Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for an IH Technician to Perform Initial Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician perform initial exposure
monitoring by collecting personal breathing‐zone air samples to characterize full‐shift exposure for each job classification in each
work area during each shift. To determine the number of new employers that may need to conduct initial monitoring OSHA
multiplied the number of existing plants by 5%.
Cost = (INITCONTTIME * CONTCOST * #INIT * %INITADD * (%LEARN + %CONT) * (#PLANTS* 5%))
Variable
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
* INITCONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician)
to conduct the initial monitoring.
* CONTCOST = Cost per hour for an outside industrial hygiene contractor =$106.73
* # INIT = Number of initial exposure measurements initial plus confirmation.
* % INITADD = Percent of plants that have not satisified initial monitoring requirement
* % LEARN = Percent of plants that will develop in‐house monitoring capability
* % CONT = Percent of plants that will continue to use an outside contractor for monitoring
* # PLANTS = Number of plants represented by the model output * 5% (new employers)
Sector 1. Electroplating
Large
20 * $ 106.73 *
2
* 25% * ( 0% + 100% ) *
930
47
=
$49,648
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 100% ) *
1,751
448
88
22
=
=
$56,062
$14,352
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
843
508
42
25
=
=
$27,006
$16,252
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
955
448
48
22
=
=
$30,591
$14,352
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
843
509
42
25
=
=
$27,006
$16,312
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0 + 100% ) *
* 25% * ( 0% + 100% ) *
959
930
48
47
=
=
$30,705
$29,789
1,751
88
=
$56,062
)*
3,560
178
=
$102,579
* ( 0% + 100% ) *
* ( 0% + 90% ) *
3,989
2,611
199
131
=
=
$127,713
$75,245
* ( 0% + 100% ) *
* ( 0% + 90% ) *
2,925
791
146
40
=
=
$93,667
$22,792
* ( 0% + 100% ) *
* ( 0% + 90% ) *
886
316
44
16
=
=
$28,377
$9,111
* ( 0% + 100% ) *
* ( 0% + 90% ) *
354
79
18
4
=
=
$11,338
$2,271
* ( 0% + 100% ) *
89
4
=
$2,835
Hard Chrome
Job Shop Chrome Plater
Captive Shop Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Small
12 * $ 106.73 * 2 * 25%
Sector 2. Welding GENERAL INDUSTRY
Large
12 * $ 106.73 * 2 * 25%
SMAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
GMAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
TIG
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
SAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
Plasma Cutting
Small
12 * $ 106.73 * 2 * 25%
Page 1
*(
0
+ 100% ) *
* ( 0% +
90%
90%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
Large
12 * $ 106.73 *
2
* 25% * ( 0% +
)*
79
4
=
$2,271
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 90% ) *
89
475
4
24
=
=
$2,835
$13,681
Small
12 * $ 106.73 *
532
27
=
$17,039
Large
2 * 25% * ( 0% + 100% ) *
MARITIME
12 * $ 106.73 * 2 * 75% * ( 0% + 50% ) *
18
1
=
$841
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
10
24
0
1
=
=
$841
$1,168
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
14
6
1
0
=
=
$1,177
$280
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
3
117
0
6
=
=
$252
$5,607
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
66
4
3
0
=
=
$5,719
$187
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
2
0
0
=
=
$168
$93
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
1
4
0
0
=
=
$84
$187
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
2
0
0
=
=
$168
$93
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
1
0
0
0
=
=
$84
$0
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
0
0
0
=
=
$0
$0
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
16
0
1
=
=
$0
$748
Small
90%
)*
9
0
=
$757
Large
12 * $ 106.73 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $ 106.73 * 2 * 25% * ( 0% +
95%
)*
202
10
=
$6,155
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
1,620
3
81
0
=
=
$51,864
$89
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
21
41
1
2
=
=
$685
$1,243
Small
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
324
20
16
1
=
=
$10,373
$621
Local
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
162
4
8
0
=
=
$5,202
$118
Local
12 * $ 106.73 *
2
* 25% * ( 0% + 100% ) *
32
2
=
$1,028
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 2
State
GOVERNMENT
12 * $ 106.73 * 2 * 25% * ( 0% +
Local
State
12 * $ 106.73 *
12 * $ 106.73 *
Local
State
95%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
)*
19
1
=
$592
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
594
0
30
0
=
=
$19,032
$0
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
8
4
0
0
=
=
$249
$118
Local
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
119
2
6
0
=
=
$3,800
$59
Local
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
59
1
3
0
=
=
$1,900
$30
12
1
=
$374
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local
12 * $ 106.73 * 2 * 25%
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large
12 * $ 106.73 * 2 * 25%
SMAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
GMAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
TIG
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
SAW
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
Plasma Cutting
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
Plasma Welding
Small
12 * $ 106.73 * 2 * 25%
Large
12 * $ 106.73 * 2 * 25%
Resistance Welding
Small
12 * $ 106.73 * 2 * 25%
MARITIME
Large
12 * $ 106.73 * 2 * 75%
SMAW
Small
12 * $ 106.73 * 2 * 75%
Large
12 * $ 106.73 * 2 * 75%
GMAW
Small
12 * $ 106.73 * 2 * 75%
Large
12 * $ 106.73 * 2 * 75%
TIG
Small
12 * $ 106.73 * 2 * 75%
Large
12 * $ 106.73 * 2 * 75%
FCAW
Small
12 * $ 106.73 * 2 * 75%
Large
12 * $ 106.73 * 2 * 75%
Plasma Cutting
Small
12 * $ 106.73 * 2 * 75%
Page 3
* ( 0% + 100% ) *
* ( 0% +
90%
)*
4,773
239
=
$137,538
* ( 0% + 100% ) *
* ( 0% + 90% ) *
4,859
3,500
243
175
=
=
$155,592
$100,869
* ( 0% + 100% ) *
* ( 0% + 90% ) *
3,563
1,060
178
53
=
=
$114,101
$30,558
* ( 0% + 100% ) *
* ( 0% + 90% ) *
1,080
424
54
21
=
=
$34,576
$12,223
* ( 0% + 100% ) *
* ( 0% + 90% ) *
432
106
22
5
=
=
$13,830
$3,056
* ( 0% + 100% ) *
* ( 0% + 90% ) *
108
106
5
5
=
=
$3,458
$3,056
* ( 0% + 100% ) *
* ( 0% + 90% ) *
108
636
5
32
=
=
$3,458
$18,335
* ( 0% + 100% ) *
648
32
=
$20,746
* ( 0% +
50%
)*
37
2
=
$1,776
* ( 0% +
* ( 0% +
90%
50%
)*
)*
21
54
1
3
=
=
$1,850
$2,570
* ( 0% +
* ( 0% +
90%
50%
)*
)*
30
13
2
1
=
=
$2,607
$607
* ( 0% +
* ( 0% +
90%
50%
)*
)*
7
251
0
13
=
=
$589
$12,055
* ( 0% +
* ( 0% +
90%
50%
)*
)*
142
8
7
0
=
=
$12,279
$374
* ( 0% +
90%
)*
5
0
=
$421
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
Large
12 * $ 106.73 *
2
* 75% * ( 0% +
50%
)*
3
0
=
$140
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
8
0
0
=
=
$168
$374
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
5
3
0
0
=
=
$421
$140
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
2
1
0
0
=
=
$168
$47
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
1
0
0
=
=
$0
$47
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
50%
)*
)*
0
33
0
2
=
=
$0
$1,589
Small
90%
)*
18
1
=
$1,598
Large
12 * $ 106.73 * 2 * 75% * ( 0% +
CONSTRUCTION
12 * $ 106.73 * 2 * 25% * ( 0% +
95%
)*
304
15
=
$9,233
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
2,293
4
115
0
=
=
$73,420
$118
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
30
60
2
3
=
=
$966
$1,835
Small
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
458
30
23
2
=
=
$14,671
$917
Local
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% + 100% ) *
* 25% * ( 0% + 95% ) *
230
6
11
0
=
=
$7,351
$178
Small
12 * $ 106.73 *
2
* 25% * ( 0% + 100% ) *
46
2
=
$1,464
Large
12 * $ 106.73 *
2
* 25% * ( 0% +
25%
)*
50
2
=
$398
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
25%
)*
)*
63
331
3
17
=
=
$1,502
$2,651
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
25%
)*
)*
1,458
101
73
5
=
=
$35,013
$810
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
75%
10%
)*
)*
18
294
1
15
=
=
$442
$941
Small
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
90%
25%
)*
)*
508
765
25
38
=
=
$14,643
$6,124
Small
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 25% * ( 0% +
* 25% * ( 0% +
50%
25%
)*
)*
4,067
16
203
1
=
=
$65,119
$130
Local
12 * $ 106.73 *
2
* 25% * ( 0% +
25%
)*
899
45
=
$7,196
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
General Industry (Aerospace)
General Industry (Autobody)
General Industry (Coil Coating)
Maritime
Construction
Government
Page 4
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
SECTOR 4. Producers of Chromates
Large
12 * $ 106.73 *
2
* 100% * ( 0% + 100% ) *
2
0
=
$267
* $ 106.73 *
2
*
)*
0
0
=
$0
* $ 106.73 *
2
* 25% * ( 0% + 100% ) *
2
0
=
$106
* $ 106.73 *
2
* 25% * ( 0% + 100% ) *
1
0
=
$32
* $ 106.73 *
2
* 25% * ( 0% + 100% ) *
3
0
=
$82
* $ 106.73 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 106.73 *
2
* 25% * ( 0% +
20%
)*
5
0
=
$78
* $ 106.73 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 106.73 *
2
* 25% * ( 0% +
75%
)*
87
4
=
$2,100
* $ 106.73 *
2
* 25% * ( 0% +
75%
)*
137
7
=
$3,299
* $ 106.73 *
2
* 100% * ( 0% +
90%
)*
3
0
=
$347
* $ 106.73 *
2
* 100% * ( 0% +
90%
)*
10
1
=
$1,157
* $ 106.73 *
2
* 25% * (
0
+ 100% ) *
86
4
=
$2,755
* $ 106.73 *
2
* 25% * (
0
+ 100% ) *
42
2
=
$1,347
* $ 106.73 *
2
* 75% * ( 0% +
80%
)*
4
0
=
$339
* $ 106.73 *
2
* 75% * ( 0% +
75%
)*
3
0
=
$212
* $ 106.73 *
2
* 100% * ( 0% + 100% ) *
1
0
=
$299
* $ 106.73 *
2
*
* ( 0% +
0%
)*
0
0
=
$0
* $ 106.73 *
2
* 75% * ( 0% +
90%
)*
37
2
=
$5,369
* $ 106.73 *
* $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
12
112
1
6
=
=
$1,033
$16,108
* $ 106.73 *
2
* 75% * ( 0% +
90%
)*
35
2
=
$3,039
* $ 106.73 *
2
* 75% * ( 0% +
90%
)*
37
2
=
$3,161
* $ 106.73 *
2
* 75% * ( 0% +
90%
)*
34
2
=
$2,978
* $ 106.73 *
2
* 25% * ( 0% +
90%
)*
178
9
=
$11,984
* $ 106.73 *
2
* 25% * ( 0% +
90%
)*
130
6
=
$3,735
* $ 106.73 *
2
* 25% * ( 0% + 100% ) *
3
0
=
$95
* $ 106.73 *
2
* 25% * ( 0% + 100% ) *
1
0
=
$32
ALL
Small
12
SECTOR 5. Chromate Pigment Procedures
Large
20
ALL
Small
12
SECTOR 6. CCA Producers
Large
12
ALL
Small
12
SECTOR 7. Chromium Catalyst Producers
Large
28
ALL
Small
12
SECTOR 8. Paint and Coating Producers
Large
12
ALL
Small
12
SECTOR 9. Printing Ink Producers
Large
12
ALL
Small
12
SECTOR 10. Plastic Colorant Producers and Users
Large
12
ALL
Small
12
SECTOR 11. Plating Mixture Producers
Large
12
ALL
Small
12
SECTOR 13. Chromium Metal Producers
Large
28
ALL
Small
12
SECTOR 14. Iron and Steel Mills
Large
20
Alloy Stainless Steel
Small
12
Large
20
Carbon Steel
Small
12
14.B Forging Industry
Large
12
Reshaping
Small
12
SECTOR 15. Iron and Steel Foundries
Large
28
ALL
Small
12
SECTOR 17. Chromium Dye Producers
Large
12
ALL
Small
12
Page 5
0%
0%
0%
0%
* ( 0% +
0%
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service
Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incerneration
Large
General Industry
Small
State
Government
Local
* ( 0% +
0%
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
12 * $ 106.73 *
2
*
)*
0
0
=
$0
12 * $ 106.73 *
2
* 100% * ( 0% + 100% ) *
5
0
=
$667
12 * $ 106.73 *
2
* 75% * ( 0% + 100% ) *
207
10
=
$19,877
12 * $ 106.73 *
2
* 75% * ( 0% + 100% ) *
1,561
78
=
$149,984
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
347
17
=
$29,956
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
703
35
=
$60,793
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
5
0
=
$469
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
17
78
1
4
=
=
$1,485
$6,721
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
5
0
=
$391
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
92
5
=
$7,938
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
367
18
=
$31,752
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
164
8
=
$14,214
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 0% * ( 0% +
* 75% * ( 0% +
90%
90%
)*
)*
0
21
0
1
=
=
$0
$1,831
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
4
0
=
$349
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
6
0
=
$509
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
0
0
=
$0
12 * $ 106.73 *
2
* 75% * ( 0% + 100% ) *
175
9
=
$16,778
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
93
38
5
2
=
=
$8,972
$3,694
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
34
1,290
2
64
=
=
$3,254
$123,890
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% + 100% ) *
* 75% * ( 0% + 100% ) *
5,162
16
258
1
=
=
$495,893
$1,560
12 * $ 106.73 *
2
* 75% * ( 0% + 100% ) *
59
3
=
$5,641
20 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
48
2
=
$6,941
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
25%
)*
)*
58
0
3
0
=
=
$4,998
$0
12 * $ 106.73 *
2
* 75% * ( 0% +
90%
)*
29
1
=
$2,499
Page 6
0%
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
Industrial Rehabilitation
Hazardous Waste‐site Work
28 * $ 106.73 *
2
* 75% * ( 0% + 100% ) *
12 * $ 106.73 *
2
*
0%
* ( 0% +
12 * $ 106.73 *
2
*
0%
Small
State
12 * $ 106.73 *
12 * $ 106.73 *
Local
Large
Item 13 COSTS
# PLANTS
# PLANTS
% CONT
% LEARN
% INITADD
# INIT
CONTCOST
INITCONTTIME
Table 1
18
1
=
$3,958
)*
0
0
=
$0
* ( 0% + 100%
*
55
3
=
$0
2
2
* 0% * ( 0% + 100%
* 100% * ( 0% + 100%
*
*
196
16
10
1
=
=
$0
$2,049
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 100% * ( 0% + 100%
* 75% * ( 0% + 90%
*
*
74
44
4
2
=
=
$9,446
$3,764
Small
State
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 75% * ( 0% +
90%
90%
*
*
143
1
7
0
=
=
$12,369
$77
Local
Large
12 * $ 106.73 *
12 * $ 106.73 *
2
2
* 75% * ( 0% +
* 0% * ( 0% +
90%
90%
*
*
201
48
10
2
=
=
$17,362
$0
Small
12 * $ 106.73 *
2
*
90%
Total
*
148
77,770
0%
Refractory Brick Restoration
Page 7
0%
* ( 0% +
7
=
3,888
$0
$3,048,250
Table 2
Initial Exposure Monitoring (§ 1910.1026(d)(2)(i) and (ii); Contract Cost for a Laboratory to Conduct Analysis of Initial
Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples
collected during initial exposure monitoring. To determine the number of new employers that may need to
conduct initial monitoring OSHA multiplied the number of existing plants by 5%.
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Cost = (SAMPCOST * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD)* #PLANTS
Variables
* SAMPCOST = Variable cost per sample = $68
* JOBCAT = Number of job categories (covering each work area).
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
*#INIT = Number of initial exposure measurements required to be satisfied equals 2
%INITADD = Percent of plants that have not satisified initial monitoring requirement
* #PLANTS = Number of plants represented by the model output * 5%
Sector 1. Electroplating
Large ( $68 * 7 * 2 * 3 *
2
* 25% ) *
930
47
=
$66,488
Small ( $68 * 7 * 1 * 3 *
Large ( $68 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
1,751
448
88
22
=
=
$62,566
$4,576
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
843
508
42
25
=
=
$4,306
$5,182
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
955
448
48
22
=
=
$4,877
$4,576
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
843
509
42
25
=
=
$4,306
$5,201
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 2 * 3 *
2
2
* 25% ) *
* 25% ) *
959
930
48
47
=
=
$4,895
$9,498
Small
( $68 * 1 * 1 * 3 *
88
=
$8,938
Large
2 * 25% ) *
1,751
GENERAL INDUSTRY
( $68 * 1 * 3 * 2 * 2 * 25% ) * 3,560
178
=
$36,342
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 3,989
* 25% ) * 2,611
199
131
=
=
$20,361
$26,658
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 2,925
* 25% ) * 791
146
40
=
=
$14,933
$8,075
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 886
* 25% ) * 316
44
16
=
=
$4,524
$3,228
Small
( $68 * 1 * 1 * 3 *
2
* 25% ) * 354
18
=
$1,808
Hard Chrome
Job Shop Chrome Plater
Captive Shop Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Sector 2. Welding
SMAW
GMAW
TIG
SAW
Page 8
S
1 El
l i
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
( $68 * 1 * 3 * 2 *
2
* 25% ) * 79
4
=
$805
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 89
* 25% ) * 79
4
4
=
=
$452
$805
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 89
* 25% ) * 475
4
24
=
=
$452
$4,847
Small
2
* 25% ) * 532
27
=
$2,716
Large
( $68 * 1 * 1 * 3 *
MARITIME
( $68 * 1 * 3 * 1 *
2
* 75% ) * 18
1
=
$268
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 10
* 75% ) * 24
0
1
=
=
$99
$372
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 14
* 75% ) * 6
1
0
=
=
$139
$89
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 3
* 75% ) * 117
0
6
=
=
$30
$1,788
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 66
* 75% ) * 4
3
0
=
=
$675
$60
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 2
* 75% ) * 2
0
0
=
=
$20
$30
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 1
* 75% ) * 4
0
0
=
=
$10
$60
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 2
* 75% ) * 2
0
0
=
=
$20
$30
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 1
* 75% ) *
0
0
0
=
=
$10
$0
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) *
* 75% ) *
0
0
0
0
=
=
$0
$0
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) *
0
* 75% ) * 16
0
1
=
=
$0
$238
Small
* 75% ) * 9
0
=
$89
Large
( $68 * 1 * 2 * 1 * 2
CONSTRUCTION
( $68 * 1 * 3 * 1 * 2
* 25% ) * 202
10
=
$1,033
Small
Large
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 1,620
* 25% ) * 3
81
0
=
=
$2,756
$15
Small
( $68 * 1 * 1 * 1 *
2
* 25% ) * 21
1
=
$36
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
Page 9
S
1 El
l i
GMAW
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
( $68 * 1 * 3 * 1 *
2
* 25% ) * 41
2
=
$209
Small
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 324
* 25% ) * 20
16
1
=
=
$551
$104
Local
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 162
* 25% ) * 4
8
0
=
=
$276
$20
Local
* 25% ) * 32
2
=
$55
State
( $68 * 1 * 1 * 1 * 2
GOVERNMENT
( $68 * 1 * 1 * 1 * 2
* 25% ) * 19
1
=
$33
Local
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 25% ) * 594
* 25% ) *
0
30
0
=
=
$1,011
$0
Local
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 25% ) * 8
* 25% ) * 4
0
0
=
=
$13
$7
Local
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 25% ) * 119
* 25% ) * 2
6
0
=
=
$202
$3
Local
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 25% ) * 59
* 25% ) * 1
3
0
=
=
$101
$2
Local
( $68 * 1 * 1 * 1 *
2
1
=
$20
Large
( $68 * 1 * 3 * 2 *
2
* 25% ) * 12
GENERAL INDUSTRY
* 25% ) * 4,773
239
=
$48,728
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 4,859
* 25% ) * 3,500
243
175
=
=
$24,806
$35,736
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 3,563
* 25% ) * 1,060
178
53
=
=
$18,191
$10,826
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 1,080
* 25% ) * 424
54
21
=
=
$5,512
$4,330
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 432
* 25% ) * 106
22
5
=
=
$2,205
$1,083
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 108
* 25% ) * 106
5
5
=
=
$551
$1,083
Small
Large
( $68 * 1 * 1 * 3 *
( $68 * 1 * 3 * 2 *
2
2
* 25% ) * 108
* 25% ) * 636
5
32
=
=
$551
$6,496
Small
( $68 * 1 * 1 * 3 *
2
* 25% ) * 648
32
=
$3,307
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 2. Mild Steel Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
Page 10
S
1 El
l i
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
MARITIME
( $68 * 1 * 3 * 1 *
2
* 75% ) * 37
2
=
$566
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 21
* 75% ) * 54
1
3
=
=
$219
$819
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 30
* 75% ) * 13
2
1
=
=
$308
$194
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 7
* 75% ) * 251
0
13
=
=
$70
$3,844
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 142
* 75% ) * 8
7
0
=
=
$1,450
$119
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 5
* 75% ) * 3
0
0
=
=
$50
$45
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 2
* 75% ) * 8
0
0
=
=
$20
$119
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 5
* 75% ) * 3
0
0
=
=
$50
$45
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) * 2
* 75% ) * 1
0
0
=
=
$20
$15
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) *
0
* 75% ) * 1
0
0
=
=
$0
$15
Small
Large
( $68 * 1 * 2 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 75% ) *
0
* 75% ) * 33
0
2
=
=
$0
$507
Small
* 75% ) * 18
1
=
$189
Large
( $68 * 1 * 2 * 1 * 2
CONSTRUCTION
( $68 * 1 * 3 * 1 * 2
* 25% ) * 304
15
=
$1,549
Small
Large
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 2,293
* 25% ) * 4
115
0
=
=
$3,902
$20
Small
Large
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 30
* 25% ) * 60
2
3
=
=
$51
$308
Small
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 3 * 1 *
2
2
* 25% ) * 458
* 25% ) * 30
23
2
=
=
$780
$154
Local
( $68 * 1 * 1 * 1 *
2
* 25% ) * 230
11
=
$391
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Page 11
S
1 El
l i
State
( $68 * 1 * 3 * 1 *
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
2
* 25% ) * 6
0
=
$30
* 1 * 1 * 1 *
2
* 25% ) * 46
2
=
$78
* 2 * 3 * 3 *
2
* 25% ) * 50
2
=
$1,521
* 2 * 1 * 3 *
* 2 * 1 * 1 *
2
2
* 25% ) * 63
* 25% ) * 331
3
17
=
=
$639
$1,127
* 2 * 1 * 1 *
* 2 * 2 * 3 *
2
2
* 25% ) * 1,458
* 25% ) * 101
73
5
=
=
$4,962
$2,066
* 2 * 1 * 3 *
* 3 * 3 * 1 *
2
2
* 25% ) * 18
* 25% ) * 294
1
15
=
=
$188
$4,501
* 3 * 1 * 1 *
* 3 * 3 * 1 *
2
2
* 25% ) * 508
* 25% ) * 765
25
38
=
=
$2,594
$11,717
* 3 * 1 * 1 *
* 2 * 3 * 1 *
2
2
* 25% ) * 4,067
* 25% ) * 16
203
1
=
=
$20,764
$166
* 2 * 1 * 1 *
2
* 25% ) * 899
45
=
$3,060
* 4 * 3 * 3 *
2
* 100% ) * 2
0
=
$510
* 0 * 1 * 3 *
2
*
0
=
$0
* 9 * 2 * 3 *
2
* 25% ) * 2
0
=
$182
* 1 * 1 * 3 *
2
* 25% ) * 1
0
=
$5
* 4 * 3 * 3 *
2
* 25% ) * 3
0
=
$157
* 0 * 3 * 0 *
2
*
0
=
$0
* 14 * 3 * 3 *
2
* 25% ) * 5
0
=
$1,116
* 0 * 1 * 3 *
2
*
0
=
$0
* 4 * 2 * 3 *
2
* 25% ) * 87
4
=
$3,571
* 4 * 2 * 3 *
2
* 25% ) * 137
7
=
$5,611
* 5 * 1 * 9 *
2
* 100% ) * 3
0
=
$923
* 3 * 1 * 5 *
2
* 100% ) * 10
1
=
$1,025
* 4 * 3 * 3 *
2
* 25% ) * 86
4
=
$5,270
* 1 * 1 * 3 *
2
* 25% ) * 42
2
=
$215
Metallizing
Local ( $68
SECTOR 3. PAINTING ‐ General Industry
Large ( $68
AEROSPACE
Small ( $68
Large ( $68
General Industry (Autobody)
Small ( $68
Large ( $68
General Industry (Coil Coating)
Small ( $68
Large ( $68
Maritime
Small ( $68
Large ( $68
Construction
Small ( $68
State ( $68
Government
Local ( $68
SECTOR 4. Producers of Chromates
Large ( $68
ALL
Small ( $68
SECTOR 5. Chromate Pigment Procedures
Large ( $68
ALL
Small ( $68
SECTOR 6. CCA Producers
Large ( $68
ALL
Small ( $68
SECTOR 7. Chromium Catalyst Producers
Large ( $68
ALL
Small ( $68
SECTOR 8. Paint and Coating Producers
Large ( $68
ALL
Small ( $68
SECTOR 9. Printing Ink Producers
Large ( $68
ALL
Small ( $68
SECTOR 10. Plastic Colorant Producers and Users
Large ( $68
ALL
Small ( $68
SECTOR 11. Plating Mixture Producers
Page 12
0%
0%
0%
)*
)*
)*
0
0
0
S
1 El
l i
ALL
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
Large
( $68 * 3 * 1 * 3 *
2
* 75% ) * 4
0
=
$203
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
14.B Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
( $68 * 3 * 1 * 3 *
2
* 75% ) * 3
0
=
$135
( $68 * 16 * 3 * 3 *
2
* 100% ) * 1
0
=
$980
( $68 * 0 * 1 * 1 *
2
*
0
=
$0
( $68 * 8 * 3 * 3 *
2
* 75% ) * 37
2
=
$13,697
( $68 * 4 * 1 * 3 *
( $68 * 8 * 3 * 3 *
2
2
* 75% ) * 12
* 75% ) * 112
1
6
=
=
$732
$41,090
( $68 * 4 * 1 * 1 *
2
* 75% ) * 35
2
=
$718
( $68 * 5 * 1 * 3 *
2
* 75% ) * 37
2
=
$2,800
( $68 * 2 * 1 * 3 *
2
* 75% ) * 34
2
=
$1,055
( $68 * 9 * 3 * 5 *
2
* 25% ) * 178
9
=
$40,941
( $68 * 5 * 1 * 5 *
2
* 25% ) * 130
6
=
$5,514
( $68 * 7 * 1 * 21 *
2
* 25% ) * 3
0
=
$742
( $68 * 5 * 1 * 7 *
2
* 25% ) * 1
0
=
$59
( $68 * 0 * 1 * 3 *
2
*
0
=
$0
( $68 * 2 * 1 * 3 *
2
* 100% ) * 5
0
=
$213
( $68 * 1 * 1 * 3 *
2
* 75% ) * 207
10
=
$3,169
( $68 * 1 * 1 * 3 *
2
* 75% ) * 1,561
78
=
$23,912
( $68 * 3 * 3 * 3 *
2
* 75% ) * 347
17
=
$47,759
( $68 * 2 * 1 * 2 *
2
* 75% ) * 703
35
=
$14,359
( $68 * 3 * 3 * 12 *
2
* 75% ) * 5
0
=
$2,990
( $68 * 2 * 1 * 4 *
( $68 * 5 * 1 * 1 *
2
2
* 75% ) * 17
* 75% ) * 78
1
4
=
=
$701
$1,984
( $68 * 1 * 1 * 1 *
2
* 75% ) * 5
0
=
$23
( $68 * 3 * 3 * 2 *
2
* 75% ) * 92
5
=
$8,437
( $68 * 2 * 1 * 2 *
2
* 75% ) * 367
18
=
$7,499
Page 13
0%
0%
)*
)*
0
0
S
1 El
l i
SECTOR 24. Chromium Catalyst Users
Large (
Catalyst Users
Small (
Large (
Chromium Catalyst Service
Companies
Small (
SECTOR 25. Refractory Brick Producers
Large (
ALL
Small (
SECTOR 26. Woodworking
Large (
General Industry
Small (
Large (
Maritime
Small (
Large (
Construction
Small (
State (
Government
Local (
SECTOR 27. Solid Waste Incerneration
Large (
General Industry
Small (
State (
Government
Local (
SECTOR 30. Superalloy Producers and Users
Large (
ALL
Small (
SECTOR 31. Construction
Large (
Industrial Rehabilitation
Hazardous Waste‐site Work
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
$68 * 2 * 3 * 3 *
2
* 75% ) * 164
8
=
$15,108
$68 * 0 * 1 * 3 *
$68 * 0 * 3 * 3 *
2
2
* 0% ) *
0
* 75% ) * 21
0
1
=
=
$0
$0
$68 * 0 * 1 * 3 *
2
* 75% ) * 4
0
=
$0
$68 * 9 * 1 * 15 *
2
* 75% ) * 6
0
=
$4,056
$68 * 0 * 1 * 0 *
2
* 75% ) *
0
=
$0
$68 * 1 * 1 * 2 *
2
* 75% ) * 175
9
=
$1,783
$68 * 1 * 1 * 2 *
$68 * 1 * 1 * 1 *
2
2
* 75% ) * 93
* 75% ) * 38
5
2
=
=
$954
$196
$68 * 1 * 1 * 1 *
$68 * 1 * 1 * 1 *
2
2
* 75% ) * 34
* 75% ) * 1,290
2
64
=
=
$173
$6,584
$68 * 1 * 1 * 1 *
$68 * 1 * 1 * 1 *
2
2
* 75% ) * 5,162
* 75% ) * 16
258
1
=
=
$26,353
$83
$68 * 1 * 1 * 1 *
2
* 75% ) * 59
3
=
$300
$68 * 6 * 3 * 15 *
2
* 75% ) * 48
2
=
$66,397
$68 * 6 * 1 * 3 *
$68 * 0 * 3 * 15 *
2
2
* 75% ) * 58
* 75% ) *
0
3
0
=
=
$5,312
$0
$68 * 6 * 1 * 3 *
2
* 75% ) * 29
1
=
$2,656
$68 * 12 * 3 * 3 *
2
* 75% ) * 18
1
=
$9,735
$68 * 0 * 3 * 3 *
2
*
0%
)*
0
=
$0
$68 * 1 * 1 * 1 *
2
*
0%
) * 55
3
=
$0
Small
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 0% ) * 196
* 100% ) * 16
10
1
=
=
$0
$109
Local
Large
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 100% ) * 74
* 75% ) * 44
4
2
=
=
$502
$222
Small
State
( $68 * 1 * 1 * 1 *
( $68 * 1 * 1 * 1 *
2
2
* 75% ) * 143
* 75% ) * 1
7
0
=
=
$730
$5
Local
( $68 * 1 * 1 * 1 *
2
* 75% ) * 201
11
=
$1,123
Page 14
0
0
S
1 El
l i
Large
( $68 * 1 * 1 * 1 *
2
*
Small
( $68 * 1 * 1 * 1 *
2
*
0%
) * 48
Item 13 COSTS
# PLANTS
# PLANTS
% INITADD
# INIT
# SAMPS
SHIFTS
JOBCAT
SAMPCOST
Table 2
2
=
$0
7
3,889
=
=
$0
$935,200
Refractory Brick Restoration
Page 15
0% ) * 148
Total
77,770
Table 3
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Employee Time and Cost to Conduct Semi‐Annual Exposure Monitoring
This table calculates the burden hours and cost of employee time to conduct semi‐annual exposure monitoring. When initial
monitoring results equal or exceed the AL and are at or below the PEL, employers must continue to monitor employees at
least every 6 months to ensure that exposures remain at or below the PEL.
Item 12 COST
TOTAL HOURS
RESPONSES
0% +
0% ) *
930
) =
$0
0
0
0.50 * $ 25.49 *
0.50 * $ 25.49 *
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
49.00%
11.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
1,751
448
) =
) =
$0
$0
0
0
0
0.50 * $ 25.49 *
0.50 * $ 25.49 *
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
11.00%
14.00%
*(
*(
0% +
0% +
0) *
0% ) *
843
508
) =
) =
$0
$0
0
0
0
0
0.50 *
*
0.50
0.50 *
0.50 *
$ 25.49 *
$ 25.49 *
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
14.00%
10.00%
*(
*(
0% +
0% +
0) *
0% ) *
955
448
) =
) =
$0
$0
0
0
0
0
$ 25.49 *
$ 25.49 *
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
10.00%
13.00%
*(
*(
0% +
0% +
0) *
0% ) *
843
509
) =
) =
$0
$0
0
0
0
0
0.50 * $ 25.49 *
0.50 * $ 25.49 *
1 * 1 * 3 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
13.00%
16.00%
*(
*(
0% +
0% +
0) *
0% ) *
959
930
) =
) =
$0
$0
0
0
0
0
0.50 * $ 25.49 *
0) *
1,751
) =
$0
0
0
0.50 * $ 25.10 *
0% +
1 * 1 * 3 * 2 * 100% * 16.00% * (
General Industry
1 * 3 * 2 * 2 * 100% *
0.92%
* ( 10% +
0% ) *
3,560
) =
$493
20
39
1.00 * $ 25.10 *
0.50 * $ 25.10 *
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.92%
0.73%
*(
*(
0% +
10% +
0% ) *
0% ) *
3,989
2,611
) =
) =
$0
$287
0
11
0
23
1.00 * $ 25.10 *
0.50 * $ 25.10 *
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.73%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
2,925
791
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
1 * 1 * 3 * 2 * 100% *
0 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
886
316
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
0 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
354
79
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
1 * 1 * 3 * 2 * 100% *
1 * 3 * 2 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
89
79
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
1 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
89
) =
$0
0
0
%ABOVEAL
Page 16
#PLANTS
%LEARN
*(
%NOTSEMI
%INHOUSE
SEMI‐ANNUALLY
49.00%
SHIFTS
#SAMPS
1 * 2 * 3 * 2 * 100% *
JOBAL
0.50 * $ 25.49 *
ADMINTIME
Sector 1. Electroplating
Large (
Hard Chrome
Small (
Large (
Job Shop
Chrome Plater
Small (
Large (
Captive Shop
Chrome Plater
Small (
Large (
Job Shop Plater
Small (
Large (
Captive Shop
Plater
Small (
Large (
Operator
Small (
Sector 2. Welding
Large (
SMAW
Small (
Large (
GMAW
Small (
Large (
TIG
Small (
Large (
SAW
Small (
Large (
Plasma Cutting
Small (
Large (
Plasma
Welding
Small (
NONSUPEWAGE
COST = BURDEN HOURS * NON SUPEWAGE
HOURS = (ADMINTIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * (%INHOUSE + %LEARN) * #PLANTS)
Variables
* ADMINTIME = In‐house administrative time (e.g., for pump calibration and report writing) per sample, in hours.
* NONSUPEWAGE = Non‐suppervisory wage rate. $/hr.
* JOBAL = Number of job categories exposed at or above the AL
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement
* 2 = # times per year (semi‐annually)
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL.
* %INHOUSE = Percent of plants already with in‐house monitoring capabilities.
* %LEARN = Percent of plants that will develop in‐house monitoring capability.
* #PLANTS = Number of plants represented by the model input.
TOTAL HOURS
RESPONSES
10% +
0% ) *
475
) =
$0
0
0
Small ( 1.00 * $ 25.10 *
*(
0% +
0% ) *
532
) =
$0
0
0
Large ( 0.50 * $ 25.10 *
0.00%
1 * 1 * 3 * 2 * 100% *
MARITIME
1 * 3 * 1 * 2 * 100% *
0.00%
*(
50% +
0% ) *
18
) =
$0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
10
24
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
14
6
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
3
117
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
66
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
2
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
1
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
2
2
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
1
0
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
0
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
16
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
*(
10% +
0% ) *
9
) =
$0
0
0
Large ( 0.50 * $ 25.10 *
0.00%
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
1 * 3 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
202
) =
$0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
1,620
3
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
21
41
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
State ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
324
20
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 25.10 *
State ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
162
4
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 25.10 *
*(
0% +
0% ) *
32
) =
$0
0
0
State ( 0.50 * $ 25.10 *
0.00%
1 * 1 * 1 * 2 * 100% *
GOVERNMENT
1 * 1 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
19
) =
$0
0
0
Local ( 1.00 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
*(
0% +
0% ) *
594
) =
$0
0
0
%LEARN
%INHOUSE
%ABOVEAL
#PLANTS
*(
%NOTSEMI
Item 12 COST
SEMI‐ANNUALLY
0.00%
SHIFTS
#SAMPS
1 * 3 * 2 * 2 * 100% *
JOBAL
Large ( 0.50 * $ 25.10 *
ADMINTIME
Resistance
Welding
NONSUPEWAGE
Table 3
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small (
Thermal Spray Large (
Tungsten
Small (
Cutting
Large (
SAW
Small (
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SMAW
0.00%
Page 17
Item 12 COST
TOTAL HOURS
RESPONSES
5% +
0% ) *
0
) =
$0
0
0
Local ( 1.00 * $ 25.10 *
State ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
8
4
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 25.10 *
State ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
119
2
) =
) =
$0
$0
0
0
0
0
Local ( 1.00 * $ 25.10 *
State ( 0.50 * $ 25.10 *
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
59
1
) =
) =
$0
$0
0
0
0
0
0.00%
*(
Local ( 1.00 * $ 25.10 * 1 * 1 * 1 * 2 * 100% *
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
SMAW
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
0.00%
*(
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
GMAW
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
TIG
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
SAW
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Plasma Cutting
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Plasma
Welding
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 2 * 2 * 100% *
0.00%
*(
Resistance
Welding
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 1 * 3 * 2 * 100% *
MARITIME
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
SMAW
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
0.00%
*(
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
GMAW
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
TIG
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
FCAW
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Plasma Cutting
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Plasma
Welding
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Oxy‐fuel
Cutting
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 2 * 100% *
0.00%
*(
Air Carbon Arc
Cutting
0.00%
*(
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 2 * 100% *
0% +
0% ) *
12
) =
$0
0
0
10% +
0% ) *
4,773
) =
$0
0
0
0% +
10% +
0% ) *
0% ) *
4,859
3,500
) =
) =
$0
$0
0
0
0
0
0% +
10% +
0% ) *
0% ) *
3,563
1,060
) =
) =
$0
$0
0
0
0
0
0% +
10% +
0% ) *
0% ) *
1,080
424
) =
) =
$0
$0
0
0
0
0
0% +
10% +
0% ) *
0% ) *
432
106
) =
) =
$0
$0
0
0
0
0
0% +
10% +
0% ) *
0% ) *
108
106
) =
) =
$0
$0
0
0
0
0
0% +
10% +
0% ) *
0% ) *
108
636
) =
) =
$0
$0
0
0
0
0
0% +
0% ) *
648
) =
$0
0
0
50% +
0% ) *
37
) =
$0
0
0
10% +
50% +
0% ) *
0% ) *
21
54
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
30
13
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
7
251
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
142
8
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
5
3
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
2
8
) =
) =
$0
$0
0
0
0
0
10% +
50% +
0% ) *
0% ) *
5
3
) =
) =
$0
$0
0
0
0
0
10% +
0% ) *
2
) =
$0
0
0
%ABOVEAL
#PLANTS
%LEARN
*(
%NOTSEMI
0.00%
SHIFTS
#SAMPS
1 * 1 * 1 * 2 * 100% *
JOBAL
State ( 0.50 * $ 25.10 *
ADMINTIME
%INHOUSE
SEMI‐ANNUALLY
NONSUPEWAGE
Table 3
Plasma Cutting
GMAW
Brazing
Metallizing
Page 18
TOTAL HOURS
RESPONSES
0% ) *
1
) =
$0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
1
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
0.50 * $ 25.10 *
0 * 2 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
50% +
0% ) *
0% ) *
0
33
) =
) =
$0
$0
0
0
0
0
1.00 * $ 25.10 *
*(
10% +
0% ) *
18
) =
$0
0
0
Large ( 0.50 * $ 25.10 *
0.00%
0 * 2 * 1 * 2 * 100% *
CONSTRUCTION
0 * 3 * 1 * 2 * 100% *
0.00%
*(
5% +
0% ) *
304
) =
$0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
2,293
4
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
30
60
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
458
30
) =
) =
$0
$0
0
0
0
0
Small ( 1.00 * $ 25.10 *
Large ( 0.50 * $ 25.10 *
0 * 1 * 1 * 2 * 100% *
0 * 3 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
5% +
0% ) *
0% ) *
230
6
) =
) =
$0
$0
0
0
0
0
*
0 * 1 * 1 * 2 * 100% *
0.00%
*(
0% +
0% ) *
46
) =
$0
0
0
*
1 * 3 * 3 * 2 * 100% *
28.00%
*(
75% +
0% ) *
50
) =
$2,974
94
188
*
*
1 * 1 * 3 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
9.00%
5.00%
*(
*(
25% +
75% +
0% ) *
0% ) *
63
331
) =
) =
$268
$393
*
*
1 * 1 * 1 * 2 * 100% *
1 * 2 * 3 * 2 * 100% *
5.00%
8.00%
*(
*(
25% +
75% +
0% ) *
0% ) *
1,458
101
) =
) =
$1,155
$1,154
36
36
36
73
*
*
1 * 1 * 3 * 2 * 100% *
2 * 3 * 1 * 2 * 100% *
8.00%
36.00%
*(
*(
25% +
90% +
0% ) *
0% ) *
18
294
) =
) =
$70
$18,098
2
571
2
1143
*
*
0 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
36.00%
22.00%
*(
*(
10% +
75% +
0% ) *
0% ) *
508
765
) =
) =
$0
$11,997
0
379
0
757
*
*
1 * 1 * 1 * 2 * 100% *
1 * 3 * 1 * 2 * 100% *
22.00%
12.00%
*(
*(
50% +
75% +
0% ) *
0% ) *
4,067
16
) =
) =
$28,347
$139
895
4
895
9
*
1 * 1 * 1 * 2 * 100% *
12.00%
*(
75% +
0% ) *
899
) =
$5,126
162
162
*
3 * 3 * 3 * 2 * 100% *
45.00%
*(
0% +
0% ) *
2
) =
$0
0
0
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
*
5 * 2 * 3 * 2 * 100% *
71.00%
*(
0% +
0% ) *
2
) =
$0
0
0
*
1 * 1 * 3 * 2 * 100% *
50.00%
*(
0% +
0% ) *
1
) =
$0
0
0
*
1 * 3 * 3 * 2 * 100% *
33.00%
*(
0% +
0% ) *
3
) =
$0
0
0
*
0 * 3 * 0 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
Small (
Thermal Spray Large (
Tungsten
Cutting
Small (
Large (
SAW
Small (
%LEARN
%INHOUSE
%ABOVEAL
#PLANTS
50% +
%NOTSEMI
Item 12 COST
SEMI‐ANNUALLY
*(
Large ( 0.50 * $ 25.10 *
SHIFTS
#SAMPS
0.00%
JOBAL
0 * 3 * 1 * 2 * 100% *
ADMINTIME
Electric Torch
Cutting
NONSUPEWAGE
Table 3
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Small ( 1.00 * $ 25.10
SECTOR 3. PAINTING
Large ( 0.50 * $ 31.68
AEROSPACE
Small ( 1.00 * $ 31.68
General
Large ( 0.50 * $ 31.68
Industry
(Autobody) Small ( 1.00 * $ 31.68
General
Large ( 0.50 * $ 31.68
Industry (Coil
Small ( 1.00 * $ 31.68
Coating)
Large ( 0.50 * $ 31.68
Maritime
Small ( 1.00 * $ 31.68
Large ( 0.50 * $ 31.68
Construction
Small ( 1.00 * $ 31.68
State ( 0.50 * $ 31.68
Government
Local ( 1.00 * $ 31.68
SECTOR 4. Producers of Chromates
Large ( 0.50 * $ 37.06
ALL
Small ( 1.00 * $ 37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $ 36.12
ALL
Small ( 1.00 * $ 36.12
SECTOR 6. CCA Producers
Large ( 0.50 * $ 30.60
ALL
Small ( 1.00 * $ 30.60
Page 19
8
8
12 24.836256
SECTOR 7. Chromium Catalyst Producers
Large ( 0.50 * $ 37.06 * 6
ALL
Small ( 1.00 * $ 37.06 * 0
SECTOR 8. Paint and Coating Producers
Large ( 0.50 * $ 27.60 * 1
ALL
Small ( 1.00 * $ 27.60 * 1
SECTOR 9. Printing Ink Producers
Large ( 0.50 * $ 27.65 * 3
ALL
Small ( 0.50 * $ 27.65 * 2
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.50 * $ 30.64 * 2
Small ( 1.00 * $ 30.64
ALL
SECTOR 11. Plating Mixture Producers
Large ( 0.50 * $ 27.50
ALL
Small ( 1.00 * $ 27.50
SECTOR 13. Chromium Metal Producers
Large ( 0.5 * $ 37.17
ALL
1 * $ 37.17
Small (
SECTOR 14. Iron and Steel Mills
Large ( 0.50 * $ 37.17
Alloy and
Stainless Steel
Small ( 1.00 * $ 37.17
Large ( 0.50 * $ 37.17
Carbon Steel
Small ( 1.00 * $ 37.17
SECTOR 14B. Forging Industry
Large ( 0.50 * $ 37.17
Reshaping
Small ( 1.00 * $ 37.17
SECTOR 15. Iron and Steel Foundries
Large ( 0.50 * $ 27.12
ALL
Small ( 1.00 * $ 27.12
SECTOR 17. Chromium Dye Producers
Large ( 0.50 * $ 36.12
ALL
Small ( 1.00 * $ 36.12
SECTOR 18. Chromium Sulfate Producers
Large ( 0.5 * $ 39.76
ALL
Small ( 0.5 * $ 39.76
SECTOR 19. Chemical Distributors
Large ( 0.50 * $ 28.67
ALL
Small ( 0.50 * $ 28.67
SECTOR 20. Textile Dyeing
Large ( 0.50 * $ 19.13
* 3 * 3 * 2 * 100% *
100.00% * (
80% +
0% ) *
5
) =
$8,331
RESPONSES
TOTAL HOURS
Item 12 COST
#PLANTS
%LEARN
%INHOUSE
%ABOVEAL
%NOTSEMI
SEMI‐ANNUALLY
SHIFTS
#SAMPS
JOBAL
NONSUPEWAGE
ADMINTIME
Table 3
225 449.64706
* 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
* 2 * 3 * 2 * 100% *
13.00%
*(
25% +
0% ) *
87
) =
$471
17
34
* 2 * 3 * 2 * 100% *
13.00%
*(
25% +
0% ) *
137
) =
$1,479
54
54
* 1 * 9 * 2 * 100% *
69.00%
*(
10% +
0% ) *
3
) =
$155
6
11
* 1 * 5 * 2 * 100% *
69.00%
*(
10% +
0% ) *
10
) =
$192
7
14
* 3 * 3 * 2 * 100% *
51.00%
*(
0
+
0
)*
86
)=
$0
0
0
*
2 * 1 * 3 * 2 * 100% *
51.00%
*(
0
+
0
)*
42
)=
$0
*
1 * 1 * 3 * 2 * 100% *
100.00% * (
20% +
0% ) *
4
) =
$73
*
1 * 1 * 3 * 2 * 100% *
100.00% * (
25% +
0% ) *
3
) =
$122
*
2 * 3 * 3 * 2 * 100% *
100.00% * (
0% +
0% ) *
1
) =
$0
0
0
*
0 * 1* 1* 2*
0% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
*
3 * 3 * 3 * 2 * 100% *
38.00%
*(
10% +
0% ) *
37
) =
$1,421
38
76
*
*
1 * 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *
38.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
12
112
) =
) =
$101
$0
3
0
3
0
*
0 * 1 * 1 * 2 * 100% *
0.00%
*(
10% +
0% ) *
35
) =
$0
0
0
*
4 * 1 * 3 * 2 * 100% *
63.00%
*(
10% +
0% ) *
37
) =
$1,028
28
79
*
2 * 1 * 3 * 2 * 100% *
63.00%
*(
10% +
0% ) *
34
) =
$968
26
26
*
6 * 3 * 5 * 2 * 100% *
100.00% * (
10% +
0% ) *
178
) =
$43,504 1,604 3208.0045
*
5 * 1 * 5 * 2 * 100% *
100.00% * (
10% +
0% ) *
130
) =
$17,578
*
6 * 1 * # * 2 * 100% *
38.00%
*(
0% +
0% ) *
3
) =
$0
0
0
*
6 * 1 * 7 * 2 * 100% *
38.00%
*(
0% +
0% ) *
1
) =
$0
0
0
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
*
1 * 1 * 3 * 2 * 100% *
27.00%
*(
0% +
0% ) *
5
) =
$0
0
0
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
207
) =
$0
0
0
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
1,561
) =
$0
0
0
*
0 * 3 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
347
) =
$0
0
0
0.00%
*(
10% +
0% ) *
703
) =
$0
0
0
0
0
3
5
4 4.4178039
648 648.08173
ALL
Small
(
0.50
* $ 19.13 *
0
* 1 * 2 * 2 * 100% *
Page 20
TOTAL HOURS
RESPONSES
0% ) *
5
) =
$135
5
10
0.00%
20.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
17
78
) =
) =
$0
$129
0
5
0
12
* 1 * 1 * 2 * 100% *
0.00%
*(
10% +
0% ) *
5
) =
$0
0
0
0 * 3 * 2 * 2 * 100% *
0.00%
*(
10% +
0% ) *
92
) =
$0
0
0
* 1 * 2 * 2 * 100% *
0.00%
*(
10% +
0% ) *
367
) =
$0
0
0
2 * 3 * 3 * 2 * 100% *
9.00%
*(
10% +
0% ) *
164
) =
$830
27
53
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
0
21
) =
) =
$0
$0
0
0
0
0
* 1 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
4
) =
$0
0
0
0 * 1 * # * 2 * 100% *
0.00%
*(
10% +
0% ) *
6
) =
$0
0
0
* 1 * 0 * 2 * 100% *
0.00%
*(
10% +
0% ) *
0
) =
$0
0
0
*
0 * 1 * 2 * 2 * 100% *
0.00%
*(
0% +
0% ) *
175
) =
$0
0
0
*
*
0
* 1 * 2 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
93
38
) =
) =
$0
$0
0
0
0
0
*
*
0 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
0.00%
22.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
34
1,290
) =
) =
$0
$0
0
0
0
0
*
*
1 * 1 * 1 * 2 * 100% *
1 * 1 * 1 * 2 * 100% *
22.00%
22.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
5,162
16
) =
) =
$0
$0
0
0
0
0
*
1 * 1 * 1 * 2 * 100% *
22.00%
*(
0% +
0% ) *
59
) =
$0
0
0
*
0 * 3 * # * 2 * 100% *
0.00%
*(
10% +
0% ) *
48
) =
$0
0
0
*
*
0
* 1 * 3 * 2 * 100% *
0 * 3 * # * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
58
0
) =
) =
$0
$0
0
0
0
0
*
0 * 1 * 3 * 2 * 100% *
0.00%
*(
10% +
0% ) *
29
) =
$0
0
0
*
*
*
*
0
* 1 * 4 * 2 * 100% *
3 * 1 * 1 * 2 * 100% *
0
%LEARN
%INHOUSE
%ABOVEAL
1 * 3 * # * 2 * 100% *
#PLANTS
10% +
%NOTSEMI
*(
*
SHIFTS
#SAMPS
25.00%
JOBAL
Item 12 COST
SECTOR 21. Colored Glass Producers
Large ( 0.50 * $ 27.66
General
Industry
Small 1.00
(
* $ 27.66
Large ( 0.50 * $ 27.66
Fiber, Flat,
Container Glass
Small 1.00
(
* $ 27.66
SECTOR 22. Printing
Large ( 0.5 * $ 19.97
SEMI‐ANNUALLY
NONSUPEWAGE
ADMINTIME
Table 3
ALL
Small
( 0.5 * $ 19.97 *
SECTOR 24. Chromium Catalyst Users
Large ( 0.5 * $ 31.14 *
0
Catalyst Users
Small
(
Large (
Chromium
Catalyst Service
Companies Small
1.0 * $ 31.14 *
0.5 * $ 31.14 *
( 1.0 * $ 31.14 *
SECTOR 25. Refractory Brick Producers
Large ( 0.5 * $ 24.56 *
0
* 1 * 3 * 2 * 100% *
0 * 3 * 3 * 2 * 100% *
0
ALL
Small
( 0.5 * $ 24.56
SECTOR 26. Woodworking
Large ( 0.50 * $ 30.76
General
Industry
Small
(
1 * $ 30.76
Large ( 0.50 * $ 30.76
Maritime
1 * $ 30.76
Small (
Large ( 0.50 * $ 30.76
Construction
1 * $ 30.76
Small (
State ( 0.50 * $ 30.76
Government
1 * $ 30.76
Local (
SECTOR 27. Solid Waste Incerneration
Large ( 0.50 * $ 26.09
General
Industry
Small
(
1 * $ 26.09
State ( 0.50 * $ 26.09
Government
1 * $ 26.09
Local (
*
0
Page 21
Item 12 COST
TOTAL HOURS
RESPONSES
0% +
0% ) *
18
) =
$0
0
0
* 3 * 3 * 2 * 100% *
0.00%
*(
0% +
0% ) *
0
) =
$0
0
0
0 * 1 * 1 * 2 * 100% *
0.00%
*(
0% +
0% ) *
55
) =
$0
0
0
%ABOVEAL
0 * 3 * 3 * 2 * 100% *
#PLANTS
*(
%NOTSEMI
%LEARN
SEMI‐ANNUALLY
0.00%
SHIFTS
#SAMPS
%INHOUSE
SECTOR 30. Superalloy Producers and Users
Large ( 0.5 * $ 26.75 *
JOBAL
NONSUPEWAGE
ADMINTIME
Table 3
ALL
Small
(
1 * $ 26.75 *
SECTOR 31. Construction Cement Workers
Large ( 0.5 * $ 30.79 *
0
Industrial Small (
Rehabilitation State (
1.0 * $ 30.79 *
0.5 * $ 30.79 *
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
0% +
0% ) *
0% ) *
196
16
) =
) =
$0
$0
0
0
0
0
Local (
Large (
1.0 * $ 30.79 *
0.5 * $ 30.79 *
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
0% +
10% +
0% ) *
0% ) *
74
44
) =
) =
$0
$0
0
0
0
0
Small (
State (
1.0 * $ 30.79 *
0.5 * $ 30.79 *
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
0.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
143
1
) =
) =
$0
$0
0
0
0
0
Local (
Large (
1.0 * $ 30.79 *
0.5 * $ 30.79 *
0 * 1 * 1 * 2 * 100% *
0 * 1 * 1 * 2 * 100% *
0.00%
60.00%
*(
*(
10% +
10% +
0% ) *
0% ) *
201
48
) =
) =
$0
$0
0
0
0
0
Small (
1.0 * $ 30.79 *
0 * 1 * 1 * 2 * 100% *
60.00%
*(
10% +
0% ) *
Total
Hazardous
Waste‐site
Work
Refractory
Brick
Restoration
Page 22
148
) =
77,770
$0
0
0
$147,017 4,930 8,048
Table 4
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for an IH Technician to Perform Semi‐Annual
Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene technician
perform semi‐annual exposure monitoring.
