 ) * ( 26.64% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

207 =

0

$28.67

$0.00

0

(

0+

0.000000 ) * ( 26.64% /

2 ) *( (

3 *

0.00%

) +(

4 *(

1 ‐

0.00%

) ) *

1,561 =

0

$28.67

$0.00

0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

347 =

0

$19.13

$0.00

0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

703 =

0

$19.13

$0.00

0

(

1+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

5=

1

$27.66

$24.56

1

(
(

0+
8+

0.000000 ) * ( 29.16% /
0.000000 ) * ( 29.16% /

2 ) *( (
2 ) *( (

3 *
3 *

10.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

10.00% ) ) *
80.00% ) ) *

17 =
78 =

0
77

$27.66
$27.66

$0.00
$2,119.02

0
92

(

2+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

5=

4

$27.66

$120.81

1
0

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

92 =

0

$19.97

$0.00

(

0+

0.000000 ) * ( 29.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

367 =

0

$19.97

$0.00

0

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

164 =

0

$31.14

$0.00

0

(
(

0+
5+

0.000000 ) * ( 26.16% /
0.000000 ) * ( 26.16% /

2 ) *( (
2 ) *( (

3 *
3 *

80.00%
80.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

80.00% ) ) *
80.00% ) ) *

0=
21 =

0
13

$31.14
$31.14

$0.00
$397.46

0
14

(

3+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

4=

5

$31.14

$150.36

2

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

80.00%

) +(

4 *(

1 ‐

80.00% ) ) *

6=

0

$24.56

$0.00

0

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

10.00%

) +(

4 *(

1 ‐

10.00% ) ) *

0=

0

$24.56

$0.00

0

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

25.00%

) +(

4 *(

1 ‐

25.00% ) ) *

175 =

0

$30.76

$0.00

0

(
(

0+
0+

0.000000 ) * ( 26.16% /
0.000000 ) * ( 26.16% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
25.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00% ) ) *
25.00% ) ) *

93 =
38 =

0
0

$30.76
$30.76

$0.00
$0.00

0
0

(
(

0+
1+

0.000000 ) * ( 26.16% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

0.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

0.00% ) ) *
50.00% ) ) *

34 =
1,290 =

0
758

$30.76
$30.76

$0.00
$23,313.44

0
379

(
(

1+
1+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

5,162 =
16 =

3,032
7

$30.76
$30.76

$93,275.71
$221.43

1,516
3

(

1+

0.000000 ) * ( 67.80% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

59 =

25

$30.76

$774.99

12

(

0+

0.000000 ) * ( 46.92% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

48 =

0

$26.09

$0.00

0

(
(

0+
1+

0.000000 ) * ( 46.92% /
0.000000 ) * ( 46.92% /

2 ) *( (
2 ) *( (

3 *
3 *

30.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

30.00% ) ) *
50.00% ) ) *

58 =
0=

0
0

$26.09
$26.09

$0.00
$8.04

0
0

(

0+

0.000000 ) * ( 46.92% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

29 =

0

$26.09

$0.00

0

(

2+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

18 =

9

$26.75

$252.75

5

(

0+

0.000000 ) * ( 26.16% /

2 ) *( (

3 *

30.00%

) +(

4 *(

1 ‐

30.00% ) ) *

0=

0

$26.75

$0.00

0

Page 166

Table 30

SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( 67.80% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *

