Control Room Management / Human Factors

ICR 201204-2137-001

OMB: 2137-0624

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2009-08-11
IC Document Collections
IC ID
Document
Title
Status
186299 Modified
ICR Details
2137-0624 201204-2137-001
Historical Active 200908-2137-001
DOT/PHMSA PHMSA-2007-27954
Control Room Management / Human Factors
New collection (Request for a new OMB Control Number)   No
Regular
Approved without change 04/13/2012
Retrieve Notice of Action (NOA) 04/13/2012
  Inventory as of this Action Requested Previously Approved
01/31/2013 36 Months From Approved
2,702 0 0
127,328 0 0
0 0 0

PHMSA proposes to revise the Federal pipeline safety regulations to address human factors and other components of control room management. The proposed rule would require operators of hazardous liquid pipelines, gas pipelines, and liquefied natural gas (LNG)to to assure controllers and control room management practices and procedures maintain pipeline safety and integrity. This proposed rule results from a PHMSA study of controllers and controller performance issues known as the Controller Certification Project (CCERT), a National Transportation Safety Board study, safety-related condition reports, operator visits and inspections, and inquiries. This rule would improve opportunities to reduce risk through more effective control of pipelines and require the human factors management plan mandated by the Pipeline Inspection, Protection, Enforcement, and Safety Act of 2006 (PIPES Act). These regulations would enhance pipeline safety by coupling strengthened control room management, including automated control systems, with improved controller training and qualifications and fatigue management. PHMSA expects these regulations will complement efforts already underway in the pipeline industry to address human factors and control room management, such as the development of new national consensus standards, including an American Petroleum Institute (API) recommended practices on roles and responsibilities, shift operations, management of change, fatigue management, alarm management and SCADA display standard, as well as comparable business practices at some pipeline companies.

US Code: 49 USC 60102 Name of Law: Federal Pipeline Safety Laws
  
None

2137-AE25 Final or interim final rulemaking 74 FR 63310 12/03/2009

No

1
IC Title Form No. Form Name
Control Room Management / Human Factors

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 2,702 0 0 2,702 0 0
Annual Time Burden (Hours) 127,328 0 0 127,328 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Changing Regulations
No
This final rule contains information collection requirements that affect hazardous liquid and gas pipeline systems. A draft of the final rule has been uploaded in this ICR record while it is being reviewed by OMB. The rule requires hazardous liquid and gas pipeline operators to keep records on the following sections: control room management procedures; roles and responsibilities of pipeline controllers; information on SCADAs, fatigue mitigation; alarm management; change management; operating experience; training; compliance validation; and deviations.

$0
No
No
Uncollected
Uncollected
No
Uncollected
Cameron Satterthwaite 202 366-8553 cameron.satterthwaite@dot.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/20/2009


© 2024 OMB.report | Privacy Policy