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Cost = (SEMICONTTIME * CONTCOST * SEMI‐ANNUALLY * %NOTSEMI * %ABOVE AL *%CONT) * #PLANTS)
Variables:
* SEMICONTTIME = Time, in hours, for an outside contractor (industrial hygiene technician)
to conduct semi‐annual monitoring
* CONTCOST = Cost per hour for an outside industrial hygiene contractor
* 2 = 2 times per year semi‐annually
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL
* %CONT = Percent of plants that will continue to use an outside contractor for monitoring
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
Large
( 12 * $ 106.73 * 2 * 100% * 49.00% * 100% ) *
930
=
$1,167,712
Small
Large
( 12 * $ 106.73 * 2 * 100% * 49.00% * 100% ) *
( 12 * $ 106.73 * 2 * 100% * 11.00% * 100% ) *
1,751
448
=
=
$2,197,640
$126,301
Small
Large
( 12 * $ 106.73 * 2 * 100% * 11.00% * 100% ) *
( 12 * $ 106.73 * 2 * 100% * 14.00% * 100% ) *
843
508
=
=
$237,652
$182,019
Small
Large
( 12 * $ 106.73 * 2 * 100% * 14.00% * 100% ) *
( 12 * $ 106.73 * 2 * 100% * 10.00% * 100% ) *
955
448
=
=
$342,625
$114,819
Small
Large
( 12 * $ 106.73 * 2 * 100% * 10.00% * 100% ) *
( 12 * $ 106.73 * 2 * 100% * 13.00% * 100% ) *
843
509
=
=
$216,048
$169,646
Small
Large
( 12 * $ 106.73 * 2 * 100% * 13.00% * 100% ) *
( 12 * $ 106.73 * 2 * 100% * 16.00% * 100% ) *
959
930
=
=
$319,334
$381,294
* 16.00% * 100% ) *
1,751
=
$717,597
*
0.92%
*
)*
3,560
=
$75,498
*
*
0.92%
0.73%
* 100% ) *
* 90% ) *
3,989
2,611
=
=
$93,997
$43,943
*
*
0.73%
0.00%
* 100% ) *
* 90% ) *
2,925
791
=
=
$54,701
$0
*
0.00%
* 100% ) *
886
=
$0
Hard Chrome
Job Shop Chrome
Plater
Captive Shop Chrome
Plater
Job Shop Plater
Captive Shop Plater
Operator
( 12 * $ 106.73 * 2 * 100%
Small
Sector 2. Welding GENERAL INDUSTRY
Large
( 12 * $ 106.73 * 2 * 100%
SMAW
( 12 * $ 106.73 * 2 * 100%
Small
Large
( 12 * $ 106.73 * 2 * 100%
GMAW
( 12 * $ 106.73 * 2 * 100%
Small
Large
( 12 * $ 106.73 * 2 * 100%
TIG
( 12 * $ 106.73 * 2 * 100%
Small
Page 23
90%
90%
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
Large
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
)*
316
=
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
354
79
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
89
79
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
89
475
=
=
$0
$0
Small
0.00%
* 100% ) *
532
=
$0
Large
( 12 * $ 106.73 * 2 * 100% *
MARITIME
( 12 * $ 106.73 * 2 * 100% *
0.00%
*
50%
)*
18
=
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
10
24
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
14
6
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
3
117
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
66
4
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
2
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
1
4
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
2
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
1
0
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
0
0
=
=
$0
$0
Small
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray
Tungsten Cutting
Page 24
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
Large
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
50%
)*
16
=
$0
Small
0.00%
*
90%
)*
9
=
$0
Large
( 0 * $ 106.73 * 2 * 100% *
CONSTRUCTION
( 12 * $ 106.73 * 2 * 100% *
0.00%
*
95%
)*
202
=
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
1,620
3
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
21
41
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
324
20
=
=
$0
$0
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
162
4
=
=
$0
$0
Small
0.00%
* 100% ) *
32
=
$0
State
( 12 * $ 106.73 * 2 * 100% *
GOVERNMENT
( 12 * $ 106.73 * 2 * 100% *
0.00%
*
)*
19
=
$0
Local
State
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
594
0
=
=
$0
$0
Local
State
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
8
4
=
=
$0
$0
Local
State
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
119
2
=
=
$0
$0
Local
State
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
59
1
=
=
$0
$0
*
0.00%
* 100% ) *
12
=
$0
*
0.00%
*
)*
4,773
=
$0
*
*
0.00%
0.00%
* 100% ) *
* 90% ) *
4,859
3,500
=
=
$0
$0
*
*
0.00%
0.00%
* 100% ) *
* 90% ) *
3,563
1,060
=
=
$0
$0
*
0.00%
* 100% ) *
1,080
=
$0
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
95%
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
( 12 * $ 106.73 * 2 * 100%
Local
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large
( 12 * $ 106.73 * 2 * 100%
SMAW
( 0 * $ 106.73 * 2 * 100%
Small
Large
( 0 * $ 106.73 * 2 * 100%
GMAW
( 0 * $ 106.73 * 2 * 100%
Small
Large
( 0 * $ 106.73 * 2 * 100%
TIG
( 0 * $ 106.73 * 2 * 100%
Small
Page 25
90%
90%
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
Large
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
)*
424
=
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
432
106
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
108
106
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
108
636
=
=
$0
$0
Small
0.00%
* 100% ) *
648
=
$0
Large
( 0 * $ 106.73 * 2 * 100% *
MARITIME
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
50%
)*
37
=
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
21
54
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
30
13
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
7
251
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
142
8
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
5
3
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
8
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
5
3
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
2
1
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
50%
)*
)*
0
1
=
=
$0
$0
Small
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray
Tungsten Cutting
Page 26
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
Large
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
50%
)*
33
=
$0
Small
0.00%
*
90%
)*
18
=
$0
Large
( 0 * $ 106.73 * 2 * 100% *
CONSTRUCTION
( 0 * $ 106.73 * 2 * 100% *
0.00%
*
95%
)*
304
=
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
2,293
4
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
30
60
=
=
$0
$0
Small
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
458
30
=
=
$0
$0
Small
State
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 95% ) *
230
6
=
=
$0
$0
Local
( 0 * $ 106.73 * 2 * 100% *
0.00%
* 100% ) *
46
=
$0
Large
( 12 * $ 106.73 * 2 * 100% * 28.00% *
25%
*
50
=
$8,907
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
9.00%
5.00%
*
*
75%
25%
)*
*
63
331
=
=
$10,815
$10,603
Small
Large
( 12 * $ 106.73 * 2 * 100% *
( 12 * $ 106.73 * 2 * 100% *
5.00%
8.00%
*
*
75%
25%
)*
*
1,458
101
=
=
$140,052
$5,184
Small
Large
( 12 * $ 106.73 * 2 * 100% * 8.00% *
( 12 * $ 106.73 * 2 * 100% * 36.00% *
75%
10%
)*
*
18
294
=
=
$2,828
$27,101
Small
Large
( 12 * $ 106.73 * 2 * 100% * 36.00% *
( 12 * $ 106.73 * 2 * 100% * 22.00% *
90%
25%
)*
*
508
765
=
=
$421,714
$107,791
Small
State
( 12 * $ 106.73 * 2 * 100% * 22.00% *
( 12 * $ 106.73 * 2 * 100% * 12.00% *
50%
25%
)*
*
4,067
16
=
=
$1,146,094
$1,248
899
=
$69,086
2
=
$2,400
0
=
$0
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
General Industry
(Autobody)
General Industry (Coil
Coating)
Maritime
Construction
Government
( 12 * $ 106.73 * 2 * 100% * 12.00% * 25% ) *
Local
SECTOR 4. Producers of Chromates
Large
( 12 * $ 106.73 * 2 * 100% * 45.00% * 100% ) *
ALL
( 0 * $ 106.73 * 2 * 100% * 0.00% * 0% ) *
Small
Page 27
SECTOR 5. Chromate Pigment Procedures
Large
( 12 * $ 106.73
ALL
( 12 * $ 106.73
Small
SECTOR 6. CCA Producers
Large
( 12 * $ 106.73
ALL
( 0 * $ 106.73
Small
SECTOR 7. Chromium Catalyst Producers
Large
( 20 * $ 106.73
ALL
( 0 * $ 106.73
Small
SECTOR 8. Paint and Coating Producers
Large
( 12 * $ 106.73
ALL
( 12 * $ 106.73
Small
SECTOR 9. Printing Ink Producers
Large
( 12 * $ 106.73
ALL
( 12 * $ 106.73
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
( 12 * $ 106.73
ALL
( 12 * $ 106.73
Small
SECTOR 11. Plating Mixture Producers
Large
( 12 * $ 106.73
ALL
( 12 * $ 106.73
Small
SECTOR 13. Chromium Metal Producers
Large
( 12 * $ 106.73
ALL
( 0 * $ 106.73
Small
SECTOR 14. Iron and Steel Mills
Large
( 12 * $ 106.73
Alloy and Stainless
Steel
( 12 * $ 106.73
Small
Large
( 0 * $ 106.73
Carbon Steel
( 0 * $ 106.73
Small
SECTOR 14B. Forging Industry
Large
( 12 * $ 106.73
Reshaping
( 12 * $ 106.73
Small
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
* 2 * 100% * 71.00% * 100% ) *
2
=
$3,596
* 2 * 100% * 50.00% * 100% ) *
1
=
$1,266
* 2 * 100% * 33.00% * 100% ) *
3
=
$2,161
* 2 * 100% *
0.00%
*
0%
)*
0
=
$0
* 2 * 100% *
100%
*
20%
)*
5
=
$4,444
* 2 * 100% *
0.00%
*
0%
)*
0
=
$0
* 2 * 100% * 13.00% *
75%
)*
87
=
$21,836
* 2 * 100% * 13.00% *
75%
)*
137
=
$34,314
* 2 * 100% * 69.00% *
90%
)*
3
=
$4,792
* 2 * 100% * 69.00% *
90%
)*
10
=
$15,972
* 2 * 100% * 51.00% * 100% ) *
86
=
$112,392
* 2 * 100% * 51.00% * 100% ) *
42
=
$54,974
* 2 * 100% *
100%
*
80%
)*
4
=
$9,053
* 2 * 100% *
100%
*
75%
)*
3
=
$5,658
* 2 * 100% *
100%
* 100% ) *
1
=
$2,562
* 2 * 0%
0.00%
*
0%
)*
0
=
$0
* 2 * 100% * 38.00% *
90%
)*
37
=
$32,646
* 2 * 100% * 38.00% *
* 2 * 100% * 0.00% *
90%
90%
)*
)*
12
112
=
=
$10,471
$0
* 2 * 100% *
*
90%
)*
35
=
$0
* 2 * 100% * 63.00% *
90%
)*
37
=
$53,102
* 2 * 100% * 63.00% *
90%
)*
34
=
$50,039
Page 28
*
0.00%
SECTOR 15. Iron and Steel Foundries
Large
( 20 *
ALL
( 12 *
Small
SECTOR 17. Chromium Dye Producers
Large
( 12 *
ALL
( 12 *
Small
SECTOR 18. Chromium Sulfate Producers
Large
( 0 *
ALL
( 12 *
Small
SECTOR 19. Chemical Distributors
Large
( 0 *
ALL
( 0 *
Small
SECTOR 20. Textile Dyeing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 21. Colored Glass Producers
Large
( 12 *
General Industry
( 0 *
Small
Large ( 12 *
Fiber, Flat, Container
Glass
Small ( 12 *
SECTOR 22. Printing
Large
( 0 *
ALL
( 0 *
Small
SECTOR 24. Chromium Catalyst Users
Large
( 12 *
Catalyst Users
( 0 *
Small
Large
( 12 *
Chromium Catalyst
Service Companies
( 12 *
Small
SECTOR 25. Refractory Brick Producers
Large
( 0 *
ALL
( 0 *
Small
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
$ 106.73 * 2 * 100% *
100%
*
90%
)*
178
=
$684,794
$ 106.73 * 2 * 100% *
100%
*
90%
)*
130
=
$298,819
$ 106.73 * 2 * 100% * 38.00% * 100% ) *
3
=
$2,887
$ 106.73 * 2 * 100% * 38.00% * 100% ) *
1
=
$962
$ 106.73 * 2 * 100% *
)*
0
=
$0
$ 106.73 * 2 * 100% * 27.00% * 100% ) *
5
=
$3,599
0.00%
*
0%
$ 106.73 * 2 * 100% *
0.00%
* 100% ) *
207
=
$0
$ 106.73 * 2 * 100% *
0.00%
* 100% ) *
1,561
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
347
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
703
=
$0
$ 106.73 * 2 * 100% * 25.00% *
90%
)*
5
=
$3,126
$ 106.73 * 2 * 100% * 0.00% *
$ 106.73 * 2 * 100% * 20.00% *
90%
90%
)*
)*
17
78
=
=
$0
$35,844
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
5
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
92
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
367
=
$0
$ 106.73 * 2 * 100% *
9.00%
*
90%
)*
164
=
$34,115
$ 106.73 * 2 * 100% *
$ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
90%
)*
)*
0
21
=
=
$0
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
4
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
6
=
$0
$ 106.73 * 2 * 100% *
0.00%
*
90%
)*
0
=
$0
Page 29
SECTOR 26. Woodworking
Large
( 0 * $ 106.73
General Industry
( 0 * $ 106.73
Small
Large
( 0 * $ 106.73
Maritime
( 0 * $ 106.73
Small
Large
( 12 * $ 106.73
Construction
( 12 * $ 106.73
Small
State
( 12 * $ 106.73
Government
( 12 * $ 106.73
Local
SECTOR 27. Solid Waste Incerneration
Large
( 0 * $ 106.73
General Industry
( 0 * $ 106.73
Small
State
( 0 * $ 106.73
Government
( 0 * $ 106.73
Local
SECTOR 30. Superalloy Producers and Users
Large
( 0 * $ 106.73
ALL
( 0 * $ 106.73
Small
SECTOR 31. Construction
Large
( 0 * $ 106.73
Item 13 COST
# PLANTS
% CONT
% ABOVEAL
% NOTSEMI
SEMI ‐ ANNUALLY
CONTCOST
SEMICONTTIME
Table 4
* 2 * 100% *
0.00%
* 100% ) *
175
=
$0
* 2 * 100% *
* 2 * 100% *
0.00%
0.00%
* 100% ) *
* 100% ) *
93
38
=
=
$0
$0
* 2 * 100% * 0.00% * 100% ) *
* 2 * 100% * 22.00% * 100% ) *
34
1,290
=
=
$0
$726,821
* 2 * 100% * 22.00% * 100% ) *
* 2 * 100% * 22.00% * 100% ) *
5,162
16
=
=
$2,909,238
$9,154
* 2 * 100% * 22.00% * 100% ) *
59
=
$33,095
* 2 * 100% *
0.00%
*
90%
)*
48
=
$0
* 2 * 100% *
* 2 * 100% *
0.00%
0.00%
*
*
90%
25%
)*
)*
58
0
=
=
$0
$0
* 2 * 100% *
0.00%
*
90%
)*
29
=
$0
* 2 * 100% *
0.00%
* 100% ) *
18
=
$0
* 2 * 100% *
0.00%
*
)*
0
=
$0
* 2 * 100% *
0.00%
* 100% ) *
55
=
$0
Small
State
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 100% ) *
196
16
=
=
$0
$0
Local
Large
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
* 100% ) *
* 90% ) *
74
44
=
=
$0
$0
Hazardous Waste‐site Small
Work
State
( 0 * $ 106.73 * 2 * 100% *
( 0 * $ 106.73 * 2 * 100% *
0.00%
0.00%
*
*
90%
90%
)*
)*
143
1
=
=
$0
$0
Local
Large
( 0 * $ 106.73 * 2 * 100% * 0.00% *
( 0 * $ 106.73 * 2 * 100% * 60.00% *
90%
90%
)*
)*
201
48
=
=
$0
$0
Small
( 0 * $ 106.73 * 2 * 100% * 60.00% *
90%
Total
)*
148
77,770
Industrial
Rehabilitation
Refractory Brick
Restoration
Page 30
0%
=
$0
= $13,556,384
Table 5
Semi‐Annual Exposure Monitoring (Paragraph (d)(2)(iii)); Contract Cost for a Laboratory to Conduct Analysis
of Semi‐Annual Exposure Monitoring Air Samples
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples
collected during semi‐annual exposure monitoring.
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Cost = (SAMPCOST * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVE AL) * #PLANTS
Variables:
* SAMPCOST = Variable cost per sample = $68
* JOBAL = Number of job categories exposed at or above the AL.
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement.
* 2 = 2 times per year (semi‐annual).
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category at or above the AL.
* #PLANTS = Number of plants represented by the model input.
Sector 1. Electroplating
Large (
$68 * 1 * 2 * 3 * 2 * 100% *
49%
) *
930
=
$372,335
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *
49%
11%
) *
1,751
448
=
$350,368
$40,272
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *
11%
14%
) *
843
508
=
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *
14%
10%
) *
955
448
=
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *
10%
13%
) *
843
509
=
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 2 * 3 * 2 * 100% *
13%
16%
) *
959
930
=
) *
=
$50,911
$121,579
Small (
$68 * 1 * 1 * 3 * 2 * 100% *
16%
) *
1,751
=
$114,406
Sector 2. Welding
SMAW
Large (
$68 * 1 * 3 * 2 * 2 * 100% *
0.92%
) *
3,560
=
$26,748
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *
0.92%
0.73%
) *
3,989
2,611
=
GMAW
$14,986
$15,568
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *
0.73%
0%
) *
) *
2,925
791
=
TIG
Small (
Large (
=
$8,721
$0
Small (
$68 * 1 * 1 * 3 * 2 * 100 *
0%
) *
886
=
$0
Hard Chrome
) *
=
Job Shop Chrome Plater
Captive Shop Chrome
Plater
) *
) *
=
=
$37,889
$58,038
$54,624
$36,611
Job Shop Plater
) *
=
$34,444
$54,093
Captive Shop Plater
Operator
General Industry
Page 31
) *
=
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$68 * 0 * 3 * 2 * 2 * 100% *
0%
) *
316
=
$0
Small (
Large (
$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
354
79
=
$0
$0
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
89
79
=
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 3 * 2 * 2 * 100% *
0%
0%
) *
89
475
=
) *
=
$0
$0
$68 * 1 * 1 * 3 * 2 * 100% *
Maritime
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
) *
532
=
$0
0%
) *
18
=
$0
Small (
Large (
$68 * 1 * 2 * 1 * 2 * 100% *
$68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
10
24
=
$0
$0
Small (
Large (
$68 * 1 * 2 * 1 * 2 * 100% *
$68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
14
6
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
3
117
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
66
4
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
2
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
1
4
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
2
=
Small ( $68 * 1 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
1
0
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
0
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
16
=
) *
=
$0
$0
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
0%
) *
9
=
$0
SAW
) *
=
Plasma Cutting
) *
=
$0
$0
Plasma Welding
Resistance Welding
Small (
SMAW
) *
=
GMAW
) *
=
$0
$0
TIG
) *
=
$0
$0
FCAW
) *
=
$0
$0
Plasma Cutting
) *
=
$0
$0
Plasma Welding
) *
=
$0
$0
Oxy‐fuel Cutting
) *
=
$0
$0
Air Carbon Arc Cutting
) *
=
$0
$0
Electric Torch Cutting
Thermal Spray Tungsten
Cutting
) *
=
$0
$0
SAW
Page 32
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
CONSTRUCTION
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
) *
202
=
$0
Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
1,620
3
=
$0
$0
Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
21
41
=
Small ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
324
20
=
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *
0%
0%
) *
162
4
=
) *
=
$0
$0
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
GOVERNMENT
State ( $68 * 1 * 1 * 1 * 2 * 100% *
0%
) *
32
=
$0
0%
) *
19
=
$0
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
594
0
=
$0
$0
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
8
4
=
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
119
2
=
Local ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 1 * 1 * 2 * 100% *
0%
0%
) *
59
1
=
) *
=
$0
$0
* 100% *
0%
) *
12
=
$0
* 100% *
0%
) *
4,773
=
$0
* 100% *
0%
0%
) *
4,859
3,500
=
$0
$0
0%
0%
) *
3,563
1,060
=
) *
) *
1,080
424
=
* 100% *
0%
0%
=
$0
$0
* 100% *
0%
) *
432
=
$0
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
Local ( $68 * 1 * 1 * 1 * 2
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( $68 * 0 * 3 * 2 * 2
SMAW
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
GMAW
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
TIG
Small ( $68 * 0 * 1 * 3 * 2
Large ( $68 * 0 * 3 * 2 * 2
SAW
Small ( $68 * 0 * 1 * 3 * 2
Page 33
* 100% *
* 100% *
* 100% *
* 100 *
) *
) *
=
=
$0
$0
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$68 * 0 * 3 * 2 * 2 * 100% *
0%
) *
106
=
$0
Small (
Large (
$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 0 * 3 * 2 * 2 * 100% *
0%
0%
) *
108
106
=
$0
$0
Small (
Large (
$68 * 0 * 1 * 3 * 2 * 100% *
$68 * 0 * 3 * 2 * 2 * 100% *
0%
0%
) *
108
636
=
) *
=
$0
$0
$68 * 0 * 1 * 3 * 2 * 100% *
Maritime
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
) *
648
=
$0
0%
) *
37
=
$0
Small (
Large (
$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
21
54
=
$0
$0
Small (
Large (
$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
30
13
=
Small (
Large (
$68 * 0 * 2 * 1 * 2 * 100% *
$68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
7
251
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
142
8
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
5
3
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
8
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
5
3
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2
1
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
1
=
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
0
33
=
) *
=
$0
$0
Small ( $68 * 0 * 2 * 1 * 2 * 100% *
0%
) *
18
=
$0
Plasma Cutting
) *
=
Plasma Welding
Resistance Welding
Small (
SMAW
) *
=
GMAW
) *
=
$0
$0
TIG
) *
=
$0
$0
FCAW
) *
=
$0
$0
Plasma Cutting
) *
=
$0
$0
Plasma Welding
) *
=
$0
$0
Oxy‐fuel Cutting
) *
=
$0
$0
Air Carbon Arc Cutting
) *
=
$0
$0
Electric Torch Cutting
Thermal Spray Tungsten
Cutting
) *
=
$0
$0
SAW
Page 34
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
CONSTRUCTION
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
) *
304
=
$0
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
2,293
4
=
$0
$0
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
30
60
=
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
458
30
=
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 3 * 1 * 2 * 100% *
0%
0%
) *
230
6
=
) *
=
$0
$0
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
0%
) *
46
=
$0
Large (
$68 * 1 * 3 * 3 * 2 * 100% *
28%
) *
50
=
$17,040
Small (
Large (
$68 * 1 * 1 * 3 * 2 * 100% *
$68 * 1 * 1 * 1 * 2 * 100% *
9%
5%
) *
63
331
=
$2,299
$2,254
Small ( $68 * 1 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 2 * 3 * 2 * 100% *
5%
8%
) *
1,458
101
=
Small ( $68 * 1 * 1 * 3 * 2 * 100% *
Large ( $68 * 2 * 3 * 1 * 2 * 100% *
8%
36%
) *
18
294
=
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 1 * 3 * 1 * 2 * 100% *
36%
22%
) *
508
765
=
Small ( $68 * 1 * 1 * 1 * 2 * 100% *
State ( $68 * 1 * 3 * 1 * 2 * 100% *
22%
12%
) *
4,067
16
=
) *
=
$121,814
$796
* 1 * 1 * 1 * 2 * 100% *
12%
) *
899
=
$14,686
* 3 * 3 * 3 * 2 * 100% *
45%
) *
2
=
$3,443
* 0 * 1 * 3 * 2 * 100% *
0%
) *
0
=
$0
* 5 * 2 * 3 * 2 * 100% *
71%
) *
2
=
$5,733
* 1 * 1 * 3 * 2 * 100% *
50%
) *
1
=
$202
SMAW
) *
=
Plasma Cutting
) *
=
$0
$0
GMAW
) *
=
$0
$0
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
General Industry
(Autobody)
General Industry (Coil
Coating)
) *
) *
) *
=
=
=
$9,924
$6,612
$601
$86,414
Maritime
) *
=
$0
$68,740
Construction
Government
Local ( $68
SECTOR 4. Producers of Chromates
Large ( $68
ALL
Small ( $68
SECTOR 5. Chromate Pigment Procedures
Large ( $68
ALL
Small ( $68
Page 35
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
SECTOR 6. CCA Producers
Large (
$68 * 1 * 3 * 3 * 2 * 100% *
33%
) *
3
=
$1,034
*
3 * 0 * 2 * 100% *
0%
) *
0
=
$0
*
3 * 3 * 2 * 100% *
100%
) *
5
=
$38,256
*
1 * 3 * 2 * 100% *
0%
) *
0
=
$0
*
2 * 3 * 2 * 100% *
13%
) *
87
=
$9,284
*
2 * 3 * 2 * 100% *
13%
) *
137
=
$14,588
*
1 * 9 * 2 * 100% *
69%
) *
3
=
$7,639
*
1 * 5 * 2 * 100% *
69%
) *
10
=
$9,431
*
3 * 3 * 2 * 100% *
51%
) *
86
=
$107,511
*
1 * 3 * 2 * 100% *
51%
) *
42
=
$17,529
*
1 * 3 * 2 * 100% *
100%
) *
4
=
$1,804
*
1 * 3 * 2 * 100% *
100%
) *
3
=
$1,203
*
3 * 3 * 2 * 100% *
100%
) *
1
=
$2,450
*
1 * 1 * 2 *
*
0%
) *
0
=
$0
*
3 * 3 * 2 * 100% *
38%
) *
37
=
$52,047
*
1 * 3 * 2 * 100% *
3 * 3 * 2 * 100% *
38%
0%
) *
) *
12
112
=
*
=
$1,855
$0
*
1 * 1 * 2 * 100% *
0%
) *
35
=
$0
*
1 * 3 * 2 * 100% *
63%
) *
37
=
$37,627
*
1 * 3 * 2 * 100% *
63%
) *
34
=
$17,728
*
3 * 5 * 2 * 100% *
100%
) *
178
=
$2,183,523
*
1 * 5 * 2 * 100% *
100%
) *
130
=
$441,116
ALL
$68 * 0
SECTOR 7. Chromium Catalyst Producers
Large ( $68 * 6
ALL
Small ( $68 * 0
SECTOR 8. Paint and Coating Producers
Large ( $68 * 1
ALL
Small ( $68 * 1
SECTOR 9. Printing Ink Producers
Large ( $68 * 3
ALL
Small ( $68 * 2
SECTOR 10. Plastic Colorant Producers and Users
Large ( $68 * 2
ALL
Small ( $68 * 2
SECTOR 11. Plating Mixture Producers
Large ( $68 * 1
ALL
Small ( $68 * 1
SECTOR 13. Chromium Metal Producers
Large ( $68 * 2
ALL
Small ( $68 * 0
SECTOR 14. Iron and Steel Mills
Large ( $68 * 3
Alloy Stainless Steel
Small ( $68 * 1
Large ( $68 * 0
Carbon Steel
Small ( $68 * 0
14B. Forging Industry
Large ( $68 * 4
Forging Industry
Small ( $68 * 2
SECTOR 15. Iron and Steel Foundries
Large ( $68 * 6
ALL
Small ( $68 * 5
Small (
Page 36
0%
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
SECTOR 17. Chromium Dye Producers
Large (
$68 * 6 * 1 * 21 * 2 * 100% *
38%
) *
3
=
$19,331
* 6 * 1 * 7 * 2 * 100% *
38%
) *
1
=
$2,148
* 0 * 1 * 3 * 2 * 100% *
0%
) *
0
=
$0
* 1 * 1 * 3 * 2 * 100% *
27%
) *
5
=
$574
* 0 * 1 * 3 * 2 * 100% *
0%
) *
207
=
$0
* 0 * 1 * 3 * 2 * 100% *
0%
) *
1,561
=
$0
* 0 * 3 * 3 * 2 * 100% *
0%
) *
347
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
703
=
$0
* 1 * 3 * 12 * 2 * 100% *
25%
) *
5
=
$6,645
* 0 * 1 * 4 * 2 * 100% *
* 3 * 1 * 1 * 2 * 100% *
0%
20%
) *
17
78
=
) *
=
$0
$6,350
* 0 * 1 * 1 * 2 * 100% *
0%
) *
5
=
$0
* 0 * 3 * 2 * 2 * 100% *
0%
) *
92
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
367
=
$0
* 2 * 3 * 3 * 2 * 100% *
9%
) *
164
=
$36,259
* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 3 * 2 * 100% *
0%
0%
) *
=
) *
0
21
=
$0
$0
* 0 * 1 * 3 * 2 * 100% *
0%
) *
4
=
$0
* 0 * 1 * 15 * 2 * 100% *
0%
) *
6
=
$0
* 0 * 1 * 0 * 2 * 100% *
0%
) *
0
=
$0
* 0 * 1 * 2 * 2 * 100% *
0%
) *
175
=
$0
* 0 * 1 * 2 * 2 * 100% *
* 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
93
38
=
) *
=
$0
$0
* 0 * 1 * 1 * 2 * 100% *
0%
) *
34
=
$0
ALL
$68
SECTOR 18. Chromium Sulfate Producers
Large ( $68
ALL
Small ( $68
SECTOR 19. Chemical Distributors
Large ( $68
ALL
Small ( $68
SECTOR 20. Textile Dyeing
Large ( $68
ALL
Small ( $68
SECTOR 21. Colored Glass Producers
Large ( $68
General Industry
Small ( $68
Large ( $68
Fiber, Flat, and Container
Glass
Small ( $68
SECTOR 22. Printing
Large ( $68
ALL
Small ( $68
SECTOR 24. Chromium Catalyst Users
Large ( $68
Catalyst User
Small ( $68
Large ( $68
Chromium Catalyst Service
Companies
Small ( $68
SECTOR 25. Refractory Brick Producers
Large ( $68
ALL
Small ( $68
SECTOR 26. Woodworking
Large ( $68
General Industry
Small ( $68
Large ( $68
Maritime
Small ( $68
Small (
Page 37
Item 13 COST
#PLANTS
%ABOVEAL
%NOTSEMI
SEMI
#SAMPS
SHIFTS
JOBAL
SAMPCOST
Table 5
Large (
$68 * 1 * 1 * 1 * 2 * 100% *
22%
) *
1,290
=
$38,626
Small (
State (
$68 * 1 * 1 * 1 * 2 * 100% *
$68 * 1 * 1 * 1 * 2 * 100% *
22%
22%
) *
5,162
16
=
) *
=
$154,606
$486
1 * 1 * 1 * 2 * 100% *
2
0 * 3 * 15 * 2 * 100% *
22%
) *
59
=
$1,759
0%
) *
48
=
$0
0 * 1 * 3 * 2 * 100% *
0 * 3 * 15 * 2 * 100% *
0%
0%
) *
58
0
=
) *
=
$0
$0
0 * 1 * 3 * 2 * 100% *
2
0 * 3 * 3 * 2 * 100% *
0%
) *
29
=
$0
0%
) *
18
=
$0
0 * 3 * 3 * 2 * 100% *
0%
) *
0
=
$0
0 * 1 * 1 * 2 * 100% *
0%
) *
55
=
$0
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
State ( $68 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
196
16
=
$0
$0
Local ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
74
44
=
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
State ( $68 * 0 * 1 * 1 * 2 * 100% *
0%
0%
) *
143
1
=
Local ( $68 * 0 * 1 * 1 * 2 * 100% *
Large ( $68 * 0 * 1 * 1 * 2 * 100% *
0%
60%
) *
201
48
=
Small ( $68 * 0 * 1 * 1 * 2 * 100% *
60%
TOTAL
) *
Construction
Government
Local ( $68 *
SECTOR 27. Solid Waste Incerneration
Large ( $68 *
General Industry
Small ( $68 *
State ( $68 *
Government
Local ( $68 *
SECTOR 30. Superalloy Producers and Users
Large ( $68 *
ALL
Small ( $68 *
SECTOR 31. Construction
Large ( $68 *
Industrial Rehabilitation
Hazardous Waste‐site
Work
Refractory Brick
Restoration
Page 38
) *
) *
) *
) *
=
=
=
=
148
=
77,770
$0
$0
$0
$0
$0
$0
$0
$4,943,561
Table 6
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Employee Time and Cost to Conduct Quarterly Exposure Monitoring
When initial monitoring results exceed the PEL, periodic monitoring every three months allows the employer to maintain an accurate
profile of employee exposures. If the employer installs or upgrades controls, quarterly monitoring will demonstrate whether the controls
are working properly.
HOURS = (ADMINTIME * JOBPEL * SHIFTS * #SAMPS * 4* %NOTQUART * %ABOVEPEL * (%INHOUSE + %LEARN)) *
#PLANTS
COST = (NONSUPEWAGE * BURDEN HOURS)
RESPONSES
=
0
0
* ( 0% + 0% )) *
* ( 0% + 0% )) *
1,751
448
=
=
$0
$0
=
=
0
0
0
0
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
843
508
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
955
448
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
843
509
=
=
$0
$0
=
=
0
0
0
0
Small ( 0.50 * $ 25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
959
930
=
=
$0
$0
=
=
0
0
0
0
0
0
Small ( 0.50 * $ 25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 * 100% *
0%
0%
Small ( 0.50 * $ 25.49 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 * 100% *
# SAMPS
* ( 0% +
SHIFTS
0%
JOBPEL
*
# PLANTS
$0
% LEARN
=
% INHOUSE
930
% ABOVEPEL
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
In‐house administrative time
Non‐supervisory wage rate, $/hr
Number of job categories exposed above the PEL
Number of work shifts.
Number of samples per exposure measurement.
Four times per year (Quarterly).
Percent of plants not performing quarterly monitoring requirements.
Percent of plants that have an employee in at least one job category above the PEL.
Percent of plantsalready with in‐house monitoring capabilities.
Percent of plants that will develop in house monitoring capability.
Number of plants represented by the model output.
ADMINTIME
Variable
*ADMINTIME =
* NONSUPEWAGE =
* JOBPEL =
* SHIFTS =
* #SAMPS =
*4 =
* %NOTQUART =
* %ABOVEPEL =
* %INHOUSE =
* %LEARN =
* #PLANTS =
Sector 1. Electroplating
Large ( 0.50 * $ 25.49 * 0 * 2 * 3 * 4 *
)) *
Hard Chrome
Job Shop Chrome
Plater
Captive Shop
Chrome Plater
Job Shop Plater
Captive Shop Plater
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
( 0.50 * $ 25.49 * 1 * 1 * 3 * 4 * 100% *
0% * ( 0% + 0% )) *
GENERAL INDUSTRY
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% * 4.85% * ( 10% + 0% )) *
1,751
=
$0
=
0
3,560
=
$130,519
=
5,200
414
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% * 4.84% * ( 0% + 0% )) *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% * 0.37% * ( 10 + 0% )) *
3,989
2,611
=
=
$0
$730,387
=
=
0
29,099
0
2,180
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% * 0.38% * ( 0% + 0% )) *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% * 0% * ( 10% + 0% )) *
2,925
791
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 0 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
886
316
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
354
79
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
89
=
$0
=
0
0
Page 39
RESPONSES
0
0
Small ( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
89
475
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% * 0%
* ( 0% + 0% )) *
532
=
$0
=
0
0
* ( 50% + 0% )) *
18
=
$0
=
0
0
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
79
# SAMPS
* ( 10% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
Plasma Welding
Resistance Welding
SMAW
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
10
24
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
14
6
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
3
117
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
66
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
2
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
1
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
2
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
1
0
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
0
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
16
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% * 0%
* ( 10% + 0% )) *
9
=
$0
=
0
0
* ( 5% + 0% )) *
202
=
$0
=
0
0
Small ( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
1,620
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
21
41
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
324
20
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
162
4
=
=
$0
$0
=
=
0
0
0
0
Local
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
32
=
$0
=
0
0
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 40
RESPONSES
0
0
Local
State
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
594
0
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
8
4
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
119
2
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
59
1
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 1 * 4 * 100% *
12
=
$0
=
0
0
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0% * ( 0% + 0% )) *
General Industry
0% * ( 10% + 0% )) *
4,773
=
$0
=
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
4,859
3,500
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
3,563
1,060
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 0 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
1,080
424
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 0 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
432
106
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
108
106
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% *
( 0.50 * $ 25.10 * 1 * 3 * 2 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 10% + 0% )) *
108
636
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 25.10 * 1 * 1 * 3 * 4 * 100% * 0%
MARITIME
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% * 0%
* ( 0% + 0% )) *
648
=
$0
=
0
0
* ( 50% + 0% )) *
37
=
$0
=
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
21
54
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
30
13
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
7
251
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
142
8
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
5
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
2
=
$0
=
0
0
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
19
# SAMPS
* ( 5% + 0% )) *
SHIFTS
GOVERNMENT
( 0.50 * $ 25.10 * 1 * 1 * 1 * 4 * 100% * 0%
JOBPEL
State
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local
Sector 2. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Page 41
RESPONSES
$0
=
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
5
3
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
2
1
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
1
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 50% + 0% )) *
0
33
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 2 * 1 * 4 * 100% * 0%
CONSTRUCTION
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% * 0%
* ( 10% + 0% )) *
18
=
$0
=
0
0
* ( 5% + 0% )) *
304
=
$0
=
0
0
Small ( 1.00 * $ 25.10 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
2,293
4
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
30
60
=
=
$0
$0
=
=
0
0
0
0
Small ( 1.00 * $ 25.10 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
458
30
=
=
$0
$0
=
=
0
0
0
0
Local
State
( 1.00 * $ 25.10 * 0 * 1 * 1 * 4 * 100% *
( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 5% + 0% )) *
230
6
=
=
$0
$0
=
=
0
0
0
0
Local
( 1.00 * $ 25.10 * 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
46
=
$0
=
0
0
Large ( 0.50 * $ 31.68 * 1 * 3 * 3 * 4 * 100% *
28%
* ( 75% + 0% )) *
50
=
$188,424
=
5,948
390
Small ( 1.00 * $ 31.68 * 1 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 31.68 * 0 * 1 * 1 * 4 * 100% *
9%
5%
* ( 25% + 0% )) *
* 75% + 0%
*
63
331
=
=
$16,948
$0
=
=
535
0
17
50
Small ( 1.00 * $ 31.68 * 2 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 31.68 * 0 * 2 * 3 * 4 * 100% *
5%
8%
*
*
25% + 0%
75% + 0%
*
*
1,458
101
=
=
$146,312
$0
=
=
4,619
0
146
150
Small ( 1.00 * $ 31.68 * 0 * 1 * 3 * 4 * 100% *
Large ( 0.50 * $ 31.68 * 1 * 3 * 1 * 4 * 100% *
8%
36%
*
*
25% + 0%
90% + 0%
*
*
18
294
=
=
$0
$573,329
=
=
0
18,098
0
1,143
Small ( 1.00 * $ 31.68 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 31.68 * 1 * 3 * 1 * 4 * 100% *
36%
22%
*
*
10% + 0%
75% + 0%
*
*
508
765
=
=
$73,427
$760,110
=
=
2,318
23,995
73
2,056
Small ( 1.00 * $ 31.68 * 1 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 31.68 * 1 * 3 * 1 * 4 * 100% *
22%
12%
*
*
50% + 0%
75% + 0%
*
*
4,067
16
=
=
$1,795,985
$8,802
=
=
56,694
278
1,790
18
* 1 * 1 * 1 * 4 * 100% *
12%
*
75% + 0%
*
899
=
$324,784
=
10,253
324
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
2
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 1 * 2 * 3 * 4 * 100% *
77%
* ( 0% + 0% )) *
2
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1
=
$0
=
0
0
% LEARN
% INHOUSE
# PLANTS
=
% ABOVEPEL
8
# SAMPS
* ( 50% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 25.10 * 0 * 3 * 1 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
AUTOBODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
Small ( 1.00 * $ 31.68
SECTOR 4. Producers of Chromates
Large ( 0.50 * $ 37.06
ALL
Small ( 1.00 * $ 37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.50 * $ 36.12
ALL
Small ( 1.00 * $ 36.12
Page 42
$0
=
0
0
* 0 * 3 * 0 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 80% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 2 * 3 * 4 * 100% *
0%
* ( 25% + 75% )) *
87
=
$0
=
0
0
* 0 * 2 * 3 * 4 * 100% *
0%
* ( 25% + 75% )) *
137
=
$0
=
0
0
* 0 * 1 * 9 * 4 * 100% *
0%
* ( 10% + 0% )) *
3
=
$0
=
0
0
* 0 * 1 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
10
=
$0
=
0
0
* 3 * 3 * 3 * 4 * 100% *
36%
* ( 0% + 0% )) *
86
=
$0
=
0
0
* 5 * 1 * 3 * 4 * 100% *
36%
* ( 0% + 0% )) *
42
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 20% + 0% )) *
4
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 25% + 0% )) *
3
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1
=
$0
=
0
0
* 0 * 1 * 1 * 4 * 0% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
37
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
12
112
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
35
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
63%
* ( 10% + 0% )) *
37
=
$0
=
0
28
* 0 * 1 * 3 * 4 * 100% *
63%
* ( 10% + 0% )) *
34
=
$0
=
0
0
* 0 * 3 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
178
=
$0
=
0
0
* 0 * 1 * 5 * 4 * 100% *
0%
* ( 10% + 0% )) *
130
=
$0
=
0
0
* 7 * 1 * 21 * 4 * 100% *
62%
* ( 0% + 0% )) *
3
=
$0
=
0
0
* 5 * 1 * 7 * 4 * 100% *
62%
* ( 0% + 0% )) *
1
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
207
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
1,561
=
$0
=
0
0
Page 43
# PLANTS
=
% LEARN
3
% INHOUSE
* ( 0% + 0% )) *
% ABOVEPEL
RESPONSES
Item 12 COSTS
% NOTQUART
0%
# SAMPS
* 0 * 3 * 3 * 4 * 100% *
SHIFTS
TOTAL HOURS
SECTOR 6. CCA Producers
Large ( 0.50 * $ 30.60
ALL
Small ( 1.00 * $ 30.60
SECTOR 7. Chromium Catalyst Producers
Large ( 0.50 * $ 37.06
ALL
Small ( 1.00 * $ 37.06
SECTOR 8. Paint and Coating Producers
Large ( 0.50 * $ 27.60
ALL
Small ( 1.00 * $ 27.60
SECTOR 9. Printing Ink Producers
Large ( 0.50 * $ 27.65
ALL
Small ( 0.50 * $ 27.65
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.50 * $ 30.64
ALL
Small ( 1.00 * $ 30.64
SECTOR 11. Plating Mixture Producers
Large ( 0.50 * $ 27.50
ALL
Small ( 1.00 * $ 27.50
SECTOR 13. Chromium Metal Producers
Large ( 0.50 * $ 37.17
ALL
Small ( 1.00 * $ 37.17
SECTOR 14. Iron and Steel Mills
Large ( 0.50 * $ 37.17
Alloy and Stainless
Steel
Small ( 1.00 * $ 37.17
Large ( 0.50 * $ 37.17
Carbon Steel
Small ( 1.00 * $ 37.17
SECTOR 14B. Forging Industry
Large ( 0.50 * $ 37.17
Reshaping
Small ( 1.00 * $ 37.17
SECTOR 15. Iron and Steel Foundries
Large ( 0.50 * $ 27.12
ALL
Small ( 1 * $ 27.12
SECTOR 17. Chromium Dye Producers
Large ( 0.50 * $ 36.12
ALL
Small ( 1 * $ 36.12
SECTOR 18. Chromium Sulfate Producers
Large ( 0.50 * $ 39.76
ALL
Small ( 0.50 * $ 39.76
SECTOR 19. Chemical Distributors
Large ( 0.50 * $ 28.67
ALL
Small ( 0.50 * $ 28.67
JOBPEL
NONSUPEWAGE
ADMINTIME
Table 6
TOTAL HOURS
RESPONSES
Item 12 COSTS
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
703
=
$0
=
0
0
* 0 * 3 * 12 * 4 * 100% *
0%
* ( 10% + 0% )) *
5
=
$0
=
0
0
* 0 * 1 * 4 * 4 * 100% *
* 1 * 1 * 1 * 4 * 100% *
0%
20%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
17
78
=
=
$0
$2,379
=
=
0
86
0
6
* 1 * 1 * 1 * 4 * 100% *
0%
* ( 10% + 0% )) *
5
=
$0
=
0
0
* 0 * 3 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
92
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 10% + 0% )) *
367
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
164
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 3 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
0
21
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 10% + 0% )) *
4
=
$0
=
0
0
* 0 * 1 * 15 * 4 * 100% *
0%
* ( 10% + 0% )) *
6
=
$0
=
0
0
* 0 * 1 * 0 * 4 * 100% *
0%
* ( 10% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
0%
* ( 0% + 0% )) *
175
=
$0
=
0
0
* 0 * 1 * 2 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
93
38
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
0%
22%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
34
1,290
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
* 0 * 1 * 1 * 4 * 100% *
22%
22%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
5,162
16
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 1 * 4 * 100% *
22%
* ( 0% + 0% )) *
59
=
$0
=
0
0
* 0 * 3 * 15 * 4 * 100% *
0%
* ( 10% * 0% )) *
48
=
$0
=
0
0
* 0 * 1 * 3 * 4 * 100% *
* 0 * 3 * 15 * 4 * 100% *
0%
0%
* ( 10% * 0% )) *
* ( 10% * 0% )) *
58
0
=
=
$0
$0
=
=
0
0
0
0
* 0 * 1 * 3 * 4 * 100% *
0%
* ( 10% * 0% )) *
29
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
18
=
$0
=
0
0
* 0 * 3 * 3 * 4 * 100% *
0%
* ( 0% + 0% )) *
0
=
$0
=
0
0
* 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
55
=
$0
=
0
0
Small ( 1.00 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
State ( 0.50 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 0% + 0% )) *
* ( 0% + 0% )) *
196
16
=
=
$0
$0
=
=
0
0
0
0
( 1.00 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
0%
* ( 0% + 0% )) *
74
=
$0
=
0
0
Local
Page 44
# PLANTS
0
% LEARN
=
% INHOUSE
$0
% ABOVEPEL
=
# SAMPS
347
SHIFTS
* ( 10% + 0% )) *
JOBPEL
0%
ADMINTIME
* 0 * 3 * 3 * 4 * 100% *
SECTOR 20. Textile Dyeing
Large ( 0.50 * $ 19.13
ALL
Small ( 0.50 * $ 19.13
SECTOR 21. Colored Glass Producers
Large ( 0.50 * $ 27.66
ALL
Small ( 1.00 * $ 27.66
Large ( 0.50 * $ 27.66
Fiber, Flat, Container
Glass
Small ( 1.00 * $ 27.66
SECTOR 22. Printing
Large ( 0.50 * $ 19.97
ALL
Small ( 0.50 * $ 19.97
SECTOR 24. Chromium Catalyst Users
Large ( 0.50 * $ 31.14
Catalyst Users
Small ( 1.00 * $ 31.14
Large ( 0.50 * $ 31.14
Chromium Catalyst
Service Companies
Small ( 1.00 * $ 31.14
SECTOR 25. Refractory Brick Producers
Large ( 0.50 * $ 24.56
ALL
Small ( 0.50 * $ 24.56
SECTOR 26. Woodworking
Large ( 0.50 * $ 30.76
General Industry
Small ( 1.00 * $ 30.76
Large ( 0.50 * $ 30.76
Maritime
Small ( 1.00 * $ 30.76
Large ( 0.50 * $ 30.76
Construction
Small ( 1.00 * $ 30.76
STATE ( 0.50 * $ 30.76
Government
LOCAL ( 1.00 * $ 30.76
SECTOR 27. Solid Waste Inceneration
Large ( 0.50 $ 26.09
GENERAL INDUSTRY
Small ( 1.00 $ 26.09
STATE ( 0.50 $ 26.09
GOVERNMENT
LOCAL ( 1.00 $ 26.09
SECTOR 30. Superalloy Producers and Users
Large ( 0.50 * $ 26.75
ALL
Small ( 1.00 * $ 26.75
SECTOR 31. Construction
Large ( 0.50 * $ 30.79
Industrial
Rehabilitation
% NOTQUART
NONSUPEWAGE
Table 6
RESPONSES
0
0
Hazardous Waste‐ Small ( 1.00 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
site Work
State ( 0.50 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
0%
0%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
143
1
=
=
$0
$0
=
=
0
0
0
0
Local ( 1.00 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
Large ( 0.50 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
0%
60%
* ( 10% + 0% )) *
* ( 10% + 0% )) *
201
48
=
=
$0
$0
=
=
0
0
0
12
Small ( 1.00 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
60%
* ( 10% + 0% )) *
148
=
Total
77,770
$0
$4,751,407
=
0
157,122
Refractory Brick
Restoration
Page 45
# PLANTS
=
% LEARN
$0
% INHOUSE
=
% ABOVEPEL
44
# SAMPS
* ( 10% + 0% )) *
SHIFTS
0%
JOBPEL
Large ( 0.50 * $ 30.79 * 0 * 1 * 1 * 4 * 100% *
ADMINTIME
TOTAL HOURS
Item 12 COSTS
% NOTQUART
NONSUPEWAGE
Table 6
0
8,795
Table 7
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for an IH Technician to Perform Quarterly
Exposure Monitoring
This table calculates the contract cost for the employer to have an outside industrial hygiene
technician perform quarterly exposure monitoring.