55 =

0

$30.79

$0.00

0

(
Small
Industrial Rehabilitation & Maintenance
State Gov't (

0+
0+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

196 =
16 =

0
0

$30.79
$30.79

$0.00
$0.00

0
0

Local Gov't (
Large
(

0+
0+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

74 =
44 =

0
0

$30.79
$30.79

$0.00
$0.00

0
0

(
Small
State Gov't (

0+
0+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

143 =
1=

0
0

$30.79
$30.79

$0.00
$0.00

0
0

Local Gov't (
Large
(

0+
1+

0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /

2 ) *( (
2 ) *( (

3 *
3 *

50.00%
50.00%

) +(
) +(

4 *(
4 *(

1 ‐
1 ‐

50.00% ) ) *
50.00% ) ) *

201 =
48 =

0
29

$30.79
$30.79

$0.00
$903.94

0
14

(

1+

0.000000 ) * ( 67.80% /

2 ) *( (

3 *

50.00%

) +(

4 *(

1 ‐

50.00% ) ) *
Total

148 =
72,329

89
37,048

$30.79

Hazardous Waste Site Work

Refractory Brick Restoration 
Small

Page 167

$2,749.93
44
$962,053.77 14,827

Table 31

Medical Examination at the Termination of  Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii); 
1915.1026(i)(2)(vi) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination at the Termination of Employment  
Employees receive a comprehensive medical examination at the termination of employment.  For employers who are providing annual medical testing (%BASEMED) the additional cost will be $227.00 
(COMPARTCOST).  For employers who are not providing annual medical testing (1‐%BASEMED) the cost for a full comprehensive examination will be $454.00 (COMPFULLCOST).  The employee turnover rate is 
divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination.  It is 
estimated that half of the employee turnover occurs at the begining of the year and the other half occurs a the end of the year.  Therefore, based on this estimation at any time during the year, it has been 
greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees require a medical examination. 
COST = (LIMEMPAL + MEDEXAMADDDERM)*(TURNOVER/2)* ((COMPARTCOST*%BASEMED)+(COMPFULLCOST*(1‐%BASEMED)))*#PLANTS

1‐%BASEMED

 COST 

* 100.00% ) + (

#PLANTS

%BASEMED

$227

COMPFULLCOST

COMPPARTCOST

Divide
2

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" 
                                    after the implementation of engineering controls.
TURNOVER/2 = Represents the frequency of termination exams.
COMPARTCOST= The cost of a  comprehensive exam for those employers already providing annual medical testing in the baseline
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLCOST = The cost of a comprehensive exam for those employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants

Sector 1. Electroplating
Large

(

3+

0.000000 ) * ( 26.16% / 2 ) * ( (

$454 * (

1 ‐ 100.00% ) ) *

1,885 =

$        155,712.17

All
Small

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

3,547 =

$                      ‐

Large

(

0+

0.000000 ) * ( 27.24% / 2 ) * ( (

$227

*

5.00%

) +(

$454 * (

1 ‐

5.00%

) ) *

7,911 =

$                      ‐

Small
Large

(
(

0+
14 +

0.000000 ) * ( 27.24% / 2 ) * ( (
2.918484 ) * ( 27.24% / 2 ) * ( (

$227
$227

*
*

0.00%
5.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

8,864 =
191 =

$                      ‐
$        185,169.42

Small
Large

(
(

1+
26 +

0.000000 ) * ( 27.24% / 2 ) * ( (
2.918484 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

0.00%
5.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

108 =
269 =

$            6,492.38
$    1,149,397.80

Small
State

(
(

3+
0+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

0.00%
5.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

2,160 =
25 =

$       969,566.39
$                      ‐

Local

(

0+

0.000000 ) * ( 67.80% / 2 ) * ( (

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

793 =

$                      ‐

Large

(

0+

0.000000 ) * ( 27.74% / 2 ) * ( (

$227

*

5.00%

) +(

$454 * (

1 ‐

5.00%

) ) *

10,607 =

$                      ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( 27.74% / 2 ) * ( (
0.000000 ) * ( 27.74% / 2 ) * ( (

$227
$227

*
*

0.00%
5.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

10,797 =
412 =

$                      ‐
$                      ‐

Small
Large

(
(

0+
10 +

0.000000 ) * ( 27.74% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

0.00%
5.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
5.00%

) ) *
) ) *

233 =
405 =

$                      ‐
$       575,371.70

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

3,058 =

$       457,559.64

Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding
General Industry

Maritime

Construction
(
1 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Small
SECTOR 3.  PAINTING                                                                                                                           General Industry
Large
( 46 + 0.000000 ) * ( 27.74% / 2 ) * ( (
AEROSPACE
(
0 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Auto Body
(
0 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
2 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Coil Coating
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
2 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Maritime
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
(
2 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Large
Construction
(
0 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Small
(
0 + 0.000000 ) * ( 67.80% / 2 ) * ( (
State
Government
(
9 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Local
SECTOR 4.  Producers of Chromates
Large
(
7 + 0.000000 ) * ( 29.16% / 2 ) * ( (
ALL
(
0 + 0.000000 ) * ( 29.16% / 2 ) * ( (
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
9 + 0.000000 ) * ( 29.16% / 2 ) * ( (
ALL
(
1 + 0.000000 ) * ( 29.16% / 2 ) * ( (
Small

