Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Event
ICR 201208-3150-002
OMB: 3150-0211
Federal Form Document
⚠️ Notice: This information collection may be outdated. More recent filings for OMB 3150-0211 can be found here:
Request for Information
Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and
9.3 of the Near-Term Task Force Review of Insights from the
Fukushima Dai-ichi Event
Extension without change of a currently approved collection
In accordance
with 5 CRF 1320, the information collection is approved for three
years.
Inventory as of this Action
Requested
Previously Approved
02/29/2016
36 Months From Approved
02/28/2013
525
0
485
457,502
0
461,067
0
0
0
Following events at the Fukushima
Dai-Ichi nuclear power plant resulting from the March 11, 2011,
earthquake and subsequent tsunami, and in response to requirements
contained in Section 402 of the Consolidated Appropriations Act
(Public Law 112-074), the NRC sought an expedited clearance from
OMB to allow the collection of information from power reactor
licensees pursuant to 10 CFR 50.54(f). OMB approved this clearance,
which will expire on September 30, 2012. The NRC is resubmitting
this collection to the OMB under the normal clearance processes.
The information requested includes: --Seismic and flooding hazard
reevaluations to determine if further regulatory action is
necessary --Walkdowns to confirm compliance with the current
licensing basis and provide input to the hazard reevaluations
--Analysis of the Emergency Preparedness capability with respect to
staffing and communication ability during a prolonged multiunit
event
The emergency clearance request
was approved on March 6, 2012 as a new collection with a total
burden of 1,383,200 hours and 1,456 responses (annualized to
461,067 hours and 485.3 responses). The current request is for
1,372,506 hours and 1,576 responses (annualized to 457,502 hours
and 525.3 responses), a decrease of 3,565 annualized hours and an
increase of 40 responses. As discussed in the comments resolution
section, NEI challenged some areas of the NRC's burden estimate.
Although the NRC is confident in its original assessment, it is
recognized that there are a number of uncertainties estimating the
burden of such a large effort. Therefore, the NRC increased its
burden estimate in these locations. The estimates for to conduct an
SPRA, SMA, flooding hazard reevaluation, integrated assessment for
flooding were increased by approximately 30%. The estimates for
communications and staffing analysis were increased 500%. Although
the burden estimates for the requirements were increased, no new
requirements were imposed as part of this renewal submission. In
addition, 4,400 hours and 110 responses were added to account for
submission of responses indicating an inability to comply with
requirements. Subsequent to submission of the initial clearance
request, licensees identified a dependence between implementing a
recent rulemaking and their response for the EP assessment.
Specifically, it was identified that the changes necessary for the
new rule would need to be made prior to responding to the Staffing
portions of the EP assessment. Additionally, recognizing the
additional complications introduced from this interface, the NRC
increased the burden estimate for responding as well. As a result,
licensees will submit letters indicating that they will be unable
to comply with the requirements in the EP assessment in the
timeframes requested. There is a change in methodology used to
estimate burden for seimic risk assessments and flooding hazard
reevaluations due to the fact that the current request takes into
account the accrual of burden over time. These activities require
licensees to perform analyses and submit reports up to seven years
after receiving the 50.54(f) letters from the NRC. The original
emergency clearance request included burden that would be incurred
outside of the three year clearance period, whereas the current
request includes burden for only those information collection
activities that are estimated to be conducted during the next three
years. The increase in responses from the original request is due
to the addition of 6 respondents: 2 reactors in the process of
resuming licensing, and 2 Combined License (COL) applicants (2
units each). The power plant licensees will be asked to perform all
information collections (seismic and flooding reevaluations and
walkdowns and emergency preparedness evaluations). Reactors
resuming licensing will be asked to perform seismic and flooding
reevaluations and emergency preparedness evaluations, but not
walkdowns, as they have not yet completed construction. COL
applicants will be asked to submit emergency preparedness
evaluations only. The addition of these respondents was determined
to be necessary after submission of the original request, and will
provide information from these licensees that is not available from
any other source.
$4,986,800
No
No
No
No
No
Uncollected
G. Edward Miller 301 415-2481
ed.miller@nrc.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.