COST =
(QUARTCONTTIME*CONTCOST*4*%NOTQUART*%ABOVEPEL*%CONT)
* #PLANTS
Variable
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTCONTTIME
* CONTCOST =
* 4 =
* %NOTQUART =
*%ABOVEPEL=
%CONT=
#PLANTS=
QUARTERLY
Time, in hours, for an outside contractor (industrial hygiene technician) to conduct
quarterly‐annual monitoring
Cost per hour for an outside industrial hygiene contractor
4 times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Percent of plants that will continue to use an outside contractor for monitoring
Number of plants represented by the model output
CONTCOST
* QUARTCONTTIME =
Sector 1. Electroplating
(
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
930
=
$0
(
(
0
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) * 1,751 =
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) * 448 =
$0
$0
(
(
12
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
843
508
=
=
$0
$0
(
(
0
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
955
448
=
=
$0
$0
(
(
12
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
843
509
=
$0
=
$0
(
(
0
0
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) *
959
930
=
$0
=
$0
(
12
* $ 106.73 * 4 * 100% * ( 0.00% * 100% ) * 1,751 =
$0
(
12
* $ 106.73 * 4 * 100% * (
4.85% *
) * 3,560 =
$796,011
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
4.84% * 100% ) * 3,989 =
0.37% * 90% ) * 2,611 =
$989,012
(
12
* $ 106.73 * 4 * 100% * (
0.38% * 100% ) * 2,925 =
$56,949
Hard Chrome
Job Shop Chrome Plater
Captive Shop Chrome
Job Shop Plater
Captive Shop Plater
Operator
Sector 2. Welding
90%
SMAW
$44,545
GMAW
Page 46
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
) *
791
=
$0
(
(
12
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
886
316
=
$0
=
$0
(
0
12
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
* $ 106.73 * 4 * 100% * (
0.00% *
354
79
=
=
$0
$0
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
(
12
12
* $ 106.73 * 4 * 100% * (
0.00% *
) *
89
79
=
=
$0
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
89
475
=
=
$0
$0
(
12
* $ 106.73 * 4 * 100% * (
MARITIME
0.00% * 100% ) *
532
=
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
18
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
10
24
=
=
$0
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
14
6
=
$0
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
3
117
=
=
$0
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
66
4
=
=
$0
$0
(
12
12
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
2
2
=
=
$0
$0
12
12
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
1
4
=
=
$0
$0
12
12
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
2
2
=
=
$0
$0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
(
12
0
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
1
0
=
=
$0
$0
(
0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
90%
TIG
SAW
(
90%
) *
Plasma Cutting
(
90%
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
(
Plasma Welding
(
(
Oxy‐fuel Cutting
(
(
Air Carbon Arc Cutting
(
Electric Torch Cutting
Page 47
Thermal Spray Tungsten
Cutting
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
0
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
0
=
$0
(
(
0
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
0
16
=
=
$0
$0
(
0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
9
=
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
95%
) *
202
=
$0
(
(
12
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) * 1,620 =
0.00% * 95% ) *
3
=
$0
(
(
12
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
21
41
=
=
$0
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
324
20
=
$0
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
162
4
=
=
$0
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
32
=
$0
SAW
CONSTRUCTION
SMAW
$0
Plasma Cutting
GMAW
Brazing
Metallizing
GOVERNMENT
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
) *
19
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
594
0
=
$0
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
8
4
=
=
$0
$0
(
12
12
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
* $ 106.73 * 4 * 100% * (
0.00% *
119
2
=
=
$0
$0
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
(
12
12
* $ 106.73 * 4 * 100% * (
0.00% *
) *
59
1
=
=
$0
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
12
=
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
) * 4,773 =
$0
(
12
12
* $ 106.73 * 4 * 100% * (
(
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) * 4,859 =
0.00% * 90% ) * 3,500 =
$0
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) * 3,563 =
$0
95%
SMAW
Plasma Cutting
GMAW
(
95%
) *
Brazing
(
95%
Metallizing
Sector 2. Mild Steel Welding
90%
SMAW
GMAW
Page 48
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
) * 1,060 =
$0
(
(
12
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) * 1,080 =
0.00% * 90% ) * 424 =
$0
(
0
0
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
* $ 106.73 * 4 * 100% * (
0.00% *
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
(
0
0
* $ 106.73 * 4 * 100% * (
0.00% *
(
(
0
0
(
90%
TIG
$0
SAW
432
106
=
=
$0
$0
) *
108
106
=
=
$0
$0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
108
636
=
=
$0
$0
0
* $ 106.73 * 4 * 100% * (
MARITIME
0.00% * 100% ) *
648
=
$0
(
12
* $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
37
=
$0
(
(
12
12
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
21
54
=
=
$0
$0
(
(
12
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
30
13
=
$0
=
$0
(
(
0
0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
7
251
=
=
$0
$0
(
(
* $ 106.73 * 4 * 100% * (
0
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
142
8
=
=
$0
$0
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
5
3
=
=
$0
$0
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
2
8
=
=
$0
$0
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0.00% *
50%
) *
5
3
=
=
$0
$0
0.00% *
90%
) *
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
2
1
=
=
$0
$0
(
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
(
90%
) *
Plasma Cutting
(
90%
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
(
Plasma Welding
(
(
Oxy‐fuel Cutting
(
(
Air Carbon Arc Cutting
(
Electric Torch Cutting
Page 49
Thermal Spray Tungsten
Cutting
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
(
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
50%
) *
1
=
$0
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
50%
) *
) *
0
33
=
$0
=
$0
(
0.00 * $ 106.73 * 4 * 100% * (
CONSTRUCTION
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
18
=
$0
0.00% *
95%
) *
304
=
$0
( 12.00 * $ 106.73 * 4 * 100% * (
( 0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) * 2,293 =
0.00% * 95% ) *
4
=
$0
(
SAW
(
SMAW
$0
Plasma Cutting
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
(
) *
30
60
=
=
$0
$0
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
458
30
=
$0
=
$0
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 95% ) *
230
6
=
=
$0
$0
( 12.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
46
=
$0
0.00% *
95%
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
( 12.00 * $ 106.73 * 4 * 100% * (
28.00% *
25%
) *
50
=
$17,814
( 12.00 * $ 106.73 * 4 * 100% * (
( 12.00 * $ 106.73 * 4 * 100% * (
9.00% *
5.00% *
75%
25%
) *
) *
63
331
=
=
$21,631
$21,207
( 12.00 * $ 106.73 * 4 * 100% * (
( 12.00 * $ 106.73 * 4 * 100% * (
5.00% *
36.00% *
75%
10%
) * 1,458 =
) * 101 =
$280,104
$18,662
( 12.00 * $ 106.73 * 4 * 100% * (
( 12.00 * $ 106.73 * 4 * 100% * (
36.00% *
8.00% *
90%
25%
) *
) *
18
294
=
=
$30,538
$30,112
( 12.00 * $ 106.73 * 4 * 100% * (
( 12.00 * $ 106.73 * 4 * 100% * (
8.00% *
75%
) *
=
$156,190
22.00% *
25%
) *
508
765
=
$215,582
( 12.00 * $ 106.73 * 4 * 100% * (
( 12.00 * $ 106.73 * 4 * 100% * (
22.00% *
12.00% *
50%
25%
) * 4,067 =
) *
16 =
( 12.00 * $ 106.73 * 4 * 100% * (
SECTOR 4. Producers of Chromates
( 0.00 * $ 106.73 * 4 * 100% * (
ALL
( 0.00 * $ 106.73 * 4 * 100% * (
SECTOR 5. Chromate Pigment Procedures
12.00% *
25%
) *
AEROSPACE
AUTOBODY
MARITIME
COIL COATING
CONSTRUCTION
$2,292,189
$2,497
GOVERNMENT
Page 50
899
=
$138,173
0.00% * 100% ) *
2
=
$0
0.00% *
0
=
$0
0%
) *
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
( 12.00 * $ 106.73 * 4 * 100% * (
77.00% * 100% ) *
2
=
$7,800
( 12.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
1
=
$0
( 12.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
3
=
$0
* 4 * 100% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
20%
) *
5
=
$0
* 4 * 100% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
75%
) *
87
=
$0
* 4 * 100% * (
0.00% *
75%
) *
137
=
$0
* 4 * 100% * (
0.00% *
90%
) *
3
=
$0
* 4 * 100% * (
0.00% *
90%
) *
10
=
$0
* 4 * 100% * (
36.00% * 100% ) *
86
=
$158,671
* 4 * 100% * (
36.00% * 100% ) *
42
=
$77,611
ALL
SECTOR 6. CCA Producers
ALL
( 12.00 * $ 106.73
SECTOR 7. Chromium Catalyst Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 8. Paint and Coating Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 9. Printing Ink Producers
( 0.00 * $ 106.73
ALL
( 0.00 * $ 106.73
SECTOR 10. Plastic Colorant Producers and Users
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 11. Plating Mixture Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 13. Chromium Metal Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 14. Iron and Steel Mills
( 0.00 * $ 106.73
ALLOY AND STAINLESS
STEEL
( 0.00 * $ 106.73
( 0.00 * $ 106.73
CARBON STEEL
( 0.00 * $ 106.73
SECTOR 14B. FORGING INDUSTRY
( 0.00 * $ 106.73
RESHAPING
( 0.00 * $ 106.73
* 4 * 100% * (
0.00% *
80%
) *
4
=
$0
* 4 * 100% * (
0.00% *
75%
) *
3
=
$0
* 4 * 100% * (
0.00% * 100% ) *
1
=
$0
* 4 *
0% * (
0.00% *
0%
) *
0
=
$0
* 4 * 100% * (
0.00% *
90%
) *
37
=
$0
* 4 * 100% * (
* 4 * 100% * (
0.00% *
0.00% *
90%
90%
) *
) *
12
112
=
$0
=
$0
* 4 * 100% * (
0.00% *
90%
) *
35
=
$0
* 4 * 100% * (
63.00% *
90%
) *
37
=
$0
* 4 * 100% * (
63.00% *
90%
) *
34
=
$0
Page 51
SECTOR 15. Iron and Steel Foundries
( 0.00 * $ 106.73
ALL
( 0.00 * $ 106.73
SECTOR 17. Chromium Dye Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 18. Chromium Sulfate Producers
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 19. Chemical Distributors
( 12.00 * $ 106.73
ALL
( 12.00 * $ 106.73
SECTOR 20. Textile Dyeing
( 0.00 * $ 106.73
ALL
( 0.00 * $ 106.73
SECTOR 21. Colored Glass Producers
( 0.00
General Industry
( 0.00
( 12.00
Fiber, Flat and Container
Glass
( 12.00
SECTOR 22. Printing
( 0.00
ALL
( 0.00
SECTOR 24. Chromium Catalyst Users
( 12.00
CATALYST USER
( 12.00
( 12.00
CATALYST SERVICE
COMPANIES
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
* 4 * 100% * (
0.00% *
90%
) *
178
=
$0
* 4 * 100% * (
0.00% *
90%
) *
130
=
$0
* 4 * 100% * (
62.00% * 100% ) *
3
=
$9,421
* 4 * 100% * (
62.00% * 100% ) *
1
=
$3,140
* 4 * 100% * (
0.00% *
) *
0
=
$0
* 4 * 100% * (
0.00% * 100% ) *
5
=
$0
* 4 * 100% * (
0.00% * 100% ) *
207
=
$0
* 4 * 100% * (
0.00% * 100% ) * 1,561 =
$0
* 4 * 100% * (
0.00% *
90%
) *
347
=
$0
* 4 * 100% * (
0.00% *
90%
) *
703
=
$0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
5
=
$0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
20.00% *
90%
90%
) *
) *
17
78
=
$0
=
$71,689
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
5
=
$0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
92
=
$0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
367
=
$0
* $ 106.73 * 4 * 100% * (
0.00% *
90%
) *
164
=
$0
* $ 106.73 * 4 * 100% * (
* $ 106.73 * 4 * 100% * (
0.00% *
0.00% *
90%
90%
) *
) *
0
21
=
$0
=
$0
$ 106.73 * 4 * 100% * (
0.00% *
90%
) *
4
=
$0
$ 106.73 * 4 * 100% * (
0.00% *
90%
) *
6
=
$0
$ 106.73 * 4 * 100% * (
0.00% *
90%
) *
0
=
$0
$ 106.73 * 4 * 100% * (
0.00% * 100% ) *
175
=
$0
$ 106.73 * 4 * 100% * (
0.00% * 100% ) *
93
=
$0
( 12.00 *
SECTOR 25. Refractory Brick Producers
( 0.00 *
ALL
( 0.00 *
SECTOR 26. Woodworking
( 0.00 *
ALL
( 0.00 *
Page 52
0%
(
0.00 * $ 106.73 * 4 * 100% * (
(
(
(
(
Item 13 COSTS
PLANTS
%CONT
*%ABOVEPEL
%NOTQUART
QUARTERLY
CONTCOST
QUARTCONTTIME
Table 7
0.00% * 100% ) *
38
=
$0
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
34 =
0.00% * 100% ) *
22.00% * 100% ) * 1,290 =
$0
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
22.00% * 100% ) * 5,162 =
22.00% * 100% ) *
16 =
$0
MARITIME
$0
CONSTRUCTION
$0
GOVERNMENT
( 0.00 * $ 106.73
SECTOR 27. Solid Waste Incerneration
( 0.00 * $ 106.73
GENERAL INDUSTRY
( 0.00 * $ 106.73
( 0.00 * $ 106.73
GOVERNMENT
( 0.00 * $ 106.73
SECTOR 30. Superalloy Producers and Users
( 0.00 * $ 106.73
ALL
( 0.00 * $ 106.73
SECTOR 31. Construction
( 0.00 * $ 106.73
Industrial Rehabilitation
* 4 * 100% * (
22.00% * 100% ) *
=
$0
* 4 * 100% * (
0.00% *
90%
) *
48
=
$0
* 4 * 100% * (
* 4 * 100% * (
0.00% *
0.00% *
90%
25%
) *
) *
58
0
=
=
$0
$0
* 4 * 100% * (
0.00% *
90%
) *
29
=
$0
* 4 * 100% * (
0.00% * 100% ) *
18
=
$0
* 4 * 100% * (
0.00% *
) *
0
=
$0
* 4 * 100% * (
0.00% * 100% ) *
55
=
$0
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 100% ) *
196
16
=
=
$0
$0
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% * 100% ) *
0.00% * 90% ) *
74
44
=
=
$0
$0
0.00% *
0.00% *
90%
90%
) *
) *
143
1
=
$0
=
$0
201
48
=
=
$0
$0
148
=
$0
$5,439,545
Hazardous Waste‐site ( 0.00 * $ 106.73 * 4 * 100% * (
Work
( 0.00 * $ 106.73 * 4 * 100% * (
Refractory Brick
Restoration
59
0%
(
(
0.00 * $ 106.73 * 4 * 100% * (
0.00 * $ 106.73 * 4 * 100% * (
0.00% *
60.00% *
90%
90%
) *
) *
(
0.00 * $ 106.73 * 4 * 100% * (
60.00% *
90%
) *
Total
77,770
Page 53
Table 8
Quarterly Exposure Monitoring (Paragraph (d)(2)(iv)); Contract Cost for a Laboratory to Conduct Analysis
of Quarterly Exposure Monitoring
This table calculates the contract cost for the employer to have a laboratory conduct analysis of air samples collected
during quarterly exposure monitoring.
(SAMPCOST * JOBPEL * SHIFTS * #SAMPS * 4 * %NOTQUART * %ABOVEPEL) * #PLANTS
QUARTERLY
%NOTQUART
%ABOVEPEL
(
$68 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
930
=
$0
Small
(
(
$68 * 0
$68 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,751
448
=
=
$0
$0
(
(
$68 * 0
$68 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
843
508
=
=
$0
$0
(
(
$68 * 0
$68 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
955
448
=
=
$0
$0
(
(
$68 * 0
$68 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
843
509
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 2 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
959
930
=
=
$0
$0
Small
3
* 4
* 100% *
0.00%
)*
1,751
=
$0
Large
( $68 * 1 * 1 *
GENERAL INDUSTRY
( $68 * 1 * 3 *
2
* 4
* 100% *
4.85%
)*
3,560
=
$282,016
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
4.84%
0.37%
)*
)*
3,989
2,611
=
=
$157,677
$15,782
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.38%
0.00%
)*
)*
2,925
791
=
=
$9,079
$0
Small
Large
(
(
$68 * 1
$68 * 0
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
886
316
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
354
79
=
=
$0
$0
Small
(
$68 * 1
* 1 *
3
* 4
* 100% *
0.00%
)*
89
=
$0
#PLANTS
Item 13 COST
#SAMPS
Large
JOBPEL
SHIFTS
Variable cost per sample
Number of job categories exposed above the PEL
Number of work shifts
Number of samples per exposure measurement
four times per year (quarterly)
Percent of plants not performing quarterly monitoring requirements
Percent of plants that have an employee in at least one job category above the PEL
Number of plants represented by the model output
SAMPCOST
Cost =
Variables
* SAMPCOST =
* JOBPEL =
* SHIFTS =
* #SAMPS =
*4 =
* %NOTQUART =
* %ABOVEPEL =
* #PLANTS =
Sector 1. Electroplating
Hard Chrome
Job Shop Chrome Plater
Large
Small
Captive Shop Chrome Plater
Large
Small
Job Shop Plater
Large
Small
Captive Shop Plater
Large
Operator
Sector 2. Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Page 54
QUARTERLY
%NOTQUART
%ABOVEPEL
$68 * 1
* 3 *
2
* 4
* 100% *
0.00%
)*
79
=
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
89
475
=
=
$0
$0
Small
(
$68 * 1
* 4
* 100% *
0.00%
)*
532
=
$0
Large (
$68 * 1
* 1 * 3
MARITIME
* 3 * 1
* 4
* 100% *
0.00%
)*
18
=
$0
Small (
Large (
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
10
24
=
=
$0
$0
Small (
Large (
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
14
6
=
=
$0
$0
Small (
Large (
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
3
117
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
66
4
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
2
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1
4
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
2
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1
0
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
0
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
16
=
=
$0
$0
Small
(
$68 * 0
* 100% *
0.00%
)*
9
=
$0
Large
(
* 2 * 1 * 4
CONSTRUCTION
$68 * 1 * 3 * 1 * 4
* 100% *
0.00%
)*
202
=
$0
Small
Large
(
(
$68 * 1
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,620
3
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
21
41
=
=
$0
$0
Small
(
$68 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
324
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
Plasma Welding
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Page 55
QUARTERLY
%NOTQUART
%ABOVEPEL
$68 * 1
* 3 *
1
* 4
* 100% *
0.00%
)*
20
=
$0
Local
State
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
162
4
=
=
$0
$0
Local
(
$68 * 1
* 100% *
0.00%
)*
32
=
$0
Large
(
* 1 * 1 * 4
GOVERNMENT
$68 * 1 * 1 * 1 * 4
* 100% *
0.00%
)*
19
=
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
594
0
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
8
4
=
=
$0
$0
Small
State
(
(
$68 * 1
$68 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
119
2
=
=
$0
$0
Local
State
(
(
$68 * 1
$68 * 1
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
59
1
=
=
$0
$0
Local
(
$68 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
12
=
$0
Large
(
$68 * 1
* 3 *
2
* 4
* 100% *
0.00%
)*
4,773
=
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
4,859
3,500
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
3,563
1,060
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
1,080
424
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
432
106
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
108
106
=
=
$0
$0
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
3
2
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
108
636
=
=
$0
$0
Small
(
$68 * 1
* 4
* 100% *
0.00%
)*
648
=
$0
Large (
$68 * 0
* 1 * 3
MARITIME
* 3 * 1
* 4
* 100% *
0.00%
)*
37
=
$0
Small (
Large (
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
21
54
=
=
$0
$0
Small (
$68 * 0
* 2 *
1
* 4
* 100% *
0.00%
)*
30
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
State
SAMPCOST
SHIFTS
Table 8
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 2. Mild Steel Welding
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance Welding
SMAW
GMAW
Page 56
QUARTERLY
%NOTQUART
%ABOVEPEL
* 3 *
1
* 4
* 100% *
0.00%
)*
13
=
$0
Small (
Large (
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
7
251
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
142
8
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
5
3
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
8
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
5
3
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2
1
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
1
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 2 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
33
=
=
$0
$0
Small
(
$68 * 0
* 100% *
0.00%
)*
18
=
$0
Large
(
* 2 * 1 * 4
CONSTRUCTION
$68 * 0 * 3 * 1 * 4
* 100% *
0.00%
)*
304
=
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
2,293
4
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
30
60
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
458
30
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 3 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
230
6
=
=
$0
$0
Small
(
$68 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
46
=
$0
Large
(
$68 * 1
* 3 *
3
* 4
* 100% * 28.00% ) *
50
=
$34,080
Small
Large
(
(
$68 * 1
$68 * 0
* 1 *
* 1 *
3
1
* 4
* 4
* 100% *
* 100% *
9.00%
5.00%
)*
)*
63
331
=
=
$4,598
$0
Small
(
$68 * 2
* 1 *
1
* 4
* 100% *
5.00%
)*
1,458
=
$39,695
#PLANTS
Item 13 COST
#SAMPS
$68 * 0
JOBPEL
Large (
SAMPCOST
SHIFTS
Table 8
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc Cutting
Electric Torch Cutting
Thermal Spray Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SECTOR 3. PAINTING
AEROSPACE
AUTOBODY
Page 57
QUARTERLY
%NOTQUART
%ABOVEPEL
$68 * 0
* 2 *
3
* 4
* 100% *
8.00%
)*
101
=
$0
Small
Large
(
(
$68 * 0
$68 * 1
* 1 *
* 3 *
3
1
* 4
* 4
* 100% * 8.00% ) *
* 100% * 36.00% ) *
18
294
=
=
$0
$86,414
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% * 36.00% ) *
* 100% * 22.00% ) *
508
765
=
=
$49,803
$137,480
Small
Large
(
(
$68 * 1
$68 * 1
* 1 *
* 3 *
1
1
* 4
* 4
* 100% * 22.00% ) *
* 100% * 12.00% ) *
4,067
16
=
=
$243,628
$1,592
Small
(
$68 * 1
* 1 *
1
* 4
* 100% * 12.00% ) *
899
=
$29,372
Large
(
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
2
=
$0
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
ALL
Small (
SECTOR 6. CCA Producers
Large (
ALL
Small (
SECTOR 7. Chromium Catalyst Producers
Large (
ALL
Small (
SECTOR 8. Paint and Coating Producers
Large (
ALL
Small (
SECTOR 9. Printing Ink Producers
Large (
ALL
Small (
SECTOR 10. Plastic Colorant Producers and Users
Large (
ALL
Small (
SECTOR 11. Plating Mixture Producers
Large (
ALL
Small (
SECTOR 13. Chromium Metal Producers
Large (
ALL
Small (
SECTOR 14. Iron and Steel Mills
Large (
ALLOY AND STAINLESS STEEL
Small (
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
$68 * 1
* 2 *
3
* 4
* 100% * 77.00% ) *
2
=
$2,487
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
1
=
$0
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
3
=
$0
$68 * 0
* 3 *
0
* 4
* 100% *
0.00%
)*
0
=
$0
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
5
=
$0
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
$68 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
87
=
$0
$68 * 0
* 2 *
3
* 4
* 100% *
0.00%
)*
137
=
$0
$60 * 0
* 1 *
9
* 4
* 100% *
0.00%
)*
3
=
$0
$60 * 0
* 1 *
5
* 4
* 100% *
0.00%
)*
10
=
$0
$68 * 3
* 3 *
3
* 4
* 100% * 36.00% ) *
86
=
$227,671
$68 * 5
* 1 *
3
* 4
* 100% * 36.00% ) *
42
=
$61,867
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
4
=
$0
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
3
=
$0
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
1
=
$0
$68 * 0
* 1 *
1
* 4
*
*
0.00%
)*
0
=
$0
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
37
=
$0
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
12
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Page 58
0%
QUARTERLY
%NOTQUART
%ABOVEPEL
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
112
=
$0
Small
(
$68 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
35
=
$0
Large
(
$68 * 0
* 1 *
3
* 4
* 100% * 63.00% ) *
37
=
$0
Small
(
$68 * 0
* 1 *
3
* 4
* 100% * 63.00% ) *
34
=
$0
Large
(
$68 * 0
* 3 *
5
* 4
* 100% *
0.00%
)*
178
=
$0
Small
(
$68 * 0
* 1 *
5
* 4
* 100% *
0.00%
)*
130
=
$0
Large
(
$68 * 7
* 1 * 21 * 4
* 100% * 62.00% ) *
3
=
$73,595
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Users
Small
Large
Chromium Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
(
$68 * 5
* 1 *
7
* 4
* 100% * 62.00% ) *
1
=
$5,841
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
5
=
$0
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
207
=
$0
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
1,561
=
$0
(
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
347
=
$0
(
$68 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
703
=
$0
(
$68 * 0
* 3 * 12 * 4
* 100% *
0.00%
)*
5
=
$0
(
(
$68 * 0
$68 * 1
* 1 *
* 1 *
4
1
* 4
* 4
* 100% * 0.00% ) *
* 100% * 20.00% ) *
17
78
=
=
$0
$4,233
(
$68 * 1
* 1 *
1
* 4
* 100% *
0.00%
)*
5
=
$0
(
$68 * 0
* 3 *
2
* 4
* 100% *
0.00%
)*
92
=
$0
(
$68 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
367
=
$0
(
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
164
=
$0
(
(
$68 * 0
$68 * 0
* 1 *
* 3 *
3
3
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
0
21
=
=
$0
$0
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
4
=
$0
(
$68 * 0
* 1 * 15 * 4
* 100% *
0.00%
)*
6
=
$0
(
$68 * 0
* 1 *
* 100% *
0.00%
)*
0
=
$0
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
CARBON STEEL
14b. FORGING INDUSTRY
Reshaping
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Page 59
0
* 4
QUARTERLY
%NOTQUART
%ABOVEPEL
$68 * 0
* 1 *
2
* 4
* 100% *
0.00%
)*
175
=
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
2
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
93
38
=
=
$0
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 22% *
0.00%
0.00%
)*
)*
34
1,290
=
=
$0
$0
Small
State
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
*
*
22% *
22% *
0.00%
0.00%
)*
)*
5,162
16
=
=
$0
$0
Local
(
$68 * 0
* 1 *
1
* 4
*
22% *
0.00%
)*
59
=
$0
Large
(
$68 * 0
* 3 * 15 * 4
* 100% *
0.00%
)*
48
=
$0
Small
Large
(
(
$68 * 0
$68 * 0
* 1 * 3 * 4
* 3 * 15 * 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
58
0
=
=
$0
$0
Small
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
$68 * 0
* 1 *
3
* 4
* 100% *
0.00%
)*
29
=
$0
(
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
18
=
$0
(
$68 * 0
* 3 *
3
* 4
* 100% *
0.00%
)*
0
=
$0
(
$68 * 0
* 1 *
1
* 4
* 100% *
0.00%
)*
55
=
$0
Small
State
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
196
16
=
=
$0
$0
Local
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
74
44
=
=
$0
$0
Small
State
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% *
* 100% *
0.00%
0.00%
)*
)*
143
1
=
=
$0
$0
Local
Large
(
(
$68 * 0
$68 * 0
* 1 *
* 1 *
1
1
* 4
* 4
* 100% * 0.00% ) *
* 100% * 60.00% ) *
201
48
=
=
$0
$0
Small
(
$68 * 0
* 1 *
1
* 4
* 100% * 60.00% ) *
#PLANTS
Item 13 COST
#SAMPS
(
JOBPEL
Large
SAMPCOST
SHIFTS
Table 8
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incerneration
GENERAL INDUSTRY
GOVERNMENT
Industrial Rehabilitation
Hazardous Waste‐site Work
Refractory Brick Restoration
Total
Page 60
148
=
$0
77,770
$1,466,910
Table 9
Employer Time and Cost to Notify Employees of Quarterly Monitoring Results
HOURS = ((NOTETIME * JOBPEL * SHIFTS * # SAMPS * 4) * %NOTQUART * %ABOVEPEL) * #PLANTS
COST = (SUPWAGE) * BURDEN HOURS
Item 12 Cost
Responses
$0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
1,751
448
0 $ 34.98
0 $ 34.98
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
843
508
0 $ 34.98
0 $ 34.98
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
955
448
0 $ 34.98
0 $ 34.98
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
843
509
0 $ 34.98
0 $ 34.98
$0
$0
0
0
0.25 * 0 *
0.25 * 0 *
1*
2*
3 * 4 * 100% *
3 * 4 * 100% *
0.00%
0.00%
*
*
959
930
0 $ 34.98
0 $ 34.98
$0
$0
0
0
0.25 * 0 *
1*
3 * 4 * 100% *
0.00%
*
1,751
0 $ 34.98
$0
0
0.25 * 1 *
3*
2 * 4 * 100% *
4.85% *
3,560
1,036 $ 34.43
$35,669
4143
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
4.84% *
0.37% *
3,989
2,611
579 $ 34.43
58 $ 34.43
$19,943
$1,996
2317
232
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.38% *
0.00% *
2,925
791
33 $ 34.43
0 $ 34.43
$1,148
$0
133
0
0.25 * 1 *
0.25 * 0 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
886
316
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 0 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
354
79
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
89
79
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1 *
1*
3 * 4 * 100% *
0.00% *
89
0 $ 34.43
$0
0
Page 61
#PLANTS
SUPWAGE
0 $ 34.98
Hours
930
%ABOVEPEL
*
4
0.00%
#SAMPS
3 * 4 * 100% *
SHIFTS
2*
JOBPEL
0.25 * 0 *
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop Chrome
Plater
Small
Large
Captive Shop
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
%NOTQUART
ASSUMPTIONS:
* SUPWAGE = Supervisory wage rate, $/hr.
* NOTETIME = Time, in hours, to notify an employee of the exposure monitoring results
* JOBPEL = Number of job categories exposed above the PEL
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* 4 = 4 times per year (quarterly)
* %NOTQUART = Percent of plants not performing quarterly monitoring requirements
* %ABOVEPEL = Percent of plants that have an employee in at least one job category above the PEL
* #PLANTS = Number of plants represented by the model input
Item 12 Cost
Responses
0 $ 34.43
$0
0
Small
0.25 * 1 *
1*
0.00% *
532
0 $ 34.43
$0
0
Large
0.25 * 1 *
1*
3 * 4 * 100% *
MARITIME
1 * 4 * 100% *
0.00% *
18
0 $ 34.43
$0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
10
24
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
14
6
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
3
117
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
66
4
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
2
2
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1
4
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
2
2
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1
0
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
0
0
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
0
16
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
0.00% *
9
0 $ 34.43
$0
0
Large
0.25 * 0 * 1 * 1 * 4 * 100% *
CONSTRUCTION
0.25 * 1 * 3 * 1 * 4 * 100% *
0.00% *
202
0 $ 34.43
$0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
1,620
3
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
21
41
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
State
0.25 * 1 *
0.25 * 1 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
324
20
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
State
0.25 * 1 *
0.25 * 1 *
1*
3*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
162
4
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
0.25 * 1 *
1*
1 * 4 * 100% *
0.00% *
32
0 $ 34.43
$0
0
SUPWAGE
475
Hours
#PLANTS
0.00% *
4
2 * 4 * 100% *
#SAMPS
3*
SHIFTS
0.25 * 1 *
JOBPEL
Large
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Resistance Welding
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Page 62
Item 12 Cost
Responses
19
0 $ 34.43
$0
0
Small
Large
0.25 * 1 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
594
0
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
8
4
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
State
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
119
2
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
State
0.25 * 1 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
59
1
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
2A. Mild Steel Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
Large
Plasma Welding
Small
Large
Resistance Welding
Small
0.25 * 1 *
1*
1 * 4 * 100% *
0.00% *
12
0 $ 34.43
$0
0
0.25 * 0 *
1*
1 * 4 * 100% *
0.00% *
4,773
0 $ 34.43
$0
0
0.25 * 1 * 1 * 1 * 4 * 100% *
0.25 * 1 * 1 * 1 * 4 * 100% *
0.00% *
0.00% *
4,859
3,500
0 $ 34.43
0 $ 34.43
$0
0
0
SHIFTS
SUPWAGE
0.00% *
Hours
#PLANTS
GOVERNMENT
1 * 4 * 100% *
4
1*
#SAMPS
0.25 * 1 *
JOBPEL
Large
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
3,563
1,060
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
1,080
424
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1
0.25 * 0
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
432
106
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
108
106
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1
0.25 * 1
* 1
* 1
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
108
636
0 $ 34.43
0 $ 34.43
$0
$0
0
0
0.25 * 1
* 1
* 1
0.00% *
648
0 $ 34.43
$0
0
Large
0.25 * 0 *
* 4 * 100% *
MARITIME
1 * 4 * 100% *
0.00% *
37
0 $ 34.43
$0
0
Small
Large
0.25 * 0 * 2 * 1 * 4 * 100% *
0.25 * 0 * 3 * 1 * 4 * 100% *
0.00% *
0.00% *
21
54
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
30
13
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
7
251
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
0.25 * 0
* 2
* 1
* 4 * 100% *
0.00% *
142
0 $ 34.43
$0
0
3*
SMAW
GMAW
TIG
FCAW
Page 63
Item 12 Cost
Responses
0.00% *
8
0 $ 34.43
$0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
5
3
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2
8
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
5
3
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2
1
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
0
1
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
0
33
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
0.25 * 0
* 2
* 1
0.00% *
18
0 $ 34.43
$0
0
Large
0.25 * 0
* 3
* 1
* 4 * 100% *
CONSTRUCTION
* 4 * 100% *
0.00% *
304
0 $ 34.43
$0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
2,293
4
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
Large
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
30
60
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Small
State
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
458
30
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
State
0.25 * 0
0.25 * 0
* 2
* 3
* 1
* 1
* 4 * 100% *
* 4 * 100% *
0.00% *
0.00% *
230
6
0 $ 34.43
0 $ 34.43
$0
$0
0
0
Local
0.25 * 0
* 2
* 1
* 4 * 100% *
0.00% *
46
0 $ 34.43
$0
0
Large
0.25 * 1 *
3*
3 * 4 * 100% *
28.00% *
50
125 $ 43.34
$5,425
501
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
9.00% *
5.00% *
63
331
17 $ 43.34
149 $ 43.34
$732
$6,459
68
596
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
5.00% *
8.00% *
1,458
101
219 $ 43.34
73 $ 43.34
$9,479
$3,158
875
291
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
8.00% *
36.00% *
18
294
4 $ 43.34
952 $ 43.34
$191
$41,269
18
3809
Small
Large
0.25 * 1 *
0.25 * 1 *
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
36.00% *
22.00% *
508
765
549 $ 43.34
1,515 $ 43.34
$23,784
$65,656
2195
6060
Small
0.25 * 1 *
1*
3 * 4 * 100% *
22.00% *
4,067
2,685 $ 43.34
$116,349
10738
SHIFTS
SUPWAGE
* 4 * 100% *
Hours
#PLANTS
* 1
4
* 3
#SAMPS
0.25 * 0
JOBPEL
Large
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Sector 3. Painting
AEROSPACE
AUTOBODY
COIL COATING
MARITIME
CONSTRUCTION
Page 64
%NOTQUART
70
*
3 * 4 * 100% *
12.00% *
899
324 $ 43.34
$14,027
1295
*
3 * 4 * 100% *
0.00% *
2
0 $ 50.86
$0
0
*
3 * 4 * 100% *
0.00% *
0
0 $ 50.86
$0
0
*
3 * 4 * 100% *
77.00% *
2
9 $ 49.57
$453
37
*
3 * 4 * 100% *
0.00% *
1
0 $ 49.57
$0
0
*
3 * 4 * 100% *
0.00% *
3
0 $ 41.98
$0
0
*
0 * 4 * 100% *
0.00% *
0
0 $ 41.98
$0
0
*
3 * 4 * 100% *
0.00% *
5
0 $ 50.86
$0
0
*
3 * 4 * 100% *
0.00% *
0
0 $ 50.86
$0
0
*
3 * 4 * 100% *
0.00% *
87
0 $ 37.87
$0
0
*
3 * 4 * 100% *
0.00% *
137
0 $ 37.87
$0
0
*
9 * 4 * 100% *
0.00% *
3
0 $ 37.94
$0
0
*
5 * 4 * 100% *
0.00% *
10
0 $ 37.94
$0
0
*
3 * 4 * 100% *
36.00% *
86
836 $ 42.04
$35,151
3345
*
3 * 4 * 100% *
36.00% *
42
227 $ 42.04
$9,552
909
*
3 * 4 * 100% *
0.00% *
4
0 $ 37.72
$0
0
*
3 * 4 * 100% *
0.00% *
3
0 $ 37.72
$0
0
*
3 * 4 * 100% *
0.00% *
1
0 $ 51.02
$0
0
*
1* 4*
0% *
0.00% *
0
0 $ 51.02
$0
0
*
3 * 4 * 100% *
0.00% *
37
0 $ 51.02
$0
0
*
*
3 * 4 * 100% *
3 * 4 * 100% *
0.00% *
38.00% *
12
112
0 $ 51.02
1,147 $ 51.02
$0
$58,523
0
4588
*
3 * 4 * 100% *
38.00% *
35
40 $ 51.02
$2,045
160
*
3 * 4 * 100% *
38.00% *
37
375 $ 51.02
$19,140
1500
*
3 * 4 * 100% *
38.00% *
34
39 $ 51.02
$2,004
157
SHIFTS
SUPWAGE
$760
Hours
18 $ 43.34
#PLANTS
16
%ABOVEPEL
12.00% *
3*
4
3 * 4 * 100% *
#SAMPS
Responses
0.25 * 1 *
Item 12 Cost
Large
JOBPEL
NOTETIME
Table 9
GOVERNMENT
0.25 * 1 * 1
Small
Sector 4. Producers of Chromates
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 5. Chromate Pigment Procedures
Large
0.25 * 1 * 2
ALL
0.25 * 0 * 1
Small
Sector 6. CCA Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 3
Small
Sector 7. Chromium Catalyst Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 8. Paint and Coating Producers
Large
0.25 * 0 * 2
ALL
0.25 * 0 * 2
Small
Sector 9. Printing Ink Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 10. Plastic Colorant Producers and Users
Large
0.25 * 3 * 3
ALL
0.25 * 5 * 1
Small
Sector 11. Plating Mixture Producers
Large
0.25 * 0 * 1
ALL
0.25 * 0 * 1
Small
Sector 13. Chromium Metal Producers
Large
0.25 * 0 * 3
ALL
0.25 * 0 * 1
Small
Sector 14. Iron and Steel Mills
Large
0.25 * 0 * 3
ALLOY AND
STAINLESS STEEL
0.25 * 0 * 1
Small
Large
0.25 * 3 * 3
CARBON STEEL
0.25 * 1 * 1
Small
14B. Forging Industry
Large
0.25 * 3 * 3
FORGING
INDUSTRY
0.25 * 1 * 1
Small
Page 65
Item 12 Cost
Responses
178
0 $ 37.21
$0
0
*
1*
5 * 4 * 100% *
0.00% *
130
0 $ 37.21
$0
0
*
1 * 21 * 4 * 100% *
62.00% *
3
270 $ 49.57
$13,398
1081
*
1*
7 * 4 * 100% *
62.00% *
1
21 $ 49.57
$1,063
86
*
1*
3 * 4 * 100% *
0.00% *
0
0 $ 54.55
$0
0
*
1*
3 * 4 * 100% *
0.00% *
5
0 $ 54.55
$0
0
*
1*
3 * 4 * 100% *
0.00% *
207
0 $ 39.35
$0
0
*
1*
3 * 4 * 100% *
0.00% *
1,561
0 $ 39.35
$0
0
*
3*
3 * 4 * 100% *
0.00% *
347
0 $ 26.25
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
703
0 $ 26.25
$0
0
0*
3 * 12 * 4 * 25% *
0.00% *
5
0 $ 37.96
$0
0
0*
1*
1*
3*
4 * 4 * 0% *
1 * 4 * 25% *
0.00% *
0.00% *
17
78
0 $ 37.96
0 $ 37.96
$0
$0
0
0
0*
1*
1* 4*
0% *
0.00% *
5
0 $ 37.96
$0
0
0*
3*
2 * 4 * 100% *
0.00% *
92
0 $ 27.39
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
367
0 $ 27.39
$0
0
0*
3*
3 * 4 * 100% *
13.00% *
164
0 $ 42.72
$0
0
0*
2*
1*
3*
3 * 4 * 100% *
3 * 4 * 100% *
0.00% *
13.00% *
0
21
0 $ 42.72
50 $ 42.72
$0
$2,118
0
198
0*
1*
3 * 4 * 100% *
0.00% *
4
0 $ 42.72
$0
0
0*
1 * 15 * 4 * 100% *
0.00% *
6
0 $ 33.72
$0
0
0*
1*
0 * 4 * 100% *
0.00% *
0
0 $ 33.72
$0
0
0*
1*
2 * 4 * 100% *
0.00% *
175
0 $ 30.34
$0
0
0*
0*
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
93
38
0 $ 30.34
0 $ 30.34
$0
$0
0
0
0*
1*
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
34
1,290
0 $ 30.34
0 $ 30.34
$0
$0
0
0
1*
1*
2 * 4 * 100% *
0.00% *
5,162
0 $ 30.34
$0
0
Page 66
SHIFTS
SUPWAGE
#PLANTS
0.00% *
Hours
%ABOVEPEL
0.25 *
Small
Sector 21. Colored Glass Producers
Large
0.25 *
ALL
0.25 *
Small
Large
0.25 *
Fiber, Flat, and
Container Glass
0.25 *
Small
Sector 22. Printing
Large
0.25 *
ALL
0.25 *
Small
Sector 24. Chromium Catalyst Users
Large
0.25 *
Catalyst Users
0.25 *
Small
Large
0.25 *
Catalyst Companies
0.25 *
Small
Sector 25. Refractory Brick Producers
Large
0.25 *
ALL
0.25 *
Small
Sector 26. Woodworking
Large
0.25 *
General Industry
0.25 *
Small
Large
0.25 *
Maritime
0.25 *
Small
Large
0.25 *
Construction
0.25 *
Small
%NOTQUART
5 * 4 * 100% *
4
3*
Sector 15. Iron and Steel Foundries
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 17. Chromium Dye Producers
Large
0.25 * 7
ALL
0.25 * 5
Small
Sector 18. Chromium Sulfate Producers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 19. Chemical Distributers
Large
0.25 * 0
ALL
0.25 * 0
Small
Sector 20. Textile Dyeing
Large
0.25 * 0
ALL
#SAMPS
*
JOBPEL
NOTETIME
Table 9
Item 12 Cost
Responses
$0
0
0.25 * 1 *
Small
Sector 27. Solid Waste Incerneration
Large
0.25 * 0 *
General Industry
0.25 * 0 *
Small
1*
2 * 4 * 100% *
0.00% *
59
0 $ 30.34
$0
0
3 * 15 * 4 * 100% *
0.00% *
48
0 $ 35.80
$0
0
SUPWAGE
0 $ 30.34
Hours
#PLANTS
16
4
0.00% *
#SAMPS
2 * 4 * 100% *
SHIFTS
1*
Large
JOBPEL
0.25 * 1 *
NOTETIME
%ABOVEPEL
%NOTQUART
Table 9
Government
1*
3 * 4 * 100% *
0.00% *
$0
0
0.25 *
0*
3*
15 * 4 * 100% *
0.00% *
58
0
0 $ 35.80
State
0 $ 35.80
$0
0
Local
0.25 *
0*
1*
3 * 4 * 100% *
0.00% *
29
0 $ 35.80
$0
0
3*
3 * 4 * 100% *
0.00% *
18
0 $ 36.71
$0
0
3*
3 * 4 * 100% *
0.00% *
0
0 $ 36.71
$0
0
1*
3 * 4 * 100% *
0.00% *
55
0 $ 42.25
$0
0
Government
Sector 30. Superalloy Producers and Users
Large
0.25 * 0 *
ALL
0.25 * 0 *
Small
Sector 31. Construction
Large
0.25 * 0 *
Small
State
0.25 * 0 *
0.25 * 0 *
1*
1*
2 * 4 * 100% *
2 * 4 * 100% *
0.00% *
0.00% *
196
16
0 $ 42.25
0 $ 42.25
$0
$0
0
0
Local
Large
0.25 * 0 *
0.25 * 0 *
1*
1*
3 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
74
44
0 $ 42.25
0 $ 42.25
$0
$0
0
0
Hazardous Waste‐ Small
site Work
State
0.25 * 0 *
0.25 * 0 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
0.00% *
143
1
0 $ 42.25
0 $ 42.25
$0
$0
0
0
Local
Large
0.25 * 0 *
0.25 * 1 *
1*
1*
1 * 4 * 100% *
1 * 4 * 100% *
0.00% *
60.00% *
201
48
0 $ 42.25
29 $ 42.25
$0
$1,216
0
115
Small
0.25 * 1 *
1*
1 * 4 * 100% *
60.00% *
Total
148
89 $ 42.25
77,770 11,468
$3,739
$494,447
354
45,870
Industrial
Rehabilitation
Refractory Brick
Restoration
Page 67
Table 9a (Remand)
Employer Time and Cost to Notify Employees of Initial Monitoring Results
Hours = (NOTETIME * JOBCAT * SHIFTS * #SAMPS * #INIT * %INITADD * #PLANTS)
Cost = BURDEN HOURS * NONSUPWAGE
# INIT
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
*
2
* 25% *
930
47
=
$6,226
244
977
Job Shop Chrome Large
Plater
Small
Large
Captive Shop
Chrome Plater
Small
( 0.25 * $ 25.49
( 0.25 * $ 25.49
7 * 1 *
1 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
1,751
448
88
22
=
=
$5,858
$429
230
17
919
67
( 0.25 * $ 25.49
( 0.25 * $ 25.49
1 * 1 *
1 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
843
508
42
25
=
=
$403
$485
16
19
63
76
Job Shop Plater
Large
( 0.25 * $ 25.49
( 0.25 * $ 25.49
1 * 1 *
1 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
955
448
48
22
=
=
$457
$429
18
17
72
67
Small
( 0.25 * $ 25.49
( 0.25 * $ 25.49
1 * 1 *
1 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
843
509
42
25
=
=
$403
$487
16
19
63
76
Captive Shop
Plater
Large
Small
Large
( 0.25 * $ 25.49
( 0.25 * $ 25.49
1 * 1 *
1 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
959
930
48
47
=
=
$458
$889
18
35
72
140
1,751
88
=
$837
33
131
# SAMPS
3
SHIFTS
7 * 2 *
JOBCAT
( 0.25 * $ 25.49
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
NONSUPEWAGE
* NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 minutes).
NONSUPWAGE = Non‐supervisory wage rate, $/hr.
* JOBCAT = Number of job categories (covering each work area)
* SHIFTS = Number of work shifts
* #SAMPS = Number of samples per exposure measurement
* #INIT = Equals two, reflecting that initial monitoring will have to be conducted twice — with readings below the action level
in order for the requirement of semi‐annual monitoring to be waived.
* %INITADD = Percent of plants that have not satisified initial monitoring requirement
* #PLANTS * 5% = Number of plants represented by the model output * 5%
Operator
Small ( 0.25 * $ 25.49 1 * 1 * 3 * 2 * 25% *
Sector 2. Welding GENERAL INDUSTRY
Large
( 0.25 * $ 25.10
1 * 3 *
2
*
2
* 25% *
3,560
178
=
$3,350
133
534
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
3,989
2,611
199
131
=
=
$1,877
$2,458
75
98
299
392
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
2,925
791
146
40
=
=
$1,377
$744
55
30
219
119
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
886
316
44
16
=
=
$417
$298
17
12
66
47
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
354
79
18
4
=
=
$167
$74
7
3
27
12
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
89
79
4
4
=
=
$42
$74
2
3
7
12
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
3
2
*
*
2
2
* 25% *
* 25% *
89
475
4
24
=
=
$42
$447
2
18
7
71
Small
( 0.25 * $ 25.10
1 * 1 *
3
*
2
* 25% *
532
27
=
$250
10
40
SMAW
GMAW
TIG
SAW
Plasma Cutting
Plasma Welding
Resistance
Welding
Page 68
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
1
4
* 75% *
* 75% *
10
24
0
1
=
=
$9
$34
0
1
1
5
2
2
* 75% *
* 75% *
14
6
1
0
=
=
$13
$8
1
0
2
1
*
*
2
2
* 75% *
* 75% *
3
117
0
6
=
=
$3
$165
0
7
0
26
1
1
*
*
2
2
* 75% *
* 75% *
66
4
3
0
=
=
$62
$5
2
0
10
1
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
2
2
0
0
=
=
$2
$3
0
0
0
0
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
1
4
0
0
=
=
$1
$5
0
0
0
1
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
2
2
0
0
=
=
$2
$3
0
0
0
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
1
0
0
0
=
=
$1
$0
0
0
0
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
0
0
0
0
=
=
$0
$0
0
0
0
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
0
16
0
1
=
=
$0
$22
0
1
0
4
Small
( 0.25 * $ 25.10
1 * 2 *
1
9
0
=
$8
0
1
Large
( 0.25 * $ 25.10
1 * 3 *
* 2 * 75% *
CONSTRUCTION
1 * 2 * 25% *
202
10
=
$95
4
15
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
1,620
3
81
0
=
=
$254
$1
10
0
40
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
21
41
1
2
=
=
$3
$19
0
1
1
3
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
324
20
16
1
=
=
$51
$10
2
0
8
2
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
162
4
8
0
=
=
$25
$2
1
0
4
0
Small
( 0.25 * $ 25.10
1 * 1 *
1
32
2
=
$5
0
1
State
( 0.25 * $ 25.10
1 * 1 *
1
* 2 * 25% *
GOVERNMENT
* 2 * 25% *
19
1
=
$3
0
0
Local
( 0.25 * $ 25.10
1 * 1 *
1
*
594
30
=
$93
4
15
# INIT
% INITADD
$25
# SAMPS
=
SHIFTS
1
JOBCAT
18
NOTETIME
# PLANTS
NONSUPEWAGE
Table 9a (Remand)
MARITIME
2 * 75% *
Large
( 0.25 * $ 25.10
1 * 3 *
1
*
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
Small
Large
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma Welding
Oxy‐fuel Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
SMAW
2
* 25% *
Page 69
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
1
*
2
* 25% *
0
0
=
$0
0
0
Local
State
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 25% *
* 25% *
8
4
0
0
=
=
$1
$1
0
0
0
0
Local
State
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 25% *
* 25% *
119
2
6
0
=
=
$19
$0
1
0
3
0
Local
State
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 25% *
* 25% *
59
1
3
0
=
=
$9
$0
0
0
1
0
*
12
1
=
$2
0
0
*
4,773
239
=
$4,492
179
716
*
*
4,859
3,500
243
175
=
=
$2,287
$3,295
91
131
364
525
*
*
3,563
1,060
178
53
=
=
$1,677
$998
67
40
267
159
*
*
1,080
424
54
21
=
=
$508
$399
20
16
81
64
*
*
432
106
22
5
=
=
$203
$100
8
4
32
16
*
*
108
106
5
5
=
=
$51
$100
2
4
8
16
*
*
108
636
5
32
=
=
$51
$599
2
24
8
95
*
648
32
=
$305
12
49
*
37
2
=
$52
2
8
*
*
21
54
1
3
=
=
$20
$76
1
3
3
12
*
*
30
13
2
1
=
=
$28
$18
1
1
5
3
*
*
7
251
0
13
=
=
$6
$354
0
14
1
56
*
*
142
8
7
0
=
=
$134
$11
5
0
21
2
*
*
5
3
0
0
=
=
$5
$4
0
0
1
1
*
*
2
8
0
0
=
=
$2
$11
0
0
0
2
*
5
0
=
$5
0
1
# SAMPS
1 * 1 *
SHIFTS
( 0.25 * $ 25.10
JOBCAT
State
NOTETIME
# INIT
NONSUPEWAGE
Table 9a (Remand)
Plasma Cutting
GMAW
Brazing
Metallizing
( 0.25 * $ 25.10 1 * 1 * 1 * 2 * 25%
Local
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
SMAW
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
GMAW
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
TIG
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
SAW
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
Plasma Cutting
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
Plasma Welding
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
Large ( 0.25 * $ 25.10 1 * 3 * 2 * 2 * 25%
Resistance
Welding
Small ( 0.25 * $ 25.10 1 * 1 * 3 * 2 * 25%
MARITIME
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
SMAW
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
GMAW
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
TIG
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
FCAW
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
Plasma Cutting
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
Plasma Welding
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Large ( 0.25 * $ 25.10 1 * 3 * 1 * 2 * 75%
Oxy‐fuel Cutting
Small ( 0.25 * $ 25.10 1 * 2 * 1 * 2 * 75%
Page 70
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
1
*
2
* 75% *
3
0
=
$4
0
1
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
2
1
0
0
=
=
$2
$1
0
0
0
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
0
1
0
0
=
=
$0
$1
0
0
0
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 2 *
1 * 3 *
1
1
*
*
2
2
* 75% *
* 75% *
0
33
0
2
=
=
$0
$47
0
2
0
7
Small
( 0.25 * $ 25.10
1 * 2 *
1
18
1
=
$17
1
3
Large
( 0.25 * $ 25.10
1 * 3 *
* 2 * 75% *
CONSTRUCTION
1 * 2 * 25% *
304
15
=
$143
6
23
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
2,293
4
115
0
=
=
$360
$2
14
0
57
0
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
30
60
2
3
=
=
$5
$28
0
1
1
5
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
458
30
23
2
=
=
$72
$14
3
1
11
2
Small
Large
( 0.25 * $ 25.10
( 0.25 * $ 25.10
1 * 1 *
1 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
230
6
11
0
=
=
$36
$3
1
0
6
0
Small ( 0.25 * $ 25.10
SECTOR 3. PAINTING
Large ( 0.25 * $ 31.68
General Industry
(Aerospace)
Small ( 0.25 * $ 31.68
Large ( 0.25 * $ 31.68
General Industry
(Autobody)
Small ( 0.25 * $ 31.68
Large ( 0.25 * $ 31.68
General Industry
(Coil Coating)
Small ( 0.25 * $ 31.68
Large ( 0.25 * $ 31.68
Maritime
Small ( 0.25 * $ 31.68
Large ( 0.25 * $ 31.68
Construction
Small ( 0.25 * $ 31.68
State
( 0.25 * $ 31.68
Government
( 0.25 * $ 31.68
Local
SECTOR 4. Producers of Chromates
Large ( 0.25 * $ 37.06
ALL
Small ( 0.25 * $ 37.06
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $ 36.12
ALL
Small ( 0.25 * $ 36.12
SECTOR 6. CCA Producers
1 * 1 *
1
*
2
* 25% *
46
2
=
$7
0
1
2 * 3 *
3
*
2
* 25% *
50
2
=
$177
6
22
1 * 1 *
2 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
63
331
3
17
=
=
$37
$787
1
25
5
99
2 * 1 *
2 * 2 *
3
3
*
*
2
2
* 25% *
* 25% *
1,458
101
73
5
=
=
$1,732
$240
55
8
219
30
2 * 1 *
3 * 3 *
3
1
*
*
2
2
* 25% *
* 25% *
18
294
1
15
=
=
$22
$524
1
17
3
66
3 * 1 *
3 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
508
765
25
38
=
=
$302
$1,363
10
43
38
172
3 * 1 *
2 * 3 *
1
1
*
*
2
2
* 25% *
* 25% *
4,067
16
203
1
=
=
$2,416
$19
76
1
305
2
2 * 1 *
1
*
2
* 25% *
899
45
=
$356
11
45
4 * 3 *
3
*
2
* 100% *
2
0
=
$69
2
7
0 * 1 *
3
*
2
*
*
0
0
=
$0
0
0
9 * 2 *
3
*
2
* 25% *
2
0
=
$24
1
3
1 * 1 *
3
*
2
* 25% *
1
0
=
$1
0
0
Electric Torch
Cutting
Thermal Spray
Tungsten Cutting
# SAMPS
1 * 3 *
SHIFTS
( 0.25 * $ 25.10
Air Carbon Arc
Cutting
JOBCAT
Large
NOTETIME
# INIT
NONSUPEWAGE
Table 9a (Remand)
SAW
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
0%
Page 71
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
3
0
=
$18
1
2
Small ( 0.25 * $ 30.60 0 * 3 * 0 *
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 * $ 37.06 14 * 3 * 3 *
ALL
Small ( 0.25 * $ 37.06 0 * 1 * 3 *
SECTOR 8. Paint and Coating Producers
Large ( 0.25 * $ 27.60 4 * 2 * 3 *
ALL
Small ( 0.25 * $ 27.60 4 * 2 * 3 *
SECTOR 9. Printing Ink Producers
Large ( 0.25 * $ 27.65 5 * 1 * 9 *
ALL
Small ( 0.25 * $ 27.65 3 * 1 * 5 *
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 * $ 30.64 4 * 3 * 3 *
ALL
Small ( 0.25 * $ 30.64 1 * 1 * 3 *
SECTOR 11. Plating Mixture Producers
Large ( 0.25 * $ 27.50 3 * 1 * 3 *
ALL
Small ( 0.25 * $ 27.50 3 * 1 * 3 *
SECTOR 13. Chromium Metal Producers
Large ( 0.25 * $ 37.17 16 * 3 * 3 *
ALL
Small ( 0.25 * $ 37.17 0 * 1 * 1 *
SECTOR 14. Iron and Steel Mills
Large ( 0.25 * $ 37.17 8 * 3 * 3 *
Alloy Stainless
Steel
Small ( 0.25 * $ 37.17 4 * 1 * 3 *
Large ( 0.25 * $ 37.17 8 * 3 * 3 *
Carbon Steel
Small ( 0.25 * $ 37.17 4 * 1 * 3 *
14.B Forging
Large ( 0.25 * $ 37.17 5 * 1 * 3 *
Forging Industry
Small ( 0.25 * $ 37.17 2 * 1 * 1 *
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 * $ 27.12 9 * 3 * 5 *
ALL
Small ( 0.25 * $ 27.12 5 * 1 * 5 *
SECTOR 17. Chromium Dye Producers
Large ( 0.25 * $ 36.12 7 * 1 * 21 *
ALL
Small ( 0.25 * $ 36.12 5 * 1 * 7 *
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 * $ 39.76 0 * 1 * 3 *
ALL
Small ( 0.25 * $ 39.76 2 * 1 * 3 *
SECTOR 19. Chemical Distributors
Large ( 0.25 * $ 28.67 1 * 1 * 3 *
ALL
Small ( 0.25 * $ 28.67 1 * 1 * 3 *
2
*
*
0
0
=
$0
0
0
2
* 25% *
5
0
=
$152
4
16
2
*
*
0
0
=
$0
0
0
2
* 25% *
87
4
=
$362
13
52
2
* 25% *
137
7
=
$569
21
82
2
* 100% *
3
0
=
$94
3
14
2
* 100% *
10
1
=
$104
4
15
2
* 25% *
86
4
=
$593
19
77
2
* 25% *
42
2
=
$24
1
3
2
* 75% *
4
0
=
$21
1
3
2
* 75% *
3
0
=
$14
0
2
2
* 100% *
1
0
=
$134
4
14
2
*
*
0
0
=
$0
0
0
2
* 75% *
37
2
=
$1,870
50
201
2
2
* 75% *
* 75% *
12
112
1
6
=
=
$100
$5,610
3
151
11
604
2
* 75% *
35
2
=
$294
8
32
2
* 75% *
37
2
=
$382
10
41
2
* 75% *
34
2
=
$48
1
5
2
* 25% *
178
9
=
$4,079
150
602
2
* 25% *
130
6
=
$549
20
81
2
* 25% *
3
0
=
$98
3
11
2
* 25% *
1
0
=
$8
0
1
2
*
*
0
0
=
$0
0
0
2
* 100% *
5
0
=
$31
1
3
2
* 75% *
207
10
=
$334
12
47
2
* 75% *
1,561
78
=
$2,518
88
351
4 * 3 *
# SAMPS
* 25% *
( 0.25 * $ 30.60
SHIFTS
2
Large
JOBCAT
*
NOTETIME
# INIT
NONSUPEWAGE
Table 9a (Remand)
3
ALL
0%
0%
0%
0%
Page 72
# SAMPS
# INIT
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
SECTOR 20. Textile Dyeing
Large ( 0.25 * $ 19.13 3 *
ALL
Small ( 0.25 * $ 19.13 2 *
SECTOR 21. Colored Glass Producers
Large ( 0.25 * $ 27.66 3 *
General Industry
Small ( 0.25 * $ 27.66 2 *
Large ( 0.25 * $ 27.66 3 *
Fiber, Flat and
Container Glass
Small ( 0.25 * $ 27.66 2 *
SECTOR 22. Printing
Large ( 0.25 * $ 19.97 3 *
ALL
Small ( 0.25 * $ 19.97 2 *
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 * $ 31.14 2 *
Catalyst Users
Small ( 0.25 * $ 31.14 0 *
Chromium
Large ( 0.25 * $ 31.14 2 *
Catalyst Service
Small ( 0.25 * $ 31.14 0 *
Companies
SECTOR 25. Refractory Brick Producers
Large ( 0.25 * $ 24.56 9 *
ALL
Small ( 0.25 * $ 24.56 0 *
SECTOR 26. Woodworking
Large ( 0.25 * $ 22.11 1 *
General Industry
Small ( 0.25 * $ 22.11 1 *
Large ( 0.25 * $ 22.11 1 *
Maritime
Small ( 0.25 * $ 22.11 1 *
Large ( 0.25 * $ 30.76 1 *
Construction
Small ( 0.25 * $ 22.11 1 *
State
( 0.25 * $ 30.76 1 *
Government
( 0.25 * $ 22.11 1 *
Local
SECTOR 27. Solid Waste Incerneration
Large ( 0.25 * $ 26.09 6 *
General Industry
Small ( 0.25 * $ 26.09 6 *
State
( 0.25 * $ 26.09 0 *
Government
( 0.25 * $ 26.09 6 *
Local
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 * $ 26.75 12 *
ALL
Small ( 0.25 * $ 26.75 0 *
SHIFTS
JOBCAT
NONSUPEWAGE
NOTETIME
Table 9a (Remand)
3 *
3
*
2
* 75% *
347
17
=
$3,355
175
702
1 *
2
*
2
* 75% *
703
35
=
$1,009
53
211
3 * 12 *
2
* 75% *
5
0
=
$304
11
44
1 * 4 *
3 * 12 *
2
2
* 75% *
* 75% *
17
78
1
4
=
=
$71
$4,354
3
157
10
630
1 *
4
*
2
* 75% *
5
0
=
$19
1
3
3 *
2
*
2
* 75% *
92
5
=
$619
31
124
1 *
2
*
2
* 75% *
367
18
=
$550
28
110
3 *
3
*
2
* 75% *
164
8
=
$1,728
55
222
1 *
3 *
3
3
*
*
2
2
* 0% *
* 75% *
0
21
0
1
=
=
$0
$223
0
7
0
29
1 *
3
*
2
*
*
4
0
=
$0
0
0
1 * 15 *
2
* 75% *
6
0
=
$366
15
60
1 *
0
*
2
* 75% *
0
0
=
$0
0
0
1 *
1
*
2
* 75% *
175
9
=
$72
3
13
1 *
1 *
1
1
*
*
2
2
* 75% *
* 75% *
93
38
5
2
=
=
$39
$16
2
1
7
3
1 *
1 *
1
1
*
*
2
2
* 75% *
* 75% *
34
1,290
2
64
=
=
$14
$744
1
24
3
97
1 *
1 *
1
1
*
*
2
2
* 75% *
* 75% *
5,162
16
258
1
=
=
$2,141
$9
97
0
387
1
1 *
1
*
2
* 75% *
59
3
=
$24
1
4
3 * 15 *
2
* 75% *
48
2
=
$6,362
244
975
1 * 3 *
3 * 15 *
2
2
* 75% *
* 75% *
58
0
3
0
=
=
$509
$0
20
0
78
0
1 *
3
*
2
* 75% *
29
1
=
$254
10
39
3 *
3
*
2
* 75% *
18
1
=
$957
36
143
3 *
3
*
2
*
0
0
=
$0
0
0
0%
0%
Page 73
*
% INITADD
# PLANTS
#PLANTS * 5%
Item 12 COSTS
HOURS
RESPONSES
3
*
2
* 75% *
55
3
=
$382
12
50
# SAMPS
4 * 1 *
SHIFTS
# INIT
SECTOR 31. Construction ‐ Cement Workers
Large ( 0.25 * $ 30.79
JOBCAT
NONSUPEWAGE
NOTETIME
Table 9a (Remand)
Industrial
Small
rehabilitation State
( 0.25 * $ 30.79
( 0.25 * $ 30.79
4 * 1 *
1 * 1 *
2
1
*
*
2
2
* 75% *
* 100% *
196
16
10
1
=
=
$907
$12
29
0
118
2
Local
Large
( 0.25 * $ 30.79
( 0.25 * $ 30.79
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 100% *
* 75% *
74
44
4
2
=
=
$57
$25
2
1
7
3
Hazardous Waste‐ Small
site Work
State
( 0.25 * $ 30.79
( 0.25 * $ 30.79
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 75% *
* 75% *
143
1
7
0
=
=
$83
$1
3
0
11
0
Local
Large
( 0.25 * $ 30.79
( 0.25 * $ 30.79
1 * 1 *
1 * 1 *
1
1
*
*
2
2
* 75% *
* 0% *
201
48
10
2
=
=
$116
$0
4
0
15
0
Small
Large
( 0.25 * $ 30.79
( 0.25 * $ 30.79
1 * 1 *
4 * 1 *
1
3
*
*
2
2
* 0% *
* 75% *
148
9,592
7
480
=
=
$0
$66,441
0
2158
0
8633
Small
State
( 0.25 * $ 30.79
( 0.25 * $ 30.79
4 * 1 *
4 * 1 *
2
3
*
*
2
2
* 75% *
* 75% *
76,673
23
3,834
1
=
=
$354,072
$160
11501
5
46004
21
( 0.25 * $ 30.79
Local
SECTOR 32. Pre‐Cast Concrete Products
Large ( 0.25 * $ 26.42
ALL
Small ( 0.25 * $ 26.42
SECTOR 32A. Ready Mix Concrete
Large ( 0.25 * $ 26.42
ALL
Small ( 0.25 * $ 26.42
Total
4 * 1 *
2
*
2
* 75% *
616
31
=
$2,844
92
369
7 * 1 * 11 *
2
* 75% *
1,330
66
=
$50,715
1920
7678
5 * 1 *
*
2
* 75% *
2,187
109
=
$32,504
1230
4921
7 * 1 * 11 *
2
* 75% *
1,994
100
=
$76,073
2879
11517
5 * 1 *
2
* 75% *
4,653
174,838
233
=
8,742
$69,157
$749,837
2618
26,091
10470
104,365
Refractory Brick
Restoration
Cement Workers
6
6
*
Page 74
Table 9b
Employer Time and Cost to Notify Employees of Semi‐Annual Monitoring Results
COST = BURDEN HOURS * NON SUPEWAGE
HOURS = (NOTETIME * NONSUPWAGE * JOBAL * SHIFTS * #SAMPS * 2 * %NOTSEMI * %ABOVEAL * #PLANTS)
Variables
* NOTETIME = Time, in hours, to notifiy an employee of the exposure monitoring results by posting .25 hours (15 mintues).