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

50 =

$          29,915.07

$227
$227

*
*

50.00%
80.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
80.00%

) ) *
) ) *

63 =
331 =

$                      ‐
$            3,857.45

$227
$227

*
*

50.00%
80.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
80.00%

) ) *
) ) *

1,458 =
101 =

$                      ‐
$            2,389.49

$227
$227

* 50.00% ) + (
* 100.00% ) + (

$454 * (
$454 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

18 =
294 =

$               547.01
$                  57.62

$227
$227

* 50.00% ) + (
* 100.00% ) + (

$454 * (
$454 * (

1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *

508 =
765 =

$          14,653.66
$               167.18

$227
$227

* 100.00% ) + (
* 100.00% ) + (

$454 * (
$454 * (

1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *

4,067 =
16 =

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

899 =

$               672.72

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

2=

$               622.23

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

0=

$                      ‐

$                      ‐
$                      ‐

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

2=

$               309.88

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

1=

$                 34.43

Page 168

0.000000 ) * ( 29.16%

2) *( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

3=

$                  56.39

Small

(

0+

0.000000 ) * ( 29.16%

2) *( (

$227

*

) +(

$454 * (

1 ‐

) ) *

0=

$                      ‐

Large

(

12 +

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

5=

$               413.17

Small

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

0=

$                      ‐

Large

(

1+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

87 =

Small

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

137 =

$                      ‐

Large

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

3=

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

10 =

$                      ‐

 COST 

#PLANTS

1‐%BASEMED

COMPFULLCOST

%BASEMED

2+

Divide
2

(

TURNOVER

Large

LIMEMPAL

COMPPARTCOST

 MEDEXAMADDERM

Variables

Table 31

SECTOR 6. CCA Producers
ALL
0.00%

0.00%

SECTOR 7.  Chromium Catalyst Producers
ALL
SECTOR 8.  Paint and Coating Producers
$                  34.43

ALL
SECTOR 9.  Printing Ink Producers
ALL
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11.  Plating Mixture Producers
Large
ALL
Small
SECTOR 13.  Chromium Metal Producers
Large
ALL
Small
SECTOR 14.  Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL
Small
SECTOR 17.  Chromium Dye Producers
Large
ALL
Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19.  Chemical Distributors
Large
ALL
Small
SECTOR 20.  Textile Dyeing
Large
ALL
Small
SECTOR 21.  Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22.  Printing
Large
ALL
Small
SECTOR 24.  Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

