NESHAP for Primary Lead Processing (40 CFR part 63, subpart TTT) (Final Rule)

ICR 201112-2060-007

OMB: 2060-0414

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2011-11-04
Supporting Statement A
2011-11-17
IC Document Collections
ICR Details
2060-0414 201112-2060-007
Historical Active 200812-2060-004
EPA/OAR 1856.08
NESHAP for Primary Lead Processing (40 CFR part 63, subpart TTT) (Final Rule)
Revision of a currently approved collection   No
Regular
Approved without change 02/03/2012
Retrieve Notice of Action (NOA) 12/14/2011
  Inventory as of this Action Requested Previously Approved
02/28/2015 36 Months From Approved 05/31/2012
4 0 4
12,397 0 12,190
162,000 0 19,000

The potential respondents are owners or operators of any existing or new affected source with primary lead processing operations. There is one facility subject to the Primary Lead Processing NESHAP. The NESHAP is applicable to any primary lead processing facility that is engaged in the production of lead metal from lead sulfide ore concentrate and the affected sources are those that meets the criteria established in ?63.1541 of the Primary Lead Processing NESHAP. The final amendments would reduce the existing main stack lead emission limit to 0.97 pound of lead per ton of lead produced, add a lead emission cap of 1.2 TPY combined for the refining operation stacks and the furnace area stack, and revise testing, reporting, and recordkeeping requirements. These amendments are explained further in the following paragraphs. The new emisison limit for the main stack has a compliance date of 60 days from the promulgation date. Stack testing for this emission point is required annually under the current standard. Quarterly stack testing from the main stack will be required beginning two years from the promulgation date of the final rule. The new emission limit and stack testing requirements for the furnace area and refining operations, the monitoring requirements, and the related reporting and recordkeeping requiremnts of the final amendments have a compliance date of 2 years from the promulgation date which will allow the facility to implement any changes necessary to meet the new and revised requirements. The final amendments require stack testing for lead compounds on a quarterly basis for three (3) stacks; the main stack, the refining baghouse #8 stack, and the combined stack for the furnace area baghouse #7 and refining operation baghouse #9. No stack testing is required for two of these emission points under the current standard. There are no capital costs associated with the final amendments. Recordkeeping for stack testing will be the same with the exception of frequency. Effective with the promulgation of the final rule, the affirmative defense provisions require recordkeeping and reporting of malfuctions and corrective actions used for estblishing grounds for affirmative defense. The frequenty of reporing of malfunctions under the affirmative defense provisions is presumed assumed to be low.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

2060-AQ43 Final or interim final rulemaking 76 FR 70834 11/15/2011

No

1
IC Title Form No. Form Name
NESHAP for Primary Lead Smelters (40 CFR Part 63, subpart TTT)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 4 4 0 0 0 0
Annual Time Burden (Hours) 12,397 12,190 0 207 0 0
Annual Cost Burden (Dollars) 162,000 19,000 0 143,000 0 0
Yes
Changing Regulations
No
For the final amendments to the Primary Lead Processing NESHAP, the components of the total annual burden attributable to this ICR include reading the amendments to the NESHAP; conducting quarterly stack tests and calculating annual emissions, reporting lead stack emissions test results on a quarterly basis, and recorkeeping and reporting for malfunctions.

$3,955
No
No
No
No
No
Uncollected
Nathan Topham 919 541-0483 topham.nathan@epamail.epa.gov

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
11/18/2011


© 2024 OMB.report | Privacy Policy