TOTAL HOURS
RESPONSES
5470
( 0.25 * $ 25.49 * 1 * 1 *
( 0.25 * $ 25.49 * 1 * 2 *
3 * 2 * 100% * 49.00% * 1,751 ) =
3 * 2 * 100% * 11.00% * 448 ) =
$32,806
$3,771
1,287
148
5148
592
( 0.25 * $ 25.49 * 1 * 1 *
( 0.25 * $ 25.49 * 1 * 2 *
3 * 2 * 100% * 11.00% *
3 * 2 * 100% * 14.00% *
843
508
)=
)=
$3,548
$5,434
139
213
557
853
( 0.25 * $ 25.49 * 1 * 1 *
( 0.25 * $ 25.49 * 1 * 2 *
3 * 2 * 100% * 14.00% *
3 * 2 * 100% * 10.00% *
955
448
)=
)=
$5,115
$3,428
201
134
803
538
( 0.25 * $ 25.49 * 1 * 1 *
( 0.25 * $ 25.49 * 1 * 2 *
3 * 2 * 100% * 10.00% *
3 * 2 * 100% * 13.00% *
843
509
)=
)=
$3,225
$5,065
127
199
506
795
( 0.25 * $ 25.49 * 1 * 1 *
( 0.25 * $ 25.49 * 1 * 2 *
3 * 2 * 100% * 13.00% *
3 * 2 * 100% * 16.00% *
959
930
)=
)=
$4,767
$11,384
187
447
748
1786
( 0.25 * $ 25.49 * 1 * 1 *
$10,712
420
1681
( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% * 16.00% * 1,751 ) =
General Industry
2 * 2 * 100% * 0.92% * 3,560 ) =
$2,466
98
393
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.92%
0.73%
* 3,989 ) =
* 2,611 ) =
$1,382
$1,435
55
57
220
229
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.73%
0.00%
* 2,925 ) =
* 791 ) =
$804
$0
32
0
128
0
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 0 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
886
316
)=
)=
$0
$0
0
0
0
0
( 0.25 * $ 25.10 * 0 * 1 *
( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
354
79
)=
)=
$0
$0
0
0
0
0
( 0.25 * $ 25.10 * 1 * 1 *
3 * 2 * 100% *
0.00%
*
89
)=
$0
0
0
Page 75
#PLANTS
%ABOVEAL
1,368
%NOTSEMI
ITEM 12 COST
SEMI‐ANNUALLY
$34,863
#SAMPS
)=
SHIFTS
3 * 2 * 100% * 49.00% *
JOBAL
( 0.25 * $ 25.49 * 1 * 2 *
NOTETIME
Sector 1. Electroplating
Large
Hard Chrome
Small
Large
Job Shop
Chrome Plater
Small
Large
Captive Shop
Chrome Plater
Small
Large
Job Shop Plater
Small
Large
Captive Shop
Plater
Small
Large
Operator
Small
Sector 2. Welding
Large
SMAW
Small
Large
GMAW
Small
Large
TIG
Small
Large
SAW
Small
Large
Plasma Cutting
Small
NONSUPEWAGE
* NONSUPEWAGE = Non‐supervisory wage rate. $/hr.
* JOBAL = Number of job categories exposed at or above the AL
* SHIFTS = Number of work shifts.
* #SAMPS = Number of samples per exposure measurement
* 2 = # times per year (semi‐annually)
* %NOTSEMI = Percent of plants not performing semi‐annual monitoring requirements.
* %ABOVEAL = Percent of plants that have an employee in at least one job category above the AL.
930
TOTAL HOURS
RESPONSES
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 1 * 1 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% *
2 * 2 * 100% *
0.00%
0.00%
*
*
89
475
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 1 *
0.00%
*
532
)=
$0
0
0
Large ( 0.25 * $ 25.10 * 1 * 3 *
3 * 2 * 100% *
MARITIME
1 * 2 * 100% *
0.00%
*
18
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
10
24
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
14
6
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
3
117
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
66
4
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
2
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
1
4
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
2
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
1
0
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
* $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
0
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
* $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
16
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
*
9
)=
$0
0
0
Large ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% * 0.00%
CONSTRUCTION
1 * 2 * 100% * 0.00%
*
202
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 1 * 1 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
* 1,620 ) =
*
3
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% *
0.00%
*
$0
0
0
#PLANTS
%ABOVEAL
79
%NOTSEMI
ITEM 12 COST
Resistance
Welding
SEMI‐ANNUALLY
*
#SAMPS
0.00%
SHIFTS
2 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 25.10 * 1 * 3 *
NOTETIME
Plasma
Welding
NONSUPEWAGE
Table 9b
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small ( 0.25
Thermal Spray Large ( 0.25
Tungsten
Small ( 0.25
Cutting
Large ( 0.25
SAW
Small ( 0.25
SMAW
Plasma Cutting
Page 76
21
)=
TOTAL HOURS
RESPONSES
41
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 1 * 1 *
State ( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
324
20
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
162
4
)=
)=
$0
$0
0
0
0
0
Local
( 0.25 * $ 25.10 * 1 * 1 *
*
32
)=
$0
0
0
State
( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% * 0.00%
GOVERNMENT
1 * 2 * 100% * 0.00%
*
19
)=
$0
0
0
Local
State
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
594
0
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
8
4
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
119
2
)=
)=
$0
$0
0
0
0
0
Local
State
( 0.25 * $ 25.10 * 1 * 1 *
( 0.25 * $ 25.10 * 1 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
59
1
)=
)=
$0
$0
0
0
0
0
*
0.00%
*
12
)=
$0
0
0
*
0.00%
* 4,773 ) =
$0
0
0
*
*
0.00%
0.00%
* 4,859 ) =
* 3,500 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
* 3,563 ) =
* 1,060 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
* 1,080 ) =
* 424 ) =
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
432
106
)=
)=
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
108
106
)=
)=
$0
$0
0
0
0
0
*
*
0.00%
0.00%
*
*
108
636
)=
)=
$0
$0
0
0
0
0
*
0.00%
*
648
)=
$0
0
0
#PLANTS
%NOTSEMI
%ABOVEAL
*
#SAMPS
0.00%
SHIFTS
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 25.10 * 1 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
GMAW
Brazing
Metallizing
SMAW
Plasma Cutting
GMAW
Brazing
Metallizing
Local ( 0.25 * $ 25.10 * 1 * 1 * 1 * 2 * 100%
Sector 2. Mild Steel Welding GENERAL INDUSTRY
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
SMAW
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
GMAW
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
TIG
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
SAW
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
Plasma Cutting
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
Plasma
Welding
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Large ( 0.25 * $ 25.10 * 0 * 3 * 2 * 2 * 100%
Resistance
Welding
Small ( 0.25 * $ 25.10 * 0 * 1 * 3 * 2 * 100%
Page 77
TOTAL HOURS
RESPONSES
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
21
54
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
30
13
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
7
251
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
142
8
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
5
3
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
8
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
5
3
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 2 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
2
1
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
* $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
1
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
* $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
0
33
)=
)=
$0
$0
0
0
0
0
* $ 25.10 * 0 * 2 *
1 * 2 * 100% *
0.00%
*
18
)=
$0
0
0
304
#PLANTS
%ABOVEAL
37
%NOTSEMI
*
#SAMPS
0.00%
SHIFTS
MARITIME
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 25.10 * 0 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
SMAW
GMAW
TIG
FCAW
Plasma Cutting
Plasma
Welding
Oxy‐fuel
Cutting
Air Carbon Arc
Cutting
Electric Torch
Cutting
Small ( 0.25
Thermal Spray Large ( 0.25
Tungsten
Cutting
Small ( 0.25
Large ( 0.25
SAW
Small ( 0.25
CONSTRUCTION
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
0.00%
*
)=
$0
0
0
Small ( 0.25 * $ 25.10 * 0 * 1 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
* 2,293 ) =
*
4
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 1 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
30
60
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 1 *
Large ( 0.25 * $ 25.10 * 0 * 3 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
458
30
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 25.10 * 0 * 1 *
1 * 2 * 100% *
0.00%
*
230
)=
$0
0
0
SMAW
Plasma Cutting
GMAW
Brazing
Page 78
TOTAL HOURS
RESPONSES
)=
$0
0
0
* 1*
1 * 2 * 100% *
0.00%
*
46
)=
$0
0
0
* 3*
3 * 2 * 100% * 28.00% *
50
)=
$1,983
63
250
* 1*
* 1*
3 * 2 * 100% *
1 * 2 * 100% *
9.00%
5.00%
*
*
63
331
)=
)=
$268
$262
8
8
34
33
* 1*
* 2*
1 * 2 * 100% *
3 * 2 * 100% *
5.00%
8.00%
* 1,458 ) =
* 101 ) =
$1,155
$769
36
24
146
97
* 1*
* 3*
3 * 2 * 100% * 8.00% *
1 * 2 * 100% * 36.00% *
18
294
)=
)=
$70
$10,055
2
317
9
1270
* 1*
* 3*
1 * 2 * 100% * 36.00% *
1 * 2 * 100% * 22.00% *
508
765
)=
)=
$0
$7,998
0
252
0
1010
* 1*
* 3*
1 * 2 * 100% * 22.00% * 4,067 ) =
1 * 2 * 100% * 12.00% * 16 ) =
$14,174
$93
447
3
1790
12
* 1*
1 * 2 * 100% * 12.00% *
899
)=
$1,709
54
216
* 3*
3 * 2 * 100% * 45.00% *
2
)=
$469
13
51
* 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 2*
3 * 2 * 100% * 71.00% *
2
)=
$761
21
84
* 1*
3 * 2 * 100% * 50.00% *
1
)=
$27
1
3
* 3*
3 * 2 * 100% * 33.00% *
3
)=
$116
4
15
* 3*
0 * 2 * 100% *
*
0
)=
$0
0
0
* 3*
3 * 2 * 100% * 100.00% *
5
)=
$5,207
141
562
* 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 2*
3 * 2 * 100% * 13.00% *
87
)=
$941
34
136
* 2*
3 * 2 * 100% * 13.00% *
137
)=
$1,479
54
214
* 1*
9 * 2 * 100% * 69.00% *
3
)=
$776
28
112
* 1*
5 * 2 * 100% * 69.00% *
10
)=
$958
35
139
* 3 * 3 * 2 * 100% * 51.00% *
86
)=
$12,101
395
1580
Small ( 0.25 * $ 30.64 * 2 * 1 * 3 * 2 * 100% * 51.00% *
ALL
SECTOR 11. Plating Mixture Producers
42
)=
$1,973
64
258
#PLANTS
%ABOVEAL
6
%NOTSEMI
*
#SAMPS
0.00%
SHIFTS
1 * 2 * 100% *
JOBAL
Large ( 0.25 * $ 25.10 * 0 * 3 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
Metallizing
Small ( 0.25 * $ 25.10 * 0
SECTOR 3. PAINTING
Large ( 0.25 * $ 31.68 * 1
AEROSPACE
Small ( 0.25 * $ 31.68 * 1
General
Large ( 0.25 * $ 31.68 * 1
Industry
(Autobody) Small ( 0.25 * $ 31.68 * 1
General
Large ( 0.25 * $ 31.68 * 1
Industry (Coil
Small ( 0.25 * $ 31.68 * 1
Coating)
Large ( 0.25 * $ 31.68 * 2
Maritime
Small ( 0.25 * $ 31.68 * 0
Large ( 0.25 * $ 31.68 * 1
Construction
Small ( 0.25 * $ 31.68 * 1
State ( 0.25 * $ 31.68 * 1
Government
Local ( 0.25 * $ 31.68 * 1
SECTOR 4. Producers of Chromates
Large ( 0.25 * $ 37.06 * 3
ALL
Small ( 0.25 * $ 37.06 * 0
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 * $ 36.12 * 5
ALL
Small ( 0.25 * $ 36.12 * 1
SECTOR 6. CCA Producers
Large ( 0.25 * $ 30.60 * 1
ALL
Small ( 0.25 * $ 30.60 * 0
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 * $ 37.06 * 6
ALL
Small ( 0.25 * $ 37.06 * 0
SECTOR 8. Paint and Coating Producers
Large ( 0.25 * $ 27.60 * 1
ALL
Small ( 0.25 * $ 27.60 * 1
SECTOR 9. Printing Ink Producers
Large ( 0.25 * $ 27.65 * 3
ALL
Small ( 0.25 * $ 27.65 * 2
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 * $ 30.64 * 2
Page 79
0.00%
0.00%
0.00%
TOTAL HOURS
RESPONSES
7
27
* 1 * 1*
3 * 2 * 100% * 100.00% *
3
)=
$122
4
18
* 2 * 3*
3 * 2 * 100% * 100.00% *
1
)=
$335
9
36
* 0 * 1*
1* 2*
*
0
)=
$0
0
0
* 3 * 3*
3 * 2 * 100% * 38.00% *
37
)=
$7,107
191
765
* 1 * 1*
* 0 * 3*
3 * 2 * 100% * 38.00% *
3 * 2 * 100% * 0.00% *
12
112
)=
)=
$253
$0
7
0
27
0
* 0 * 1*
1 * 2 * 100% *
*
35
)=
$0
0
0
* 4 * 1*
3 * 2 * 100% * 63.00% *
37
)=
$5,138
138
553
* 2 * 1*
3 * 2 * 100% * 63.00% *
34
)=
$2,421
65
260
* 6 * 3*
5 * 2 * 100% * 100.00% *
178
)=
$217,522
8,020
32080
* 5 * 1*
5 * 2 * 100% * 100.00% *
130
)=
$43,944
1,620
6481
* 6 * 1 * 21 * 2 * 100% * 38.00% *
3
)=
$2,564
71
284
* 6 * 1*
7 * 2 * 100% * 38.00% *
1
)=
$285
8
32
* 0 * 1*
3 * 2 * 100% *
*
0
)=
$0
0
0
* 1 * 1*
3 * 2 * 100% * 27.00% *
5
)=
$84
2
8
* 0 * 1*
3 * 2 * 100% *
0.00%
*
207
)=
$0
0
0
* 0 * 1*
3 * 2 * 100% *
0.00%
* 1,561 ) =
$0
0
0
* 0 * 3*
3 * 2 * 100% *
0.00%
*
347
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
703
)=
$0
0
0
* 1 * 3 * 12 * 2 * 100% * 25.00% *
5
)=
$675
24
98
* 0 * 1*
17
)=
$0
0
0
#PLANTS
%ABOVEAL
$182
%NOTSEMI
)=
#SAMPS
4
SHIFTS
3 * 2 * 100% * 100.00% *
JOBAL
Large ( 0.25 * $ 27.50 * 1 * 1 *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
ALL
Small ( 0.25 * $ 27.50
SECTOR 13. Chromium Metal Producers
Large ( 0.25 * $ 37.17
ALL
Small ( 0.25 * $ 37.17
SECTOR 14. Iron and Steel Mills
Large ( 0.25 * $ 37.17
Alloy and
Stainless Steel
Small ( 0.25 * $ 37.17
Large ( 0.25 * $ 37.17
Carbon Steel
Small ( 0.25 * $ 37.17
SECTOR 14B. Forging Industry
Large ( 0.25 * $ 37.17
Reshaping
Small ( 0.25 * $ 37.17
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 * $ 27.12
ALL
Small ( 0.25 * $ 27.12
SECTOR 17. Chromium Dye Producers
Large ( 0.25 * $ 36.12
ALL
Small ( 0.25 * $ 36.12
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 * $ 39.76
ALL
Small ( 0.25 * $ 39.76
SECTOR 19. Chemical Distributors
Large ( 0.25 * $ 28.67
ALL
Small ( 0.25 * $ 28.67
SECTOR 20. Textile Dyeing
Large ( 0.25 * $ 19.13
ALL
Small ( 0.25 * $ 19.13
SECTOR 21. Colored Glass Producers
Large ( 0.25 * $ 27.66
General
Industry
Small ( 0.25 * $ 27.66
0% *
4 * 2 * 100% *
Page 80
0.00%
0.00%
0.00%
0.00%
*
RESPONSES
23
93
* 0 * 1*
1 * 2 * 100% *
0.00%
*
5
)=
$0
0
0
* 0 * 3*
2 * 2 * 100% *
0.00%
*
92
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
367
)=
$0
0
0
* 2 * 3*
3 * 2 * 100% *
9.00%
*
164
)=
$4,148
133
533
* 0 * 1*
* 0 * 3*
3 * 2 * 100% *
3 * 2 * 100% *
0.00%
0.00%
*
*
0
21
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
3 * 2 * 100% *
0.00%
*
4
)=
$0
0
0
* 0 * 1 * 15 * 2 * 100% *
0.00%
*
6
)=
$0
0
0
* 0 * 1*
0 * 2 * 100% *
0.00%
*
0
)=
$0
0
0
* 0 * 1*
2 * 2 * 100% *
0.00%
*
175
)=
$0
0
0
* 0 * 1*
* 0 * 1*
2 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
93
38
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
* 1 * 1*
1 * 2 * 100% * 0.00% * 34 ) =
1 * 2 * 100% * 22.00% * 1,290 ) =
$0
$4,364
0
142
0
567
* 1 * 1*
* 1 * 1*
1 * 2 * 100% * 22.00% * 5,162 ) =
1 * 2 * 100% * 22.00% * 16 ) =
$17,469
$55
568
2
2271
7
* 1 * 1*
1 * 2 * 100% * 22.00% *
#PLANTS
%ABOVEAL
$645
%NOTSEMI
TOTAL HOURS
Small ( 0.25 * $ 27.66
SECTOR 22. Printing
Large ( 0.25 * $ 19.97
ALL
Small ( 0.25 * $ 19.97
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 * $ 31.14
Catalyst Users
Small ( 0.25 * $ 31.14
Chromium Large ( 0.25 * $ 31.14
Catalyst Service
Small ( 0.25 * $ 31.14
Companies
SECTOR 25. Refractory Brick Producers
Large ( 0.25 * $ 24.56
ALL
Small ( 0.25 * $ 24.56
SECTOR 26. Woodworking
Large ( 0.25 * $ 30.76
General
Industry
Small ( 0.25 * $ 30.76
Large ( 0.25 * $ 30.76
Maritime
Small ( 0.25 * $ 30.76
Large ( 0.25 * $ 30.76
Construction
Small ( 0.25 * $ 30.76
State ( 0.25 * $ 30.76
Government
Local ( 0.25 * $ 30.76
SECTOR 27. Solid Waste Incerneration
Large ( 0.25 * $ 26.09
General
Industry
Small ( 0.25 * $ 26.09
State ( 0.25 * $ 26.09
Government
Local ( 0.25 * $ 26.09
SEMI‐ANNUALLY
)=
Large ( 0.25 * $ 27.66 * 3 * 1 *
#SAMPS
78
SHIFTS
1 * 2 * 100% * 20.00% *
JOBAL
ITEM 12 COST
Fiber, Flat,
Container Glass
NONSUPEWAGE
NOTETIME
Table 9b
59
)=
$199
6
26
* 0 * 3 * 15 * 2 * 100% *
0.00%
*
48
)=
$0
0
0
* 0 * 1 * 3 * 2 * 100% *
* 0 * 3 * 15 * 2 * 100% *
0.00%
0.00%
*
*
58
0
)=
)=
$0
$0
0
0
0
0
* 0 * 1*
0.00%
*
29
)=
$0
0
0
3 * 2 * 100% *
Page 81
TOTAL HOURS
RESPONSES
$0
0
0
3 * 2 * 100% *
0.00%
*
0
)=
$0
0
0
1 * 2 * 100% *
0.00%
*
55
)=
$0
0
0
Industrial Small ( 0.25 * $ 30.79 * 0 * 1 *
Rehabilitation State ( 0.25 * $ 30.79 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
196
16
)=
)=
$0
$0
0
0
0
0
Local ( 0.25 * $ 30.79 * 0 * 1 *
Large ( 0.25 * $ 30.79 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
74
44
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 30.79 * 0 * 1 *
State ( 0.25 * $ 30.79 * 0 * 1 *
1 * 2 * 100% *
1 * 2 * 100% *
0.00%
0.00%
*
*
143
1
)=
)=
$0
$0
0
0
0
0
Local ( 0.25 * $ 30.79 * 0 * 1 *
Large ( 0.25 * $ 30.79 * 0 * 1 *
1 * 2 * 100% * 0.00% *
1 * 2 * 100% * 60.00% *
201
48
)=
)=
$0
$0
0
0
0
0
Small ( 0.25 * $ 30.79 * 0 * 1 *
1 * 2 * 100% * 60.00% *
$0
0
$466,191 16,790
0
67,160
Hazardous
Waste‐site
Work
Refractory
Brick
Restoration
Page 82
#PLANTS
%ABOVEAL
)=
%NOTSEMI
18
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 * $ 26.75 * 0 * 3 *
ALL
Small ( 0.25 * $ 26.75 * 0 * 3 *
SECTOR 31. Construction Cement Workers
Large ( 0.25 * $ 30.79 * 0 * 1 *
#SAMPS
*
SHIFTS
0.00%
JOBAL
3 * 2 * 100% *
NOTETIME
ITEM 12 COST
SEMI‐ANNUALLY
NONSUPEWAGE
Table 9b
148 ) =
77,770
Table 10
Respiratory‐Protection Program: Qualitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee and Industrial Hygiene Technician Time and Cost to Conduct Qualitative Fit Testing
This table calculates the burden hours and cost of employee and industrial hygienist time to conduct fit‐testing. The time, in hours, for an employee
to be qualitative fit‐tested is multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
COST = BURDEN HOURS * NONSUPEWAGE
*ASSUMPTIONS:
Item 12 COST
RESPONSES
NONSUPEWAGE
0.25 ) *
5,447 *
71%
*
1
) =
1,934 * $ 25.49 =
$49,294
3,867
Small ( 0.25 +
0.25 ) *
1,188 *
97%
*
1
) =
576 * $ 25.49 =
$14,683
1,152
Large ( 0.25 +
0.25 ) *
2,874 *
81%
*
1
) =
1,164 * $ 25.10 =
$29,213
2,328
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
2,101 *
2,345 *
98%
55%
*
*
1
1
) =
) =
1,030 * $ 25.10 =
645 * $ 25.10 =
$25,844
$16,190
2,059
1,290
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
55 *
3,247 *
95%
88%
*
*
1
1
) =
) =
26 * $ 25.10 =
1,429 * $ 25.10
$661
$35,863
53
2,858
Small ( 0.25 +
State ( 0.25 +
0.25 ) *
0.25 ) *
2,511 *
15 *
99%
88%
*
*
1
1
) =
) =
1,243 * $ 25.10 *
6 * $ 25.10 *
$31,196
$161
2,486
13
( 0.25 +
0.25 ) *
74 *
99%
*
1
) =
37 * $ 25.10 *
$919
73
( 0.25 +
0.25 ) *
696 *
81%
*
1
) =
282 * $ 25.10 =
$7,071
563
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
2,101 *
17 *
98%
55%
*
*
1
1
) =
) =
1,030 * $ 25.10 =
5 * $ 25.10 =
$25,844
$114
2,059
9
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
0*
662 *
95%
88%
*
1
1
) =
)
0 * $ 25.10 =
291 $ 25.10
$0
$7,317
0
583
( 0.25 +
( 0.25 +
0.25 ) *
0.25 ) *
533 *
15 *
99%
88%
*
*
1
1
) =
) =
264
6
$ 25.10 =
$ 25.10 =
$6,624
$161
528
13
( 0.25 +
0.25 ) *
74 *
99%
*
1
) =
37
$ 25.10 =
$919
73
( 0.25 +
0.25 ) * 46 *
81%
*
50
) =
925 * $ 31.68 =
$29,311
1,851
( 0.25 +
0.25 ) * 0 *
98%
*
63
) =
4 * $ 31.68 =
$125
8
#PLANTS
1‐%FITBASE
QLFITEMP
Large ( 0.25 +
QLFITTIME
QLFITTECH
BURDEN HOURS
* QLFITTIME = Time, in hours, for an employee to be qualitative fit‐tested
* QLFITTECH = Time, in hours, for a technician to conduct one qualitative fit test
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* NONSUPEWAGE = Non‐Supervisory wage rate
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Local
Sector 2A. Mild Steel Welding
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
SECTOR 3. Painting
Large
GENERAL INDUSTRY
(AEROSPACE)
Small
Page 83
Item 12 COST
RESPONSES
NONSUPEWAGE
81%
*
) =
123 * $ 31.68 =
$3,908
247
Small ( 0.25 +
Large ( 0.25 +
0.25 ) * 0 *
0.25 ) * 2 *
98%
81%
* 1,458 ) =
* 101 ) =
151 * $ 31.68 =
75 * $ 31.68 =
$4,788
$2,388
302
151
Small ( 0.25 +
Large ( 0.25 +
0.25 ) * 1 * 98% *
0.25 ) * 3 * 55.00% *
18
294
) =
) =
8 * $ 31.68 =
235 * $ 31.68 =
$263
$7,430
17
469
Small ( 0.25 +
Large ( 0.25 +
0.25 ) * 1 *
0.25 ) * 471 *
95%
0%
*
*
508
1
) =
) =
243 * $ 31.68 =
0 * $ 31.68 =
$7,700
$0
486
0
Small ( 0.25 +
State ( 0.25 +
0.25 ) * 593 *
0.25 ) * 43 *
0%
0%
*
*
1
1
) =
) =
0 * $ 31.68 =
0 * $ 31.68 =
$0
$0
0
0
* 186 *
0%
*
1
) =
0 * $ 31.68 =
$0
0
* 7 *
37%
*
2
) =
3 * $ 37.06 =
$104
6
*
0*
93%
*
0
) =
0 * $ 37.06 =
$0
0
* 9 *
37%
*
2
) =
3 * $ 36.12 =
$118
7
* 1 *
93%
*
1
) =
0 * $ 36.12 =
$16
1
* 2 *
37%
*
3
) =
1 * $ 30.60 =
$25
2
*
0*
93%
*
0
) =
0 * $ 30.60 =
$0
0
* 12 *
37%
*
5
) =
12 * $ 37.06 =
$446
24
*
0*
93%
*
0
) =
0 * $ 37.06 =
$0
0
* 1 *
37%
*
87
) =
17 * $ 27.60 =
$465
34
*
0*
93%
*
137
) =
0 * $ 27.60 =
$0
0
* 12 *
37%
*
3
) =
7 * $ 27.65 =
$186
13
* 3 *
93%
*
10
) =
14 * $ 27.65 =
$389
28
* 361 *
54%
*
1
) =
97 * $ 30.64 =
$2,986
195
* 36 *
95%
*
1
) =
17 * $ 30.64 =
$531
35
* 3 *
37%
*
4
) =
2 * $ 27.50 =
$67
5
* 1 *
93%
*
3
) =
1 * $ 27.50 =
$38
3
#PLANTS
QLFITEMP
1‐%FITBASE
0.25 ) * 1 *
QLFITTECH
Large ( 0.25 +
QLFITTIME
GENERAL INDUSTRY
(AUTO BODY REPAIR)
BURDEN HOURS
Table 10
331
COIL COATING
MARITIME
CONSTRUCTION
Local ( 0.25 + 0.25 )
SECTOR 4. Producers of Chromates
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 5. Chromate Pigment Procedures
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 6. CCA Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 7. Chromium Catalyst Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 8. Paint and Coating Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 9. Printing Ink Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
SECTOR 11. Plating Mixture Producers
Large ( 0.25 + 0.25 )
ALL
Small ( 0.25 + 0.25 )
Page 84
RESPONSES
*
1
) =
2 * $ 37.17 =
$83
4
0.25 ) *
0*
95%
*
0
) =
0 * $ 37.17 =
$0
0
0.25 ) * 30 *
56%
*
37
) =
308 * $ 37.17 =
$11,454
616
0.25 ) * 1 *
0.25 ) * 1 *
95%
56%
*
*
12
112
) =
) =
8 * $ 37.17 =
22 * $ 37.17 =
$297
$818
16
44
0.25 ) * 1 *
95%
*
35
) =
23 * $ 37.17 =
$873
47
Large ( 0.25 +
0.25 ) * 3 *
56%
*
37
) =
29 * $ 37.17 =
$1,070
58
Small ( 0.25 +
SECTOR 15. Iron and Steel Foundries
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 17. Chromium Dye Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 18. Chromium Sulfate Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 19. Chemical Distributors
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 20. Textile Dyeing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 21. Colored Glass Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
FIBER, FLAT, AND
CONTAINER GLASS
Small ( 0.25 +
SECTOR 22. Printing
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 24. Chromium Catalyst Users
Large ( 0.25 +
Chromium Catalyst
Users
Small ( 0.25 +
0.25 ) * 1 *
95%
*
34
) =
12 * $ 37.17 =
$428
23
0.25 ) * 19 *
56%
*
178
) =
943 * $ 27.12 =
$25,584
1,887
0.25 ) * 5 *
95%
*
130
) =
277 * $ 27.12 =
$7,515
554
0.25 ) * 32 *
37%
*
3
) =
17 * $ 36.12 =
$627
35
0.25 ) * 7 *
93%
*
1
) =
3 * $ 36.12 =
$115
6
0.25 ) *
0*
37%
*
0
) =
0 * $ 39.76 =
$0
0
0.25 ) *
0*
93%
*
5
) =
0 * $ 39.76 =
$0
0
0.25 ) *
0*
92%
*
207
) =
0 * $ 28.67 =
$0
0
0.25 ) *
0*
99%
* 1,561 ) =
0 * $ 28.67 =
$0
0
0.25 ) *
0*
89%
*
347
) =
0 * $ 19.13 =
$0
0
0.25 ) *
0*
99%
*
703
) =
0 * $ 19.13 =
$0
0
0.25 ) * 1 *
76%
*
5
) =
2 * $ 27.66 =
$52
4
0.25 ) *
0*
0.25 ) * 8 *
97%
76%
*
*
17
78
) =
) =
0 * $ 27.66 =
240 * $ 27.66 =
$0
$6,647
0
481
0.25 ) * 2 *
97%
*
5
) =
4 * $ 27.66 =
$110
8
0.25 ) *
0*
98%
*
92
) =
0 * $ 19.97 =
$0
0
0.25 ) *
0 * 99.70% *
367
) =
0 * $ 19.97 =
$0
0
#PLANTS
QLFITEMP
1‐%FITBASE
56%
SECTOR 13. Chromium Metal Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 14. Iron and Steel Mills
Large ( 0.25 +
ALL
Small ( 0.25 +
Large ( 0.25 +
CARBON STEEL
Small ( 0.25 +
QLFITTECH
0.25 ) * 8 *
QLFITTIME
Item 12 COST
NONSUPEWAGE
BURDEN HOURS
Table 10
14b. FORGING INDUSTRY
RESHAPING INDUSTRY
0.25 ) * 1 *
67%
*
1
) =
0 * $ 31.14 =
$11
1
0.25 ) *
97%
*
0
) =
0 * $ 31.14 =
$0
0
0*
Page 85
RESPONSES
0*
0%
*
1
) =
0 * $ 31.14 =
$0
0
Small ( 0.25 +
SECTOR 25. Refractory Brick Producers
Large ( 0.25 +
ALL
Small ( 0.25 +
SECTOR 26. Woodworking
GENERAL INDUSTRY Large ( 0.25 +
0.25 ) *
0*
0%
*
1
) =
0 * $ 31.14 =
$0
0
0.25 ) *
0*
76%
*
6
) =
0 * $ 24.56 =
$0
0
0.25 ) *
0*
97%
*
0
) =
0 * $ 24.56 =
$0
0
0.25 ) *
0*
94%
*
1
) =
0 * $ 30.76 =
$0
0
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
55%
*
1
38
) =
) =
0 * $ 30.76 =
0 * $ 30.76 =
$0
$0
0
MARITIME
CONSTRUCTION
Small ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
95%
88%
34
1
) =
) =
0 * $ 30.76 =
0 * $ 30.76 =
$0
$0
0
Small ( 0.25 +
State ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
1
1
) =
) =
0 * $ 30.76 =
0 * $ 30.76 =
$0
$0
0
0
0*
88%
*
1
) =
0 * $ 30.76 =
$0
0
) * 6 *
59%
*
48
) =
87 * $ 26.09 =
$2,273
174
) * 1 *
) *
0*
96%
59%
*
*
58
0
) =
) =
24 * $ 26.09 =
0 * $ 26.09 =
$634
$0
49
) *
0*
96%
*
29
) =
0 * $ 26.09 =
$0
0
) *
0*
56%
*
18
) =
0 * $ 26.75 =
$0
0
) *
0*
95%
*
0
) =
0 * $ 26.75 =
$0
0
) *
0*
88%
*
55
) =
0 * $ 30.79 =
$0
0
INDUSTRIAL
Small ( 0.25 +
REHABILITATION AND
State ( 0.25 +
MAINTENANCE
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
196
16
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Local ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
88%
88%
*
*
74
1
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
HAZARDOUS WASTE‐ Small ( 0.25 +
SITE WORK
State ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
99%
88%
*
*
1
1
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Local ( 0.25 +
Large ( 0.25 +
0.25 ) *
0.25 ) *
0*
0*
88%
88%
*
*
1
48
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Small ( 0.25 +
0.25 ) *
0*
99%
Total
*
148 ) =
7,853
0 * $ 30.79 =
13,947
$0
$371,946
0
27,894
#PLANTS
QLFITEMP
1‐%FITBASE
0.25 ) *
Catalyst Service
Companies
QLFITTECH
Large ( 0.25 +
QLFITTIME
Item 12 COST
NONSUPEWAGE
BURDEN HOURS
Table 10
GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 27. Solid Waste Incineration
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
State ( 0.25 + 0.25
GOVERNMENT
Local ( 0.25 + 0.25
SECTOR 30. Superalloy Producers and Users
Large ( 0.25 + 0.25
ALL
Small ( 0.25 + 0.25
SECTOR 31. Construction
Large ( 0.25 + 0.25
REFRACTORY BRICK
RESTORATION
) *
Page 86
Table 11
Respiratory‐Protection Program: Cost of Materials for Qualitative Fit Testing
This table calculates the contract cost of the materials used for qualitative fit‐testing by multiplying the number of
employees who require qualitative fit‐testing by the cost of materials per fit‐test.
COST = ((QLFITMTRLS * QLFITEMP) * 1‐%FITBASE * #PLANTS)
#PLANTS
Item 13 Cost
71%
*
1
= $ 307
Small ( $ 0.08 * 1,188 ) *
97%
*
1
= $ 91
Large ( $ 0.08 * 2,874 ) *
81%
*
1
= $ 185
Small ( $ 0.08 * 2,101 ) *
Large ( $ 0.08 * 2,345 ) *
98%
55%
*
*
1
1
= $ 164
= $ 102
55 ) *
Small ( $ 0.08 *
Large ( $ 0.08 * 3,247 ) *
95%
88%
*
*
1
1
= $ 4
= $ 227
Small ( $ 0.08 * 2,511 ) *
15 ) *
State ( $ 0.08
99%
88%
*
*
1
1
= $ 197
= $ 1
Local ( $ 0.08
74
) *
99%
*
1
= $ 6
Large ( $ 0.08 *
696
) *
81%
*
1
= $ 45
Small ( $ 0.08 * 2,101 ) *
17 ) *
Large ( $ 0.08 *
98%
55%
*
*
1
1
= $ 164
= $ 1
Small ( $ 0.08 *
Large ( $ 0.08 *
0
662
) *
) *
95%
88%
*
*
1
1
=
0
= $ 46
Small ( $ 0.08 *
State ( $ 0.08 *
533
15
) *
*
99%
88%
*
*
1
1
= $ 42
= $ 1
Local ( $ 0.08 *
74
*
99%
*
1
= $ 6
Large ( $ 0.08 *
46
) *
81%
*
50
= $ 147
Small ( $ 0.08 *
Large ( $ 0.08 *
0
1
) *
) *
98%
81%
*
*
63
331
= $ 1
= $ 20
Small ( $ 0.08 *
0
) *
98%
*
1,458
= $ 24
QLFITEMP
1‐%FITBASE
Large ( $ 0.08 * 5,447 ) *
QLFITMTRLS
Variables
* QLFITMTRLS = Cost of materials per qualitative fit‐testing
* QLFITEMP ‐ Number of employees requiring annual qualitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTO BODY REPAIR)
Page 87
Item 13 Cost
101
= $ 12
1
) *
98%
*
Small ( $ 0.08 *
Large ( $ 0.08 * 1 ) * 55.00% *
18
294
= $ 1
= $ 13
Small ( $ 0.08 * 0 ) *
Large ( $ 0.08 * 471 ) *
95%
0.00%
*
*
508
1
= $ 13
=
0
Small ( $ 0.08 *
State ( $ 0.08 *
593
43
) *
) *
0.00%
0.00%
*
*
1
1
=
=
0
0
Local ( $ 0.08 *
186
) *
0.00%
*
1
=
0
Large ( $ 0.08 *
7
) *
37%
*
2
= $ 0.45
Small ( $ 0.08 *
0
) *
93%
*
0
=
Large ( $ 0.08 *
9
) *
37%
*
2
= $ 1
Small ( $ 0.08 *
1
) *
93%
*
1
= $ 0
Large ( $ 0.08 * 4 ) *
37%
*
3
= $ 0.32
Small ( $ 0.08 *
0) *
93%
*
0
=
Large ( $ 0.08 *
QLFITEMP
1‐%FITBASE
*
QLFITMTRLS
#PLANTS
Variables
Table 11
2
) *
81%
COIL COATING
MARITIME
CONSTRUCTION
SECTOR 4. Producers of Chromates
ALL
0
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
0
SECTOR 7. Chromium Catalyst Producers
Large ( $ 0.08 *
12
) *
37%
*
5
= $ 2
Small ( $ 0.08 *
0
) *
93%
*
0
=
Large ( $ 0.08 *
1
) *
37%
*
87
= $ 3
Small ( $ 0.08 *
0
) *
93%
*
137
=
Large ( $ 0.08 *
12
) *
37%
*
3
= $ 1
( $ 0.08 *
3
) *
93%
*
10
= $ 2
( $ 0.08 *
361
) *
54%
*
1
= $ 15
( $ 0.08 *
36
) *
95%
*
1
= $ 3
( $ 0.08 *
3
) *
37%
*
4
= $ 0.39
( $ 0.08 *
1
) *
93%
*
3
= $ 0.22
ALL
0
SECTOR 8. Paint and Coating Producers
ALL
0
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
Page 88
#PLANTS
Item 13 Cost
8
) *
56%
*
1
= $ 0.36
Small ( $ 0.08 *
0
) *
95%
*
0
=
Large ( $ 0.08 *
30
) *
56%
*
37
= $ 49
Small ( $ 0.08 *
Large ( $ 0.08 *
1
1
) *
) *
95%
56%
*
*
12
112
= $ 1
= $ 3
Small ( $ 0.08 *
1
) *
95%
*
35
= $ 4
Large ( $ 0.08 *
3
) *
56%
*
37
= $ 5
Small ( $ 0.08 *
1
) *
95%
*
34
= $ 2
Large ( $ 0.08 *
19
) *
56%
*
178
= $ 150
Small ( $ 0.08 *
5
) *
95%
*
130
= $ 44
Large ( $ 0.08 *
32
) *
37%
*
3
= $ 3
Small ( $ 0.08 *
7
) *
93%
*
1
= $ 0.51
0) *
37%
*
0
=
Small ( $ 0.08 * 1 ) *
93%
*
5
= $ 0.40
Large ( $ 0.08 *
0
) *
92%
*
207
=
0
Small ( $ 0.08 *
0
) *
99%
*
1,561
=
0
Large ( $ 0.08 *
0
) *
89%
*
347
=
0
Small ( $ 0.08 *
0
) *
99%
*
703
=
0
Large ( $ 0.08 *
1
) *
76%
*
5
= $ 0.30
Small ( $ 0.08 *
Large ( $ 0.08 *
0
8
) *
) *
97%
76%
*
*
17
78
=
0
= $ 38.17
Small ( $ 0.08 *
2
) *
97%
*
5
= $ 1
Large ( $ 0.08 *
0
) *
98%
*
92
=
0
Small ( $ 0.08 *
0
) * 99.70% *
367
=
0
QLFITEMP
1‐%FITBASE
Large ( $ 0.08 *
QLFITMTRLS
Variables
Table 11
SECTOR 13. Chromium Metal Producers
ALL
0
SECTOR 14. Iron and Steel Mills
ALLOY AND STAINLESS STEEL
Carbon Steel
14b. FORGING INDUSTRY
RESHAPING INDUSTRY
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
Large ( $ 0.08 *
0
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
Page 89
#PLANTS
Item 13 Cost
67%
*
1
= $ 0.05
0
) *
Small ( $ 0.08 *
Large ( $ 0.08 * 1 ) *
97%
67%
*
*
0
1
=
0
= $ 0.05
Small ( $ 0.08 *
0) *
97%
*
1
=
0
QLFITEMP
1‐%FITBASE
) *
QLFITMTRLS
Variables
Table 11
SECTOR 24. Chromium Catalyst Users
Large ( $ 0.08 *
1
CHROMIUM CATALYST USERS
CHROMIUM CATALYST COMPANIES
SECTOR 25. Refractory Brick Producers
Large ( $ 0.08 *
0
) *
76%
*
6
=
0
Small ( $ 0.08 *
0
) *
97%
*
0
=
0
Large ( $ 0.08 *
0
) *
94%
*
1
=
0
Small ( $ 0.08 *
Large ( $ 0.08 *
0
0
) *
) *
99%
55%
*
*
1
38
=
=
0
0
Small ( $ 0.08 *
Large ( $ 0.08 *
0
0
) *
) *
95%
88%
*
*
34
1
=
=
0
0
Small ( $ 0.08 *
State ( $ 0.08 *
0
0
) *
) *
99%
88%
*
*
1
1
=
=
0
0
Local ( $ 0.08 *
0
) *
88%
*
1
=
0
Large ( $ 0.08 *
6
) *
59%
*
48
= $ 14
Small ( $ 0.08 *
State ( $ 0.08 *
1
0
) *
) *
96%
59%
*
*
58
0
= $ 4
=
0
Local ( $ 0.08 *
0
) *
96%
*
29
=
0
Large ( $ 0.08 +
0) *
56%
*
18 =
0
Small ( $ 0.08 +
0) *
95%
*
0=
0
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
Large ( $ 0.08 *
0
) *
88%
*
55
=
0
Small ( $ 0.08 *
State ( $ 0.08 *
0
0
) *
) *
99%
88%
*
*
196
16
=
=
0
0
Local ( $ 0.08 *
Large ( $ 0.08 *
0
0
) *
) *
88%
88%
*
*
74
1
=
=
0
0
Small ( $ 0.08 *
State ( $ 0.08 *
0
0
) *
) *
99%
88%
*
*
1
1
=
=
0
0
Local ( $ 0.08 *
0
) *
88%
*
1
=
0
Page 90
Item 13 Cost
#PLANTS
1‐%FITBASE
QLFITEMP
QLFITMTRLS
Variables
Table 11
Large ( $ 0.08 *
0
) *
88%
*
48
=
0
Small ( $ 0.08 *
0
) *
99%
Total
*
148
=
7,853
0
$ 2,166
REFRACTORY BRICK RESTORATION
Page 91
Table 12
Respirator Protection Program: Quantitative Fit Testing for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Conduct Quantitative Fit Testing
This table calculates the burden hour and cost of employee time to be fit‐tested. The time, in hours, for an employee to be quantitative fit‐tested is
multiplied by the number of employees that require fit ‐testing and by the nonsupervisory wage rate.