86 =

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

42 =

(

2+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

4=

$                      ‐
29.16
$               359.34

(

1+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

3=

$               107.74

(

8+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

1=

$                      ‐

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

0=

$                      ‐

(

30 +

0.006497 ) * ( 26.16% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

37 =

$          33,102.41

(
(

1+
1+

0.000309 ) * ( 26.16% / 2 ) * ( (
0.000155 ) * ( 26.16% / 2 ) * ( (

$227
$227

*
*

30.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

30.00%
50.00%

) ) *
) ) *

12 =
112 =

$               711.00
$            2,343.59

(

1+

0.000309 ) * ( 26.16% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

35 =

$            2,066.87

(

0+

0.000619 ) * ( 26.16% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

37 =

$                    0.68

(

0+

0.000155 ) * ( 26.16% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

34 =

$                    0.22

(

19 +

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

178 =

$          40,438.48

(

5+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

130 =

$          31,174.18

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

3=

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

1=

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

0=

$                      ‐

(

1+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

* 100.00% ) + (

$454 * (

1 ‐ 100.00% ) ) *

5=

$                 34.43

(

0+

0.000000 ) * ( 26.64% / 2 ) * ( (

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

207 =

$                      ‐

(

0+

0.000000 ) * ( 26.64% / 2 ) * ( (

$227

*

0.00%

) +(

$454 * (

1 ‐

0.00%

) ) *

1,561 =

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

347 =

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

703 =

$                      ‐

(

1+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

5=

$                  88.79

(
(

0+
8+

0.000000 ) * ( 29.16% / 2 ) * ( (
0.000000 ) * ( 29.16% / 2 ) * ( (

$227
$227

*
*

10.00%
80.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

10.00%
80.00%

) ) *
) ) *

17 =
78 =

$                      ‐
$            8,583.76

(

2+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

5=

$               492.52

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

92 =

$                      ‐

(

0+

0.000000 ) * ( 29.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

367 =

$                      ‐

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

164 =

$                      ‐

(
(

0+
5+

0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 26.16% / 2 ) * ( (

$227
$227

*
*

80.00%
80.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

80.00%
80.00%

) ) *
) ) *

0=
21 =

$                      ‐
$            1,387.92

(

3+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

4=

$               534.21

Page 169

 COST 

#PLANTS

1‐%BASEMED

COMPFULLCOST

%BASEMED

COMPPARTCOST

Divide
2

TURNOVER

 MEDEXAMADDERM

LIMEMPAL

Variables

Table 31

SECTOR 25.  Refractory Brick Producers
Large

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

80.00%

) +(

$454 * (

1 ‐

80.00%

) ) *

6=

$                      ‐

Small

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

10.00%

) +(

$454 * (

1 ‐

10.00%

) ) *

0=

$                      ‐

Large

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

25.00%

) +(

$454 * (

1 ‐

25.00%

) ) *

175 =

$                      ‐

Small
Large

(
(

0+
0+

0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 26.16% / 2 ) * ( (

$227
$227

*
*

0.00%
25.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
25.00%

) ) *
) ) *

93 =
38 =

$                      ‐
$                      ‐

Small
Large

(
(

0+
1+

0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

0.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

0.00%
50.00%

) ) *
) ) *

34 =
1,290 =

$                      ‐
$          85,955.20

Small
State

(
(

1+
1+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

50.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

5,162 =
16 =

$       343,951.69
$               804.54

ALL
SECTOR 26.  Woodworking
General Industry

Maritime

Construction

Government
Local

(

1+

0.000000 ) * ( 67.80% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

59 =

$            2,845.89

Large

(

0+

0.000000 ) * ( 46.92% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

48 =

$                      ‐

Small
State

(
(

0+
1+

0.000000 ) * ( 46.92% / 2 ) * ( (
0.000000 ) * ( 46.92% / 2 ) * ( (

$227
$227

*
*

30.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

30.00%
50.00%

) ) *
) ) *

58 =
0=

$                      ‐
$                  23.31

Local
SECTOR 30.  Superalloy Producers and Users
Large
ALL
Small
SECTOR 31.  Construction
Large

(

0+

0.000000 ) * ( 46.92% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

29 =

$                      ‐

SECTOR 27.  Solid Waste Incineration
ALL

Government

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

(

2+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

18 =

(

0+

0.000000 ) * ( 26.16% / 2 ) * ( (

$227

*

30.00%

) +(

$454 * (

1 ‐

30.00%

) ) *

0=

$                      ‐

$            1,057.15

(

0+

0.000000 ) * ( 67.80% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%

) ) *

55 =

$                      ‐

(
Small
State Gov't (

0+
0+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

50.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

196 =
16 =

$                      ‐
$                      ‐

Local Gov't (
Large
(

0+
0+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

50.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

74 =
44 =

$                      ‐
$                      ‐

(
Small
State Gov't (

0+
0+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

50.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

143 =
1=

$                      ‐
$                      ‐

Local Gov't (
Large
(

0+
1+

0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (

$227
$227

*
*

50.00%
50.00%

) +(
) +(

$454 * (
$454 * (

1 ‐
1 ‐

50.00%
50.00%

) ) *
) ) *

201 =
48 =

$                      ‐
$            3,313.76

(

1+

0.000000 ) * ( 67.80% / 2 ) * ( (

$227

*

50.00%

) +(

$454 * (

1 ‐

50.00%
Total

) ) *

148 =
72,329

$          10,115.87
$         4,122,494

Refractory Brick Restoration 
Small

Page 170

Table 32

Information Provided to the PLHCP (§§ 1910.1026(k)(4), 1915.1026(i)(4), and 1926.1126(i)(4)); Clerical Time and Cost to Provide Information to the  PLHCP 
This table estimates the burden hours and costs for employers to update required information in worker records and provide the information to the 
PLHCP.  OSHA assumes that it will take 5 minutes for a clerical worker to update the worker record and provide this information.  The Agency 
reduced the time for this requirement from 1 hour to 5 minutes because, after the first year of medical surveillance, employers will not need to 
establish files.
Hours = POTEXEMP * MEDRECORD * PLANTS
COST = BURDEN HOURS * CLWAGE

Responses

Cost

CLWAGE

Hours

#PLANTS

MEDRECORD

POTEXEMP

* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the 
implementation of engineering controls.
* MEDRECORD = Clerical time per employee, in hours, to maintain detailed medical records and provide to the PLHCP (.08 hour)
* CLWAGE = Clerical wage. $/hr.
* #PLANTS = Number of plants represented by the model

Sector 1. Electroplating
Large

6 * 0.08 *

1,885 =

840 *

$18.19 =

$15,268.39 10494.052

Small

1 * 0.08 *

3,547 =

263 *

$18.19 =

Large

2 * 0.08 *

7,911 =

1,231 *

$17.90 =

$4,787.65 3290.5807
0
$22,047.48 15392.153

Small
Large

0 * 0.08 *
18 * 0.08 *

8,864 =
191 =

0 *
282 *

$17.90 =
$17.90 =

$0.00
0
$5,048.25 3524.3716

Small
Large

1 * 0.08 *
50 * 0.08 *

108 =
269 =

8 *
1,070 *

$17.90 =
$17.90 =

$150.47 105.04974
$19,150.56 13369.709

Small
State 

5 * 0.08 *
2 * 0.08 *

2,160 =
25 =

840 *
4 *

$17.90 =
$17.90 =

$15,047.16 10504.974
$70.49 49.212493

Local 

0 * 0.08 *

793 =

0 *

$17.90 =

Large

1 * 0.08 *

10,607 =

825 *

$17.90 =

Small
Large

0 * 0.08 *
0 * 0.08 *

10,797 =
412 =

0 *
0 *

$17.90 =
$17.90 =

Small
Large

1 * 0.08 *
18 * 0.08 *

233 =
405 =

18 *
598 *

$17.90 =
$17.90 =

$325.34 227.13458
$10,714.66 7480.2989

=

476 *

$17.90 =

$8,521.30 5949.0332

=

186 *

$22.51 =

$4,196.98 2330.2829

=
=

5 *
317 *

$22.51 =
$17.90 =

$103.63 57.53785
$5,672.18 3959.9579

=
=

107 *
15 *

$17.90 =
$17.90 =

$1,921.03 1341.1396
$266.64 186.15187

=
=

1 *
65 *

$17.90 =
$22.51 =

$24.24 16.922897
$1,453.79 807.18704

=
=

37 *
133 *

$22.51 =
$22.51 =

$837.86 465.20125
$2,995.10 1662.9645

=
=

236 *
11 *

$22.51 =
$17.90 =

$5,307.61 2946.9326
$203.50 142.07178

=

45 *

$17.90 =

$804.50 561.65191

=

1 *

$26.43 =

$32.07 15.167153

=

0 *

$26.43 =

All
Sector 2. Welding
General Industry

Maritime

Construction

Government
Sector 2. Mild Steel Welding

$0.00

0
0
$14,780.11 10318.535

General Industry
$0.00
$0.00

0
0

Maritme

Construction
2 * 0.08 *
3,058
Small
SECTOR 3.  PAINTING                                                                              GENERAL INDUSTRY
Large
47 * 0.08 *
50
Aerospace
1 * 0.08 *
63
Small
Large
12 * 0.08 *
331
Auto Body
1 * 0.08 *
1,458
Small
Large
2 * 0.08 *
101
Coil Coating
1 * 0.08 *
18
Small
Large
3 * 0.08 *
294
Maritime 
1 * 0.08 *
508
Small
2 * 0.08 *
765
Large
Construction
1 * 0.08 *
4,067
Small
9 * 0.08 *
16
State 
Government
1 * 0.08 *
899
Local 
SECTOR 4.  Producers of Chromates
Large
7 * 0.08 *
2
All
0 * 0.08 *
0
Small