BURDEN HOURS = (QNFITTIME + QNFITTEMP) * 1‐%FITBASE * #PLANTS
COST = BURDEN HOURS * NONSUPWAGE
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
Large
(
0.5 *
0
) *
71%
*
1
) =
0 * $ 25.49 =
$0
0
Small
(
0.5 *
0
) *
97%
*
1
) =
0 * $ 25.49 =
$0
0
Large
(
0.5 *
0
) *
81%
*
1
) =
0 * $ 25.10 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
55%
*
*
1
1
) =
) =
0 * $ 25.10 =
0 * $ 25.10 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
88%
*
1
1
) =
) =
0 * $ 25.10 =
0 * $ 25.10 =
$0
$0
0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
1
1
) =
) =
0 * $ 25.10 =
0 * $ 25.10 =
$0
$0
0
0
Local
(
0.5 *
0
) *
99%
1
) =
0 * $ 25.10 =
$0
0
Large
(
0.5 *
0
) *
81%
*
1
) =
0 * $ 25.10 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
55%
*
1
1
) =
) =
0 * $ 25.10 =
0 * $ 25.10 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
82%
1
1
) =
) =
0 * $ 25.10 =
0 * $ 25.10 =
$0
$0
0
0
Small
(
0.5 *
0
) *
99%
1
) =
0 * $ 25.10 =
$0
0
Large
(
0.5 *
0
) *
81%
*
50
) =
0 * $ 31.68 =
$0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
81%
*
*
63
331
) =
) =
0 * $ 31.68 =
0 * $ 31.68 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
98%
81%
*
*
1,458
101
) =
) =
0 * $ 31.68 =
0 * $ 31.68 =
$0
$0
0
0
Small
Large
(
(
0.5 *
0.5 *
0
0
) * 98% *
) * 55.00%
18
294
) =
) =
0 * $ 31.68 =
0 * $ 31.68 =
$0
$0
0
0
Small
(
0.5 *
0
) *
508
) =
0 * $ 31.68 =
$0
0
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
* QNFITTIME = Time, in hours, for an employee to be quantitative fit‐tested
* QNFITTEMP = Number of employees requiring annual quantitative fit‐testing
* 1‐%FITBASE (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the baseline)
* #PLANTS = Number of plants represented by the model input
* NONSUPEWAGE = Non‐Supervisory wage rate
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
REPAIR
COIL COATING
MARITIME
95%
Page 92
QNFITEMP
1‐%FITBASE
#PLANTS
Item 12 COST
Responses
NONSUPEWAGE
QNFITTIME
BURDEN HOURS
Table 12
Large
(
0.5 *
0
) *
0%
1
) =
0 * $ 31.68 =
$0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
0%
0%
1
1
) =
) =
0 * $ 31.68 =
0 * $ 31.68 =
$0
$0
0
0
Local
(
0.5 *
0
) *
0%
1
) =
0 * $ 31.68 =
$0
0
Large
(
0.5 *
0
) *
37%
*
2
) =
0 * $ 37.06 =
$0
0
(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8. Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9. Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11. Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13. Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14. Iron and Steel Mills
Large
(
ALLOY AND STAINLESS STEEL
(
Small
Large
(
CARBON STEEL
(
Small
14b. FORGING INDUSTRY
Large
(
RESHAPING INDUSTRY
(
Small
0.5 *
0
) *
93%
*
0
) =
0 * $ 37.06 =
$0
0
0.5 *
0
) *
37%
*
2
) =
0 * $ 36.12 =
$0
0
0.5 *
0
) *
93%
*
1
) =
0 * $ 36.12 =
$0
0
0.5 *
0
) *
37%
*
3
) =
0 * $ 30.60 =
$0
0
0.5 *
0
) *
93%
*
0
) =
0 * $ 30.60 =
$0
0
0.5 *
0
) *
37%
*
5
) =
0 * $ 37.06 =
$0
0
0.5 *
0
) *
93%
*
0
) =
0 * $ 37.06 =
$0
0
0.5 *
0
) *
37%
*
87
) =
0 * $ 27.60 =
$0
0
0.5 *
0
) *
93%
*
137
) =
0 * $ 27.60 =
$0
0
0.5 *
0
) *
37%
*
3
) =
0 * $ 27.65 =
$0
0
0.5 *
*
0.5 *
0
) *
93%
*
10
) =
0 * $ 27.65 =
$0
0
0
) *
54%
*
1
) =
0 * $ 30.64 =
$0
0
0.5 *
0
) *
95%
*
1
) =
0 * $ 30.64 =
$0
0
0.5 *
0
) *
37%
*
4
) =
0 * $ 27.50 =
$0
0
0.5 *
0
) *
93%
*
3
) =
0 * $ 27.50 =
$0
0
0.5 *
0
) *
56%
*
1
) =
0 * $ 37.17 =
$0
0
0.5 *
0
) *
95%
*
0
) =
0 * $ 37.17 =
$0
0
0.5 *
0
) *
56%
*
37
) =
0 * $ 37.17 =
$0
0
0.5 *
0.5 *
0
0
) *
) *
95%
56%
*
*
12
112
) =
) =
0 * $ 37.17 =
0 * $ 37.17 =
$0
$0
0
0
0.5 *
0
) *
95%
*
35
) =
0 * $ 37.17 =
$0
0
0.5 *
0
) *
56%
*
37
) =
0 * $ 37.17 =
$0
0
0.5 *
0
) *
95%
*
34
) =
0 * $ 37.17 =
$0
0
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Page 93
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
Large
(
0.5 *
0
) *
56%
*
178
) =
0 * $ 27.12 =
$0
0
Small
(
0.5 *
0
) *
95%
*
130
) =
0 * $ 27.12 =
$0
0
Large
(
0.5 *
0
) *
37%
*
3
) =
0 * $ 36.12 =
$0
0
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Carbon, Flat, and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
(
0.5 *
0
) *
93%
*
1
) =
0 * $ 36.12 =
$0
0
(
0.5 *
0
) *
37%
*
0
) =
0 * $ 39.76 =
$0
0
(
0.5 *
0
) *
93%
*
5
) =
0 * $ 39.76 =
$0
0
(
0.5 *
0
) *
92%
*
207
) =
0 * $ 28.67 =
$0
0
(
0.5 *
0
) *
99%
*
1,561
) =
0 * $ 28.67 =
$0
0
(
0.5 *
0
) *
89%
*
347
) =
0 * $ 19.13 =
$0
0
(
0.5 *
0
) *
99%
*
703
) =
0 * $ 19.13 =
$0
0
(
0.5 *
0
) *
76%
*
5
) =
0 * $ 27.66 =
$0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
97%
76%
*
*
17
78
) =
) =
0 * $ 27.66 =
0 * $ 27.66 =
$0
$0
0
0
(
0.5 *
0
) *
97%
*
5
) =
0 * $ 27.66 =
$0
0
(
0.5 *
0
) *
98%
*
92
) =
0 * $ 19.97 =
$0
0
(
0.5 *
0
) * 99.70% *
367
) =
0 * $ 19.97 =
$0
0
(
0.5 *
0
) *
67%
*
1
) =
0 * $ 31.14 =
$0
0
(
(
0.5 *
0
) *
0.5 * 109 ) *
97%
67%
*
*
0
1
) =
) =
0 * $ 31.14 =
36 * $ 31.14 =
$0
$1,137
0
73
(
0.5 *
10 ) *
97%
*
1
) =
5 * $ 31.14 =
$152
10
(
0.5 *
0
) *
76%
*
6
) =
0 * $ 24.56 =
$0
0
(
0.5 *
0
) *
97%
*
0
) =
0 * $ 24.56 =
$0
0
(
0.5 *
0
) *
94%
*
1
) =
0 * $ 30.76 =
$0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
55%
*
*
1
38
) =
) =
0 * $ 30.76 =
0 * $ 30.76 =
$0
$0
0
0
(
(
0.5 *
0.5 *
0
0
) *
) *
95%
88%
*
*
34
1
) =
) =
0 * $ 30.76 =
0 * $ 30.76 =
$0
$0
0
0
(
0.5 *
0
) *
99%
*
1
) =
0 * $ 30.76 =
$0
0
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
Table 12
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Page 94
Item 12 COST
Responses
NONSUPEWAGE
QNFITEMP
State
(
0.5 *
0
) *
88%
*
1
) =
0 * $ 30.76 =
$0
0
Local
(
0.5 *
0
) *
88%
*
1
) =
0 * $ 30.76 =
$0
0
Large
(
0.5 *
0
) *
59%
*
48
) =
0 * $ 26.09 =
$0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
96%
59%
*
*
58
0
) =
) =
0 * $ 26.09 =
0 * $ 26.09 =
$0
$0
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0.5 *
0
) *
96%
*
29
) =
0 * $ 26.09 =
$0
0
(
0.5 *
0
) *
56%
*
18
) =
0 * $ 26.75 =
$0
0
(
0.5 *
0
) *
95%
*
0
) =
0 * $ 26.75 =
$0
0
(
0.5 *
0
) *
88%
*
55
) =
0 * $ 30.79 =
$0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
*
*
196
16
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Local
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
88%
88%
*
*
74
1
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Small
State
(
(
0.5 *
0.5 *
0
0
) *
) *
99%
88%
*
*
1
1
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Local
Large
(
(
0.5 *
0.5 *
0
0
) *
) *
88%
88%
*
*
1
48
) =
) =
0 * $ 30.79 =
0 * $ 30.79 =
$0
$0
0
0
Small
(
0.5 *
0
) *
99%
Total
*
148
) =
7,851
0 * $ 30.79 =
41
$0
$1,289
0
83
#PLANTS
1‐%FITBASE
QNFITTIME
BURDEN HOURS
Table 12
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 95
Table 13
Respiratory Protection Program: Contract Cost for an Industrial Hygienist to Conduct Quantitative Fit Testing for Respirators
This table calculates the contract cost for the industrial hygiene technician to conduct quantitative fit‐testing.
COST = ((QNFITCOST * QNFITEMP) * 1‐%FITBASE * #PLANTS)
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
* QNFITCOST = $34.00 hourly cost for a industrial hygiene technician * # of hours
* QNFITTEMP = # Employees requiring annual quantitative fit‐test
* 1‐%FITBASE = Percent of plants not conducting fit‐testing (%FITBASE is the percent of plants conducting annual respirator fit‐testing in the
baseline)
* #PLANTS = Number of plants represented by the model input
Sector 1. Electroplating
Large
(
$0
0
*
0
*
71%
*
1
) = $ ‐
Small
(
$0
0
*
0
*
97%
*
1
) = $ ‐
Large
(
$68
2
*
0
*
81%
*
1
) = $ ‐
Small
Large
(
(
$68
$0
2
0
*
*
0
0
*
*
98%
55%
*
*
1
1
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
95%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
0
0
*
*
0
0
*
*
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
(
$0
0
*
0
*
99%
*
1
) = $ ‐
Large
(
$68
2
*
0
*
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
$68
$0
2
0
*
*
0
0
*
*
98%
81%
*
*
1
1
) = $ ‐
) = $ ‐
CONSTRUCTION
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
98%
81%
*
*
1
1
) = $ ‐
) = $ ‐
Small
(
$0
0
*
0
*
98%
*
1
) = $ ‐
Large
(
$0
0
*
0
*
81%
*
50
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
98%
81%
*
*
63
331
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
98%
81%
*
*
1,458
101
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
* 98% *
* 55.00% *
18
294
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
95%
0%
*
*
508
1
) = $ ‐
) = $ ‐
Small
(
$0
0
*
0
*
0%
*
1
) = $ ‐
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
COIL COATING
MARITIME
CONSTRUCTION
Page 96
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
State
(
$0
0
*
0
*
0%
*
1
) = $ ‐
Local
(
$0
0
*
0
*
0%
*
1
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
2
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
1
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
3
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
5
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
87
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
137
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
3
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
10
) = $ ‐
Large
(
$0
0
*
0
*
54%
*
1
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
1
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
4
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
3
) = $ ‐
Large
(
$0
0
*
0
*
56%
*
1
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
56%
*
37
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
95%
56%
*
*
12
112
) = $ ‐
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
35
) = $ ‐
Large
(
$0
0
*
0
*
56%
*
37
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
34
) = $ ‐
Large
(
$0
0
*
0
*
56%
*
178
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
130
) = $ ‐
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
CARBON STEEL
14b. RESHAPING INDUSTRY
RESHAPING
SECTOR 15. Iron and Steel Foundries
ALL
Page 97
Item 13 COST
#PLANTS
1‐%FITBASE
QNFITEMP
QNFITCOST
Variables
Table 13
SECTOR 17. Chromium Dye Producers
Large
(
$0
0
*
0
*
37%
*
3
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
1
) = $ ‐
Large
(
$0
0
*
0
*
37%
*
0
) = $ ‐
Small
(
$0
0
*
0
*
93%
*
5
) = $ ‐
Large
(
$0
0
*
0
*
92%
*
207
) = $ ‐
Small
(
$0
0
*
0
*
99%
*
1,561
) = $ ‐
Large
(
$0
0
*
0
*
89%
*
347
) = $ ‐
Small
(
$0
0
*
0
*
99%
*
703
) = $ ‐
Large
(
$0
0
*
0
*
76%
*
5
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
97%
76%
*
*
17
78
) = $ ‐
) = $ ‐
Small
(
$0
0
*
0
*
97%
*
5
) = $ ‐
Large
(
$0
0
*
0
*
98%
*
92
) = $ ‐
Small
(
$0
0
*
0
* 99.70% *
367
) = $ ‐
Large
(
$0
0
*
0
*
67%
*
1
) = $ ‐
Small
Large
(
(
$0
$123
0
4
*
*
0
30
*
*
97%
100%
*
*
0
1
) = $ ‐
) = $ 3,676
Small
(
$11
0
*
30
*
100%
*
1
) = $ 340
Large
(
$0
0
*
0
*
76%
*
6
) = $ ‐
Small
(
$0
0
*
0
*
97%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
94%
*
1
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
99%
55%
*
*
1
38
) = $ ‐
) = $ ‐
Small
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
95%
88%
*
*
34
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
0
0
*
*
0
0
*
99%
88%
*
1
1
) = $ ‐
) = $ ‐
Local
(
$0
0
*
0
1
) = $ ‐
$0
0
*
0
*
59%
*
48
) = $ ‐
$0
0
*
0
*
96%
*
58
) = $ ‐
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Carbon, Flat, and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
88%
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
(
(
Page 98
#PLANTS
Item 13 COST
1‐%FITBASE
State
(
$0
0
*
0
59%
0
) = $ ‐
Local
(
$0
0
*
0
96%
29
) = $ ‐
Large
(
$0
0
*
0
*
56%
*
18
) = $ ‐
Small
(
$0
0
*
0
*
95%
*
0
) = $ ‐
Large
(
$0
0
*
0
*
88%
*
55
) = $ ‐
Small
State
(
(
$0
$0
0
0
*
*
0
0
*
*
99%
88%
*
*
196
16
) = $ ‐
) = $ ‐
Local
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
88%
88%
*
*
74
1
) = $ ‐
) = $ ‐
Small
State
(
(
$0
$0
0
0
*
*
0
0
*
*
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
Large
(
(
$0
$0
0
0
*
*
0
0
*
*
88%
88%
*
*
1
48
) = $ ‐
) = $ ‐
Small
(
$0
0
*
0
*
99%
Total
*
148
) = $ ‐
7,851
$ 4,016
QNFITCOST
QNFITEMP
Variables
Table 13
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION AND
MAINTENANCE
Page 99
Table 14
Respiratory‐Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Questionnaire for Respirator Use
This table calculates the burden hours and cost of employee time to complete a medical questionnaire. The hours and cost is determined by the
number of employees who are at or above the action level and at or below the PEL by the time it takes to fill our the medical questionnaire and by non‐
supervisory wage rate.
Hours = (EMPAL * MEDHISTTIME * 1‐%FITBASE * #PLANTS)
Cost = Hours x NONSUPEWAGE
RESPONSES
71%
*
1
)
=
657.44 * $ 25.49 = $ 16,760
3,867
Small (
1,188 * 0.17 *
97%
*
1
)
=
195.82 * $ 25.49 = $ 4,992
1,152
Large (
0 * 0.17 *
81%
*
1
)
=
Small (
Large (
0 * 0.17 *
2,345 * 0.17 *
98%
55%
*
*
1
1
)
)
Small (
Large (
55 * 0.17 *
3,247 * 0.17 *
95%
88%
*
*
1
1
Small (
State (
2,511 * 0.17 *
15 * 0.17 *
99%
88%
*
*
Local (
74 * 0.17 *
99%
Large (
0 * 0.17 *
Small (
Large (
Hours
#PLANTS
1‐%FITBASE
5,447 * 0.17 *
MEDHISTTIME
Large (
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Variables:
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* MEDHISTTIME = Employee time to complete medical history questionnaire
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
Sector 1. Electroplating
ALL
Sector 2. Welding
0.00 * $ 25.10 =
0
0
=
=
0.00 * $ 25.10 =
0
219.30 * $ 25.10 = $ 5,505
0
1,290
)
)
=
=
8.96 * $ 25.10 = $ 225
485.80 * $ 25.10 = $ 12,194
53
2,858
1
1
)
)
=
=
422.58 * $ 25.10 = $ 10,607
2.18 * $ 25.10 = $ 55
2,486
13
*
1
)
=
12.44 * $ 25.10 = $ 312
73
55%
*
1
)
=
0.00 * $ 25.10 =
0
0
0 * 0.17 *
17 * 0.17 *
95%
88%
*
*
1
1
)
)
=
=
0.00 * $ 25.10 =
0
2.47 * $ 25.10 = $ 62
0
15
Small (
Large (
0 * 0.17 *
662 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 25.10 =
0
99.11 * $ 25.10 = $ 2,488
0
583
Small (
533 * 0.17 *
99%
*
1
)
=
89.72 * $ 25.10 = $ 2,252
528
Large ( 32 * 0.17 *
81%
*
50
)
=
220.21 * $ 31.68 = $ 6,976
1,295
0 * 0.17 *
Small (
Large ( 1 * 0.17 *
98%
81%
*
*
63
331
)
)
=
=
0.00 * $ 31.68 =
0
41.95 * $ 31.68 = $ 1,329
0
247
0 * 0.17 *
Small (
Large ( 2 * 0.17 *
98%
81%
* 1,458 )
* 101 )
=
=
0.00 * $ 31.68 =
0
25.63 * $ 31.68 = $ 812
0
151
Small ( 1 * 0.17 *
98%
*
=
2.82 * $ 31.68 = $ 89
17
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
GENERAL INDUSTRY AUTOBODY
REPAIR
COIL COATING
Page 100
18
)
RESPONSES
)
=
25.16 * $ 31.68 = $ 797
148
1 * 0.17 *
Small (
Large ( 471 * 0.17 *
95%
0%
*
*
508
1
)
)
=
=
82.06 * $ 31.68 =
0.00 * $ 31.68 =
2599.584
0
483
0
Small ( 593 * 0.17 *
State ( 43 * 0.17 *
0%
0%
*
*
1
1
)
)
=
=
0.00 * $ 31.68 =
0.00 * $ 31.68 =
0
0
0
0
Local ( 186 * 0.17 *
0%
*
1
)
=
0.00 * $ 31.68 =
0
0
Large ( 7 * 0.17 *
37%
*
2
)
=
0.95 * $ 37.06 = $ 35
6
* 0.17 *
93%
*
0
)
=
0.00 * $ 37.06 =
0
0
* 0.17 *
37%
*
2
)
=
0.00 * $ 36.12 =
0
5
* 0.17 *
93%
*
1
)
=
0.00 * $ 36.12 =
0
1
* 0.17 *
37%
*
3
)
=
0.00 * $ 30.60 =
0
2
* 0.17 *
93%
*
0
)
=
0.00 * $ 30.60 =
0
0
* 0.17 *
37%
*
5
)
=
4.09 * $ 37.06 = $ 152
24
* 0.17 *
93%
*
0
)
=
0.00 * $ 37.06 =
0
0
* 0.17 *
37%
*
87
)
=
5.72 * $ 27.60 = $ 158
34
* 0.17 *
93%
*
137
)
=
0.00 * $ 27.60 =
0
0
* 0.17 *
37%
*
3
)
=
2.28 * $ 27.65 = $ 63
13
* 0.17 *
93%
*
10
)
=
4.78 * $ 27.65 = $ 132
28
* 0.17 *
54%
*
1
)
=
33.14 * $ 30.64 = $ 1,015
195
* 0.17 *
95%
*
1
)
=
5.89 * $ 30.64 = $ 180
35
* 0.17 *
37%
*
4
)
=
0.61 * $ 27.50 = $ 17
4
* 0.17 *
93%
*
3
)
=
0.34 * $ 27.50 = $ 9
2
* 0.17 *
56%
*
1
)
=
0.76 * $ 37.17 = $ 28
4
* 0.17 *
95%
*
0
)
=
0.00 * $ 37.17 =
0
0
* 0.17 *
56%
*
37
)
=
104.76 * $ 37.17 = $ 3,894
616
* 0.17 *
* 0.17 *
95%
56%
*
*
12
112
)
)
=
=
2.71 * $ 37.17 = $ 101
7.48 * $ 37.17 = $ 278
16
44
* 0.17 *
95%
*
35
)
=
7.98 * $ 37.17 = $ 297
47
* 0.17 *
56%
*
37
)
=
9.79 * $ 37.17 = $ 364
58
* 0.17 *
95%
*
34
)
=
3.91 * $ 37.17 = $ 145
23
Hours
#PLANTS
1‐%FITBASE
294
MEDHISTTIME
Large ( 1 * 0.17 * 55.00% *
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Table 14
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
0
Small (
SECTOR 5. Chromate Pigment Procedures
Large (
6
ALL
1
Small (
SECTOR 6. CCA Producers
Large ( 2
ALL
0
Small (
SECTOR 7. Chromium Catalyst Producers
Large ( 12
ALL
0
Small (
SECTOR 8. Paint and Coating Producers
Large ( 1
ALL
0
Small (
SECTOR 9. Printing Ink Producers
Large ( 12
ALL
Small ( 3
SECTOR 10. Plastic Colorant Producers and Users
Large ( 361
ALL
Small ( 36
SECTOR 11. Plating Mixture Producers
Large ( 2
ALL
Small ( 1
SECTOR 13. Chromium Metal Producers
Large ( 8
ALL
0
Small (
SECTOR 14. Iron and Steel Mills
Large ( 30
ALL
Small ( 1
Large ( 1
CARBON STEEL
Small ( 1
14b. RESHAPING
Large ( 3
RESHAPING
Small ( 1
Page 101
RESPONSES
*
178
)
=
320.71 * $ 27.12 = $ 8,698
1,887
Small ( 5 * 0.17 *
95%
*
130
)
=
94.21 * $ 27.12 = $ 2,555
554
Large ( 32 * 0.17 *
37%
*
3
)
=
5.90 * $ 36.12 = $ 213
35
( 7 * 0.17 *
93%
*
1
)
=
1.08 * $ 36.12 = $ 39
6
(
0 * 0.17 *
37%
*
0
)
=
0.00 * $ 39.76 =
0
0
(
1 * 0.17 *
93%
*
5
)
=
0.86 * $ 39.76 = $ 34
5
(
0 * 0.17 *
92%
*
207
)
=
0.00 * $ 28.67 =
0
0
(
0 * 0.17 *
99%
* 1,561 )
=
0.00 * $ 28.67 =
0
0
(
0 * 0.17 *
89%
*
347
)
=
0.00 * $ 19.13 =
0
0
(
0 * 0.17 *
99%
*
703
)
=
0.00 * $ 19.13 =
0
0
( 1 * 0.17 *
76%
*
5
)
=
0.63 * $ 27.66 = $ 18
4
(
0 * 0.17 *
( 6 * 0.17 *
97%
76%
*
*
17
78
)
)
=
=
0
0.00 * $ 27.66 =
63.55 * $ 27.66 = $ 1,758
0
374
( 1 * 0.17 *
97%
*
5
)
=
0.67 * $ 27.66 = $ 19
4
(
0 * 0.17 *
98%
*
92
)
=
0.00 * $ 19.97 =
0
0
(
0 * 0.17 * 99.70% *
367
)
=
0.00 * $ 19.97 =
0
0
Hours
#PLANTS
1‐%FITBASE
56%
MEDHISTTIME
Large ( 19 * 0.17 *
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Table 14
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, CONTAINER GLASS
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
Large
CONSTRUCTION
Small
State
GOVERNMENT
Local
(
1
* 0.17 *
67%
*
1
)
=
0.11 * $ 31.14 = $ 4
1
(
(
0 * 0.17 *
109 * 0.17 *
97%
0%
*
*
0
1
)
)
=
=
0.00 * $ 31.14 =
0.00 * $ 31.14 =
0
0
0
0
(
0 * 0.17 *
0%
*
1
)
=
0.00 * $ 31.14 =
0
0
(
0 * 0.17 *
76%
*
6
)
=
0.00 * $ 24.56 =
0
0
(
0 * 0.17 *
97%
*
0
)
=
0.00 * $ 24.56 =
0
0
(
0 * 0.17 *
94%
*
1
)
=
0.00 * $ 30.76 =
0
0
(
(
0 * 0.17 *
0 * 0.17 *
99%
55%
*
*
1
38
)
)
=
=
0.00 * $ 30.76 =
* $ 30.76 =
0
0
0
0
(
(
0 * 0.17 *
0 * 0.17 *
95%
88%
*
*
34
1
)
)
=
=
0.00 * $ 30.76 =
0.00 * $ 30.76 =
0
0
0
0
(
(
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 30.76 =
0.00 * $ 30.76 =
0
0
0
0
(
0 * 0.17 *
88%
*
1
)
=
0.00 * $ 30.76 =
0
0
Page 102
RESPONSES
59%
*
48
)
=
0.00 * $ 26.09 =
0
0
Small (
State (
0 * 0.17 *
0 * 0.17 *
96%
59%
*
*
58
0
)
)
=
=
0.00 * $ 26.09 =
0.00 * $ 26.09
0
0
0
0
(
0 * 0.17 *
96%
*
29
)
=
0.00 * $ 26.09
0
0
(
0 * 0.17 *
56%
*
18
)
=
0.00 * $ 26.75 =
0
0
(
0 * 0.17 *
95%
*
0
)
=
0.00 * $ 26.75 =
0
0
(
0 * 0.17 *
88%
*
55
)
=
0.00 * $ 30.79 =
0
0
INDUSTRIAL REHABILITATION AND Small (
MAINTENANCE
State (
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
196
16
)
)
=
=
0.00 * $ 30.79 =
0.00 * $ 30.79 =
0
0
0
0
Local (
Large (
0 * 0.17 *
0 * 0.17 *
88%
88%
*
*
74
1
)
)
=
=
0.00 * $ 30.79 =
0.00 * $ 30.79 =
0
0
0
0
Small (
State (
0 * 0.17 *
0 * 0.17 *
99%
88%
*
*
1
1
)
)
=
=
0.00 * $ 30.79 =
0.00 * $ 30.79 =
0
0
0
0
Local (
Large (
0 * 0.17 *
0 * 0.17 *
88%
88%
*
*
1
48
)
)
=
=
0.00 * $ 30.79 =
0.00 * $ 30.79 =
0
0
0
0
Small (
0 * 0.17 *
99%
*
148 )
7,851
=
0.00 * $ 30.79 =
0
3,277
$ 88,261
0
19,281
Hours
#PLANTS
1‐%FITBASE
0 * 0.17 *
MEDHISTTIME
Large (
EMPAL
Item 12 COST
NONSUPEWAGE
Variables
Table 14
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total
Page 103
Table 15
Respiratory Protection Program: Medical Questionnaire for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Contract Cost for a PLHCP to Review the Medical Questionnaire for Respirator Use
This table calculates the contract cost of the medical questionnaire and review by the licensed physician.
COST = (EMPAL * MEDHISTCOST * 1‐%FITBASE * #PLANTS)
Item 13 COST
(
5,447 * $ 40.31 *
71%
*
1
) = $ 155,873.17
Small
(
1,188 * $ 40.31 *
97%
*
1
) = $ 46,428.29
Large
(
0 * $ 40.31 *
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
0 * $ 40.31 *
2,345 * $ 40.31 *
98%
55%
*
*
1
1
) = $ ‐
) = $ 51,995.14
CONSTRUCTION
Small
Large
(
(
55 * $ 40.31 *
3,247 * $ 40.31 *
95%
88%
*
*
1
1
) = $ 2,123.25
) = $ 115,178.61
Small
State
(
(
2,511 * $ 40.31 *
15 * $ 40.31 *
99%
88%
*
*
1
1
) = $ 100,190.38
) = $ 517.58
Local
(
74 * $ 40.31 *
99%
*
1
) = $ 2,950.20
Large
(
0 * $ 40.31 *
81%
*
1
) = $ ‐
MARITIME
Small
Large
(
(
0 * $ 40.31 *
17 * $ 40.31 *
98%
55%
*
*
1
1
) = $ ‐
) = $ 366.62
CONSTRUCTION
Small
Large
(
(
0 * $ 40.31 *
662 * $ 40.31 *
95%
88%
*
*
1
1
) = $ ‐
) = $ 23,498.09
Small
(
533 * $ 40.31 *
99%
*
1
) = $ 21,272.50
Large
(
32 * $ 40.31 *
81%
*
50
) = $ 52,210.56
Small
Large
(
(
0 * $ 40.31 *
1 * $ 40.31 *
98%
81%
*
*
63
331
) = $ ‐
) = $ 9,944.87
Small
Large
(
(
0 * $ 40.31 *
2 * $ 40.31 *
98%
81%
*
*
1,458
101
) = $ ‐
) = $ 6,077.42
Small
Large
(
(
1 * $ 40.31 * 98% *
1 * $ 40.31 * 55.00% *
18
294
) = $ 668.45
) = $ 6,514.91
Small
(
1
508
) = $ 19,456.17
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
1‐%FITBASE
Large
EMPAL
#PLANTS
MEDHISTCOST
Variables
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* MEDHISTCOST = Cost of medical history questionnaire to be reviewed by a PLHCP.
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY REPAIR)
GENERAL INDUSTRY (COIL COATING)
MARITIME
$ 40.31 *
Page 104
95%
*
Item 13 COST
#PLANTS
1‐%FITBASE
MEDHISTCOST
EMPAL
Variables
Table 15
Large
(
471 * $ 40.31 *
0%
*
1
) = $ ‐
Small
State
(
(
593 * $ 40.31 *
43 * $ 40.31 *
0%
0%
*
*
1
1
) = $ ‐
) = $ ‐
Local
(
186 * $ 40.31 *
0%
*
1
) = $ ‐
Large
(
7 * $ 40.31 *
37%
*
2
) = $ 226.19
Small
(
0 * $ 40.31 *
93%
*
0
) = $ ‐
Large
(
6 * $ 40.31 *
37%
*
2
) = $ 184.15
Small
(
1 * $ 40.31 *
93%
*
1
) = $ 38.57
Large
(
2 * $ 40.31 *
37%
*
3
) = $ 64.99
Small
(
0 * $ 40.31 *
93%
*
0
Large
(
12 * $ 40.31 *
37%
*
5
) = $ ‐
$ ‐
) = $ 969.38
Small
(
0 * $ 40.31 *
93%
*
0
) = $ ‐
Large
(
1 * $ 40.31 *
37%
*
87
) = $ 1,357.14
Small
(
0 * $ 40.31 *
93%
*
137
) = $ ‐
Large
(
12 * $ 40.31 *
37%
*
3
) = $ 541.26
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
(
3 * $ 40.31 *
93%
*
10
) = $ 1,133.73
(
361 * $ 40.31 *
54%
*
1
) = $ 7,856.30
Small
(
36 * $ 40.31 *
95%
*
1
) = $ 1,396.45
Large
(
2 * $ 40.31 *
37%
*
4
) = $ 145.53
Small
(
1 * $ 40.31 *
93%
*
3
) = $ 81.29
Large
(
8 * $ 40.31 *
56%
*
1
) = $ 180.57
Small
(
0 * $ 40.31 *
95%
*
0
) = $ ‐
Large
(
30 * $ 40.31 *
56%
*
37
) = $ 24,838.26
Small
Large
(
(
1 * $ 40.31 *
1 * $ 40.31 *
95%
56%
*
*
12
112
) = $ 643.59
) = $ 1,774.16
Small
(
1 * $ 40.31 *
95%
*
35
) = $ 1,892.92
Large
(
3 * $ 40.31 *
56%
*
37
) = $ 2,320.92
Small
(
1 * $ 40.31 *
95%
*
34
) = $ 927.53
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
Alloy and Stainless Steel
Carbon Steel
14b. RESHAPING INDUSTRY
Reshaping Industry
Page 105
Item 13 COST
(
19 * $ 40.31 *
56%
*
178
) = $ 76,038.56
Small
(
5 * $ 40.31 *
95%
*
130
) = $ 22,336.62
Large
(
32 * $ 40.31 *
37%
*
3
) = $ 1,399.31
Small
(
7 * $ 40.31 *
93%
*
1
) = $ 256.46
Large
(
0 * $ 40.31 *
37%
*
0
) = $ ‐
Small
(
1 * $ 40.31 *
93%
*
5
) = $ 203.05
Large
(
0 * $ 40.31 *
92%
*
207
) = $ ‐
Small
(
0 * $ 40.31 *
99%
*
1,561
) = $ ‐
Large
(
0 * $ 40.31 *
89%
*
347
) = $ ‐
Small
(
0 * $ 40.31 *
99%
*
703
) = $ ‐
Large
(
1 * $ 40.31 *
76%
*
5
) = $ 150.18
Small
Large
(
(
0 * $ 40.31 *
6 * $ 40.31 *
97%
76%
*
*
17
78
) = $ ‐
) = $ 15,068.24
Small
(
1 * $ 40.31 *
97%
*
5
) = $ 159.73
Large
(
0 * $ 40.31 *
98%
*
92
) = $ ‐
Small
(
0 * $ 40.31 * 99.70% *
367
) = $ ‐
Large
(
1 * $ 40.31 *
67%
*
1
) = $ 27.24
Small
Large
(
(
0 * $ 40.31 *
109 $ 40.31 *
97%
0%
*
*
0
1
) = $ ‐
) = $ ‐
Small
(
0
$ 40.31 *
0%
*
1
) = $ ‐
Large
(
0 * $ 40.31 *
76%
*
6
) = $ ‐
Small
(
0 * $ 40.31 *
97%
*
0
) = $ ‐
Large
(
0 * $ 40.31 *
94%
*
1
) = $ ‐
Small
Large
(
(
0 * $ 40.31 *
0 * $ 40.31 *
99%
55%
*
*
1
38
) = $ ‐
) = $ ‐
Small
Large
(
(
0 * $ 40.31 *
0 * $ 40.31 *
95%
88%
*
*
34
1
) = $ ‐
) = $ ‐
Small
(
0 * $ 40.31 *
99%
*
1
) = $ ‐
1‐%FITBASE
Large
EMPAL
#PLANTS
MEDHISTCOST
Variables
Table 15
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
FIBER, FLAT AND CONTAINER GLASS
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
Page 106
Item 13 COST
#PLANTS
1‐%FITBASE
MEDHISTCOST
EMPAL
Variables
Table 15
State
(
0 * $ 40.31 *
88%
*
1
) = $ ‐
Local
(
0 * $ 40.31 *
88%
*
1
) = $ ‐
Large
(
0
59%
48
$ ‐
Small
State
(
(
0 * $ 40.31 *
0 $ 40.31
96%
59%
58
0
) = $ ‐
$ ‐
Local
(
0
96%
29
$ ‐
Large
(
0 * $ 40.31 *
56%
*
18
) = $ ‐
Small
(
0 * $ 40.31 *
95%
*
0
) = $ ‐
Large
(
0 * $ 40.31 *
88%
*
55
) = $ ‐
Small
State
(
(
0 * $ 40.31 *
0 * $ 40.31 *
99%
88%
*
*
196
16
) = $ ‐
) = $ ‐
Local
Large
(
(
0 * $ 40.31 *
0 * $ 40.31 *
88%
88%
*
*
74
1
) = $ ‐
) = $ ‐
Small
State
(
(
0 * $ 40.31 *
0 * $ 40.31 *
99%
88%
*
*
1
1
) = $ ‐
) = $ ‐
Local
Large
(
(
0 * $ 40.31 *
0 * $ 40.31 *
88%
88%
*
*
1
48
) = $ ‐
) = $ ‐
Small
(
0 * $ 40.31 *
99%
Total
*
148
) = $ ‐
7,851
$ 777,479
Government
SECTOR 27. Solid Waste Incineration
$ 40.31
ALL
*
Government
$ 40.31
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 107
Table 16
Respiratory Protection Program: Follow‐up Medical Examination for Respirator Use (§§ 1910.1026(g)(2), 1915.1026(f)(2), and 1926.1126(f)(2));
Employee Time and Cost to Complete the Medical Examination for Respirator Use
This table calculates the burden hour and cost estimate for employees that "fail" the medical history
questionnaire. It is estimated that 23% (EMPMEDXAM) will not pass the medial questionnaire
BURDEN HOURS = (EMPAL * RESPEXAMTIME * %EMPMEDEXAM * 1‐%FITBASE * PLANTS)
COST = BURDEN HOURS * NONSUPEWAGE
Item 12 COST
Responses
5,447 *
3*
23% *
71%
*
1
=
2668.42 * $ 25.49 $ 68,025.07
889
Small
(
1,188 *
3*
23% *
97%
*
1
=
794.81 * $ 21.43 $ 17,032.84
265
Large
(
0*
3*
23% *
81%
*
1
=
0.00 * $ 21.10 $ ‐
Small
Large
(
(
0*
2,345 *
3*
3*
23% *
23% *
98%
55%
*
*
1
1
=
0.00 * $ 21.10 $ ‐
890.11 * $ 21.10 $ 18,781.38
0
297
Small
Large
(
(
55 *
3,247 *
3*
3*
23% *
23% *
95%
88%
*
*
1
1
=
=
36.35 * $ 21.10 $ 766.95
1971.76 * $ 21.10 $ 41,604.14
12
657
Small
State
(
(
2,511 *
15 *
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
1715.17 * $ 21.10 $ 36,190.18
8.86 * $ 21.10 $ 186.96
572
3
Local
(
74 *
3*
23% *
99%
*
1
=
50.50 * $ 21.10 $ 1,065.65
17
Large
(
0*
3*
23% *
81%
*
1
=
0.00 * $ 21.10 $ ‐
0
Small
Large
(
(
0*
17 *
3*
3*
23% *
23% *
98%
55%
*
*
1
1
=
0.00 * $ 21.10 $ ‐
6.28 * $ 21.10 $ 132.43
0
2
Small
Large
(
(
0*
662 *
3*
3*
23% *
23% *
95%
88%
*
*
1
1
=
=
0.00 * $ 21.10 $ ‐
402.27 * $ 21.10 $ 8,487.84
0
134
Small
(
533 *
3*
23% *
99%
*
1
=
364.17 * $ 21.10 $ 7,683.93
121
Large
(
32 *
3*
23% *
81%
*
50
=
893.80 *
26.63 $ 23,801.91
298
Small
Large
(
(
0*
1*
3*
3*
23% *
23% *
98%
81%
*
*
63
331
=
=
0.00 *
170.25 *
26.63 $ ‐
26.63 $ 4,533.70
0
57
Small
Large
(
(
0*
2*
3*
3*
23% *
23% *
98%
81%
* 1,458 =
* 101 =
0.00 *
104.04 *
26.63 $ ‐
26.63 $ 2,770.59
0
35
Small
(
1*
3*
23% *
98%
*
11.44 *
26.63 $ 304.73
4
HOURS
EMPAL
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
* EMPAL = Number of employees who wear respirators who are at or above the AL and at or below the PEL
in the model plant
* RESPEXAMTIME = Employee time, in hours, for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
* NONSUPEWAGE = Non‐Supervisory wage rate
* %EMPMEDEXAM = Percent of employees who "fail" an initial medical exam
Sector 1. Electroplating
ALL
Sector 2. Welding
0
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY (AEROSPACE)
GENERAL INDUSTRY (AUTOBODY
REPAIR)
GENERAL INDUSTRY (COIL
COATING)
Page 108
18
=
Responses
(
1*
3*
23% * 55.00% *
294
=
102.11 *
26.63 $ 2,719.17
34
Small
Large
(
(
1*
471 *
3*
3*
23% *
23% *
95%
0%
*
*
508
1
=
=
333.07 *
0.00 *
26.63 $ 8,869.74
26.63 $ ‐
111
0
Small
State
(
(
593 *
43
3*
3
23% *
23%
0%
0%
*
1
1
=
0.00 *
0.00
26.63 $ ‐
26.63 $ ‐
0
0
Local
(
186
3
23%
0%
0.00
26.63 $ ‐
0
Large
(
7*
3*
23% *
37%
*
2
=
3.87 *
31.15 $ 120.62
1
(
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
ALL
(
Small
SECTOR 6. CCA Producers
Large
(
ALL
(
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
ALL
(
Small
SECTOR 8. Paint and Coating Producers
Large
(
ALL
(
Small
SECTOR 9. Printing Ink Producers
Large
(
ALL
(
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
(
ALL
(
Small
SECTOR 11. Plating Mixture Producers
Large
(
ALL
(
Small
SECTOR 13. Chromium Metal Producers
Large
(
ALL
(
Small
SECTOR 14. Iron and Steel Mills
Large
(
Alloy and Stainless Steel
(
Small
Large
(
Carbon Steel
(
Small
0*
3*
23% *
93%
*
0
=
0.00 *
31.15 $ ‐
0
6*
3*
23% *
37%
*
2
=
3.15 *
30.36 $ 95.71
1
1*
3*
23% *
93%
*
1
=
0.66 *
30.36 $ 20.05
0
2*
3*
23% *
37%
*
3
=
1.11 *
25.72 $ 28.62
0
0*
3*
23% *
93%
*
0
=
0.00 *
25.72 $ ‐
0
12 *
3*
23% *
37%
*
5
=
16.60 *
31.15 $ 516.94
6
0*
3*
23% *
93%
*
0
=
0.00 *
31.15 $ ‐
0
1*
3*
23% *
37%
*
87
=
23.23 *
23.20 $ 539.01
8
0*
3*
23% *
93%
*
137
=
0.00 *
23.20 $ ‐
0
12 *
3*
23% *
37%
*
3
=
9.27 *
23.24 $ 215.34
3
3*
3*
23% *
93%
*
10
=
19.41 *
23.24 $ 451.05
6
361 *
3*
23% *
54%
*
1
=
134.49 *
25.76 $ 3,464.55
45
36 *
3*
23% *
95%
*
1
=
23.91 *
25.76 $ 615.82
8
2*
3*
23% *
37%
*
4
=
2.49 *
23.12 $ 57.60
1
1*
3*
23% *
93%
*
3
=
23.12 $ 32.17
0
8*
3*
23% *
56%
*
1
=
1.39 *
0.00
3.09 *
31.25 $ 96.60
1
0*
3*
23% *
95%
*
0
=
0.00 *
31.25 $ ‐
0
30 *
3*
23% *
56%
*
37
=
425.21 *
31.25 $ 13,287.81
142
1*
1*
3*
3*
23% *
23% *
95%
56%
*
*
12
112
=
=
11.02 *
30.37 *
31.25 $ 344.30
31.25 $ 949.13
4
10
1*
3*
23% *
95%
*
35
=
32.41 *
31.25 $ 1,012.66
11
HOURS
#PLANTS
1‐%FITBASE
Large
EMPAL
Item 12 COST
NONSUPEWAGE
%EMPMEDEXAM
RESPEXAMTIME
Table 16
MARITIME
CONSTRUCTION
GOVERNMENT
1
SECTOR 4. Producers of Chromates
ALL
Page 109
Item 12 COST
Responses
3*
3*
23% *
56%
*
37
=
39.73 *
31.25 $ 1,241.63
13
Small
(
1*
3*
23% *
95%
*
34
=
15.88 *
31.25 $ 496.20
5
Large
(
19 *
3*
23% *
56%
*
178
=
1301.72 *
22.8 $ 29,679.12
434
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
Small
Large
Chromium Catalyst Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
GENERAL INDUSTRY
Small
Large
MARITIME
Small
(
5*
3*
23% *
95%
*
130
=
382.38 *
22.8 $ 8,718.36
127
(
32 *
3*
23% *
37%
*
3
=
23.95 *
30.36 $ 727.27
8
(
7*
3*
23% *
93%
*
1
=
4.39 *
30.36 $ 133.29
1
(
0*
3*
23% *
37%
*
0
=
0.00 *
33.42 $ ‐
0
(
1*
3*
23% *
93%
*
5
=
3.48 *
33.42 $ 116.17
1
(
0*
3*
23% *
92%
*
207
=
0.00 *
24.1 $ ‐
0
(
0*
3*
23% *
99%
* 1,561 =
0.00 *
24.1 $ ‐
0
(
0*
3*
23% *
89%
*
347
=
0.00 *
16.08 $ ‐
0
(
0*
3*
23% *
99%
*
703
=
0.00 *
16.08 $ ‐
0
(
1*
3*
23% *
76%
*
5
=
2.57 *
23.25 $ 59.78
1
(
(
0*
6*
3*
3*
23% *
23% *
97%
76%
*
*
17
78
=
=
0.00 *
257.96 *
23.25 $ ‐
23.25 $ 5,997.47
0
86
(
1*
3*
23% *
97%
*
5
=
2.73 *
23.25 $ 63.58
1
(
0*
3*
23% *
98%
*
92
=
0.00 *
16.79 $ ‐
0
(
0*
3*
23% * 99.70% *
367
=
0.00 *
16.79 $ ‐
0
(
1*
3*
23% *
67%
*
1
=
0.47 *
26.18 $ 12.21
0
(
(
0*
109 *
3*
3*
23% *
23% *
0%
0%
*
*
0
1
=
=
0.00 *
0.00 *
26.18 $ ‐
26.18 $ ‐
0
0
(
0*
3*
23% *
97%
*
1
=
0.00 *
26.18 $ ‐
0
(
0*
3*
23% *
76%
*
6
=
0.00 *
20.65 $ ‐
0
(
0*
3*
23% *
97%
*
0
=
0.00 *
20.65 $ ‐
0
(
0*
3*
23% *
94%
*
1
=
0.00 *
18.59 $ ‐
0
(
(
0*
0*
3*
3*
23% *
23% *
99%
55%
*
*
1
38
=
=
0.00 *
0.00 *
18.59 $ ‐
18.59 $ ‐
0
0
(
0*
3*
23% *
95%
*
34
=
0.00 *
18.59 $ ‐
0
HOURS
EMPAL
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
Table 16
SECTOR 14B. Forging Industry
RESHAPING INDUSTRY
SECTOR 15. Iron and Steel Foundries
ALL
Page 110
23% *
88%
*
1
=
0.00 *
18.59 $ ‐
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
0.00 *
0.00 *
18.59 $ ‐
18.59 $ ‐
0
0
Local
(
0*
3*
23% *
88%
*
1
=
0.00 *
18.59 $ ‐
0
Large
(
0*
3*
23% *
59%
*
48
=
0.00 *
21.93 $ ‐
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
96%
59%
*
*
58
0
=
=
0.00 *
0.00 *
21.93 $ ‐
21.93 $ ‐
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0*
3*
23% *
96%
*
29
=
0.00 *
21.93 $ ‐
0
(
0*
3*
23% *
56%
*
18
=
0.00 *
22.49 $ ‐
0
(
0*
3*
23% *
95%
*
0
=
0.00 *
22.49 $ ‐
0
(
0*
3*
23% *
88%
*
55
=
0.00
25.88 $ ‐
0
INDUSTRIAL REHABILITATION AND Small
MAINTENANCE
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
196
16
=
=
0.00
0.00
25.88 $ ‐
25.88 $ ‐
0
0
Local
Large
(
(
0*
0*
3*
3*
23% *
23% *
88%
88%
*
*
74
1
=
=
0.00
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Small
State
(
(
0*
0*
3*
3*
23% *
23% *
99%
88%
*
*
1
1
=
=
0.00 *
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Local
Large
(
(
0*
0*
3*
3*
23% *
23% *
88%
88%
*
*
1
48
=
=
0.00 *
0.00 *
25.88 $ ‐
25.88 $ ‐
0
0
Small
(
0*
3*
23% *
99%
Total
*
148 =
7,851
0.00 *
13,300
HOURS
EMPAL
Responses
3*
Item 12 COST
0*
NONSUPEWAGE
(
#PLANTS
1‐%FITBASE
Large
RESPEXAMTIME
%EMPMEDEXAM
Table 16
CONSTRUCTION
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Page 111
25.88 $ ‐
$ 312,050
0
4,433
Table 17
Respiratory Protection Program: Follow‐up Medical Examination for Respirator Use;
Contract Cost for a PLHCP to Conduct the Medical Examination for Respirator Use
Employers must use a PLHCP to conduct the follow‐up medical examination. The follow‐up medical
examination allows PLHCPs to obtain additional information that may be useful in arriving at a final medical
recommendation regarding respirator use.
1‐%FITBASE
#PLANTS
Item 13 Cost
5,447 * $ 120.91 *
23% *
71%
*
1
$ 107,542.40
Small
1,188 * $ 120.91 *
23% *
97%
*
1
$ 32,032.51
Large
0 * $ 120.91 *
23% *
81%
*
1
$ ‐
Small
Large
0 * $ 120.91 *
2,345 * $ 120.91 *
23% *
23% *
98%
55%
*
*
1
1
$ ‐
$ 35,873.28
Small
Large
55 * $ 120.91 *
3,247 * $ 120.91 *
23% *
23% *
95%
88%
*
*
1
1
$ 1,464.91
$ 79,465.79
Small
State
2,511 * $ 120.91 *
15 * $ 120.91 *
23% *
23% *
99%
88%
*
*
1
1
$ 69,124.88
$ 357.10
Local
74 * $ 120.91 *
23% *
99%
*
1
$ 2,035.45
Large
0 * $ 120.91 *
23% *
81%
*
1
$ ‐
Small
Large
0 * $ 120.91 *
17 * $ 120.91 *
23% *
23% *
98%
55%
*
*
1
1
$ ‐
$ 252.94
Small
Large
0 * $ 120.91 *
662 * $ 120.91 *
23% *
23% *
95%
88%
*
*
1
1
$ ‐
$ 16,212.16
Small
533 * $ 120.91 *
23% *
99%
*
1
$ 14,676.65
Large
46 * $ 120.91 *
23% *
81%
*
50
$ 51,459.87
Small
0 * $ 120.91 *
23% *
98%
*
63
$ ‐
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
COST = (EMPAL * RESPEXAMCOST * %EMPMEDEXAM * 1‐%FITBASE * #PLANTS)
* EMPAL = Number of employees who wear respirators for more than 5 hours/week and who are at or above the AL
and at or below the PEL in the model plant
* RESPEXAMCOST = Cost for medical exam for respirator use
* %EMPMEDEXAM = Percent of employees that will require a medical exam for respirator use
* 1‐%FITBASE = Percent of plants not conducting annual respirator fit‐test
* #PLANTS = Number of plants represented by the model output
Sector 1. Electroplating
ALL
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. PAINTING
GENERAL INDUSTRY AEROSPACE
Page 112
1‐%FITBASE
#PLANTS
Item 13 Cost
1 * $ 120.91 *
23% *
81%
*
331
$ 6,861.32
Small
Large
0 * $ 120.91 *
2 * $ 120.91 *
23% *
23% *
98%
81%
*
*
1,458
101
$ ‐
$ 4,193.03
Small
Large
1 * $ 120.91 *
1 * $ 120.91 *
23% * 98% *
23% * 55.00% *
18
294
$ 461.19
$ 4,115.20
Small
Large
1 * $ 120.91 *
471 * $ 120.91 *
23% *
23% *
95%
0%
*
*
508
1
$ 13,423.50
$ ‐
Small
State
593 * $ 120.91 *
43 * $ 120.91 *
23% *
23% *
0%
0%
*
*
1
1
$ ‐
$ ‐
Local
186 * $ 120.91 *
23% *
0%
*
1
Large
7 * $ 120.91 *
23% *
37%
*
2
$ ‐
$ ‐
$ 156.06
0 * $ 120.91 *
23% *
93%
*
0
$ ‐
6 * $ 120.91 *
23% *
37%
*
2
$ 127.05
1 * $ 120.91 *
23% *
93%
*
1
2 * $ 120.91 *
23% *
37%
*
3
$ 26.61
$ ‐
$ 44.84
0 * $ 120.91 *
23% *
93%
*
0
$ ‐
12 * $ 120.91 *
23% *
37%
*
5
$ 668.81
0 * $ 120.91 *
23% *
93%
*
0
$ ‐
1 * $ 120.91 *
23% *
37%
*
87
$ 936.34
0 * $ 120.91 *
23% *
93%
*
137
$ ‐
12 * $ 120.91 *
23% *
37%
*
3
$ 373.44
3 * $ 120.91 *
23% *
93%
*
10
$ 782.20
361 * $ 120.91 *
23% *
54%
*
1
$ 5,420.34
36 * $ 120.91 *
23% *
95%
*
1
$ 963.46
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
GENERAL INDUSTRY AUTOBODY
COIL COATINGS
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
Page 113
1‐%FITBASE
#PLANTS
Item 13 Cost
2 * $ 120.91 *
23% *
37%
*
4
$ 100.41
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy and Stainless Steel
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping Industry
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container
small
1 * $ 120.91 *
23% *
93%
*
3
8 * $ 120.91 *
23% *
56%
*
1
$ 56.08
$ ‐
$ 124.58
0 * $ 120.91 *
23% *
95%
*
0
$ ‐
30 * $ 120.91 *
23% *
56%
*
37
$ 17,136.79
1 * $ 120.91 *
1 * $ 120.91 *
23% *
23% *
95%
56%
*
*
12
112
$ 444.04
$ 1,224.06
1 * $ 120.91 *
23% *
95%
*
35
$ 1,305.99
3 * $ 120.91 *
23% *
56%
*
37
$ 1,601.28
1 * $ 120.91 *
23% *
95%
*
34
$ 639.94
19 * $ 120.91 *
23% *
56%
*
178
$ 52,461.69
5 * $ 120.91 *
23% *
95%
*
130
$ 15,410.82
32 * $ 120.91 *
23% *
37%
*
3
$ 965.43
7 * $ 120.91 *
23% *
93%
*
1
$ 176.94
0 * $ 120.91 *
23% *
37%
*
0
$ ‐
1 * $ 120.91 *
23% *
93%
*
5
$ 140.09
0 * $ 120.91 *
23% *
92%
*
207
$ ‐
0 * $ 120.91 *
23% *
99%
*
1,561
$ ‐
0 * $ 120.91 *
23% *
89%
*
347
$ ‐
0 * $ 120.91 *
23% *
99%
*
703
$ ‐
1 * $ 120.91 *
23% *
76%
*
5
$ 103.62
0 * $ 120.91 *
6 * $ 120.91 *
23% *
23% *
97%
76%
*
*
17
78
$ ‐
$ 10,396.11
1 * $ 120.91 *
23% *
97%
*
5
$ 110.21
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
SECTOR 11. Plating Mixture Producers
ALL
Page 114
23% *
98%
*
92
Small
0 * $ 120.91 *
23% * 99.70% *
367
Large
1 * $ 120.91 *
23% *
67%
*
1
$ ‐
$ ‐
$ 18.79
Small
Large
0 * $ 120.91 *
109 * $ 120.91 *
23% *
23% *
0%
0%
*
*
0
1
$ ‐
$ ‐
Small
0 * $ 120.91 *
23% *
0%
*
1
$ ‐
Large
0 * $ 120.91 *
23% *
76%
*
6
$ ‐
Small
0 * $ 120.91 *
23% *
97%
*
0
$ ‐
Large
0 * $ 120.91 *
23% *
94%
*
1
$ ‐
Small
Large
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
99%
55%
*
*
1
38
$ ‐
$ ‐
Small
Large
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
95%
88%
*
*
34
1
$ ‐
$ ‐
Small
State
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
99%
88%
*
*
1
1
$ ‐
$ ‐
Local
0 * $ 120.91 *
23% *
88%
*
1
Large
0 * $ 120.91 *
23% *
59%
*
48
$ ‐
$ ‐
$ ‐
Small
State
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
96%
59%
*
*
58
0
$ ‐
$ ‐
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
0 * $ 120.91 *
23% *
96%
*
29
$ ‐
0 * $ 120.91 *
23% *
56%
*
18
$ ‐
0 * $ 120.91 *
23% *
95%
*
0
$ ‐
0 * $ 120.91 *
23% *
88%
*
55
$ ‐
Small
State
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
99%
88%
*
*
196
16
$ ‐
$ ‐
Local
0 * $ 120.91 *
23% *
88%
*
74
$ ‐
#PLANTS
Item 13 Cost
1‐%FITBASE
0 * $ 120.91 *
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
SECTOR 22. Printing
$ ‐
$ ‐
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
INDUSTRIAL REHABILITATION AND
MAINTENANCE
Page 115
23% *
88%
*
1
$ ‐
HAZARDOUS WASTE‐SITE WORK
Small
State
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
99%
88%
*
*
1
1
$ ‐
$ ‐
Local
Large
0 * $ 120.91 *
0 * $ 120.91 *
23% *
23% *
88%
88%
*
*
1
48
$ ‐
$ ‐
Small
0 * $ 120.91 *
18,109
23% *
99%
*
148
$ ‐
7,851 $ 551,468
#PLANTS
Item 13 Cost
1‐%FITBASE
0 * $ 120.91 *
RESPEXAMCOST
Large
EMPAL
%EMPMEDEXAM
Table 17
REFRACTORY BRICK RESTORATION
Total
Page 116
Table 18
Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv),
1915.1026(g)(2)(iv), and 1926.1126(g)(2)(iv)); Contract Cost to Obtain Cr(VI) Hazard‐Warning Labels for
Bags or Containers Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
This table calculates the contract cost for purchasing appropriate labels for glove disposal containers. OSHA estimates
that 5% of the containers will need new or replacement labels. The number of replacement gloves used throughout the
year is divided by 1,602. The factor of 1,602 is the estimated number of gloves that can fit into a thirty‐gallon garbage
bag.