Page 171

$0.00

0

Responses

Cost

CLWAGE

Hours

#PLANTS

MEDRECORD

POTEXEMP

Table 32

SECTOR 5. Chromate Pigment Procedures
Large

25 * 0.08 *

2=

4 *

$26.43 =

$104.43 49.393048

Small

3 * 0.08 *

1=

0 *

$26.43 =

$6.53 3.0870655

Large

3 * 0.08 *

3=

1 *

$21.81 =

$11.41 6.5373192

Small

0 * 0.08 *

0=

0 *

$21.81 =

Large

27 * 0.08 *

5=

11 *

$26.43 =

Small

0 * 0.08 *

0=

0 *

$26.43 =

Large

5 * 0.08 *

87 =

36 *

$19.69 =

$716.80 455.01458

Small

2 * 0.08 *

137 =

23 *

$19.69 =

$450.56 286.00916

Large

0 * 0.08 *

3=

0 *

$19.72 =

$0.00

0

Small

0 * 0.08 *

10 =

0 *

$19.72 =

$0.00

0

Large

0 * 0.08 *

86 =

0 *

$21.84 =

$0.00

0

Small

0 * 0.08 *

42 =

0 *

$21.84 =

$0.00

0

Large

2 * 0.08 *

4=

1 *

$19.61 =

$15.31 9.7584957

Small

1 * 0.08 *

3=

0 *

$19.61 =

$6.80 4.3371092

Large

13 * 0.08 *

1

1 *

$26.51

$27.57

13

Small

0 * 0.08 *

0

0 *

$26.51

$0.00

0

Large

40 * 0.08 *

37 =

119 *

$26.51 =

$3,167.36 1493.4539

Small
Large

1 * 0.08 *
10 * 0.08 *

12 =
112 =

1 *
88 *

$26.51 =
$26.51 =

$35.65 16.808154
$2,333.85 1100.4397

Small

1 * 0.08 *

35 =

4 *

$26.51 =

$104.84 49.435747

Large

3 * 0.08 *

37 =

8 *

$26.51 =

$218.08 102.82635

Small

0 * 0.08 *

34 =

0 *

$26.51 =

Large

27 * 0.08 *

178 =

385 *

$19.34 =

$7,445.72 4812.6137

Small

5 * 0.08 *

130 =

56 *

$19.34 =

$1,083.01 700.01654

Large

0 * 0.08 *

3=

0 *

$25.76 =

$0.00

0

Small

0 * 0.08 *

1=

0 *

$25.76 =

$0.00

Large

0 * 0.08 *

0=

0 *

$28.36 =

$0.00

0
0
0

Small

3 * 0.08 *

5=

1 *

$28.36 =

Large

0 * 0.08 *

207 =

0 *

$20.44 =

$0.00

0

Small

0 * 0.08 *

1,561 =

0 *

$20.44 =

$0.00

0

Large

0 * 0.08 *

347 =

0 *

$13.64 =

$0.00

0

Small

0 * 0.08 *

703 =

0 *

$13.64 =

$0.00

0

All
SECTOR 6. CCA Producers
All
$0.00

0

SECTOR 7.  Chromium Catalyst Producers
$297.77 140.83785

All
$0.00

0

SECTOR 8.  Paint and Coating Producers
All
SECTOR 9.  Printing Ink Producers
All
SECTOR 10.  Plastic Colorant Producers and Users
All
SECTOR 11.  Plating Mixture Producers
All
SECTOR 13.  Chromium Metal Producers
All
SECTOR 14.  Iron and Steel Mills
All

Carbon Steel
SECTOR 14B.  Forging Industry
All
$0.00

0

SECTOR 15.  Iron and Steel Foundries
All
SECTOR 17.  Chromium Dye Producers
All
SECTOR 18.  Chromium Sulfate Producers
All
$36.86 16.250521

SECTOR 19.  Chemical Distributors
All
SECTOR 20.  Textile Dyeing
All

Page 172

Responses

Cost

CLWAGE

Hours

#PLANTS

MEDRECORD

POTEXEMP

Table 32

SECTOR 21.  Colored Glass Producers
Large

1 * 0.08 *

5=

0 *

$14.24 =

$5.58 4.9027183

Small
Large

0 * 0.08 *
10 * 0.08 *

17 =
78 =

0 *
62 *

$14.24 =
$14.24 =

$0.00
0
$880.40 772.99525

Small

2 * 0.08 *

5=

1 *

$14.24 =

$9.31 8.1711971

Large

0 * 0.08 *

92 =

0 *

$14.24 =

$0.00

0

Small

0 * 0.08 *

367 =

0 *

$14.24 =

$0.00

0

Large

1 * 0.08 *

164 =

13 *

$22.21 =

$294.65 165.84795

Small
Large

0 * 0.08 *
10 * 0.08 *

0=
21 =

0 *
17 *

$21.97 =
$21.97 =

$0.00
0
$375.59 213.66914

Small

5 * 0.08 *

4=

2 *

$21.97 =

$35.77 20.349442

Large

0 * 0.08 *

6=

0 *

$17.53 =

$0.00

0

Small

0 * 0.08 *

0=

0 *

$17.53 =

$0.00

0

Large

1 * 0.08 *

175 =

13 *

$21.93 =

Small
Large

0 * 0.08 *
0 * 0.08 *

93 =
38 =

0 *
0 *

$21.93 =
$21.93 =

Small
Large

0 * 0.08 *
3 * 0.08 *

34 =
1,290 =

0 *
268 *

$21.93 =
$21.93 =

$0.00
0
$5,878.44 3351.3807

Small
State

1 * 0.08 *
1 * 0.08 *

5,162 =
16 =

358 *
1 *

$21.93 =
$21.93 =

$7,843.19 4471.5086
$17.80 10.147984

Local

1 * 0.08 *

59 =

3 *

$21.93 =

$64.35 36.688867

Large

0 * 0.08 *

48 =

0 *

$18.73 =

$0.00

0

Small
State

0 * 0.08 *
0 * 0.08 *

58 =
0=

0 *
0 *

$18.73 =
$21.93 =

$0.00
$0.00

0
0

Local

0 * 0.08 *

29 =

0 *

$21.93 =

$0.00

0

Large

2 * 0.08 *

18 =

3 *

$19.08 =

Small

0 * 0.08 *

0=

0 *

$19.08 =

$0.00

0

Large

0 * 0.08 *

55 =

0 *

$21.96 =

$0.00

0

Small
State Gov't

0 * 0.08 *
0 * 0.08 *

196 =
16 =

0 *
0 *

$21.96 =
$21.96 =

$0.00
$0.00

0
0

Local Gov't
Large

0 * 0.08 *
0 * 0.08 *

74 =
44 =

0 *
0 *

$21.96 =
$21.96 =

$0.00
$0.00

0
0

Small
State Gov't

0 * 0.08 *
0 * 0.08 *

143 =
1=

0 *
0 *

$21.96 =
$21.96 =

$0.00
$0.00

0
0

Local Gov't
Large

0 * 0.08 *
9 * 0.08 *

201 =
48 =

0 *
34 *

$21.96 =
$21.96 =

$0.00
0
$749.13 426.40096

Small

1 * 0.08 *

148 =
72,329

10 *
9,142

$21.96 =

$230.29 131.07881
172,517
114,269

All

Fiber, Flat, and Container Glass
SECTOR 22.  Printing
All
SECTOR 24.  Chromium Catalyst Users
All

Chromium Catalyst Companies
SECTOR 25.  Refractory Brick Producers
All
SECTOR 26.  Woodworking
$286.16 163.14101

General Industry
$0.00
$0.00

0
0

Maritime

Construction

Government
SECTOR 27.  Solid Waste Incineration
All

Government
SECTOR 30.  Superalloy Producers and Users
$52.88 34.641633

All
SECTOR 31.  Construction

Industrial Rehabilitation & Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration 
Total

Page 173

Table 33

Clerical Time and Cost to Provide the PLHCP’s Written Medical Opinion to Employee
and to Establish and Maintain Record for Air Monitoring Data and Medical Surveillance
The Standard requires that employers maintain exposure and medical surveillance records.  As part of the medical record, 
employers must maintain a copy of the PLHCP's written opinion.  OSHA assumes that the 5 minutes for recordkeeping 
includes the time it takes for employers to provide a copy of the PLHCP's written opinion to the employee.  

Responses

1,885 =

2,099

$18.19 $         38,171

26,235

Small

0.08 *

3 *

3,547 =

790

$18.19 $         14,363

9,872

Large

0.08 *

3 *

11,423 =

2,667

$17.90 $         47,752

33,338

Small

0.08 *

3 *

14,088 =

3,289

$17.90 $         58,895

41,117

Large

0.08 *

4 *

11,742

3,655

$17.90 $         65,448

45,692

Small

0.08 *

1 *

11,967

931

$17.90 $         16,676

11,642

Large

0.08 *

44 *      1,557 =

5,537

$22.51 $      124,656

69,213

Small
SECTOR 4.  Producers of Chromates
Large
ALL

0.08 *

2 *      7,013 =

848

$22.51 $         19,091

10,600

0.08 *

    78 *

2=

13

$26.43 $              344

163

Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL

0.08 *

0 *

0=

0

$26.43 $               ‐

0.08 *

25 *

2=

4

$26.43 $              104

49

Small

0.08 *

3 *

1=

0

$26.43 $                   7

3

Large

0.08 *

       8 *

3=

2

$21.81 $                 34

20

0.08 *

0 *

0=

0

$21.81

0.08 *

    66 *

5=

27

0.08 *

0 *

0=

0

EMPEXP

CLWAGE

14 *

HOURS

0.08 *

#PLANTS

Large

RECTIME

COST

HOURS = RECTIME * EMPEXP * #PLANTS 
COST = Hours x CLWAGE
RECTIME =  Time, 0.08 hour per record for exposed workers
EMPEXP =  Exposed employees to chromium or employees exposed dermally
#PLANTS = Number of Plants
CLWAGE = Clerical wage Rate