Cost = GLOVERPL/1,602 * 5%*$0.32 *#PLANTS
Item 13 Cost
#PLANTS
COST
5% of containers need labels
NOGLOVESCONT
GLOVEREPL
Variables
GLOVEREPL = The number of glove replacements per year
NOGLOVESCONT = The number of gloves that can fit into a thirty‐gallon container.
5% of containers need new or replacement labels.
COST = The cost of a label
#PLANTS = Number of model plants
COST = The cost of a label
Sector 1. Electroplating
ALL
Large
Small
54,888,821 / 1,602 1713.13 $0.36
11,970,179 / 1,602 373.60 $0.36
1=
1=
$622
$136
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Large
Small
Large
Small
Large
Small
State
Local
0
0
0
0
0
0
0
0
/
/
/
/
/
/
/
/
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
7,911
8,864
191
108
269
2,160
25
793
=
=
=
=
=
=
=
=
$0
$0
$0
$0
$0
$0
$0
$0
Large
Small
Large
Small
Large
Small
0
0
0
0
0
0
/
/
/
/
/
/
1,602
1,602
1,602
1,602
1,602
1,602
0.00
0.00
0.00
0.00
0.00
0.00
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
10,607
10,797
412
233
405
3,058
=
=
=
=
=
=
$0
$0
$0
$0
$0
$0
125,000 / 1,602
1,000 / 1,602
3.90
0.03
$0.36
$0.36
50 =
63 =
$70
$1
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
AEROSPACE
Large
Small
Page 117
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1.90
0.16
0.44
0.09
0.16
0.06
0.44
0.09
0.16
1.84
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
Large
Small
75,000 / 1,602
0 / 1,602
2.34
0.00
Large
Small
24,000 / 1,602
3,000 / 1,602
Large
Small
GLOVEREPL
Item 13 Cost
COST
61,000
5,000
14,000
3,000
5,000
2,000
14,000
3,000
5,000
59,000
#PLANTS
5% of containers need labels
Large
Small
Large
Small
Large
Small
Large
Small
State
Local
Variables
NOGLOVESCONT
Table 18
=
=
=
=
=
=
=
=
=
=
$229
$83
$16
$1
$17
$12
$121
$138
$1
$601
$0.36
$0.36
2=
0=
$2
$0
0.75
0.09
$0.36
$0.36
2=
1=
$1
$0
8,760 / 1,602
0 / 1,602
0.27
0.00
$0.36
$0.36
3=
0=
$0
$0
Large
Small
57,000 / 1,602
0 / 1,602
1.78
0.00
$0.36
$0.36
5=
0=
$3
$0
Large
Small
12,000 / 1,602
6,000 / 1,602
0.37
0.19
$0.36
$0.36
87 =
137 =
$12
$9
Large
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
GENERAL INDUSTRY
Small
24,000 / 1,602
480 / 1,602
0.75
0.01
$0.36
$0.36
3=
10 =
$1
$0
583 / 1,602
120 / 1,602
0.02
0.00
$0.36
$0.36
86 =
42 =
$1
$0
14,400 / 1,602
2,880 / 1,602
0.45
0.09
$0.36
$0.36
4=
3=
$1
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
1=
0=
$0
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
37 =
12 =
$0
$0
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
/
/
/
/
/
/
/
/
/
/
331
1,458
101
18
294
508
765
4,067
16
899
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
Page 118
COST
Large
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
GENERAL INDUSTRY
Large
Small
MARITIME
Large
Small
CARBON STEEL
$0.36
$0.36
0=
0=
$0
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
37 =
34 =
$0
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
178 =
130 =
$0
$0
3,840 / 1,602
840 / 1,602
0.12
0.03
$0.36
$0.36
3=
1=
$0
$0
0 / 1,602
2,000 / 1,602
0.00
0.06
$0.36
$0.36
0=
5=
$0
$0
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
207 =
1,561 =
$0
$0
7,580 / 1,602
240 / 1,602
0.24
0.01
$0.36
$0.36
347 =
703 =
$30
$2
1,000
0
0
0
1,602
1,602
1,602
1,602
0.03
0.00
0.00
0.00
$0.36
$0.36
$0.36
$0.36
5
17
0
0
=
=
=
=
$0
$0
$0
$0
5,460 / 1,602
360 / 1,602
0.17
0.01
$0.36
$0.36
92 =
367 =
$6
$1
1,602
1,602
1,602
1,602
0.06
0.00
0.94
0.47
$0.36
$0.36
$0.36
$0.36
164
0
21
4
=
=
=
=
$4
$0
$7
$1
11,000 / 1,602
0 / 1,602
0.34
0.00
$0.36
$0.36
6=
0=
$1
$0
0.00
0.00
0.00
0.00
$0.36
$0.36
$0.36
$0.36
2,000
0
30,000
15,000
0
0
0
0
Page 119
/
/
/
/
/
/
/
/
/
/
/
/
1,602
1,602
1,602
1,602
#PLANTS
Item 13 Cost
5% of containers need labels
0.00
0.00
NOGLOVESCONT
0 / 1,602
0 / 1,602
GLOVEREPL
Variables
Table 18
175
93
38
34
=
=
=
=
$0
$0
$0
$0
COST
2,000
1,000
1,000
1,000
/
/
/
/
1,602
1,602
1,602
1,602
0.06
0.03
0.03
0.03
$0.36
$0.36
$0.36
$0.36
1,290
5,162
16
59
=
=
=
=
$29
$58
$0
$1
Large
Small
State
Local
20,000
3,000
20,000
3,000
/
/
/
/
1,602
1,602
1,602
1,602
0.62
0.09
0.62
0.09
$0.36
$0.36
$0.36
$0.36
48
58
0
29
=
=
=
=
$11
$2
$0
$1
0 / 1,602
0 / 1,602
0.00
0.00
$0.36
$0.36
18 =
0=
$0
$0
0.00
0.00
0.00
0.00
0.44
0.09
0.06
0.09
0.44
0.03
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
$0.36
Total
GOVERNMENT
#PLANTS
GLOVEREPL
CONSTRUCTION
Item 13 Cost
5% of containers need labels
Large
Small
State
Local
Variables
NOGLOVESCONT
Table 18
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
Large
Small
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Large
Small
State
Local
Large
Small
State
Local
Large
Small
0
0
0
0
14,000
3,000
2,000
3,000
14,000
1,000
Page 120
/
/
/
/
/
/
/
/
/
/
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
1,602
0
0
0
0
44
143
1
201
48
148
66,329
=
=
=
=
=
=
=
=
$0
$0
$0
$0
$7
$5
$0
$7
$8
$2
$2,258
Table 18a
Protective Work Clothing and Equipment, Removal and Storage (§§1910.1026(h)(2)(iv), 1915.1026(g)(2)(iv),
and 1926.1126(g)(2)(iv)); Clerical Time and Cost to Affix Cr(VI) Hazard‐Warning Labels for Bags or Containers
Used to Store Cr(VI)‐Contaminated Protective Clothing or Equipment
OSHA assumes that it will take 1 minute of clerical employee time to obtain and affix Cr(VI) hazard‐warning labels to glove
disposal containers. OSHA assumes the number of labels will be the same as the number of containers needing labels, as
calculated in Table 18.
Responses
Item 12 Cost
HCLWage
Burden Hours
AFFIX
#PLANTS
Variables
5% of containers need labels
5% of containers need new or replacement labels = see Table 18
* HCLWAGE = Highest clerical wage rate (overestimation)
* AFFIX = 1 minute for a clerical worker to obtain and affix label
#PLANTS = Number of model plants
COST = The cost to obtain and affix the label
Sector 1. Electroplating
ALL
1713.13 *
373.60 *
1 *
1 *
0.02
0.02
=
=
34.26
7.47
*
*
$28.36 =
$28.36 =
$971.69 1713.13
$211.91 373.60
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
7,911
8,864
191
108
269
2,160
25
793
*
*
*
*
*
*
*
*
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
=
=
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
=
=
=
=
=
=
=
=
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
10,607
10,797
412
233
405
3,058
*
*
*
*
*
*
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
=
=
=
=
=
=
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.90
0.03
1.90
0.16
0.44
0.09
0.16
0.06
0.44
0.09
*
*
*
*
*
*
*
*
*
*
50
63
331
1,458
101
18
294
508
765
4,067
*
*
*
*
*
*
*
*
*
*
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
=
=
=
=
3.88
0.04
12.61
4.55
0.88
0.03
0.92
0.63
6.69
7.62
*
*
*
*
*
*
*
*
*
*
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
=
=
=
=
=
=
=
=
=
=
$109.92
$1.11
$357.60
$129.05
$25.08
$0.98
$26.01
$17.99
$189.62
$216.02
193.79
1.95
630.47
227.52
44.21
1.72
45.86
31.72
334.31
380.85
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
AEROSPACE
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
Page 121
Responses
Item 12 Cost
HCLWage
Burden Hours
AFFIX
#PLANTS
Variables
5% of containers need labels
Table 18a
0.16
1.84
*
*
16 *
899 *
0.02
0.02
=
=
0.05
33.11
*
*
$28.36 =
$28.36 =
2.34
0.00
*
*
2 *
0 *
0.02
0.02
=
=
0.10
0.00
*
*
$28.36 =
$28.36 =
$2.76
$0.00
4.87
0.00
0.75
0.09
*
*
2 *
1 *
0.02
0.02
=
=
0.03
0.00
*
*
$28.36 =
$28.36 =
$0.84
$0.05
1.48
0.09
0.27
0.00
*
*
3 *
0 *
0.02
0.02
=
=
0.01
0.00
*
*
$28.36 =
$28.36 =
$0.40
$0.00
0.70
0.00
1.78
0.00
*
*
5 *
0 *
0.02
0.02
=
=
0.19
0.00
*
*
$28.36 =
$28.36 =
$5.25
$0.00
9.26
0.00
0.37
0.19
*
*
87 *
137 *
0.02
0.02
=
=
0.65
0.51
*
*
$28.36 =
$28.36 =
$18.57
$14.59
32.75
25.73
0.75
0.01
SECTOR 10. Plastic Colorant Producers and Users
0.02
ALL
0.00
SECTOR 11. Plating Mixture Producers
0.45
ALL
0.09
SECTOR 13. Chromium Metal Producers
0.00
ALL
0.00
SECTOR 14. Iron and Steel Mills
0.00
GENERAL INDUSTRY
0.00
0.00
CARBON STEEL
0.00
SECTOR 14b. Alloy Stainless Steel Forging Industry
0.00
RESHAPING INDUSTRY
0.00
SECTOR 15. Iron and Steel Foundries
0.00
ALL
0.00
SECTOR 17. Chromium Dye Producers
0.12
ALL
0.03
*
*
3 *
10 *
0.02
0.02
=
=
0.05
0.00
*
*
$28.36 =
$28.36 =
$1.28
$0.09
2.26
0.15
*
*
86 *
42 *
0.02
0.02
=
=
0.03
0.00
*
*
$28.36 =
$28.36 =
$0.89
$0.09
1.57
0.16
*
*
4 *
3 *
0.02
0.02
=
=
0.04
0.01
*
*
$28.36 =
$28.36 =
$1.13
$0.15
1.99
0.26
*
*
1 *
0 *
0.02
0.02
=
=
0.00
0.00
*
*
$28.36 =
$28.36 =
$0.00
$0.00
0.00
0.00
GOVERNMENT
$1.44
2.53
$938.99 1655.48
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
*
*
*
*
37
12
0
0
*
*
*
*
0.02
0.02
0.02
0.02
=
=
=
=
0.00
0.00
0.00
0.00
*
*
*
*
$28.36
$28.36
$28.36
$28.36
=
=
=
=
$0.00
$0.00
$0.00
$0.00
0.00
0.00
0.00
0.00
*
*
37 *
34 *
0.02
0.02
=
=
0.00
0.00
*
*
$28.36 =
$28.36 =
$0.00
$0.00
0.00
0.00
*
*
178 *
130 *
0.02
0.02
=
=
0.00
0.00
*
*
$28.36 =
$28.36 =
$0.00
$0.00
0.00
0.00
*
*
3 *
1 *
0.02
0.02
=
=
0.01
0.00
*
*
$28.36 =
$28.36 =
$0.20
$0.01
0.36
0.03
Page 122
Responses
*
*
0 *
5 *
0.02
0.02
=
=
0.00
0.01
*
*
$28.36 =
$28.36 =
$0.00
$0.18
0.00
0.32
0.00
0.00
*
*
207 *
1,561 *
0.02
0.02
=
=
0.00
0.00
*
*
$28.36 =
$28.36 =
$0.00
$0.00
0.00
0.00
0.24
0.01
*
*
347 *
703 *
0.02
0.02
=
=
1.64
0.11
*
*
$28.36 =
$28.36 =
$46.50
$2.99
81.97
5.27
0.03
0.00
0.00
0.00
*
*
*
*
5
17
0
0
*
*
*
*
0.02
0.02
0.02
0.02
=
=
=
=
0.00
0.00
0.00
0.00
*
*
*
*
$28.36
$28.36
$28.36
$28.36
=
=
=
=
$0.10
$0.00
$0.00
$0.00
0.17
0.00
0.00
0.00
0.17
0.01
*
*
92 *
367 *
0.02
0.02
=
=
0.31
0.08
*
*
$28.36 =
$28.36 =
$8.87
$2.34
15.65
4.13
0.06
0.00
0.94
0.47
*
*
*
*
164
0
21
4
*
*
*
*
0.02
0.02
0.02
0.02
=
=
=
=
0.21
0.00
0.40
0.04
*
*
*
*
$28.36
$28.36
$28.36
$28.36
=
=
=
=
$5.82
$0.00
$11.25
$1.07
10.26
0.00
19.83
1.89
0.34
0.00
*
*
6 *
0 *
0.02
0.02
=
=
0.04
0.00
*
*
$28.36 =
$28.36 =
$1.15
$0.00
2.02
0.00
0.00
0.00
0.00
0.00
0.06
0.03
0.03
0.03
*
*
*
*
*
*
*
*
175
93
38
34
1,290
5,162
16
59
*
*
*
*
*
*
*
*
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
=
=
0.00
0.00
0.00
0.00
1.61
3.22
0.01
0.04
*
*
*
*
*
*
*
*
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
=
=
=
=
=
=
=
=
$0.00
$0.00
$0.00
$0.00
$45.66
$91.39
$0.29
$1.04
0.00
0.00
0.00
0.00
80.51
161.12
0.51
1.83
0.62
0.09
0.62
0.09
*
*
*
*
48
58
0
29
*
*
*
*
0.02
0.02
0.02
0.02
=
=
=
=
0.60
0.11
0.00
0.05
*
*
*
*
$28.36
$28.36
$28.36
$28.36
=
=
=
=
$17.06
$3.07
$0.00
$1.54
30.07
5.41
0.00
2.71
0.00
0.00
*
*
18 *
0 *
0.02
0.02
=
=
0.00
0.00
*
*
$28.36 =
$28.36 =
$0.00
$0.00
0.00
0.00
AFFIX
HCLWage
Item 12 Cost
Burden Hours
0.00
0.06
#PLANTS
Variables
5% of containers need labels
Table 18a
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
FIBER, FLAT, AND CONTAINER GLASS
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Chromium Catalyst Users
Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
Page 123
Responses
Item 12 Cost
HCLWage
Burden Hours
AFFIX
#PLANTS
Variables
5% of containers need labels
Table 18a
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total
0.00
0.00
0.00
0.00
0.44
0.09
0.06
0.09
0.44
0.03
*
*
*
*
*
*
*
*
*
*
0
0
0
0
44
143
1
201
48
148
66,329
*
*
*
*
*
*
*
*
*
*
Page 124
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
=
=
=
=
=
=
=
=
0.00
0.00
0.00
0.00
0.38
0.27
0.00
0.38
0.42
0.09
124.39
*
*
*
*
*
*
*
*
*
*
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
$28.36
=
=
=
=
=
=
=
=
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$10.79
19.03
$7.60
13.40
$0.03
0.06
$10.67
18.80
$11.89
20.97
$2.61
4.60
$3,527.60 6219.32
Table 19
Protective Work Clothing and Equipment, Cleaning and Replacement (§§ 1910.1026(h)(3)(iii),
1915.1026(g)(3)(iii), and 1926.1126(g)(3)(iii))
Employer Time and Cost to Inform Laundry Contractor About Cr(VI)‐Contaminated Protective Clothing or Equipment
The laundering company will be informed of the presence of hexavalent chromium in the laundry at the commencement of the laundering
agreement. Laundering facilities typically collect dirty uniforms for cleaning. It is estimated that the laundering facility will assume the cost burden
for labeling the contaminated laundry and include the cost in their laundering fee. For purposes of calculating burden hours, OSHA assumes that it
will take a maximum of five minutes to notify the laundry, and that 25% of the plants will need to annually notify or reinform the laundry.
0.08
0.08
=
=
*
*
*
*
*
*
*
*
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
=
=
=
=
=
=
=
=
158.22
177.29
3.81
2.16
5.39
43.19
0.51
15.86
*
*
*
*
*
*
*
*
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
=
=
=
=
=
=
=
=
$ 5,448.31
$ 6,104.90
$ 131.32
$ 74.37
$ 185.59
$ 1,487.36
$ 17.42
$ 546.04
7,911
8,864
191
108
269
2,160
25
793
2651.7
2699.4
102.88
58.37
101.17
764.4
*
*
*
*
*
*
0.08
0.08
0.08
0.08
0.08
0.08
=
=
=
=
=
=
212.13
215.95
8.23
4.67
8.09
61.15
*
*
*
*
*
*
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
$ 34.43
=
=
=
=
=
=
$ 7,304.84
$ 7,436.15
$ 283.40
$ 160.80
$ 278.71
$ 2,105.76
10,607
10,797
412
233
405
3,058
12.418
15.638
82.788
364.5
25.296
4.5993
73.472
127.03
191.27
1016.9
4.0608
224.75
*
*
*
*
*
*
*
*
*
*
*
*
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
=
=
=
=
=
=
=
=
=
=
=
=
0.99
1.25
6.62
29.16
2.02
0.37
5.88
10.16
15.30
81.35
0.32
17.98
*
*
*
*
*
*
*
*
*
*
*
*
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
$ 43.34
=
=
=
=
=
=
=
=
=
=
=
=
$ 43.06
$ 54.22
$ 287.05
$ 1,263.80
$ 87.71
$ 15.95
$ 254.75
$ 440.45
$ 663.19
$ 3,525.73
$ 14.08
$ 779.28
50
63
331
1,458
101
18
294
508
765
4,067
16
899
Large
Small
2 0.5204 *
0
0*
0.08
0.08
=
=
0.04 * $ 50.86 = $ 2.12
0.00 * $ 50.86 = $ ‐
2
0
Large
Small
2 0.4943 *
1 0.2472 *
0.08
0.08
=
=
0.04 * $ 49.57 = $ 1.96
0.02 * $ 49.57 = $ 0.98
2
1
RESPONSES
0.02 * $ 34.98 = $ 0.70
0.02 * $ 34.98 = $ 0.70
1
1
SUPWAGE
Item 12 Cost
BURDEN HOURS
NOTIME
0.25 *
0.25 *
#PLANTS
# of PLANTS *25%
Hours = #PLANTS * NOTTIME
Cost = Hours * SUPEWAGE
#PLANTS = Number of plants represented by the model plant * 25% need to notify or reinform.
NOTIME = Time to notify the laundry.
SUPEWAGE = Supervisory Wage Rate
Sector 1. Electroplating
ALL
Large
Small
1
1
Large
Small
Large
Small
Large
Small
State
Local
7,911
8,864
191
108
269
2,160
25
793
1977.8
2216.1
47.669
26.996
67.368
539.92
6.3234
198.21
Large
Small
Large
Small
Large
Small
10,607
10,797
412
233
405
3,058
Large
Small
Large
Small
Large
Small
Large
Small
Large
Small
State
Local
50
63
331
1,458
101
18
294
508
765
4,067
16
899
Sector 2. Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Sector 2A. Mild Steel Welding
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
SECTOR 3. Painting
GENERAL INDUSTRY
AEROSPACE
AUTO BODY
COIL COATING
MARITIME
CONSTRUCTION
GOVERNMENT
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
Page 125
Table 19
SECTOR 6. CCA Producers
Large
Small
3 0.6392 *
0
0*
0.08
0.08
=
=
0.05 * $ 41.98 = $ 2.15
0.00 * $ 41.98 = $ ‐
3
0
Large
Small
5 1.3011 *
0
0*
0.08
0.08
=
=
0.10 * $ 50.86 = $ 5.29
0.00 * $ 50.86 = $ ‐
5
0
Large
Small
87 21.858 *
137 34.348 *
0.08
0.08
=
=
1.75 * $ 37.87 = $ 66.23
2.75 * $ 37.87 = $ 104.07
87
137
Large
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
GENERAL INDUSTRY
Small
Large
CARBON STEEL
Small
SECTOR 14b. Alloy Stainless Steel Forging Industry
Large
RESHAPING INDUSTRY
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
FIBER, FLAT, AND CONTAINER GLASS
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Chromium Catalyst Users
Small
Large
Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
3 0.7531 *
10 2.5102 *
0.08
0.08
=
=
0.06 * $ 37.94 = $ 2.29
0.20 * $ 37.94 = $ 7.62
3
10
86 21.508 *
42 10.52 *
0.08
0.08
=
=
1.72 * $ 42.04 = $ 72.33
0.84 * $ 42.04 = $ 35.38
86
42
4 1.1045 *
3 0.7363 *
0.08
0.08
=
=
0.09 * $ 37.72 = $ 3.33
0.06 * $ 37.72 = $ 2.22
4
3
1
0
0.25 *
0*
0.08
0.08
=
=
0.02 * $ 51.02 = $ 1.02
0.00 * $ 51.02 = $ ‐
1
0
37 9.3161 *
12 2.9882 *
0
0*
0
0*
0.08
0.08
0.08
0.08
=
=
=
=
0.75
0.24
0.00
0.00
$ 38.03
$ 12.20
$ ‐
$ ‐
37
12
0
0
37 9.1404 *
34 8.613 *
0.08
0.08
=
=
0.73 * $ 51.02 = $ 37.31
0.69 * $ 51.02 = $ 35.16
37
34
178 44.556 *
130 32.404 *
0.08
0.08
=
=
3.56 * $ 37.21 = $ 132.63
2.59 * $ 37.21 = $ 96.46
178
130
3 0.7415 *
1 0.2472 *
0.08
0.08
=
=
0.06 * $ 49.57 = $ 2.94
0.02 * $ 49.57 = $ 0.98
3
1
0
0*
5 1.3011 *
0.08
0.08
=
=
0.00 * $ 54.55 = $ ‐
0.10 * $ 54.55 = $ 5.68
0
5
207 51.732 *
1,561 390.34 *
0.08
0.08
=
=
4.14 * $ 39.35 = $ 162.87
31.23 * $ 39.35 = $ 1,228.93
207
1,561
347 86.625 *
703 175.8 *
0.08
0.08
=
=
6.93 * $ 26.25 = $ 181.92
14.06 * $ 26.25 = $ 369.20
347
703
5 1.3559 *
17 4.2937 *
0
0*
0
0*
0.08
0.08
0.08
0.08
=
=
=
=
0.11
0.34
0.00
0.00
$ 4.12
$ 13.04
$ ‐
$ ‐
5
17
0
0
92 22.954 *
367 91.817 *
0.08
0.08
=
=
1.84 * $ 27.39 = $ 50.30
7.35 * $ 27.39 = $ 201.22
92
367
164 41.104 *
0
0*
21 5.2957 *
4 1.0087 *
0.08
0.08
0.08
0.08
=
=
=
=
3.29
0.00
0.42
0.08
$ 140.49
$ ‐
$ 18.10
$ 3.45
164
0
21
4
6 1.4714 *
0
0*
0.08
0.08
=
=
0.12 * $ 33.72 = $ 3.97
0.00 * $ 33.72 = $ ‐
6
0
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
Page 126
*
*
*
*
*
*
*
*
*
*
*
*
$ 51.02
$ 51.02
$ 51.02
$ 51.02
$ 37.96
$ 37.96
$ 37.96
$ 37.96
$ 42.72
$ 42.72
$ 42.72
$ 42.72
=
=
=
=
=
=
=
=
=
=
=
=
Table 19
GENERAL INDUSTRY
MARITIME
CONSTRUCTION
GOVERNMENT
Large
Small
Large
Small
Large
Small
State
Local
175
93
38
34
1,290
5,162
16
59
43.666
23.351
9.6131
8.4687
322.43
1290.6
4.0608
14.682
*
*
*
*
*
*
*
*
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
=
=
=
=
=
=
=
=
3.49
1.87
0.77
0.68
25.79
103.25
0.32
1.17
*
*
*
*
*
*
*
*
$ 42.20
$ 42.20
$ 42.20
$ 42.20
$ 42.20
$ 42.20
$ 42.20
$ 42.20
=
=
=
=
=
=
=
=
$ 147.41
$ 78.83
$ 32.45
$ 28.59
$ 1,088.49
$ 4,356.89
$ 13.71
$ 49.56
175
93
38
34
1,290
5,162
16
59
Large
Small
State
Local
48 12.043 *
58 14.452 *
0
0*
29 7.2259 *
0.08
0.08
0.08
0.08
=
=
=
=
0.96
1.16
0.00
0.58
*
*
*
*
$ 35.80
$ 35.80
$ 35.80
$ 35.80
=
=
=
=
$ 34.49
$ 41.39
$ ‐
$ 20.69
48
58
0
29
Large
Small
18 4.4143 *
0
0*
0.08
0.08
=
=
0.35 * $ 36.71 = $ 12.96
0.00 * $ 36.71 = $ ‐
18
0
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
=
=
=
=
=
=
=
=
=
=
SECTOR 27. Solid Waste Incineration
ALL
GOVERNMENT
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
INDUSTRIAL REHABILITATION AND
MAINTENANCE
HAZARDOUS WASTE‐SITE WORK
REFRACTORY BRICK RESTORATION
Total
Large
Small
State
Local
Large
Small
State
Local
Large
Small
0
0
0
0
44
143
1
201
48
148
0
0
0
0
10.885
35.767
0.2222
50.207
11.996
36.877
16,582
*
*
*
*
*
*
*
*
*
Page 127
0.00
0.00
0.00
0.00
0.87
2.86
0.02
4.02
0.96
2.95
1,327
*
*
*
*
*
*
*
$ 42.27
$ 42.27
$ 42.27
$ 42.27
$ 42.27
$ 42.27
$ 42.27
$ 42.27
* $ 42.27
* $ 42.27
=
=
=
=
=
=
$ ‐
$ ‐
$ ‐
$ ‐
$ 36.81
$ 120.94
$ 0.75
$170
= $ 40.57
= $ 124.70
$48,440.60
0
0
0
0
44
143
1
201
48
148
66,329
Table 20
Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and 1926.1126(i)(1)(i)(A), (i)(3)(i), and
(i)(3)(ii))
Employee Time and Cost to Complete the Initial Medical Examination
This table calculates the burden hours and costs of employee time to complete the initial medical examinations for those employees who are potentially
exposed to airborne hexavalent chromium at or above the action level or who show "signs or symptoms" of exposure to hexavalent chromium before
the implementation of engineering controls. For purposes of estimating the ICR costs, the Agency assumes that: all initial monitoring is completed,
existing employers will experience a 5% turnover of potentially exposed employees with initial medical examinations, and new employers will have no
employees requiring an initial medical examination.
Hours = POTEXEMP*MEDEXAMTIME * #PLANTS
Cost = POTEXEMP* MEDEXAMTIME *NONSUPWAGE * #PLANTS
RESPONSES
1,885 =
1,574 * $25.49
$40,128
10,494
Small
1 0.0464 * 3 *
3,547 =
494 * $25.49
$12,583
3,291
Large
2 0.0973 * 3 *
7,911 =
2,309 * $25.10
$57,952
15,392
Small
Large
0
0
* 3 *
18 0.9242 * 3 *
8,864 =
191 =
0 * $25.10
529 * $25.10
$0
$13,269
0
3,524
Small
Large
1 0.0486 * 3 *
50 2.4807 * 3 *
108 =
269 =
16 * $25.10
2,005 * $25.10
$396
$50,337
105
13,370
Small
Local
5 0.2432 * 3 *
2 0.0973 * 3 *
2,160 =
25 =
1,576 * $25.10
7 * $25.10
$39,551
$185
10,505
49
State
0
* 3 *
793 =
0 * $25.10
$0
0
0.0486 * 3 *
10,607 =
1,548 * $25.10
$38,849
10,319
* 3 *
* 3 *
10,797 =
412 =
0 * $25.10
0 * $25.10
$0
$0
0
0
0.0486 * 3 *
0.9242 * 3 *
233 =
405 =
34 * $25.10
1,122 * $25.10
$855
$28,163
227
7,480
*
3,058 =
892 * $25.10
$22,398
5,949
*
50 =
350 * $31.68
$11,073
2,330
*
*
63 =
331 =
9 * $31.68
594 * $31.68
$273
$18,817
58
3,960
*
*
1,458 =
101 =
201 * $31.68
28 * $31.68
$6,373
$885
1,341
186
*
*
18 =
294 =
3 * $31.68
121 * $31.68
$80
$3,836
17
807
*
508 =
70 * $31.68
$2,211
465
Hours
6 0.2783 * 3 *
#PLANTS
Large
POTEXEMP
Item 12 Cost
NONSUPEWAGE
MEDEXAMTIME
POTEXEMP * 5%
Variables
* POTEXEMP * 5% = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* MEDEXAMTIME = Employee time, in hours, for a medical examination.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants
Sector 1. Electroplating
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
0
Sector 2. Mild Steel Welding
Large
1
Small
Large
0
0
Small
Large
1
18
General Industry
0
0
Maritime
Construction
2
0.0973 * 3
Small
SECTOR 3. PAINTING GENERAL INDUSTRY
Large
47 2.3456 * 3
AEROSPACE
1
0.046 * 3
Small
Large
12 0.5979 * 3
Autobody
1
0.046 * 3
Small
Large
2
0.092 * 3
Coil Coating
1
0.046 * 3
Small
Large
3
0.1373 * 3
Maritime
1
0.0458 * 3
Small
Page 128
RESPONSES
0.1087 * 3 *
765 =
249 * $31.68
$7,902
1,663
Small
Local
1
9
0.0362 * 3 *
0.4373 * 3 *
4,067 =
16 =
442 * $31.68
21 * $31.68
$14,003
$675
2,947
142
State
1
0.0312 * 3 *
899 =
84 * $31.68
$2,669
562
Large
7
0.3643 * 3 *
2=
2 * $37.06
$84
15
* 3 *
0=
0 * $37.06
$0
0
Large
25 1.249 * 3 *
2=
7 * $36.12
$268
49
Small
3 0.1561 * 3 *
1=
0 * $36.12
$17
3
0.1278 * 3 *
3=
1 * $30.60
$30
7
* 3 *
0=
0 * $30.60
$0
0
1.3531 * 3 *
5=
21 * $37.06
$783
141
Hours
2
#PLANTS
Large
POTEXEMP
Item 12 Cost
NONSUPEWAGE
MEDEXAMTIME
POTEXEMP * 5%
Variables
Table 20
Construction
Government
SECTOR 4. Producers of Chromates
ALL
0
Small
SECTOR 5. Chromate Pigment Procedures
ALL
0
SECTOR 6. CCA Producers
Large
3
ALL
0
Small
0
SECTOR 7. Chromium Catalyst Producers
Large
27
ALL
Small
0
0
* 3 *
0=
0 * $37.06
$0
0
Large
5 0.2602 * 3 *
87 =
68 * $27.60
$1,884
455
Small
2 0.1041 * 3 *
137 =
43 * $27.60
$1,184
286
Large
0
0
* 3 *
3=
0 * $27.65
$0
0
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
0
0
* 3 *
10 =
0 * $27.65
$0
0
0
0
* 3 *
86 =
0 * $30.64
$0
0
0
0
* 3 *
42 =
0 * $30.64
$0
0
2
0.1104 * 3 *
4=
1 * $27.50
$40
10
1
0.0736 * 3 *
3=
1 * $27.50
$18
4
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
13
0.65
* 3 *
1=
2 * $37.17
$72
13
0
* 3 *
0=
0 * $37.17
$0
0
40
2.0039 * 3 *
37 =
224 * $37.17
$8,328
1,493
1
10
0.0703 * 3 *
0.4922 * 3 *
12 =
112 =
3 * $37.17
165 * $37.17
$94
$6,136
17
1,100
1
0.0703 * 3 *
35 =
7 * $37.17
$276
49
3
0.1406 * 3 *
37 =
15 * $37.17
$573
103
* 3 *
34 =
0 * $37.17
$0
0
1.3502 * 3 *
178 =
722 * $27.12
$19,579
4,813
0
0
27
0
5
0.27
* 3 *
130 =
105 * $27.12
$2,848
700
0
0
* 3 *
3=
0 * $36.12
$0
0
0
0
* 3 *
1=
0 * $36.12
$0
0
Page 129
Item 12 Cost
RESPONSES
NONSUPEWAGE
0
* 3 *
0=
0 * $39.76
$0
0
Small
3 0.1561 * 3 *
5=
2 * $39.76
$97
16
Large
0
0
* 3 *
207 =
0 * $28.67
$0
0
Small
0
0
* 3 *
1,561 =
0 * $28.67
$0
0
Large
0
0
* 3 *
347 =
0 * $19.13
$0
0
Small
0
0
* 3 *
703 =
0 * $19.13
$0
0
0.0452 * 3 *
5=
1 * $27.66
$20
5
Hours
0
#PLANTS
MEDEXAMTIME
Large
POTEXEMP
POTEXEMP * 5%
Variables
Table 20
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
Large
1
Small
Large
10
0
* 3 *
0.4972 * 3 *
17 =
78 =
0 * $27.66
116 * $27.66
$0
$3,207
0
773
Small
2
0.0904 * 3 *
5=
1 * $27.66
$34
8
ALL
0
Fiber, Flat and Container Glass
SECTOR 22. Printing
Large
0
0
* 3 *
92 =
0 * $19.97
$0
0
Small
0
0
* 3 *
367 =
0 * $19.97
$0
0
0.0504 * 3 *
164 =
25 * $31.14
$775
166
Small
Large
0
0
* 3 *
10 0.5043 * 3 *
0=
21 =
0 * $31.14
32 * $31.14
$0
$998
0
Small
5 0.2522 * 3 *
4=
3 * $31.14
$95
20
Large
0
0
* 3 *
6=
0 * $24.56
$0
0
Small
0
0
* 3 *
0=
0 * $24.56
$0
0
Large
1 0.0467 * 3 *
175 =
24 * $30.76
$753
163
Small
Large
0
0
* 3 *
* 3 *
93 =
38 =
0 * $30.76
0 * $30.76
$0
$0
0
0
Small
Large
0
0
* 3 *
3 0.1299 * 3 *
34 =
1,290 =
0 * $30.76
503 * $30.76
$0
$15,465
0
3,351
Small
State
1 0.0433 * 3 *
1 0.0312 * 3 *
5,162 =
16 =
671 * $30.76
2 * $30.76
$20,633
$47
4,472
10
Local
1 0.0312 * 3 *
59 =
6 * $30.76
$169
37
Large
0
0
* 3 *
48 =
0 * $26.09
$0
0
Small
State
0
0
0
0
* 3 *
* 3 *
58 =
0=
0 * $26.09
0 * $26.09
$0
$0
0
0
Local
0
0
* 3 *
29 =
0 * $26.09
$0
0
Large
2 0.0981 * 3 *
18 =
5 * $26.75
$139
35
Small
0
0=
0 * $26.75
$0
0
ALL
SECTOR 24. Chromium Catalyst Users
Large
1
Catalyst Users
Chromium Catalyst Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
0
0
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
0
* 3 *
Page 130
Item 12 Cost
RESPONSES
NONSUPEWAGE
0
0
* 3 *
55 =
0 * $30.79
$0
0
Small
State Gov't
0
0
0
0
* 3 *
* 3 *
196 =
16 =
0 * $30.79
0 * $30.79
$0
$0
0
0
Local Gov't
Large
0
0
0
0
* 3 *
* 3 *
74 =
44 =
0 * $30.79
0 * $30.79
$0
$0
0
0
Small
State Gov't
0
0
0
0
* 3 *
* 3 *
143 =
1=
0 * $30.79
0 * $30.79
$0
$0
0
0
Local Gov't
Large
0
0
* 3 *
9 0.4443 * 3 *
201 =
48 =
0 * $30.79
64 * $30.79
$0
$1,969
0
426
Small
1 0.0444 * 3 *
148 =
72,329
20 * $30.79
$605
$460,684
131
114,055
Hours
#PLANTS
MEDEXAMTIME
Large
POTEXEMP
POTEXEMP * 5%
Variables
Table 20
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 131
17,140
Table 21
Initial Medical Examination (§§ 1910.1026(k)(1)(i)(A), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(1)(i)(A), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination
This table calculates the cost for a contractor PLHCP to conduct initial medical examinations.
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
COST = POTEXEMP * MEDEXAMCOST * # PLANTS
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms"
before the implementation of engineering controls * 5%
*MEDEXAMCOST = Cost of medical exam
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
6 0.2783 *
$142 *
1,885 =
$74,404
Small
1 0.0464 *
$142 *
3,547 =
$23,331
Large
2 0.0973 *
$142 *
7,911 =
$109,132
Small
Large
0 0.0000 *
18 0.9242 *
$142 *
$142 *
8,864 =
191 =
$0
$24,988
Small
Large
1 0.0486 *
50 2.4807 *
$142 *
$142 *
108 =
269 =
$745
$94,792
Small
State
5 0.2432 *
2 0.0973 *
$142 *
$142 *
2,160 =
25 =
$74,481
$349
Local
0 0.0000 *
$142 *
793 =
$0
Large
1 0.0486 *
$142 *
10,607 =
$73,159
Small
Large
0 0.0000 *
0 0.0000 *
$142 *
$142 *
10,797 =
412 =
$0
$0
Small
Large
1 0.0486 *
18 0.9242 *
$142 *
$142 *
233 =
405 =
$1,610
$53,036
*
$142 *
3,058 =
$42,179
*
$142 *
50 =
$16,522
*
*
$142 *
$142 *
63 =
331 =
$408
$4,319
*
*
$142 *
$142 *
1,458 =
101 =
$9,509
$1,320
*
$142 *
18 =
$120
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
2 0.0973
Small
SECTOR 3. PAINTING General Industry
Large
47 2.3456
AEROSPACE
1 0.0460
Small
Large
2 0.0920
Auto Body
1 0.0460
Small
Large
2 0.0920
Coil Coating
1 0.0460
Small
Page 132
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
3 0.1373 *
$142 *
294 =
$5,723
Small
Large
1 0.0458 *
2 0.1087 *
$142 *
$142 *
508 =
765 =
$3,298
$11,791
Small
State
1 0.0362 *
9 0.4373 *
$142 *
$142 *
4,067 =
16 =
$20,894
$1,007
Local
1 0.0312 *
$142 *
899 =
$3,982
Large
7 0.3643 *
$142 *
2=
$108
Small
0 0.0000 *
$142 *
0=
$0
Large
25 1.2490 *
$142 *
2=
$350
Small
3 0.1561 *
$142 *
1=
$22
Large
3 0.1278 *
$142 *
3=
$46
Small
0 0.0000 *
$142 *
0=
$0
Large
27 1.3531 *
$142 *
5=
$999
Small
0 0.0000 *
$142 *
0=
$0
Large
5 0.2602 *
$142 *
87 =
$3,226
Small
2 0.1041 *
$142 *
137 =
$2,028
Large
0 0.0000 *
$142 *
3=
$0
Small
0 0.0000 *
$142 *
10 =
$0
Large
0 0.0000 *
$142 *
86 =
$0
Small
0 0.0000 *
$142 *
42 =
$0
Large
2 0.1104 *
$142 *
4=
$69
Small
1 0.0736 *
$142 *
3=
$31
Large
13 0.6500 *
$142 *
1=
$92
Small
0 0.0000 *
$142 *
0=
$0
Large
40 2.0039 *
$142 *
37 =
$10,589
Small
1 0.0703 *
$142 *
12 =
$119
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
General Industry
Page 133
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
10 0.4922 *
$142 *
112 =
$7,802
Small
1 0.0703 *
$142 *
35 =
$351
Large
3 0.1406 *
$142 *
37 =
$729
Small
0 0.0000 *
$142 *
34 =
$0
Large
27 1.3502 *
$142 *
178 =
$34,122
Small
5 0.2700 *
$142 *
130 =
$4,963
Large
0 0.0000 *
$142 *
3=
$0
Small
0 0.0000 *
$142 *
1=
$0
Large
0 0.0000 *
$142 *
0=
$0
Small
3 0.1561 *
$142 *
5=
$115
Large
0 0.0000 *
$142 *
207 =
$0
Small
0 0.0000 *
$142 *
1,561 =
$0
Large
0 0.0000 *
$142 *
347 =
$0
Small
0 0.0000 *
$142 *
703 =
$0
Large
1 0.0452 *
$142 *
5=
$35
Small
Large
0 0.0000 *
10 0.4972 *
$142 *
$142 *
17 =
78 =
$0
$5,481
Small
2 0.0904 *
$142 *
5=
$58
Large
0 0.0000 *
$142 *
92 =
$0
Small
0 0.0000 *
$142 *
367 =
$0
Large
1 0.0504 *
$142 *
164 =
$1,176
Small
0 0.0000 *
$142 *
0=
$0
Carbon Steel
SECTOR 14B. Forging Industry
Reshaping
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
General Industry
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Page 134
COST
#PLANTS
MEDEXAMCOST
POTEXEMP*5%
Variables
POTEXEMP
Table 21
Large
10 0.5043 *
$142 *
21 =
$1,515
Small
5 0.2522 *
$142 *
4=
$144
Large
0 0.0000 *
$142 *
6=
$0
Small
0 0.0000 *
$142 *
0=
$0
Large
1 0.0467 *
$142 *
175 =
$1,157
Small
Large
0 0.0000 *
0 0.0000 *
$142 *
$142 *
93 =
38 =
$0
$0
Small
Large
0 0.0000 *
3 0.1299 *
$142 *
$142 *
34 =
1,290 =
$0
$23,762
Small
State
1 0.0433 *
1 0.0312 *
$142 *
$142 *
5,162 =
16 =
$31,703
$72
Local
1 0.0312 *
$142 *
59 =
$260
Large
0 0.0000 *
$142 *
48 =
$0
Small
State
0 0.0000 *
1 0.0438 *
$142 *
$142 *
58 =
0=
$0
$0
Local
0 0.0000 *
$142 *
29 =
$0
Large
2 0.0981 *
$142 *
18 =
$246
Small
0 0.0000 *
$142 *
0=
$0
Large
0 0.0000 *
$142 *
55 =
$0
Small
State
0 0.0000 *
0 0.0000 *
$142 *
$142 *
196 =
16 =
$0
$0
Local
Large
0 0.0000 *
0 0.0000 *
$142 *
$142 *
74 =
44 =
$0
$0
Small
State
0 0.0000 *
0 0.0000 *
$142 *
$142 *
143 =
1=
$0
$0
Local
Large
0 0.0000 *
9 0.4443 *
$142 *
$142 *
201 =
48 =
$0
$3,023
Small
1 0.0444 *
$142 *
148 =
72,329
$929
$786,420
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 135
Table 22
Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii);
and 1926.1126(i)(2)(ii), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Annual Medical Examination
This table calculates the burden hours and costs associated with employee time to complete the annual medical examination in the year after the initial medical
examination is completed. These hours and costs are for existing emplyoees who are potentially exposed at or above the action level or who show "signs and
symptoms" of exposure. The Agency assumes that a varying percentage of existing plants will have employees who will complete these exams; these percentages
are specific to each sector and plant size (large or small). Employees who work for employers who conduct annual examinations, %BASEMED, will incur a
incremental medical exam time of 3 hours. Employees who are not working for employers providing annual medical examinations (1‐%BASEMED) will incur three
hours for a full limited medical exam.
COST = (LIMEMPAL + MEDEXAMADDERM)*(LIMPARTIME * %BASEMED)+(LIMFULLTIME*(1‐%BASEMED))*PLANTS
Hours= Burden Hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
LIMPARTIME = Incremental employee time, in hours, for a partial limited exam
%BASEMED = Percentage of employers who are providing annual medical examinations
Responses
(
3+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1,885 =
15,741
$25.49
$401,282
5,247
Small
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
3,547 =
0
$25.49
$0
0
Large
(
0+
0.000000 ) * ( ( 3 *
5.00%
) +(
3.00 * (
1 ‐
5.00%
) ) *
7,911 =
0
$25.10
$0
0
Small
Large
(
(
0+
14 +
0.000000 ) * ( ( 3 *
2.918484 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,864 =
191 =
0
9,460
$25.10
$25.10
$0
$237,451
0
3,153
Small
Large
(
(
1+
26 +
0.000000 ) * ( ( 3 *
2.918484 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
108 =
269 =
315
23,594
$25.10
$25.10
$7,910
$592,202
105
7,865
Small
State
(
(
3+
0+
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,160 =
25 =
18,909
0
$25.10
$25.10
$474,617
$0
6,303
0
Local
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
793 =
0
$25.10
$0
0
Large
(
0+
0.000000 ) * ( ( 3 *
5.00%
) +(
3.00 * (
1 ‐
5.00%
) ) * 10,607 =
0
$25.10
$0
0
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) * 10,797 =
) ) *
412 =
0
0
$25.10
$25.10
$0
$0
0
0
Small
Large
(
(
0+
10 +
0.000000 ) * ( ( 3 *
0.000000 ) * ( ( 3 *
0.00%
5.00%
) +(
) +(
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
233 =
405 =
0
11,811
$25.10
$25.10
$0
$296,457
0
3,937
Small
(
1+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
3,058 =
8,924
$25.10
$223,982
2,975
Large
( 46 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
50 =
6,854
$31.68
$217,117
2,285
Small
Large
(
0+
( 1 +
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
63 =
331 =
0
914
$31.68
$31.68
$0
$28,949
0
305
Small
Large
(
0+
( 2 +
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,458 =
101 =
0
558
$31.68
$31.68
$0
$17,691
0
186
Small
Large
( 1 +
( 2 +
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
294 =
51
0
$31.68
$31.68
$1,608
$0
17
538
Small
Large
(
1+
( 2 +
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
508 =
765 =
1,396
4,989
$31.68
$31.68
$44,211
$158,041
465
1,663
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
3.00 * (
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
4,067 =
16 =
0
0
$31.68
$31.68
$0
$0
0
0
Local
( 9 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
899 =
23,589
$31.68
$747,276
7,863
Large
( 7 +
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
2=
46
$37.06
$1,686
15
Small
(
0.000000 ) * ( ( 3 *
3.00 * (
1 ‐
0.00%
0=
0
$37.06
$0
0
Hours
Large
#PLANTS
Cost
NONSUPEWAGE
1‐%BASEMED
LIMPFULLTIME
%BASEMED
LIMPARTIME
MEDEXAMADDERM
LIMEMPAL
Variables
LIMITFULLTIME = Employee time, in hours, for a full limited medical exam
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Auto Body
Coil Coating
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
0+
0.00%
) +(
Page 136
) ) *
9+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
2=
56
$36.12
$2,007
19
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
3
$36.12
$111
1
( 2 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
3=
13
$30.60
$400
4
(
0.000000 ) * ( ( 3 *
) +(
3.00 * (
1 ‐
) ) *
0=
0
$30.60
$0
0
( 12 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
5=
195
$37.06
$7,226
65
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
0=
0
$37.06
$0
0
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
87 =
273
$27.60
$7,535
91
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
137 =
0
$27.60
$0
0
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
3=
0
$27.65
$0
0
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
10 =
0
$27.65
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
86 =
0
$30.64
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
42 =
0
$30.64
$0
0
( 2 +
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
4=
29
$27.50
$805
10
( 1 +
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
3=
7
$27.50
$179
2
( 8 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
24
$37.17
$892
8
(
0.000000 ) * ( ( 3 *
) +(
3.00 * (
1 ‐
0.00%
) ) *
0=
0
$37.17
$0
0
( 30 + 0.006497
) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
37 =
3,302
$37.17
$122,751
1,101
( 1 + 0.000309
( 1 + 0.000155
) * ( ( 3 * 30.00% ) + (
) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
12 =
112 =
50
236
$37.17
$37.17
$1,875
$8,768
17
79
( 1 + 0.000309
) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
35 =
148
$37.17
$5,514
49
0+
0+
0.00%
0.00%
0.00%
Hours
(
#PLANTS
Responses
NONSUPEWAGE
1‐%BASEMED
LIMPFULLTIME
%BASEMED
LIMPARTIME
Cost
SECTOR 5. Chromate Pigment Procedures
Large
ALL
Small
SECTOR 6. CCA Producers
Large
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
MEDEXAMADDERM
LIMEMPAL
Variables
Table 22
(
0+
0.000619 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
37 =
0
$37.17
$3
0
(
0+
0.000155 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
34 =
0
$37.17
$1
0
( 19 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
178 =
10,106
$27.12
$274,112
3,369
( 5 +
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
130 =
1,750
$27.12
$47,465
583
(
0 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
3=
0
$36.12
$0
0
(
0 +
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
1=
0
$36.12
$0
0
(
0+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
0=
0
$39.76
$0
0
(
1+
0.000000 ) * ( ( 3 * 100.00% ) + (
3.00 * (
1 ‐ 100.00% ) ) *
5=
16
$39.76
$646
5
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
207 =
0
$28.67
$0
0
(
0+
0.000000 ) * ( ( 3 *
0.00%
) +(
3.00 * (
1 ‐
0.00%
) ) *
1,561 =
0
$28.67
$0
0
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
347 =
0
$19.13
$0
0
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
703 =
0
$19.13
$0
0
( 1 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
5=
15
$27.66
$407
5
(
0+
( 8 +
0.000000 ) * ( ( 3 * 10.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
10.00% ) ) *
80.00% ) ) *
17 =
78 =
0
1,897
$27.66
$27.66
$0
$52,476
0
632
( 2 +
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
5=
25
$27.66
$678
8
Page 137
Cost
Responses
NONSUPEWAGE
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
92 =
0
$19.97
$0
0
Small
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
367 =
0
$19.97
$0
0
Large
(
0 +
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
164 =
0
$31.14
$0
0
Small
Large
(
(
0+
5+
0.000000 ) * ( ( 3 * 80.00% ) + (
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
21 =
0
321
$31.14
$31.14
$0
$9,982
0
107
Small
(
3+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
4=
37
$31.14
$1,141
12
Large
(
0+
0.000000 ) * ( ( 3 * 80.00% ) + (
3.00 * (
1 ‐
80.00% ) ) *
6=
0
$24.56
$0
0
Small
(
0+
0.000000 ) * ( ( 3 * 10.00% ) + (
3.00 * (
1 ‐
10.00% ) ) *
0=
0
$24.56
$0
0
Large
(
0+
0.000000 ) * ( ( 3 * 25.00% ) + (
3.00 * (
1 ‐
25.00% ) ) *
175 =
0
$30.76
$0
0
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 25.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
93 =
38 =
0
0
$30.76
$30.76
$0
$0
0
0
Small
Large
(
(
0+
1+
0.000000 ) * ( ( 3 * 0.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
34 =
1,290 =
0
3,351
$30.76
$30.76
$0
$103,097
0
1,117
Small
State
(
(
1+
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
5,162 =
16 =
13,415
30
$30.76
$30.76
$412,664
$937
4,472
10
Local
(
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
59 =
110
$30.76
$3,386
37
Large
(
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
48 =
0
$26.09
$0
0
Small
State
(
(
0+
1+
0.000000 ) * ( ( 3 * 30.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
58 =
0=
0
0
$26.09
$26.09
$0
$0
0
0
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
29 =
0
$26.09
$0
0
(
2+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
18 =
104
$26.75
$2,780
35
(
0+
0.000000 ) * ( ( 3 * 30.00% ) + (
3.00 * (
1 ‐
30.00% ) ) *
0=
0
$26.72
$0
0
(
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
55 =
0
$30.79
$0
0
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
196 =
16 =
0
0
$30.79
$30.79
$0
$0
0
0
Local
Large
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
74 =
44 =
0
0
$30.79
$30.79
$0
$0
0
0
Small
State
(
(
0+
0+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
143 =
1=
0
0
$30.79
$30.79
$0
$0
0
0
Local
Large
(
(
0+
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
3.00 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
201 =
48 =
0
128
$30.79
$30.79
$0
$3,938
0
43
Small
(
1+
0.000000 ) * ( ( 3 * 50.00% ) + (
3.00 * (
1 ‐
50.00% ) ) *
148 =
72,329
393
163,184
$30.79
Hours
#PLANTS
0+
%BASEMED
(
LIMPARTIME
Large
LIMEMPAL
1‐%BASEMED
LIMPFULLTIME
MEDEXAMADDERM
Variables
Table 22
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 138
$12,106
131
$4,534,363 54,933
Table 23
Annual Medical Examination (§§ 1910.1026(k)(2)(ii), (k)(3)(i), and (k)(3)(ii); 1915.1026(i)(2)(ii), (i)(3)(i), and (i)(3)(ii); and
1926.1126(i)(2)(ii), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination
This table calculates the cost for a contractor PLHCP to conduct the annual medical examination. Employers who were providing annual examinations (%BASEMED) will incur a partial
medical exam cost per employee. Employers who were NOT providing annual medical examinations (1‐%BASEMED) will incur the full cost of a medical exam per employee.
COST = (LIMEMPAL + MEDEXAMADDERM)*((PARTFULLCOST*%BASEMED)+(LIMFULLCOST *(1‐%BASEMED))*PLANTS
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
PARTFULLCOST = The cost of a partial medical exam for employers who are providing annual medical examinations.
%BASEMED = Percentage of employers who are providing annual medical examinations
COST
#PLANTS
1‐%BASEMED
LIMFULLCOST
%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
LIMEMPAL
Variables
LIMITFULLCOST = The cost of a medical examination for employers who are not providing annual medical examinations
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
1,885 =
$ 634,456
Small
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
3,547 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 120.92 *
5.00%
) +(
$142 * (
1 ‐
5.00%
) ) *
7,911 =
$ ‐
Small
Large
(
(
0+
14 +
0.000000 ) * ( ( 120.92 *
2.918484 ) * ( ( 120.92 *
0.00%
5.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,864 =
191 =
$ ‐
$ 443,863
Small
Large
(
(
1+
26 +
0.000000 ) * ( ( 120.92 *
2.918484 ) * ( ( 120.92 *
0.00%
5.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
108 =
269 =
$ 14,896
$ 1,106,993
Small
State
(
(
3+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
0.00%
5.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,160 =
25 =
$ 893,774
$ ‐
Local
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
) +(
$142 * (
1 ‐
0.00%
) ) *
793 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 120.92 *
5.00%
) +(
$142 * (
1 ‐
5.00%
) ) *
10,607 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
0.00%
5.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,797 =
412 =
$ ‐
$ ‐
Small
Large
(
(
0+
10 +
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
0.00%
5.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
233 =
405 =
$ ‐
$ 554,162
) +(
$142 * (
1 ‐
0.00%
) ) *
3,058 =
$ 421,792
) +(
$142 * (
1 ‐
80.00% ) ) *
50 =
$ 285,789
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
63 =
331 =
$ ‐
$ 38,105
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,458 =
101 =
$ ‐
$ 23,287
) +(
) +(
$142 * (
$142 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
294 =
$ 2,223
$ 65,069
) +(
) +(
$142 * (
$121 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
508 =
765 =
$ 61,109
$ 201,081
) +(
) +(
$121 * (
$121 * (
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
4,067 =
16 =
) +(
$121 * (
1 ‐ 100.00% ) ) *
899 =
$ 950,787
) +(
$142 * (
1 ‐
50.00% ) ) *
2=
$ 1,992
) +(
$142 * (
1 ‐
0.00%
0=
$ ‐
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
(
1+
0.000000 ) * ( ( 120.92 *
0.00%
Small
SECTOR 3. PAINTING General Industry
Large
( 46 +
0.000000 ) * ( ( 120.92 *
80.00%
AEROSPACE
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
1+
0.000000 ) * ( ( 120.92 *
80.00%
Auto Body
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 120.92 *
80.00%
Coil Coating
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
Small
Large
(
2+
0.000000 ) * ( ( 120.92 * 100.00%
Maritime
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
Small
(
2+
0.000000 ) * ( ( 120.92 * 100.00%
Large
Construction
(
0+
0.000000 ) * ( ( 120.92 * 100.00%
Small
(
0+
0.000000 ) * ( ( 120.92 * 100.00%
State
Government
(
9+
0.000000 ) * ( ( 120.92 * 100.00%
Local
SECTOR 4. Producers of Chromates
Large
(
7+
0.000000 ) * ( ( 120.92 *
50.00%
ALL
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
Small
Page 139
) ) *
$ ‐
$ ‐
COST
#PLANTS
1‐%BASEMED
LIMFULLCOST
%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
LIMEMPAL
Variables
Table 23
SECTOR 5. Chromate Pigment Procedures
Large
(
9+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
2=
$ 2,240
Small
(
1+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
1=
$ 124
Large
(
2+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
3=
$ 527
Small
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
) +(
$142 * (
1 ‐
) ) *
0=
$ ‐
Large
(
12 +
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
5=
$ 7,860
Small
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
Large
(
1+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
87 =
Small
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
137 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
3=
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
10 =
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
86 =
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
42 =
$ ‐
(
2+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
4=
$ 1,282
(
1+
0.000000 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
3=
$ 294
(
8+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
1=
$ 967
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
) +(
$142 * (
1 ‐
0.00%
) ) *
0=
$ ‐
(
30 +
0.006497 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
37 =
$ 144,585
(
(
1+
1+
0.000309 ) * ( ( 120.92 *
0.000155 ) * ( ( 120.92 *
30.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
12 =
112 =
$ 2,279
$ 10,327
(
1+
0.000309 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
35 =
$ 6,702
(
0+
0.000619 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
37 =
$ 3
(
0+
0.000155 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
34 =
$ 1
(
19 +
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
178 =
$ 421,421
(
5+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
130 =
$ 81,501
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
3=
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
1=
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
(
1+
0.000000 ) * ( ( 120.92 *
100.00%
) +(
$142 * (
1 ‐ 100.00% ) ) *
5=
$ 655
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
) +(
$142 * (
1 ‐
0.00%
) ) *
207 =
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
0.00%
) +(
$142 * (
1 ‐
0.00%
) ) *
1,561 =
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
347 =
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
703 =
$ ‐
(
1+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
5=
(
0+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
17 =
ALL
SECTOR 6. CCA Producers
ALL
0.00%
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
$ 11,004
ALL
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Page 140
$ 613
$ ‐
8+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
78 =
$ 79,116
Small
(
2+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
5=
$ 1,142
Large
(
0+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
92 =
$ ‐
Small
(
0+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
367 =
$ ‐
Large
(
0+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
164 =
$ ‐
Small
Large
(
(
0+
5+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
80.00%
80.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
21 =
$ ‐
$ 13,364
Small
(
3+
0.000000 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
4=
$ 1,655
Large
(
0+
0.000000 ) * ( ( 120.92 *
80.00%
) +(
$142 * (
1 ‐
80.00% ) ) *
6=
$ ‐
Small
(
0+
0.000000 ) * ( ( 120.92 *
10.00%
) +(
$142 * (
1 ‐
10.00% ) ) *
0=
$ ‐
Large
(
0+
0.000000 ) * ( ( 120.92 *
25.00%
) +(
$142 * (
1 ‐
25.00% ) ) *
175 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
0.00%
25.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
93 =
38 =
$ ‐
$ ‐
Small
Large
(
(
0+
1+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
0.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
34 =
1,290 =
$ ‐
$ 146,745
Small
State
(
(
1+
1+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
50.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
5,162 =
16 =
$ 587,375
$ 1,333
Local
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
59 =
$ 4,819
Large
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
48 =
$ ‐
Small
State
(
(
0+
1+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
30.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
58 =
0=
$ ‐
$ ‐
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
29 =
$ ‐
(
2+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
18 =
$ 4,551
(
0+
0.000000 ) * ( ( 120.92 *
30.00%
) +(
$142 * (
1 ‐
30.00% ) ) *
0=
$ ‐
(
0+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
55 =
$ ‐
Small
State
(
(
0+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
50.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
196 =
16 =
$ ‐
$ ‐
Local
Large
(
(
0+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
50.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
74 =
44 =
$ ‐
$ ‐
Small
State
(
(
0+
0+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
50.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
143 =
1=
$ ‐
$ ‐
Local
Large
(
(
0+
1+
0.000000 ) * ( ( 120.92 *
0.000000 ) * ( ( 120.92 *
50.00%
50.00%
) +(
) +(
$142 * (
$142 * (
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
201 =
48 =
$ ‐
$ 5,601
Small
(
1+
0.000000 ) * ( ( 120.92 *
50.00%
) +(
$142 * (
1 ‐
50.00% ) ) *
Total
148 =
72,329
$ 17,218
$ 7,254,681
%BASEMED
COST
#PLANTS
(
LIMFULLCOST
Large
LIMEMPAL
1‐%BASEMED
LIMPPARTCOST
MEDEXAMADDERM
Variables
Table 23
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
General Industry
Chromium Service Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Page 141
Table 24
Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost for Complete Initial Medical Examination with Additional Tests
The burden hour and cost equation is for the employee time to receive additional tests after the employee is found to have abnormal initial
medical exam results. The Agency assumes that .5% of employees potentially exposed employees at or above the AL and workers with "signs
and symptoms" will be found to have abnormal exam results and will receive additional testing.
BURDEN HOURS = POTEXEMP * 5% * %PREVABN * MEDEXAMADDAL * #PLANTS
COST = Burden Hours * NONSUPWAGE
Responses
0.50% *
4
*
1,885 =
10 *
$25.49
$268
3
Small
0.0464 *
0.50% *
4
*
3,547 =
3*
$25.49
$84
1
Large
0.0973 *
0.50% *
4
*
7,911 =
15 *
$25.10
$386
4
Small
Large
0.0000 *
0.9242 *
0.50% *
0.50% *
4
4
*
*
8,864 =
191 =
0*
4*
$25.10
$25.10
$0
$88
0
1
Small
Large
0.0486 *
2.4807 *
0.50% *
0.50% *
4
4
*
*
108 =
269 =
0*
13 *
$25.10
$25.10
$3
$336
0
3
Small
State
0.2432 *
0.0973 *
0.50% *
0.50% *
4
4
*
*
2,160 =
25 =
11 *
0*
$25.10
$25.10
$264
$1
3
0
Local
0.0000 *
0.50% *
4
*
793 =
0*
$25.10
$0
0
Large
0.0486 *
0.50% *
4
*
10,607 =
10 *
$25.10
$259
3
Small
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
10,797 =
412 =
0*
0*
$25.10
$25.10
$0
$0
0
0
Small
Large
0.0486 *
0.9242 *
0.50% *
0.50% *
4
4
*
*
233 =
405 =
0*
7
$25.10
$25.10
$6
$188
0
2
Small
0.0973 *
0.50% *
4
*
3,058 =
6
$25.10
$149
1
Large
2.3456 *
0.50% *
4
*
50 =
2*
$31.68
$74
1
Small
0.0460 *
0.50% *
4
*
63 =
0*
$31.68
$2
0
NONSUPEWAGE
0.2783 *
Hours
Cost
Sector 1. Electroplating
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
* POTEXEMP * 5% = Total number of employees potentially exposed at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDEXAMADDAL = Employee time for medical examination with additional testing
#PLANTS = Number of Plants
NONSUPEWAGE = Nonsupervisory wage rate.
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
Page 142
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
331 =
1*
$31.68
$19
0
Small
Large
0.0460 *
0.0920 *
0.50% *
0.50% *
4
4
*
*
1,458 =
101 =
1*
0*
$31.68
$31.68
$42
$6
0
0
Small
Large
0.0460 *
0.1373 *
0.50% *
0.50% *
4
4
*
*
18 =
294 =
0*
1*
$31.68
$31.68
$1
$26
0
0
Small
Large
0.0458 *
0.1087 *
0.50% *
0.50% *
4
4
*
*
508 =
765 =
0*
2*
$31.68
$31.68
$15
$53
0
0
Small
State
0.0362 *
0.4373 *
0.50% *
0.50% *
4
4
*
*
4,067 =
16 =
3*
0*
$31.68
$31.68
$93
$5
1
0
Local
0.0312 *
0.50% *
4
*
899 =
1*
$31.68
$18
0
Large
0.3643 *
0.50% *
4
*
2=
0*
$37.06
$1
0
0.0000 *
0.50% *
4
*
0=
0*
$37.06
$0
0
1.2490 *
0.50% *
4
*
2=
0*
$36.12
$2
0
0.1561 *
0.50% *
4
*
1=
0*
$36.12
$0
0
0.1278 *
0.50% *
4
*
3=
0*
$30.60
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$30.60
$0
0
1.3531 *
0.50% *
4
*
5=
0*
$37.06
$5
0
0.0000 *
0.50% *
4
*
0=
0*
$37.06
$0
0
0.2602 *
0.50% *
4
*
87 =
0*
$27.60
$13
0
0.1041 *
0.50% *
4
*
137 =
0*
$27.60
$8
0
0.0000 *
0.50% *
4
*
3=
0*
$27.65
$0
0
0.0000 *
0.50% *
4
*
10 =
0*
$27.65
$0
0
0.0000 *
0.50% *
4
*
86 =
0*
$30.64
$0
0
0.0000 *
0.50% *
4
*
42 =
0*
$30.64
$0
0
0.1104 *
0.50% *
4
*
4=
0*
$27.50
$0
0
0.0736 *
0.50% *
4
*
3=
0*
$27.50
$0
0
0.6500 *
0.50% *
4
*
1=
0*
$37.17
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$37.17
$0
0
Hours
0.0920 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
AUTOBODY REPAIR
COIL COATING
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
All
Small
SECTOR 5. Chromate Pigment Procedures
Large
All
Small
SECTOR 6. CCA Producers
Large
All
Small
SECTOR 7. Chromium Catalyst Producers
Large
All
Small
SECTOR 8. Paint and Coating Producers
Large
All
Small
SECTOR 9. Printing Ink Producers
Large
All
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
All
Small
SECTOR 11. Plating Mixture Producers
Large
All
Small
SECTOR 13. Chromium Metal Producers
Large
All
Small
Page 143
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
37 =
1*
$37.17
$56
0
0
Small
Large
0.0703 *
0.4922 *
0.50% *
0.50% *
4
4
*
*
12 =
112 =
0*
1*
$37.17
$37.17
$1
$41
0
0
Small
0.0703 *
0.50% *
4
*
35 =
0*
$37.17
$2
0
Large
0.1406 *
0.50% *
4
*
37 =
0*
$37.17
$4
0
Small
0.0000 *
0.50% *
4
*
34 =
0*
$37.17
$0
0
Large
1.3502 *
0.50% *
4
*
178 =
5*
$27.12
$131
1
Small
0.2700 *
0.50% *
4
*
130 =
1*
$27.12
$19
0
Large
0.0000 *
0.50% *
4
*
3=
0*
$36.12
$0
0
Small
SECTOR 18. Chromium Sulfate Producers
Large
All
Small
SECTOR 19. Chemical Distributors
Large
All
Small
SECTOR 20. Textile Dyeing
Large
All
Small
SECTOR 21. Colored Glass Producers
Large
All
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
All
Small
SECTOR 24. Chromium Catalyst Users
Large
All
Small
Large
Catalyst Service Companies
Small
0.0000 *
0.50% *
4
*
1=
0*
$36.12
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$39.76
$0
0
0.1561 *
0.50% *
4
*
5=
0*
$39.76
$1
0
0.0000 *
0.50% *
4
*
207 =
0*
$28.67
$0
0
0.0000 *
0.50% *
4
*
1,561 =
0*
$28.67
$0
0
0.0000 *
0.50% *
4
*
347 =
0*
$19.13
$0
0
0.0000 *
0.50% *
4
*
703 =
0*
$19.13
$0
0
0.0452 *
0.50% *
4
*
5=
0*
$27.66
$0
0
0.0000 *
0.4972 *
0.50% *
0.50% *
4
4
*
*
17 =
78 =
0*
1*
$27.66
$27.66
$0
$21
0
0
0.0904 *
0.50% *
4
*
5=
0*
$27.66
$0
0
0.0000 *
0.50% *
4
*
92 =
0*
$19.97
$0
0
0.0000 *
0.50% *
4
*
367 =
0*
$19.97
$0
0
0.0504 *
0.50% *
4
*
164 =
0*
$31.14
$5
0
0.0000 *
0.5043 *
0.50% *
0.50% *
4
4
*
*
0=
21 =
0*
0*
$31.14
$31.14
$0
$7
0
0
0.2522 *
0.50% *
4
*
4=
0*
$31.14
$1
0
Hours
2.0039 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
SECTOR 14. Iron and Steel Mills
All
Carbon Steel
14B.
Reshaping Industry
SECTOR 15. Iron and Steel Foundries
All
SECTOR 17. Chromium Dye Producers
All
Page 144
NONSUPEWAGE
Cost
Responses
0.50% *
4
*
6=
0*
$24.56
$0
0
Small
0.0000 *
0.50% *
4
*
0=
0*
$24.56
$0
0
Large
0.0467 *
0.50% *
4
*
175 =
0*
$30.76
$5
0
Small
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
93 =
38 =
0*
0*
$30.76
$30.76
$0
$0
0
0
Small
0.0000 *
0.50% *
4
*
34 =
0*
$30.76
$0
0
Large
0.1299 *
0.50% *
4
*
1,290 =
3*
$30.76
$103
1
Small
Local
0.0433 *
0.0312 *
0.50% *
0.50% *
4
4
*
*
5,162 =
16 =
4*
0*
$30.76
$30.76
$138
$0
1
0
State
0.0312 *
0.50% *
4
*
59 =
0*
$30.76
$1
0
Large
0.0000 *
0.50% *
4
*
48 =
0*
$30.76
$0
0
Small
Local
0.0000 *
0.50% *
4
*
58 =
0*
$30.76
$0
0
0.0438 *
0.50% *
4
*
0=
0*
$26.09
$0
0
State
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
0.0000 *
0.50% *
4
*
29 =
0*
$26.09
$0
0
0.0981 *
0.50% *
4
*
18 =
0*
$26.75
$0
0
0.0000 *
0.50% *
4
*
0=
0*
$26.75
$0
0
0.0000 *
0.50% *
4
*
55 =
0*
$30.79
$0
0
Small
State Gov't
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
196 =
16 =
0*
0*
$30.79
$30.79
$0
$0
0
0
Local Gov't
Large
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
74 =
44 =
0*
0*
$30.79
$30.79
$0
$0
0
0
Small
State Gov't
0.0000 *
0.0000 *
0.50% *
0.50% *
4
4
*
*
143 =
1=
0*
0*
$30.79
$30.79
$0
$0
0
0
Local Gov't
Large
0.0000 *
0.4443 *
0.50% *
0.50% *
4
4
*
*
201 =
48 =
0*
0*
$30.79
$30.79
$0
$13
0
0
Small
0.0444 *
0.50% *
Total
4
*
148 =
72,329
0*
111
$30.79
$4
$2,964
0
28
Hours
0.0000 *
#PLANTS
MEDEXAMADDAL
Large
POTEXEMP * 5%
%PREVABN
Variables
Table 24
SECTOR 25. Refractory Brick Producers
All
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration &
Maintenance
Page 145
Table 25
Initial Medical Examination with Additional Tests (§§1910.1026(k)(1)(i)(B) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(1)(i)(B) and (i)(3)(i)‐(i)(3)(iii))
Contract Cost for a PLHCP to Conduct the Initial Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual
medical examination results.
0.2783
*
0.50% *
$241.82
*
1,885 = $634
Small
0.0464
*
0.50% *
$241.82
*
3,547 = $199
Large
0.0973
*
0.50% *
$241.82
*
7,911 = $931
Small
Large
0.0000
0.9242
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
8,864 = $0
191 = $213
Small
Large
0.0486
2.4807
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
108 = $6
269 = $808
Small
State
0.2432
0.0973
*
0.50% *
0.50% *
$241.82
*
2,160 = $635
*
$241.82
*
25 = $3
Local
0.0000
*
0.50% *
$241.82
*
793 = $0
Large
0.0486
*
0.50% *
$241.82
*
10,607 = $624
Small
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
10,797 = $0
412 = $0
Small
Large
0.0486
0.9242
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
233 = $14
405 = $452
Small
0.0973
*
0.50% *
$241.82
*
3,058 = $360
Large
2.3456
*
0.50% *
$241.82
*
50 = $141
Small
Large
0.0460
0.0920
*
0.50% *
0.50% *
$241.82
*
63 = $3
$241.82
*
331 = $37
Small
Large
0.0460
0.0920
*
0.50% *
0.50% *
$241.82
*
1,458 = $81
*
$241.82
*
101 = $11
Small
0.0460
*
0.50% *
$241.82
*
18 = $1
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
* POTEXEMP * 5% = Total number of new potentially exposed employees at or above the AL and workers with "signs and symptoms" before
the implementation of engineering controls.
* %PREVABN = Percent of previously exposed employees who will be found to have abnormal exam results.
*MEDCOSTADD = Cost for medical examination with additional testing
#PLANTS = Number of Plants
Sector 1. Electroplating
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
*
General Industry AUTOBODY
COIL COATING
Page 146
0.1373
*
0.50% *
$241.82
*
294 = $49
Small
Large
0.0458
0.1087
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
508 = $28
765 = $101
Small
0.0362
*
0.50% *
$241.82
*
4,067 = $178
State
0.4373
*
0.50% *
$241.82
*
16 = $9
Local
0.0312
*
0.50% *
$241.82
*
899 = $34
Large
0.3643
*
0.50% *
$241.82
*
2 = $1
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Large
1.2490
*
0.50% *
$241.82
*
2 = $3
Small
0.1561
*
0.50% *
$241.82
*
1 = $0
Large
0.1278
*
0.50% *
$241.82
*
3 = $0
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Large
1.3531
*
0.50% *
$241.82
*
5 = $9
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Large
0.2602
*
0.50% *
$241.82
*
87 = $28
Small
0.1041
*
0.50% *
$241.82
*
137 = $17
Large
0.0000
*
0.50% *
$241.82
*
3 = $0
Small
0.0000
*
0.50% *
$241.82
*
10 = $0
Large
0.0000
*
0.50% *
$241.82
*
86 = $0
Small
0.0000
*
0.50% *
$241.82
*
42 = $0
Large
0.1104
*
0.50% *
$241.82
*
4 = $1
Small
0.0736
*
0.50% *
$241.82
*
3 = $0
Large
0.6500
*
0.50% *
$241.82
*
1 = $1
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Large
2.0039
*
0.50% *
$241.82
*
37 = $90
Small
0.0703
*
0.50% *
$241.82
*
12 = $1
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
Maritime
Construction
Governments
SECTOR 4. Producers of Chromates
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
Page 147
0.4922
*
0.50% *
$241.82
*
112 = $67
Small
0.0703
*
0.50% *
$241.82
*
35 = $3
Large
0.1406
*
0.50% *
$241.82
*
37 = $6
Small
0.0000
*
0.50% *
$241.82
*
34 = $0
Large
1.3502
*
0.50% *
$241.82
*
178 = $291
Small
0.2700
*
0.50% *
$241.82
*
130 = $42
Large
0.0000
*
0.50% *
$241.82
*
3 = $0
Small
0.0000
*
0.50% *
$241.82
*
1 = $0
Large
0.0000
*
0.50% *
$241.82
*
0 = $0
Small
0.1561
*
0.50% *
$241.82
*
5 = $1
Large
0.0000
*
0.50% *
$241.82
*
207 = $0
Small
0.0000
*
0.50% *
$241.82
*
1,561 = $0
Large
0.0000
*
0.50% *
$241.82
*
347 = $0
Small
0.0000
*
0.50% *
$241.82
*
703 = $0
Large
0.0452
*
0.50% *
$241.82
*
5 = $0
Small
Large
0.0000
0.4972
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
17 = $0
78 = $47
Small
0.0904
*
0.50% *
$241.82
*
5 = $0
Large
0.0000
*
0.50% *
$241.82
*
92 = $0
Small
0.0000
*
0.50% *
$241.82
*
367 = $0
Large
0.0504
*
0.50% *
$241.82
*
164 = $10
Small
Large
0.0000
0.5043
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
0 = $0
21 = $13
Small
0.2522
*
0.50% *
$241.82
*
4 = $1
Large
0.0000
*
0.50% *
$241.82
*
6 = $0
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat, Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
Page 148
0.0467
*
0.50% *
$241.82
*
175 = $10
Small
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
93 = $0
38 = $0
Small
Large
0.0000
0.1299
*
0.50% *
0.50% *
$241.82
*
34 = $0
$241.82
*
1,290 = $203
Small
State
0.0433
0.0312
*
0.50% *
0.50% *
$241.82
*
5,162 = $270
*
$241.82
*
16 = $1
Local
0.0312
*
0.50% *
$241.82
*
59 = $2
Large
0.0000
*
0.50% *
$241.82
*
48 = $0
Small
State
0.0000
0.0438
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
58 = $0
0 = $0
Local
0.0000
*
0.50% *
$241.82
*
29 = $0
Large
0.0981
*
0.50% *
$241.82
*
18 = $2
Small
0.0000
*
0.50% *
$241.82
*
0 = $0
Large
0.0000
*
0.50% *
$241.82
*
55 = $0
Small
State Gov't
0.0000
0.0000
*
0.50% *
0.50% *
$241.82
*
196 = $0
*
$241.82
*
16 = $0
Local Gov't
Large
0.0000
0.0000
*
*
0.50% *
0.50% *
$241.82
$241.82
*
*
74 = $0
44 = $0
Small
State Gov't
0.0000
0.0000
*
0.50% *
0.50% *
$241.82
*
143 = $0
$241.82
*
1 = $0
Local Gov't
Large
0.0000
0.4443
*
0.50% *
0.50% *
$241.82
*
201 = $0
*
$241.82
*
Small
0.0444
*
0.50% *
$241.82
*
Cost
MEDCOSTADD
Large
#PLANTS
%PREVABN
POTEXEMP * 5%
Table 25
SECTOR 26. Woodworking
General Industry
Maritime
*
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
*
48 = $26
Refractory Brick Restoration & Maintenance
Total
Page 149
148 = $8
72,329
$6,706
Table 26
Annual Medical Examination with Additional Tests (1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii) and (i)(3)(i)‐(i)(3)(iii); and
1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii))
Employee Time and Cost to Complete the Annual Medical Examination with Additional Tests
This table calculates the burden hours and costs for the time it takes an employee to receive additional tests after the employee is found to
have abnormal annual medical exam test results.
Hours = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * ADDMEDTIME * #PLANTS
Cost =Hours *NONSUPWAGE
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
ADDMEDTIME
%ALABN
MEDEXAMADDERM
LIMEMPAL
Variables
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the
implementation of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year (and therefore requiring a limited or comprehensive
medical exam who will be found to have abnormal results)
*ADDMEDTIME = Three hours for an employee to receive additional testing after exam tests are abnormal.
*NONSUPEWAGE ‐ Non‐supervisory wage rate
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
( 3 +
0.00000 ) *
0.50% * 3 *
1,885 =
79 * $25.49
$2,006
26
Small
( 0 +
0.00000 ) *
0.50% * 3 *
3,547 =
0 * $21.43
$0
0
Large
( 0 +
0.00000 ) *
0.50% * 3 *
7,911 =
0 * $25.10
$0
0
Small
Large
( 0 +
( 14 +
0.00000 ) *
2.91848 ) *
0.50% * 3 *
0.50% * 3 *
8,864 =
191 =
0 * $21.43
47 * $25.10
$0
$1,187
0
16
Small
Large
( 1 +
( 26 +
0.00000 ) *
2.91848 ) *
0.50% * 3 *
0.50% * 3 *
108 =
269 =
2 * $22.43
118 * $25.10
$35
$2,961
1
39
Small
Local
( 3 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
2,160 =
25 =
95 * $23.43
0 * $25.10
$2,215
$0
32
0
State
( 0 +
0.00000 ) *
0.50% * 3 *
793 =
0 * $24.43
$0
0
Large
( 0 +
0.00000 ) *
0.50% * 3 *
10,607 =
0 * $25.10
$0
0
Small
Large
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
10,797 =
412 =
0 * $24.43
0 * $25.10
$0
$0
0
0
Small
Large
( 0 +
( 10 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
233 =
405 =
0 * $25.43
59 * $25.10
$0
$1,482
0
20
*
3,058 =
45 * $26.43
$1,179
15
*
50 =
34 * $31.68
$1,086
11
*
*
63 =
331 =
0 * $26.43
5 * $31.68
$0
$145
0
2
*
*
1,458 =
101 =
0 * $27.43
3 * $31.68
$0
$88
0
1
*
18 =
0 * $28.43
$7
0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
Small ( 1 + 0.00000 ) * 0.50% * 3
SECTOR 3. PAINTING GENERAL INDUSTRY
Large ( 46 + 0.00000 ) * 0.50% * 3
AEROSPACE
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 1 + 0.00000 ) * 0.50% * 3
Autobody
Small ( 0 + 0.00000 ) * 0.50% * 3
Large ( 2 + 0.00000 ) * 0.50% * 3
Coil Coating
Small ( 1 + 0.00000 ) * 0.50% * 3
Table 26
Large
( 2 +
0.00000 ) *
0.50% * 3 *
294 =
8 * $31.68
$256
3
Small
Large
( 1 +
( 2 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
508 =
765 =
7 * $29.43
25 * $31.68
$205
$790
2
8
Small
Local
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
4,067 =
16 =
0 * $30.43
0 * $31.68
$0
$0
0
0
State
( 9 +
0.00000 ) *
0.50% * 3 *
899 =
118 * $31.43
$3,707
39
Large
( 7 +
0.00000 ) *
0.50% * 3 *
2=
0 * $37.06
$8
0
Small
SECTOR 5. Chromate Pigment Procedures
ALL
Large
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
( 9 +
0.00000 ) *
0.50% * 3 *
2=
0 * $36.12
$10
0
Small
( 1 +
0.00000 ) *
0.50% * 3 *
1=
0 * $31.43
$0
0
Large
( 2 +
0.00000 ) *
0.50% * 3 *
3=
0 * $30.60
$2
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
5=
1 * $37.06
$36
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00378 ) *
0.50% * 3 *
87 =
1 * $27.60
$38
0
+
0.00000 ) *
0.50% * 3 *
137 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
3=
0 * $27.65
$0
0
+
0.00000 ) *
0.50% * 3 *
10 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
86 =
0 * $30.64
$0
0
+
0.00000 ) *
0.50% * 3 *
42 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
4=
0 * $27.50
$4
0
+
0.00000 ) *
0.50% * 3 *
3=
0 * $31.43
$1
0
+
0.00000 ) *
0.50% * 3 *
1=
0 * $37.17
$4
0
+
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
+
0.00650 ) *
0.50% * 3 *
37 =
17 * $37.17
$614
6
+
+
0.00031 ) *
0.00015 ) *
0.50% * 3 *
0.50% * 3 *
12 =
112 =
0 * $31.43
1 * $37.17
$8
$44
0
0
+
0.00031 ) *
0.50% * 3 *
35 =
1 * $31.43
$23
0
+
0.00062 ) *
0.50% * 3 *
37 =
0 * $37.17
$0
0
+
0.00015 ) *
0.50% * 3 *
34 =
0 * $31.43
$0
0
+
0.00000 ) *
0.50% * 3 *
178 =
51 * $27.12
$1,371
17
+
0.00000 ) *
0.50% * 3 *
130 =
9 * $31.43
$275
3
+
0.00000 ) *
0.50% * 3 *
3=
0 * $36.12
$0
0
+
0.00000 ) *
0.50% * 3 *
1=
0 * $31.43
$0
0
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
SECTOR 6. CCA Producers
ALL
Small ( 0
SECTOR 7. Chromium Catalyst Producers
Large ( 12
ALL
Small ( 0
SECTOR 8. Paint and Coating Producers
Large ( 1
ALL
Small ( 0
SECTOR 9. Printing Ink Producers
Large ( 0
ALL
Small ( 0
SECTOR 10. Plastic Colorant Producers and Users
Large ( 0
ALL
Small ( 0
SECTOR 11. Plating Mixture Producers
Large ( 2
ALL
Small ( 1
SECTOR 13. Chromium Metal Producers
Large ( 8
ALL
Small ( 0
SECTOR 14. Iron and Steel Mills
Large ( 30
Alloy Stainless Steel
Small ( 1
Large ( 1
Carbon Steel
Small ( 1
14B. Alloy Stainless Steel Forging Industry
Large ( 0
Reshaping
Small ( 0
SECTOR 15. Iron and Steel Foundries
Large ( 19
ALL
Small ( 5
SECTOR 17. Chromium Dye Producers
Large ( 0
ALL
Small ( 0
Table 26
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
Catalyst Users
Small
Large
Chromium Catalyst Service
Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
Industrial Rehabilitation &
Maintenance
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $39.76
$0
0
( 1 +
0.00000 ) *
0.50% * 3 *
5=
0 * $31.43
$3
0
( 0 +
0.00000 ) *
0.50% * 3 *
207 =
0 * $28.67
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
1,561 =
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
347 =
0 * $19.13
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
703 =
0 * $31.43
$0
0
( 1 +
0.00000 ) *
0.50% * 3 *
5=
0 * $27.66
$2
0
( 0 +
( 8 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
17 =
78 =
0 * $31.43
9 * $27.66
$0
$262
0
3
( 2 +
0.00000 ) *
0.50% * 3 *
5=
0 * $31.43
$4
0
( 0 +
0.00000 ) *
0.50% * 3 *
92 =
0 * $19.97
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
367 =
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
164 =
0 * $31.14
$0
0
( 0 +
( 5 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
0=
21 =
0 * $31.43
2 * $31.14
$0
$50
0
1
( 3 +
0.00000 ) *
0.50% * 3 *
4=
0 * $31.43
$6
0
( 0 +
0.00000 ) *
0.50% * 3 *
6=
0 * $24.56
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $31.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
175 =
0 * $30.76
$0
0
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
93 =
38 =
0 * $31.43
0 * $30.76
$0
$0
0
0
( 0 +
( 1 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
34 =
1,290 =
0 * $31.43
17 * $30.76
$0
$515
0
6
( 1 +
( 1 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
5,162 =
16 =
67 * $31.43
0 * $30.76
$2,108
$5
22
0
( 1 +
0.00000 ) *
0.50% * 3 *
59 =
1 * $31.43
$17
0
( 0 +
0.00000 ) *
0.50% * 3 *
48 =
0 * $26.09
$0
0
( 0 +
( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
58 =
0=
0 * $31.43
0 * $26.09
$0
$0
0
0
( 0 +
0.00000 ) *
0.50% * 3 *
29 =
0 * $32.43
$0
0
(
4 +
0.00000 ) *
0.50% * 3 *
18 =
1 * $26.75
$28
0
(
0 +
0.00000 ) *
0.50% * 3 *
0=
0 * $32.43
$0
0
( 0 +
0.00000 ) *
0.50% * 3 *
55 =
0 * $30.79
$0
0
Small ( 0 +
State Go( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
196 =
16 =
0 * $32.43
0 * $30.79
$0
$0
0
0
Local Go( 0 +
0.00000 ) *
0.50% * 3 *
74 =
0 * $33.43
$0
0
Table 26
Large
Hazardous Waste Site Work
( 0 +
0.00000 ) *
0.50% * 3 *
44 =
0 * $30.79
$0
0
Small ( 0 +
State Go( 0 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
143 =
1=
0 * $34.43
0 * $30.79
$0
$0
0
0
Local Go( 0 +
Large ( 1 +
0.00000 ) *
0.00000 ) *
0.50% * 3 *
0.50% * 3 *
201 =
48 =
0 * $35.43
1 * $30.79
$0
$20
0
0
( 1 +
0.00000 ) *
0.50% * 3 *
148 =
72,329
2 * $36.43
$72
$22,881
1
275
Refractory Brick Restoration
Small
TOTALS
825
Table 27
Annual Medical Examination with Additional Tests (§§ 1910.1026(k)(2)(ii) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(2)(ii) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(ii) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Annual Medical Examination with Additional Tests
This table calculates the cost for a contractor PLHCP to conduct additional medical testing for those employees who have abnormal annual medical examination
results. Abnormal results will require additional medical testing "as deemed appropriate by the physician."
COST = (LIMEMPAL + MEDEXAMADDERM) * %ALABN * MEDCOSTADD* #PLANTS
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation
of engineering controls.
*%ALABN = Percent of employees exposed at or above the action level 30 days per year (and therefore requiring a limited or comprehensive
medical exam who will be found to have abnormal results
#PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3+
0) *
0.50% ) * $241.82 *
1,885 =
$6,344
Small
(
0+
0) *
0.50% ) * $241.82 *
3,547 =
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
7,911 =
$0
Small
Large
(
(
0+
14 +
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
8,864 =
191 =
$0
$3,140
Small
Large
(
(
1+
26 +
0) *
3) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
108 =
269 =
$127
$9,509
Small
State
(
(
3+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
2,160 =
25 =
$7,621
$0
Local
(
0+
0) *
0.50% ) * $241.82 *
793 =
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
10,607 =
$0
Small
Large
(
(
0+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
10,797 =
412 =
$0
$0
Small
Large
(
(
0+
10 +
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
233 =
405 =
$0
$4,760
Small
(
1+
0) *
0.50% ) * $241.82 *
3,058 =
$3,597
Large
(
46 +
0) *
0.50% ) * $241.82 *
50 =
$2,762
Small
Large
(
(
0+
1+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
63 =
331 =
$0
$368
Small
Large
(
(
0+
2+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
1,458 =
101 =
$0
$225
Small
Large
(
(
1+
2+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
18 =
294 =
$20
$651
Small
Large
(
(
1+
2+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
508 =
765 =
$562
$2,011
Small
State
(
0+
0) *
0.50% ) * $241.82 *
4,067 =
$0
(
0+
0) *
0.50% ) * $241.82 *
16 =
$0
Local
(
9+
0) *
0.50% ) * $241.82 *
899 =
$9,507
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
General Industry AEROSPACE
General Industry AUTOBODY
COIL COATING
Maritime
Construction
Governments
Page 154
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
SECTOR 4. Producers of Chromates
Large
(
7+
0) *
0.50% ) * $241.82 *
2=
$18
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
9+
0) *
0.50% ) * $241.82 *
2=
$22
Small
(
1+
0) *
0.50% ) * $241.82 *
1=
$1
Large
(
2+
0) *
0.50% ) * $241.82 *
3=
$5
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
12 +
0) *
0.50% ) * $241.82 *
5=
$79
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
1+
0.00378 ) *
0.50% ) * $241.82 *
87 =
$110
Small
(
0+
0) *
0.50% ) * $241.82 *
137 =
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
3=
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
10 =
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
86 =
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
42 =
$0
Large
(
2+
0) *
0.50% ) * $241.82 *
4=
$12
Small
(
1+
0) *
0.50% ) * $241.82 *
3=
$3
Large
(
8+
0) *
0.50% ) * $241.82 *
1=
$10
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
30 + 0.00650 ) *
0.50% ) * $241.82 *
37 =
$1,331
Small
Large
(
(
1 + 0.00031 ) *
1 + 0.00015 ) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
12 =
112 =
$20
$95
Small
(
1 + 0.00031 ) *
0.50% ) * $241.82 *
35 =
$60
Large
(
0+
0.00062 ) *
0.50% ) * $241.82 *
37 =
$0
Small
(
0+
0.00015 ) *
0.50% ) * $241.82 *
34 =
$0
Large
(
19 +
0) *
0.50% ) * $241.82 *
178 =
$4,073
Small
(
5+
0) *
0.50% ) * $241.82 *
130 =
$705
Large
(
0+
0) *
0.50% ) * $241.82 *
3=
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
1=
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Small
(
1+
0) *
0.50% ) * $241.82 *
5=
$7
Large
(
0+
0) *
0.50% ) * $241.82 *
207 =
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
1,561 =
$0
ALL
SECTOR 5. Chromate Pigment Procedures
ALL
SECTOR 6. CCA Producers
ALL
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
ALL
SECTOR 9. Printing Ink Producers
ALL
SECTOR 10. Plastic Colorant Producers and Users
ALL
SECTOR 11. Plating Mixture Producers
ALL
SECTOR 13. Chromium Metal Producers
ALL
SECTOR 14. Iron and Steel Mills
ALL
Carbon Steel
SECTOR 14B. Forging Industry
ALL
SECTOR 15. Iron and Steel Foundries
ALL
SECTOR 17. Chromium Dye Producers
ALL
SECTOR 18. Chromium Sulfate Producers
ALL
SECTOR 19. Chemical Distributors
ALL
Page 155
Cost
Large
(
0+
0) *
0.50% ) * $241.82 *
347 =
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
703 =
$0
Large
(
1+
0) *
0.50% ) * $241.82 *
5=
$6
Small
Large
(
(
0+
8+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
17 =
78 =
$0
$765
Small
(
2+
0) *
0.50% ) * $241.82 *
5=
$10
Large
(
0+
0) *
0.50% ) * $241.82 *
92 =
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
367 =
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
164 =
$0
Small
Large
(
(
0+
5+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
0=
21 =
$0
$129
Small
(
3+
0) *
0.50% ) * $241.82 *
4=
$15
Large
(
0+
0) *
0.50% ) * $241.82 *
6=
$0
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
175 =
$0
Small
Large
(
(
0+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
93 =
38 =
$0
$0
Small
Large
(
(
0+
1+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
34 =
1,290 =
$0
$1,351
Small
State
(
(
1+
1+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
5,162 =
16 =
$5,407
$12
Local
(
1+
0) *
0.50% ) * $241.82 *
59 =
$44
Large
(
0+
0) *
0.50% ) * $241.82 *
48 =
$0
Small
State
(
(
0+
1+
0) *
1) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
58 =
0=
$0
$0
Local
(
0+
0) *
0.50% ) * $241.82 *
29 =
$0
Large
(
2+
2) *
0.50% ) * $241.82 *
18 =
$84
Small
(
0+
0) *
0.50% ) * $241.82 *
0=
$0
Large
(
0+
0) *
0.50% ) * $241.82 *
55 =
$0
(
Small
State Gov't (
0+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
196 =
16 =
$0
$0
Local Gov't (
Large
(
0+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
74 =
44 =
$0
$0
)
Small
State Gov't (
0+
0+
0) *
0) *
0.50% ) * $241.82 *
0.50% ) * $241.82 *
143 =
1=
$0
$0
Local Gov't (
0+
0) *
0.50% ) * $241.82 *
201 =
$0
%ALABN
#PLANTS
MEDCOSTADD
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
SECTOR 20. Textile Dyeing
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat, Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
ALL
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
ALL
Government
SECTOR 30. Superalloy Producers and Users
ALL
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Page 156
Cost
#PLANTS
MEDCOSTADD
%ALABN
MEDEXAMADDERM
Variables
LIMEMPAL
Table 27
Large
(
1+
0) *
0.50% ) * $241.82 *
48 =
$52
Small
(
1+
0) *
0.50% ) * $241.82 *
148 =
72,329
$0
$65,631
Refractory Brick Restoration & Maintenance
Total
Page 157
Table 28
Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i),
and (i)(3)(ii); and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination After Initial Assignment
This table calculates the burden hours and cost for those employees who are newly assigned to operations that involve exposure at or above the action level to receive medical
examinations. It is estimated that the employee will be provided a comprehensive medical examination.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLTIME * (1‐%BASEMED) * #PLANTS
Cost =Hours *NONSUPWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of engineering controls.
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
*COMPFULLTIME = Four hours for an employee to receive a comprehensive medical examination
*NONSUPEWAGE ‐ Non‐supervisory wage rate
(1‐%BASEMED) = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3
+
0.00000 ) * 26.16% *
4
* (
1
‐ 100.00% ) *
1,885 =
0 * $25.49
$0
Small
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 100.00%
*
3,547 =
0 * $25.49
$0
Large
(
0
+
0.00000 ) * 27.24% *
4
* (
1
‐
5.00%
*
7,911 =
0 * $25.10
$0
0
Small
Large
(
(
0
14
+
+
0.00000 ) * 27.24% *
2.91848 ) * 27.24% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
8,864 =
191 =
0 * $25.10
3,264 * $25.10
$0
$81,930
0
816
Small
Large
(
(
1
26
+
+
0.00000 ) * 27.24% *
2.91848 ) * 27.24% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
108 =
269 =
114 * $25.10
8,141 * $25.10
$2,873
$204,333
29
2,035
Small
Local
(
(
3
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
2,160 =
25 =
6,868 * $25.10
0 * $25.10
$172,381
$0
1,717
0
State
(
0
+
0.00000 ) * 27.24% *
4
* (
1
‐
0.00%
*
793 =
0 * $25.10
$0
0
Large
(
0
+
0.00000 ) * 27.24% *
4
* (
1
‐
5.00%
*
10,607 =
0 * $25.10
$0
0
Small
Large
(
(
0
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
10,797 =
412 =
0 * $25.10
0 * $25.10
$0
$0
0
0
Small
Large
(
(
0
10
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐
‐
0.00%
5.00%
*
*
233 =
405 =
0 * $25.10
4,075 * $25.10
$0
$102,290
0
1,072
Small
(
1
+
0.00000 ) * 27.24% *
4
* (
1
‐
0.00%
*
3,058 =
3,241 * $25.10
$81,350
810
Large
(
46
+
0.00000 ) * 27.24% *
4
* (
1
‐ 80.00%
*
50 =
498 * $31.68
$15,771
124
Small
Large
(
(
0
1
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 80.00%
*
*
63 =
331 =
0 * $31.68
66 * $31.68
$0
$2,103
0
17
Small
Large
(
(
0
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 80.00%
*
*
1,458 =
101 =
0 * $31.68
41 * $31.68
$0
$1,285
0
10
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 100.00%
*
*
18 =
294 =
9 * $31.68
0 * $31.68
$292
$0
2
0
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 100.00%
*
*
508 =
765 =
253 * $31.68
0 * $31.68
$8,029
$0
63
0
Small
Local
(
(
0
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
4
4
* (
* (
1
1
‐ 100.00%
‐ 100.00%
*
*
4,067 =
16 =
0 * $31.68
0 * $31.68
$0
$0
0
0
State
(
9
+
0.00000 ) * 27.24% *
4
* (
1
‐ 100.00%
*
899 =
0 * $31.68
$0
0
Large
(
7
+
0.00000 ) * 29.16% *
4
* (
1
‐ 50.00%
*
2=
9 * $37.06
$328
2
Small
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐
*
0=
0 * $37.06
$0
0
0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Autobody
Coil Coating
Maritime
Construction
Government
SECTOR 4. Producers of Chromates
ALL
Page 158
0.00%
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 28
SECTOR 5. Chromate Pigment Procedures
Large
ALL
(
9
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
2=
0 * $36.12
$0
0
Small
(
1
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
1=
0 * $36.12
$0
0
Large
(
2
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
3=
0 * $30.60
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐
*
0=
0 * $30.60
$0
0
(
12
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
5=
0 * $37.06
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
0=
0 * $37.06
$0
0
(
1
+
0.00378 ) * 29.16% *
4
* (
1
‐ 100.00%
*
87 =
0 * $27.60
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
137 =
0 * $27.60
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 80.00%
*
3=
0 * $27.65
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 10.00%
*
10 =
0 * $27.65
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
86 =
0 * $30.64
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
42 =
0 * $30.64
$0
0
(
2
+
0.00000 ) * 29.16% *
4
* (
1
‐ 50.00%
*
4=
6 * $27.50
$157
1
(
1
+
0.00000 ) * 29.16% *
4
* (
1
‐ 30.00%
*
3=
2 * $27.50
$49
0
(
8
+
0.00000 ) * 26.16% *
4
* (
1
‐ 100.00%
*
1=
0 * $37.17
$0
0
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐
0.00%
*
0=
0 * $37.17
$0
0
(
30
+
0.00650 ) * 26.16% *
4
* (
1
‐ 50.00%
*
37 =
576 * $37.17
$21,408
144
(
(
1
1
+
+
0.00031 ) * 26.16% *
0.00015 ) * 26.16% *
4
4
* (
* (
1
1
‐ 30.00%
‐ 50.00%
*
*
12 =
112 =
12 * $37.17
41 * $37.17
$458
$1,529
3
10
(
1
+
0.00031 ) * 26.16% *
4
* (
1
‐ 30.00%
*
35 =
36 * $37.17
$1,346
9
(
0
+
0.00062 ) * 26.16% *
4
* (
1
‐ 50.00%
*
37 =
0 * $37.17
$0
0
(
0
+
0.00015 ) * 26.16% *
4
* (
1
‐ 30.00%
*
34 =
0 * $37.17
$0
0
(
19
+
0.00000 ) * 26.16% *
4
* (
1
‐ 80.00%
*
178 =
705 * $27.12
$19,122
176
(
5
+
0.00000 ) * 26.16% *
4
* (
1
‐ 10.00%
*
130 =
549 * $27.12
$14,900
137
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
3=
0 * $36.12
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
1=
0 * $36.12
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
0=
0 * $39.76
$0
0
(
1
+
0.00000 ) * 29.16% *
4
* (
1
‐ 100.00%
*
5=
0 * $39.76
$0
0
(
0
+
0.00000 ) * 26.64% *
4
* (
1
‐
0.00%
*
207 =
0 * $28.67
$0
0
(
0
+
0.00000 ) * 26.64% *
4
* (
1
‐
0.00%
*
1,561 =
0 * $28.67
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 80.00%
*
347 =
0 * $19.13
$0
0
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 10.00%
*
703 =
0 * $19.13
$0
0
(
1
+
0.00000 ) * 29.16% *
4
* (
1
‐ 80.00%
*
5=
1 * $27.66
$32
0
(
(
0
8
+
+
0.00000 ) * 29.16% *
0.00000 ) * 29.16% *
4
4
* (
* (
1
1
‐ 10.00%
‐ 80.00%
*
*
17 =
78 =
0 * $27.66
148 * $27.66
$0
$4,081
0
37
(
2
+
0.00000 ) * 29.16% *
4
* (
1
‐ 10.00%
*
5=
9 * $27.66
$237
2
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
ALL
Small
Large
Fiber, Flat and Container Glass
Small
Page 159
0.00%
RESPONSES
Cost
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 28
SECTOR 22. Printing
Large
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 80.00%
*
92 =
0 * $19.97
$0
0
Small
(
0
+
0.00000 ) * 29.16% *
4
* (
1
‐ 10.00%
*
367 =
0 * $19.97
$0
0
Large
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 80.00%
*
164 =
0 * $31.14
$0
0
Small
Large
(
(
0
5
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
4
4
* (
* (
1
1
‐ 80.00%
‐ 80.00%
*
*
0=
21 =
0 * $31.14
22 * $31.14
$0
$696
0
6
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
3
+
0.00000 ) * 26.16% *
4
* (
1
‐ 80.00%
*
4=
3 * $31.14
$80
1
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 80.00%
*
6=
0 * $24.56
$0
0
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 10.00%
*
0=
0 * $24.56
$0
0
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 25.00%
*
175 =
0 * $30.76
$0
0
(
(
0
0
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
4
4
* (
* (
1
1
‐ 0.00%
‐ 25.00%
*
*
93 =
38 =
0 * $30.76
0 * $30.76
$0
$0
0
0
(
(
0
1
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
4
4
* (
* (
1
1
‐ 0.00%
‐ 50.00%
*
*
34 =
1,290 =
0 * $30.76
584 * $30.76
$0
$17,980
0
146
(
(
1
1
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
5,162 =
16 =
2,339 * $30.76
5 * $30.76
$71,969
$163
585
1
(
1
+
0.00000 ) * 26.16% *
4
* (
1
‐ 50.00%
*
59 =
19 * $30.76
$591
5
(
0
+
0.00000 ) * 46.92% *
4
* (
1
‐ 50.00%
*
48 =
0 * $26.09
$0
0
(
(
0
0
+
+
0.00000 ) * 46.92% *
0.00000 ) * 46.92% *
4
4
* (
* (
1
1
‐ 30.00%
‐ 50.00%
*
*
58 =
0=
0 * $26.09
0 * $26.09
$0
$0
0
0
(
0
+
0.00000 ) * 46.92% *
4
* (
1
‐ 30.00%
*
29 =
0 * $26.09
$0
0
(
4
+
0.00000 ) * 26.16% *
4
* (
1
‐ 50.00%
*
18 =
36 * $26.75
$970
9
(
0
+
0.00000 ) * 26.16% *
4
* (
1
‐ 30.00%
*
0=
0 * $26.75
$0
0
(
0
+
0.00000 ) * 67.80% *
4
* (
1
‐ 50.00%
*
55 =
0 * $30.79
$0
0
(
Small
State Gov't (
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
196 =
16 =
0 * $30.79
0 * $30.79
$0
$0
0
0
Local Gov't (
Large
(
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
74 =
44 =
0 * $30.79
0 * $30.79
$0
$0
0
0
(
Small
State Gov't (
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
143 =
1=
0 * $30.79
0 * $30.79
$0
$0
0
0
Local Gov't (
Large
(
0
1
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
4
4
* (
* (
1
1
‐ 50.00%
‐ 50.00%
*
*
201 =
48 =
0 * $30.79
58 * $30.79
$0
$1,780
0
14
(
1
+
0.00000 ) * 67.80% *
4
* (
1
‐ 50.00%
*
148 =
72,329
178 * $30.79
31,910
$5,472
$835,984
44
8,031
ALL
SECTOR 24. Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service
Companies
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Small
TOTAL
Page 160
Table 29
Medical Examination After Initial Assignment (§§1910.1026(k)(2)(i), (k)(3)(i), and (k)(3)(ii);1915.1026(i)(2)(i), (i)(3)(i), and (i)(3)(ii);
and 1926.1126(i)(2)(i), (i)(3)(i), and (i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination After Initial Assignment
This table calculates the cost for a contractor PLHCP to conduct medical examinations to employees newly assigned to operations that involve exposure at or above the
action level.