Sector 1. Electroplating
ALL
Sector 2. Welding
ALL
Sector 2B. Mild Steel Welding

SECTOR 3.  PAINTING
ALL

SECTOR 6. CCA Producers
ALL

Small
SECTOR 7.  Chromium Catalyst Producers
Large
ALL
Small

Page 174

0

0

0

$26.43 $              722

341

$26.43

0

0

Responses

131

$19.69 $           2,580

1,638

0.08 *

8 *

137 =

92

$19.69 $           1,802

1,144

0.08 *

20 *

3=

5

$19.72 $                 95

60

0.08 *
Small
SECTOR 10.  Plastic Colorant Producers and Users
Large
0.08 *
ALL

20 *

10 =

16

$19.72 $              318

202

6 *

86 =

39

$21.84 $              844

483

Small
SECTOR 11.  Plating Mixture Producers
Large
ALL

0.08 *

1 *

42 =

3

$21.84 $                 69

39

0.08 *

    13 *

4=

4

$19.61 $                 87

55

Small
SECTOR 13.  Chromium Metal Producers
Large
ALL

0.08 *

       3 *

3=

1

$19.61 $                 14

9

0.08 *

    47 *

1=

4

$26.51 $              100

47

Small

0.08 *

0 *

0=

0

$26.51 $               ‐

SECTOR 14.  Iron and Steel Mills
Large
ALL

0.08 *

46 *

2,124 =

7,885

$26.51 $      209,046

98,568

Small
SECTOR 15.  Iron and Steel Foundries
Large
ALL

0.08 *

3 *

24 =

5

$26.51 $              143

67

0.08 *

  115 *

178 =

1,643

$19.34 $         31,768

20,534

Small
SECTOR 17.  Chromium Dye Producers
Large
ALL

0.08 *

  115 *

130 =

1,195

$19.34 $         23,104

14,934

0.08 *

32

*

3=

8

$25.76 $              193

94

Small
SECTOR 18.  Chromium Sulfate Producers
Large
ALL

0.08 *

7

*

1=

1

$25.76 $                 14

7

0.08 *

0 *

0=

0

$28.36 $               ‐

0

Small
SECTOR 19.  Chemical Distributors
Large
ALL

0.08 *

2 *

5=

1

$28.36 $                 25

0.08 *

0 *

207 =

0

$20.44 $               ‐

Small

0.08 *

0 *

1,561 =

0

$20.44 $               ‐

Large

0.08 *

58 *

347 =

1,618

$13.64 $         22,065

20,224

Small

0.08 *

2 *

703 =

104

$13.64 $           1,422

1,303

Small
SECTOR 9.  Printing Ink Producers
Large
ALL

SECTOR 20.  Textile Dyeing
ALL

EMPEXP
Page 175

CLWAGE

87 =

HOURS

19 *

SECTOR 8.  Paint and Coating Producers
Large
ALL

#PLANTS

0.08 *

RECTIME

COST

Table 33

0

11

0

COST

Responses

5 *

83 =

30

$14.24 $              428

376

Small

0.08 *

1 *

22 =

2

$14.24 $                 22

20

Large

0.08 *

43 *

92 =

317

$14.24 $           4,513

3,962

Small
SECTOR 24.  Chromium Catalyst Users
Large
ALL

0.08 *

3 *

0=

0

*

164 =

398

$22.21 $           8,839

4,975

Small
Large

0.08 *
0.08 *

15 *
1 *

0=
21

0
2

$22.21 $               ‐
$22.21 $                 38

21

0.08 *

0 *

0

0

$22.21 $               ‐

0.08 *

12 *

6=

6

$17.53 $                 97

Small

0.08 *

0 *

0=

0

$17.53 $               ‐

Large

0.08 *

0

*

1,519 =

0

$21.93 $               ‐

0

Small
SECTOR 27.  Solid Waste Incarnation
Large
ALL

0.08 *

0

*

5,348 =

0

$21.93 $               ‐

0

0.08 *

0 *

48 =

0

$18.61 $               ‐

0

Small
SECTOR 30.  Superalloy Producers and Users
Large
ALL

0.08 *

1 *

87 =

6

$18.61 $              113

76

0.08 *

38 *

18 =

54

$19.08 $           1,031

676

Small

0.08 *

0 *

0=

0

Large

0.08 *

21

55

94

$21.96 $           2,064

1,175

Small
State Gov't

0.08 *
0.08 *

1
1

196
16

14
1

$21.96 $              307
$21.96 $                 25

175
14

Local Gov't
Large

0.08
0.08 *

1
12

74
44

5
43

$21.96 $              115
$21.96 $              952

66
542

Small
State Gov't

0.08 *
0.08 *

3
2

143
1

31
0

$21.96 $              670
$21.96 $                   3

381
2

Local Gov't
Large

0.08 *
0.08 *

3
12

201
48

43
48

$21.96 $              941
$21.96 $           1,049

535
597

Small

0.08 *

1

148

10

$21.96 $              230

131

SECTOR 22.  Printing
ALL

Catalyst Service Companies

Small
SECTOR 25.  Refractory Brick Producers
Large
ALL

SECTOR 26.  Woodworking
ALL

0.08 *

30

CLWAGE

HOURS

0.08 *

EMPEXP

SECTOR 21.  Colored Glass Producers
Large
ALL

RECTIME

#PLANTS

Table 33

$14.24 $               ‐

0

0
69

$19.08 $               ‐

SECTOR 31.  Construction

Industrial Rehabilitation & 
Maintenance

Hazardous Waste Site Work

Refractory Brick Restoration & 
Maintenance

Page 176

Page 177

Responses

33,720

COST

HOURS

TOTAL

CLWAGE

#PLANTS
77,227

EMPEXP

RECTIME

Table 33

$      701,388

421,495

Table 34
Access to Records
The employer must provide, upon request, information to OSHA during the context of a compliance inspection.
Providing access to such materials should require no more than 5 minutes of supervisor time.
Number of total facilities covered by the Standard = 77,770
Inspection Rate (1.4%)
Number of Inspection = 77,770 *1.4%= 1,089
Highest Supervisory Wage Rate = $54.55
Burden
Hours
1,089 *

0.08 (supervisor hrs.)=

Cost
87 *

$54.55 =

$4,746.00


File Typeapplication/pdf
File TitleChromium Tables 1-34 ROCIS 12-17-12.xlsx
Authorrshowalter
File Modified2012-12-18
File Created2012-12-18

© 2024 OMB.report | Privacy Policy