Hours = (LIMEMPAL + MEDEXAMADDERM)*TURNOVER*COMPFULLCOST *(1‐%BASEMED)*#PLANTS
Cost =Hours *NONSUPWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after implementation of engineering controls
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms" after the implementation of
engineering controls.
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
*COMPFULLCOST = Cost for an employer to administer a comprehensive medical examination
1‐%BASEMED = Percentage of establishments that do not have annual medical surveillance for their employees in the baseline.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3
+
0.00000 ) * 26.16% *
$454.63
* (
1
‐
100.00%
) *
1,885 =
$0
Small
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
100.00%
*
3,547 =
$0
Large
(
0
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
5.00%
*
7,911 =
$0
Small
Large
(
(
0
14
+
+
0.00000 ) * 27.24% *
2.91848 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
5.00%
*
*
8,864 =
191 =
$0
$370,991
Small
Large
(
(
1
26
+
+
0.00000 ) * 27.24% *
2.91848 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
5.00%
*
*
108 =
269 =
$13,009
$925,251
Small
Local
(
(
3
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
5.00%
*
*
2,160 =
25 =
$780,565
$0
State
(
0
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
0.00%
*
793 =
$0
Large
(
0
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
5.00%
*
10,607 =
$0
Small
Large
(
(
0
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
5.00%
*
*
10,797 =
412 =
$0
$0
Small
Large
(
(
0
10
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
5.00%
*
*
233 =
405 =
$0
$463,182
Small
(
1
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
0.00%
*
3,058 =
$368,366
Large
(
46
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
80.00%
*
50 =
$56,585
Small
Large
(
(
0
1
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
80.00%
*
*
63 =
331 =
$0
$7,545
Small
Large
(
(
0
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
80.00%
*
*
1,458 =
101 =
$0
$4,611
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
100.00%
*
*
18 =
294 =
$1,048
$0
Small
Large
(
(
1
2
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
100.00%
*
*
508 =
765 =
$28,805
$0
Small
Local
(
(
0
0
+
+
0.00000 ) * 27.24% *
0.00000 ) * 27.24% *
$454.63
$454.63
*
*
1
1
‐
‐
100.00%
100.00%
*
*
4,067 =
16 =
$0
$0
State
(
9
+
0.00000 ) * 27.24% *
$454.63
*
1
‐
100.00%
*
899 =
$0
ALL
Sector 2. Welding
General Industry
Maritime
Construction
GOVERNMENT
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
SECTOR 3. PAINTING
AEROSPACE
Autobody
Coil Coating
Maritime
Construction
Government
Page 161
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 29
SECTOR 4. Producers of Chromates
Large
(
7
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
50.00%
*
2=
$1,005
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
0.00%
*
0=
$0
(
9
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
2=
$0
Small
(
1
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
1=
$0
Large
(
2
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
3=
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
0.00%
*
0=
$0
(
12
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
5=
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
0=
$0
(
1
+
0.00378 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
87 =
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
137 =
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
80.00%
*
3=
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
10.00%
*
10 =
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
86 =
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
42 =
$0
(
2
+
0.00000 ) *
0 *
$454.63
*
1
‐
50.00%
*
4=
$647
(
1
+
0.00000 ) *
0 *
$454.63
*
1
‐
30.00%
*
3=
$201
(
8
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
100.00%
*
1=
$0
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
0.00%
*
0=
$0
(
30
+
0.00650 ) * 26.16% *
$454.63
*
1
‐
50.00%
*
37 =
$65,452
(
(
1
1
+
+
0.00031 ) * 26.16% *
0.00015 ) * 26.16% *
$454.63
$454.63
*
*
1
1
‐
‐
30.00%
50.00%
*
*
12 =
112 =
$1,400
$4,675
(
1
+
0.00031 ) * 26.16% *
$454.63
*
1
‐
30.00%
*
35 =
$4,117
(
0
+
0.00062 ) * 26.16% *
$454.63
*
1
‐
50.00%
*
37 =
$1
(
0
+
0.00015 ) * 26.16% *
$454.63
*
1
‐
30.00%
*
34 =
$0
(
19
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
80.00%
*
178 =
$80,131
(
5
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
10.00%
*
130 =
$62,440
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
3=
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
1=
$0
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
0=
$0
(
1
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
100.00%
*
5=
$0
(
0
+
0.00000 ) * 26.64% *
$454.63
*
1
‐
0.00%
*
207 =
$0
(
0
+
0.00000 ) * 26.64% *
$454.63
*
1
‐
0.00%
*
1,561 =
$0
ALL
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
SECTOR 8. Paint and Coating Producers
Large
ALL
Small
SECTOR 9. Printing Ink Producers
Large
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
Alloy Stainless Steel
Small
Large
Carbon Steel
Small
14B. Alloy Stainless Steel Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
Page 162
Cost
#PLANTS
1 ‐%BASEMED
COMPFULLCOST
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 29
SECTOR 20. Textile Dyeing
Large
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
80.00%
*
347 =
$0
Small
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
10.00%
*
703 =
$0
Large
(
1
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
80.00%
*
5=
$130
Small
Large
(
(
0
8
+
+
0.00000 ) * 29.16% *
0.00000 ) * 29.16% *
$454.63
$454.63
*
*
1
1
‐
‐
10.00%
80.00%
*
*
17 =
78 =
$0
$16,769
Small
(
2
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
10.00%
*
5=
$975
Large
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
80.00%
*
92 =
$0
Small
(
0
+
0.00000 ) * 29.16% *
$454.63
*
1
‐
10.00%
*
367 =
$0
Large
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
80.00%
*
164 =
$0
Small
Large
(
(
0
5
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
$454.63
$454.63
*
*
1
1
‐
‐
80.00%
80.00%
*
*
0=
21 =
$0
$2,541
(
3
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
80.00%
*
4=
$290
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
80.00%
*
6=
$0
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
10.00%
*
0=
$0
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
25.00%
*
175 =
$0
(
(
0
0
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
25.00%
*
*
93 =
38 =
$0
$0
(
(
0
1
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
$454.63
$454.63
*
*
1
1
‐
‐
0.00%
50.00%
*
*
34 =
1,290 =
$0
$66,430
(
(
1
1
+
+
0.00000 ) * 26.16% *
0.00000 ) * 26.16% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
50.00%
*
*
5,162 =
16 =
$265,900
$603
(
1
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
50.00%
*
59 =
$2,182
(
0
+
0.00000 ) * 46.92% *
$454.63
*
1
‐
50.00%
*
48 =
$0
(
(
0
0
+
+
0.00000 ) * 46.92% *
0.00000 ) * 46.92% *
$454.63
$454.63
*
*
1
1
‐
‐
30.00%
50.00%
*
*
58 =
0=
$0
$0
(
0
+
0.00000 ) * 46.92% *
$454.63
*
1
‐
30.00%
*
29 =
$0
(
4
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
50.00%
*
18 =
$4,120
(
0
+
0.00000 ) * 26.16% *
$454.63
*
1
‐
30.00%
*
0=
$0
(
0
+
0.00000 ) * 67.80% *
$454.63
*
1
‐
50.00%
*
55 =
$0
Small
State Gov't
(
(
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
50.00%
*
*
196 =
16 =
$0
$0
Local Gov't
Large
(
(
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
50.00%
*
*
74 =
44 =
$0
$0
Small
State Gov't
(
(
0
0
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
50.00%
*
*
143 =
1=
$0
$0
Local Gov't
Large
(
(
0
1
+
+
0.00000 ) * 67.80% *
0.00000 ) * 67.80% *
$454.63
$454.63
*
*
1
1
‐
‐
50.00%
50.00%
*
*
201 =
48 =
$0
$6,572
Small
(
1
+
0.00000 ) * 67.80% *
$454.63
*
1
‐
50.00%
*
148 =
$20,202
ALL
SECTOR 21. Colored Glass Producers
ALL
Fiber, Flat and Container Glass
SECTOR 22. Printing
ALL
SECTOR 24. Chromium Catalyst Users
Catalyst Users
Chromium Catalyst Service
Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Page 163
Page 164
1 ‐%BASEMED
#PLANTS
Cost
COMPFULLCOST
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 29
TOTAL
72,329
$3,626,744
Table 30
Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(2)(vi) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Employee Time and Cost to Complete the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing (%BASEMED) the additional employee
time will be 3 hours (COMPARTTIME). For employers who are not providing annual medical testing (1‐%BASEMED) the time for a full comprehensive examination is 4 hours (COMPFULLTIME).
The employee turnover rate is divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months
prior to the date of determination. It is estimated that half of the employee turnover occurs at the beginning of the year and the other half occurs a the end of the year. Therefore, based on
this estimation at any time during the year, it has been greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees
require a medical examination.
Cost
Responses
NONSUPEWAGE
Hours
#PLANTS
1‐%BASEMED
COMPFULLTIME
%BASEMED
COMPPARTTIME
Divide
2
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Burden hours = (LIMEMPAL + MEDEXAMADDERM)*(TURNOVER/2)* ((COMPARTTIME*%BASEMED)+(COMPFULLTIME*(1‐%BASEMED)))*#PLANTS
Cost = Burden hours x NONSUPEWAGE
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
COMPARTTIME= The time an employee takes for a comprehensive exam when employed by employers already providing annual medical testing in the baseline.
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLTIME = The time an employee takes for a comprehensive exam when employed by employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
NONSUPEWAGE = Non‐supervisory Wage Rate
$52,487.70
686
Sector 1. Electroplating
Large
(
3+
0.000000 ) * ( 26.16% /
2 ) *( (
3 * 100.00% ) + (
Small
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 * 100.00% ) + (
Large
(
0+
0.000000 ) * ( 27.24% /
2 ) *( (
3 *
5.00%
) +(
Small
Large
(
(
0+
14 +
0.000000 ) * ( 27.24% /
2.918484 ) * ( 27.24% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
Small
Large
(
(
1+
26 +
0.000000 ) * ( 27.24% /
2.918484 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
Small
State
(
(
3+
0+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
Local
(
0+
0.000000 ) * ( 67.80% /
2 ) *( (
Large
(
0+
0.000000 ) * ( 27.74% /
2 ) *( (
Small
Large
(
(
0+
0+
0.000000 ) * ( 27.74% /
0.000000 ) * ( 27.74% /
Small
Large
(
(
0+
10 +
0.000000 ) * ( 27.74% /
0.000000 ) * ( 67.80% /
4 *(
1 ‐ 100.00% ) ) *
1,885 =
2,059
$25.49
4 *(
1 ‐ 100.00% ) ) *
3,547 =
$25.49
$0.00
0
4 *(
1 ‐
5.00%
) ) *
7,911 =
0
$25.10
$0.00
0
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,864 =
191 =
0
1,632
$25.10
$25.10
$0.00
$40,973.52
0
429
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
108 =
269 =
57
10,133
$25.10
$25.10
$1,436.51
$254,328.83
14
2,666
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,160 =
25 =
8,547
0
$25.10
$25.10
$214,526.81
$0.00
2,137
0
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
793 =
0
$25.10
$0.00
0
3 *
5.00%
) +(
4 *(
1 ‐
5.00%
) ) *
10,607 =
0
$25.10
$0.00
0
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,797 =
412 =
0
0
$25.10
$25.10
$0.00
$0.00
0
0
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
5.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
233 =
405 =
0
5,072
$25.10
$25.10
$0.00
$127,311.21
0
1,335
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
(
1+
0.000000 ) * ( 67.80% / 2 ) * (
Small
SECTOR 3. PAINTING General Industry
Large
(
46 +
0.000000 ) * ( 27.74% / 2 ) * (
AEROSPACE
(
0
+
0.000000
) * ( 27.74% / 2 ) * (
Small
Large
(
1+
0.000000 ) * ( 27.74% / 2 ) * (
Auto Body
(
0+
0.000000 ) * ( 27.74% / 2 ) * (
Small
Large
(
2+
0.000000 ) * ( 27.74% / 2 ) * (
Coil Coating
(
1+
0.000000 ) * ( 27.74% / 2 ) * (
Small
Large
(
2+
0.000000 ) * ( 27.74% / 2 ) * (
Maritime
(
1
+
0.000000
) * ( 27.74% / 2 ) * (
Small
(
2+
0.000000 ) * ( 67.80% / 2 ) * (
Large
Construction
(
0+
0.000000 ) * ( 67.80% / 2 ) * (
Small
(
0+
0.000000 ) * ( 67.80% / 2 ) * (
State
Government
(
9+
0.000000 ) * ( 67.80% / 2 ) * (
Local
SECTOR 4. Producers of Chromates
Large
(
7+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
9+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
1+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 6. CCA Producers
Large
(
2+
0.000000 ) * ( 29.16%
2 ) *(
ALL
2 ) *(
(
0+
0.000000 ) * ( 29.16%
Small
SECTOR 7. Chromium Catalyst Producers
Large
(
12 +
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small
SECTOR 8. Paint and Coating Producers
Large
(
1+
0.000000 ) * ( 29.16% / 2 ) * (
ALL
(
0+
0.000000 ) * ( 29.16% / 2 ) * (
Small
(
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
3,058 =
4,033
$25.10
$101,239.90
1,008
(
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
50 =
269
$31.68
$8,515.44
317
(
(
3 *
3 *
50.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
63 =
331 =
0
34
$31.68
$31.68
$0.00
$1,080.43
0
42
(
(
3 *
3 *
50.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
80.00% ) ) *
1,458 =
101 =
0
21
$31.68
$31.68
$0.00
$673.73
0
26
(
(
3 * 50.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
294 =
5
1
$31.68
$31.68
$154.77
$24.14
2
75
(
(
3 * 50.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
508 =
765 =
129
2
$31.68
$31.68
$4,094.04
$70.03
65
564
(
(
3 * 100.00% ) + (
3 * 100.00% ) + (
4 *(
4 *(
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
4,067 =
16 =
0
0
$31.68
$31.68
$0.00
$0.00
0
0
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
899 =
9
$31.68
$281.78
2,666
(
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
2=
6
$37.06
$222.93
2
(
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
0=
0
$37.00
$0.00
0
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
2=
4
$36.12
$147.98
3
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$36.12
$16.44
0
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
3=
1
$30.60
$22.81
1
(
3 *
) +(
4 *(
1 ‐
) ) *
0=
0
$30.60
$0.00
0
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
5=
5
$37.06
$202.44
9
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
0=
0
$37.06
$0.00
0
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
87 =
0
$27.60
$12.56
13
(
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
137 =
0
$27.60
$0.00
0
0.00%
Page 165
0.00%
Table 30
SECTOR 9. Printing Ink Producers
Large
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
3=
0
$27.65
$0.00
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
10 =
0
$27.65
$0.00
0
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
86 =
0
$30.64
$0.00
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
42 =
0
$30.64
$0.00
0
(
2+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
4=
3
$27.50
$91.55
1
(
1+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
3=
1
$27.50
$27.01
0
1
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
Small
SECTOR 26. Woodworking
Large
General Industry
Small
Large
Maritime
Small
Large
Construction
Small
State
Government
Local
SECTOR 27. Solid Waste Incineration
Large
ALL
Small
State
Government
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
(
8+
0.000000 ) * ( 26.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$37.17
$0.00
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
0=
0
$37.17
$0.00
0
(
30 +
0.006497 ) * ( 26.16% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
37 =
294
$37.17
$10,919.35
144
(
(
1+
1+
0.000309 ) * ( 26.16% /
0.000155 ) * ( 26.16% /
2 ) *( (
2 ) *( (
3 *
3 *
30.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
12 =
112 =
6
21
$37.17
$37.17
$235.04
$769.69
2
10
(
1+
0.000309 ) * ( 26.16% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
35 =
18
$37.17
$679.36
6
(
0+
0.000619 ) * ( 26.16% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
37 =
0
$37.17
$0.22
0
(
0+
0.000155 ) * ( 26.16% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
34 =
0
$37.17
$0.07
0
(
19 +
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
178 =
358
$27.12
$9,721.97
441
(
5+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
130 =
275
$27.12
$7,454.95
76
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
3=
0
$36.12
$0.00
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
1=
0
$36.12
$0.00
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
0=
0
$39.76
$0.00
0
(
1+
0.000000 ) * ( 29.16% /
2 ) *( (
3 * 100.00% ) + (
4 *(
1 ‐ 100.00% ) ) *
5=
0
$39.76
$18.10
1
(
0+
0.000000 ) * ( 26.64% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
207 =
0
$28.67
$0.00
0
(
0+
0.000000 ) * ( 26.64% /
2 ) *( (
3 *
0.00%
) +(
4 *(
1 ‐
0.00%
) ) *
1,561 =
0
$28.67
$0.00
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
347 =
0
$19.13
$0.00
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
703 =
0
$19.13
$0.00
0
(
1+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
5=
1
$27.66
$24.56
1
(
(
0+
8+
0.000000 ) * ( 29.16% /
0.000000 ) * ( 29.16% /
2 ) *( (
2 ) *( (
3 *
3 *
10.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
10.00% ) ) *
80.00% ) ) *
17 =
78 =
0
77
$27.66
$27.66
$0.00
$2,119.02
0
92
(
2+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
5=
4
$27.66
$120.81
1
0
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
92 =
0
$19.97
$0.00
(
0+
0.000000 ) * ( 29.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
367 =
0
$19.97
$0.00
0
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
164 =
0
$31.14
$0.00
0
(
(
0+
5+
0.000000 ) * ( 26.16% /
0.000000 ) * ( 26.16% /
2 ) *( (
2 ) *( (
3 *
3 *
80.00%
80.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
80.00% ) ) *
80.00% ) ) *
0=
21 =
0
13
$31.14
$31.14
$0.00
$397.46
0
14
(
3+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
4=
5
$31.14
$150.36
2
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
80.00%
) +(
4 *(
1 ‐
80.00% ) ) *
6=
0
$24.56
$0.00
0
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
10.00%
) +(
4 *(
1 ‐
10.00% ) ) *
0=
0
$24.56
$0.00
0
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
25.00%
) +(
4 *(
1 ‐
25.00% ) ) *
175 =
0
$30.76
$0.00
0
(
(
0+
0+
0.000000 ) * ( 26.16% /
0.000000 ) * ( 26.16% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
25.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00% ) ) *
25.00% ) ) *
93 =
38 =
0
0
$30.76
$30.76
$0.00
$0.00
0
0
(
(
0+
1+
0.000000 ) * ( 26.16% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
0.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
0.00% ) ) *
50.00% ) ) *
34 =
1,290 =
0
758
$30.76
$30.76
$0.00
$23,313.44
0
379
(
(
1+
1+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
5,162 =
16 =
3,032
7
$30.76
$30.76
$93,275.71
$221.43
1,516
3
(
1+
0.000000 ) * ( 67.80% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
59 =
25
$30.76
$774.99
12
(
0+
0.000000 ) * ( 46.92% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
48 =
0
$26.09
$0.00
0
(
(
0+
1+
0.000000 ) * ( 46.92% /
0.000000 ) * ( 46.92% /
2 ) *( (
2 ) *( (
3 *
3 *
30.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
30.00% ) ) *
50.00% ) ) *
58 =
0=
0
0
$26.09
$26.09
$0.00
$8.04
0
0
(
0+
0.000000 ) * ( 46.92% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
29 =
0
$26.09
$0.00
0
(
2+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
18 =
9
$26.75
$252.75
5
(
0+
0.000000 ) * ( 26.16% /
2 ) *( (
3 *
30.00%
) +(
4 *(
1 ‐
30.00% ) ) *
0=
0
$26.75
$0.00
0
Page 166
Table 30
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( 67.80% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
55 =
0
$30.79
$0.00
0
(
Small
Industrial Rehabilitation & Maintenance
State Gov't (
0+
0+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
196 =
16 =
0
0
$30.79
$30.79
$0.00
$0.00
0
0
Local Gov't (
Large
(
0+
0+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
74 =
44 =
0
0
$30.79
$30.79
$0.00
$0.00
0
0
(
Small
State Gov't (
0+
0+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
143 =
1=
0
0
$30.79
$30.79
$0.00
$0.00
0
0
Local Gov't (
Large
(
0+
1+
0.000000 ) * ( 67.80% /
0.000000 ) * ( 67.80% /
2 ) *( (
2 ) *( (
3 *
3 *
50.00%
50.00%
) +(
) +(
4 *(
4 *(
1 ‐
1 ‐
50.00% ) ) *
50.00% ) ) *
201 =
48 =
0
29
$30.79
$30.79
$0.00
$903.94
0
14
(
1+
0.000000 ) * ( 67.80% /
2 ) *( (
3 *
50.00%
) +(
4 *(
1 ‐
50.00% ) ) *
Total
148 =
72,329
89
37,048
$30.79
Hazardous Waste Site Work
Refractory Brick Restoration
Small
Page 167
$2,749.93
44
$962,053.77 14,827
Table 31
Medical Examination at the Termination of Employment (§§ 1910.1026(k)(2)(vi) and (k)(3)(i)‐(k)(3)(iii);
1915.1026(i)(2)(vi) and (i)(3)(i)‐(i)(3)(iii); and 1926.1126(i)(2)(vi) and (i)(3)(i)‐(i)(3)(ii))
Contract Cost for a PLHCP to Conduct the Medical Examination at the Termination of Employment
Employees receive a comprehensive medical examination at the termination of employment. For employers who are providing annual medical testing (%BASEMED) the additional cost will be $227.00
(COMPARTCOST). For employers who are not providing annual medical testing (1‐%BASEMED) the cost for a full comprehensive examination will be $454.00 (COMPFULLCOST). The employee turnover rate is
divided by two, because medical examinations must be provided at the termination of employment ". . . unless the last examination . . . was less then six months prior to the date of determination. It is
estimated that half of the employee turnover occurs at the begining of the year and the other half occurs a the end of the year. Therefore, based on this estimation at any time during the year, it has been
greater then six months since their last medical examination for half of the employees that are leaving, and therefore, these employees require a medical examination.
COST = (LIMEMPAL + MEDEXAMADDDERM)*(TURNOVER/2)* ((COMPARTCOST*%BASEMED)+(COMPFULLCOST*(1‐%BASEMED)))*#PLANTS
1‐%BASEMED
COST
* 100.00% ) + (
#PLANTS
%BASEMED
$227
COMPFULLCOST
COMPPARTCOST
Divide
2
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
* LIMEMPAL = Number of employees requiring a limited medical exam b/c at or > AL after the implementation of engineering controls.
* MEDEXAMADDERM = Number of employees at or above the AL requiring a limited medical exam b/c of dermal "signs and symptoms"
after the implementation of engineering controls.
TURNOVER/2 = Represents the frequency of termination exams.
COMPARTCOST= The cost of a comprehensive exam for those employers already providing annual medical testing in the baseline
%BASEMED = Percentage of employers who are providing annual medical examinations
COMPFULLCOST = The cost of a comprehensive exam for those employers who were not providing any annual medical testing in the baseline.
*1‐%BASEMED = Percentage of plants that are not providing annual medical examinations.
* #PLANTS = Number of Plants
Sector 1. Electroplating
Large
(
3+
0.000000 ) * ( 26.16% / 2 ) * ( (
$454 * (
1 ‐ 100.00% ) ) *
1,885 =
$ 155,712.17
All
Small
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
3,547 =
$ ‐
Large
(
0+
0.000000 ) * ( 27.24% / 2 ) * ( (
$227
*
5.00%
) +(
$454 * (
1 ‐
5.00%
) ) *
7,911 =
$ ‐
Small
Large
(
(
0+
14 +
0.000000 ) * ( 27.24% / 2 ) * ( (
2.918484 ) * ( 27.24% / 2 ) * ( (
$227
$227
*
*
0.00%
5.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
8,864 =
191 =
$ ‐
$ 185,169.42
Small
Large
(
(
1+
26 +
0.000000 ) * ( 27.24% / 2 ) * ( (
2.918484 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
0.00%
5.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
108 =
269 =
$ 6,492.38
$ 1,149,397.80
Small
State
(
(
3+
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
0.00%
5.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
2,160 =
25 =
$ 969,566.39
$ ‐
Local
(
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
793 =
$ ‐
Large
(
0+
0.000000 ) * ( 27.74% / 2 ) * ( (
$227
*
5.00%
) +(
$454 * (
1 ‐
5.00%
) ) *
10,607 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( 27.74% / 2 ) * ( (
0.000000 ) * ( 27.74% / 2 ) * ( (
$227
$227
*
*
0.00%
5.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
10,797 =
412 =
$ ‐
$ ‐
Small
Large
(
(
0+
10 +
0.000000 ) * ( 27.74% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
0.00%
5.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
5.00%
) ) *
) ) *
233 =
405 =
$ ‐
$ 575,371.70
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
3,058 =
$ 457,559.64
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
General Industry
Maritime
Construction
(
1 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Small
SECTOR 3. PAINTING General Industry
Large
( 46 + 0.000000 ) * ( 27.74% / 2 ) * ( (
AEROSPACE
(
0 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Auto Body
(
0 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
2 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Coil Coating
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
Large
(
2 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Maritime
(
1 + 0.000000 ) * ( 27.74% / 2 ) * ( (
Small
(
2 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Large
Construction
(
0 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Small
(
0 + 0.000000 ) * ( 67.80% / 2 ) * ( (
State
Government
(
9 + 0.000000 ) * ( 67.80% / 2 ) * ( (
Local
SECTOR 4. Producers of Chromates
Large
(
7 + 0.000000 ) * ( 29.16% / 2 ) * ( (
ALL
(
0 + 0.000000 ) * ( 29.16% / 2 ) * ( (
Small
SECTOR 5. Chromate Pigment Procedures
Large
(
9 + 0.000000 ) * ( 29.16% / 2 ) * ( (
ALL
(
1 + 0.000000 ) * ( 29.16% / 2 ) * ( (
Small
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
50 =
$ 29,915.07
$227
$227
*
*
50.00%
80.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
80.00%
) ) *
) ) *
63 =
331 =
$ ‐
$ 3,857.45
$227
$227
*
*
50.00%
80.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
80.00%
) ) *
) ) *
1,458 =
101 =
$ ‐
$ 2,389.49
$227
$227
* 50.00% ) + (
* 100.00% ) + (
$454 * (
$454 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
18 =
294 =
$ 547.01
$ 57.62
$227
$227
* 50.00% ) + (
* 100.00% ) + (
$454 * (
$454 * (
1 ‐ 50.00% ) ) *
1 ‐ 100.00% ) ) *
508 =
765 =
$ 14,653.66
$ 167.18
$227
$227
* 100.00% ) + (
* 100.00% ) + (
$454 * (
$454 * (
1 ‐ 100.00% ) ) *
1 ‐ 100.00% ) ) *
4,067 =
16 =
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
899 =
$ 672.72
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
2=
$ 622.23
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
0=
$ ‐
$ ‐
$ ‐
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
2=
$ 309.88
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
1=
$ 34.43
Page 168
0.000000 ) * ( 29.16%
2) *( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
3=
$ 56.39
Small
(
0+
0.000000 ) * ( 29.16%
2) *( (
$227
*
) +(
$454 * (
1 ‐
) ) *
0=
$ ‐
Large
(
12 +
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
5=
$ 413.17
Small
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
Large
(
1+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
87 =
Small
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
137 =
$ ‐
Large
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
3=
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
10 =
$ ‐
COST
#PLANTS
1‐%BASEMED
COMPFULLCOST
%BASEMED
2+
Divide
2
(
TURNOVER
Large
LIMEMPAL
COMPPARTCOST
MEDEXAMADDERM
Variables
Table 31
SECTOR 6. CCA Producers
ALL
0.00%
0.00%
SECTOR 7. Chromium Catalyst Producers
ALL
SECTOR 8. Paint and Coating Producers
$ 34.43
ALL
SECTOR 9. Printing Ink Producers
ALL
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
ALL
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
Small
SECTOR 14. Iron and Steel Mills
Large
General Industry
Small
Large
Carbon Steel
Small
SECTOR 14B. Forging Industry
Large
Reshaping
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
Small
SECTOR 19. Chemical Distributors
Large
ALL
Small
SECTOR 20. Textile Dyeing
Large
ALL
Small
SECTOR 21. Colored Glass Producers
Large
General Industry
Small
Large
Fiber, Flat and Container Glass
Small
SECTOR 22. Printing
Large
ALL
Small
SECTOR 24. Chromium Catalyst Users
Large
General Industry
Small
Large
Chromium Service Companies
Small
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
86 =
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
42 =
(
2+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
4=
$ ‐
29.16
$ 359.34
(
1+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
3=
$ 107.74
(
8+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
1=
$ ‐
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
0=
$ ‐
(
30 +
0.006497 ) * ( 26.16% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
37 =
$ 33,102.41
(
(
1+
1+
0.000309 ) * ( 26.16% / 2 ) * ( (
0.000155 ) * ( 26.16% / 2 ) * ( (
$227
$227
*
*
30.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
30.00%
50.00%
) ) *
) ) *
12 =
112 =
$ 711.00
$ 2,343.59
(
1+
0.000309 ) * ( 26.16% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
35 =
$ 2,066.87
(
0+
0.000619 ) * ( 26.16% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
37 =
$ 0.68
(
0+
0.000155 ) * ( 26.16% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
34 =
$ 0.22
(
19 +
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
178 =
$ 40,438.48
(
5+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
130 =
$ 31,174.18
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
3=
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
1=
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
0=
$ ‐
(
1+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
* 100.00% ) + (
$454 * (
1 ‐ 100.00% ) ) *
5=
$ 34.43
(
0+
0.000000 ) * ( 26.64% / 2 ) * ( (
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
207 =
$ ‐
(
0+
0.000000 ) * ( 26.64% / 2 ) * ( (
$227
*
0.00%
) +(
$454 * (
1 ‐
0.00%
) ) *
1,561 =
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
347 =
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
703 =
$ ‐
(
1+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
5=
$ 88.79
(
(
0+
8+
0.000000 ) * ( 29.16% / 2 ) * ( (
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
$227
*
*
10.00%
80.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
10.00%
80.00%
) ) *
) ) *
17 =
78 =
$ ‐
$ 8,583.76
(
2+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
5=
$ 492.52
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
92 =
$ ‐
(
0+
0.000000 ) * ( 29.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
367 =
$ ‐
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
164 =
$ ‐
(
(
0+
5+
0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
$227
*
*
80.00%
80.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
80.00%
80.00%
) ) *
) ) *
0=
21 =
$ ‐
$ 1,387.92
(
3+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
4=
$ 534.21
Page 169
COST
#PLANTS
1‐%BASEMED
COMPFULLCOST
%BASEMED
COMPPARTCOST
Divide
2
TURNOVER
MEDEXAMADDERM
LIMEMPAL
Variables
Table 31
SECTOR 25. Refractory Brick Producers
Large
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
80.00%
) +(
$454 * (
1 ‐
80.00%
) ) *
6=
$ ‐
Small
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
10.00%
) +(
$454 * (
1 ‐
10.00%
) ) *
0=
$ ‐
Large
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
25.00%
) +(
$454 * (
1 ‐
25.00%
) ) *
175 =
$ ‐
Small
Large
(
(
0+
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
$227
*
*
0.00%
25.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
25.00%
) ) *
) ) *
93 =
38 =
$ ‐
$ ‐
Small
Large
(
(
0+
1+
0.000000 ) * ( 26.16% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
0.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
0.00%
50.00%
) ) *
) ) *
34 =
1,290 =
$ ‐
$ 85,955.20
Small
State
(
(
1+
1+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
50.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
5,162 =
16 =
$ 343,951.69
$ 804.54
ALL
SECTOR 26. Woodworking
General Industry
Maritime
Construction
Government
Local
(
1+
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
59 =
$ 2,845.89
Large
(
0+
0.000000 ) * ( 46.92% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
48 =
$ ‐
Small
State
(
(
0+
1+
0.000000 ) * ( 46.92% / 2 ) * ( (
0.000000 ) * ( 46.92% / 2 ) * ( (
$227
$227
*
*
30.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
30.00%
50.00%
) ) *
) ) *
58 =
0=
$ ‐
$ 23.31
Local
SECTOR 30. Superalloy Producers and Users
Large
ALL
Small
SECTOR 31. Construction
Large
(
0+
0.000000 ) * ( 46.92% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
29 =
$ ‐
SECTOR 27. Solid Waste Incineration
ALL
Government
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
(
2+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
18 =
(
0+
0.000000 ) * ( 26.16% / 2 ) * ( (
$227
*
30.00%
) +(
$454 * (
1 ‐
30.00%
) ) *
0=
$ ‐
$ 1,057.15
(
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
) ) *
55 =
$ ‐
(
Small
State Gov't (
0+
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
50.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
196 =
16 =
$ ‐
$ ‐
Local Gov't (
Large
(
0+
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
50.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
74 =
44 =
$ ‐
$ ‐
(
Small
State Gov't (
0+
0+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
50.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
143 =
1=
$ ‐
$ ‐
Local Gov't (
Large
(
0+
1+
0.000000 ) * ( 67.80% / 2 ) * ( (
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
$227
*
*
50.00%
50.00%
) +(
) +(
$454 * (
$454 * (
1 ‐
1 ‐
50.00%
50.00%
) ) *
) ) *
201 =
48 =
$ ‐
$ 3,313.76
(
1+
0.000000 ) * ( 67.80% / 2 ) * ( (
$227
*
50.00%
) +(
$454 * (
1 ‐
50.00%
Total
) ) *
148 =
72,329
$ 10,115.87
$ 4,122,494
Refractory Brick Restoration
Small
Page 170
Table 32
Information Provided to the PLHCP (§§ 1910.1026(k)(4), 1915.1026(i)(4), and 1926.1126(i)(4)); Clerical Time and Cost to Provide Information to the PLHCP
This table estimates the burden hours and costs for employers to update required information in worker records and provide the information to the
PLHCP. OSHA assumes that it will take 5 minutes for a clerical worker to update the worker record and provide this information. The Agency
reduced the time for this requirement from 1 hour to 5 minutes because, after the first year of medical surveillance, employers will not need to
establish files.
Hours = POTEXEMP * MEDRECORD * PLANTS
COST = BURDEN HOURS * CLWAGE
Responses
Cost
CLWAGE
Hours
#PLANTS
MEDRECORD
POTEXEMP
* POTEXEMP = Total number of potentially exposed employees at or above the AL and workers with "signs and symptoms" before the
implementation of engineering controls.
* MEDRECORD = Clerical time per employee, in hours, to maintain detailed medical records and provide to the PLHCP (.08 hour)
* CLWAGE = Clerical wage. $/hr.
* #PLANTS = Number of plants represented by the model
Sector 1. Electroplating
Large
6 * 0.08 *
1,885 =
840 *
$18.19 =
$15,268.39 10494.052
Small
1 * 0.08 *
3,547 =
263 *
$18.19 =
Large
2 * 0.08 *
7,911 =
1,231 *
$17.90 =
$4,787.65 3290.5807
0
$22,047.48 15392.153
Small
Large
0 * 0.08 *
18 * 0.08 *
8,864 =
191 =
0 *
282 *
$17.90 =
$17.90 =
$0.00
0
$5,048.25 3524.3716
Small
Large
1 * 0.08 *
50 * 0.08 *
108 =
269 =
8 *
1,070 *
$17.90 =
$17.90 =
$150.47 105.04974
$19,150.56 13369.709
Small
State
5 * 0.08 *
2 * 0.08 *
2,160 =
25 =
840 *
4 *
$17.90 =
$17.90 =
$15,047.16 10504.974
$70.49 49.212493
Local
0 * 0.08 *
793 =
0 *
$17.90 =
Large
1 * 0.08 *
10,607 =
825 *
$17.90 =
Small
Large
0 * 0.08 *
0 * 0.08 *
10,797 =
412 =
0 *
0 *
$17.90 =
$17.90 =
Small
Large
1 * 0.08 *
18 * 0.08 *
233 =
405 =
18 *
598 *
$17.90 =
$17.90 =
$325.34 227.13458
$10,714.66 7480.2989
=
476 *
$17.90 =
$8,521.30 5949.0332
=
186 *
$22.51 =
$4,196.98 2330.2829
=
=
5 *
317 *
$22.51 =
$17.90 =
$103.63 57.53785
$5,672.18 3959.9579
=
=
107 *
15 *
$17.90 =
$17.90 =
$1,921.03 1341.1396
$266.64 186.15187
=
=
1 *
65 *
$17.90 =
$22.51 =
$24.24 16.922897
$1,453.79 807.18704
=
=
37 *
133 *
$22.51 =
$22.51 =
$837.86 465.20125
$2,995.10 1662.9645
=
=
236 *
11 *
$22.51 =
$17.90 =
$5,307.61 2946.9326
$203.50 142.07178
=
45 *
$17.90 =
$804.50 561.65191
=
1 *
$26.43 =
$32.07 15.167153
=
0 *
$26.43 =
All
Sector 2. Welding
General Industry
Maritime
Construction
Government
Sector 2. Mild Steel Welding
$0.00
0
0
$14,780.11 10318.535
General Industry
$0.00
$0.00
0
0
Maritme
Construction
2 * 0.08 *
3,058
Small
SECTOR 3. PAINTING GENERAL INDUSTRY
Large
47 * 0.08 *
50
Aerospace
1 * 0.08 *
63
Small
Large
12 * 0.08 *
331
Auto Body
1 * 0.08 *
1,458
Small
Large
2 * 0.08 *
101
Coil Coating
1 * 0.08 *
18
Small
Large
3 * 0.08 *
294
Maritime
1 * 0.08 *
508
Small
2 * 0.08 *
765
Large
Construction
1 * 0.08 *
4,067
Small
9 * 0.08 *
16
State
Government
1 * 0.08 *
899
Local
SECTOR 4. Producers of Chromates
Large
7 * 0.08 *
2
All
0 * 0.08 *
0
Small
Page 171
$0.00
0
Responses
Cost
CLWAGE
Hours
#PLANTS
MEDRECORD
POTEXEMP
Table 32
SECTOR 5. Chromate Pigment Procedures
Large
25 * 0.08 *
2=
4 *
$26.43 =
$104.43 49.393048
Small
3 * 0.08 *
1=
0 *
$26.43 =
$6.53 3.0870655
Large
3 * 0.08 *
3=
1 *
$21.81 =
$11.41 6.5373192
Small
0 * 0.08 *
0=
0 *
$21.81 =
Large
27 * 0.08 *
5=
11 *
$26.43 =
Small
0 * 0.08 *
0=
0 *
$26.43 =
Large
5 * 0.08 *
87 =
36 *
$19.69 =
$716.80 455.01458
Small
2 * 0.08 *
137 =
23 *
$19.69 =
$450.56 286.00916
Large
0 * 0.08 *
3=
0 *
$19.72 =
$0.00
0
Small
0 * 0.08 *
10 =
0 *
$19.72 =
$0.00
0
Large
0 * 0.08 *
86 =
0 *
$21.84 =
$0.00
0
Small
0 * 0.08 *
42 =
0 *
$21.84 =
$0.00
0
Large
2 * 0.08 *
4=
1 *
$19.61 =
$15.31 9.7584957
Small
1 * 0.08 *
3=
0 *
$19.61 =
$6.80 4.3371092
Large
13 * 0.08 *
1
1 *
$26.51
$27.57
13
Small
0 * 0.08 *
0
0 *
$26.51
$0.00
0
Large
40 * 0.08 *
37 =
119 *
$26.51 =
$3,167.36 1493.4539
Small
Large
1 * 0.08 *
10 * 0.08 *
12 =
112 =
1 *
88 *
$26.51 =
$26.51 =
$35.65 16.808154
$2,333.85 1100.4397
Small
1 * 0.08 *
35 =
4 *
$26.51 =
$104.84 49.435747
Large
3 * 0.08 *
37 =
8 *
$26.51 =
$218.08 102.82635
Small
0 * 0.08 *
34 =
0 *
$26.51 =
Large
27 * 0.08 *
178 =
385 *
$19.34 =
$7,445.72 4812.6137
Small
5 * 0.08 *
130 =
56 *
$19.34 =
$1,083.01 700.01654
Large
0 * 0.08 *
3=
0 *
$25.76 =
$0.00
0
Small
0 * 0.08 *
1=
0 *
$25.76 =
$0.00
Large
0 * 0.08 *
0=
0 *
$28.36 =
$0.00
0
0
0
Small
3 * 0.08 *
5=
1 *
$28.36 =
Large
0 * 0.08 *
207 =
0 *
$20.44 =
$0.00
0
Small
0 * 0.08 *
1,561 =
0 *
$20.44 =
$0.00
0
Large
0 * 0.08 *
347 =
0 *
$13.64 =
$0.00
0
Small
0 * 0.08 *
703 =
0 *
$13.64 =
$0.00
0
All
SECTOR 6. CCA Producers
All
$0.00
0
SECTOR 7. Chromium Catalyst Producers
$297.77 140.83785
All
$0.00
0
SECTOR 8. Paint and Coating Producers
All
SECTOR 9. Printing Ink Producers
All
SECTOR 10. Plastic Colorant Producers and Users
All
SECTOR 11. Plating Mixture Producers
All
SECTOR 13. Chromium Metal Producers
All
SECTOR 14. Iron and Steel Mills
All
Carbon Steel
SECTOR 14B. Forging Industry
All
$0.00
0
SECTOR 15. Iron and Steel Foundries
All
SECTOR 17. Chromium Dye Producers
All
SECTOR 18. Chromium Sulfate Producers
All
$36.86 16.250521
SECTOR 19. Chemical Distributors
All
SECTOR 20. Textile Dyeing
All
Page 172
Responses
Cost
CLWAGE
Hours
#PLANTS
MEDRECORD
POTEXEMP
Table 32
SECTOR 21. Colored Glass Producers
Large
1 * 0.08 *
5=
0 *
$14.24 =
$5.58 4.9027183
Small
Large
0 * 0.08 *
10 * 0.08 *
17 =
78 =
0 *
62 *
$14.24 =
$14.24 =
$0.00
0
$880.40 772.99525
Small
2 * 0.08 *
5=
1 *
$14.24 =
$9.31 8.1711971
Large
0 * 0.08 *
92 =
0 *
$14.24 =
$0.00
0
Small
0 * 0.08 *
367 =
0 *
$14.24 =
$0.00
0
Large
1 * 0.08 *
164 =
13 *
$22.21 =
$294.65 165.84795
Small
Large
0 * 0.08 *
10 * 0.08 *
0=
21 =
0 *
17 *
$21.97 =
$21.97 =
$0.00
0
$375.59 213.66914
Small
5 * 0.08 *
4=
2 *
$21.97 =
$35.77 20.349442
Large
0 * 0.08 *
6=
0 *
$17.53 =
$0.00
0
Small
0 * 0.08 *
0=
0 *
$17.53 =
$0.00
0
Large
1 * 0.08 *
175 =
13 *
$21.93 =
Small
Large
0 * 0.08 *
0 * 0.08 *
93 =
38 =
0 *
0 *
$21.93 =
$21.93 =
Small
Large
0 * 0.08 *
3 * 0.08 *
34 =
1,290 =
0 *
268 *
$21.93 =
$21.93 =
$0.00
0
$5,878.44 3351.3807
Small
State
1 * 0.08 *
1 * 0.08 *
5,162 =
16 =
358 *
1 *
$21.93 =
$21.93 =
$7,843.19 4471.5086
$17.80 10.147984
Local
1 * 0.08 *
59 =
3 *
$21.93 =
$64.35 36.688867
Large
0 * 0.08 *
48 =
0 *
$18.73 =
$0.00
0
Small
State
0 * 0.08 *
0 * 0.08 *
58 =
0=
0 *
0 *
$18.73 =
$21.93 =
$0.00
$0.00
0
0
Local
0 * 0.08 *
29 =
0 *
$21.93 =
$0.00
0
Large
2 * 0.08 *
18 =
3 *
$19.08 =
Small
0 * 0.08 *
0=
0 *
$19.08 =
$0.00
0
Large
0 * 0.08 *
55 =
0 *
$21.96 =
$0.00
0
Small
State Gov't
0 * 0.08 *
0 * 0.08 *
196 =
16 =
0 *
0 *
$21.96 =
$21.96 =
$0.00
$0.00
0
0
Local Gov't
Large
0 * 0.08 *
0 * 0.08 *
74 =
44 =
0 *
0 *
$21.96 =
$21.96 =
$0.00
$0.00
0
0
Small
State Gov't
0 * 0.08 *
0 * 0.08 *
143 =
1=
0 *
0 *
$21.96 =
$21.96 =
$0.00
$0.00
0
0
Local Gov't
Large
0 * 0.08 *
9 * 0.08 *
201 =
48 =
0 *
34 *
$21.96 =
$21.96 =
$0.00
0
$749.13 426.40096
Small
1 * 0.08 *
148 =
72,329
10 *
9,142
$21.96 =
$230.29 131.07881
172,517
114,269
All
Fiber, Flat, and Container Glass
SECTOR 22. Printing
All
SECTOR 24. Chromium Catalyst Users
All
Chromium Catalyst Companies
SECTOR 25. Refractory Brick Producers
All
SECTOR 26. Woodworking
$286.16 163.14101
General Industry
$0.00
$0.00
0
0
Maritime
Construction
Government
SECTOR 27. Solid Waste Incineration
All
Government
SECTOR 30. Superalloy Producers and Users
$52.88 34.641633
All
SECTOR 31. Construction
Industrial Rehabilitation & Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration
Total
Page 173
Table 33
Clerical Time and Cost to Provide the PLHCP’s Written Medical Opinion to Employee
and to Establish and Maintain Record for Air Monitoring Data and Medical Surveillance
The Standard requires that employers maintain exposure and medical surveillance records. As part of the medical record,
employers must maintain a copy of the PLHCP's written opinion. OSHA assumes that the 5 minutes for recordkeeping
includes the time it takes for employers to provide a copy of the PLHCP's written opinion to the employee.
Responses
1,885 =
2,099
$18.19 $ 38,171
26,235
Small
0.08 *
3 *
3,547 =
790
$18.19 $ 14,363
9,872
Large
0.08 *
3 *
11,423 =
2,667
$17.90 $ 47,752
33,338
Small
0.08 *
3 *
14,088 =
3,289
$17.90 $ 58,895
41,117
Large
0.08 *
4 *
11,742
3,655
$17.90 $ 65,448
45,692
Small
0.08 *
1 *
11,967
931
$17.90 $ 16,676
11,642
Large
0.08 *
44 * 1,557 =
5,537
$22.51 $ 124,656
69,213
Small
SECTOR 4. Producers of Chromates
Large
ALL
0.08 *
2 * 7,013 =
848
$22.51 $ 19,091
10,600
0.08 *
78 *
2=
13
$26.43 $ 344
163
Small
SECTOR 5. Chromate Pigment Procedures
Large
ALL
0.08 *
0 *
0=
0
$26.43 $ ‐
0.08 *
25 *
2=
4
$26.43 $ 104
49
Small
0.08 *
3 *
1=
0
$26.43 $ 7
3
Large
0.08 *
8 *
3=
2
$21.81 $ 34
20
0.08 *
0 *
0=
0
$21.81
0.08 *
66 *
5=
27
0.08 *
0 *
0=
0
EMPEXP
CLWAGE
14 *
HOURS
0.08 *
#PLANTS
Large
RECTIME
COST
HOURS = RECTIME * EMPEXP * #PLANTS
COST = Hours x CLWAGE
RECTIME = Time, 0.08 hour per record for exposed workers
EMPEXP = Exposed employees to chromium or employees exposed dermally
#PLANTS = Number of Plants
CLWAGE = Clerical wage Rate
Sector 1. Electroplating
ALL
Sector 2. Welding
ALL
Sector 2B. Mild Steel Welding
SECTOR 3. PAINTING
ALL
SECTOR 6. CCA Producers
ALL
Small
SECTOR 7. Chromium Catalyst Producers
Large
ALL
Small
Page 174
0
0
0
$26.43 $ 722
341
$26.43
0
0
Responses
131
$19.69 $ 2,580
1,638
0.08 *
8 *
137 =
92
$19.69 $ 1,802
1,144
0.08 *
20 *
3=
5
$19.72 $ 95
60
0.08 *
Small
SECTOR 10. Plastic Colorant Producers and Users
Large
0.08 *
ALL
20 *
10 =
16
$19.72 $ 318
202
6 *
86 =
39
$21.84 $ 844
483
Small
SECTOR 11. Plating Mixture Producers
Large
ALL
0.08 *
1 *
42 =
3
$21.84 $ 69
39
0.08 *
13 *
4=
4
$19.61 $ 87
55
Small
SECTOR 13. Chromium Metal Producers
Large
ALL
0.08 *
3 *
3=
1
$19.61 $ 14
9
0.08 *
47 *
1=
4
$26.51 $ 100
47
Small
0.08 *
0 *
0=
0
$26.51 $ ‐
SECTOR 14. Iron and Steel Mills
Large
ALL
0.08 *
46 *
2,124 =
7,885
$26.51 $ 209,046
98,568
Small
SECTOR 15. Iron and Steel Foundries
Large
ALL
0.08 *
3 *
24 =
5
$26.51 $ 143
67
0.08 *
115 *
178 =
1,643
$19.34 $ 31,768
20,534
Small
SECTOR 17. Chromium Dye Producers
Large
ALL
0.08 *
115 *
130 =
1,195
$19.34 $ 23,104
14,934
0.08 *
32
*
3=
8
$25.76 $ 193
94
Small
SECTOR 18. Chromium Sulfate Producers
Large
ALL
0.08 *
7
*
1=
1
$25.76 $ 14
7
0.08 *
0 *
0=
0
$28.36 $ ‐
0
Small
SECTOR 19. Chemical Distributors
Large
ALL
0.08 *
2 *
5=
1
$28.36 $ 25
0.08 *
0 *
207 =
0
$20.44 $ ‐
Small
0.08 *
0 *
1,561 =
0
$20.44 $ ‐
Large
0.08 *
58 *
347 =
1,618
$13.64 $ 22,065
20,224
Small
0.08 *
2 *
703 =
104
$13.64 $ 1,422
1,303
Small
SECTOR 9. Printing Ink Producers
Large
ALL
SECTOR 20. Textile Dyeing
ALL
EMPEXP
Page 175
CLWAGE
87 =
HOURS
19 *
SECTOR 8. Paint and Coating Producers
Large
ALL
#PLANTS
0.08 *
RECTIME
COST
Table 33
0
11
0
COST
Responses
5 *
83 =
30
$14.24 $ 428
376
Small
0.08 *
1 *
22 =
2
$14.24 $ 22
20
Large
0.08 *
43 *
92 =
317
$14.24 $ 4,513
3,962
Small
SECTOR 24. Chromium Catalyst Users
Large
ALL
0.08 *
3 *
0=
0
*
164 =
398
$22.21 $ 8,839
4,975
Small
Large
0.08 *
0.08 *
15 *
1 *
0=
21
0
2
$22.21 $ ‐
$22.21 $ 38
21
0.08 *
0 *
0
0
$22.21 $ ‐
0.08 *
12 *
6=
6
$17.53 $ 97
Small
0.08 *
0 *
0=
0
$17.53 $ ‐
Large
0.08 *
0
*
1,519 =
0
$21.93 $ ‐
0
Small
SECTOR 27. Solid Waste Incarnation
Large
ALL
0.08 *
0
*
5,348 =
0
$21.93 $ ‐
0
0.08 *
0 *
48 =
0
$18.61 $ ‐
0
Small
SECTOR 30. Superalloy Producers and Users
Large
ALL
0.08 *
1 *
87 =
6
$18.61 $ 113
76
0.08 *
38 *
18 =
54
$19.08 $ 1,031
676
Small
0.08 *
0 *
0=
0
Large
0.08 *
21
55
94
$21.96 $ 2,064
1,175
Small
State Gov't
0.08 *
0.08 *
1
1
196
16
14
1
$21.96 $ 307
$21.96 $ 25
175
14
Local Gov't
Large
0.08
0.08 *
1
12
74
44
5
43
$21.96 $ 115
$21.96 $ 952
66
542
Small
State Gov't
0.08 *
0.08 *
3
2
143
1
31
0
$21.96 $ 670
$21.96 $ 3
381
2
Local Gov't
Large
0.08 *
0.08 *
3
12
201
48
43
48
$21.96 $ 941
$21.96 $ 1,049
535
597
Small
0.08 *
1
148
10
$21.96 $ 230
131
SECTOR 22. Printing
ALL
Catalyst Service Companies
Small
SECTOR 25. Refractory Brick Producers
Large
ALL
SECTOR 26. Woodworking
ALL
0.08 *
30
CLWAGE
HOURS
0.08 *
EMPEXP
SECTOR 21. Colored Glass Producers
Large
ALL
RECTIME
#PLANTS
Table 33
$14.24 $ ‐
0
0
69
$19.08 $ ‐
SECTOR 31. Construction
Industrial Rehabilitation &
Maintenance
Hazardous Waste Site Work
Refractory Brick Restoration &
Maintenance
Page 176
Page 177
Responses
33,720
COST
HOURS
TOTAL
CLWAGE
#PLANTS
77,227
EMPEXP
RECTIME
Table 33
$ 701,388
421,495
Table 34
Access to Records
The employer must provide, upon request, information to OSHA during the context of a compliance inspection.
Providing access to such materials should require no more than 5 minutes of supervisor time.
Number of total facilities covered by the Standard = 77,770
Inspection Rate (1.4%)
Number of Inspection = 77,770 *1.4%= 1,089
Highest Supervisory Wage Rate = $54.55
Burden
Hours
1,089 *
0.08 (supervisor hrs.)=
Cost
87 *
$54.55 =
$4,746.00
File Type | application/pdf |
File Title | Chromium Tables 1-34 ROCIS 12-17-12.xlsx |
Author | rshowalter |
File Modified | 2012-12-18 |
File Created | 2012-12-18 |